foi #16443 - port authority of new york & new...
TRANSCRIPT
Olivencia, Mildred
From: Sent: To: Cc: Subject:
Information:
First Name: Heather Last Name: Gaw
[email protected] Friday, October 30, 2015 1 :01 PM Olivencia, Mildred Torres-Rojas, Genara; Van Duyne, Sheree; Ng, Danny Freedom of Information Online Request Form
Company: Lewis Brisbois Bisgaard & Smith Mailing Address 1: 77 Water Street, 21st Floor Mailing Address 2: City: New York State: NY Zip Code: 10005 Email Address: [email protected] Phone:212-232-1404 R~quired copies of the records: Yes
List of specific record(s):
FOI #16443
I .Documents, including but not limited to invoices, purchase orders, sales records, contracts, agreements, inventory lists, specifications, receipts, certificates, permits, andor service records, regarding the construction, renovation, remodeling, and redesign of the John F. Kennedy Airport flea ldlewild Airport, the presence, role, andor identity of the general contractor, and the presence, role, andor identity of the sub-contractors, between 1956 and 1965. 2.Documents, including but not limited to invoices, purchase orders, sales records, contracts, agreements, inventory lists, specifications, receipts, blueprints, plans, correspondence, certificates, permits, andor promotional materials, regarding the use of asbestos containing materials and products, including but not limited to joint compound during the construction, renovation, remodeling, and redesign of JFK Airport, between 1956 and 1965. 3. All documents related to any and all asbestos abatements at JFK Airport.
April 4, 2016
Ms. Heather Gaw Lewis Brisbois Bisgaard & Smith 77 Water Street, 21st Fl New York, NY 10005
Re: Freedom of Information Reference No. 16443
Dear Ms. Gaw:
THE PORT AUllHIRnY OF NY & NJ
FOi Administrator
This is in response to your October 30, 2015 request, which has been processed under the Port Authority's Freedom oflnformation Code, copy enclosed, for copies of the following records: 1. Documents, including but not limited to invoices, purchase orders, sales records, contracts, agreements, inventory lists, specifications, receipts, ce1iificates, permits, and/or service records, regarding the construction, renovation, remodeling, and redesign of the John F. Kennedy Airport fka Idlewild Airpmi - specifically the construction of offices in the main floor of the main terminal - the presence, role, and/or identity of the general contractor, and the presence, role, and/or identity of the sub-contractors, in the 1970s. (Work was performed through Local Union 1974 if that assists with narrowing the time frame.) 2. Documents, including but not limited to invoices, purchase orders, sales records, contracts, agreements, inventory lists, specifications, receipts, blueprints, plans, co1Tespondence, ce1iificates, permits, and/or promotional materials, regarding the use of asbestos containing materials and products, including but not limited to joint compound during the construction, renovation, remodeling, and redesign of JFK Airport, specifically the construction of offices in the main floor of the main terminal, in the 1970s. 3. Documents including, but not limited to contracts, agreements, invoices, purchase orders, specifications, receipts, drawings, blueprints, plans, correspondence, certificates, and/or permits, regarding asbestos abatement performed at the John F. Kennedy Airp01i f/k/a Idlewild Airport, specifically the offices in the main floor of the main terminal.
Please be advised that we have searched our files and found no documents responsive to items 1 and 2 of the request. The records that may have been responsive to items 1 and 2, to the extent that they existed, were 1 ikely destroyed at The World Trade Center on September 11, 2001.
Material responsive to item 3 of your request can be found on the P01i Authority's website at http://corpinfo.panynj.gov/documents/16443-o/. Paper copies are available upon request.
Please refer to the above FOI reference number in any future correspondence relating to your request.
(~71 ht&_<, rs.
\t~: 'V .·. J
~a ·~ ~ I Jt / ,. . '--
FOI Admmit tor
Enclosure 4 World Trade Cente1, I Bth floor I 5() Creenw,ch Street !Vew York, fVY 7 0007
212 L/"55 .Hi42 I.212 435 7555
INTERNATIONAL ARRIVALS BUILDING
BUILDING SO .
x. eu1Lo1Na-sv-su1Lo1Ng ReeoRrs
FINDINGS AND OBSERVATIONS
BUILDING 50 • INTERNATIONAL ARRIVALS BUILDING
The International Arrivals Building (IAB) is a three-story airline terminal building with a crawl space and was constructed in 1957. [tis constructed with concrete, steel. cinder block. and brick. The entire strucrure, including crawl space, encompasses approximately l.5 million square feet of floor space. nearly all of which has been renovated or will be renovated in the future, ·
Passenger terminal space is leased by the Port Authority of New York and New Jersey to tenants which include Aer Lingus, Aerolineas Argentinas, Aeromexico, Air France, Air India. Air Porrugal, Alitalia. American Telephone and Telegraph (AT&n. Barney Construction, Citibank, Dynair. El Al, Faber, Five Star Parking, Hudson General, Iberia, 181 Security, Icelandair, International Duty Free (IDF). International Shoppes, Japan Airlines (JAL), Korea Air Lines (KAL), KLM Royal Dutch Airlines. Lacsa.. Lan Chile, Lufthansa. Marriott Host, Mutual of Omaha. National Weather Services, New York Telephone (NYTEL), Nigeria Air, Ogden Allied, Pakistan International Airlines (PIA), Scandinavian Air Systems (SAS), Scrvair. Skycaps, Swissair. Tele·trip Triangle Maintenance, United States Department of Agriculture (USDA), United Stares Department of Commerce. and Varig.
I
The building is heated with hot water radiant and forced·air systems, and is cooled by a chilled water forced·air system. High temperarure hot water is supplied to the International Arrivals Building from the centraJ heating plant. These systems contain an extensive network of plumbing and duct work which is exposed in 30 utility rooms and runs throughout the building. Most ot the plumbing and duct work is insulated. Insulated domestic water lines and roof drains are present throughout the building within the pipe chases.
Asbestos-<:ontaining materiaJs Identified In thls facility include corrugated cardboard, wrapped cardboard,. anil~ magnesia pipe insulations and corresponding mudded joint packings on elbows. tees. and valves; mudded joint packing on fibergl~·insulated piping systems; breeching insulation; duct insulation: tank insulation; vinyl floor tiles; acoustical/decorative plaster; fireproofing material: a.nd transite·typc materials used as elc:ctrica! conduit channeling. The majority of the asbestos-containing mechanical insulations are present in the crawl space, utility rooms. above the drop ceiling systems. and within pipe chases. The piping systems with asbestos-containing insulation are the domestic water. hot warer supply and return, chilled water supply and return, and roof drain systems. Although the fireproofing material is pr~nt throughout the facility, it was identified as asbestoscontaining in the third floor tan room in the Iberia/Aeromexico tenant space and in the th.ird floor fan room in the Lufthansa tenant space. The fireproofing in these two areas has ~n classified as Priority Level l due to the overall material. condition and accessibility, Hall·Kimbrell recommends the fireproofing be removed using gross removal procedures. The mudded joint packing., on the tibergliw·insulated piping systems should be removed at the same time as the fireproofing to ensure complete removaJ of all asbestos-containing materials from these areas and eliminate the need for future abatement The remaining fireproofing was sampled and detemuned nonasbestos-containing.
Asbestos-containing acoustical/decorative plaster is present on the ceiling., of various areas throughout the building including the office space leased by Barney Construction, the International Duty Free store space, the Marriott Snack Bar space, and the Mutual o{ Omaha tenant space, aJI on the second noor: and the east and west wing second floor gate and common areal!. The plaster in these areas has ern:ountered both contact and water damage in various amounts. Due to the accessibility and condition of the plaster, it has been classified as Priority Level I. Areas of contact damage should be repaired and encapsulated to prevent fiber fallout until removal becomes feasible. Areas of water damage can only be repaired after the source of the water is ltXated and eliminated; Once th.is has ~n done, the damaged areas should be repaired and encapsulated until removal is fea:;ihte. Oue to the extensive amount of plaster, it must he abated usin~ gross removal procedures.
HALL·KlMBRELL ENVIRONMENTAL SERVICES, INC, PRIORITIZATION ASBESTOS ASsl:SSMENT ST\JOV
X. BUILOING-BY·BUILDING REPORT$
Utility Room l on the first floor in the center section of the facility contains badly damaged asbestos·containing pipe and tank insulations and assoc:iated debris on the floor. Utility Room l has been classified as Priority Level I area due to the poor macerial condition and frequency of access. Due to the condition of the material, Hall· Kimbrell recommends abatement of the room using gross removal proc;edures to ensure the complete removal of all asbestos-containing materials.
The final Priority u:vel I areas are prescm in the unexcavated crawl space. Maintenance work has been performed on the piping systems and asbestos-cont.tining insulation debris was left on the tloor. The Special Response Team of the Port Authority periodically enters this area and removes the insulation debris: therefore, the quantities listed on the spreadsheets may no longer be accurate. Please refer to the spreadsheets for material locations and quarttitics. and specific area comments.
Acoustical/decorative plaster ceilings are present in the second floor Citibank office space, the second and third tloor El Al Airlines passenger lobby and lounge, the second floor Marriott storage room and Room 2220, the third floor Marriott banquet room, the second floor Port Authority engineer's office, the third floor common lounges, and the main lobby area of the facility. The plaster in these areas exhibited little to no damage ac the time of the inspecti_on. However, these areas have been classified as Priority Level II due ro the accessibility and friability of the material. · Hall-l(jmbrell recommends the implementation of an operations and maintenance program to monitor the plaster for signs of damage or deteriorauon until ·complete removal is feasible. Any damage should be repaired as needed using nonasbestos materials.
The pipe and tank insulations throughout the crawl space ceiling; crawt space Mechanical Rooms 3, 4, S, and 6: first floor Mechanical Room 1: first floor janitor's closet: and third floor Mechanical Rooms 10 and 22 have been classified as Prioricy Level II materials. The insulations have various amounts·of contact and water damage. Hall• l(jmbrell recommends that damaged asbestos-containing mechanical insulation be removed and repl~d with
~onasbestos<ontaining insulation. The mechanical rooms can be individually abated by gross removal procedures to ensure complete removal of all asbestos-containing ma,crials. Addressing tfie mecnamc.11.oom~~ individual basis is an economical approach to abatement because each room can be addressed as funding betomes available. The crawl space and crawl space mechanical rooms should be addressed collectively in a gross abatement project to forego the need for multiple smaller abatement projects addressing individual areas. A large gross abatement project would eliminate the need for construction of many smaller containments, and would decrease long·term abatement costs.
Transite·type panels were observed on the Interior jetway walls. These panels could not be sampled without creating severe cosmetic damage. They are cementitious and present little health hazard unless sawn, sanded, drilled, or In any other way altered causing release of fibers. The panels should be treated as asbestos-containing until they are analyzed prior to demolition or renovation.'
The remaining asbestos-containing materials present in the facility were In good condition and have been classified as Priority Levels m and IV. Hall·Kimbrell recommends the implementation of an operations and maintenance program to monitor these materials for signs of damage or deterioration until complete removal is feasible. Any damage should be repaired as needed to prevent fiber release and exposure. No other friable asbestos-containing materials were identified during the inspection.
Materials sampled and determined nonasbcstos-containing include ceiling tiles. floor tiles. mudded joint packings on fibcrglass·insulated piping systems. fireproofing. and wallboard. Please refer to the spreadsheets for material loqitions and quantities. and specific area comments.
HALL·KIMBRELL ENVIRONMENTAL SERVICES, INC. PRIORmZATtON ASBESTOS ASSESSMENT sruov
X, BUILDING-BY-BUILDING REPORT§
COST ESTIMATE
BUILDlNG 50 • INTERNATIONAL ARRIVALS BUILDING
Removal of all asbestos-containing materials in Priority Level 1 and replacement with nonasbestos-<:ontaining materials.
Total Removal/Replacement
10% Condnge .-;y
Total Removal/Replacement with Contingency
$8..572.841
$857,284
$9,430,125
The above total cost with contingency is an estimate of the actual cost once the bids are opened or the project is negotiated'with a contractor.
Architccrural/Engineering fees for design management. development of specifications and plans. etc.
• Estimated at 6.5% of Total Construction Cost:
6.$% X S9,430,12S
On·site air monitoring and construction supervision during abatement (based on $490.00 per S·hour shift per technician)
Estimated at 1,636 8·hour shifts:
l,636 X $490
Reimbursable out-of·pocket and travel-related expenses
~timated at 2.0% of Total Construction Cost:
2.0% X $9,430,125
Total Project Estimate Including ProfessionaJ Fees and Cr 'ltingency
HALL·KlMBAELL ENVIRONMENTAL SERVICES, INC,
$612.958
$801,640
$188,603
$11,033,326
PRIORITIZATION ASBESTOS AsSESSMENT STUOV
X. BUILDING-BY-BUILDING REPORT§
COST ESTIMATE
BUILDING 50 • INTERNATIONAL ARRIVALS BUILDlNG
Removal of all asbestos-<ontaining materials in Priority Level II and replacement with nonasbestos-conraining materials.
Total Removal/Replacement
10% Contingency
Total Removal/Replacement with Contingency
$3.318.232
$331,823
$3.650,055
TI1e above total cost with contingency is an estimate of the actual cost once the bids are opened or the project is negotiated with a contractor.
Architectural/Engineering fees for design management, development of specifications and plans, etc.
Estimated at 6.5% of Total Construction Cosr:
6.5% X $3,650,055
On·$ite air monitoring and construction supervision during abatement (based on $490.00 per 8·hour shift per technician)
Estimated at 633 8·hour shifts:
633 X $490
Reimbursable out·of·pocket and travel·related expenses
Estimated at 2.0% of Total Construction Cost:
2.0% X $3,650,0SS
Total Project Estimate. Including Professional Feeund Conti11g~ncy
HALL·KlMBRELL ENVIRONMENTAL SERVICES, INC,
$237,254
$310,170
$73,001
$4,270.480
PRIORmZATION AsaE5TOS ASSESSMENT Sruov
X. BUILOINQ·BY·BUILOING REPORTS
COST ESTIMATE
BUILDING 50 • INTERNATIONAL ARRIVALS BUILDING
Removal of all asbestos-containing materials in Priority Level III and replacement with nonasbestos-containing materials.
Total Removal/Replacement
10% Contingency
Total Removal/Replacement with Contingency
S2,683,807
$268.381
$2,952.188
The above total cost with contingency i!i an estimate of the actual cost once the bids are opened or the project is negotiated with a contractor.
ArchitecruraJIEngineering fees for design management. development of specifications and plans. etc.
Estimated at 6.5% of Total Construction Cost:
6.S% X $2,952.188
On·site air monitoring and construction supervision during abatement (based on $490.00 per 8·hour shift per technician)
Estimated at 572 8-hour shifts:
572 X $490
Reimbursable out-of-pocket and travel•related expe11Se$
Estimated at 2.0% of Total Construction Cost:
2.0% X $2,952,188
Total Project Estimate Including Professional fees and Contingency
HAl.1.·KlMBREU. ENVIRONMENTAL SERVICES, INC,
$191,892
$250,880
$59,044
$3,454.004
PRIORmZATION ASBESTOS ASSESSMENT sruov
X, BUILDING-BY·BLU~DING BEPQRTS
COST ESTIMATE
BUILDING 50 • INTERNATIONAL ARRIVALS BUILDING
Removal of all asbestos-<:ontaining materials in Prioriry Level IV and replacement with nonasbestos-<:ontainlng materials.
Total Removal/Replacement
10% Contingency
Total Removal/Replacement with Contingency
$769.723
s16,9n
$846,695
The above total cost with contingency is an estimate of the acrual cost once the bids are opened or the project is negotiated with a contractor.
Arch.itecrural/Engineering fees for design management, development of specifications and plans, etc.
--Est-imated---at---6:l----%--0f-TotaLConstructLon_Cost_
6.7% X ~.69S
On·site air monitoring and construction supervision during abatement (based on $490.00 per S·hour shift per technician)
Estimated at 150 8·hour sh.ifts:
150 X $490
Reimbursable out-<>f·pocket and travel-related expenses
Estimated at 2.0% of Total Construction Cost:
2.0% X $846,695
Total Project Estimate Including Professional fees and Contingency
HALL·KIMBRELL ENVIRONMENTAL SERVICES, INC.
ss6.m
$73.SOO
$16,934
$993,8..58
PRIORmZATlON ASBESTOS ASseSSMENT STUDY
Picture#
2
3
4
5
6
7
8
10
11
12
X, BUILDING-ey.eUtLDtNG BEPQBIS
PHOTOGRAPH LOG
BUILDING 50 • INTERNATIONAL AR RIV Al.S BUILDING
Qescnotioo International Arrivals Building, basement crawl space, by UR6, piping and debris.
International Arrivals Building, basement crawt space, UR6, piping and debris.
International Arrivals Building, basement crawl space, under customs, piping and debris.
International Arrivals Building, entryWay, common area, curved ceiling, acoustical plaster.
International Arrivals Building, First floor, east wing. Oate 12. fireproofing
International Arrivals Building, First Floor. east wing, Utility Room 2. piping
International Arrivals Building, First F1oor, east wing., Utility Room 2. tanks
International Arrivals Building, Second Floor, west wing. Utility Room 7, duct insulation.
1ntmi_a_t_lo_na!_Al'm'lULB1lilding._S«_o_ruLBoor._ wes1Jlling.Mnid_Otlciling._ acoustical plaster
International Arrivals Building. Second Floor, west wing, switch gear room. "Pyrobar .. firebrick
International Arrivals Building. Second Floor, west wing, switch gear room, fireproofing on I-beam.
International Arrivals Building, Second Floor, west wing. switch gear room. fireproofing on I·beam.
HALL-KlMBAELL ENVIRONMENTAL SERVlCS~, INC, PRIORmZATION ASBESTOS ASSESSMENT STIJDV
...
ff,, I n I I
,-."' I • ~
A "
(
1
8
9
L
£
?:'!
0 '!
n 6
CllEIIT: NEW Y~IC POIIT AUTIIORITT
.,·
HAt.L·ICIHIR!LL EIIVIRONIEIITAL S£11VICES INC, ASBUTO$ PEnooAAPHIC ANALYSIS
PROJECT IIO: 1170277 m: IIITEAIIATIONAI. AlRPOltT ASBESTOS
SAMPLE NINEII IK»tO AS8/Pfll!$ TOTAL AU CHAY AHO CAO ANT TRE IIOOL
62 •187001 y y 70 3S 35 10 62 ·187002 y y 65 35 30 10 62 • 1117003 y y 70 40 30 10 63 • 11!7004 y y 35 35 45 63 ·18700S y v 30 :so 45 63 ·187006 y y 35 35 40 0 ·187007 If If 0 60 0 • 181008 14 y 6 6 0 ·187009 II II 0 40 0 ·187010 N II 0 85 64 • 187011 y y 50 50 64 • 187012 y y 55 55 64 • 187013 y y 50 50 65 ·187014 y y 50 so 65 •181015 y y 50 50 65 • 181016 v y 55 55 0 ·187017 N y 80 80 66 •187018 y y 60 60 66 •187019 y v 60 60 66 ·187020 y v 45 45 20 67 ·187021 y v 55 55 10 67 ·187022 y y 50 50 10 67 • 187023 y v 55 55 10 0 •181024 M y 55 30 25 68 ·187025 v y 70 45 Z5 68 ·187026 y y 65 65 68 ·18ro27 v y 70 70 69 • 187'028 y M 0 70 69 •187029 y N 0 .!·,, 15
- w-;fll703IJ T T ----o-- - --ro-70 ·187031 y y 60 60 70 •11!7032 y T 60 60 70 •11!7033 y y 65 '65 71 ·187034 y y 50 50 71 ·187035 y y 55 55 11 •187036 y y 50 50 0 •1117031 II y 40 40 72 ·1870]1 y y 65 65 72 •187039 y T 55 55 72 ·187040 y y 60 60 73 •187041 y y 60 60 73 •187042 y y 60 60 73 ·187043 y y 60 60 20 74 •187044 y II 0 70 74 ·187045 y N 0 65 74 ·187046 y 14 0 70 75 ·187047 y II 0 5 75 •187048 y " 0 5 15 •187049 '( II 0 5 7'5 • 187050 y N 0 s 7'5 • 187051 '( N 0 5 0 • 1870S2 " N 0 70 0 ·187M3 II IC 0 65 76 •187054 y II 0 70 76 ·187055 y II 0 65 76 ·187056 y N 0 70 n -1a7051 y II 0 n -1ema y II 0 77 ·187'M9 y II 0 n ·187060 y N 0 n ·187061 y II 0 78 •187062 y y 2 z 7ll • 181063 y y 3 :s nl ·1!11064 y v 2 z 78 ·187065 y y 2 z
178 · 1871166 y v i! 2 0 • 187067 N N 0 rs
IIUllOING: 050 O T H E II N A T E A l A L S
t:EL MICA PER BINDER OTHER TOTAL
20 100 2S 100 20 100 zo 100 Z5 100 25 100
30 10 100 34 50 CAL GM 10 100
45 10 5 100 15 100 50 100 45 100 50 100 50 100 50 100 45 100
10 10 100 40 100 40 100 35 100 35 100 40 100 35 100 45 100 30 100 35 100 30 100 30 100 2S 100
----30- _._,oo-40 100 30 10 L 100 35 100 50 100 45 100 ,o 100
50 10 100 35 ,100 45 100 40 100 40 100 40 100 20 100 30 100 35 100 JO 100
40 55 GYP 100 45 50 GYP 100 45 SO GYP 100 40 55 GYP 100 45 50 GYP 100
20 10 100 2S 10 100
30 100 35 100 30 100
20 55 25 100 25 55 20 100 20 S5 25 100 2S 55 20 100 25 50 2S 100 rs 60 2S 100 20 ,o 50 17 100 18 10 50 20 100 25 50 23 100 zo 55 Z3 100 15 10 100
Cl.lEIIT: NEW YOilK POltf AUTIIORITY
HALL·~IMSIIEL~ ENVIROIIMENTAL SERVICES INC, ASSESTOS PETROGRAPMIC ANALYSIS
PROJECT NCI: N1'0271 JFK IIITEIIIATIOIW. AlaP<ltlT ASilliSTOS
SANPlt IUG!l IQ40 AS8/PIU!S TOTAL ASS ClllilV A140 Cltt) ANT TRI WOO\.
0 •187068 N II 0 60 79 ·187069 y M 0 79 •18TOTO y N 0 79 ·187071 y II 0 0 •187072 II N 0 70 0 •187073 N 14 0 75 &O ·187074 y II 0 6(1
80 •18707'!1 y II 0 55 80 ·187076 y N 0 55 0 ·187077 N N 0 50 0 •187078 N N 0 40 0 ·187079 M II 0 55 0 ·187080 N II 0 35 0 •1131081 II N Cl 35 0 ·187082 N 14 0 60 0 ·187083 II N 0 90 0 • 181084 N N 0 65 81 •1810M N N 0 81 •187086 M " 0 81 • 187087 II N 0 0 ·187088 M N 0 30 82 ·187089 v v 15 15 82 ·1117090 y y 15 15 82 • 187091 '( y 15 15 0 ·187092 N N 0 0 ·187093 N y 25 2S 26 ·187101 y y 15 15 10 26 •187102 y v -ZS- -a- - - -,o-26 ·187103 y v 35 35 20 21 ·1117104 '( '( 40 40 10 27 ·187105 y y 10 r 10 30 '21 ·1117106 y y so l 50 20 0 •1117107 II y 2
l 2
21 ·1117108 y ., 60 6Q
28 ·1117109 y \' 40 40 211 ·1117110 '( 't :ro 30
0 • 187111 Iii y 70 I 70 29 ,11m12 y y 55 55 29 ·187113 y y 50 I 50 29 •1117114 y y so I 50 30 • 187115 " y 60 I 60 20 30 ·1117116 N '( 15
' 15 40
30 • 1117117 N '( 40 ·: 40 20 31 • 181118 y y 10 10 31 • 187119 y y 35 ! 35 31 ·1117120 y y 20
: 20 0 • 187121 M y 20 20 l2 •1117122 y y 2S ' 15 10 10 32 ·187123 y y 40 f 2S 15 32 • 187124 y y 50 25 25 33 •187125 y y 70 i 20 50 33 ·1117126 y y 40 i 30 10 n -1r11121 y y 55 35 20 0 ·1157121 M v 25 I 15 10 34 ·1117129 y y 50 r 50 20 34 ·187130 y y 2S I· 20 5 30 34 ·1117131 y y 30 zo 10 30 35 • 1117132 y y 50 5() 10 35 ·187Ul y y 10 10 40 35 • 1117134 y N 0 50 0 •187135 N y 40 40 36 ·187136 y y 45 4S 36 ·161137 '( y SS 55 10 36 •1117138 y y <.ti 40 r ·187139 I( y 25 25 37 • 18714-0 M " 0 :s7 • 1117141 H II 0 50
BUii.DiNG: 050 O T If E A M A T E A I A L S
C£L MICA Pilli IUIIOER OTHER TOTAL
30 10 100 20 30 50 GM 100 20 30 50 GM 100 10 30 60 GM 100
20 10 100 15 10 100
zo 20 GM 100 lO 15 Gl4 100 Z:5 20 GM 100
35 10 5 100 40 15 5 100 3S 10 100 35 i!'S 5 100 45 15 5 100 35 5 100
to 100 2S 10 100
25 2.5 50 Gl4 100 20 20 GM CAI. 60 100
20 ZS 45 GM SF 10 100 45 20 s 100
50 35 100 55 30 100 50 35 100
65 35 GM 100 45 TAii SFM 30 100
15 40 20 GN 100 -10- ---'25- ---10---P-T- ---GN· ..... ..... -- 100 10 2:5 10 GM 10 30 10 PT 100
30 10 PT Git 20 100 30 100
9Q a 100 10 30 100 10 40 10 COT 100 10 50 10 COT 100
]() 100 25 20 \. 100 35 15 \. 100 30 20 I. 100 20 100 45 100 40 100
10 60 20 Gl4 100 35 30 GN 100
10 35 35 Gl4 100 70 10 100 10 35 20 Gl4 100 10 25 2S Gl4 100
20 30 Gl4 100 30 100 60 100 . 45 100 55 20 GM 100 30 100 45 100 40 100
10 10 20 I. 100· 40 10 MF 100 50 100 40 20 fJIII 100 2:5 20 L HAG 10 100 10 15 L 'NAG 10 100 35 15 L IIAG 10 100
60 15 100 9() 10 PT 100 50 100
IIALL•ICIICUl!LL ENVIIOINNTAl SERVIC!S INC. A$8HTOS PETROCAAPHIC ANALYSIS . '
CUENT: NEW YORIC PORT AUTHORITY PROJECT NO: N7027T JFIC INTERIIATIOIIAL AIRPORT BUILDING: 050
A ~ I E S T O S O T H E R M A T E R I A L S SN4I' LE NVl48f: II HC»tO ASIIPll&S TOTAL ASI CHRT mo CllO ANT ru WOOl. CEL MICA PER 81NOER OTHER TOTAL
37 • 111714,! II N 0 90 10 PT 100 311 • 1117143 y II 0 60 40 100 311 ·187141, y y 45 45 10 25 20 L 100 311 • 1117145 y N 0 60 40 100 39 ·187146 y y 25 15 to 75 100 39 • 187147 y y 40 20 20 60 too I 39 • 1117148 y y 30 20 10 70 100 40 • 187149 y y 40 20 20 60 too 40 • 181150 y y 45 25 zo 55 100 40 ·187151 y y 35 15 20 65 100 41 • 187152 y y 35 20 15 65 too 41 ·187153 y v 55 20 35 4S 100 41 • 187154 y y 30 15 ts 70 100 0 ·1!!7155 M v 50 50 40 10 100 42 ·1117156 v y 55 55 10 35 100 42 •1117157 y v 20 20 50 10 20 100 42 • 1871511 y y 30 30 50 10 10 100 43 •187159 y y 30 30 40 30 too 43 ·187160 y y 25 25 SS 20 100 43 • 187161 y y 40 40 50 10 too 44 ·187162 y y 80 40 40 10 10 COT 100 44 ·1117163 v '( 65 30 35 35 100 44 •187164 y y 60 30 JO 40 100 45 ·187165 y y 45 20 2S 55 100 45 ·1117166 y y 40 20 20 60 100 45 ·1117167 y y 50 15 35 50 too 46 ·187168 y y 25 10 15 75 100
1-46----.--, 8 7169- -y- -v- -10- -10-- ---'20_ 100 46 ·187170 y y 20 10 10 80 ------ioo-47 •1117171 y y 20 10 10 80 100 47 ·187172 y y 30 20 10 70 100 47 •111711'3 y y 50 15 35 50 100 48 ·187174 y y 45 15 30 45 10 COT 100 48 ·187175 y y 4 45 10 35 45 10 COT 100 48 ·187176 y y 45 15 30 45 10 COT 100 49 ·187171 y y l5 15 20 65 100 49 •187178 y y 45 25 20 55 100 49 •187179 y y 40 15 25 60 100 50 ·1117180 y y 40 20 zo 60 100 50 • 187181 y y 55 40 15 45 100 50 ·187182 y y 60 40 20 40 100 51 •1871113 y y 55 35 20 45 100 51 • 187184 y y 55 30 25 45 100 51 ·1871115 y y 70 40 30 30 100 52 • 187186 y y 65 30 ~, 35 JOO 52 ·11171117 y y 60 25 35 40 100 52 ·11!7188 y y 50 ZS 25 50 100 53 •11!71119 y y 80 45 35 20 100 53 ·187190 y y 85 40 45 15 100 53 ·11!7191 y y 65 30 35 35 100 54 •187192 y y 65 30 35 25 10 COT 100 54 ·187193 y y 85 40 45 15 100 54 •187194 y y 75 30 45 ~ 100 55 ·1117195 y y 70 30 40 lO 100 ss -11m96 y y 65 20 ,s 35 100 55 • 1117197 y y 65 45 20 35 too 56 ·1117196 y y 60 45 15 40 100 56 ·1117199 y y 40 20 20 60 100 56 •187200 y y 70 30 40 30 100 83 ·187221 y y 10 1() 6S 15 10 Gii 100 83 ·1117U2 y y 12 12 63 15 10 OH 100 113 • 1117223 y y 1(1 10 63 12 15 Git too 113 ·11l7U4 y y 15 15 65 10 10 GM 100 113 •1117225 y y 10 10 70 10 10 GM 100 83 ·1tmZ6 y y 12 12 . 63 15 10 GM 100 83 • 1117227 y y 10 10 65 \5 10 GM 100 83 ·1117UII y y 12 12 66 12 10 G14 100
IIALL•KIPl9ULL EIIVIIIOIIMl!NTAl. SOVICH INC. AS!l!STOS PETROGRAPHIC ANALYSIS
CLIENT; NEW YOIIK PORT AUTHCMITY PROJECT NO: N702T1 JFIC INTEWflOIIAL AIRPORT 8UILDING1 050
,. $ a e s T s 0 O T H E R H A T ! I I A L $ SNIP1.E NOMl!EII HQ!O ASII/PflH TOTAL AH CHllV MO CftO ANT TRli i.m4. cu. HICA Pffl IIUIOE!t OTHE!t TOTAL
S3 ·187229 y y 15 15 60 15 10 GH 100 83 ·1117230 y y 10 10 68 10 12 GH 100 83 ·187231 y y 1!1 15 10 55 10 10 GM 100 83 •187232 y y 12 12 10 53 15 10 GH 100 83 ·181233 'f y 10 10 10 58 12 10 GH 100 83 ·18m4 '( y 12 12 15 51 12 10 GH 100 83 ·181235 y '( 12 12 10 53 15 10 GM 100 83 ·187236 y y 10 10 10 55 15 10 GH 100 83 ·187237 v y 12 12 10 58 10 10 !lH 100 83 ·187238 y y 15 15 10 55 10 to GM 100 83 ·187239 y y 10 10 10 58 12 10 GH 100 83 ·18nt.0 v y 10 10 15 50 15 10 GH 100 57 ·187301 y y 70 30 40 30 100 57 ·187302 y y 50 30 20 50 100 57 ·187303 y y 50 30 20 50 100 511 ·187304 y y 55 25 30 45 100 511 • 187305 y y 55 45 10 45 100 5!1 ·187306 y y 45 30 15 .. 55 100 59 ·187307 y y 55 25 30 45 100 59 • 187308 y y 55 30 25 45 100 59 •187309 y y 60 20 40 40 100 60 ·187310 v y zo 2(! 40 40 100 60 • 187311 y y 30 30 40 30 100 60 ·18131Z y y 35 35 35 30 100 0 • 187313 N 'I' 20 20 1'\l 10 TAR 100 61 • 187314 y y 60 60 40 100 61 ·187315 y y 55 55 l 45 100 &1-----.,m10 -y- -y- - ----60- --6-0- t j(l _3ll__ 100 0 • 187317 14 y 65 65 25 10 100 0 ·187318 N N 0 100 SI' 100 0 ·187319 II y 2 2 10 811 CAL 100 0 ·187321 N II 0 i 30 50 10 10 100 0 ·187322 II N 0 I 30 45 25 100 0 ·18732l Id II • 0 15 8S GM 100 0 ·187324 N IC 0 I 80 20 100 0 •181325 N N 0 40 50 10 100 114 • 181326 y y 8 8 32 10 50 GM 100 84 •181327 y y 5 s 45 10 40 lll4 100 84 •187328 y y " " 36 30 30 Gl4 100 84 •187329 y y II 8 40 12 40 Gii 100 84 -1arno y y 8 8 10 32 50 GM 100 0 ·187331 N H 0 8(! 20 100 0 •181332 N y 2 2 15 83 l'll4 100 0 ·1873D N y 2 2 10 3IJ GM 100 0 ·187334 N N 0 65 10 • 2S 100 85 ·181335 y y 5 5 45 50 100 as ·187336 y y 6 6 44 50 100 85 ·187337 y y 8 8 42 so 100 0 •181338 II II 0 90 10 100 86 ·187339 y y 10 10 50 30 10 PT 100 86 ·181340 y y 10 10 50 30 10 PT 100 86 ·147341 y y 5 '5 :so 55 10 PT 100 86 •187342 y y 10 ·10· :so 50 10 PT 100 86 ·187343 y y 8 8 52 35 5 PT 100 111' •187344 y N 0 20 60 20 GM 100 81' ·187345 y N () 10 70 20 GM 100 81' ·18134l, y II 0 10 70 2(! GM 100 81' • 187347 II II 0 20 60 Z0 CH 100 81' ·181343 y II 0 20 60 2(! CM 100 84 ·187349 y II 0 90 10 100 118 • 181350 y y 2 2 118 10 100 88 ·187351 y v 4 4 86 10 100 89 ·187352 y II 0 40 20 40 GM 100 89 ·187353 y II 0 50 . 10 40 QI 100 89 ·187354 y II 0 40 10 50 G14 100 89 •187355 y II 0 30 10 60 GH 100 89 • 187356 y N 0 40 10 50 QI 100
HALL•ICIMIIRELL ENVIIIOMMENTAL SIRVICl!S INC. ASltSTO$ PETROlll!AJ>HIC AIIALYSIS
CLIENT: ME\I YOAIC POllT AUTHORITY PROJECT NO: 1170277 JFIC INTERNATIONAL AIRp()IIT BUILDING: OSO
A S 8 e $ T O S O T H E R M A T e R I A L S SAMPLE NtMBEII HOMO ASI/JlltEs TOTAL AS8 CllllY AMO tRO ANT TRE YlOl. C!L MICA Pl!ft BINOl!R OTHER TOTA~
0 • 187357 II II 0 Z5 60 15 GM 100 90 •187358 y y 35 35 15 50 100 90 ·187359 y y 35 35 20 45 100 90 ·187360 y y 34 30 30 40 100 90 •187361 y y 2S 25 2S so 100 90 ·187362 y y 10 10 JO 60 100 91 •187363 y Ii 0 40 60 100 91 •187364 y Ii 0 40 60 100 91 ·187365 v II 0 50 50 100 91 ·187366 y N 0 40 60 100 91 ·187361 y Ii 0 50 50 100 91 ·1117364 y " 0 60 40 100 91 •187369 y II 0 30 70 100 0 ·137370 M M IJ 20 80 CAL 100 0 • 187371 M N 0 40 30 30 100 0 ·187372 II y 2 2 40 58 TAR 100 0 • 1876S8 N y 1 2 5 20 73 CAL 100 1 ·187659 y v 20 20 30 50 100 1 ·187660 y y 30 30 JO 40 100 , ·187661 y y 30 JO 30 40 100 2 ·187662 y y 35 35 30 35 100 2 ·187663 y y 20 20 40 40 100 2 ·187664 y y 25 25 35 40 100 0 ·187665 N y 30 30 10 60 100 3 ·187666 N y 5· 5 75 20 100 3 •187667 N y 40 40 34 34 100 3 ·187668 Iii v 45 45 lO 2S 100 0~1ar669- -N- -Y- --30-.- - _JQ_
- - 1'0 100 0 ·187670 N v 30 30 70 ,uo-4 ·187671 y y 50 10 40 50 100 4 ·187672 y y 50 20 JO 50 100 4 ·187673 y y 40 10 30 60 100 0 ·187674 M y 5 5 as 10 100 5 ·181675 y y 40 40 20 40 TAii 100 5 ·187676 y y 45 45 35 20 TAii 100 5 ·187611' y y 40 40 I 50 10 TAR 100 0 ·1&7678 N y 65 65 20 15 100 6 •14761'9 y y 30 30 1'0 100 6 •187680 y y 35 35 55 10 TAii 100 6 • 187681 y y 40 40 so 10 TAR 100 7 •187682 y N 0 35 30 35 100 7 ·187683 y N 0 40 25 35 100 7 ·1876111, y N 0 40 30 30 100 0 ·11$761SS M ·Y 40 40 60 100 0 ·187686 N y 20 zo 70 10 100 a ·187687 y y 20 20 20 60 100 IS ·187688 y y 40 40 40 20 TAJI 100 8 ·187689 y y 15 15 lO 55 100 9 •187690 y '., 2 2 6(1 38 100 9 ·187691 y ti 0 50 50 100 9 ·187(,92 y M 0 . ' 50 50 100 10 ·187693 y N 0 40 6() 100 10 ·187694 y II 0 45 55 100 10 ·18769'5 y N 0 50 50 100 ,, •187836 N y 1'0 1'0 lO 100 11 •181837 y y 25 25 ~ 50 CAL 100 11 ·187838 y y 20 20 30 50 CAL 100 a ·181'8W N N 0 50 20 10 10 10 PT 100 0 ·187841 N N 0 80 20 GM 100 0 ·187842 Ii N 0 70 30 GM 100 0 ·187843 N y 2 2 18 60 CAI. 100 0 • 187844 Ii M 0 10 10 20 Gl4 100 0 • 187845 N N 0 40 30 30 GYP too 12 •187846 y y 30 30 50 20 CAI. 100 12 •1117847 y y ~o 40 40 20 CAL 100 12 · 1117848 y y 40 40 50 10 CAI. 100 13 • 187849 v I! 0 . 50 40 10 G14 100
IIALL·KIHIIULL ENYIROINNTAL SERVICl!S INC. ASBESTOS PETltOGAAPHIC ANALYSIS
CLIEIIT: NEW YORK POIIT NJTHOIUTY PROJECT ij01 N70277 JFK INTERNATlotlAL AIRPORT IIUILDIIIQI 050
A S I E S T O S O T H E R M A T E II I A L S SN4Pt.l! NUMIM!II l«»IO ASII/Plll!S TOTAL AS8 CllllV AHO ClO -...r TRI! WOOi. Cl:L Ille.A PEii Bl!iOEII OTHER TOTAL
13 -111mo y N 0 50 10 30 10 GM 100 13 • 11171151 v II 0 50 10 40 100 14 ·111ffl2 '{ y 50 50 10 40 100 14 •1117!153 y y 40 40 50 10 Gl4 100 11, • 1117851, y y 50 50 40 10 QM 100 0 • 11171155 14 'I TO 70 10 20 100 15 ·111Tffl y y 70 30 40 30 100 15 ·1871157 y v 80 40 40 10 10 100 15 • 1871158 y y 70 30 40 10 20 100 16·18~ y y 80 40 40 20 100 16 ·187860 y y 70 30 40 30 100 16 •1117861 y y 70 30 40 30 100 17 • 1871162 y '( 80 20 60 20 100 17 • 1l!lnl63 y '( go JO 50 20 100 17 • 187ll64 y y 80 40 40 20 100 18 •187&5 y y 80 40 40 10 10 Pi!I 100 111 • 1117866 y y 80 30 50 20 100 18 •187867 y y 60 40 40 10 10 P1' 100 0 ·1117868 N y 50 so 10 40 100 19 • 11171169 y y 40 40 60 100 19 • 1117870 y y 7Q 30 40 zo 10 PT 100 19 ·187871 y y ro 30 40 20 10 PT 100 20 •1!17872 II y 60 40 20 40 10() 20 ·187873 y y 50 50 20 zo 10 PT 100 20 ·187874 y y 40 40 20 30 10 PT 100 21 ·18787'5 y y 30 30 zo 40 10 PT 100 21 ·187876 y y 40 40 30 20 10 PT 100 n-·l878rr- -y- --y- -- ~---- -30- ---- ~ -50- j_Q_ __1_0__H_ 100 0 •18787a If "' 0 40 60 TAA 100 Z2 ·1878111 y y 5 5 50 45 100 U •187882 y II 0 50 50 100 22 ·1878113 y y to 10 50 40 100 23 ·187884 y y 40 40 411 20 ,oo 23 ·187885 y y 30 30 50 20 100 23 • 1117886 y y 40 40 40 20 100 24 •1878111 y y 40 . 40 50 10 100 24 ·1878113 y y 40 '° so 10 100 24 ·1117889 y II 0 60 40 100 0 • 181119() II y $0 50 50 100 0 • 1871191 H II 0 10 90 100
0 • 1117892 N II 0 80 10 10 TAR 100 25 • 1871194 y N 0 30 50 20 GM 100 25 • 187895 Y. M 0 20 60 ZO GM 100 2S •1117896 y N 0 30 so 20 GM 100 25 • 1871197 y N 0 10 30 40 zo Gl4 100 0 •294350 M y 8 8 20 58 CA TA 14 100 92 ·379386 y y 65 63 2 35 100 ~ ·379387 .Y T 55 45 10 10 35 100 9Z ·3mall y y 65 60 5 35 100 0 ·379389 N y 10 10 24 64 CA TA 2 100
HAll·ICIHSREll ENIIIROIIHENTAl SERVICES, INC.
Asbeatoa Assessment Survey
ll·IC llui ldtng ta: 21
AREA TENANT AREA OESCRIPTION
Building llumber: 050 P119e
Building NIIIIIC: INTERNATlOIIAl ARRIVALS IIUILOING JFIC AIRPORT
BulldiOII Type: ifiltlNAl comuuct<Ni: 1957
Inspected: 04/29/88
Inspector: Bryant/Gideon
---- - IO&M UIIIT Of PIPE " EXP REMOVAi. REPLACEMENT TOTAL
# LOCATIOIII OF 1111.TERIAL SAMPLE ·
IIJHIIEll BllllC SAMPLE !IESCIUPTIOI! I all)f QUAIIT MEASURE ID ASS POT PL COSTS COSTS cdsrs
001 5 STAI\\ Parking·Emst Wing-3rd floor
above drop cei I Ing .on steel a ·bullls 187047·75 fireproofing 187048·75 fireproofing 1871149·75 tireproofin9 t870S0-75 fireproofing 187051-75 fireproofing
002 S STAR Parking-East WinQ•lrd Floor·Ceilina
offices 187371-0 acoustical tile
003 5 STAR Parking-East Wir,a·lrd flocr·Floor&-
offices 1a7319·0 · vinyl floor tile
The 1'xt' vinyl floor tiles mre in sood c:ondition.
AREA AVERAGE lt i\SB ·
I CIMt 2550 sq.ft. OMC
OHC
Ol4C
OHC
AREA AVERAGE X ASS·
atG 3600 sq.ft.
AREA AVERAGE X ASII •
ma 3600 sq. ft .
TENANT - 5 STAR
0%
0
0
0
0
0
MEA TOT.Al so $0 so
ox
0
AAfA TOTAL $0 so so
2%
2 5 IV $16,344 S12,384 $28,728 !
AREA TOTAL $16,344 St2,384 ~2a.na I
!
TOTAL $16,344 S12,3~ ~2a.na
HALL·(tNBRELt EHV!RONHl:NTAl SERVICES, lNC.
A&besto$ As$essment Survey
tl·K Building I: 21
AREA TENANT AREA DESCRIPTION I LOCAilOM OF t!ATERIAL
SAMPLE UBER IIUU: SAMPLE DESCIUPTIQII tE
004 AER LI NGUS East l.!ing·11t f&oor·ll111iimge llandl Ing
janitor's c:loset·along cc:il iog 187693·10 mjp on non·suapec:t pipe cover oo 187694·10 ajp on non·auspect pipe covctr rlKA
9S . I 1876 • 10 111Jp on non·susp,11et pipe cover OMA
11t ceiHna 187849·13 111Jp on non-suspect pipe cover «IMA at cell Ing 187Sli9·1l 111jp on non-suspect pipe cover ~
187850· 13 111jp on non·suapect pipe cover «\.c,. • I
187851·13 IIIJp on non·-pect pipe cover OM
at ceil Ing 1""2•14 ojp ~~·""""'PIP'•~• ~ at cell Ing 187852·14 alp on non·auspect pipe cover •
1871151·14 . ajp on non-suspect pipe cover 187854· 14 ajp on non-suspect pll)ll cover ~ - '
The N1teri11l ill in tair condition with a few erHs allowine loc11liied c:ont11c:t lllld water dali.eeo. I
005 AER LINQIS hst ldins·tu floor·CaHlnsa
passe119er ticket area 187339·86 sprayed ecoustlcel plaster 187340·86 sprayed ac:OU111tlcel plaster
187341·116 sprayed acoustical plaster 187342·86 spreye;d acoustical plaster 187343·116 sprayed acoustical plaiter
1he uterlal ta In good condition and Is encapouletcd with paint.
006 AEII. LI IIGUS East Mlng·1at floor·Offic:cs·Ceiling
Q'10
~
~ QNll
CIUAJ!f
Ulllll l()f
Hf:ASU!!E
Sui I ding NUlllber: 050 Page 2
Building ilalllle: INTERIIATIONAL AltRIVALS BUILDING JFK AIRl'Oltl
Bui ldll'l!I Type: TERMINAL Cons.tructllld: 1957
PIPE
10
inspected: 04/29/88 Inspector: Bryant/Gideon
% B!P
ASS POT Pl REIIOVAL REPLACENEIIT
COSTS COSTS TO~AL COSTS
AREA AVERAGE% AS&· 16"
10 to in. lli.O. Oil 0
0
0
'.50 12 in. O.D. IIYS/R I)
60 4 in. O.D. Hlo'S/l 0 I)
()
35 8 in. O.D. Clo'S/i! 50 25 IH S2,266 $1,332 ~3,598 65 6 In. o.o. CYS/11 50 2S IU $3,383 S1,947 ~5,370
40 25 DU I
50 25 UI
'
Ai!IEA TOTAL S5,649 $3,319 Sll,968
AREA AIIEIIAGe X ASB • 9X
3960 sq.ft. 10 24 au S128,4Q $37,699 st¥, 161
10 24 m s 24 Ill
10 24 II!
8 24 IU __ i
AREA TOTAL $128,462 Sl?,699 $166, 161
AREA AIIERAGE X ASB · an
HALL·KIHBRELL EHVIRONHENTAL SERVICES, INC.
A5beStos Assess111ent Survey
H·OC Building•: 2U
AREA TEIIAJIT All:EA OESCJIIPTIQII fl LOCATIO!il Of WITEIIIAL
ticlr.et office
SAMll'lf
IUtiEII. BULK SMPLE l>ESCUPTIDII
187124·0 acCU3tical tile
007 AER LI MOOS East Ying·lst floor-Offlc:ll5·Floora
ticlr.at agent's offices hallway
baesmsa handling office
187319·0 vinyl floor tUe 187319·0 vinyl floor tile 187lll·O vinyl ftooc- t Ile
'l'he vinyl floor tiles are adhered to a CO(\Crete floor and are In 110Cld condition.
000 AU LIIIGUS East Ying-tat Floor·Allcve Orap Ceiling
ludins co re11trOC11111 187846·12 ajp on non·11uspec:t pipe cover 187847-12 ajp on non-ampect pipe cowr 18784tH2 ajp on non-suspect pipe cover
leadi119 to heaters 187849·13 ajp on non-SU11pec:t pipe cover
1871150·1:, ajp on non-suspect pipe cover
187851·13 ajp oi'I nan·&uspect pipe cover leadln; to air handlers 187852·14 ajp on non·autpect pipe cover
187853·14 ajp on non·suapect pipe cover 187854-14 mjp on non·auapect pipe cover
]Olli I ca>e
la4G
OIIZ
OM?
00
OMA
OMA OMA
OMA
OMA
OMA OMA
OMA
OMA
1.11111 Of
QlWlf HEASIJU
1050 sq. ft.
liui !ding l!Ulllber; 050 Page ~
Suildi"ll N&111e: INTERIIAilOIIAL ARtllVALS BUILOIHG
JFK AJRPORT
Buildins Type: TERIUIW.
tonstruc:ted: 1957
lnspecud: 04/29/&a inspector: Bryant/Gideon
PIPE % EXP ltEMO\fAl REPLACENEJIT ill ASS POT Pl COSTS COSTS
0
AAEA TOT.Al so so
T~TAL COSTS
so
AIIEA A llfltAGE X il!SII - 21'
1050 sq. ft. z 6 Ill St..,767 Sl,6tZ !SS,379 250 sq.ft. 2 6 ill $1,135 $860 /st,995 200 11q.f1t. 2 6 IV S90& S68a lst,596
I
AAEA TOTAL $6,810 SS, 160 i1t,970
AltlEJI. AVERAGI: l!. AU • 28X
19 4 in. O.D. !)1,1 30 14 IV $718 $399 ! $1, 117 40 14 Ill
40 14 Ill
20 4 in. o.o. i!WS/R 0
0 0
8 6 in. o.o. a!S/11 so 14 HI S4t6 $245 $661
40 14 Ill
50 14 Ill
The piping Is above the drop celling and hi in good condition. Quantities given are eatlaates based upon ll.llEA TOTAL s1, 1:sr. $644 ! Sl,778 Inspection.
IIALl·KIM8RflL ENVIRONl'IENTAL SERI/ICES, INC.
Asbestos Assessment Survey
H·K Building#: 21
Jl§IEA TfNAIIT AREA DESCi!IPilOIII
I LOCATIOII O~ MAJERIAL
009 AEII UNGUS hst Wing-ht floor
ba99a9e h"ndl ins area-on 1-bejmnitor•s ~10,et-on l·beaslfl
SAlll'LE
lllMIER
1157363-91
1117363-91
11'17364-91 187165-91
187366·91 1!17367-91 187368-91
187369-91
SULK SAKIPLE PfitlllPTIOII
fireproofine f I reproofing
fireproofing fireproof Ina
fireproofinQ firep.-ooUng fireproof In;
f i l'Ctpl"OOfing
0111 AER I..INGUS East Wing-ht floor·Atxlva Crop Ceil i11S
on stattl l·ll::icu,111:111 1111363-91 Ureproofln& 187364·91 fireproofing 181365-91 f I reproof Ing 187366-91 fireproofing
181367-91 f I reproofina 1873611·91 flreprooflns 187369·91 fireproofing
on AER U)IGIJS East finger-1st floor
mintenance .i.hop·on I-be- 187363·91 fireproofing
lo&N
Building lil.llllber: 050 Page + Buildill!il Nnm,e: INlERNATIOlfAl ARRIVALS BlllLDINGI
,IF!( AIRPORT
Building Type! TERMINAL Construct€!d: 1957
inspected: 04/29/118
Inspector: lry111nt/Gldeon
l EJCl> RENOIIAL lEPLACEJIEMf I al)f IIUAlli
UNIT Of
MEASUilE
PIPE
ID AH POT PL COSTS toliJS TOTAL
I COSTS
AREA AIIEIIAGE l ASII • Ill
late 32115 sq.ft. 0
IG!C 325 sq.ft. 0
IOIIC €1
IOKC 0
IOIC 0
lou: 0
IOHC 0
lot!C 0
AiEA lOlf.Al so .. so
AIIEA AIIEl!AGE :l ASII • Ill
IOMC 3100 sq. ft. 0
IOIIC 0
IOMC 0
IOMC 0
IOMC 0
l«:IMC II
IIK 0
MEA TOTAL $0 $0
AREA AVERAGE l A$II • 01'
IOHC 1450 sq. tr. 0
11
so
$0
MALL·ICIHBRELL EIIVIROHHEIITAl SERVICES, IIIC.
Asbestos Assessment Survey
K·K Building I: 21
AREA TEIIAIIT AREA DESClllPTIOlil I LOCATl!lli Of ~TERIAL
SAJIIPLE
IIINlfll IWU( liAIHPLE ll>ESCIIIPHOII
187364·91 fireprootina 181365·91 ti reproofing 187366·91 H rc,proofina 187367-91 fireprooflna 187368-91 fireproofing 181369·91 fireproofing
012 AER UIIGUS East finger-1st floor·ti&intenance Area
111torage & locker rOC111·on D·be- 181163·91 fireproofing 187!64·91 fireproofing 187365·91 fireprooflne
187166·91 f i reproofini, 187367-91 fireproofing 187368·91 fireproofing 187369·91 fireproofing
01! AElt LIIIGUS East finger-1st floor·Halntenal'\Ce Shop
at ccil Ing
at ceil Ins 1871149·13 111jp on non·auspcc:t pipe cover 187849-11 11jp on non-suspect pipe cover 187850·13 11jp on non·auapcct pipe cover 187851-13 aajp on non·a.spect pipe cover
fo&ac lcooe I
IOKC IDKC IOMC IOKC I Cll4C
I Cll4C
Ol4C
ate Ole
OIIC
ONC -OMC
Ol4C
OMA
OMA
OMA
OKA
at ceiling 1871152-14 111jp on non-suspect pipe cover I OMA
IUIIIT OF
QUAJ,!J MEASURE
llui I ding ltklllt>er: 050 Pai,e 51
Building llaae: IIITEIINATIOIIAL ARRIVALS BU!LO!HG JflC MRPOIIT
Building Type: TERHIIIAL Consuucted: 1957
hlspccted: 04/29/88
inspector: Bryent/Gtc:leon
PIPE % EJl!f ilfltOVAL IEf'UClltENT T~JAL 10 As& POJ PL COSH COSTS its
0
0 0
0 0
0
AilEA TOJ Al $0 $0
AAEA AVERAGE X /l\SI • Olt
200 sq. ft. 0 0
0
0 Ill 0
II
AREA iO'l'IJ. so so
~!EA AVERAGE % ASI • ;m,
35 6 In. 0.0. IIIIS/11 0 30 4 in. o.o. IIIIS/11 0
0
0
$0
$0
28 6 in. O.D. Cl.lS/11 50 25 IU $1,457 $856 i S2,!13
KALL·ICIMSRELL ENVIROl,ll4ENTAL ~.ZRVICl:S, INC.
Asbestos Assessment Survey
H-IC Building#: 21
AREA IENAllt· AREA DESCRlPTIOII ff LOCATEOII Of MATERIAi.
SAMPLE IIUIIIIEII IWLIC SJIJIPLE DESCRIPUOII
out UMIT Of
COOE ~T lllfASI.IRE
~~~~~~~~~~~~~~~~~~~~~~~~~~~~~-~-.~~~~
187853-14 ajp on non-suspect pipe c~ OMA 187854-14 mjp on non·111uspect pipe cov~r OMA
I
Bui ldill!il IIUl!i:ler: 050 Page ! 6
Bul!dlflll N!11118: llliERNATlot!Al ARRIVALS IUILOl~G .IFIIC UIIPORT
Building type:: ieilll'IIIIAL Constru:::tad: 1957
Jnspected: 04/29/88 Inspector: Bryant/Gideon
PIPE 1' EXP ID i\$11 POT PL
40 25 Iii 50 25 111
lEMOIIAL llEPLACEMEIIJ COSTS COSU
TOTAL COSTS
The m.nerieal is ir,, good co.n,aiit loo. AREA TOTAL $1,457 $856 S2,313
014 AEI! LI NWS East fin,1Cr-1st Fl·"alnt. S!lop·Ceillng
operations office area
office crea throughout
187370-0 at:ouaticel tile 187370-0 acoustical tile
015 AEiit UINGUS
storage & ~hop area office 11rea
operations office
016 AEII LIIIGUS
oo steel i·be-
East finser·lat floor·Malnt. Shop-Floor
187323-0 Ul7323-0
187323·0
vinyl floor tile vinyl floor tile vinyl floor tile
Ease finger·1flt H·Above Drop Celling
187363·91 fi reproofi 1'111
187364·91 tlnproof-lns 187365·91 f ireproofll'III
181366-91 f I reproof Ins 187367·91 fireprooOng
(»I(;
OIIG
QM?
ON?
Oil
OMC Ol4C
Ol4C
Ol4C
ate
AREA AVERAGE X ASB • °" 600 aq. ft. 0
400 sq.ft. 0
AREA TOTAL $0 so so
AREA AVERA!if X ASB • 01'
500 sq.ft. 0
400 gq.tt. 0
600 sq.ft. 0
~ TOTAL so so $0
AREA AIIERAGf X ASI • ox
850 sq.ft. 0 II 0
0
0
HALl-KlHBRELL ENVll!ONHEIIJAL SERVICES, !IIC.
Asbestos Assessment Survey
11-K Building I: 21
Ai!EA TENANT AllEA llESCllPTIOIQ I LOCATIOII Of MATERIAL
WIIPLE
IIUMIIER IIUlK SANPLE OESClllPTIOII
187368-91 f ireproo111 ne 187369-91 fl reproof ins
017 AEII LUIGl!S East Wins·2nd floor·Abova Orcp Ceiling
on steel I ·be-
017.A AEII ll llGUS
to rest ll"O<llllllll
to air handlers
leading to heaters
187894-25 fireproofing 187695·25 firepa-OOfhlfil
187196-ZS flrmprooflne
187897·25 firmprooflClfil
Ent Ying-2nd Floor-Above Drop Ceil ins
187836·11 1111jp on non·s.uapect pipe cover
187&37·11 111jp on non·s.1.11pec:t ptpe cover
1erus-n 111jp on fllll\•wepect pipe cover
187884·2l ajp on ncn·wepect pipe cover
187W·2l ajp on non·guspact pipe cover
1117886·23 ajp on non-guspec:t pipe cover
1117'aa1·24 ajp on non-suspect pipe cover
187888-24 mjp on nan-auspec:t pipe cover
j I
I o&l4
j I
talE
Cite
ate
Cite
QIC
06C
ClMC
acA
OMA
OIA
OiA
OMA
OMA
OiA
OiA
1117889-24 111jp on non·auspact pipe cover Ol4A
Olll'i OF QUAIIT MEASURE
Bui ldilllil lllulber: 050 P~ 1 l!h.rilding ,._: IIITHNATIONAL ARRIVALS BUILOIIIG !
.m: AIRPOlt1 luitdh-.g l~: 'l'EllmlNAL
CCNtNCted. 1957
I ntpected: 04/29/118
Inspector: lryanl/Glde<ln
PIPE Ill
i EXP llEltOVAl REPlAC£MEIIT IISi l'Oi PL
0 0
AREA iOTAI.
COSTS COSTS
so so
TOTAL ~TS
so
AREA AVERAGE~ 1151 °" 1Zl0 &q.h. !I
0
0
0
AAEA 'i'OTAL
AIIEA AVERAGE% UII • 34%
19 4 in. o.o. 1)1,1 10 14 2S 14 20 14
8 6 in. o.o. Cl.IS/II 40 14
3lll 14 40 14
20 4 In. O.D. lit.IS/II 40 \4
40 14 I) 14
so so . so
Ill $718 $199 s1.111 Ill
IV IV $416 S245 $661
Ill .. , IV $756 $420 St, 176 J'I
111
HALL-KIMBRELL ENVIROHl4fll1AL SERVICES, INC.
Asbestos Assessmcnc Survey
H·K Building#; 21
AREA lEIIAIIJ AREA DESCRIPTIOII t LOCATIOM Of MATERIAL
$1\HPLE
OUIIIEII Ml iAMPLE DESCIIPTIClll
018 l!Efl llti!GUS East Ying-lrd f~oor-Above Drop Celllne
on steel 1-ro..- 187047-15 tlreprooflng 187048-75 fireproofing
187049-75 fl reproofing 1117050·15 fireprooflne 187051-75 f ireprooflns
019 AER UIIGUS East Ying·lrd floor-floors
hallway 11re11> 187319-0 vinyl floor tile persO!ll'lel l oungm 18731!HI vinyl ftOCM" tile storage roet11 187319-0 vinyl floor tile
women• m res troet11 167333-0 vinyl floor ttlo
111en's restrooa 18733:M> vinyl floor tile
The vinyl flogr til<ltll are ~cred to a concrete floor structure.
020 AElt UIIGUS E&&t Ming·3rd floor-Ceilings
patrician suite 11l7339-86 sprayed mcOU11tic11l plaster
Goldefl ShaNoc:lt lOUl'lllC 187339-86 sprayed ai;OU11tic11l pl111ner
lo&N lalDE
CIIC QIC
QNC
QIC
QNC
00 aa
I QI? aa
I aa
OMO
Oil
llui lding ~.: 050 Page
lluildlng lllllllfl: !IITERNATIOIIAL ARRIVALS BUILDING Jfl( Al RPOIIT
llui ldil"l!I Type: TWINAL Constiructed: 1957
lnspec:ted: 04/29/11111
Inspector: tryllll'lt/Gldeon
UKll OF
MEASUIIE
Pll'f
ID 2' Eli!P REHOIIAL REPLACEMENT
111.tAlli A$ll !'Oi fl COSTS COSTS
llii!EA 10111.1.. S1,890 $1,064
--·-·f'
AREA A\IERAGE Z ASII - Ill
lOOI) sq. ft. 0
0
0
0 II
AifA i'01P.I.. so $0
AREA AVERAGE% ASI - 2l
280 sq.h. 2 6 IV S},271 $963 400 sq.ft. 2 6 Ill si,ai6 S\,176 225 sq.ft. 2 6 Ill $1,021 1174
85 sq.ft. 2 6 111 13116 S292
60 sq. ft. 2 6 IV s:563 $275
AREA lOtl\L Slo,857 S3,6IIO
AREA AVERAGE X ASI - 9"
260 sq.ft. 10 24 Ill $8,434 S2,41S
690 sq.ft. 10 24 m 122,384 16,569
TOTAL I
COSTS
IS2,954
$0
$2,234 $], 192
S1,79S $678
1635
! sa,537
I
~10,W. I 28,953
HALL·KIHBRELL EMVlROl41!.ENTAl SERVICES, INC.
Asbestos Assessment Survey
H·IC Building#: 21
AREA TENANT AiEA OESCll!PTIO!ol SAMPLE lo&H tll LOCAllOM DF AATEIUAL Nlll&EII IUU SMPLE DEsatlll'TIOI! CODE
Iara lounge 187339·66 sprayed 11eouetfi;al plaster ICM) 187340·86 sprayed acoustical plaster CM)
181l41·86 sprayed acoustical plaster (Ill
181142·66 sprayed a~tlcal plaster IHI
181341·66 sprayed 11Coustical plaster QI)
The cnaterial ia in good concllticn and is encapeulated with paint.
021 Aflt LIIIGUS East Ying·lrd Floor·Ceillngs
hallways 1873?4·11 acoustical tile ONG
personnel lounge 1111324·0 acoustical tlta ONG
stora~ rOC111 181324·0 acoustical tile ()MG
offices 181324·0 ac04.IStical tile ONG
uur OF
QUAIIJ MEASUIIE
1240 sq.ft.
Elui I ding >i\Al>U: 050 Page 9
Building N11111e: INTERNATIONAL ARRIVALS BUILDING JFIC Alftl'OltT
Building Type: TERHINIU. Constructed: 1957
Inspected: 04/29/1!8
lnspectOl": 8rysn1t/Gideorl
PIPE ,. fKl' RfMOVAl llfPLACEMEllt II) J\$61 POT Pl COSTS COSJS
10 24 UR $40,226 $11,805 10 24 Ill 5 24 HI
10 24 m a 24 UI
..UEA TOTAL $71.044 $20,849
TOTAL I
COSTS
I
f52,031 I
I I
I
I I
f91,893
AREA A \/EilAGE X ASS • Ol
2M sq.ft. II
400 sq. ft. 0 15 aq. ft. 0
1125 sq.ft. 0
AREA iOTAL $0 $0 so
TENANT - AEI llWGUS TOTAL 5221,303 $73,271 294,574
ttALL·KIMBRELl ENVIRONHENTAL SERVICES, INC.
Asbestos Aisessment Survey
H-K Building#: 21
AREA TENANT AREA DESCl!IP1IOIII S LOCATION Of NATERIAL
SMPLE
IIUM&ER l!UUC SMPLE OEliCUPTIOII
022 AIR fRANCE west 1.1ing· bt Floor-Ceil ine
front lobby
offices & hallways
023 A I II fllANCE
hat lway in rear
187088-0 drop or lay· In panel
187088-0 drop or lay-In pcncl
vest wlr111·1st floor·Floors
181333-0 vinyl floor tile
o&N 1.11111 OF
COOE GUAl,ll MEASl.ie.E
Building ilu&b!r: 050 Page t llui ldl119 11-: 1111EIINATIOIIAL ARRIVALS BUILOINGI
Jfl( A!IIPOIIT
liuildi ng iypc; TEIU«UW.
Constructed: 1957
tnspec:ted: C4i29/88
Inspector: Sry1111t/Gideon
PIPE l EXP
ID AS& POT PL
REMOVAL REPLACfMElll · TOTAL COSiS COSTS chsvs
AREA AVERAGE X ASI • ox
OIIG 6200 sq.ft. 0 OIIG 2210 sq.h. .o
AREA TOTAL so so
ARfA AVERAGE X ASli - 2%
so
Ol!Z 2a.G sq.ft. 2 5 Ill St,271 S963 S2,2l4
nu, vinyl floor tiles arc in aood cooclition. Minor contact daaage cnlne frao wear end ltcar oo flooring. AREA '1'01AL i1.2n i963 S2,234
024 Allt FIIAl!CE Yest Ylng·ist Floor·flooring
hallway 11:>ehincl counters Ul7001H) vinyl floor tile Gil
Jha floor tiles arc in fair tc> socd condition with ainor daalllee frCIII 4tYer)'day llll!lr and *ur.
025 Alli fllAIICE west wins-1at floor
b6gsege handl Ins area at wall
Janhor•s c:loset at Wlllli
187846·12 11'17846-12
11'11647-12
187848-12
111jp on non-suspect pipe cover I ajp on non·auapec:t pipe cover I 111jp on non-suspect pipe cover mjp on non-suspect pipe cover
OKA
CIMA
DKA
OIA
AREA AVERAGE X AS!il -
300 sq.ft.
AilEA AVERAGE I ASB •
16 fl in. O.D- 1)11
4 4 in_ O.ll. ow
67'
' s Ill S1,362 $1,032 I SZ,394 I
l\ifA TOTAL s1.36Z S1,032 ~94
37%
30 23 Iii S1,036 S609 S1,645
30 23 Ill $151 $84 S235 40 Zl UI
40 23 UI
ffALL-i::IHBiell ENVIRQl,ll'IENTAL SERVICES. IIIC.
Asbestos Assessment Survey
11-i:: aui I ding ii: 21
AREA TENANT -AREA DESCRIPTION I lOCAil0$! Of WIJERIAl
SMIPLE IUIIEl llllU: &NIPLE OESCIIPTIOII
Tile nulded joint packlngs are In Ver( good condition with l htle contact dunge.
026 AIR FRANCIE west Wins-1st floor-ceilings
custQGIS area-above counters 1111185-at sprayed acoustical plaster 187086·!11 11.pre,yl!d ac-tical _plaater 1!17087-1!11 aprayed ac-ticat plaster
south wall-over ticket Cai.B1ters 187089·1!12 ·aprayld ac:oustlcat plaster 187090·82 sprayl!d ac:ouatlcal plaster 187091-112 sprayed ac:Ol.!lltlcal plaster
ihe acoustic11I ptai.t111r is in good cMCSIUon and hH been encapsulated.
027 AIR fl!ANCE loi'e&t Wing-1st floor-eaggage Mandllng
on steel I ·be.11111111 167363•91 fireproofing 187364·91 flreproofhl(J -187365·91 f lreprooflr11 187366·91 f i reproofina 157367·91 f I reproof Ina 187368·91 f ireproofin; 187369·91 fireproofing
'
. CUI
ewe
QIU)
QIU)
Oii> QIU)
Oii)
OIIO
OIIC OIIC
OIIC
OIIC QIIC
OltC
OKC
QUAll1
UNH Of
IIEASIJIIE
Suildins lill.lllRbc!r: oso Page ,,
Building Nlllllfl: INJERIIATIONAL ARRIVALS IUILOfNG JFK AIRPORt
liluildl1111 Type: TEIIHIIIAl C:onstructl!d: 1957
Inspected: 04/291818 Inspector: lryantJGideon
l'lff
10
t UP RfltOVAL REPLACEltENT AU POJ Pl costs COSTS
AREA TOTAL S1,157 $693
TOI Al I
COSTS
I S1,880 !
AREA A\lfRAGE ~ ASB - ~
1200 sq.ft. 0
0
0
2400 sq. ft. 15 35 HI sn,ooo $20,520 ~92,520 15 35 HI I
15 35 m I I I
____!
AREA IOTA!. $72,000 SZ0,520 1$92,520
AREA AV~llAGIE '.l Asa • ox
23~ sq.ft. l!I
0
0
Ill (I
0
0
J\REA TOTAL so so so
HALL-KIMBRELL ENVIRONMENTAL SERVICES, IMC.
Asbestos As,essment Survey
H·K iulldinQ •: 21
lliui ldlng !Nlber-: 050 Page 12 Suildll'l!I lllldlle: lNTERIIATIONAI. ARRIVALS BUILDING
JflC AlltPOIIT
Buildil'llil Type: TERHIIIAL Coosuuc:tmd: 1957
Inspected: Olt/'l.9/84
Inspector: ltyantfGtdeon
AREA TEIIAIIT AREA DESCRIPTIOII I lpcATIOH OF MATERIAL
SAMPLE IIINIIER
pill UNIT Of PIPE li: DP RE!tcWAl REPLACEHEMT T~tAL CO$TS IIUL!C SAl<IPI.E 111:&ealPHoel ~ QUANT 1111:ASUIU: U> AU !'OT Pl
028 Ai a HANCE West Wi111i1-1St floor·Abolla Drop Ceiling
on ueel I ·ba·- 181363·91 187364-91
1117365·91
187366-91
117367-91
181368-91 187369·91
1 i reproo§ Ina Hreprogfln;a
·f I reproof Ina fireproofing fireproof Ina
fireproof I no fireproofing
~ IOMC llll!C IOMC ICMC IOMC IOMC
029 A IR FIIAtlCE Yest Wing-tat floor-Above Drop Calling
l eadine to a-eliltrOOIIIIS 11171136·11 111jp on non-auspect pipe cover I «»IA
til7837-1t ajp en non·:u:pect pipe cover I OMA
187831Mt ajp on non-aus~t pipe cover I Ol'IA
!ceding to heaters 1&7136·36 ajp on non-auspKt pipe cover I oi.A
187137·36 111Jp on non--~t pipe cover I OMA 187138-36 ajp oo non·11us~t pipe ."ver OMA
leadlns to anr hl!ndlers 187143·38 11jp en non-1U11pec:t pipe cover I ONA
187144·3!1 •lP on non--pec:t pipe cover I ONA 181145-38 ajp on ncn-auspect pipe cover ONA
AREA A VEIW.E X AO - Ill
1900 sq.ft. 0
0 0 0
0
0
0
AAEA TOJAl
AAEA AlleRA.Ge 1 ,11$11 • 337'
18 4 in. 0.1). l)n.J 70 1l
25 1l 20 1l
22 4 In. o.o. HIJS/11 45 u 55 13 40 tl
~ 6 In. 0.0. CI.IS/R 0 13 45 13 0 u
The Nterlml is above the drop ceHlns and hi not exposed. Quantities given are utlut~ based on iMpCCtion. AllfA TOTAL
030 AIR FRANCE ~est flngcr·1at Floor AREA AlleRAGE I ASS - 161
IV
IV IV IV iY 1\1
l!V
IV 1\1
COSTI COSTS
so $0
$680 $]73
$832 $462
$312 $183
S1,824 $1,023
so
,Sl,058
I
!s1.z94
5495
S2,847
HALl-KlHSRfll fHVIROl,IMENTAl SERVICES, INC,
Asbe:.to& A&scss:ment Surv,i,y
H-1( Building t: 21
AllEA TENANT .AlEA OESCRlPTION t LOCAT!OII Of MATERIAL
garage area et ceiling
garage area at celling garage area at c:ellillfil
parking ar .... ·111t ceH il'l!il
WIPI.E Ill.NEii
1878'9-tl 187850-13 187851-tl
18785,M4
187552·14 1871153·14
181854·14 187044-74
187045·74
tll7046·74
1 ..
llllll SAKl'LE OESCllll'HClM I ca>f
ajp oo non·auspec:t pipe cover ) lll4A
1111jp cn non·auspec:t pipe cover I OIA
aajp on non·suspec:t pipe cover lll4A
1111jp cn non·11.1Spect pipe cover / 04A
11jp on nan•111J11pect pipe cover I OIA
ajp on non·IIUllpec:t pipe c:ovar lll4A
111jp on non·-pec:t pipe cover OMA ajp on non·auspect pipe cover OMA
ajp on non·auspec:c pipe cover OMA
111jp on non-suspect pipe cov11r ClHA
·ihe IIIUdded joint p,ickings are in fair to good condhloo 1o1lth cinly 1Dinor contact dause ilsible. I
031 AIR flWtte west finger·111t H~r·tei Hns
office & storage rOOIIIII
032 AIR FRANCE west flnser·1st floor
open parking aree &torage/locker rOOAl!l·on steel l·beat111
187080·0 drcp or lay·in panel
167l63·91 fireproofing 187363·91 fl reproofing 187364·91 fireproofing 187365·91 fireproofing
187366·91 fireproofina 187367 ·91 fireproof h:>a
1673611-91 ti reproof ins
Oii«.
OIIC
OHC OIIC
OIIC
OKC
llMC
tlHC
QUA!li
UIIIT Of
HEASUl!E
1111 6 hi. o.o.
18 6 In. o.o. 14 4 in. O.D.
12 10 In. 0.11.
Sui I ding llh.illlbcr; 1150 Page U B1.1Hdln9 Nu,e: illTEitMATIOIIAl ARRIVALS BUILDING j
Jfl( AH.POltT
iluildl Iii Type: TEMllNAL
Constructed: 1957
insp11Ctli>d: 04/N/M Inspector: Bryant/Gideon
PIPE
10
lildS/11
CWS/R CWS/R
DR
11', 9P
ASS ll'OT Pl.
0
0 0
50 25 111 50 25 IU 40 25 Ul 50 25 UI
I)
I)
0
AIIEA TOTAL
REIIOYAL REPLACEHEIIJ
COSTS COSTS
S9l7 SS50 SS29 S2:94
S1,466 $844
TOTAL I
COSTS I
Sl,487 '823
SZ,310
AREA AVERAGE 7' ASII - ox
615 sq.ft. 0
.llltEA. TOTAL so so so
AlEA. A\IEUGE l ASI • Ill
242:5 sq.ft. 0
1920 sq.ft. 0
0
0 I)
Ci I)
HAlL·KIHBRftl fNVIROl,ID'IENTAL SERVICES, IIIC.
Asbestos Assessment Survey
H·K Building S: 21
Building i!k.rlllbor: 050 l'&ge
Building Naome; INTERNATIOMAL ARRIVALS BUILDING JFIC AIRPORT
lllui lding Type: TEl!Hll!Al Constructed: 1957
Inspected: 04129/88 Inspector: llrymnt/Gideon
AIIEA TENANT AREA DESCRIPTIOS I LOCAH061 OF W.JEIIIIAl
SAMPLE Ill.NEiii IIUU( SA!e?LE DESCUPIICMI
IOSN wn of I CIDE lllWIT MEASUIIE
PIPE ll: EXP
ID ASI POT Pl
REMOVAL REPLACEMENT
COSU COSTS
Tt;ITAL cos,s
. . 187369-91" fireproof I ne i CIIC 0
IIREA TOTAi. so $0 $(1
031 AIR FRANCE Yest Wing-2nd Floor-emu ing AREA AVEl!AGE X ASB • ox
le Club th,C<JgnOUt 181053-0 11cOW1tlal tile ICIIIG 7000 sq.h. 0
AaEA T011AL so Sil so
034 All! FRANCE 1,1eu Mine-2nd Floor-Above Drop tell Ing AREA AVERAGE% ASi · 0%
on steel 1-bea,o,a 187894-25 ti reproofing ICll!IC 1950 sq.ft. 0 187895-25 Hreproof!11111 IOIIC 0 187896·25 Urepr-oofllllll IONC 0 187897-25 fireproof1119 IONC 0
N!fA TOTAL so so so
035 AIR filANCE West Wing-2nd floor-Above Drop Ceil Ing AREA AVERAGE ll: A£i - 347'
leodlng to restrOOIIIII 1117836· 11 111jp en noo·mwpect pipe cover ~ 16 4 in. O.D. ow 10 13 IV S605 $3]6 ! $941 ,,,.,,..,, ... ~ ~-....... , .... """ ~ 25 D IV 157838·11 mjp on non-suspect pipe cover 20 13 IV
leading to air handlers 117884·23 sjp en non•lll.lllj)GClt plp1 cover 15 6 in. O.D. Cl.IS/fl 40 13 111 5416 S245 ! $661 187585·23 111Jp on noo-sl.llipllCt pipe cover lO 13 JV 187886·23 111Jp on non·W11pect pipe cover , 40 1l IV
HALL·KIMBRELL ENVIROliHEN1AL SERVICES, INC.
Asbestos A5ses.....,nt Survey
ti·K Building#: 21
AREA TENANT AREA DESCR1PT&OII SAl'IIPLE O&A UliH Of
S LOCAIIOII Of MATERIAL liUll!Et Ill.ILK ~LE DESClltPTIOlil COO£ mwn l4EASllaE
leading to heaters 187887·24 ajp on non·-pect pipe covarl OIA UI 4 in. 0.11.
U178118·24 ajp on non·-pect pipe cover CHA
1111889·24 ajp on non-suspect pipe cover a4A
Tile 11111ter-ial above drop cell 1119 Is in good to fair condition allowing mlnly •IIC daelile·I auanthtes given are
esti111ates taken frOilll inspection.
Bui I ding 14uaben 050 Page 1~
Elulldln9 N-: IIITERIIATIOIIAI. ARRIVALS BUllDIN~ Jf!( AIRPORT
llulldla,e Type: TElll4111AI.
Constructed: 1951 1111lpKted: 04/29/88
Inspector: 11.ryant/GldeQl'I
PEPE lt EXP REtlOVAl REPLACEHENT iD ASS POT Pl
11\dS/R 40 13 IV
40 U ill 0 13 ill
Al!EA TOTAL
COSTS COSTS
$680 Sl78
$1,101 $959
~OTAL COSTS
I I
s1.osa
SZ.660
036 AIR FRAIICE West Ying-3rd floor·Celllns AREA A\.IEIIAGE l& ASB • 0%
offices throughout 187008·0 drop or lay-in panel CMG 3250 sq.ft. II
AREA TOTAL so so so
037 AIR fllAIICE Mesi Ying-3rd fl~·floorins AREA AIIERAGE l A.Sii • 6%
offices throughout 187005·0 vinyl floor tile Ola 3450 sq.ft. 6 5 IV S15,66l 511,1168 SZ7,5l1
l'lle floor- t Hes are in eood ccnditlan allowing 111lnor wear frm deity useee. AAEA tOJAl stS,663 $11,1168 . / S27,531
038 ,AIR fllANCE West wine-3rd Floor-ftoorlns AAEA AIIHA!ii: 1' ASlil • 2%
offices throughout 181333-0 vinyl floor tUe 042 3250 sq. ft. 2 5 IV $14,755 S11, 180 $25.935
Tile floor tHei. are in good conc:lltlcn, with localized areas of contact ~S- where c:~rner11 are broten. AREA TOTAL S14.755 s11.1ao SZS,935
ffALL·U:IHBRfLL EHVIROIIHENJAl SERVICES, INC.
Asbestos Assessment Sur~ey
ff-U: Building I: 21
AREA TEMANT_ AIIEA DESCIIIPTIOII I lOCATICIII Of MATERIAL
SAMPLE
t!UNIH IIU!.U: $ANPLE l>£$ClUPUON
039 AIR FltANCE lolest l&ing·3rdl flcor·Abow Orop Celling
on steel 1-bel>IIIII 187047·75 flreproof51ll1! 1&7048-15 flreproof5111 ~67049-7'.> iireproof!1111 187050·15 fireprootl1111 1117051•15 fireproof.11111
0&N UIIU Of
CODE QIWll 111:ASU!lE
Building Number: 0511 Pa;,. 16 I
Building NIIS!t: INifllNATIOMAL ARRIVALS BUILDING JFIC A UlPOll'f
Building Type: TEmllNAL
CONtructed: 1957
Pil'f
10
I rn;pec ted: 04/29/88 h1:$pectcwr: lllryant/Gidacn
X EXP IIEHCIIIAL IEPLACEIIENT AS& POI l'l COSTS C05'1$
TOTAL I cosu I
AREA AllfllAGE 1' As.I · 0%
llMC
llMC
OtlC
OtlC
CMC
2100 sq.ft. 0
0 (I
0
0
ilEA TOTAL so so so
TEIUINT • Ali FRANCIE HITM. $111,2.!9 S49,-082 f160,311
HALl-lClHBREll ENVIRONMENTAL SERVICES, INC.
Asbestos Assessnoent Survey
H-IC Buitding t: 21
llui lding !dumber:
BuHdif'II! NIIIIR:
050 Page 171 INTElltllAifOIIAL ARRIVALS BUILDING I
JflC AIRPORT I Building Type: 11:RIUIIAL !
Constructed: 1957
Inspected: 04(l:9/88 Inspector: Bryant/Gideon
Alll:A TENANl AREA OUICRIPHOII
t lOCATIOII Of ~TERIAl SMPLE IIIN!Elt IWU'. IWtPlE l!IESCIIIPTlON
Ollt IUIIIT Of
CllOE QUANT MEASURE PIPE
Iii! REHOVAl AEPLACENEMl
~~~ 2l; fl(!>
AS1i POT Pl COST& COSTS
040 Allt IWORA west Wlng-1at ftoor-flcorine AREA AVEIIAGE X AU - ~
offices throughout 187323-0 vinyl floor tile I lll42 900 sq.ft_ II
Ml.EA tOTAl so so so
041 AIR INDlA Yest finger-tat flocr·ICeilins Al!EA A\IERAGE % ASS· ox
engineerill!, offices throughout 187072·0 acoustical tile Olli 1356 sq.ft. 0
llllEA tOUl.. so $0 $0
042 AIR IHOIA Yest Ying-1st Floer-Ceiling AREA AI/ERAGE ,: ASII • 02:
offices I passenger lobby 187072·0 acoustical tile CMG 3650 sq.ft. 0
AREA TOTAL so $0 so
043 AIR llll>IA Yest Ying-tat Floor-Bagsaiae Kandling AaEA AVERAGE I LUil • 211'
at ceit Ing 187136·36 111jp «i ncn·suspect pipe cover QM 26 4 in. o.o. KWS/11 45 ZS UB $983 SS46 I 51,s29 187117·36 sjp «l non-suspect pipe cover OMA 55 25 !II 187135·36 ajp on non-suspect pipe cover QM 40 25 au
at ceH ln; 1117143·38 mjp on non-suspect pipe cover OMA 19 4 in. 0.0. CIIS/11 0 25 in st.474 5819 I SZ,293 at cell Ing 111.7143·38 111jp on non·iruspect pipe cover/ O!IA 211 a in. 0.11. CIJS/11 0 25 UI s1.1113 St,066 , $2,879
187144-38 ajp on non-muapect pipe cover OMA 45 25 IU 187145,38 •ip on non-suspect pipe cover OMA 0 25 nu
HALL·KIMB!fll fNIIIRONMENTAL SERVICES, INC.
AsbcStO$ Assess.n,ent Survey
H·K Butldil'l9 II; 21
AREA TENANT AIIEA DESCRIPTION
f LOCATIOII Of MATERIAL
ot c::eiline
SAMPLE .b&it
IUW:R Bou:: SAMPLE DeSCIIPTIOOI ~E
L.. 187044·74 111jp on non-$Ullp8Ct pipe cover ~ 1117045·74 111jp on non·sllllf)eCt pipe cover OIA
187046·74 111Jp on non·suspect pipe cover ~
Tile mudded joint pad:ings are in good CMalUlcn 1o1ith only miner contact dallaee visible.
044 AIR INIIDA west Wlne·1mt Floor·1m;;a9e Nandllns
oo z;tect I ·l:xu1111s 187363·91 ti reprooff ns ~ 187364·91 flreprootln; ¢tic 187365·91 flreproofln;;i k
I 187!66·91 Hreproofl~ qHC 1!37367·91 flnprooflne qHC
t 181368·91 flreprooffne 167369·91 fireproofiuig
°'5 AIR lldill!A West Wi09·bt floor·.Abow Drop Ceil ins
on i.teel I ·bitil!llill 1117363·91 fireproofing ~ 187364·91 fireproofing
187365·91 fireproofing
1111366·91 fl reproofing t ~
1117367·91 f I reproofi ne
1111368·91 f I reproof I 119 1111369·91 fireproofing
t ~
IJN!i OF
!IUAlit HEAUIE . U, 10 In. O.D.
Bui ldine liU!llbtir:: 050 Pap 18
Building II-; UiTEIIIIAHOtlAl AIIRIIIALS BUILDING
.lfC Al lltPOltT
Bui lclini.i iype: JEIHflllll
COl\$tNCted: 1957
Inspected: or.m188 Inspector: lilryant/Gldeon
PIPE l EXP REMOVAL REPU.CEIEIIT ro1TAL
ID ASi IPOT PL COSTS COSTS ccrrs I
!)Ii 0
0
0 !
--' MEA TO'i'Al $4,210 12,4]1 $6,701
I
AIIEA AVERAGE % ASS • ox
1175 sq.ft. 0 0
0
0
0 0
0
---AIIEA TOiAL $0 $0 $0
AiEA AVEIIAGE % Ail • 0%
2200 sq.ft. 0
0 0 0 0
0 0
KALL·ICIHBREll EHViROIIMEIITAl SERVICES, IIIC.
Asbestos Asscssaient Survey
K·IC Building#: 21
AREA TENANT AlilEA DESCRIPTIOOO I LOCATla.l Of MATERIAL
-~-------~---------
$Al!PlE
lllNf:lt IULIC SANPLE DESCIIPTloel
IOU! UIII t OF I COOE QUAIIT MIEASUiE
Buildi!lfil llumber: 050 Page 191
Suildin,1 N!llle; &IITERNAllOl!AL ARRIVAL$ BUILDING
JFIC AIRl'Oltl Bui !din; Type: lERIIIIIAL
Constructed: 1957 Inspected: 04/29/88 Inspector: !lrys,nt/liideon
PIPE X EXP lEtlOVAL REPLAcettEMT ID ASS POT PL costs COSTS
AW TOTAL so so
TOTAL I
j's
so
D'6 AIR IIIDU West Wlng·1st floor-Above Drop telli119 AREA AVERAGE X AU • 28X i
! leading to restrOOGIS 187846·12 11jp on non-Ol!SflOCt pipe cover I OIIA
181847·12 1111jp on non·-,iect pipe Covel" I OIIA 187848·12 111]p on non-eumpect pipe cover OMA
!ceding to heaters 18784'iH3 1111Jp on non·wspect pipit conr Ol'lA
187850·13 111jp on non-&UlllpltCt pipe cover ONA
18185M3 ajp on non·auspect pipe cover Ol'lA
leading to eir handler• 181852·14 1111jp on non·-pect pipe cover OMA
181853·14 iajp on non·-pcct pipe cover Ol'lA
18785'"14 ajp on non-e!J8pect pipe cover OHA
20 4 in. O.D. DY
20 4 in. o.o. KIIS/1!
6 6 In. O.il. O.,S/1!
30 40 40
0 0
0 so 40 50
t3 IV t3 IV tl IV
1l IV
t3 IV tl IV
ihe IIUdded joint pacldnea 111r111 in good c:9fldition. lluantitln given ere an eetl111111te teltcrj fram inspcctioo and Al!EA·TOUL
available "as bull ts•. ·
041 Allil UiOIA West lling·2nd fLoor·Cefllnga AllEA AIGERAGE % Mill • OX
l Ot.nSH & rOOIIIS th rough out 187072·0 acoustical tile ONG 3168 sq.ft. ·o
AAEA TOT.Al
048 AIR 1111)1.1. Yest llifl9·2nd Flcor·.Above Orop Ceil 11\111 ARE.A AIIERAGE X #1$11 • Ill
oo steel I-be- 181344·87 f i reJ)l"oof ins ONC 1200 sq.ft. 0
S756 $420 i$1, 176
$312 S18l S495
$1,068 $603 $1,671
$0 so so
lfALL·tlMBREll ENVIRONMENTAL SERVICES, INC.
Asbestos Assess111ent Survey
H·IC Building I: 21
AREA TENANT AREA DESCRIPTIOlil I LOCATIOII Of ll!AJERIAL
SNIPI.E IIUNIIER IUI.IC SANPI.E DESQRPTICII
187345-87 fireproofing 187346-81 fl reproofing 187347-87 fireproofing 167348-87 fl reproof if!G
lciiN wn OF
lcaoe QUAldJ IIIEASUIIE
I
]OKC IOIIC IONC IOHC
1,
Bui !ding li..-er: 050 Page 20
ISuHdlng ll11111e: llllHIIATIOliAL ARRIVALS 8UILOltlG
,IFI( .A UlPORT
auildif11i1 T)lplt: TElll'IINAL C<lNtructed: 1957
1n11pected: 01.m1• ll'lllpector: lllryant/Gldcton
PRPE I Eia> REMOVAL IIEPUCEME•T RO ASS POT PL
0
0 0
0
AilfA TOTAL
COSTS COSTS
so $()
TOTAL !
COSTS
so
ttALL·OCIHBRELL EMVIROl!HENTAl SERVICES, INC.
Ast>estos Assess111Cnt Survey
H·OC Building a: 21
AJIEA tENAIIT .AIIEA OESCRltHO&I
i LOCATIOII OF MATERIAL
SAMPLE
IUlnEII IUU( SAMPLE DESCIUPll Oii
o< IJalll Of
CODE IIUAla1 IEASIJIE
ilui Idling MlRbcr: 050 P•ae 21
lluHding Nl!llllle: UITEIIIIATIOIIAL ARRIVAL$ IIUILOING I
.me A! RPOIT
llui I ding Type: TERMIIIAL Coostr-ucted: 1957
PIPE
«o
Inspected: 04/29/88 Inspector: llrymnt/Gtdeon
% EXP lEHOVAL REPLACEMENT
ASII POT PL costs COST$
TOTAL I
COSTS !
HALL-llHBRELL ENVIROIIHENTAL SEIIVICES, INC.
Asbastos A&sesst11ent Survey
IM( IJui ldiOIII Ill: 21
AREA 1fNANT AREA DESCRIPTIOI! # LOCAIIO!i OF MATERIAL
SANIPLE
lill!IIEIII IIIJI.IC SAIIPl..f OHCIUll'lTIOII ~ lfCIDE 9UAIIT
UIIH Of
tlEASUIIE
llui lding 111.-»r: 050 Page 2Z
aulldlne N118C: INTEtYAilONAL ARtlVALS IUILDING Jfl( AiRPOIIT
B1.1Hcling Type: TEIIIUYAI.
tcnstru:ted: 1'ilS7
PllPE
EO
lnmpKtcd: 04/29/Ba lnspKtor: fllryant/llideon
:!I fl(!> REIIOIIA1. REPLACEMENT AH l'Oi Pl COSTS COSTS
TOTAL I
COSTS
I
HALl·Kl"BRELL EMVIRON141:111AL SERVICES, !MC.
Aibe&to, Assessment Survey
K·l Building S: 21
AREA TENANT AlilEA DeSCUPHON di 1.0CATIOII Of MATEatAI.
iAlftf IIUl4BElt lllll.l SAMPLE llfliCltlPllOOI t UIIH OF
QUAIIT IGEASUIIE
lllullc!il'll! !lumber: 050 P~ 23 Building ijllllle: IIITEIIIIATIOIIAL ARRIVALS BUILDING
.!fl JIIIIPCIIT
Building type: IEIMIIW.
COlllltructed: 1957
lnspKted: 04/29/88 lospKtor: llry1111t/Gideon
PIPE . I Ell? IIEMOVAl lEPUCENEIIT Ill Asa !"OT IPL cons COSTS
TOTAL I
C05iTS
HALL·KIHBRfiL fHVJRONMl:.NTAI. SERVICES, INC.
Asbestos AssesS111Cnt Survey
K·K Building t: 21
AJIEA TENANT AllfA DESCIIIPTIOIIII tlJ UICA Tl al OF WI. TIEIUAI.
SAMPLE WMIH IIIULK ~Lf OESCRIPTIOIII
o&H COOE
Ulili OF QIWIT t!EASUiE
I
Bu~:~:~~~: ~~ERNATJOIIAL ARRIVALSP~;LOJN~4
JFK AIRPORT
filui 14illi T~: TEIIKINAL Constructed: 1957
IIISpected: 04/29/88 Inspector: llry11111t/Gideon
PIPE Ill
:; IE>!P
AA POT Pl
REHOYAL REPLACEMENT COSTS COST$
~OTAL COSTS I
HALL·OC!HBftELL Ell\llROHMENTAl SERVICES, INC.
Asbestos Assesss,ent Survey
H·l Building I: 21
Building IIIBll>er: 050 P119e · 25
Bulldifl!ii N.....,: iNTERNATIOIIAL ARRIVALS IIUllDlNG .IFS: AIIIPOIIT
Buildine lyp,a: lERJoilNAl Constructed: 1957
inspected: 04/29/M inspector; lryant/Gideon
AREA TENANT AREA DESCIIIIPTION liANPLE
ll!Nfl
]o&M Ullli Of PIPE I El!II' RfkOVAL REPLACEMEIIT TQTAL
COSTS i
# LOCATl<W Of bl!ATEllAL lilUUC SAIIIPl.E DESCl!PilON I CQDf CIUAIIT 14EASUIIIE Ill ASII POT PL
056 ALHAUA bleat Ying-1st Floor·Ceili119
offices l hallways
passen,ser lobby·froot perlmieter
057 AlllAI.IA i.est ~ins-1st floor
-chine rOOS1-t1t cell Ing
baggage handling 'roca
1111&c:hine rOOIII at ceil il'llll
181082•0
18708l-O
drop or lay-in panel
drop or lay· In panel I CltlG
IOMG
I
187136·36 ajp on non·-pect pipe cowr I CHA
18713&,36 11jp on non--pect pipe cover CHA
187117·34 11jp on non·-pect pipit cover OMA
18713iM6 111jp on non·SU111pect pipe cover I Cll4A 187143·38 111jp on non·11U11pec:t pipe co..,.., OMA
187144-38 ajp on non-sU11pe<=t pipe cover Ol4A
187145·38 ajp en non-suspect pipe cover , OMA
The pipe Insulation Is ln good ccndltfion, but slisht contact ~· hi visible.
058 ALHALIA west Willll,l·1at floor·lass•lilC Handling
on l-be11111111 187363-91 fireproof Ing
187364-91 fireproof 1119 187365-91 fireproofing 187366·91 fireproofing 157367-91 fireproofing 157368·91 fireproofing 187369·91 fireproofing
..
I
I Oi4C OKC
' ()MC
I CJ94C
, OMC
'OKC
: lll1C
AREA A llfllAGE X ASlll • OX
1950 aq. ft.
800 sq. ft. 0
0
Al!EA TOTAL
AREA AVERAGE % ASS - 31%
52 4 in. O.D. KIIS/2 45 2l 60 4 in. 0.1>. IIIJS/lt 45 2l
55 2l 40 23
Ill IU Ul HI
54 6 in. 0.1>. OIS/R o a ·an 45 23
0 23
.AREA _l'OT Al
AREA AVUAGE % AS& - 0:11:
1625 sq.ft. 0
0 0 0 0 0 0
ill Ill
COSTS CO$lli
so
$1,966
S2,268
$2,810
$7,044
so
$1,092
$1,260
$1,651
$4,003
I
I
so
1
$3,058
$3,528
I
I
$4,461
t;U,047
NAll·K!HBRfll ENVIRO!ll'IENTAL SERVICES, INC.
Asbestos Assesi.iaent Survey
K·K Building I: 21
AREA TfNA!jT AREA OESCRIPJIOlil S LOCATION Of MATERIAL
SAIIPLE liUIISER BULK SNIPLE DfSCltBJITlotl
059 ALHAUA ~est finger-1st ft·Jfre Storave·Office
mt celling on structural steel I-be- 187363·91 fireproofi111 187364-91 H reproofln,;
18736$·91 f I reproofhie
187366·91 fireproofing
187367-91 f lreproofl111
1!7361·91 fireproo0119 1117369-91 fireproofing
060 AlHALIA wen iillng·bt Hoor-Abcwe Orgp Ceiling
oo i.teel I ·I:>¢- 18736l-91 ti reproofinm
1117364-91 f i reprooffns
187365·91 f I reprooffine
18736&·91 fireproof Ing
187367·91 f I reproof 1119
157361H>1 firepi-ooflng
187369·91 fireproofing
..
Sui lding Nt.llllber: 050 Page 26 Building llem,e: INTIEJ!.IIATlONAl ARRIVALS 8UlLOINJ
JFK AlllPORT I
Bui ldil'II! 1~: TEffllllAl I tonscructed: 1957 'I
Impacted: 04/29/8&
Impactor: Bryant/Gldean I
I
'o&IC UNIV Of
I CQ)f QW\IIJ MEASUiE t: P 11'£ l IEJCf' RE111111AJ.. REPI.ACEJEIIJ II) ASS POT ?I.. COSili COSTS
AREA JOTJll so $0 ' iO
AREA AVERAGE X ASII · 0% I
I OIIIC 1573 sq.ft. 0
IOHC 0
IH 0
IONC 0
1: Ill
0
IONC 0 I
I AAfA TOTAL $!) so so
AIIEA AVfltAGE l AU· 0%
~ 2400 sq.ft. 0
~ 0
'pMC 0
PNC 0
PNC ll
PKC 0
r 0
Ali!EA TOJAL $0 $0 $0
'I
I
I
KALL·ICIMSIIEll ENVIRONMENTAL SERVICES. INC.
Asbestos Assessa,,ent Survey
H-, Building S: 21
AREA TENANT AREA CESClllPilOII B LOCATIOlll OF lt\lERlAl
SAMPLE
IUIIIEII BUi.lC SAMPLE 11£SCRBPTI061 ~ 061 ALITALIA YKt lling·1i;t nocr·Abcw Drop Ceiling
throughout
throughout
througllout
throogllout
U171!46·12 mjp on non-suspect pipe cover IOIIA 187847·12 1111jp cn nan·auspec:t pipe ccver OIIA 187841H2 1111}p on ncn·auspec:t pipe cover IOIIA 1871149·13 111jp on non·sl.llSpeCt pipe cover ONA
187850·13 111Jp on ncn-siaspect pipe cover OMA
1818S1•1l ajp on non-suspect pipe cover I OMA.
11lffi2·14 1111jp en ncn--pect pipe cover OMA.
11785iH4 1111jp on non-lU8pect pipe cover alA
18ffil·14 1111jp on non--pect pipe cover I OIIA 187854-14 s]p on non·-pec:t pipe c01111r I ONA
Building li~r: OSO Page 27 Building Naiae: INTERIIAllOIIAL ARRIVALS BUILDING
,lflt Al RPORl
Building Type: TERMIIIAL Constructed: 1957
Inspected: 04/291&4 Inspector: fllryant/Gldeon
u1m of. Pil'f l l:lU>
QUANT IEAillilE ID ASS POT PL
REIO/Al IEPUCEMEIIT COSTS CO$TS
TOTAL COSTS
AREA AVE~ l Alil • 2U
24 4 in. o.b. DW
16 4 in. O.ll. IIWS/R
10 6 in. O.D. Cl,IS/11
4 4 in. 0.0. Ci,1$/11
30 13 111 40 13 111 40 U Ill
0
0
0 so l3 1\1
50 13 111 40 13 IV
50 tl IV
S907
$520
$151
S504
$106 S84
!
I
fl,411
I ~ jT
$826
S235
The lllUdded joint packinas on non·alllllpect pipe covering ii above the drop and perunent c~lllng. The quo,ntl1tiee AAEA TOTA!. s1.s1a S894 IS2.4n
given mre euiutes based on iNpec:tlcn llll!d 111vsHabl111 •as built&".
..; :! . "' t'j ;: .. UJ
"' ! ... ... ::; .. :,,. .. ... ~ "' .. "' ;;. ... "' .. ... x: :, u 1 ! "' "' ... ... "' ... Q
~ ;: c N
z ~ ,..; ::l ! "' "' ~ .. ... :< !' ... .... g w .. :§ .. .. < ~ "' x: <II ·; .. 9 0 w .. Ill ... .. ... .8 .. .. ...
"' ...
< .. "' • :,:: < <
HALL-KIMBRELL ENVIR()l,KENlAL SERVICES, INC.
Asbestos Assessment Survey
K·K Building j: 21
AREA TENANT AREA IIESCRIPTIOII I lOCAil~ Of IIATERIAl
SAMPLE
IIUIW:l SIAIC SAMPLE llfSCIUPTIOlf °'" !Mil Of
ICODE QIWIT NEASIJIIE
Bui ,ding liUIOer: 050 Paae ~
luilding N~: !NlERNATIOlilJ. ARRIVALS BUILDING .IFK AIRflORT
lui lding Type: tflltUNAl Constructed: 1957
inspected: 04iZ9IM lnspectOI": lryant/Clidecn
PIPE
ID
% EXP REMOVAL 111:PLACEIEMT ASS l'OT PL COSTS COSTS
TOlAL I
COSTS I
HAlL·llNBRflL ENVIROillll:NiAl SEllVECfS, INC.
Asbestos Assessment Survey
K·l Building#: 21
AREA TENANT AREA OESCftlPTIOI! I lOCAJfOII Of .14ATElllAl
SAIIPLE
IIINEll rwu: SANPlf 01:SCRIPTICld
069 AJ ! T East Wing-1st floor-lot:ii;,y Area-Ceiling
pllooe center 187371-0 mcOUf.ti~at t§le
~
t I , I
Sui I dill!,I llumber: 050 PA9e 30
BuHdlng !!Me: lllTEllfllATIOIW. ARRIVALS llt.lllOING
.JFK AiRl'OllT !Nilelling lypct, Tfli!HUIAL
Constructed: 1957 Inspected: 04/29/M Inspector: ilry&nttGldeon
UNIT OF PBPE X UP llEMOVAL REPLACfNfMT EllWIT IEJ\SURE BO ASI POT PL COSTS COSTS
AAEA AVEIW.E 111: Aili • Ill
400 sq.ft. ill
AllEA TOTAL $0 $0
TENANT - Ai & T TOTAi. $0 $0
TOTAL cosr,r.
$0
so
KALl-llli'IIIRELL ENVIROldHENVAL SERVICES, BMC-
A.bestos Assessment Survey
H-l Suildil'IQ I: 21
ARfA TEIIIANT AREA IIESCRIPTI~ I lOCAllOII Of IIIAIEIIAL
office area
SMPLE
IILNEllt euuc SMPlE IIESCIUPTtOII
o&H Ullli Of
QUANT IIEASUIIE
lluildil'lQ IIIUl!llber: 050 Page 31 Building N11111e; !NTERNAtllle!Al ARRIVALS 8UJLOING
JFIC AIRPORT Building Tlf?<!:: lERMll!JIL
Constructed: 1957
l mipected: 04/29/88 lnapector: lryant/Gldeon
PIPE 2: EXP REMOVAL ftEPLACEt!ENT ID ASS POT fl COSTS COSTS
TOT~ COSTS
Tha sprayed acoustical plaster im hi poor con,Ution whh contut and ..ater dellltse areas visible. JJ!fA TOTAL I I
TENANT - lilARIIIEW Dl$1ST. TOTAL
u :!! .,; l!f > .. llt ! .... ... <( ..: ~ ...
= .... 0.
"" > :; w ~ .. ...
:, u ~ 5 VI "" "' j ;;; ~ ... :;: ""
e
"' .... a ... .. ~ ~ -.... ... .. l!' ... .., .. s w .. :§ ... "" <C ~ ii! ....
§ ':i .. i? ... .. .. .... ... .x 'f <( .... ! ~ .. :a: ...
..:
HALL·KIMSRfll ENVIROI.IHENTAL SERVICES, INC.
Asbestos A&&e&saient Survey
ll·IC Bai !ding ill: 21
AREA TENANl AREA DESCftlPTlOW t loc;A110N Of il'IATERIAl
offices
ihe sprayed plaster is applied eo the ceill floor.
SAMPLE
IIINEt IULIC SAMPLE DESCllll'TlClli DIM
ICODf U!UT 01'
CIIWIT MEASURE
Bui !ding NU!lll;,cr: 050 P~ 33 SuHding II-: UIJflltliAllOtlM. ARRIVALS BUILDING
.IFK ADll'OllT
Building T)'Plt: TEIIMIIIAL
Cena true: ted: 1951 Inspected: 04/29/86 inspector: llryent/Gldeon
PIPE % EXP REMOVAL REPLACEMENT ID As& POT PL COSTS COSTS
TQTAL CQST$
HALl·KJHBREll EIIVIRONHElliAL SERVICES, INC.
Asbestos Assessinent Survey
H·K Building I: 21
AREA TEIIAIIT AREA DfSCRIPilOlil Iii LOCATION OF IIATEIUAL
$AMPLE
IIINER IIUlllC SAMPLE DESCIUPJI061
013 I) EA Eau lding·t,u floor·Ceillne
offices . 181371·0 acouatlcmi gjle
I fllal l.lllll Of
!:me QUAlilf tlEASUi!E I
lui ldlng Piuaber: 050 Pa;e 3~.
Suildin; Nam!!,; IMJERIIATIONAL AJIRIVALS BUILDING .me AIRPOS!l
Building Type: TERHINl\l Constructed: 1957
Inspected: 04/29/Ba llnspector: llryl&llt/Gldeon
Pil'f I IEllP RENOll.lll REPlACENEMJ ~I) AS!il POT Pl COSTS C<ISJS
TqJAL
co!s1s
I AAEA AVERAGE l ASI • OX
I
!»tea
I
1500 sq.ft. 0
AAIEA l!OTAL
TEIIAIIT · ll E TOH\.l
----- ----- -----$0 so $0
$0 so so
HAll-KIHBREll ENVIROIIME)ITAL SERVICES, INC.
Asbestos Assess1111ent Survey
M-K Building#: 21
AREA TENAIIV AREA OfSCIIIPTIDN # lOCATIOII OF l'IAiERIAl
SAMPLE
MUMBEll BUI..&( liAIIPI.E DfSCltlPTIOl r U!jlT OF WAIIT IIEASUIIE
llui lding Nun:ier: 050 Page 35
Building Nilllllle: IMTfiblATIOIIAl ARRIVALS BUILDING Jf!. AIRPOIIIT
Building Type: TIEftHlliA!. Constructed: 1957
Inspected: 04/29/88 lnsp,Ktor: lllryant/Gldecn
PIPf 11: EXP REMOVAL REPLACl:IIEIIT ID AU POT Pl COST$ COSTS
TOT~ cos)s
;.::=================:::::=--~~~~~~~
IIAI.L-~!N8REll EIIVIROHHEIITAL SERVICES, IIIC.
Asbestos Asses5ment Survey
H·IC Building#: 21
AREA TEIIAIIT AIIEA DESCIIIPilOla • lOCATIOli Of MATElllAL
SANPlf IUIBEII IWI.IC $AIIPLII: DESCRIPHOII 1
I
QI.WIT
UIIIT OF
IIEASVIIE
Building IIUl!bcr: 050 Page 36 ' Building 11111111111!: IIITERIIATIOIIAL ARRIVALS IIUllDIIIG
JFK AIRPORT
Bui ldins lype: TEIINlliAL J:onsttllCted: 1957
PIPE
ID
I nspcicted: 04/29/BIJ
Inspector: llryant/Gidoon
11. EM? 11£HOVAL IIEPUCEJIEIIT AH POT fl COSTS COSTS
TOT~l COSTS
ffALL·KIHBREll ENVIROl>ll!ENlAL SERVICES, INC.
Asbestos Assessment Surv"y
H·t Bulldnng I: 21
AAEA TENANT AREA OESCIUPTIOIII
S LOCATIOtl OF IIIATERlAL
on DUT'I' HIEE East finger·1at Floor
on I-beams
078 DUTY fREE East Fingar-1st Floor
StOU!jlll !UH
SAMPLE
IUIIElt
181363-91
187364-91
157365-91
187366-91
181367-91
181364-91
181369-91
O&N
IUI..IC SMPLE DESCRIPTION ICOOE -,--fireproof Ing
firllj)l"ooflna fireprooffna fireproofing fireproof Ina fireproofing Ureprootlna
! alt QIC
OIIC
OHC
I Cl8tC 'ONC
OHC
187849·1:i 111Jp on non·-pect pipe cowr I CIIA 187850·13 1111jp on non·-pect pipe "over I CICA
187851-13 alp en non-auapoct.Plpe cover !CJHA
Bui lc:11119 liuaber: 050 Page :st r Building II...,.: INTERNATlot!AL ARRIVAL$ BUILDING
JH AIRPORT Bui I ding iype: iERIIINAL
Constructed: 1951 Inspected: 04/29/M lnspec:tOI"": Bryant/Gideon
UHBT OF Pi!'f I EXP REMOVAL REPLACENENJ QUAIIJ PlfASUIIE 10 ASII POT Pl
AIIEA AVERAGE % AH • OX
4320 sq.ft. 0
0 0 0
0
0
0
Al!EA TOTAL
AREA AVERAGE I ASI • U
110 4 in. o.o. !Mi/R 0 0 0
AREA iOJAl
COST$ COST$
$0 so
$0 so
TQTAL COSTS
so
so
HALL·KiMBRElL ENVIRONMENTAL SERVlCES, INC.
Asbestos A&scss,nent Survey
ii·K Building 1#: 21
AREA TENANI AREA DESC611Pllll$! S LOCATIOII Of IIA1ER1Al
SAMPLE IIIINIEfl 8UU( SAMPLE OHCIUPTIOII
oue Llllli Of
WA!it l'IEASUIIE
liui lding NUlllbcir: 050 Page 38
Building llllllllll: INTERNATIONAL ARRIVALS BUILDING JFK AIIIPOltT
llui I ding Iype: TERMINAL
Constn.icud: 1957 insp@Cted: 04/29/M il'lllpeetor: Bryant/Gideon
PIPE ,; UP REMOVAL f!EPLACENEMT ID ASi l"Ot Pl COSTS COSTS
TOlAL COSTS
KALl-llKBRELL ENVIRONMENiAl SERVICES, INC.
Asbestos Assessment Survey
M·l Building I: 21
AIEA TENANT AREA DESCIIIPTIOII # LOCA110il Of MATERIAL
SNIPU
IUIIB UIC s»IPI..E DESCIIIPTIOIII ~ lllll Of CODE QUANT l'JEASURE
llu i Id i 119 Nl..llrber: 050 Page 39
Building Malllll!: IMTERIIATIONAL ARRIVALS BUILDING .me AJRPOIIT
iiul ldlng Type: lEIIKIIIAl
Constn.icted: 1957 I nspectGld: 04/29/511!
Inspector: lllryant/Gideon
PIK J El!P REJIOII.AL IIEPLACEIIEIIT ID ASI POT Pl COSTS COilS
10lll ~ts
KAt.L·OCIMBltEll ENVJROHKElllAl SERVICES, IIIC.
A5bestoa Asae,sment Sur:vey
H·t llullding #: 21
AREA TEIIAIIT AREA i>£SCRIPTIOII I LOCAilC* OF KATEIIAl
$.W'I.£
IIUNiEI
081 D'tll All West finger-let floor-Celling
SUU: SAIIPQ.f IIESCIIPTIDIII
O&,t I COOi:
I
I WC1rlcshopa ll. I oder rOOIIIII 187077·0 drop or llllrin panel QIG
082 OTN Alli!
et ceiling heater~ et celling hemtQrm
083 DYii Allt
west finger-1st Floor
lolest finger·lllt floor
on steel 1·be11111111 et cefllne
187849·13 1871149·13 187550·13 187851·1]
187363·91
Ul7364·91
187365·91 187366-91
187367-91
181'361S·91
187369·91
111Jp on non-suspect pipe cover fNA ajp on non-liluspect pipe cover ~ 111Jp on non-suspect pipe cover 1111jp <ln non·muspcct pipe cover ~
fireproofing
fireproofine
fireproofins f lr-eproofl ng f I reproof Ing fl reproofi1111 fl reproof Ing
IOMC 1: OMC Q4C
mtc OMC
lluHding IIUl!lber: 050 P•ge 40
Building IIOll!e: INTERIIATIOl!Al ARRIVALS IOllDING Jft IJIPOIIJ
lui tdlng Typo: lfltMIIIAL CCNtructed: 1957
Inspected: 04/29/M
l11SpKtor: llryant/Gldeoo
IJIIIIT OF l'IPE I EXP REIIOIIAl lEPUCEMEIIT QUAIIT IEASIJIIE H) AA l'Oi PL
AREA AVfllAG.E I AU - Ol
212 sq. ft. 0
AilEA TOTAL
AREA AVERAGE % ASI • Ol
16 4 in. O.ll.
14 6 In. o.o. 11\dS/R
INS/Iii
0
0
0
0
.Mei. JO'l'Al
l,IIEA Al/ERA~ " IIISi • 0%
1225 sq. ft. 0 0
II 0
0
0
0
AREA 'i'OlAl
COSTS COSTS
$0 so
$0 so
so so
TOTAL lmiS
so
$0
$0
ttALL·l{IHBRflL ENVIROIIKEIIYAL SERVICES, INC.
Asbestos Assessment Survey
K·l Building t: 21
AUA tEIIAl!T AREA l>fSCJlll'HOIII • LOCAilOI! Of 111!.iERIAL
$AMPLE
Ill.MER
..
Pf,14 BUUC SAMPLE DESClll''IIOII IXlOE IIUAIIT
uelli Of
MEASUIIE
!!luildlne 11\Sllbeir: 050 P1194t 41 Building lllllllll: JMTEIUIATIOIIAL ARRIVALS IUILD!NG
Jfl{ Al RPOC!T
Bui I ding 1\'p!i: tEIIIHIIAL «:onuructecl: 1957
Inspected:: GI.Jl.9/88
Inspector: lllryant/Gldeon
l'Al'f l DP IEtlO'IAl IEPUCEIIEIIT llD AS!I !'OT PL CO$iSI COSTS
TOTAL Ctl$TS
1EIIAIIT • PYII AIR TOTAL so so so
MALL·iJHSREll ENVlllOIIHENTAl SERVICES, INC.
Asbestos Assessttnt Survey
H-~ Building M: 21
Building liUl!ber: 050 Pa;e 42 Buildlil!ll UIIIMI: IMTEIIIATIOIIAL ARRIVALS IUlLDIIIG
Jfl( Al IIPCJRT Bui ldln,a lypct; lEi!KIIIAl
Ccnsti"UCtll<I: 1957
lnspectlld: 04/29/88
Inspector: lryaint/Gldeon
AIIEA TENANT AllEA IPESClllPTIOII SAMPLE I °'" Ullill Of Plil'f " EXP REMOVAL REPUCfllEIIT T!)TAl
Ill LOCATIOII.Of !UTEIUAl NIJMBS BUU: SAflflE DESClBP11DN , tool: QUA!ll MEASURE Ill ASll POT Pl COSiS COSTS COSTS
----··---------0&4 EL Al AIRLINES Liest fl Oller-1st FlOOl'·CeH i11111
offices & locker rOOIIIIS iine 1N1intenan.ce c~. rOOSI Malas
1810711-0
187079-0
drop or hay· fin painel acOUllitlcal tUe
085 EL AL AIRLINES west Lling·tst ftoor-Floorlna
ecployee offlcet1 &·hallways 187323-0 vinyl floor tile
086 El Al AlllllliES west flnger-10t"fl.oc>r·Flooring
IIIWllntc:nance offices 187323·0 vinyl floor tile
087 EL Al AIRllWES Liest finger·tat floor
workshops & stGrerOOl!la 187363·91 H reproofing 187364·91- fireproofing 167365·91 fireproofing
1111366·91 fireproofing 1117367·91 fireproofing 187366-91 fireproofing
I
IIOl4G IOl4G
()NZ
oa
OIIC ate ace IJHC
OIIC
OKC
illA AVERAGE X Ast - ox
nos sq.h. 0 312 sq.ft. ll
AREA TOTAL
AREA AVERAGE I ASI · ox
2975 sq.ft. ll
AREA TOiAl
AREA AVERAGE l AU · OX
1100 &q.ft. ill
AIIEA ll"OYM.
AREA AVl:RAGE !<I ASII • 0%
600 sq.ft. I)
ill ii)
ll 0
0
$0 iO
$0 so
$0 $0
$0
50
so
HALl·KIMBREll ENVIROIIMENTAl SERVICES, IMC.
Asbestos Assessment Survey
H·I( Sui ldine SI: 21
lwi lding liUulber: 050 Paa- 43 · Building lul!De: INJEtNATlOIIAl AltRJVALS IOILDING ,
.IFlC AIRPORT Buildi!lll Type: TIElll41NAL
CoNltNCted: 1957
lnsp,,cted: 04/29/88
inap;::ctor: lryant/Gidecln
AREA TENANT AREA DE5CltlPTIOIII I LOCAliOII Of liAlEIIAl
SWLE
Ill.NIER
o&IG llllll Of PB PE % EXP IIEHOIIAL IEPI.ACEIIENT TO~Al I
IIIUUt SAMPLE DEKIIIPTIOII l!XIDE QUAIIJ t!EASUIIE
!
Ill AU !'OT PL COSTS COSTS ~Tl
088 fl AL .UIIUNfS
at ceiling
at ccHlne
at ceiling
at coH Ing
1&7369·91 ti reproof Ins
West fi011er·1at flr·StorerOOIII/Workshop
187881·22 a,jp on non·awpect pipe c:ovcr 18111112·22 mjp on noru·-pect pipe cowr
1117883·22 111jp on non-suepect pipe cover HlTI36·36 1111jp en noru·awipect pipe cover 1871J1·36 111jp on norn·ISU!lpeCt pipe cover 1&7138·36 1111jp on non·muspect pipe cover 187143·38 1111Jp on noru·1BU11PKt pipe cover
187143·36 sjp on non·muspect pipe ClWer
187144·38 1111jp on non·muc;pKt pipe caver 187145·38 111jp on non·aU11pect pipe cover
r I
t: J»c,. J»c,. J»c,. I
E ~
Iha IIIUdded joint packlnes are in fair to good condition. The 111aterlal ia located at the 1eillns, I
the potential for fUl"tller ccnt111et daM&e. j
089 El Al AilltUIIES wen Flnger·1st flr·.Above Drop Celline I
leading to rut r~ 1871146·12 mjp on non-suspect pipe cover OM I
187847·12 111jp on non-suspect pipe cover OIA • I
187~8-12 IIIJP on non·suspect pipe cover jlNA leading to heaters 1Sltl6·36 111jp on non·Sl.lllpect pipe cover OIA
• I 187131·36 111Jp on non·IWl!pect pipe cover f1"A 1157138·36 111jp .on non-suspect pipe cover fflA
0
Ali:EA TOTAL
lillEA AVERAGE l .ui- • 22%
12 4 in. O.D. i)l,i
14 4 In. 0.1>. IIWS/lt
4£11 4 in. O.D. a.IS/Ii
14 a In. o.o. a.is11t
thl.lll ll111ittne
S 25 IU
o 25 um 10 25 JU
45 25 UI SS 25 DH
.tiO 25 Hi II 25 Ill
II 2S JU
45 2S Ill 0 25 IU
AIIEA TOTAL
AlilEA AVEIWiE I ill • 42%
24 4 In. 0.1>.
24 4 in. 0.0.
w
!Mi/ii
30 U IV 40 13 lV
40 13 JV
45 11 111 55 13 IV 40 1l JV
$0
S4S4
$529
$1,51Z $901
$3,402
$901
S907
so
S2SZ
$294
$840 $533
Sl,919
S504
$504
$0
$706
$823
~.352 .1.440
~5.321
•1.,11
~t.411
ffALL-,IKSRtLL fNVIROHHENlAL SERV!CES, INC.
Asbestos Aasessa>ent Survey
H-IC Bulldll'll! I: 21
AREA TENANT AIIEA DESCRIPTlall I LOCATIIIII Of MATERIAL
SAMPLE
NUll8EII BOllC $Alll&'LE l>EKIUPTIOII
lo&H Imo£
I
lllill Of
QIJAIIJ MEAUE
Sui I ding 1141.aiiber: 050 Pa;c 4tJ
8uHdill'll N-: IIITEltllATJOIW. ARRIVALS 8UILD111G JFK All!POU
BuUdln&1 T)'P'9; TEl!tilllAL
Constructed; 1957
PIPE
ID
Inspected: 04/'29/88 lnspec:tOI': 1.-yantJGideon
X EXP llENOIIAL IIEPLACEIIENT · TQTAL ASI li'OT PL COSTS COSTS COSTS
The material is in good ccnditlan. The quantltlo glvm are uti1110tu bued on on·ahe jnspecdon. All!EA l!OUL st,814 S1,008 112,822
···-···-····-··----------
090 fl Al Alill~ES west finser-1at fl-Above Drop Ceiling
in offices on steel l·belllllllS 187363-91
187364·91 1.1!17365·91 1157366·91
Ul7367·91 1613615·9t 1111369-91
091 fl Al AIRLINES ·wost Wll'>!ll·1at ftoor·Ceiling
~loyce workrOOIIIIS & office~ behind t!cltet c:ountera paaaenger lobby
pa&a~r loi:by llli~le
by COl.l'itl!ll"g 25 & 26
1111061-0
1117067·0 1117067·0
1670611-11
187068·0
f i reproofine fi rc:prooflne flreproofine fireproofh111 fl reprooflne fireproofing
flrq,rooflne
111cOU111tlcal tile IICOUlltig,l tltll
11ceu11tlc11l t He drop or lay·in panel drop or lay· In pcin,iil
092 fl AL AIRLINES West Wlng·1at floor•8QiSB911l Hcndllng
I~ 1: ,QIC IOIC IOIIC 10IC I I
Olli
OIIG
Olli
ONG
ClHG
AREA AVERAGE % .ii.Si • OX
900 aq.tt.
AREA AI/EIIAGE X ASS·
4151 i;;q.ft.
200 sq.ft.
9000 sq.ft. 1140 sq. ft.
640 sq.ft.
AREA 11111!:RAGE l& ASI -
0
0 0 0 0
0
0
AIIEA tOTAl
°" 0 0 0 0 0
IUIEA T01Al
ox
so $0 $0
$() so so
'#!"
HALl·KIKBRELL ENVIROliH!:NTAL SERVICES, IIIC.
Asbestos As~essinent Survey
11-11: Building Ill: 21
AllEA TEIIAIIIT AREA DESCRIPilOII I LOCAII08>1 OF IIATERIAL
on steel J·belflll&·throughout
~
SAMPLE ll.Nflt BULK SAIIPLE DHCIUPilOII
187047-15 firep;ooflne 187044-15 fireproof Ina 1570l.9-15 f i reproof! llfil 187050·75. fireprooflna \87051·15 fireproofing
09] EL AL AUUIIES 1,iest Wing·lat Hoor-Above Drop Ceiling
on structural steel 187057-11 fi reproofin;: 18111511· 11 fireproofine 1117059-11 f i reproofine 1117060-71 f i reprooflne 187061-71 tlreproofine
094 EL Ai. AUL!IIES West Yine·1at Floor~!>l•ssasa llandline
at ceiling heaters 1871l7·36 ajp on non·suapoct pipe cover 1117137-36 111jp on non·miapec:t pipe cover 187138-36 ajp on non-suspect pipe cover
at cellil'II! 187143-38 ajp on non-Guepect pipe cover at cell in@ 18714l·38 ajp en non•guspect pipe cover at ceiling 187143·38 ajp en non·guepect pipe cover
187144-311 ajp on non·guspect pipe cover 187145-38 11jp on non·l!UlpeCt pipe cover
i °'" I CC0E
I
: llNC I
I ate
I OtlC
I Ole
I OMC
ONC
llNC
ate
OMC
Q4C
cw. ONA
CINA
OMA
OMA
OMA
cw. CINA
',;
Ull!T OF
ClUAlil tEASlJtt
2123 sq.ft.
!luildin; IIUIIII::>@,; 050 Pase .r;s
Suildlns 11-: llllEIUIATIOIIAL ARRIVALS BIJILDINlil
JFK AIRPORT Suildin;;i lypa: TEltfi!IIIIAL
C<lmtructedl: 1957
inspected: 04/29/88
iMpector: Bryant/Gideon
li'll'E l Ellt lEMO\rAl IEPUCENEJtl . TPTAL UI 11511 l'Oi PL CO$T$ COSTS tj)stS
I)
I)
I)
I)
(I
AAEA TOTAL. . so so
I I I
I :.~·
$0
AIIEA AVERAGE% Asa· °" 11175 sq.ft. 0
(I
0 (I
0
Al!EA TOTAL so $0 so
AIIEA AIIEIIAGI: % ASI · 21,i;
411 4 in. O.D. IMS/II 55 25 HI St,81' s1,ooa $2,822 55 25 IU 40 25 JU
28 8 in. o.o. QJS/1 0 25 IU $1,813 $1,1166 12,879 44 6 in. O.D. CIJS/11 0 25 JU $2,290 51,345 $],635 36 4 in. 0.0. CYS/11 0 25 IH $1,361 $756 $2,111
45 25 JU
lJI 25 Ul
HALL·llHBREI.I. EIIVJROHHEIIIAL SERVICES, INC.
Asbes[os Asses&ment Survey
H·l Building#: 21
AREA IEMAIIT AREA OESCRIPTIOII SAMPLE - UillH OF I
fl LOCAUOII OF !tATEIUAL Ill.MEii . SIJLIC SAMPLE lilfSDIPTIOll llQDE WA.Iii MfASUIIE I
187044·74 ajp en non-suspect pipe cowr 41MA 14 10 In.. 0.0. 187045-74 alp on non-suspect pipe cover ~ 167046-74 1ajp on non·auapect pl pe cover OMA
I
1111 cei I ins
The mudded joint packings ue in eood condition ~hh very ainor contact dallage 11iaible inllocalhed areas.
I lluilding IIU!lbor; 050 Page 46
Sui lllliflll 00111111118: IIITEll.ilATl061Al ARRIVALS BUILOlllG ,
Jfl( AIRPORT
liui lllline Type: TIE&KUIAL Constructed: 1957
PIPE
ID
011
Inspected: 04/29/SS Inspector: lllryant/Gideoo
~ Ell!!>
A.Sii POJ Pl
0
0 0
MEA iOTAL
RENOV.AL ltEPLACEIENT COSTS COSTS
S7,278 $4, 175
TO.Al COSTS
$11,453
095 El. AL A!IIUIIES ldHt Wins-1st floor·.Abova Drop CaH ir,g I
AREA AVERAGE % AY • 29%
leading to reatrooe15 tS78l.6·12 njp Oil non·auapect pipe cover 181847·12 111jp on non·auepec:t pipe cover 181848·12 mjp on non·suapec:t pipe cover
leading to radiator• 187132·35 ajp Oil noR·SU$f18Ct pipe cover 187133·35 111Jp on non·auspec;t plpa cover 187134·35 ~jp on non•auspect pipe cover
li,. 28 4 In. o.o.
~
~ 21;4 In. o.o.
r l>W
m!S/ll
30 16 IY 40 16 IV 40 16 IV 50 16 IV 10 16 1\1 0 16 IV
AIIEA 'iOU.i..
$1,0511 $588 .1.646
$907 :504 $1,01
St,965 $1,092 Jl,057
KALL·KIHSREll ENVIIIOl!HfNlAL S£RV1CES, !NC.
ASbesaos Assessment Survey
ff-IC Building#: 21
AREA TENANT AREA DEiCRIPflOII '8 UXA.TIO.. Of IIATEIUAL
$AAPLE IIUltiEI BUI.IC SAltPlE DESCRIPTHIII 1:E UIIH Of
QIJAIIT MEASI.IH
llui ldinii llil.llllber; 050 Page 47i Buildi119 N....,: INTEINATIOIIAL AaRIVALS lll.llLOING
JFK Ali!PORT
llui !ding Type: TERHUIAL Construc:Urd: 1957
l1111pec:ted: 04/2'9/M
Inspect~: llryant/Gideon
PIPE l UP REMOVAL REPLACEMENT ID Asa POT PL COSTS COSTS
TQlAL CQST$
HAll-(JKRRELL ENVIROHMEMTAL SERVICES, IIIC.
Asbestos Assess,oent Survey
H-l Buildin,a #~ 21
AREA TENANT AREA DfSCIIP!IOII I lOCAiiOII OF KATfRIAL
SAMPt.E
IIINfR ~
liULli: SAltPlE DESCIIIPJIOII c;a>£ QUAIIIT
IJjjlJ Of
!!EAUIE
Building !lumber: 050 Page 48'
Building ll8111C: iMTERIIAtlONAl ARRIVALS BUILDING .IFS: AllPOIIT
Bui I dine Type: UltlUIIIAl
Cons tnicted: 1957 inspected: 04/29/M Inspector: lllrymnt/Gideon
P!Pf l IEMP REMOWAl REPLACEMENT ID JI.SIS POI PL COSTIII COSTS
TOTAL
~rs
HALL·iCIHBRELl ENVIRONMENTAL SERVICES, INC.
Asbcl.1os Assessment Survey
II-IC liluilding lit: 21
AREA TENANT AREA DESCRIPTIOIII I lOCATIOII Of MATERIAL
liiAl'IPU
IIUIIIER IIUU: SAMPLE !OfSCUl'llOII
9'" LINH Of qllDE CIUAIIJ HEASUIIIE
I
lilui ldins IIL.llllber: 1150 h11e 49 liluslding Na1111e: INTEIU!AllOIIAL ARRIVALS 8UILOING
JfiC AUtPOIIT
eulldins Type: TERMINAL Constructed: 1951
PIPE iD
Inspected: 04J2:9JM Inspector: liryMt/Gideon
111 IEJ!P IWIOVII&. 11£PLACatEIT A.Sil POI Pl COSTS COST5
TOTi\l COS JS
l!ALL·OCIHBREll ENVIROIIMENTAL SERVICES, IMC.
Asbestos Assesi;,ment Survey
l!·IC $uilding i: 21 .
AREA TENAIIT AREA DIESCRIPTIOII # LOCATIOII OF IIAUIUAL
SAAPLE
IIIUll8Ell
105 El AL AlRllNES Wl!St Wlns·lrd floor-Above Celling
lilUUC SAHPLE DEW I Pf I ON ~ f>E
'
WAll11
U4111 Of
ltEASUIIIE
llui lding Number: oso Pave 501
Building N&111e: !MIIERNATlONAl ARRIVALS IUILDING Jfl AIRPORT
llui ldine Typci. TIEIMUIAl
Constiructecl: 1957
Inspected: 04/29/&!. inspecton iryant/Gideon
PIPE
lD 1' IEIU'
ASll POI' Pl
llENOVAl REPLACEMENT COSTS COSTS
TqTAl tqSTS
AREA AVERAGE% ASE - 151
HALL·OCIHBRELL ENVIROIIHENTAL SERVICES, INC.
Asbestos Assesi;meot Survey
H·K Building~: 21
AREA 1ENA~T AREA OESCRIPTIOII
' lOCATIOlol Of MATERIAL SNll'LE IU48ER IIIULK SAMPLE OE5Clt1PTIOII f
107 fABER west Flnger·1at floor-tailing l oHi,;c
1011 fABEII: llest finger· hit floor
at ceiling heater
1117082·0 drop or lay- in panel
187849·13 ajp oo ncn·SU1pect pipe cover ~ 1m51l·13 ajp en ncn·suspect pipe cover ~ 187851-tl 111jp en ncn·auspect pipe cover CIIA
iluHdlng NU!lber: 050 Page 5l
Building II-: HIIJERNAHONAL AAIIIVALS llllllOING Jf!C Alll'QdtT
Buildine Type: 1ERMINAL Constructed: 1957
Inspected: 04/29/118 Inspector: llryant/Gldeon
WIT Of PIPE l £XP 1111:MOYAL REPLACEMEMT QUANT IIIEASURE ID ASI POI Pl
AREA AVEIWol! l ASI • Ill
260 sq.ft. 0
AREA iOlAL
AAfA AVERAGE X ASI - OX
10 6 in. o.o. li\lS/R 0
0
0
AIIEA TOTAL
COSTS COSTS
so $()
$() SD
TDT(tl CO$fS
so
so
TENANT • FASEi! TOTAL Sil so ; so
HALl·OCIHSRELL E~VIIIOl<IHENTAL 5EIIVICES, llllC.
Asbestos Assessment Survey
ff·K 1luildi119 I: 2t
AREA TENANT AREA OESCRIPJIOIII
S lOCAilOII OF MATERIAL SAMPLE
IUEBEII lillll.( SAMPLE 0£SCIUPTI091
-·· -··- --------------------------------109 HUDSON GENERAL Yest Fingar-1st floor-Ceiling
hatlway 187077•0 drop or lay-in panel
110 HUDSON GENERAL Yest Finsar-1at f!oor-Parta IIOOE/Shopa
at c:eiLillll 187361-91 f I reproof Ina 187364-91 fl reproofing 187365·91 flnprooaina 187366-91 fireproof!~ 187367-91 flreprootlne 181368-91 fireprooHna 187369·91 tlreprooflna
iluitdlns lh.llriler: 050 Pase 5~ lluHding II-: 1NtlEltDIATI08W. AltltJVAL5 IWILOl~
.me ADRPOIIIT Building Type: TERl4111AL
Conatruc:tlld: 1957 Inspected: 04/29/!18
IMp,Ktor: Bryant/Gideon
Ol!t UIIH OF Pil'f
ID
% EXP IIEIIOVAL ltEPUCENENT TPTAL cpsn cme QI.IAl!i HEASUIIE ASi ll'OT Pl
CHG
l!lNC
OIC QMC
(K
Ole
l!lNC
OHC
Alll:A A VfflAGE %. AU - 0%
700 sq.ft. 0
Af!EA iOTAL
AIIEA AVIEIIAGE t. ii.Sii • OX
2970 aq.h. 0
0 0
0 0 0
II
.AAEA JOTAL
COSTS COSTS
$0 $0
.$0 so
$0
so
HALL·KIHaREll EMVIROIIKEIITAL SERVICES, INC.
Asbestos Assessment Survey
H·K Building S; 2t
AREA TEMAIIT AIIEJI. OfSClllPTIOII # lOCAIIOIII OF JIATERIAL
SAMl'lf
IJUIIE&
112 AEROKEl!ICO Eeat finQ.r-·1st Floor-·Floora
locker rooms 187332·0 corr I don 1111332·0 offices 1a1332-o
operationa office 1111332-0 Sta ff I oung11 1am2-o
lllc floor t Hes show only IIIIOderate dMl,&ge.
IIIIJI.I( SAMPLE DESCltnP'l'IOII
vinyl floor tile vinyl floor ti le
vinyl floor tile vinyl flOOI" ti le vinyl floor tile
113 AEIIOll4El! I CO East I.ling & fir,ecr·1at Floor-Celling
office aret11Z 111m1-o acoostkal tita
oper&tiona office 1111331·0 IICOl.llltlc:&i !:Ile st&tf lounge 181331·0 acOU11tic:ai tfi le
I
I
I
D<
CCIDE
OMZ
OMZ
OMZ
OflZ
OMZ
la«. . a«.
OHG
flluiiding ilUl>ber;: OSO hge 5~
BuHdln;; II-: IIITERIIIITIOIIAI. ARRIVALS 8UILDI~
JflC AIRPORT
Building Type: TERMINAL
Constructed: 1957 I nspectelll; 04/29 /88 Inspector-: 1.-YMt/Gideon
I.Jlill Of
IIEASl.lilf
IPJPI: X UP ltEHOVAl IEl'lACEMEIIT QU.UIT ID ASB ,OJ Pl COSTS COSTS
AREA A Vl:llAlil: 7' ASI · 2X
283 5q.ft. 2 5 IV S1,285 S974 400 sq.ft. 2 5 IV 11,816 St,376 650 5q.ft. 2 5 IV S2,951 S2,236
14,00 sq. ft. 2 5 IV 16,356 54,816 225 sq.ft. 2 5 !\I 11,021 S774
--.AREA TOTAL $13,429 Sl0, 176
AREA A VfllAGE I ASI • 00'.
650 sq.ft. Cl
1400 sq.ft. Cl
225 sq.ft. Cl
AREA tOTAl so so
TEIIA~T • AEROMl:XiCO TOTAL $13,429 $10,176
~OTAL
Q>STS
S2,259
13, 192
SS-, 1117 1s11,m
11,195
---IS23,605
so
$23,605
HALL·tiHSRfll fNVIROHHENTAL SERVICES, INC.
Asbestos Asscssllbent Survey
~-t Building,: 21
AREA TENANT AREA OESCIIIPTIQH
S LOCAil<* Of MATERIAL SAMPLE IIU4BEII IIUUC SA*'LE OEstallPHOII
114 liERIA/AEIIOf!El( East Wir1111·let Floor·lagseae llandlina
throughout 187849·13 mjp oo non-musp2Ct pl~ CCVIH'
187850-13 iajp on U10R-B1111PKt pipe cover 187851·13 mjp on non·suapect.plpe cover
U5 1.8EIUA/AEROKEX Elllflt Ying·1at Floor·Saggage Handling
electrical closet 187363·91 fireproofing
on l·bclld!IS 1117363·91 fireproof Ing 187364·91 flreprooHns
187365·91 fireproofing 1117366·91 fireproofing
1117367-91 f I rcprooHns 1873611·91 fireproofing
116 ISEII IA/ AflllotlEX East finger-1st floor-Garage
thiroushout 187849·13 11jp en non· EIUlf)eCt pipe cover 187850-13 111jp on non-suspect pipe cover
iui I ding N~r: OSO P.11e ~4
Sulldiog N1111111e: INTERNATIOHAL ARRIVALS BUILOIN~ Jfl. AIIIPORT
!iui ld!l!G Type: TEl!IUIIAL Conatrucu:d: 1957
iMpCCted: 04/29/88
IMpector: Bryant/Gideon
OCH Ullll Of
CODE CIIW!i l'lfASl.laE
PIPE
ID
X EXP
AS& l?OJ l'l
iEMOVAL REPLACEMENT COSTS COSTS
TOTAL
1;05lS
AREA AVERAGE l Ail· Ol
4'.»IA 56 4 in. o.o. llblS/11 0
OMA 0
CM 0
AIIEA TOTAL so so
Al!EA AVERAGE I W · Ol
QIC OOsq.h. 0
DIC 3540 sq. ft. 0
OIIC 0
ate 0
Ol1C Ill
IX 0
Ol!C 0
AREA TOTAL SQ $0
MIEA AYEIIAGI: X ASI - Ill
Ol4,\ 20, in. O.D. lrNS/lt 0
°"" 0 187851-ll 111jp on non·11uspect pipe coverl OKA 0
$0
so
IIALL·KIMBRflL ENViROiiHENTAl SERVICES, INC.
Asbestos As5CS$...,nt Survey
N·K llui lding II: 21
AREA TENANT AREA OESCIUPilOIII ti LOCAH<* OF !>IATERIAl.
117 IBERIA/AEROKEX East Finger-1st flOOl"
on I-beams
SAMPLE IIUIISER
187363-91
187364-91
187365-91
187366-91
187361-91
167368-91
187.569-91
118 ISERIA/AEROl!EX East ~Ins-tat floor·Ceillng
lobby area
office corridors
locker rOOIRS
187331-0 111m1-o 1117331-0
IIUl~ SAKPlf DESCJ!lPTlOH
fi rep4"00fil'l9 ff reproof I 119 finproofil'l9 flnprooflns
flreproofil'l9 fireproofing
fireproof Ins
acoustical tile
acoustical tile acoustical tile
119 IBERIA/AER014EX East Wing-1st floor-Above Drop Ceiling
Bui L ding lli!umber: 050 Page 5~
euildi09 Naae: IIITERIIATIONAL AIIRJVALS IUILOING ,lfli: AEIPOIIT
Building Type: TERMIIIAL Constructed: 1957
l nspecced: 04/29/la Inspector: SryMt/Gicleon
o&M UIUT Of PIPE X EJII> REMOVAL IEPLAC£IIEJIT TQIAL CQSTS COCE QUAIIT 111:ASUIIE iO ASI POT PL COSTS COSTS
ARIEA TOiAl $0 so
AREA AVERAGE X ASB - ox
OIIC 1980 sq.ft. 0 OIIC 0
OIIC 0
OIIC 0 OIIC 0
OIIC 0 OIIC 0
AREA. iOTAL so so
AREA AVERAGE li: AH • °" O!IG 2250 sq.ft. 0 OMG 380 eq. ft_ 0
ONG 283 eq.ft. 0
MfA iOTAl so so
AREA AVERAGE X ASB • 33X
$0
so
so
leadit'lll to restrl>OIQS 187836·11 111jp on non-suspect pipe cover I OKA tll7837-11 ajp on non-suspect pipe cover OIIA
25 4 in. O.D. DII 70 1-' IV
25 1-' IV
S945 $525 Sl,470
KALl-KIHSRELL ENV!RONMENJAL SERVICES. IMC.
Asbestos Assess.lllel'lt Survey
H·K Building~: 21
AREA TENANT AIIEA OESCIIPTIOII I LOCATION Of lt6!TERIAl
lellding to heaters
leading to cir handlers
SAMPLE Ill.NH IIIJLIC SAMPLE OESCIIHIOII
put r I
11178!11-11 •lP on non-suspect pipe cover fl"" 1117136·36 ajp on non·&UllplCt pipe cover fl"" 187137·36 ajp en non-suspect plpt cover fl"" Ul7138·36 ajp on nori·awpgct pip; cover
1
owi.
187143·38 ajp on non-~u,;pec:t pipe cover ICIMA 1117144·38 12jp on non·11USpec:t pipe cover ,OHA
llUAliT UIUT Of
141:ASllllE
23 I, in. 0.0.
S 6 in. 0.1).
1117145·38 1111jp on non·swpact pipe cover I Th• pipes are above the drop c•H ins and are unexposed. The qumnth is given are based on esti11111tes taken upon
lnspectlon. the 11111terial is in fair to good condition whh -t of the deteriioratlon ~ to age and wator
~~- I
Building lllulber: 050 Page s« Building Mlldlle: IMTEIIMATIONAL ARRIVALS 8UILOJWG
..!flC AIIIPOIIT lluHding Type: JERIIIIW.
Ccnsuucted: 1957 Inspected: 04/29/00 Inspector: lilryant/Gideon
PIPE 10
l EXP REMOVAL REPLACEMENT ASII POT Pl COSTS COSTS
20 14 Ill
111,15/llt 45 14 Ill $569 ~83 55 14 111 40 14 Ill
CWS/1 0 14 IV M16 $245 45 14 Ill
0 14 Ill
AIIEA TOTAL S2,230 S1,2S3
T(ITAL cqsrs
lst.352
1661
~1.w
120 IBERIA/AEROKEX East Fii,aer·1st Floor-Above CeilinQ AllEA AIIEIIAGf X AS&· 24%
leading to heaters
leading to air hendlers
157849-U 1111jp on non·aU111pect pipe cover ClM
187850·13 111Jp on non·suspec:t pipe cover OIIA 187851-13 1111Djp on non·11U11R9Ct pipe covcor OIA
187852-14 111jp on non·11UGp11Ct pipe cover OMA 1117853·14 111jp on non·CIU3pect pfpe ccvcor OIIA
1871154·14 sjp en non-suspect pipe cover OMA I
I
121 JBERIAJAEROHEX East Ying-1st floor-Above Drop Ceiling I
on steel !·be- 167363·91 fireproofing
167364·91 fireproofing 181365-91 fireproofing
IOIIC !OMC I
OMC
12 4 in. o.o. l!ldS/11 0 0
0
16 In. o.o. CidS/R 50 14
40 ,, 50 14
A!IEA TOTAL
AREA AVERAGE % I\SI • 0%
3915 sq.ft. 0
0 0
IV $361, $214 5578
111
IV
$361, S214 $578
IIALL-KIHBRELL ENVIROIIKENTAL SERVICES, IIIIC.
Asbestos Assessment Survey
H-IC Building#: 21
AREA TENANT AREA OESCRIPilOIII iAJIIPLE
• LOCATION OF IIA1ERIAI. IUIIIIIEl
181366-91
187367-91 131368-91 187369·9t
122 iBERlA/AEROMEJ( East fill98£'•1at floor-Abovt Ceiling
on &leel I ·beMIS 181363-91
U11'364-91 187l65·91 181366·91 187367·91
187368·91 187l61iHl1
IIULIC SAMPLE l>ESCIUPHOM
fireproof! ns f I reproof Ing fireproof ins f i reproof ing
fireproofing fireproofh19 firltpl"ooftns fl reproof 11191 ti reprooflna f I rcprCK1f hia ft reprlKlf Ing
bUI I FODE I
~ ate ~ I
IIJl4C
!
I~ iCJNC
1: I IJIC
CHC
OIIC
UlilJ Of
WAIIT MEASUltE
lluilcling lliumer: 050 Page 57
Building W11111e: llllTERIIATIONAl ARRIVALS BUILOIIIG
.lflC AtRPOl!T
Building lyp,e: TEIKIMAI. Constructed: 1957
iospectcd: OJ./29 /88 lnspcctM: 8ry11nt/Gideon
Pll'f l l:XP llENOI/Al IEPUCEMENt U> ASII !'OT Pl
0 0
0
0
Al!EA lOTAI.
COSTS COSJS
$0 so
1otAL cosrs
AREA AVERAGE X ASB • OX
1145 sq.ft. 0
0
0
Iii 0
0 0
ARIEA lOTAl $0 so
so
$0
HALL·KIKBRELL ENVIROldMl:NlAl SERVICES, INC.
Asbestos Assessment Survey
H·K Building f: 21
AREA UNANT AREA OESCIUPHOill
SI ll>CATIOII Of AATERIAI.
SAMPLE
DIUIIIBER IIUU: SIIKPLE OEsatlPTIOII
08.N UIIU' OF
COOE QUAIIT MEASUl!E
Bui ldlllll 11a.mtiei-: 050 Pltlle 5~ Bulldin,s Name: INTERNATlOIIAl ARRIVALS IIUILDI~
.IFK AIRPORT Bui ldi119 Type: JEbUIIAL
Coostiruc:tedl: 1951
Pll'f
ID
INpectillCII: 04/29/68 lmpector: lryant/Gldeon
l EKP REIIOVAL REPLACEMENT ASS l"OT Pl COSTS CO$TS
~OTAL c;osTS
KALL·llK8REll ENVIROWMl:NlAl S~RVICES, lllt.
Asbestos Asselisment Survey
H·l Building#: 2t
AREA TEIIAlti AltEA DESCIUl'llllli t LOCATJOOI Of MATERIAL
i.AMPlE
IUIIER BUU: SAMPLE IIESCIIIPT!CII Of" CfM CIUAIIT
Ulo!IT Of
l'IEA~E
aui lding lwlllber: CSO Page S9
lluildlng MGille: IMiEIIIATIOIIAL AltllVALS BUILDING JflC Allll'Oltl
lluildlng Type: VERJUIW.
Constructed: 1957 Inspected: 04/2:9/IIL'I Inspector: lllryant/llaideon
PIPE % EMP REMOVAL REPI.ACEJIEIIT
10 ASII P01 PL COSTS COSTS TOT~ costs
HAll·llHBRfll ENVIROHllfNTAl SERVICES, INC.
Asbestos Assessment Survey
H·K Building S: 21
AREA iENANT AAEJ\ DESCRIPTIOII M lOCAilOII Of MAleliAl
SANPLE IUm:lt
Cll,M
BUI.II( SAMPLE DESCRIPTlal ~E WANT
tltllT Of
IIEASURE
lll.1Hding lilUlllber: OSO Page 601
8uildlns N1111111e: INTEllllATIOIIAl ARRIVALS IUILDING JFK AIRPOIIT
llui lding Type: TERKIIIAL
Ccnstructeci: 1957
PKPIE
ill
I nspactlld: 04/29/M Inspector: Bryant/Gideon
x !E)11!' IW!O\IAL IIEPLACEIIEIIT ASI! POT Pl COSTS COSTS
!OTAL CO$TS
HAlL·KIHBREll ENVIROliHENTAl SERVICES, INC.
A5bestos Assessment Survey
H·K Building•: 21
AREA TENANT AREA OESClllPTl1l61
• LOCATIO!I Of IIATERIAL SAIIPLE
NI.IKIIER BUUC SAIHPLE DESCltlPTIOII
131 BBEl!IA East Yins i Ftineer-tst Floor·teillnga
ticket agent's office 1am1-o &e(!'A&tical tile
beegage service r00111 187331-0 IICOWtiClll tile
corridor t8733Hl acoustical tile
11tor119e room 187331-0 acowitical tile
lost & found 181331-CII acoustical tile
locker r00011 187331-0 acouatlclll tile
duty 1>1111119er•s off lee 187331-0 acoostlc!ll tile
operations office 1873:St·O acoustical t Ile llt od: room tl!T.U1·0 acoustical tile
132 ISEIUA Eallt Wing , flnacr·tat Floor-Hoers
lost & found roan 18132!·0 vinyl floor tile
ticket agent'm office 187323·0 vinyl floor tile
stormge rOall 18732!·0 vinyl floor tile
opermtiona office 187323-0 vinyl floor tile
lock er r<><* 187323-0 vinyl floor tile
beggmge sitrvlee ir00111 1111323·11 vinyl floor tile duty 1M1t11119er'a office 187323·0 vinyl floor tile corridor 187323-0 vi nyt floor t Ile stock roaa 187323·0 vinyl floor tile
O&at IJIIIT OF
i CODE OOAl!l MEASURE
lilui l<lling IIIUIIIDc:r: 050 Page 611
Buildint Name: INTERNATIONAL ARRIVAL$ BUILDING .lfK AIRPOIU' •
lluHdina Type: lERIIUIAL
Cena tructed: 1957
Inspected: 04/29/M Inspector: lryant/Gldeoo
PIPE :II. IE:l!P REIIOVAL REPLACENENI ID ASI PO? PL COSTS COSTS
tqTAL cq5TS
I
AREA AVERAGE l ASI · ox
IOIIG I Cl4G ICJMG I <JMG
OMG
OMG
OMG
Cl4G
OHG
OIIZ
00 00
ioo I a,a
I: I OIIZ
336 sq.ft. 75 sq.ft.
150 sq.ft. 300 sq. ft.
225 sq.ft. 1110 sq.ft.
135 sq.ft.
1600 sq.ft. 11,0 sq.ft.
AREA A\IEll!AGE ll ASi -
225 sq.ft.
336 siq.ft.
300 sq.ft. 90 sq.ft.
180 llq. ft.
75 sq.ft. 135 llq. ft.
150 i;q.ft.
140 sq.ft.
0 0 0 0
0 0
0 Cl ()
AAEA TOTAL $0 so
°" 0
0 0
0
0 (I
0
0 I)
AIIIEA JOJAL $0 $1)
so
so
HALL-KIMBRELL EHVIROitliENIAl SERVICES, IIIC.
Asbestos Asses&lllent Survey
H-K Building I: 21
Al!f.11. TEIIAIIT .II.ti.II. OESCUPHON
fl i.OCAHOIII OF MATflllAI..
SAMPLE
l!eUIIIIEI IIIJU( SANPU: OESCllPTlml 1:e ~T
lui I ding lllllllb&r: 050 Page i!2
UldfT Of
MEASURE
TIENANT • UIEIUA
Building lll!llle: IIITElilATIOIIAI.. ARRIVALS IIUII.OIN~
.me AHPOftT Building T)lpe: TERltUIAL
Constructed: 1957 lmpectlld: 04/29/88 inspector: lryamt/Gldeon
l'll'f
ID I !EXP RENOVA!. REPLACEMENT
.11.$8 POT PL COSTS COSTS
TOJAI. so so
TPUI. cps rs
$0
HALL·KlHBRElL EIIVBROIIMEIITAl SfRVlCES, tllC.
Asbestos Assessment Survey
k-K Building#: 21
AREA lEIIAlli AREA DEiCRIPTIOII • LOCAllON Of l'IATER!Al
SAMPLE DUIIBEI IIUU SMPLE OESCHPTIO!i
IOUI UNH OF ICQOE QIWIT IIEASIJRE !
liul I ding lwnber: 050 Page 6~ lluilding llue: IIITEIUIATIOIIAL AIIRIVALS IUIU>IIIG
JflC AIRPOltT
ll!uilding Type: 1fRIUIIAL Constructed: 1957
l1111pected: 04/29/88
Ill!lpector: iryant/Gideoo
PIPE J. EltP REMOVAL REPUCBENT II> IISB l'OT PL COSTS costs
TqTAL CQSTS
HA1L·KIKBRfLL fWVlRONKENTAL SERVICES, INC.
Asbestos Assessnoent Survey
H·I( Building I: 21
AiEA TENANT ABIEA OESCRIPT!OIII I LOCAT!f:»I Of ~1ERIAL
iAl'IIPLE
!UltiR °"" IIUllC SAMPLE DEWIIPTHlll COOi: IIIWIT
UIIH OF
MEASl.lilE
!lui lding N<m>er: 050 Page ~
iuilding Nllft!IC: INTERNATIO!IAL AllRIVALS IIUILDIN~ Jfl( AIIPORT
Building Typt: TEIMIIW. Congtructll!d: 1951
lmpected: 04/29/58
IMpeetor: llryentJGlcleon
Pil'f
ID
x ex, ASS POT fl
REMOVAL REPUCEIIENT
COSTS COSTS TPTAL
tj)STS
134 I CflAIIII) I AIIGENJ East Wing·1st Floor·B•Slleae Handline UEA AVERAGE t AU • 16%
throughout 1!17693·10 1ajp on non·etJSpec:t pipe cover I OIIA
167694·10 1111jp on non·sUipl!Ct pipe c:CV6lr ClllA
187695• to ajp on non--pect _pipe c:ovw OIIA
tll l"OUjjllOUt 187849·13 ajp on non·suspect pipe c:ovel' I 011A
187850·11 •JP on non·llllJllpect pipe COVIii" OIIA
187851·13 mjp on non-sumpect pipe cover I OIIA
throuahout 187852-14 111jp on non·SU11pect pipe cover I 011A
tllr OOQllou t 187852· 14 111jp on non· IWlf)Kt pipe ,;over OIIA
187853-14 1111jp on non·-pec:t pipe cover I OMA
Ul7854·14 ajp on nan-suspect pipe cove!' I OMA
20 I! in. O.D.
1115 4 In. O.D.
40 4 in. O.D.
25 6 in. 0.1).
DR
illdS/11
CWS/R
a.lS/R
0
0 0
0 0 I)
50 24
50 24
40 24
50 24
The 111Dterial is near the ceiling running into HYAC units throughout the baQsasc area. ~he 11111terial is In fair c:Ol'ldltion t11itll se1111 contact ~ in isolated areas.
AREA TOTAL
135 !CELANO/ARGENT East Ying-1st floor-iasease Handllnil
Oil I · ~IIIDS 187363·91
187364-91
181365·91 187366·91 187367·91 187368·91
187369·91
fireproofing fireproofing fl reproofinsi fl reproofing fireproof! ne f I reproof Ins fireproof Ing
OltC
OMC
OMC
OIIC OIIC
OiKC
OHC
AREA AVERAGE % AU • Cl
3250 sq.ft. 0
0
0 0
0 0
0
IUllEA TOTAL
IU
IU IU
m
$1,512 S1,301
s2.eu
so
$840
S764
S1.604
so
$2,352 '2.065
$4,417
so
"ALL-ICIKBRELL ENVIROIIHENTAL SERVICES. INC.
Asbestos Assessment Survey
N-IC SuildiOII I: 21
AJIEA TENANT AREA DEStRIPllON I lOCATIOI! OF MATERIAL
SANl'lE IIUHIIIER IIULIC SNIPLE DESCRIPTIOII
136 ICfLAND/ARGfliT E1111t lililll!-1at floor-Cctl ling
opcratiDnS offic:es operations offic:em
187322-0 187325-0
drop or lay-in penal drop or lay-In ponel
137 ICELANO/ARGEIIT East Ming-1st floor-Operations Office
offic:e area 181323-0 vinyl floor tile
na ICElAIIO/ARGEM'i East lili!'lll-1at Floor-Above Drop Celling
leJ:ldins to re111U00111& 187846·12 111Jp on non-wapact pipe cover 187847·12 111Jp on non·auapect pipe cover 187841!1·12 1111jp en non·wapect pipe c1111er
leading to heaters 1117136·36 aJp en non·11USpec:t pipe cover 1117131'-36 111Jp on non-suspect pipe cover 1111138·36 111]p en non-11USpcc:t pipe eover
leadlllll! to 11ir handlers 1117143·3! ajp on non·auspect pipe cover 1117141,·36 ajp on non-suspect pipt eover 1117145·3! onjp on non·a1.15peCt pipe cover
o< I re ! OMa
tMG
F I I I
I
'~ ONA IONA
OM
OlilA
OMA
ONA
QIA
tlHA
iiiuH ding Number: 050 Page 65 ' lluilding N111111e: IIITERIIATIONAL ARRIVALS IUILDING
JflC AIRPORT
!Sui !ding T~: TERMIIIIAL
Coostructed: 1957
i napected: 04/"/:9/FJa inspector: lllrylll'lt/Gldcon
U41T Of PIPE l EXP RENOVAL REPLACEMENT QIJAIIT IEASURE ID ASII l'Ol PL
AREA AVERAGE l AS& - OX
2040 sq.ft.
360 sq.ft. 0
0
MU TOTAi.
AIIEA A\IEIIIAGE X ASS • OX
620 sq. ft. 0
AAU lOTAl
AllEA AVEl!AGE l A.SI - lll
11 4 In. 0.0. DY 30 15
40 15 40 15
2l 4 in. O.D, 111,15/l 45 15 55 15 40 15
9 6 in. O.ll. Ci,IS/R ii) IS 45 15
0 15
IV
111 IV
IV IV IV IV IV IV
COSTS COSTS
so so
so so
$643 S357
$1169 $483
S468 $215
TO~Al c;otrs
. .:::'$()
so
,1.000
i1,1s2
S743
HALl·KIHBRfll fHVIRO!iHENlAl SERVICE$, INC.
A&beSt0$ Assessment Survey
H·OC Buitding J: 21
AREA lENAN1 AREA OESCIIIIPTlilel I LOCAllllil Of MATERIAL
SAMPLE IUIIIH
Oll't
IIIJUC SANl'lE l>ESCRIPJIOII COO£ CIIWIT
Ullll Of
1111:ASUIIE
Building NUl!lber: 050 Page ~
Building NllllNl: INlERNATI014AL ARRIVALS BUILDIN~ Jfl( AIJIPOIJ
Building Type: TEIIKINAL Constructed: 1957
ln.spcc~<l!d: 04/29/88 lMpector: Bryant/Gideon
PIPE 11: EKP REMOVAL REPLACEMENT II> ASB POT l'l COSTS COSTS
jJOTAL
COSTS
The aiatedels represented In tM111 arH are iibove III drop ceilfns at ceiUns level. Condition 1111 hlr to 11ood
with d-11e bains ciiuee to aging and pcaalble Wiit&!" ~tt. The quanthles giwn are e~th1atee baaed upon inspection.
AREA TOTAL $1,980 $1,115 Sl,095
139 I CEllUIO/ARGElilT E~t Yins-1st floor-Above Drop Ceiling
on steel l·beam 187363·91 flreprooHl\fi 187364·91 fireproof ins
187365·91 fl repNIOHl'IS
18~·91 ti reproofing 187367-91 fireproofins 181368-91 t I reproof ins 187369·91 f lrcproofins
CHI:
OKC
(IMC
llKC
QIC Cite
(INC
AID A 1/fRAGE % ASS • Ol
2950 sq.ft. 0
0 0
0 0
0 0
AREA TOTAL so so so
HALL-KIMBRflL fNVIROIIMENTAl SERVICES, INC.
Asbestos As&csslllCl\t Survey
H-IC Building S: 21
AREA TENANT AREA DESCRlPJIOid I LOCATIClel Of IU.lERIAl
SMPLE IIIJMBER IWLIC SAAl'LE IIESCIUPTION
08.M
1CODE OOAIIT
Olllt OF
IIIEASIJ«E
Bui !ding ll!Ulllbei": 050 t'119c 67! Bulldil'l<JI N111111e: lNTEi!NATIOIIAL ARRIVALS BUILDING
JFK AlRl'(Jfll
Building Type:. TERMINAL
Constructed: 1957 lrutpectcd: 04/29/Ba
lnspec:tcr: lllryant/Gldeon
PIPE l DP REMOVAi. ifPLACSIENT JD ASi POT Pl COSTS COSTS
TQTAL ctjsTS
__ jj_
. u ~
.,.· w ... ;: .. w Ill ~ ... :! .. >, .. ... " ~ ... .. .. ... '.Ii! ... ... ..
:l u it ! "' Ill
"' - "' "' a ... ;: c: N 0 .. u .: ;:5
~ w \II ... " "" .... " ! g .... ..
w .. ;; .. .. < .. .. .. .... ! .. ·; ..
~ ... ':' .. .. ... .... ll " .. ... :t: ... ~ Ill .. ..
< ,c
HALL-KIMBRELL ENVIAOHIIEN1Al SERVICES, INC_
- Asbestos AssesS111Cnt Sur~ey
IHC Bui ldi119 Ill: 21
AREA TENANT AREA DESCAIPii0$i # LOCAIIOII Of MATERIAL
SAMPLE IUIBER
0tN IMH Of
BULIC SAMPLE DfSCIIIPWlll I
CODE QUAIIT MEASU!lE j
lilui I ding ~r: 050 Page 69
Building NIIIIIIC: INTERIIATIOIIAL ARRIVALS BUILDING
JflC AIIIPOIIT
ilu! I dine type: lUHIIIAL CQClStructed: 1957
inspected: 04/29/88 Inspector: Bryant/Gideon
PIPE X DP IIU:HOVAL REPLACEMEtlT ID AS& POT PL COSTS COSTS
tOT~l costs
l!All·ICIMBRELL ENVIRONMENTAL SERVICES, INC.
Asbestos Assessment Survey
H-IC Buitdina M: 21
AREA fENANl AREA DESCRIPTION I LOCATIOII OF MATERIAL
SAMPLE Ill.NEii 6UI..IC SANl'I.E l>ESC&lf>TlOII
o&M lllUT Of
CODE QI.WIT t!EAS!laE
iui ldirre iiuabsr: 050 Page 7~
.Building Nasae: INTEIUIATIOIIAL ARRIVALS BUILDlNGI
JFIC AIIIPORT
Sui I ding Type: TEIIOO!IIAL
Constructed; 1951 INpecU1d: 04/29/88 Inspector: Bryant/Gideon
Pll'E
ii)
X EXP
ASI POT Pl.
REMOVAL REf>l.At£MEMT COSTS costs
TPTAl cp$TS
IIALL·OCIH6RELL ENVIRONHEIITAl SERVICES, INC.
A,bestos Assessment Survey
H·OC Building~. 21
AIIEA TEtiAlli AREA DESCilll'llOW
B LOCATIOII Of NAT.EIUAL
SAIIPLE
IIINIEII BUUC SMPLE Ol:SCllll'TtOII
147 IIIT'l SIIOPS Enst Ffflller•tat floor-Storage Area
nt ca,il ing
at ceiling
148 INT'L Sl!Oi'li
on I ·beams
11!7849·13 11jp on non·suapoc:t pipe cover 1!11849· 13 11jp on non·suspec:t pipe cover
187850·13 11jp on non-suspect pipe cover 187851·13 mjp on non·suspect pipe cover
East Fi~r-1st Floor·Storase Area
187363·91 fireproofing 187364·91 f I reproofing 187365·91 fireproofing 187366·91 fireproofing 187367·91 fireproofing 1117368·91 fireproofing 187369·91 fireprooflne
~ CODE
!
i OMA
I ;: CHA
Ol4C
ck ~
~ tjKc
I OMC
I
wn OF
CIIUAIIT . 111:ASURE
illui lding IIISOer: 050 Page 71
Building 111111111!!: IIITERIIAJIOIIAl ARRIVALS BUILOING JflC AllPOl!T
Building Type: ilEIIHIIIAL
Constructed: 1957·
PIPE II>
lru;pected: o.4/29/M
Inspector: llrya.nt/Gideon
l IEl<P REMOVAL IIEPLACENEIIT ASIII POT Pl COSTS COSTS
TOJi,AL ~rs
Al/EA AVERAGc 11. Asa • OX
40 4 in. o.o. ZO 6 In. o.o.
IIWS~
mlS/111 0
0
0
0
AAfA TOTAL
AREA A VE RAGE % Ailil • OX
3000 sq.ft. 0
0
0
0 0
0
0
AREA iOUL
$0 so
I,.·
so so
I •
I
so
$0
HALL·KIMBRELL ENVIROl!MfNiAl SERVICES, INC.
Asbestos Assessment Survey
H·K Building#: 21
AIIEA lEIIAliT AAEA OESCIIIP1ill$!
I LOCATION OF 141\lEIIIAI..
Wli'LE IUIIBEII euu: SAMPLE OUCUli'lJON
OB.le UIIIT Of
COOE QI.WIT EBE
Bui I dins IILlliler: 050 Page 7~ liuilding II-: INTIEIIIIIAJIOHAL ARRIVALS iUILOINGI
Jfl( AIIIIPOll1
lit8i hi! Iii Type: lEIIHUIAL
Constructed: 1951 lMpec:tllld: 04/29/M lmpec:tor: lryillllt/Gldeon
Pil'e ll: EXP RENOI/Al llEPUCEHENT UI ASB l'OJ Pi. COSTS C05tS
AREA 110TAI. $() so
T~TAL cj)su
TIEIIAIU • Ull' L SOOIPS 1!011Al $0 so
so
so
HALL·KIKeRELL ENVIRONKEHTAl SERVICES, IIIC.
Asbestos ASSCSSl!ICfl[ Survey
IH: !loildling #: 21
AREA TENANT AREA OESCRIPTIOII
" LOCAil(ll; OF KATERIAL SNIPI.E IUl8EI Bill~ SAMPLE OESCltlPTIOM
150 JAL East Wing·1st ftoor·laggage llandllng
throu9hout 187691·10 ajp on non-suspect pipe cover 187694-tG 111Jp on non-suspect pipe cover 187695·10 111jp on non-suspect pipe cover
throughoot 187849·15 111jp on non·IIOSpl!Ct pipe cov111r 1111850·13 111jp on non·11uspect pipe cover 187851·13 ·111jp on non·suspect pipe cover
nst JAL East Wing-tat F!oor·Bsesagc llandllng
on l·beams; 187363-91 fl reproof! ns 167364·91 ti reproof Ins 187365·91 f I reproof Ina 1111366·91 fireproofing 187367·91 fireproofing
167368·91 f I repc-oof Ins 187369·91 fl reproof i 119
152 JAL fast Wing·hlt f!oor·Operations Office
offices throughout 187319·0 vinyl floor tile
~ I.Jiiii Of
!11.11 lding ldulllber: 050 Page 73
luildli!lil N11111111: IIITEIIIIATIOIIAL ARRIVALS BtlllOING Jl'IL'. Alftl'OIIT
ioi ldil'llil lyp!!: URKIIIAL
Constructed: 1957
Inspected; 04/29/at,
Inspector: BryGnt/Gideon
X EXP REMOYAL REPUCEMEIIT JO.AL CODE QUANT l!EASURE I
PIPE 10 AS!a l'O'I' Pl COSTS COSTS CO$TS
I Cl4A I llHA. I Cl4A I OIA I OMA I llNA
au: !
QI( I
OltC i
QfC I
OKC I
ate I
l»IC
AIIEA A \IE RAG£ X A Sil • m;
l 12 In. (Ul. 01
90 4 in. O.D. INS/II
0
0
0
0 0 0
Ati::A TOTAL
JJIIEA AVERAGE l ASB · Oll:
2400 sq.ft. 0 0
0
0
0
0 0
AIIIEA lOlAI.
AREA AVERAGE% ASS· 2%
$0 $0
so so
$0
so
Clfo!Z 1225 sq.ft. 2 6 IV $5,561 $4,214 $~,775
------ - --"------~---
MAlL·llNBRELl ENVIR~NTAl SERVICES, INC.
Asbestos Assei.smcnt Survey
ff·K Building~: 21
llui ldlng liuilbtr: 050 Palll! 74 Buildine NIIIIIMl: JNTERNATIOIIAL ARRIVALS IUILDING
,lflC A I ltPOill
iuildint lYP*! 1ERIIIIIAL
Constn,ctecl: 1957
lmpcc:ted: 04/Z9/88 lnlipcc:tor: lryant/Gidecln
~~~---~~~~~~~~~~~~~~~~~~~~--~~~~~~~~~--t-~~-'-~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~
AREA TENAllli AREA DESCRIPJIOII I lOCATIOII Of iiATEilAL
SAMPLE IIUHIIEII lllllK SAMPLE DESCRIPTIO.S
lllN UIIIJ Of Pl?e l f)IID
COOE CIUAl!T KEASUl!E ID ASS l"Oi Pl
the 11111terial is adhered to concrete floor snd le in good condition. The area serves es offices for operat!Clfll!I. AAEA i011'.Al
15l JAL E11u loll.ne·1st floor·(lperaatlCM OUicea
offices throughout 161324-0 acoustical tile
154 JAL East Ying & flnger-1at Floor
aho11e drop cei i ing on steel I ·be- 187363-91 fireproofine
1117364·91 flreproof61111
187365·91 ffreproofl1119
1!11366-91 ti nproofir19 187367 ·91 fl reproof Ina
16736a·91 fireprooH1119
157369·91 fireproofing
Ol!G
QIC
OMC
OIIC
OMC
Ole
au: 04I:
AIIEA A\IEAAGE li: ASS • ():I;
1225 sq. ft. 0
A!lfA TOTAL
AREA AVERAGE X /1\S& • OX
2850 sq.ft. I)
I)
0
0
0
0
II
AlEA JOtAI.
IWIOVAL AEPUCENEIIT
cons cos rs
SS,561 54,214
so so
so so
TPTAl tpSTS
$9,775
so
$0
l!All·~IHBREll ENVIRONMENTAL SERVICES, INC.
Asbestos Assessment Survey
H·K Bulldi119 ti: 21
AREA TEIIAIIT AIIEA DESClllPHOIII
ti LOCAT !Oii OF IIA'l'ERIAl
iMPLE IIINEII euu:: SAMPLE DESCRIPTBOII
O&M Ullll OF I
CODE WAIIT MEASURE
!
Building Null!ber: 050 Page 75
Building N111111e: IIITERNATIOIIAL ARRIVALS 8UILOING JFK AIRPOaT
lllul lding Type: lEIUUNAl Constructed; 1957
Inspected: 04/29/M Inspector: Bryant/Gideon
P!l'E l HP REilCIVAL REPLACEMENT no ASI l'O'I' PL COSTS COSTS
AREA TOTA!.. $680 $378
TOTA~
COST~
s11,osa
HALL-KIMBRELL ENVIROIIMENtAL Sfl!V!CfS, !NC.
Asbestos AssesSl!lef'lt Survey
ff·K Sui ldill!il f: 21
Oil.IC I
Building Numer: 050 Page 76
Buiidlog M..-e: 1NTERNATIOIIAL ARRIVALS BUILDING" JFII: AUIPOU
Suiiding TYJ)e: TERMINAL Constructed: 1957
Inspected: 04/29/8&
Inspector: lirymnt/Gideon
PIPE % DP REMOVAL REPLACEMENT AREA TENANT AIIEA°oe$CIIIPTIOII I lOCATIOII Of l'IATEllAl
WIPLE
lolll!SEII • IIULK SAMPLE DESCIIPTIIDII CODE WAliT
IJl!H Of
IIEA~E Ill ASS POT PL COSTS COSTS
TOT~L
cos~~ !
161 JAL Eest Fir,geir·lat Floor·Opera:lcns·floor
offices 187370·0 vinyl floor tfle 0!4Z
162 JAL East Fingor·bt Hoor·Above Ceiling
lelldin; to re&tl'OOIIIS & sinks 187846-12 1111jp on aion·suapect pipe cover ~ 1111847·12 mjp on non-s~t pipe cover ~ 18784!·1? mjp on non·aumpect pipe cover ~
AltEA AVERAGE X ASII • OX
400 sq.ft. ll
AREA TOTAL
AREA AVERAGE X ASB · ]3%
19 4 in. O.ll. 1)18 30 n m 41l 23 UR
,o a m
' so $0 $0
$716 $399 St, 117
HALL·OCIKSRELL EIIVIROOIIIENTAL SERVICES, INC.
Asbestos Ass~ssment Survey
H·K Suitding I: 21
AREA TENANT AIIEA OESCRIPTI091 I LOCAilOII OF PIATERIAL
leading to heaters
lesdll'lll to air handlers
SAHl'LE
IIUISEII! Wt.IC SAHPLE Ol:SC:IUPTIOII
()UC
~ QUANJ I
UlllT Of
IIEASUt!E
tll1136·36 ajp on non·-pect pipe cover Ul7137·3' mjp on non-wapect pipe cover 181135-36 111jp on non·suapect pipe cover
181143·38 ajp on non-suspect pipe cover
187144·38 •!P on non-suspect pipe c:over
w oicA
22 4 In. O.D.
I OIA
I ; 11171'5·38 111jp on non·suspect pipe cover ~
I
9 6 in. O.D.
The OMterial ill above the drop c:eHlna and in hir to llood condition with dmnege occurlng ~ to water and age
of pipe. The quantities are esth1atn based upon Inspection.
TENANT • JAL
- -,~----
!lui !ding lluaber: oso Paee n Building lilaee: U.!TEIIIIATIOIIAL ARRIVALS BUILDING
JFK Aillf1Jal
Building Typo: iEIIHiNAL CONtructed: 1951
Inspected: 04/29/11.a
Inspector: lryant/Gfdoon
PIPE 10
ll: EMI' REMDIIAL REPLACEMENT Ast POT Pl COSTS COSTS
IMi/R 45 231 Ill $832 $462 55 23 Ul 40 2J HI
CIIS/R 0 231 Ill $468 S275
.. s 2:S Ill 0 2J IU
AREA TOTAL $2,018 S1, 136
TOTAL $12,958 $9,284
TOT~L
costs
s1.m
IS743
$~,154
$22,246
KAll·KIHSREll ENVlllCllil'IEIITAL SERVICES. INC.
Asbestos Asse.sment Survey
ff·K llunlding II: 21
AREA TENANl AIEA ilESCl:iPTlOii I LOCATION OF IIATEIIAL
SJUIPt.E
llMEI IU.t:: SAMPLIE DESCRIPTION
163 KUI East Wing-1st Floor·Sa;ga;a Hlll'ldllng
in ceiling 181149·13 ajp on non·S1J11pect pipe cover
11!17850-13 111jp on non--pect pfpa cover
117851-13 1111jp on ncn-SILl6pKt plpa COYGlr
et ceil !nu Ul785,M4 111jp on non-suspect pipu cover
117853-14 ajp on non-suspect plpa covi;rr
187854·14 111jp en non-suspect pipe cover
o&11 um oF axje QWUIT N:ASURE
Bui I ding IIU'llber: 050 Page 76
luildil'lll illldllCI: J•TERIIATIOIIAL ARRIVALS SUJLOING ,U'I( AIRPORT
Building Type: TERMINAL Comtructed: 1957
Piii'£
ID
Inspected: 04/29/118 Inspector: lllryant/Gidecn
S EXP IIEl«lllAl REPUCEJIEIIT
ASi POT PL COSTS COSTS
TOTAL
COSTS
AREA AIIERAGE X ASII - 241
~ 98 4 in. o.o. 0 I
OMA 0 I
!»IA 0
cw. ,;5 6 In. 0.0. I
CWS/111 50 24 D II S2,342 Sl,376 Sl,718
<:MA 40 24 UJ cw. 50 24 JU
I
i
Ille audded joint packlnes are In good condltlM and have a eood encapsuhnt coating on th•i AIIEA TOTAi. '2,342 S1,376 S3i718.
164 ltUI East l,llng·1st floor
elecuicel rOQll·on l·beM111
ba111la11e handl Ing-on i ·be-187361-91
187363-91
187364-91
187365-91 181366-91
187367-91
1111368·91
1117369-91
U,S ICU! fut Wing-1st floor·Cel I ing
offices
entrM1C111
187321-0 1117322-0
f I reproof lng fl reproofing
fireproofing fireproofing fireproofing fireproofing fireproofing
fl reproofl1111
drop or lay-In p,Dnel drop or lay· In ~l
i
~ I
OilC I
OIIC I
QIIC I
(»IC I
a4C
c.ic! I
GIG I
~
I 11
AREA AIIERAGE lt i\Sli - m;
250 sq.ft. 0
3840 sq.ft. 0
0
0
0
0 0
0
AREA JOTAl so so so -· --·-·
AREA AVERAGE X A.Sill • 01
985 sq.ft. 0
3200 sq.ft. ill
HALL·ICIHSREll ENVIRONMENTAL SERVICES, INC,
Asbestos Assess,nent Survey
H·K Building#: 21
AREA lENANT AREA DESCIIIPTION II LOCAl'IOII Of MATERIAL
officca rest rOOIIIS
offices
SAHPlf WMIEIII
181322·0 1117124·0
'87124·0
o&II
BULK SAMPLE D£SCIIIPTION ~ drop or lay· In p.Ml <»4G
I acoustical tile Q4G
I .IBCOUllt !cal ti lot Cl!«\
UNIT Of
WAlli IIEASIJRE
850 sq.ft. 210 sq.ft.
1200 sq. ft.
liuiadins Number: 050 ... ge 79 Building N1>111e: INTERNATIONAL ARRIVALS BUILDING
JFIC AIIIPOlin
iluilding Type: TElli.lllAl
Constructed: 1951
ln&pected: Ofe/'l9/8!!J
Inspector: Bryant/Gideon
PIPE X EXP l!EtlOVAl REPLACEMENT ID AS8 POV PL
0
0
0
AIIEA TOTAL
COSTS COSTS
so so
TOTAL COST SI
so
166 lCLN East Wing-1st floor·Flocrs ARU AVERAGE X ASII · 2X
i
office llllreas 1117319·0 vinyl floor tile (»4~ 3248 sq.ft. 2 6 IV S14,746 S11, 173 S25,~19
-The vinyl floor tiles llliCl!ered to a concrete floor structure. . AREA lOTAI. $14,746 S1t, 173 . S25,~19
:,)61 ICLH East Wins·1st floor-Above Drop Ceiling AREA AVERAGE 1 ASS· Ult
leeding to restrOOIIIS t87836-n mjp on oon·111uspect pipe cover a4A 18 4 in. 0.D. DI.I 10 15 IV $680 $378 $1,()58 187837·11 111jp on non·muspeet pipe cover crJ 25 15 IV 181838·11 111Jp on non·-pe,:t pipe cover crJ 20 15 IV
leadilll! to hellliters 187136-36 111jp on non-suspect pipe cover oJ 21 4 in. o.o. HMS/fl 45 15 IV $794 $441 S1,235 187137•36 ajp on non·111U11peet pipe cover ~ 55 15 ill
187138-36 111jp on non-suspect pipe cover QNAI I
40 15 !\I leading to air 1111ndl11r111 1111143·38 ,ajp on non-suspect pip& cover OMA! 7 6 in. 0.1). CIJS/R II ts 311 $364 S214 S~78
11!171'4·38 111jp on nan-suspect pipe cover OHA1 45 15 IV 181145·38 rajp on non-suspect pipe cover OMA! II 15 JV
!
The material la above the ell-op ceilin; and in good condition. I . AREA 'IOTAl $1,838 S2,~71 Dl!IIMlge my oc:cur due to age of pipe or water Sl,033
cont11ct. Quantities are estimates based on inspection.
HALL·ICIHBRELL ENVJRONl!ENTAL SERVICES, (NC.
Asbestos Assessment Survey
H·OC Building#: 21
AREA TEWAlilT AREA llESCillP'i'IOlil
# LOCA Tl Oii Of NA VEIUAL
SAMPLE
lil!NEI BULK SAMPLE OESCIIIPTIOII
168 UH East Ying & finger-1st Floor
ebove drop celling on steel l·be11111111 187363·91 fireproofing 181364·91 fireproofing 187365-91 fireproofing 181366-91 Hraproofino 187367·91 fireproofins 187366-91 fireproofing 187369-91 fireproofing
169 !CUI East lding·bt floor-Above Drop Celt ing
Oii neel 1-be!lmli 117344-87 fi reproofi 119 187345-87 fireproofing 187346-87 firapi-ooting
187347-87 fireproof Ing
1111348·87 fl reproofing
i I
(»IC I
~ ace
I !l4C
Ol4ri i
Ol4C
~
Oii: I
Q4C I
lll4C I
OHC I
OIIC I
Bui I ding lrullber: 050 hge 80
QIJAIIIT
I.NIH OF
MEASIJIIE
Building N111111e: INJEltllATIONAL ARRIVALS BU1LDING JflC AIRPORT
l!!uHdlng T'l'J)e; JflllUIIAL
Constructed: 1957
PIPE
10
anspected: 04/29/88
Inspector; &lrylll\t/Gideon
% EXP RIEMOVAI. llEPI.ACfJENT
ASIII POT Pl. COSTS COSTS
TOJAj..
COSTS
Al!EA AVERAGE% ASB - 0%
3850 sq.ft. 0
0 (ii
0
0 (ii
0
AREA i'OU.l so $0
AREA AVERAGE% ASII 0%
1625 S<il-ft. (l
0
0
0 (l
AREA TOTAL so so
so
so
MALL-ICIHSRELL ENVIROIIHfNTAL SERVIICES, INC.
Asbestos Asses&Alent Survey
M-K Building I: 21
AREA TEIIANT AllfA DESCRIPiiOII • LOCATIOII Of IEAlERIAl
SAl'IPI.E
IIINIH IICILK SAMPLE DESCRIPTlOII
OIMI I
CODE !
Cll:WiT
UNl1r Of MIEAStJaE
Building l!Ullber: 050 Page 81
iiiuildlng Nlli!IC: INTERIIAJIOIIAt ARRIVALS BUILDING JflC AIR?a!T
Building Type: ifRHINAl Constr-ucted: 19S7
PIPE
RD
Inspected: Ol./29/88
Hmpector; llryl!ll'lt/Gldeoo
X EIIP RB«>VAL IEPLACEMENT . ASS li'Oi PL COSTS COSTS
TOTAL
costs
HALl·KIHBRELL ENVIRONIIEIITAL SERVICES, INC.
Asbel.te>s A&$1:Ssment Survey
II-IC Bui !Cling I: 21
AREA TEIIANT Al!EA OElliCRlPTIIOel I lOCATIOII OF INAJERIAl
SAIIPlE ll!Nllef( IIULIC u.H?lE !IElliCIUPTIOII
QUI aibe
I
UNIT Of
QUAIIT MEASURE
lluilding llun>er: 050 Page 82
Building lll!Ollle: IIITERIIATIOIIAL ARRIVALS BUILDING me AIRPORT
iuH~ing J}'Jle: TERKllilAL.
Constructed: 1957 Inspected: 04/29/115 Snsp&ete>r: filryant/Gideon
PIPE
ID
X U!P
ASII POT Pl
REMOVAL REPLACEMEIIT COSTS COSTS
TOT~ COS~S
HALL·KIHBRELL ENVlROIIHENTAL SERVICES, INC.
Asbestos Asscs51i11C<lt Survey
H·K Building#: 21
AREA TENANT AREA DESCRIPTll»I I LOCAllOII OI' MATERIAL
SANPLE llllNER
0UG Ullll OF
IIUI.IC SAMPLE CESCllPTIOII dice WANT MEASUIIE I
Sui lding NUEl>ber: 050 Page 83
Building HDIIIII:: IMTERIIATIONAL ARRIVALS BUILDING JFIC Al IPOIIT
Building Type: TEl!MlliAl
C-tructcd: 1957 IMpec:tedl: lllt/29/85 Inspector: llryant/Gideon
PIPf %. EXP REl'IOI/AL IEPUlCEHENT ID AU l'OT Pl COSTS COSTS
TOT~ cos~s
HALL·OCIHBRELL ENVIROIIHENTAl SERVICES, INC.
Asbestos Assessment Survey
H·K Building I: 21
AREA TENANT AllfA OESCIIPTIOII t LOCAilllll Of MATEl!Al
179 KLII East Fineer-1at floor
~ar.sie·on I ·beUK
storaee r00111·00 I ·b:aechanic:al storage-on i ·bellm
SANPlf IIINEII
187363·91 1;1361-91 11111363·91 18736'·91 181365·91
181366·91 187367·91
187368·91
187369·91
IIUUC $AJIIIIPLE DHCRIPWll!
ti reproofing firGproofing
U reproof! 119 fireproofing U reproofing fireproofing t I reproof 1119 ff reproofilllfll f I reproofing
CUI LIIH OF I
~E WAIIIJ 141:ASUltE
!ilui loins ilullber: oso Pase Bl. Building NIISIII: IIITEIIIIAilOMAL ARRIVAL$ BUJLOING
Jfl( IU RPOIIT
Bui ldhl9 Jypc: TERMINAL
c-tructed: 1951 Inspected: 04JZ9JM Inspector: lryant/Gideon
l'JPf
ID :It EJOl IWIOYAl IEPLACEIEIIT
AA! POT PL CCSTS COSTS TOT~
costrs
AaEA AVERAGE% ASB · 0%
I
~ 1600 eq.ft. 0
<»f 3375 eq.H. 0
Ole 270 ,sq.ft. 0 i
Cll4C 0
4* 0
-= 0 I
OMC ll
OMC 0 I
Ol4C 0
.UEA TOTAL so so so
IIJI.Ll·ICIHBREll ENVIRONMENTAL SERVICES, INC.
Asbel;tos Assessa,ent Survey
M·IC Building#: 21
AAEA TENANT AAEA DEitllPHOII
# LOCATIOl>I Of l'IAi~RJAI. SNl't.E IUISER IIUU'. SAMPlE Ol:SCU l'TJCII
180 Jl:LN Emst fl1111er·let Floor·Cell ing ·
!Dreak l"OOIII
technical department 18132H>
151321·0 drop or lay-In panel
drop or lay- in panel
181 ICU4 East fl"IICr·1st Floor-floors
break r00111 technical deplartinent
The floor tiles are In good condition.
187319·0 vinyl floor tile 187319-0 vinyl floor tile
; i
CMG I
CHG
qKZ
~
QUAMT
UMIT Of
HEASUIIE
liui lding IIUlll:>er: 050 Page 85
Building !!eae: INTERNATIONAL ARRIVALS BUILDING J FIC Al lll'ORT
Sui lding Type: lERMUIAI. Constructed: 1957
i nspe.::ted: 04/29 /88 INpKtor: Bryant/Gideon
l'IPE I EXP REMOVAL llEPI.ACEMEIIJ ID ASI POT Pl. COSTS COSTS
TOJ~l COSTS
AIIEA AVERAGE t. AU· 0%
416 sq.ft.
192 111q. ft.
..U:EA AVERAGE t.ASi ·
416 sq. ft.
192 sq.ft.
iEIIAl!i • !Cl.Ii
0
0
AIIEA lllTAl
2:t
2 5 I\/ 2 5 1\1
AREA TOTAL
TOTAi.
so
$1,889
$872
S2,761
S0,616
so
S1,"3t $660
S2,09t
S29,0SI
so
SJ,320 s~.s3z
~.852
$7µ,667
MALL-KIHBRELL fNVIROIIMENTAL SERVICES, JNC.
Asbestos Assesi.ment survey
H-IC Building I: 21
AREA IENANT AREA OESCl!IPTIOII 8 lllCATJOti Of MATERIAL
INl'LE IUl1ER MIC SAMPLE DESCIIPH<lll
Q&,11 l.llitlT Of
ciJDE WANT IEASUIIE !
lluilding ~r: 050 P~ge 86 '
Building N41111e: INTERNATIONAL ARRIVALS BUILDING JH AIRPORT
luitding lype: TatllNAL
Constructed: 1957
PIPE Ill
lnapectod: 04/29/88 lnsp,Ktor: lllryant/Gideon
X EXP REMOIIAL REPLACEMENT ASI POT Pl COSTS COSTS
TOTAL cos,s
HALL-KIMBRELL ENVIRONHEIIIAL SERVICES, INC.
Asbestos Assessment Survey
H·K Buildi09 a: 21
AREA TEIIAYT AREA DESCl!PTIOII I LOCATIDII OF KAlERIAl
IWIIPLE il!NiER IIUI.K $AMPLE DESCRIPTION
183 lACSA Eaat Wing· ht Floor·CeH ins
office ere11 187331·0 ecouatlcal tile
184 LACSA Elll5t Wing·1st Floor·flcor
office eree 187333·0 vinyl floor tfl11
The material ls In good condition.
Giit IJIIH OF !
CCipE WANT MEASURE
llui ldir111 lltm>Cr: 050 P419e -87
Building 141111\Wl: llllERIIATIONAL ARRIVALS iUILO!NG .ilfllC Alli?ORT
lluildlng llfP8: URIIIIIAl Constructed: 1957
Inspected; 04/29/118 Inspector: lryoot/Clfcleon
PIPE % ENP REIIDVAL REPLACEMENT JOlAl Ill ASII POT Pl. COSTS COSTS COSJS
AREA AIIUAGE % ASill • 0%
~ 300 sq.ft. 0
AREA JO'l'AL so so so
AREA AVERAGE% ASS· 2%
~ 300 sq.ft. 2 15 IV $1,362 $1,032 $2~394
AREA TOTAL Sl,362 $1,032 $2~394
TENANT • 1.ACSA TOTAL $1,362 $1,032 $2)394
IIAlL·KIKBRfll fNVIROU,fHEWTAI. Sl:21/ICfS, INC.
Asbestos Assessment Survey
11-K Building I: 21
AREA ll'EOIAHT AltEA DESCIIIPJIOII D&il I
Building NUl!Der: 050 Page 881
Building N4111!11e: INTERBIATIOIIAL AIIRJVALS ilJILDING ,!Fl( AUll'ORT
Building Type: TERHINAI. Coru.tructed: 1957
Inspected: 04/29188 Inspector: Bryant/GI~
X El€P ifMOVAL IEPLACEIENJ M LOCATI091 Of HATEalAL
SAHPLE aul!IEII MIC SAMPLE MSCIIPJIOII CODE • CIUAIIT
Ulllt Of
IEAUE
PIPE
ID ASII POT Pl COSTS COSTS
TOT~
cosrrs I
185 LUHIIANSA East Fi1"'11i1Qr·1at Floor·Floora
corridor lounge
eircreft 111111intenance office
1117333·0 U11J33·0
187333·0
vinyl floor tile vinyl floor Ute vinyl floor tile
04Z I
tlf!Z ®
The vinyl floor tile& ere adhered to a concrete floor and are in good c:on:lition.
186 UJfJIIANSA hat fitl!ller· 1st Hoor·Cail ins
flight dispatch
aircraft 111111intenance office corridor lounge
187 lUHHAMSJ\ E••! flneet"·1st Floor
11111l11te~• & atormge gmrage
111111intenanee & storage sarae• 11111intenance i storage garage
151lla·O drop or lay-in panel 187338·0 drop or lay- in panel 18733&·0 cu-op or l&y· (11 fl!Ml
1.87338·0 drop or lay- in panel
~ OHfi OHfi lll4G
1171149·13 111jp on Mn"IUIPKt pipe cover ~ 11171150·13 111jp on non·auspec;t pipe cover °"' 1111851·13 111Jp on non·s1111peet pipe cover ~ 187SS2·14 111jp on non-suspect pipe cover ~ 187852·14 ajp on non·a1U11pect pipe cover ~ 1871153·14 111jp on non·wspeet pi,» cover CJ«1! 187!154-14 111jp oo non·a1U11pect pipe cover °"'I
' I
MIEA AVHAGE 2' ASI • 21
720 sq.ft. 2 5 IV S3,269 S1.,t.77 SS,746 400 sq. ft. 2 s ill $1,616 $1,376 ·~.192 350 ;.q.H. 2 5 Ill $1,5!19 S1,204 l?,793
-AllEA YOU.I. S6,67' 15,057 s1tn1
···-----
AAEA A\IERA«.E % ASII • 0%
2400 sq.ft. 0 350 aq.H. 0
720 sq.ft. 0
400 sq.ft. 0
.AAEA TOJAI. so so $()
·--
AREA AVERAGE l ASI - 24%
130 .(, in. O.D. i!US/1 0 II
0
60 6 in. 0.0. CMS/I 50 27 UI $3, 122 $1,834 «~.956 120 8 in. o.o. C\IS/111 50 27 Ill $1,TIO $4,568 "$12~338
40 27 I ii
so 27 UI
..; ~ ,,; l'-1
i .. ...
i ; .. w ... ... w ... ! "f' ... ~ ::,;
... N
ii
j
.. ! ... ~ ... :.. ! ... ... .. .. ...
~ .. 1 .. ... :::, ...
J . ... & i ... & &
i .. ....
.! -~
I ... .. .. } ... .. .. .. ...
... ... It
HALL·KIHIIRELL ENVIRONMENTAL SERVICES, INC.
Asbestos Asses51a1tnt Survey
IMC Bui I cling ti: 21
~llfA TEN.AlilT AllEA DESCllPiiOII I LOCATIOII OF IIIIATERIAL
SAMPLE IUll£11
190 LUH~llSA bet !illng·bt Hocr-CeHinQ
passenger entryway U17l39·86
tame-& u1mH:16 1em2-86 187343-86
MIC SAHPU: DESCIIUPHON
sprayed ll!CllUlltical plaster sprayed ae-tlcal pluter sprayed SCCU11tlc11l pleater sprayed mcCJUStlcal plaster sprayed IIICOU&tlcal pl11111ter
Tiie 11pr111yed acoustical plaster la in llood condition Md has been enc:1paulat~
191 LUf'IHAIISA East w:'l,!-18i floor·&ase•ee Handling
OIH i Ullli Of
aJDE Q\WIT IEASIJIIE
Sui I ding IIUID!lr: 050 Page 90
8uildil'li! NIM!e: INTEIINATIOlilAL ARRIVALS IIUILDlNG JflC AIRPORT
lulldlng TlflPG: TEltHINAl Constructed: 1957
Inspected: 04/'l.9/58 Inspector: lrymt/Gldeon
PIPE
ID
X EXP REMOVAL 11£PlACEIIENT ASII POT Pl CDSJS COSlS
AIIEA lOiAL so $0
TOTAL COSTS
1$0
AiEA AVERAGE l A$11 • ft
OKI) 11880 .eq. ft. 10 27 Ill $385,]87 $113,098 5494,4~5 ~ 10 27 KU a,m 5 27 ill
mm 10 27 111
alJl> i II 21 Iii
AIIEA 'i'OTAI. $385,387 $113,098 5498,4155
AREA A\llERACE l ASI · t6%
throughout i8769]·10 1111jp on non-suspect: pip& cover QiA 27 12 in. 0.11. I>~ 0
throughout 187691·10 111J1> on non·~t pipe cover QfA 20 8 in. G.D. Oil 0
1117694·10 111jp on non·~t pipe cover au 0 187695·10 111jp on ncra-~t pipe cover a«A 0
tillroughout 18784iH3 111jp on non·IIUlpe<:t plpa cov11r au 95 4 in. 0.11. 111.iS/R 0 187850·13 111jp on non·suapect pipe cover ONA 0
187851·13 111Jp on non·suspect pipe cover OIA ! 0
throughout 1117852-14 1111Jp on non·swpec:t pipe cover OKA 40 8 in. 0.11. CWS/ll 50 25 HI $2,590 $1,523 S4, 1,3
tbrougllout 187852·14 111jp on non·auspect pipe cover OKA 35 10 in. o.o. 0.'S/111 50 25 Ui $2,948 St,842 S4,~ 187353-14 111jp on ncn·auapec:t pipe cover CHA 40 25 ill 187854·14 111jp on non·111111pect pipe cover c»iA 50 25 BU
IIALL-ICIMBRELL EWVIROIIKEWTAL $ERVICES, IIIC.
A&bcstos AsscsSlllent Survey
11-1( llui I ding ill: 21
AREA TENANT AREA DESCRIPTI0$1 I LOCATIOM Of 1"ATERIAL
WIPLE llllMIEl IIUU( $AMPLE DESCRIPTION
(U l.lllli Of
CO!)E WAIIT MEASURE
Building WU'lber: OSO Pa9e 91 ·
Building Maae: INTERIIAT!OIIAL ARRIVALS BUILOIIIG JflC AUtPORT
Building Type: TERMIIIAL Constru:tlld: 1951
Inspected: 04/29/88 Inspector: Bryant/Gideon
PIPE 21: EXP IIEHOVAL ltEPLACENEIIT TOTA~ ID AS!! POT Pi.. COSTS COSTS COSTS
The ,naurlal ia ln fair c:ondltlon, whh •- IIIIUdded joint pacldnss llhowh111 iaolatad arear; of contac:t and Mater
damage.
AREA TOTAL S5,53S Sl,365 SSJ905
192 LUflllAIISA Eaat Ylng·\st Floor·aaegllll8 Handling AREA AVERAGE l ASB · 0%
pn I-beams 181363·91 fl reproof Ing ~ 5800 sq.ft. 0
18~·91 fireproofing OMC (I
181365-91 f I reproof Ing ~ 0
187366-91 fireproofing ~ I)
181367-91 fireproofing ~ I)
187368-91 firepnofine ~ I.I
181369·91 fireproofing M: 0
AREA TOTAi. so so so
193 I.IJfTHANSA East Wlng·1st floor-Ceiling AREA AVERAGE 21: ASII 0%
operations offices 181534·0 acoust !cal tile K 2400 sq.ft. 0
AREA iOU.l so so so
194 WfTIWISA fast Ying & finser·1st fl·Abova Ceiling AREA AVERAGE% ASS - 33:ll
leading to restrOOIIIS 11171136-11 111jp on non-suspect pipe cover oo I
24 4 iin. 0.1>. 1)1,1 70 14 Ill $907 $504 $1,411 1117831·11 1111jp on non·su&pect pipe cover 00
I 25 14 IV
11171138-11 111jp oo non-suspect pipe cover 00 20 14 Ill
HALL·~IHBRELL ENVIROIIMEMTAL SERVICES, INC.
Asbestos Assessment Survey
ff·IC Building S: 21
AREA TENANT AREA l>ESClll?TiO!il S LOCATICfil Of IL\TEIIIAL
lcmding to heaters
to air 1111,ndlen
SAIIPLE
IUIIE!t
1111136·36
IIIULIC SNIPLE D£SCIUPHOII
1111jp on Mn·St.llpect pfpo cover 181137·]6 ajp Cll'I non-suspect pipe cover
OM IIIIIIJ OF !
Cl/OE GUANT IEASURE
I
a:tA 29 4 in. O.D. Q4A
187138·36 ! ajp on non·auapect pipe cover Cll4A
1117143·311 ajp on non·11&1111pact pipe cover ~ 1111144·311 111jp on non·muspect pipe cover ~
12 4 fn. O.ll.
187145·311 1111jp on non· suspect pipe cover ctiA I
ihe piping nms above drop celllne. The quantities elven are esthatee based upon lnapectl;on.
195 1.Ufi HAl!SA
lluildil'IIJ IIU!lber: 050 P.ge 921 lilullding 11811111t: IUTERUATIONAL ARRIVALS BUILDING
.me AIRPORT lllui I ding Type; iERIUIIAi.
Ccmtructed: 1957
inspected: 04/29/88 Inspector: Bryant/Gideon
PIPE I EXP REMOVAL REPlACENEIIT ill A$1ii l'01l' PL COSTS COSTS
!IY$/l! 45 U, IV $1,096 S609 55 14 IV 40 14 nv
CIJS/11 0 14 nv 14~ $252 45 14 IV 0 14 IV
AIIEA TOTAi. $2,457 11,365
TOTI\L
COSh
1),705
I
11706
l~,152~
East lding·ht floor·Abow Drop Celling AIIEA 41\IEl!AGE :I: ASI • 11%
on steel !·be- 187l63·91 fir•oofina QMC ,750 sq.ft. 0 187364·91 fir•ooflng I
~ 0 . 181365·91 fireproofl119 Ol4C 0 I 187366·91 fireproof In; ~ 0 187367-91 fireproof in; ~ 0 181l68·91 fir,apl"oofing c»iC 0 181369-91 fi reprooff r,g Ole 0
'
HALL-ICIIHIIRELL ENVIROIIMENiAl SERVICES, IMC.
Asbestos Assessment Survey
H-K Building I: 21
AIIEA TENANT AllfA DESCRlPTIOIII I lOCATIOOI Of tiATEIIIAl
WIPI.E IUISEII IIIULIC iNIIPLE 01:SCtll''l'IOIII
out IJIIIT OF
caiE CIUAl!J l<JEASIJRE
flui I ding NU!lbcr: 050 Page 93 luilding MISll!e: INlERIIATIOIIAl ARRIVALS IUILDING
J FIC Allll'OIIT
lluildlne lll,)lt: TEIIHIIIAL
Constructed: 1957
PIPE Ull
Inspected; 04/29/et. Inspector: llry111nt/Gideon
X EICP llfMOYAl IIEPLACENEIIT AH POT PL COSTS COSTS
TOTALI
COST~
HAll·KIMBRELL ENVIRONl«EIITAL il:RVJCES, IIIC.
Asbestos A&sess,nent Survey
!MC illui I ding ii: 21
AREA TEIIANT AIIEA 11!£SCRJPTI0$1 # LOCATIOOI Of MATERIAL
SAMPLE IUISH BUU: UNPLE OESCIIPHON
u mie QIJAMT
UNIT Of
KEASUIIE
llui I dine IIU1111>er: 0511 Pegit 94 '
llluilding Iii-: INTERIIAHOIIAL AIIRIVALS IUILOING ,me AIIIPORT
11.iilding Type: TEIIKUNAL Constructed: 1957
PIPE
Ill
Inspected: 04JZ9JS8 Inspector: llryant/Gldeon
X EIIP IIEl«lYAL IIEPLACEIIEIIT A.Sib POT Pl. COSTS COSTS
TOT~ COST~
IIAll·OCIMBREll ENVIRDIIHENTAl SERVICES, INC.
Asbeatos Assessment Survay
11-1:: ilul ldlng I: 21
AREA TENANT AREA 01:SCIUPTIOlil I LOCATIC161 OI' NAiERlAL
IWIPLE
NI.NEii IIULK SAMPLE DESCIIPTIOII ~ wn of CODE lliJABIT IIIEASU!lE
aui lding 11Ullll:>er: 0511 Page 95
luildil'l!I N11111e: INlERNATIOliAL ARRIVALS BUILDING Jf 11: AIRl'OI.T
Building Typo: TERMINAL Com1tructed: 1957
inspected: 04/29/811
Jnspector: Bryant/Gideon
PIPE 11: EXP IIEIO.IAL llfPLACENENT ID AU POV Pl COSTS COSTS
TOTALI
COST SI
--,- -... .,c ...
~ ~ !
~ § Q ... ...
c, - :a i" i ~ ~ Q,
"' .., i § ~ ;;; ~ • ...
J I I "' ... ~ i ~ ... @~ ... i Gil "' - "" :t l ... i .....
0 .. w a. IS .. ... ... ~ ii b - ... ... ... 1111 ... 0..
~ i i ! ! ~ ,.. 2 w
i z ... ~ l l M :,c :Ill !!' ! ... a ! EC
! ii ::? I - -! -; au :e s .... i,,. ,l,
~ w
ii I
-- -- -,-1- -
..; :! ,.,; l!j
~ ~ ! ~ ... :.. ,c ... -.. .. 0. • z > - w
i .. "' ... ::, t: I "' .. ... ... la ;: I N
~! z -.... "' :I -.. ... .. 2' ... ... .. ; w .. ~
... "' < I I ... ... '5 :Iii
;;; 2 w ... ... .. ... ! w "' ... . w .... ,c ~ "" ...
:ic: c
IIAlL·KilllllRELL ENVIRO!iMl:NiAL SERVICES, INC.
Asbestos Asse&&soent Survey
H-K Building I: 21
AIIEA TEN.\IIT Ai!EA OESCIIIPTIOIII j lOCATIOlt Of JIIIATERIAL
£Wlt.E
IILNEII IIIULC SAMPLE CEIICIIPTIOII
205 MAftiUOTi Yest Mins-tat flOOl"-Cefllll'llil
throughout receiving 187080-0 drop or lay-in penel
o&1e; wn OF
~ QUAIIJ MEASURE
111ui lding ~r: 050 Page 97
!iuilclilllll II-; UiTERIIAllOldAL AalllVAlS BUILDING .me AlltPOIU
!ruilclinsi llf?EI: TEIH!NAl
Cormtroc:ted: 111S7
l'IPE
10
Bmpected: 04!l!IJOO Impactor: 11-yant/Gideon
X EXP AS& POT Pl
~AL &EPLACENENT COSTS COSTS
TOJAL COSTS
AREA AVERAGE !l ASII - 02'
OMG; 1000 sq.ft. Q
IJIEA TOTAL so so ISO
... N
;; i
Ill
ii
IIAll·KIHBRELl fll\llROIIKENTAL SE.RVICES, INC.
Asbestos AssnlilMflt Survey
H·K Building j: 21
AREA TENANT AREA DESCRIPTIOII I LOCATIOII OF IIIATERIAL
SAMPLE IUIIEII IIULIC WIPLE ouatll'TIOIII
°* um Of cmE C!W.Nl IEASUIRE
llul hllng IIUll!:,er: 050 Page 99
!llullding ~: lNTERNATllltlAL ARRIVALS IUILDING JFSC AIIP!l!IT
Building type: JERKIIIAL CMStNCted: 1957
Inspected: 04/2:9/88 Rmpectort llrymnt/Gideoft
PIK % EXI' ilfl«lllAL IIEPLACEMENJ TOTA~ ID AU ~11 Pl COSTS COSTS costs
c..i ! ..; l!f i i ! ... .... "' :,,. ... :1 ... ~ !:; « "" w
~ 3 .. ... Ill ~ ! ... .. i
... Cl ... ; N ;:s O
"" i. ... .. ~ ! .. .... " a' ... .., .. ... 8 w .. -; .. "' .. <Ill - i ,J g .. :i iii 0 UJ ... ... ... .. ... l! ~ ~ .... 3: ~ .. ... "" <( <
u
"' -
HAll·llHBRELL ENVIRONMENTAL $ERVICES, !Mt.
Asbesro, AGGe&£n1ent Survey
H·l luildins •: 21
AREA TfMAMT AllfA llfSCRIPTIOBI I 1..0CATl!»I OI' HATeRIAL
~E WlNBER IIUl IC SAMPLE DESCIU PTIOII
Olle' INIT Of
mwn IEASUIIE
luHdin,g Di~r: 050 Page 102 lluHdlng ii-: IIITEbATIOIIAL ARRIVALS BUILDING
JFK AIAPORT llui[ding Tj,pe: TERMINAL
Coostructed: 1957
PIPE
ID
Inspected: 04/29/68 Inspector: lryimt/Gideoo
x fl(p REMOVAL IEPLACEMeNT ASll fOT il'L COSTS COSTS
TOTAL COSTS
u :!! .,; ~ ... :,,
"' ill l!I .., ... ,. ;:: ~ o( ... ~ !!; ~ 2
I ..
fl i :I
"' "' .. ... ~ \!; > ~ "' :arc ii i5 ! ... ..
' ... :I ~ ... .... .. < ... .. ! ... ls "' <C :a ! -c .., .. ·; "' ~
0 ... .. ... ... .. ... .8 ¥- -c ... ... ... <( .. "' ~ = <
cl :! .,; ... ... ;; ... w Cit
! -! .... "" ),, ... -.... ~ a. ... :g - .., ~ ~ ; i ... .. .. ... Q ~ > ! ..... ,c
"" ,.; ... ~ ... ... .. ,c .. .. !!' ~
.... .. .. w .. '.ii .. .,: ~ ! ..
i "" 9 2 "' ... .. ... .8 >:c ,c ... ~ :a .. "' • c ,c
MAll•KIHBRELl ENVIR~NTAl SERVICI:$, INC.
A&besto1, Assessment survey
ff·I( 8ultdlne #: 21
AREA TENAa!T AREA DEstalPTIC* a LOCAJlOII Of IU.1ERIAL
·-·- -·--·--·- ----------·-
SAMPLE IUIIBEllt 114JLI( SAMPLE Dl:SCIUPHOII
o&H i
cooe: GUAIIT
llllll OF IEASUIIE
llui lding tll.mber: 050 Page 105 Suildlng_ff.....,: INTERNATIONAL ARRIVALS BUILDING
JflC AIRPOU lluilding iypa: TERKIIIAl
CONltnicted: 1957 Inspected: 04/29/811 IMpecton llryant/Gideon
PIPE l EXP IIENCI\IAL IIEPUCENEltT ID ASI l'OT Pl COSTS COSTS
TOTAL
COSTS
MALL-ICINBRfll fNVIRONHENTAl SERVICES. INC.
Asbestos Asses&111ent SIJl"vey
M·K Building f: 21
AUA TENANT AIIEA OESCIUPHOl4
M 1.0CA'l'IOO Of MATEIIIAL SANPLE IUIIIEIII MIC SANPLE DESCIIPHOIII
O&l4; UNIT Of COile QI.WU IEASUltE
Building llullber: 050 Page 106 lluilding Nilllllle: INifRNATloe!AL ARRIVALS IUILDING
Jfl( AIIIPOSIT
lluildi"ij Type: TERMINAi.
Constructed: 1957
liMpe<:ted: 04/29/81!,
INpec:tor: iryant/Gideon
l'li'E
1111
X EXP
ASI POT Pl
REIIO't'Al ltEPUCEIIENT COSTS COSTS
TOTAL COST~
ltALL·KIK!IREll ENVIROliHENTAL SERVICES, IIIC.
Asbestos AsseaSl!IOl\t Survey
ll·K auHd.ing II: 21
AREA TENANT AREA DESCAIPHOIII I LOCATIOOI OF MATERIAL
$MPl£
IIINIEII IIIUUC SAMPLE OHCIIIPTICJII °'": um OF CtlO£ QlWIJ MEASURE
Building IIU!llber; 050 Page 107 Building N~: IIITERIIATIOIIAL ARRIVAL$ BUILDING
JO: Allll'Olti
iulldlng Type; TERM!ltAL Comtruc:tcd: 1957
PIIPE ID
inspected: i!l4/29/88 lmpector: 811f&nt/Gldeon
" HP IIEIIIOIIAL llEPLACENfllJ Ast ,OJ PL COSiJS COSTS
TOTAL COSJS
~----··--~--------------------------
HALl·!CIMSREll ENVlROIIHENTAl SERVlCEi, INC.
Asbcatcs Assessment Survey
H-K Building I: 21
AREA 1EN.ulT AltEA CE&C!IPTIOIII • lOCAilOII OF MATEftlAl
IAHl'lE IUl8£11 rwu: 5AIIPI.E DEICUPmlll
OI.M Ullll OF I
CCCf QUAIIT PIEASURE
Buildi!llil 1tuober: 050 Page l08 !lulldlnll Millil\e: !UJEIIIATIOIIAL ARRIVALS BUILOIIG
JF!C ARIIIJ?Oal
lluilding Type: UIIIMIIIAl
Constructed: 1957
i'il'E
ii)
1 mpscted: 04/29/88 lrn;pector: lryent/Gldeon
x aP IEMOVAL IEPLACl:MEMT AU POT Pl COSTS COS JS
TOTAi+ COST$
~ALL·ICIHBREll ENVIRONMENTAL SERVICES, IIIC.
Asbestos Assess.ent Survey
M·K Building#: 21
AIIEA TEl!AIIT AREA 01:SCUP'l'IOII
I lOCATIIJOI Of MATEIIIAI. Wl'Lf lillllM8U
224 OlillEII Al.LIED lil'l!st Fineer·lat floor·CelllllGI
oHicn 1117080-0
225 OlillEII ALLIED East l Uest Fln;er·lst Floor
break r00111·at celling 157849·13 east shop·at celling 157849·13
187850·13 187851·13
226 OGDEII ALLIED !,lest finser·1st floor
lbrcak r00111·on l·bc- 111363-91 lba99a9e erca·m I-be- 111363·91
187364·91 181365·91 187366-91 187367·91 187l68·91 181369-91
IULIC SAMPLE OHCIIPTIOII
drop or ley·in panel
111jp on non·suepect pipe cover
OU. UIIIT OF COOE CIUAIIT MEASUQE
Bui hill ng llullber: 050 Page 109
liluHding 11-: UIJERIIAJIONAL ARRIVALS BUILDING
JflC AIIIPCftT
llullding I)1)CI: iEIIHIIIAI..
Constructed: 1957 !Inspected: 04/29/M
Inspector: Bryant/Gideon
fll"f
ID l IEICF
AU POT Pl afMOVAl IEPLACEIIEIIT
COSTS COSTS TOJlil,.I COST~
AIIEA AVERAGE l ASI · ot
OltG 86(1 sq.ft. 0
AREA TOTAL so so I so
AREA AVERAGE % ASII • ot
~ 20 4 in. o.o. M/11 0
ajp on non·1uspect pipe cover ~ 24 4 in. O.D. 111,1$/11 0
111Jp on non-suspect pipe cover OKA 0
ajp on non·fl.USpect pipe cover 00 I]
.AAEA TOTAi. so so I SO
I
I
AREA AVERAGE %~511 · ox
fireproofing OHC 280 sq.ft. ll
fireproofing OMC 4125 sq. ft. ll
fireproofing OHC ll
fireproof Ing OMC 0
11 reproofine a,cc (j
fl reproofing OHC 0 f lre:proo fi ng QIC 0
ii reproof Ing OHC 0
ffAlL-K!MllREll ENVIROIIHEMTAL SEJitVICES, INC.
Asbestos Assessment Survey
H-l Suildlng #: 21
AREA TEIIIJIT UEA DfKIIPHOII
m LOCAliOII Of l!IATEIIAL
227 OGllEN ALLIED EA,t Finger-1st floor
on I-beams throughout
&W'LE IIUNIElll
1117361-91 187364-91 187365-91 117366-91 117167-91 1a1'36a-91 187169-91
228 OGDEN ALLIED Ent finger-hit floor-Abo\/$ C.Hlns
on steel I-be- 187363-91 187364-91 111165-91 187366-91 187367-91 1117368-91
1117369-91
IIIUI.IC SAl4PLE DHCIUPJIOII
flreprOOffl'III f lreprooflna fireprocffna fireproofing flnprootlna ff reproofing f!reprootlng
fireproof Ing fireproofing fireproofing fireproofing fireproofing fireproofing fireproofing
Building Nuoiber: 050 Pege 110
iuildlng N11111111: lNTERIIATIOllAL ARRIVALS BUILDING I
JFIC AUIPOU
iuilding Type: TERMINAL I , Constructed: 1957
Inspected: °'/29/88 inspector: lryant/Gideon
GUI IJNH OF PIPE x El(!> 11£l«JVAl IIEIPLACEIIEIIT COOE QI.WIT lllEASUIIE ED ASI POT
OMC
~ OMC
OMC
OHC
o.c OHC
OKC.
Ol4C OMC.
OMC
OHC
OHC
OHC
AREA TOTAL
AIIEA AVERAGE % JI.Si • 0%
850 sq.ft. 0
0
0
0
0
0
0
Ai!EA TOTAL
AliEA AIIEIIAGE % ASS - 11%
1375 sq.ft. O ()
0 I)
0
0
0
MEA TOTAL
PL C.OSiS CO$TS
$0 $0
SC so
so $0
I TOT~L
cos~s
$0
so
\'o
ffAlL-Kll48Rfll ENViRO!iHENTAL SERVICES, INC.
Asbegtos Assesall!lellt Survey
ff-K Building f: 21
AllfA TEIIAA!l AIEA DESCIIPHo.!
a LOCAJJOII Of IIIAJERIAL SAlli?Lf IUGflt euuc SNIPLE DESCIIIIPTIOII
OBI! WIT Of
CODE' QllAIIT IEASUIIE
iuHdill!I lil..lllber: 050 Page 111 lklilding limiae: lliiERNATiOlfJU. ARRIVALS StJILOING
JflC Aill?OIIT lulldil!l$D Type; TEIIHINAl
COOlltNCted: 1957 illtlp@Cted; 04/29/815
insp,actO?": Bryant/Gideon
l'll'f U)
l w RDIO\IAl IEPLACEIEMT TOTAL ASS !'OT fl COSTS COSTS COSTS
i-
HALL·OCIM&RELl ENYlRONKl:IITAl SERVICES, lllt.
Asbe5tos Asses&111ent Survey
H·OC Building#: 21
iluilainei ltulilber: 050 Page 112
iuUding l4allilt: IIITERliATIOiiAL ARRIVALS IUllOIIIG
JfK AIRPORT
iuUding T)Plt: TIEIIIUIIAL
Conetructedl; 1957 l1111peeted: 04/29/88
IMpeetor; IBiryaant/Gideon
AIEA JEIWIT AIIIEA OUCIIPTHlll IIMIPlE
IUIIIEII
CUI UlilT Of Pll'E
1!1 11: IEl!I' REMO\/Al REPLACENEIIT TOTAL
fl lOCATIC81 Of i'IAJEIIIIAL llllU IMPLE DESCIUPJJOII COOE IIUAIIT MEASURE ASI l'OJ l'l
230 PIA ldeat Wlns·1st floor-Colline
office 11rea office copy rOOIIII
181840-0 11COU11tlcal tlla 187840-0 a,couatlcal tila
OKG
ONG
230A PIA West Ying-1st floor-Floortne
copy rOOIII 181843·0 vinyl floor tHe OMZ
?he -terial was in good condhlcn.
231 PIA Yest Ylng·ht l'loor·WIIHs
escalator walkway are&·an sldos office ores en waillG
23i! PIA ldcst Wl1_111·1at flooir
baggage hand! Ing room
stock r00111
1871144·0 hard wall/ceilinQ plmmtor 151844·0 han:I Wiill/colling plm~ter
Cilll)
Cilll)
187693· 10 111jp on non·auspect pipe cover OMA 11!11694·10 ajp on non-suspect pipe cover OMA 181695-10 ajp on non·8U18peet pipe cover OMA 1871146·12 1111jp on nan·ouape¢t pipe cover OMA !87847·12 ajp on nan-suspect pipe.cover OMA
AREA AVERAGE X ASI - €l2:
H,4 sq.ft.
144 sq. ft. 0
0
AREA TOTAL
AIIEA AYE~AGE % ASI • 2l
144 aq.tt. 2 U IV
AIIEA TOTAL
AREA AVERAGE I ASI • 0%
1720 sq.ft.
576 sq.ft.
0 0
AiU TOTAL
AREA AVERAGE % ASI • ;m;
10 8 in. O.D. DR
10 4 in. O.D. 1)1,j
0
0
0
30 ·20 m 40 20 IU
COSJS COSH COSTS
so so --- 10
$654 $1,95
5654 $495
so so
$378 $210
I
$1, 1~9 I
$1, 149 I
~ I
I
SS~
MALL·KIMIIRELL ENVIROliHENIAL SERVICES. INC.
Asbestos Assessinent Survey
11-1( llui I ding di: 21
AREA TENANT AREA OESCftlPiloel ~ LOCATIOH OF NA1ER1AL
11tor1111e rooea atod: rOQIII
etoc:11: rooa ba.99nge handl Ing roa11 baggage handling rOOIII
stock roam
11tor1111e rOC!II
IAMPLE Obi UIIJT Of
)IUMIER rwu: SAHPLE DESCIIIPTI064 CQDE1 CIIWIT IEASUltE
18™3-12 aJp on non·auepec:t pipe cover CHA
11184iH3 ajp on non•suepec:t pipe cover OHA , S 8 In. o.o. 141849·13 ajp on nim·suapec:t pipe cover 04A 12 4 in. 0.11.
1i184!M3 ajp on non•auepect pipe cover OAA i 10 8 In. O.D.
187&49·13 ajp on non-11uapect pipe -r OMA ' 2S 4 In. O.D.
187849·13 ajp on non·11ugpect pipe cover OHA 10 8 in. O.D. 117850·13 ajp on non-suspect pipe cover OHA 1117851·13 ajp on non-suspect pipe cover OHA 1111652·14 111.lp on non-suspect pipe cover OMA 10 8 iin. O.ll. il\17852-14 111Jp on ncn·9Ullpcte1t pipe cover OMA , S 8 In. O.D.
187653-14 ajp on non-suspect pipe eover OHA
187854· 14 alp on non-suapcc:i pipe c:over OMA
Tho 1IOUdded joint pacli:inss were obeerved to be in eocd condition with no afgnlfic:ant dldallgo vi'.s&ble. According to renovation plans, aU or IIIOSt of the pipes in this area are to be r411111We:I.
liluilding No.aber: 050 P•ge 113
BuitdlO!l Nll!llle: INlERIIATIONAL ARRIVALS IIUILDING ,lf!C AHPO!U
liui ldiO!l Type: U!itUIIAL CCNtructed: 1957
IMpKted: 04/29/811
inspector: lllryant/Glde«I
PIPE ii)
ll: El!P REl40VAL IEPLACEMENT ASS POT PL
40 ZO IU GIS/ll 0
!Mi/II 0 i!l,!S/ll 0 111,1$/ll 0 !Mi/II 0
0
0
Cl.IS/II 50 20 Ui 111,1$/R so 20 UI
,o 20 Ill
50 20 UI
AREA TOTAL
COSTS cosrs
~a S324
st,350
$3111 $190
S781
TOTAL COSTS
Sl,O~
S5
14
$2, 131
233 PlA \.lest Ying-1st floor AREA AVERAGE X ASI · Di
stoc:k rOQtll·on I ·belllllS
bll99ege hlllldl Ing rOC111·on I ·be-1117845·0 fl,eproofing 1117363·91 fireproofine 1117364·91 fireproofing UIT.565-91 fireproofing U17366·91 fi;eproofing
1117367·91 fi;eprooflng 1117168·91 flreproofill!il l87369·91 fireproofill!il
------- ·-··· .. - _,,_ .. ____ -
Ole
OIC,
OIC
OIC OIIC,
c»IC
OIC
Ol4C
7S aq. ft. II 1430 sq. ft. 0
0
0
0
0
0
0
HALl·KIN8RELl eMVlli!Oill4£ffJAL SEiVIICES, IMC.
Asbestos As&e&smenc survey
K·IC Dullding #: 21
AHA lEIIAlll AIIEA DEKIIPUIJII
I LOCATION OF PIATERIAL SAHPLE IINIEIII
..
!WI.IC SAMPLE llESCllPTIOJI
O&M UII IT Of
CODE QIWIT l!EASIJaE
liuHdi ng itUR"E>er: 050 Page 114
luildJng IC1111111t: JWTERNATIOO!Al ARRIVALS BUILCIQG JfK Al IIPOIIT
llui ldlllll Type: TfllHl!fAL
c-u·uctod: 1957
!n&pKU1d; Oi./29/88 ll'llllpector; llry1111t/Gldeoo
PIPE " flll' li!Ele(WAL REl"UCEIIEICT
Ill ASS !l>OT Pl COSTS COSTS
Ml:A TOTAL so so
TOTAL
COSTS
$0
I
j 234 Pill Yein Win;·1et floor·Abow Drcp Ceiling l\llEA A VERA GE % ASil - m
I
leadini, to reGtr004ll 1tll846·1Z 111Jp on non·auapect pipe cover D4A 18 4 fo. 0.0. 18781,7·12 •JP on non·a1Jf11?8Ct pips cover OIA 117848·12. iii}p on non·auapect pipe cover OHA
leadine to heating unitm 151349·13 111Jp on non•SUllpGCt pipe cover OIA 2S 4 in. o.o. lelldi1111 to heatinQ units 111349·13 11Jp on llcr\•8Uf11?8Ct pip. cover OIA 10 6 in. O.D.
117850·13 111jp on non·SUBpect pipe cover OIA 18ffi1·1l ajp on llcr\·SUBpeet pipe cover ClMll
leading to air hllndl Ing units 111852·14, 1111jp en llcr\•suspect pipe cover CMA 22 6 in. o.o. 1871153·14 1111Jp on llcr\·-,..C:t pips eover OIIA
187154·14 ajp en non·suspect pipe co\ltir OM
ille drop ceiling la ai mtel p&Ml type of~ ceiUn;. TIMI oqitiro colUng In thla area Is to Ale rl!Dil!OVed
1ecording to r-vi1tl~ pl-. The quanthiu wen obtained by impec:tion.
OIS/111 30 12 40 12
40 12 !Mii/11 0 !Ml/Ill 0
0 0
Cb'S/R 50 12 40 12 so 12
AIIEJI TOTAi.
235 PIA Weat Wln,;·1st floor-Above Orop Cell in; AJlEJI AVERAGE X ASS • ox
on steel J·be- 16136l·91 fireproofing (IMC 2850 sq.ft. 0
187364·91 flreprooflne OIIC ll
161365·91 fireproof Ins OHC 0
161366-91 flreproof1119 OHC ll
187367·91 fireproof Ing OHC 0
1!l1l68·91 fireproofing OHC 0
111369·91 fl reproof! 119 OHC 0
I It# S68(I S37B St,0$8 11!1
I IV
I
I
IV SI, 145 $673 Sl,8~8 IV IV
$1,825 $1,051 SZ,67~
I
HAll·~lMBREll EIIYiRCMdMEIITAl SERVICES, INC.·
Asbestos Assessllll!nt Survey
H-IC Bulldifl!I I: 21
AREA TENANT AREA Df$CIIIPTIOII I lOCAi!OII Of MATERIAL
IAll't.E
IUGEI IIIULIC $AIIIPLIE DHCRIPIIOII Oll8I UNIT Of
ccioe QUAIIJ NEASUIIE
llui iding NU!flber: 050 Page 115
Building II-: INTERIIIATlOIIAL ARRIVALS BUILDING JFIC AIIIIPOiT
Building Type: TERNIIIIAL
Constructed: 1957 !m;pec:tad; 04/Z9/M lm;pector: lryant/Gldeon
PIPE % ID a!lalOIIAl IEPLACEIIENJ UD ASS l'O'f Pl. COSTS COSTS
Ji.REA TOTA!. so so
TOTAj.
COSTS I
so
NALL-ICIHBRElL fNVlROIIHENTAl SERVICES, IIIC.
Asbestos Assessment Survey
M-( luilding #: 21
AREA TEMAIIT AREA DESCIIIPTIOII I lOCATtOII OF IIAiERIAl
$ABIIPU:
lllNEll IUllC WIPLE DESCIIPtlON * UIIT OF ta>£ QtWIT 14i:ASUIIE
llui lding IIU!lber: 050 h11• 116
Building IIBllldlt: IMJERIIATIOIIAL ARRIVALS IIJILDJIIG JflC AlllPOOT
iuitdllng l'l/l)0: lEIIMIIIAL Constructed: 1957
inspected: 04/29/Ba
lmpector: ln-yant/Gldeon
PIPE X EXP Rl:HOVAl llEPLACEHEIIT 10 ASB l'Oi Pl COSTS COSTS
Al!EA lDlAll. so so
TOTALI
COST~ I
HALl·ICl1411RELL ENVIR~NTAL SEIIIVJCES, INC.
Asbestos Asses1S111COt Survey
H·t lulldine #: 21
AREA TENANT AREA DESCRIPHOOI S lOCATIOII Of MUUAl.
SAl'IPU: 111.IMBH i!IIJLI( SAHPU! DEKllPTIOII
Oii& wn oF IXlll>E QIJAIIT IIEASUIIE
Building IIUl!lb!!r: 050 Page 117
9uildlng Nllll!OII: INTERMAllONAL ARRIVALS IUILDING Jfl Alll'OIIT
iuUding Typo: 111:RJ!IIMAIL c-trucud: 1957
Kmpectmi: 04/29/83 lnapKtM: lllryant/illdeon
I
1.
PIPE U',
l EXP ASII l'OT PIL
IEIIIOIIAl REPt.ACENEMJ cos rs COSTS
TOTAL. cosrs1
... .. ... j "' § .. ... w
"' m :a: ~ . ... ..;
:
I... i s I i I ~ :a ..... ....... ., :is ,c !~~! Q ... w
"' :!! ... Q .. ... - .g ....
J ~
11• ~ ;: .. ... ..
~ ... .., .. ! ... ~ ... • .. z - ... w 5 ... I :, i "' .. ... .. N :!: ... > i ,c Q
"' - w ! w ~ ... I: ... ... .. .~ ... g w .. .. ..: ? ! "' ... :a: .. .ii 0 .... ':" ... .. ... ] w ,c ;ii
'"' ...
""' ..
~ "' ,c
c..i ,,. ... .,.· l'.1 > 1:1 ... ! _, ...
~ ;: ~ «I ... ... ... .. ,. - ... I s ff ...
Ill ... ii ... - :?l ~ > i N .. .;; ;:s 8 w "' .. :I -., II> ! .... .... .. ... g ... .. ! "' < i _, ! .. ·-0 -:, ...
¥ .. ... .. .. "" .8 '1' .. .... ...
1111 .,: "' :IC ... 31 < <
ii ...; :! . "' ~ ;: .. i § ... ~ c
I ... • ... "' z
~ w
I ... ;E .... ..
i ;;. Q ~ i c ... ... ~ ... ! .. :'! -... ti !' ... ... ... ... g w .. :; "' c ~ I ... .. '5 "' ;;; 0 ... .. ... ... .. ... .8 ¥ ,c ..... ... c .. "' ~ '1111 :,; ...
HAll-KIHIIAELL ENVIROIINEIITAL ifiVJCIES, l~C.
Asbcsto, Assessment Survey
H-1( Building #: 21
AIU TIEIIAlii AlfA DESCII I Pil ON
# LOCATIOI! Of NATEiiAl !WR.IE
IIUllell IIULIC SAMPLE DHUIPTIOII 0&N UNIV Of
CODE CIWIT !EIUiUIIE
Bui ldi119 lllts?ber: 050 Page 122 Building N11111a: INVERNATIOIIAL ARRIVALS IIUllDIIIG
,lfl( AUIPOIIT Building Type: TEIUIINAL
Constructed: 1957 Inspected: 04/29/88 INpKtor: llrymnt/Gidecn
llEPUCENENT
HALL-KIMBRELL ENVIAOlll4ENTAL SERVICE$, lllC.
Asbestos Assessment SUrvey
H-IC Building#: 21
AREA TEIWII AREA DESCIIPll'BCIN
" LOCATIOIII Of MATERIAL lWIPl.E llll4IIEII IIIUI.IC SNIPLE DESCIUPTBIIIII
C&H' UIIIT OF
CX!Of' QtWIT !EASUIE
Bui !ding NUl!llbeir: 050 Page 123
Building Nllllllle: INlERlfATIOIIAL ARRIVALS IUILOING JflC AIRPORT
Building Type: TEl!KINAl c-truc:ted: 1957
Inspected: 04/29/811 lnspecton llryant/Giekon
PIPE
ID X Eia> lllfllOI/Al llPUCEIIENJ TOTAl
11$1 POT Pl cos,, COSTS COSTS
~ . ... l!f ;: • lie ! .... .... ~ ,c ,.. ... ... .. Q. "" "' > - ... I '.5 a i <It "' .. .. ,.. I ... ; ; N Q c z - ... l! w .. !ll -.... .. !!' ... _, .. ... a w .. ! .. ,c
! .. :i ! ....
0 ... ~ .. ... ... .. .... 1! ¥ i5 ... .. .. "" :l .. :,:: ,c
--.-en c ..
lQ "' ! § .. z
Q ... .. .. - .. ii Ii Cit .... ~ ... iii ~ "' c .... 1 Ii c ~
.. ~ ! .. Ii ~ "" z :II ....... .. c i,.. ~ i ...
Cl w ... .. ... ~ i' t ...
"' ~ ... Q .. ... ... ... ~ i U If U t• !i 2 I!! B ! z jjlf l>C
CD
2' ~
.~ ! f 'Cl 2 - ::, .i : ·1 m
... ..... Q II ... ! "" w
:a: .. !
ti
a ... t ti ~ ... ... I .. ;
ii J ~
.... ~ ;; ... ~ ! ... ::! c :,.. ... ; ... .. ... I
:,, - "' .. g i :I
"' ... ... ~ ... i I N ,c
Q
w it ! ~ .. ""' .. l!' g ... .. ... w ... ;; "' c ~ a, - ... :0:: .. '5 "' 0 w ":' .. "' ... .. ... .8 .. c ... ::: ... -i .. ...
c "'
HALL-KIMBRELL ENVIROIIHENTAL $1:RVICES, iMC.
Asbestos Assessment Survey
H-K Building M: 21
AREA ieNANT AREA DESCRIPTION S LOCATIOII OF ICATERIAL
SNIPLE DIUNBER a,uu: SAlll'U DESCRIPTIOtt
OCall UtilT Of
CODE QUANT IEASUl!E
Building loll.Sillber: 050 Page 126
luilding Na111e: lNTERNAJlo.lAL ARRIVALS IIUILOING ,lflC AIRPORT
Sui lding l)'l)e: TERHIIIJIL
«:cn,structed: 1957
lnspected: Ol./29/a& Inspector: lry1111t/Gideon
PIPE 11 EXJ'
ID ASD POT Pl REMOVAL REPLACEMENT
COST$ COSTS
TOTA( CO$TJ
I
l
MALl·tlHBRELL EHVIROMHEMTAl SERVICES, IMC.
Asbestos ASflcs&ment Survey
H·K &uildlng #: 21
AIIEA TEIIAltJ AREA DeitlllPTIClel
' lOCATIOII Of i«ATERIAl ~E IIUHIElll illJUC SAMPLE Dl:SCltlPTIOM
Ol8I Ulll Of
C00E ~T fJIEASIJIE
Building IIU!lber: 050 Pap 127
luitding ti1>111e: IIITERIIAllOl!Al ASIIIVALS IUILOIIIG Jf1C AIIIPOl!T
ill.Ii tding T\!?8: URl4111Al
Ccr11nructlld: 1957
Inspected: 04/29/58 Inspector: lljlll,Rt/Gldeon
l'IPE ID
X U:P ltEl«JIIAl IIEPlACEMEIIT TOTAl! ASI KIT Pl COSTS COSTS COSTS
!
ffALL-ICIH6RELl ENVIROIIMENTAL SEIIVICES, INC.
A5bestos Assess111ent Survey
II-IC Building #: 21 ·
AREA TENANT AREA OESCB!JPi!Olo! I LOCATIOSI Of JIIATEIIAL
s.w>LE 8UIEI lilUUC SAHPLE DESCIIPTIClll
ObC UIIIT Of
COOE QUANT IEAWIIE
Building Ni.mier: 050 Page 128
Building Nasie; INTERNATIONAL ARRIVALS 8UILOING .IIFIC JUIIPOl!l
Building TVf!C: 'l'El!NIIW.-
Ccnstnicted: 1957 lnspKted: Olo/'l.9/819,
h111pcctcr: lryent/Gideon
PIPE 1' DP IIEMOVAl IEPLACENEtlJ HI ASI POT PL COSTS COSTS
iO~AL coifs
HALL·K!ll!IREll ENVIRONHENTAL SERVICES, INC.
Asbestos Assessment Survey
H·K Building I: 21
AREA TEIIANT AREA l>ESCRll'U (lei
I lOCAJIOII OF tlAJEIIIAl
IWIPU!'.
WIMlilEA IIULK SAHPLE IDESCIIIPTIOII
260 PORT AUTIIORl'O Cooter Section-1st Floor·UIUII
on l·beM1. 1111047·75 fireproofing 1111048·75 f I reproof Ing 1871l49· 1S Unprooflng 1157050·15 fl reprooffi ng
Ul705H'5 fireproofing
261 PORT AUT ..all I TI Center Sectlon·1at floor·URl1
dallestic converter tank 11 1117101·26 boiler/tank insulation 187102·26 boller/tanlc i11111uletiOll 187103·26 boiler/tri lnsu!ation
domestic converter tllnl: 12 187104·27 boller/tllnk insulation 187105·27 boller/tenA: insulation 187106·27 bGller/tank insulation
OUO l!IIIT Of
CODE CI\WIJ MEASU!if
Building IIUllll:ler: 050 P•;e 129 i!luildine 11811111: lllTERMAllllllAl. ARRIVALS BUILDING
.mi: AlltPOIIT Suilding Type: TERHIIIAl
ConstNCtedl 1957
l'JPE
!D
inspected: 04/29/Y JNpector: lryant/Gfideon
l EXP REIIOVAL IIEPLACENENT AS& li'Oi PL COSTS COSTS
TOTAL I com!
AREA AVERAGE% ASI • °" OMC 3680 gq.fL 0 Ole Ii OMC ll (!Kt ll ace 0
AREA TOTAL so so ISO
AREA A VEIIAGE % ASII • 32%
i
OMI 151 sq.ft. 15 24 m $7,221 s5,m I
$13,«)04 CHli 2S 24 IU I
OMS 35 24 IU. i M 151 sq.ft. 40 24 IU S7,221 $5,783 $13,004
CHS 10 24 Ill OH& ~
50 24 Ill
HALL-ICIHSRELL ENVIROIIHENTAL SERVICES, INC.·
Asbe&tos A$Gcssment Survey
H-IC Building#: 21
AREA TEIIAIIT AllEA DESCIUPTIClei
I 1.0CAJIOH Of IIATEIIIAI.
IUHIII heat 111xc:hangeir tri
breechcr stmcl:-northe111st cornctr of l"CQll:I
HWS/R CCl'l\lertor tank Si
1111$/R converror tank 62
llldS/R convcrtor tenlt 1113
SAIIPI.E lllMBEI
11!17125·33 117126-D 181121-D 1111140-37 187141-37 187142-37 181146-39 187147·39 187146·39 187149-40 187150·40 1117151·40 111152·41 117151·41
117154-41
°"' lllllli Of
IUI..IC $AMPLE 111:saUPHml CODE QUASIT t!EASURE
boiler/tank i111111.1l11tion QKfi ·109 sq. ft.
boiler/tank i1111Uh1tlon Oil
boiler/tank IN11.1l@tlon CHI
breecher/exhlllllrt s;Clclc podi:111!1 Ol4lil 125 sq.ft. brHCher/exh-t etaclc packillli!I Clllll
breechertexhauet 11t1clc peckhis OKIII boHer/tri illfllllatlon Cle 70 sq.ft.
bot ler/tu l1111Ul11tlon Clllll
boiler/tu lnauletlon OIIB
bol ler/tu Insulation OMS 70 sq.ft. boi I er/tank tMuletlon ONO
boiler/tu inaul11tlon OM8
boiler/tent _IMUletlon ClllS 70 Bq-h. boiler/tent i11S1.1l11tlon OIIII
boi ler/tri IMl.llatlon OKI
ilu1se two dcllce111tic conve111"i:or tmli:111 are In II l"OOl!II in the 11outheau comer of llll41t. They mho.i aigns of dmm,mge,
!but hevm ~ l'Kllntly ~ulotc:id e;o!d'i p;:.il'lt cndl mrm very hard to panete-11te. Vile hish teipm111:ure hut exchangmr t11nk11 are enc11p11ulated vhh a 11111tsl j8Cbt. The l>reecher etacli: ie encapsulated with a aatal jacket.
lui !ding !lud:>er: 050 Page 130
Building Mll!IIIIII: IITERMATi0!4AL ARRIVALS BUILDING
JH: AIRPORi
lilui !ding Type: TEIU>IIIIIAL
CONtructed; 1957 imp11Cted: 04/29/Bt, tmpecter: illryant/Gideon
PIPE X IOO' IIIEIIO\IAL REPLACEMENT
ID ASB POT Pl
70 24 um 40 24 IH 55 24 IU 0
0
0
25 24 UI 40 24 IH 30 Z4 iU
40 24 DH 45 24 RU
35 24 UI 35 24 mu 55 24 Ill 30 24 UI
AREA TOTAi..
COSTS COSTS
55,212 $4, 175
$3,347 SZ,681
$],347 $2.681
$3,347 SZ,681
129,1.195 $23,7114
TOTAL COSTS
S9,3$7
S6,0~ !
i S6,028
:
I
i
S6,02a
i
i I
151,479
262 PORT AUTIIOaliY Center Section·1111t floor·Ulli!l1 AREA AVERAGE % ASlll - 452' '1
I I
southwe&t corner of rOOl!ll 187155·0 dabrla <»If a sq • .ft. 50 96 I S100 so S100
boiler tri 1111122·32 boller/tri insulation OMIII 44 sq.ft. 25 96 i S2,104 St,685 $3,789
11!11123·32 bol ler/tri insulation Ol8 ,o 96 I I
181124-32 boiler/tri insulation CM 50 96 I I I
soulhwen corner of rllGl!I 1117136-36 ajp on non·auspec:t pipe cover au 4 6 in_ 0-D- l<l\t'S/R 45 96 I S208 S122 Sl:$0
187137·36 ajp on non·uuapect pipe cover DIA 55 96
1211138·36 111Jp on non-suspect pipe c:over <»IA 40 96
I I :: .. .. ,a; .. 0
i <C
... "'
it
! 2 g ,_
J« ! i »! a ;: -
ii
.! ... • ] !
; !
·- -~!-a-- - ---- -- -1- -·
:. 8 & .... • •
a o 0 .o .... c: ... c: : t:; ... N ....
i i i GI 4' GI ,: "" ,C
i i i
-- -- - --~-i- -- ~ -.., "' o,;
!!
i .. ... j ! l 1 . ;
,.; .,; ,,; .. . ..
. . ... .. tt ~~
8 -
... .. fi
.! !
HAll-KIHSREll ENVIRONHENTAL iERVICES, INC-
A,beslos Asses,ment Survey
It-IC Building II: 21
Alll::A l!EIWIT AlfA OESCIUPJIOOI
ii LOCAUOIIII Of MATEIIJU.
IBMPLE IUIIEII IIUUC WIPLE DESCIIPTIOli!
Oi.M l.lt!H Of
cmE CIIWIT !'iEASIJal:
SuUdins NUl!lber: 050 Page 132
luilding NIISl!Gt: JNTERIIAllOIIAL ARRIVALS IIUILDING Jl'IC AlllPOH
S!uilding TllP$: iellfflllAL
Constructed: 1957 Bnspec:tlKII; 04/29/815 ll'lllpC«:tor: iryant/Gldeon
~
PIP£ l DP IWICMIAl ftEPLACENEIIT 10 AU POT ft. COSTS COiTS
TOTAL COSTS
Z63 POU AUTIKllUU Center Sectlon·bt Floor·UH2 Alie.A AIIEIIAGe X ASI • m
!throughout throughout
thrCU9hcut
ihrouatiout throuhgcut
near boiler tani:
near boiler tw near. convertor tenlcs near convertor tria throushout
throu;ihout
throughout
thrcuehout
near bollttr tri
near bol ler tri
throu;ihout
near bol lar tank
near bol lar tri
117107-0
11!17107·0
Hl111H3
117111·0
Ull12HD 117128·0
117128·0 11'7135·0 111115·0
wlllA)8d nrdboan1Jp1per pipe urapped Al"db:oMdlpr,par pipe corn.i;aced plJPe cowrlne corrugaiad pipe coverlne corrugated pipe c-rlne pipe covering _pipe covering
pipe covering pipe cov11rlna
OM
Ol4A
c:4A QM
OMA
OMA
Ol4A
OM
OAA 187108-28 ajp on wrapped catcl>oard/peper OMA
1171115-28 ajp en wrapped carcboerd/paper Ol4A 187109-28 ajp on wrapped carcboerd/paper OAA ' 187110·28 ajp on wilf)p8d cordloard/paper OM
187112·29 ajp on corrugate pipe c:GYarlne OAA 187112·29 ajp on corruaatm pipe coverlne Ol4A 187113-29 111jp on corrugate pipe CO¥erlng OAA 187114·29 111Jp on corrugate pl~ covorlna mtA
1117115·30 111Jp on nD:1·11uapect pipe CCl\ler OM
987115·30 111Jp on ncn·auspect pipe cover Ol4A 187116·30 ajp on ncn·1U1Spect pipe cover OAA 117117·30 ajp on ncn·suspect pipe cover lllCA 187118·31 111jp on corrugate pipe covering <lNA
117119·31 111jp on corrugate pipe cCMtrine <lNA
1111120-31 1111jp on corrueate pipe covering lllCA 187129·34 ·ajp on pipe coverlne OHA
187t29·l4 111jp on pipe covering Ol4A 187130·34 1111Jp on pipe covering Ol4A 187131·34 ajp on pipe coverlns OIA
125 ft. 6 In. 0.0. ll>Y
235 ft. 4 In. 0.0. lliY
146 ft. 6 In. O.D. OW
325 ft. 4 In. o.o. OtD
38 ft. 14 in. 0.0. 01 210 ft. 6 in. 0.0. lPS 100 ft. 8 in. 0.0. LI'S
285 ft. 8 in. 0.0. l!lTIM 170 ft. 4 In. O.D. Nllll,IS 38 6 in. o.o. 01'I
62 4 In. o.o. OtD
49 6 in. 0.0. Oil 75 4 in. o.o. ll!,I
35 4 in. 0.0. I.I'S
50 6 in. O.D. I.PS
12 14 in. o.o.
70 6 in. 0.0.
18 B In. o.o.
O!t
I.I'S
l!'S
2 39 UI 2 19 llU
7lli 39 Ui
70 39 UI 20 39 UI 2S 39 UI
25 39 UI 40 39 UI 40 39 JIU 60 39 HI
60 39 IU
40 39 IU 30 39 iU 55 39 IU
55 39 HI
50 39 iii
50 39 IH 60 39 iH
.60 39 Ui
15 39 Ill 40 39 HI 10 39 Ill 35 39 IU 20 39 UI 511 39 Ill
511 39 HI 25 39 JU 30 39 IU
s2.1a2 $2,820 $2,58' $1,900 11,286 Sl,661 $1,S)(K $5,426 $2,040 St,978 $2,344
$2,550 $2,835
$1,323 $2,602
$1.399
Sl,643 $5,051
st.365 st,765 st.616 $2,441 $1,017
$2,293
$1,360
S3,476
s1.211 Sl,162
st.JOZ
st.495 St,575
$735
St,525
Sll99
S2, 140
S2,969
I
S!.~47 54,~85
"·~ 56,~1 sz.~3 SS.9(60 Sl.~64 's11.~02
S3.~t7 S3,~41> S3,4'6
! $4,048
S4,~10
I
!
S2.f5 $4,1,30
s2,fa
I s,.~ sa ~zo
• !
HALL·KIKIIIRELL EIIVIROl,IIIENTAI. SERVICES. IIIC,
Asbeato& Asaeasment Survey
II-IC Bui tding 111: 21
AREA TEl!Aln .AlEA CESCIUPTIOII f UlCATIOIII Of M'l'IEIUAL
near convertor tenll:a near converter tmn&a
throushout throushout throughout throughout
throughout througbout thrcugllout
°"' SWI.E
lllNIIIEI IIUllC SAMPLE DIEICIIPTJOII ca,e QI.WIT
ll!H Of
MEASURE
187132·35 111Jp cm pipe cowrina CIIA 115 a In. o.c. 187132·35 1111Jp on pipe c:overlna CIMA 61 12 in. O.D. 187133·35 111Jp on pipe covering OMA
181'134·35 111jp on pipe cowrlng CIIA 187136·36 111jp cm non·11uepect pipe CoYer OMA 310 4 in. o.o. 157136·36 Bjp <in non·suapoc:t pipe cover OMA 285 6 in. 0.0. 187136·36 1111Jp on non·IIUllpect pipe c:over CIIA 315 a in. o.D. 181136·36 BJp on non·auapect pipe cover OMA 185 12 1n. O.D.
Ul7131·36 1111Jp on non·auapgct pipe cover OMA 187138·36 ajp on non·muapect pipe covar OMA 187143· Je 11111Jp on non·11uspec:t pipe cover OM 115 6 In. 0.0. 187143·38 ajp on non·11U11pec:t pipe cover OMA lllO 8 in. O.D.
187143·38 111jp on non·11Wp11Ct pipe cover 4lflA 28111 10 in. o.11. 187144·38 BJp <in non·suepect pl,- cover OIIA 1151145·38 111Jp on non-suspect pi,- cover <JNA
The HVAC piping In this rOGIII runs fros the area around the convertor tanks to lar1119 air hmndllne unite throughOL!t the rOCIIID. Many of the pipK are at or near the ceH fllQ. There 111r11 local !zed 11.-us of cantect and
11&ter a-11• throughout tile l'OOIII.
lluildi~ IMull!ber: 050 Page 133
Bulldins !illflMt: INTEll!IIATIOIIAL ARRIVALS BUILOIMG .me AIIIPCRT
Building Type: TERHIIIIAI. tonetructed: 1951
inspected: 04/29/88
Inspector: lllryent/Gldeon
l'll"f
ID X Ell? IIEIOIAL llEPUCSEltT
AA POT PL COSTS COSTS
l<IT!M 50 l9 IU '7.446 54.371 lli!NS 50 l9 IU $6,226 $3,891
10 19 HI 0 19 IU
INS/I ,s 39 IU sn.11a $6,510 IIWS/1 45 ]9 HI S14,Sl1 SS,712 ffi!S/R ,5 l9 HI $20,396 $11,992 lll,IS/I ,s ]9 Iii s1a.w St1,IS01
55 351 HI ,o l9 IU OISJi O l9 IU $5,985 SJ,516 MJII il 39 HI $24,605 $14,467 C\!SJII il ]9 JU m,saz $14,739
45 39 JU 0 ]9 HI
AIIEA TOTAi. $183,206 $110,824
TOTAL
COSJS
Stt,ez~ St0, 11lj
$18,228 .S23,54Ji S3Z,~ .$30,6841
i S9,501i
.s19,oni
$39,3211
$294 0301 .
264 PORT AUTHORITY Center Sectlon·1at floor·URIZ AREA A\IIEIIAGE X A.Siii • OX
on l·be- · 117047·15 fireproofing
117048·15 firepi-ooflne 1157049·75 fireproofing
, 187050·15 fireproofing
1157051·15 fireproofing
one au: OMC
OHC
OIC
3680 sq.ft. 0
II 0
0 0
HALL·tlH8RfLL ENVIROHNEMTAL SERVICES. EMC.
A&beatoa Asaessaent Survey
H·IC luildlf!G I: 21
AIIEA JfMAlili AIU llESCII IPrlonl
I UICAT IOII Of Mo\'l'EUAl
SAIIPI.E IIUNIIER IIIUI..C UM?Lf DESCIIIPTIOII
Qll,N UII Ir Of
COOE Q\Wit IEASU!lE
lluHding N~: 050 Piage 134
Suildl~ Id-: UITERMATIOIAL ARRIVALS IUIU>lltG JFIC AHl'Qfli
iul ldll'lt,I Type: ifRflllW.
Con.mtructed: 1957 I nap«ted: 114/29 /88
l11t1pec:tcr: lllryMt/&idilon
PIP£ X f)I.I> IEHOVAL REPUCEMEIIT TOTAL
ID ASI POT PL COSlS COSTS COSTS
AIIIEA TOTAL $0 $0
------- --·
$0
265 i'OIIT Alli 1:100 fill' C&lnt<ar Sect4~·1st fl1110r·Ullli2 AIEA AVEIIAGE X ASI - 331
brccc:llar stac:lt 1!7140·31 breec:her/exil11t1111t stec:k pmctdna OB 125 cq.ft. I)
1871-U·J? breedlor/uhauiat stec:t pad:ina OIC I!)
187142-31 breer:her/exllllUSt stec:lt pac:ltlna CIIII I)
dolllestic: converter tanit 11 187156-42 boiler/unit insulation (N 151 sq. ft. 55 31 m s1.221 ss.m S13,004 187151·42 boiler/tllnlt Insulation Oil 211 H UI
1i7t58-42 boiter/tmnlc insulation 08 llli 31 Ui
domestic converter tllnlt az 1i7159·4l boiler/tank insulation Olli 1Sil sq.ft. lll Ji Jill S1,221 $5,783 $13,004
117160-41 bolter/tllllllr. Insulation Oil 25 38 Bii
187161·43 boiler/tank l1111uletilln (N 40 31 m ooiler tri 187162·44 bol ler/tanlt insttlatloo (N 99 sq.ft. SO 31 m ~-™ Sl.792 sa.su
il7'63-44 .boiler/tank Insulation Oltl 65 311 HI 187164·44 boiler/tank lnsulatfcin all 60 lll IU
IIIISJII COfl'ofcrtor tllllk Ill 161165·45 .boHer/tri ll'llluletlon OKA 10 eq.ft. 45 lll IU $3,347 $2,681 ~.oza t17166·45 lbollei-/tri insulation all 40 31 IU
187t61·'5 boiler/tank Insulation all 511 lll IU
IIIIS/ll cOl!l'llertor tmnt n 111168·46 boiler/tri insulation De 10 1q.ft. 25 31 IU $3,347 S2,681 S6,02a 117169·'6 boiler/tank Insulation all 111 38 m 117i10·46 boller/tllllllr. lneulattc,n all 20 31 UI
MIIS/11 converter t&nt 11,'J 187111·47 boiler/tank Insulation aw 711 11q. ft. 20 lll m Sl,347 $2,681 $6,028
187112·41 boiler/tent insulation IHI 30 38 IU
1217173·41 boi ler/tri Insulation QI.II 50 38 Iii
ffALL·KIIIIIIREll ENVIRONIEIITAl SERVICES, INC.
Asbestos Asseast11e11t Survey
ti-IC Building I: 21
AREA lEIIANT Al!EA IIIEiiCRIPTIOII
S LOCATION Of MATERIAL SAl>IPLE UI.NEI IIWC $AMPLE OfSCIUPHOlt
o&al UNIT Of
alOf QUAMT MEASURE
OOIIICstic convertor tria are enc:apgulated with @ bnvy c:o11t of paint, es is tb41 boiler tank, but both haw e few
isolated erea.11 of contact ~ In a wry GMU 111r111a. Jb11 three c:om,111rtor tenu are enc:apaulsted 1111 di II llle4:at jecltet and 11111re obcerved to be fin gocd condition.
Building ll!umiier: 050 P~ 135
Building lllldlllllt: IIIITERIIATIOliAL ARRIVALS IUILDIIIG .ifiC Alltl'OltT
Buildll'IQI Type: lERMIIIJU.
Canstracted: 1957
iNPGCted: 04/29/M Rnspector: · 1ry11nt/Gideoo
PIPE % Elli' REMO\IAL REPLACEMENT TOTAL JD AS3 l'Ol PL COSTS COSTS COliTS
AREA lOTIU. $29,217 $23,401 $52,618
266 POU AU'i'IIORITl East Yine·1at floor·Jllll'lltor•a Cloaet AHA 1111\ERAGE X AA - 42:X
above wmllh basin above wish batln above wash basin
above waall basin
187107·0 wrapped cerdlboard/pmper pipe OIA
187111·0 c:orrusatecll pipe COYerlne OIA
1(1710&·28 ajp on wrapped cerd>card/paper OiA
1871119·28 ajp on wapped c:arct,oard/peper OiA
181110·28 ajp an wrapped cardboard/paper OIIA
187112·29 ajp on con-usate plpt covering OiA
187113·29 ajp on corn,aaate pipe c:owrlne CIA 187114·29 ajp en corrusate pipe covering OMA
4 ft. 4 in. o.o. 4 ft. 4 In. o.o. 2 4 fn. o.o.
1 4 fn. O.D.
A large hole had bGlen knocked In the well above II waah win In thla clout am corrupted c:1rcl»ard and wrllpped
cardboard were ellpCSl!d.
!)QI
ID~
!)QI
DIN
Z 45 u 70 45 u 6ll 45 n 40 45 ii lll 45 u 55 45 u 50 45 n 50 45 u
MEA TOTAi.
267 POll'i' AI.ITIIOIIITY E1111t fil'IQl!r-tat Floor AREA AIIEIIAGE :II. ASII - 31'X
storage garage
ihe 1111teriel is In fair con:11tlcn.
187846·12 ajp on l'IOl'l·suspect pipe c:-r OiA
187847·12 111Jp on non-auspect pipe cover OKA
187148·12 111Jp on non•IIUSpKlt plJl)II COVIii' OMA
40 4 in. O.D. Old 30 21 UI 40 21 Ui
40 21 UI
llafA TOTAi..
$48 $30 $14 $48 $]0 $71 $16 $42 $118
Sl& $21 $59
$210 S12l sn3
$1,512 S840 152,352
$1,512 S840 52,352
IIALL-KIHIIRELL ENVIROIIHENTAL SEIIVICES, lllC.
'l\sbestoa Assmas11>e111t Survey
H·K Duildin,g #: 21
AIIEA TEIIANT AREA DHCIIIPHOM II LOCATIOII Of IU.TEIIA!.
268 POll11' AlffOORHY Wost flnser·1at flCIOI'
!Ml int mhoi,-m str~tw-s& ste&I ! ·beesls
fiiliiarstlon corridor·cn steel B·~
SMIN.E ~II
18?W-91 1S730·91 Ul~·91 Ul1J65·91 111366-91 187.567-91 1117.568·91 187.569-91
IIIUUC SANPllE DEDIPTIC*
u r.,-oouns fl l'lpf"OOftft8
flreprooflne f I reprooffl18 flreproofil'I& fireproofing f lreproof Ing fl reproofing
269 POlU .AUTIIOIU111' West finacr-1st floor·Caflina·
south imieretl«a con·ldor·thrOUilJliout 181371·0 ac:OIUlltical tile
270 l'Oiti AUTIIORITY East flnsar·1at floor-Celling
mlntenmnce llhop 1117007·0 drop or lay-In panel
271 POU AUJlfCUl'Y East fill'l1iler·1at floor·M1int1111W111,C:e Shop
OM Ulllf Of
II.Ii ldif\9 llud:>er: 050 Paae 136 llulldlng 1,1.,....; IIITEIIIIATJ061Al AIIIUIIALS IIUllDIIIG
Jfl( A I RPO!tJ
lluHding Twe: fftitlllAL
COMtru:ted: 1957 inspected: 0&,/'29/84
Inspector; lryllll'lt/Gldeon
PIPE I EXP ilEHOVAI. IEl'UCEJIEMT TOTAL C01>E QUAIIJ IEASUli ID ASIII POJ PL COSTS COSTS COSIS
AREA AVERAGE l ASII · Cll
<me 600 liq-ft. 0
CIIMC 400 liq. ft. 0 OMC (l
c»!C (l
OMC 0
OMC 0
ClltC 0
ClltC 0
MEA TOTAL 00 !O
AIIEA AlleftAGE l ASII - • Q94G 4600 sq.ft. 0
AIIIEA TOTAi. $0 $0
AREA AVERAGE X ASi • OI
OM6 21WO sq. ft. 0
MEA U:IJAL $0 so
AREA AVERAGE I ASS - ox
$0
$0
so
KALL-KIMBRELL Ell~iROl!MfNTAl SElllVlCfS, lll!C.
Asbesto5 Assess...,nt Survey
K-K Building#: 2t
AREA TEIIAIIT AIIEA DESCUPTICldil
I LOCATICM Of 14AUIUAL
throushout
2Tl PORT AUTIIOl!ITY East Finger-1st floor
SM'lfll:
IUIIEII llllll.11: SAl'IPI..E Df&UIPT Ullll
t813l3-0 vinyl floor tile
---·- -- ii rep4"ooflng .. _. ___ ___ , ....... HreprooflnQI .. -·- --
181364-91 flr.-ooftng 111736S-91 fireproofing
11!17366·91 fireproofing 1111367·91 ti reprooflna 187368·91 fireproofing
181369-91 fireprooflna
Bui I ding IIUl!lber: 050 Page 137 iluHding 11-: UITEill!ATIOIW. ARRIVALS III.IIU>lNG
.me A I RPORT
lllui ldine Type: fERIUIW. Ccrt11tl"UCted: 1951
l.nspected: 04/29/SS imipector: !llry11nt!Gideon
O&M Ulill Of
al>E QUAIIT NEASUIIE
PIN '.II: EX!>
ID Aili POT Pl
AEJIOVAL. llfPLACEMEllt COSU COSTS
TOTAL COSTS
Oil 2800 sq_ft. 0
AIIEA TOTA!.
AREA AIIEIIAGE X ASI - 0%
100 sq.ft- Cl
160 sq.ft- Cl Cl
0 0
Cl 0
Cl
AAEA TOTAL
$0 $0
$0 $0
so
so
HALl.-~IHIIREll. EIIV!ROIIIIEIITAL SERVICES, IIIC.
"Asbestos Assessment Survey
ti-IC llui ldlng Ill: 21
AAEA TENANT AREA DESCJtlPTIOII
fl lOCA Tl 0$! Of !IA TEJUAl
$Alfie
DIIJIIIIIIEI oou: SAMPLE OESCllPTIOII O&n
CCIOE llltWIT
lllH OF
MEASURE
lluildine ll~r: 050 Page 139 Building lla;ae: IIITEIINATIOIIAL ARRIVALS BUILDING
JFK All!POlli
Bui !dill!II Type: TEJll>liMAI.
Constructed: 1957 Inspected: 04/Z'il/118 Inspector: lryant/Gidecn
l'li>E X HP RENDVAI.. REPLACEMENT ID ASII POT Pl COSTS COSTS
MEA TOTAi. so $0
TOTAL COSTS
$0
HALL·~BHllRELL ENVIRONl4ENTAl SERVJCES0 IIIC.
Asbestos Asae&IB&!lellt Survey
H·t muildi09 #: 21
AREA lEtiAMT AREA OESCIIIPT!OIII I UlCATIOII Of 8"iEIIAL
Wll'l.E IIILNIEll lltlU( SAMPLE DESCUPTIOIII
OIOI UIIIT Of
CODE CIUAIIT IEASIJIIE
Bui I ding lluaber: 050 P119e 140
lluildnl'llll Nllldlllll: IIITEl!IIATIOIIAL ARRIVALS IUltDIMG ,!fl( AIRPOIIT
lluildi09 Type: JEIIIUIIAL ConstructllCI: 1957
lmpectllld: 6'/29/88
ln11pcctor: Brysnt/Gldeon
PIH: l DP ia40\fAl llEPLACENENt ID ASI !'OT Pl costs COSTS
TOTAL COSTS
KALL·KIMBRELL fNVIROIIHENTAl liEl!ViCES. INC.
Asbestos Assessment Survey
H-K Building#: 21
AREA TENANT AREA OESCll!Pilllll II I..OCA TIOIII Of i'!AlEIUAI..
UN!'I.IE
IILMlfl lilULIC SAMPLE l>ESCIUPTJOIII
O&M UNH Of
CODE CIUADIT l'IEASURE
liuilding Nl&1iber:. 050 P~ 141 Building N.....,: INJERIIATIOIIAI. ARRIVALS BUILDING
.me AJRPOIIT Building lype: TERM[NAL
Constructed; 1951
Inspected: 04/29/88
Inspector: BryMt/Gldecn
Pl.PE II>
llf. EXP ltfMOIIAL ltEPUC£NfNT ASB POT Pi. COSTS COSTS
TOTAL
~TS
MALL·IC!IISRELL ENVIROOll4ENTAL SERVICES, !NC.
Asbestos Asses&111ent Survey
Ii-I( iulld'ing I: 21
AIIEII 1UANT .UEA DESatlfi'Hmt ti LOCAHOM OF MTEIUAL
MMf'U:
IIIINEII! IIIIJLIC SAM?LE DESCIIIPHOII OU! Ulllr Of
COCE Qi.WIT IEASUIE
Vile •teriel ia a irucber-Ulle inwlaUon applied to pipe on whillt appears tc ba M old sir-conditioner ccmtrol ay11te111.
Bui ldin;i l!Ullber: ll50 Pa99 142
iulldlng N&flldt: INTERNATIONAL ARRIVAlS llllllOING JflC Alltl'OltT
liul lding Type: TellHINM.
Comtruct!!d: 1957
hupe,; ted: 114/29 /88 Inspector: lryantl(;fdeon
l'lll'E I OP IWOIAI. REPLACEltEIR IC A!>a POT PL COSTS COSTS
AREA TOTAi. $4 S3
TOTAL
cosu
$1
HALL·KlMBRELL ENVIROIIKENTAL SERVICES, INC.
Asbestos Aues-t Survey
H·K Building S: 21
AREA TENANT AREA DESCRIPT!Cld 4' lOCATBCIIN OF ~TEIUAL
IWIPLIE IUIIEIII lilUUC Utel'LE DfSCUPtiOII °'" Cll>E QUA.Iii
LllilT Of
MEASURE
llle Nteri11ft in tlill11 aru ahooia elen,e of contact and woter ~. with the IIOl'G traveled areas h11vi11Q mrc
severe dllmege. Tillis 1111111terh1l 111 also 111\bjac:t to air sn>alon and lbui ldine vibration.
llui lc;iine IIU11100r: 050 Page 143
SuildiOlii N11111111: INTEIIIIIATi<»IAL AIIIIIIVALS IUILOING JI'&:: AIIIPOIIT
Bi,ilding Type: TEIIIHIIIAl
Constructed: 1951
Plll>E
Ill
lmpectocll: 1>4/29/118
Jnspector: Crya,nt/Gideon
x IEl(P llNO'IIAl REPLACEJIENT
ASI PCT Pt COSTS COSTS TOTAL COSTS
AREA TOTAL 1,442.282 $423,259 1,865.541
NALL-ICINBRfLL fNVIROl!HENTAL SERVICES, BIIIC.
AsbeMo& AssesSJnCnt Survey
M·IC Building I: 21
AREA TENANT AREA DESCRJPTIOII
' lOCAllOI! OF IIATEIIAl SMl?lE NIINEI
O&N u,m Of
IUlK SAKPLE DEscatlPTIOII COOE QUANT MEASURE
-~-- --------~ ------------
Building lluroer: 050 Page 144
Building NIIIIIC: INTERNATIONAL ARRIVALS IUILOIIIG JFIC AIIPOIIIT
llui !ding lVl)II: JERMIIW. C4l«ll!tl'ucted: 1957
Inspected: 04/29/88
Inspector: lllry11.11t/Gldllon
PIPE
IO
X EJU> REMOVAL IEPlACEMEMf TOTAL ASB POT Pl COSTS COSTS COSTS
HALL·ICIHBll£Ll fNVIROIIKEIITAL SERVICES, IIIC.
Asbe$tos Assesi.ment Survey
H·IC Building I: 21
AREA l'ENAIIT AREA OESCIIIHl!ltl
Ill 1..0CA ii Oii Of DIA ifHAI. UNl'LE
IUlll:11 &IULIC lliAHPlf DEsa!IPTlllel
O£III UIIH OF
CODE WAIIT NEASUll!E
81.11 lding Nullber: 0511 P119e 145 Building N111111e: illlERIIATIOIIAL ARRIVALS IIJILDIIIG
Jfl( AIIIIPORt
Building Type: i.Eat!UIAL
Corn;tructed: 1957
l~ted: 04/29/815
lnapeetor; lryant/Gldeon
PIPE % EIIP IEMOVAI. REPUcaEllt ID AS& POT Pl. COSTS C:OSTli
tOtAI.
costs
~ u, l!:! ;: .. . Ill ! ... ~ .. :,., ... ... .. ... .. "' :,, - w 1 3 ~ .. ! Ill "' I "' .. - * )!; ;: ~
N
u1 ! :z .... .. • :I .. ... ~ ! .... .. ~ w .. :§ ... "" .. I ! ... .. ·; ~
0 .. ... ... .. ... ! w ,c .... :is ... < .... .. .. = ~ :<
.... .., ~i ~ .. a
9 !iii fi ;; "' _, ~ ;;; "' ~
i... 1 I I ;: I i I '; "' ! - ... :: 0 l!!:i~~t _, ... ~ ~ ~ ~ <F ~ Cl
j j 111 ii ~2 ....... ! ~ t t ~ "' .. !' ~
!!' :; ·- i !! I! :9 ... -~ ~ ·~ (J ~ ~ :::: i :,
Ii .. ...
i! u :! .; ~ ili Ill .§ .i ..J ..,; ! ... -... II. M 2 ...... I ~ g i
"' ... "" ... "" Q ~ ; i N
= • :5 ! ... .. ~-..., .. r .. ... ... .. 8 w .. :§ IX <( ~ ... "' ,.;: .. ·; .. ':' 0 ... ... .. .. .. ... 1l ¥ c ..... 1 .. <( ... "' ,. <(
HALL·KI.HIIRELL fHIIIROMHENJA( Sl:R\11.CES, IIIC.
Asbestos As&eslllDCnt Survey
H·K Building#: 21
AREA TENANT AREA OfSCilPTIIOli I LOCATIOli Of MATfllAl
Wil'llE IIIIMIIEllt IIIULIC SAMPLE IIEsat IPHOII
O&II UtllT llf
cooe WAJIT IEASUIIE
Bui I ding lllJmbotr: 050 Page 148
Building Nlil!lllle: INTIERIIATIOIIAL ARRI\/AlS llUILDlNG JflC AIRPORT
llluUding ?)'I"": tfRMIIIAL
C0i11Jitru::ted: 1957
PIPf ID
Inspected; 04/29/811 i nspcc:tor: llryant/Gideon
,: Ell? REMOIIAL REPLACEMENT Ailil POT PL COSiS COSTS
TOTAL COSTS
HALL-KIMBRELL ENVIROiillfNIAL SERVICES, INC.
Asbestos AssesslllCf'lt SIJll"vey
H-l Building I: 21
AIIIEA TENAIIT AIEA llEliCRIPUlilll
I LOCAHOtl Of IIATEIUAl
SAMPLE Iii.NIER IWl.11( SAl'IPLE DEKIUPTIOII
.,
Ol!H Ullil Of
CCJDE CIUAIIT IEASUIIE
Building NUllber: 050 Page 149
Buildill!il Naee: IMlEJIMATIOlllll. ARRIVALS IIUILOlMG JFK AUIPOOT
Building Type: lEMllW.
Constructed: 1951 Inspected: 04/29/88 Inspector: llryant/Gldeon
PIPE ll. EJU> latOVAL IIEPLACENEIIT Ill ASS POT Pl COSTS COSTS
TOUL costs
HALL·(IH8RfLL ENVIROIIMENtAl SERVICES, IIIIC.
Asbcstoc As.es5rnent Survey
H·S: &utldlns,i S: 21
AREA TEIIANT AREA OEISCllPT!lle4 M LOCATIOII Of liATEltlAl.
SMPI.E
lllmEIII IIUU( SAHl!'LE OHCllllf'UOII
GUI UIIH Of
COOE QUANT lllEASURE
Building NU!lber: 050 Page 150 Buildins ltllllllle: JNTERIIATIOl!Al ARRIVALS IUILDING
.IFS: Allll?OaT
Building Type: JIEltUNAl Connructod: 1951
Inspected: 04/29/St,
inspector: lryoot/Gldeon
PBl"f I: VII' llftOIAL llEPLACEIEIJ TOTAL
ID AH POT Pl 00$TS COSTS COSTS
c.i !
:i tJ
> .. ~ ... c ,.. ... 41 .. j I .. .. ;;j > i "" i.: ... .. .. .., 41 ? .J "' "' ..
~ "' "' "' :!: .... 3 0
'¥ .. Oil ... .... 11 ... .., c "' :a: = <(
! ... ....
8 Cl
...... I!
! ~ ..... 4, .. - ... i i l!i ; 8 c -.... c ... 8 ~ .., ,.. ... ... c ... ... .. <C
..; ~
.,,· !!l ; .. ~ ! ... :;t "I;
t ... ; .. !!: "' i ... J
.. ... :ii i .... ... « ... Cl ~ ;; i N .,i ,. ;. :l# ! w .. "' -.... .. ! ~ .., UI
w ~ § ... ~ ... ; ! ... .. j 0 w ':' .. ... .. ... .8 ':' "' .., w
"' "' :,: "" "" ::,: <( ...
HJIJ.l-~IMBRELL fllVIRa>il'!ElliAL SERVICES, INC-
AsbeSt0$ Assessaent Survey
H-K Building S: 21
AREA lEIIAllf AREA OESCIUPUce!
Ill LOCAHOII OF MATEIUAL
SAIIPLE IUIIEII ltlllC SNIPLE DESCII IPTIOli
CUI I.IIIH OF
COOE CIUAIIT MEASLll!E
Sui !ding NUllbe.: 050 P~ 153
lklildillll II-: IIITERIIATICIIAL Al!IUVALS IUUDIIIG Jfll: A!Rp(ljtl
&uHding Typct: Tl:IIHI IIAL Constructed: 1957
lnspectl!d: 04/29/118 Inspector: &ryent/Gideon
PIPE
ID
1' UP REMOVAL REPLACEMENT TOJAL ASII l'Ol Pl COSTS COSTS COSTS
HAll·KJHSRfll EIIVIII0$1Ml:NJAL SERVICES, JIIC.
A~bestos AsseslSl!lent Survey
H·D( Building S: 21
AREA iENAlll A•EA OESCIIIFTIOII fl LOCATIOII Of MATERIAL
SAHPlf
IUlll9 BUllC S#JIPl.E DEBCIUPTUlll OU! lllllH OF
CODE CIIWIT t!IEASUIIE
Building IIU!lllb&r: 050 IPavt 154
Bulldil'l!iJ ii-; U!TfilllATIOIW. .ARRIVALS BUILDING Jfl( AlltPOIH
!luildllns Type; TEIIIHIIIAL
Constructed: 1951 Inspected; 04/29/8!
I na:pector: lilrya.nt/Gidaon
IP!PIE
Ill
X El!P IIENOIIAL IIEPLACl:NE•T TOTAL ASII POT Pl COSTS costs COSTS
IIALL·KlMIIRELL ENVIRONMENTAL SERVICES, INC.
Asbestos A&S8$$111e«lt Survey
IMC Building ti; 21
AREA TENANT AREA OESCRIPilOlil I LOCAilOII Of IIJATBIAL
lWIPLE
IANEI IIIIUI.IC SAMPLE DESCAIPJIOIO O&II wn OF
CWE WAIIT MEASURE
Building Number: 050 Page 155
Building Wa.me: IMTERIIATIOIIAL ARRIVALS BUILOJNG JFK iUltPOIT
llui !ding Type: TEIIMUIAL
Constll'UCted:: 1957
Inspected: 04/29/88 Inspector:: tr-yant/Gideon
PIPE 1' fJi(p REm/Al REPI.ACENEIIT TOTAL ID AS!i\ POT Pl cosn; COSTS COSTS
i ::,,
"' w ... ... I ..
I .... i
i "' .. ... .. .,;
~ .. .. .! ~
... "'
ii
HALL-KlllllRELL ENVIROIIKENTAL SERVICES, INC.
Asbestos AssC$saent Survey
II-IC Suildh,g ti: 21
AIEA TENA.141 AHA DESCUPTHIII WIIPI.E • O&le
Building Nuober: 050 P1199 157 lluildlng bae: ltlTERIU<TIOIIAI. AIIIUVAI.S BUILDING
Jfl( AIRP(IU
llul Id Ing Type: TEIIHIIW.
Constructed: 1957
inspected: 04/29/118
inepec:tor: Srymt/Gideoll
REIQOVAL REPLACEIIENT
ffALL-l(IIISRfLL fNYi~NiAL $ElltVlaE$0
INC.
Asbestos Assessment Survey
H-K Building I: 21
AIU:4 TEIIAIIT AftfA CESC&IPllClli I lOCAJIOlil Of MAifl!Al
SMPI.E ll'lllllifl IIIULI( SAMPLE DEISCIBPTlllll
cue alOf:
l!IIIH Of
QtWIJ MEASURE
llui ldlng lillmiber: 050 Page 155
lultdlng Mao!IQ: JIIJERIIATIOIUU. ARRIVALS lllllOIIIG JFK AUifORT
lilul !ding Type: TERMIIIAL Constructed: 1957
i?IPf
ID
inspected: 04/29/84
lmpector: lryent/Gldeon
l EU>
ASI POT Pl laiOVAL IIEPLACENENi
COSTS COSTS TOTAi.
COSJ~
.., ... .. i ;; "' ... .... ... w
"' ~ i? .... .., c
"'
.. "'
~ ..... c
ii ~ 111·
~ ; 1111
~ 8 .,, .... ii:
,c
"' r ... ... "'1 a ... ~ ~
... ... w I .. .. :;:j ICI l!5 > I ,c :a: ii ... ~ w ... ... .. .... II .. .. ... .. c < w "' :§ .. 8 "' < i I .., .. ·s ii' 0 w .. • ... .. ... B >f' ~ ..J .. "' "' ... ,..
"' ,.; ...:
. u :!I v, I!! i w fl> ! ~ ...
f "' ... -... .... :II - w
I ~ g ... .. ... 1'i ~ ;E
> I "'c!5 :I! ii: w i1J w ... ~ -.J " g, ... ..,
"' ... g w .. ll!I c :!:! i ... :,,: "' ·:; 2 ... ¥- ... a, .. .... 1! '>f'
,c ... ::: ... ~ : "" ..
HAll·KIN8REtL ENVIROliPIENTAL SERVICES, IIIIC.
• ASbe$tos Asse&Slllent Survey
H·K Building S; 21
AltEA ifl!Al!T Alie.A DESCIIIPTIOII
fl LOCATIOII Of MAUii.Ai. SNftf
IIIUllllfll IIIOI.K SA!f'I.E OfSCIUPTIOII OIM UIUT Of
CODE QUAIIT MEASURE
Building NUll!bor: 050 l?age 162 iiuildini,i 1<11>11111!: illlTERMATIOIIAl ARRIVALS BUILDING
JFK AIIIPOIIIJ
Building Type: JER~INAL Constructed: 1957 ·
inspected: 04/29/33 lnzpector: lryant/Gldeon
PIP!i: x DI" llEDDIAl REPLACENEIIT ID AS& POJ Pl COSTS COSTS
TOTAl
COSTS
i! ..; :!! .,.· ... ... ; .. :JC i!I ... ... < !
.::: ~ ... ~ ... z ... w ; i j .,. .. ... .. ~ ~ ; i 1\1
"" .. : ! w ll· c -_,
~ ... ... "' g w .. ~
.. .. <C ~ ~ ... .. :i a Q .... ,.. ... • ...
.:.. .. <C ! w _,
'"' .... • ~ .. .. .. <(
tiAll-KIMSRELL ENVillOIIHEUTAL SERYJCl:S, l~C.
Asbe5tos A,ses5tllent Survey
H-K Suildi11Q M: 21
AIIEA TENANT .IUIEA DESCIIPflOII I LOCATION Of l'IATERIAL
SNIPLll!
IUIIIEIII SUI.IC SAMPLE DEiC!'I I Plier.I 0£H UIIIT OF
CODE QUANT HEASIJRE
lluHdin,g IIUl'lber: 050 p~ 164 Building IIMBC: INTERIIATIOldAL ARRIVALS liUILDIIIG
JFK AIIIPOIU llui I ding Type: lfffl!IW.
co.,uructed: 1957 lnspcctlld: 04/29/88 !mpcctor: lllryant/Glde«i
PIPE X EXP REMOVAL REPLACEMENT II> ASE POT PL COSTS COSTS
TOTAL COSTS
HALL·Kl"BRELL ENVJROlll4ENTAL SERVICfS, IIIC.
• Asbestos ASSCSSIDCOl Survey
H·l(.iullding II: 21
AREA TENANT AREA OESCIIIPIIOIII II LOCAHOOI Of RATEIUAl
e
$Allll'Lf
IIIMIEII lllll( SAMPLE OESQIPTIOOI o< UIIH Of
CODE QUAIIJ MEASURE
Buildine NU!lber: 050 Page 165 Building Naae: llltEllNATlOIIAl ARRIVALS IIUILOING
JFK AIRPORT lluildill,Q Type: lElll>IIIW.
Constructed: 1957
lnss»cted: 04/29/M lnspec:tor: liryMt/Gideon
PIPE X EXP REMOVAL IEPUCEIIEIIT ID ASS POT Pl. COSTS COSTS
TOI AL COSTS
..; :!! flll.
~ > ... al
! ~ ~ ),. ... -... ~ a. .. .. - ... I ~ g ...
w i:E .. .. ... Q ~ ;: I N
i:5 ! .. -.... "' ~ .. ... ti I ... .... "' ..: .... .. ;; ... 8 "" "" ~ ! ... ..
'5 ""' 0 ... ¥ .. ... .. .. ... ..8 ~ i5 ... ..: "' "' "" ... "' "" ""
HALL·OCINIIR~ll EIIVIROlit!ENTAL SERVICES, IIIC.
Asbestos AssesSllll!flt Stu-vey
H·( Building#: 21
AIIU TEIWIJ AREA DESCR IPHODI
#I LOCAHOII Of MTHIAL Ul!Pt.E IIIUIIIIEI llUUC SANPLE DESCIUPTIOO
lllM
CODE QIJA&IT lllr!IT Of
MEASURE
lilui I ding Number: 050 Page 167
lluHdlng oo-: llliEl!IIATIOIU.l ARRIVALS BUllOIMG ,!fl( A IIH'OtilT
lluHdins lype: TESIMIIIAI.
Constructed: 1957 Inspected: 04/29/88 Inspector: llryant/liidean
PIPE
ID X IEXP
ASI l'OT PL aalOVAL REPLACBENJ
COSTS • COSJS TOTAL
COSTS
HALL·KIHBRELl EHVIRONlleNJAL SERVICES, INC.
Asbestos Assessment Survey
H-i iluildinsi #: 21
AREA TENANT AJIEA IDESCIIPJIOII # LOCATIOII Of MATERIAL.
5ANl'I..E
IIIIMIIEfl IULIIC SA!IPLE DESCiUPHON OUt UNIT Of
CODE QUAJIT tlEASIJIIE
lllui ldi1>11 lilaber: 050 Pqe 166
ilulldi119 N-. Ull'a!PIATIOIW. ARRIVALS IIUILOJIIG
JFIC AIIIPOlt llluildins Type; TERMINAL
C«istructod: 1957 Inspected: fJ4/29/88
lnepoctor; llry.11nt/Gideon
PIPE I EXP ltl:MO\IAL REPt.ACEt4EIIJ II> ASII POT IPL COSTS COS JS
JO JAL
COSTS
..; ~
.,.· ... u ;: ; ... c ~ .. "' >
I j
"' ... ; i .. w ... ~ ... Ill w .. "' < m ;a; .. .. 3 .:.. 11 ... < \II
"' <
.. N
i. ! :; '; ... ~
""
t .. ... .. ...
!! .... c .. ;; 11, - "' g i w Q ....
i:5 0
~ ! .. 8 ..
~ ... .. w ... c ~ 'Ill <
MALL-KIMBRELL ENVIROl!Hl:NTAL SERVICES, INC.
Asbestos A&&ess111Cnt Survey
M·IC Building#: 21
.AllfA mwn AIIEA I.IESCIIIPJICllt
I LOC.AUOII Of IIArEUAi.. SMPi.f IUIIEII llllllC SAlfl'I..IE DIESCRIPtlc»I
OUI UIIIJ Of
CODE QU.UJ IEASUIIE
lluilding NUl!lbcr: 050 IPa,ae t70
Building N11111e: ONTERIU.Tl'*"L ARRIVALS IUILDll!G Jfl( AHPOll!J
ii!ui I ding l)'Pe: TIEIIIIUlrlAI. Constructed: 1957
lnepectlld: 04/29/1!14
Inspector: llry<1111t/Gldilon
Plff
ID x f!U'
l!Si POT Pl IIENOVAL REPl.ACEIIEMt costs COSTS
TOTAL
COSTS
J ~
"' . ... u
> .. l.lt § ., ... "'
,.. . t ~ ... Cl • :,i j ... w
I 12 i ... .. ... ... Q ... > c: "' ~ 0
"' !· -w ! .., ... ':l -., !' . ... ... ..
~ w .. :; ... "' "' .. "' .. ... ll: ... :i .. ; e w .. "" .... ... .8 ¥ "' .... "' .... ~ .. .. ..
..,: "'
HALl-KIHBRIELl EIIVIROlilMEHTAi. SERVICES, INC.
Asbestos Asse..s,nent Survey
ff-II( Building I: 21
AREA TENANT AREA OESClillPTIOtl IJ LOCATION Of l'IAiflllAl
SWLE IUIISEI IIIIJLII( SAIIPLE cemDPHON
DUG lllllT OF
CODE 01.Wli IIEASIJltE
Ill.Ii I ding IIIS!lber: 050 PDQC 1ll ·luilding N11111111t: IIIJIElllAVJO&IAL AlRIVALS IUILOING
Jfll( AlllPOIIT
luilding Type: iEIUIINAL Constructed: 1957
lnapectlld: 04/29/81,
PIPE
II>
lmpector: lryant/Gldeon
l EXP IIEHOVAL lllfPUCENEIIT ASS POT Pl COSTS COSTS
TOTAL COSTS
_, "' s j i 5 ;I ..
IM ... _, j ! !
ex ~
i.. J Ii iii :3~ .. "' - ~ Ii c w
" ii,.. :,. ... ... :!! ~ ;! .:;
a. "' ~ ... Q , b j ........ a 2 ~ 1 "SI t i .. .. i i l ac ! z 2' !' .. 2 !' :; ! I - - :!! Q ~= ·~ u - :, :, a: -·; "' ... Gil
...... ~ ~ - < ! lit
... I
§§
! ;:: a.
§ w a
i 14 ;
ii
~ IA•
~ > .. \JI ! ... :;! >,. -"' ,__ ... .. a. "' .. > - w
I 3 ;i "' ... .. * :!I i I f\l
i; : l! w .. ~-... ti ~ ... -' ... < w ..
~ .. l:I .. <( ~ I
.., ... ·; .. 0 w
¥- .. "' ... ... .8 " ..: .. .;. ~ .. "' "' :,; < "'
NALL·Kl"18RELL ENVIR~IITAL $1:RV!CfS, IMC.
Asbestos Assesi.ment Survey
ll·K iuildlng #: 21
AiEA TEIWIT Alf.A OESCIIIIPTROII S LOCAHOII Of ICATHIAI.
$AMPlE
IUIIEII IIIIJU: SAHl'lE DESCIUPTJOII QUI
COOE !Jiiii Of
QUAlat IIEASIJRE
Suilclh19 IIURilbet": 050 Pa111t 174
lllullc:li«IIJ ll11111e: IIHEIU4ATIOIAL I\IIRIVALS WllDIIIG
.me ARIIIPOIIIT
llluildil'IG Type: iEIIHIIIM. CO!lilltructlld: 1957
IMpeeteci: 04/29/88 Inspector: lry11nt/Gldaon
PIPE % EllP IIEMOl,IAL REl'UCEIIENT HI ASI l'Oi Pl COSTS COSTS
TOfAt.
COSTS
HALL·KIIISRELL ENIIIROIU'll:NlAL SERVICES, illC.
• A£bestos Assessment Survey
H-IC Buildinsa #: 21
A~EA TENANT AREA D£SCRIPTIOII I kOCATIOII Of tlATERIAL
SMPI.E
eli.Nlll:I IULIC SAHPLE DESCIIIPTIOII
lt.O SAS t.lut Yina·1H floor-Above CaiUnt
pcrlMflfflt/drop cell inss·on .uni 1-1:11- 187563-91 fireprooflne 187364-91 fl reproofl11G 181365-91 flreproofine 187366·91 fheproofine 181361-91 fireproofing 187368-91 flreprooflne 181369·91 fireproofing
341 SAS West Yins·1st floor·Above Celti1111s
leadine to restrOOIIIIII 187836-11 imJp on non·BU&pec:t pipe cover
187el7·U 111jp on non-GU11p11Ct pipe cover
1ama-n ajp on IIOl'l·~t pipe COYet leadlns to air handl11N1 187875·21 ajp on non·au&pDCt pipit cover
187876·21 ajp on non·auspect pipit cover 187817·21 a}p on non--pect pipe cover
leadil'l!I to heaters 117136·36 1111jp on non·euspeclt pipe cover 117137·36 111jp on non•IIUllpect pipe cover
117138·36 111Jp on non-suspect pipe cover
OM(
liluihlliB'l9 llraber: 050 Paa- 175
Building ll111111e: INTElitllATl!lllAL ARRIVALS llllllDING
JfiC AIRfOIIT llui Idling Type: UIIIMIIML
COO$tructed: 1957 Inspected: 04/29/84
I napector: lllryBnt/Giclecn
Pll'f :t a? IEl40\/Al IEPL~T
COOE QUANT UIIIT OF
MEASURE ID ASB POT IPL COSTS COSTS
fQlAl COSTS
Dltc
OMC
Ole
Dltc
CIC
!lHC
l»IC
OIA
OM
OIA
<»IA OIA
4»IA QIA
04A
a4A
AJIEA AVEIIAGE X ASB - OX
1280 sq. ft. 0 0
0
0 0
0
0
AREA TOTAL
.AREA A IIEQAGE :t AS!ll • 3921.
14 4 In. O.D. Oii 10 15
25 15
20 15 10 6 in. o.o. a.'S/11 311 15
40 15
311 1$
26 4 in. 0.0. lil,IS/11 '45 15 55 15
'40 15
$0 $0 $0
IV 11529 1294 1821,
I'll
IV IV $520 Sl06 1826 IV
111 Ill $983 $546 s1,529,
Ill Ill
Th• PUdded joint pec:king11 on non·wapect insulation ere above the drop cefil ing. The quentitiea given ere AREA TOTAL Sl,032 $1, 146 Sl,178 esti111ates taken frm the inspection.
HALL-KIHSRfLL EHVIROIIIIIENTAL SERVICES, l~C.
Asbestos Assessnent Survey
IM'. Building l!I: 21
AREA TENANT AREA Dfstl!IPTIOGI l!I LOCATIIJII OF !IAlERIAl
. 342 SAS lleat Ylne-111t Hooe
ti.9111110e h&ndl ins erea
l)ecii: offic111S·111t cell Ina & west lldll!H
air h11ndl ine rOQlll·by air hMdllel"lll
al r hand! lne rOC111-by ak hmndlera
air handl lnQ rOOllll·by air handlen11
back offices·at celling
be99m11e hl&lldling mrea
bacl: offic:u-et cell Ing & wet weH
baosiage handling area
SAHPI..IE
IUIIH IWlK SAHPLE D!:SCIJPT!Clft
Old! wn oF COOE CIIWIT .IEASUl!E
Bui ldil'l!I Nlaber: 050 P11t1a 176
Buildang N11111e: INTEiNATI014AL ARl!IVALS BUtLDlNG .me AIRPOltT
Building type: TEIIUIIAL
Coostructed: 1957
Inspected: 04J29Jet!, lnapector: li!'yantJGidoon
PIP£ X f)(P iBIOVAl REPLACENENT TOTAL .
i D ASII POT PL OOSH COSTS COSTS
AREA AVERAGE l W - 21%
H16&6·0 corrupted pipe CO'olllrln; OM 75 ft. 6 in. O.D. ~/I! 20 24 UI $1,309 $819 sz,tza ~87686-0 corrusotlld ptpe c:owrlne mA 10 ft. 4 In. O.D. IIIIS/it 20 24 HI $840 $526 $1,366 1181136·36 ajp on ncn-auapec:a pipe CQYCI" OMA 12 4 in. O.D. 111,!S/R 45 24 911 $454 $252 $706 187131-36 111jp on non-suspect pipe covmr a«A 55 24 IU 181138-36 111jp on ncn-suapec:t pipe cover OIA 40 24 UI 181141-34 111jp en non-suspect pipe cover OI,\ 24 .(, in. O.D. Cid'S/R 0 24 Ill $907 $504 $1,411 187143-34 111jp on non-111uapcict pipe c:ovar OMA 14 a in. o.o. CV../11 0 24 UI $907 SSl3 S1,440 181144-34 111jp on non·suapact pipe c:over OMA 45 24 UJI 18711,S·la 111Jp on non·s1.111pec:t pipe cover ONA 0 z, UI
187044·74 111jp on non-suspect pipe cover OHA 8 a In. o.o. lll!i 0 1&7045·74 111jp on nan·aU&pect pipe cover OIA 0
187046-74 11Jp on non-lll.lapect pipe cover OMA 0 187687-8 111jp on cOl"rUf,Jlltc pl~ coverine OKA 16 4 in. 0.0. INS/I! 20 24 Ul $6115 $336 $9'1 161687-8 111Jp «i c:orrusatc pipe coverine OM 8 4 in. o.o. !Mi/I! zo 24 UI S302 S168 $470
187681-8 ajp on corrugate pipe c:overlns OMA 34 8 in. 0.0. HI.IS/Ill zo 2, Ui 112,202 s1.m Sl,496 1876&HI mjp on c:orrug11te pipe coverl09 OMA 40 24 UI 187689-8 sjp on c:orrueate pipu covering OIA 15 24 Ill
lhe area hlld been rmovauid In 1984, but apparently pipe Insulation o.11111 Ueft alone. The arateriat Is in good AREA JOTAI. $7,526 $4,432 $11,958 condition overutl.
143 SAS &leat Ying-1st Floor AREA AVERAGE X ASS· 0%
mir h&ndl Ins rOQl!•on steel I-be- 181363-91 fl reproofing OMC 650 sq. ft. 0
ba11911111e hendllns roaa·on steel I·~ 187363·91 ff reproof Ing ate 6925 sq. ft. 0
18~·91 fireproof foe OHC 0
181365-91 Hreprooflng OIC 0
HALL ·ICIM!IRELL ENVIROltji'IENJJU. SEIIVICES, llilC.
Asbestos Assessment Survey
ff-K Buildif>i I: 21
A~ TEIWIT AltEA DESCUPTIOII SAICPI.E o< S LOCATIOII Of IU.TERIAl !lltNER SULK $MP!.£ DESQIPTIOII aioe
187366·91 fireproofing au: 181367-91 fireproofing Ol4C
187368·91 fireproofing ()MC
UNET Of
QUANT i!EASUIIE
iluHdins !lumber: 0511 Pege 1 n luildi11111111111111: lNTEaNATIDMAl ARRIVALS IUllOING
JFIC AIRPORT
llui lding Typi!: TEIIHUW.
Constructed: 1957 lnspc,c:tecl: 04/29/88
Inspector. Aryllll'lt/Gidcon
Pll'f X EIIP REIQIAl REPUCEMEltT TOTAL
ID ASS l'OT Pl COSTS COSTS COSTS
a 0
a
MEA TOTAL so so
·;::ii,
$04~
l4' SAS laktst flllQlllr·lst Floor AREA AVERAGE X ilSli - 511
above bruit roocm· 1u cell Ing 1871U·O corrugated pipe coverfne ClNA 60 ft. 4 in. G.D. g&rage-at celling 187875-21 •Ji> on ncn-auapact pipe cowr ClNA 18 4 In. 0.0.
187876-21 •Jp on non·SUGpKt pipe cOYCH" QIU.
181817-21 •Jp on non-1W11pKt pipe cOYCH" ClNA
above break roocm-11t emf line 181112·29 ajp on c:orru;ata pipe covering ONA 12 4 In. ID.D. 187111-29 111jp on corruaata plpa covering CIMA 187114·29 mjp on corru;ate pipe covering OMA
parts storage-at calllne 187136-36 111Jp en non-suspect pipe cover OMA 8 4 in. o.o. 151131·36 111jp en non-llUll?Kt pl~ cover ONA
181138-36 111jp on non·11USpect pipe cover Cl94A
The IO!..ldded joint p,acklnee are in lilood overall condition with only 111inor contiac:t daluga. Sou corrusated pipe covering fs found elonfi! with fibcrsleas.
Dlil 70 36 CVS/It 30 36
40 36 30 36
Oii 55 36 so 36 50 36
t!WS/5! 45 36 SS l6
40 l6
AIU JOiAl
l,5 SAS West flng«r-1at Floor·Ceiling AREA AVERAGE l ASII • ~
tine aaintenance otfices·throushout 117068-0 drop or lay- in palll!l CMG 850 sq.ft. 0
IU U1
Ui UI
UI un UI 1111
IU HI
S720
$680
$454
$302
52,156
$451 $3711
S252
Sl68
S1,249
S1,171 s1,osa
S706
$470
s1.,os
HALL·KIHIIRELL fNVlROIIHEIIJAl SERVICES, IIIC.
Asbestos Assessaient Survey
IHC llui ldlng II: 21
AIIEA liEIIAMi AREA DESCIII PHOSI
ti LOCATIOM Of M'l'HIAl
346 SAS 1.1e11t finger· i11t floor
line miointenance offlce11-tbrouahcut
Ulftf IUl!Et 1iUUC $Al'IPLIE DHCIIPTICIII
1i136l·91 flreproofine Ul1364·91 firep-ooffne 187365·91 ffrcprooflne 151366-91 fireproofing 187367-91 flreprooflne 167368·91 ffrcproofl1111 187369·91 firep1"00fi119
347 SAS Vest finger-1at floor·floorine
locker rOOlll 181008·0 vinyl floor tiUe
The floor tile, are in fair condlticin Mith locolfzlld contact daalge visible.
0&!4 Ul!IJ Of
COOE Q!Wlt IIEASURE
eui&ding liume~: 1150 Page t7! liluildlng Iii-: ill'l'ElilllATIOIIAL ARRIVALS IIUILDIIIG
JflC Al~T
llluilding 1Y!)fl; 111:IIHIIIAL
Coonr1.1Ctcci: 1957 l~ted: Oi,/29/N lmpcctoir: 111ryant/Ghhon
PAPE X SIP IEDIOVAL IEPLACEMEIIJ TOUL UI ASS POT Pl. COSTS COSTS COSTS
Af!EA lOliAl so so so
AREA AVERAGE l ASl • Ol
otlC 1000 sq.ft. 0 otlC 0
otlC 0 OIIC 0
OltC 0
Ctlt 0
otlC 0
AIIEA TOTAL $0 so so
AREA AVERAGE X Alill • 61
ma 220 aq.1t. 6 1 IV $999 $757 St,75~
AllfA TOTAi. $999 $151 $1,756
HALL·KlHWIIELL ENVIROIIMENTAL SERVICES, ll!C.
Asbestos Asses&all!llt Survey
H·IC Building I: 21
AREA IEIIAIIT AREA 0£SCIIIPTI081 I UlCATIOIII OF MTIEIIIM.
UWI..E
IIUIIIEI IIIIJllC WIPLE Dl:SCIUPTICGI
~ UIIH OF
COOE CWAlll 1111:ASURE
Building IIIUllll:Jel': 050 Pqe 179
luilding H111111e: INTERIIATl<JdlAL ARRIVALS IUILOIHG ,Sfl( AHPOIIT
Building Type: TE~lll!Al Constructecll: 1957
inspected: 04/29/88 inspector: lry11nt/Gidecn
PIPE lt. EXP REIIOY.IU. aEPLAQEHEJlt ID ARI POT Pl COSTS COSTS
A.REA TOTA!. so so
TOTAL COSTS
so
~ 14~
~ > .. w Ill
! :.t .,! ,. ... -... ~ ... Git
i - 141 l 3 ....
i ... ; ii ;;: N ~ :!5 ill .. - .. i! : <( -... 2' ... ... ... g· w .. :; ... ... <(
! "' ... :re .. '5 iii 0 w .. .. ... ... ... .8 ':' <C ... w "' ... "" ~ ... "" <(
HALL-ICIHSRELL ENVlROIIHENTAL SERVICES, INC.
Asbestos ASSCS!ill'ICllt Survey
11-1( llui !ding II: 21
AREA TEii.ANT AREA OESCIIIIPTIOII O<
ilui Id Ing 1111.!lllber: 050 1'•941 181
Building Nllllle: JNTERMATIOIIA1. ARRIVALS.&UllDIMG JFK AUIPOltT
Building Jype:·TE1!14UIAL Constructed: 1951
Inspected: 04/29/118 Inspector: lrymnl:/Gidecn
fl!Pii: X EXP RIEl40\IAL REPLACEIIIENT t8 lCCATIOlil Of MlEIUAl
IMPl.f
IIUIIIIIIEll SUI.IC SAMPLE DESCIUl'TIOII COOE QIWll WIT OF
IIEASURE ID Mil! POT Pl. COSTS COSTS
TOfAL
COSTS
351 SEIIVAUt East flnger-1@t floor
gerase-et ceilil'lll
storage rC>0111·throughaut locker room-throughout
151693·10 ajp an nan·suspact plpt cover OIIA 151694•10 1111jp on nan·suapect pipe cover OIIA 157695-10 ajp an nan·SUSPKt pip,1 cover OIIA
157849·13 ajp an nan·suspect pipe cover OIIA 157849-13 ajp on nan·suapect pipe cover IOl4A 187850·13 111jp on nan·suspect pipe cover «»IA
187e51·13 aajp on nan-suspect pipe cover OMA
352 SERVAIR East finger-1st Floor·Floor
office 181370·0 vill)ll floor tile 11»12
)53 SERVAIR Eau fir111C1r·11n floor
garage area·on l·bc11111111 181363·91 flreproofllllil OtlC
187364-91 flreprooflne OIIC
187365-91 f I reproof ins OMC 187366·91 fireproofing OflC
187361·91 fl_reprooflns llt4C
187368·91 fireproofing llMC
187369-91 fireproofing Ott
IJIIEA AVERAGE lit ASII - OX
6 12 in. 0.1). DI! 0 0
0
15 4 in. 0.11. Miii 0
15 4 in. O.D. INS~ 0
0
0
AREA TOTAL $0 so
AllfA A VEIIAlilE !II; ASil - °" 400 sq.ft. 0
AIU:A TOTAi. $0 so
AREA AVERAGE% ASI • °" 2100 sq. ft. 0
0
0 0
0
0
il
so
so
HALL·KIKBIIELl fNVIIIOfltlENTAl SERVICES, INC.
.Asbestos Assess,nent Survey
H·OC Building I: 21
AREA TENAIIT AREA OESCIBPTIOII fl LOCAHOII OF IIATEIUAL
UlftE
IIUIIIEIII IIIUUt 5AIIPLE D£SCRIPllON
QUI !Jiff!' Of
CQDE QUANT NEASUl!E
liluHding ltullber: 050 PaQD 182 Building ija111e: INTEROOATJOIU\L ARRIVALS IUILOING
,.IFIC AllffilH
liul lding !ype: mumw. CONtructed: 1957
ln11pected: 04/'29/88
l~tor: lry&nt/Gidoon
PIPE lD
I EXP REMOVAL IEPl.ACEIIIEIIT TOTAL AU l?Ci Pl COSTS COSTS COSiJS
AAIEA TOJM. so so ------------------------------=-~·---7.·•.
!54 SEIIVAIII Emat Flnecr·1st Floor·Coilfi~ MEA AIIEIIAGE 'J: ASI ~ OX
office 11ree Ul'1009·0 drop or lay· In pMel . GIG 400 sq.ft. ii
AREA JOUI. $0 $0
TENA~T · SEIIIIAIII TOTAL so so
tlO
so
so
HALL·KIHSRELL ENVIR~NTAI.. SERVICES, IIIC.
Asbestos Assessment SIJl"vey
H·li: Sui !ding I: 21
AREA TEIWIT AREA OESClllPTllll I LOCAll(!!II Of MTEIUAL
IAIIPlf
tuDIEl IIUU ·swLE DE~IPTIOII
OIIC UIIH Of
alDE QUAMT llfASUllE
lluitdinQ IIISlllbcr: 050 Page 183 luHdhig ll11111e: IIITIERIIATIOIW. ARRIVALS IUILDUIG
Jfll( Al IU'Oli
Sul lding Type: iEIRMIIW.
CMStNCtcd; 1951 Inspected: 04/29/118 lnspec:tor; llryant/GldeM
PIPE l DP REMOVAL 1£PlACENElll ID ASS POT Pl COSTS cosrs
TOTAL COSTS
IIALL·KIKIIRELL fNVIRONHEIITAl SflVICES, INC.
Asbeatos Assessment Survey
K·I( 8uildi!lll f: 21
AREA TEMAIIIT AUA DESCIUl'HOII
ti UICAilON OF IIIATEUU
SNIPLE IIUIIEII iUU'. SAMPLE DfSClll'111€*
Olli UIIIT Of COOE CIUAIIT t!EASIJRE
Building IIUl!lbsr: 050 Page U14 Building N11111111e: IIITERNATIOHAL ARRIVALS BIIJJLDING
JflC Alll!POltT
Building lype: TEIIHIIIAL COMtructed: 1957
impec:tlld: 04/2:9/111!
!nspactc.-: lryantJGideon
Pll'f ill
I E!IP llfteQ\fAL REPLACEIIEMT TOTAL ASS POT Pl. COSTS COSTS COSTS
356 SWISS AIII llesi fingef'·1®t flOOI" AREA Alll:RAGE X ASS • 211
offices g stor~ re1-technlcel se8'fice·
offices & storage n111·tGChnlcal service
office= & atoraee ntG·technicel service
187!36·36 ejp on non·sl.!Speet pipe cowr ~ll1137·36 . aajp en non-suspect pipe cover 187138-36 ajp on non-1;11,1spec:t pipe cover
187143-38 11Jp on non·suspeet plp111 cover 181144-38 ajp on non-muapec:t plp111 cover 181145·38 11jp on ncn·susl)Kt pipe cover 187044-7(. 11jp on ncn·auspec:t pipe cover
187045-74 111Jp on ncn--pect pipe cover
187046-74 111Jp on non-llUlpKt pipe cover
OMA 22 4 in. O.D.
OMA
09fA
OMA 48 6 in. O.D.
OMA
OMA
OMA 4 10 in. o.o. QM
OMA
The llOUdded joint packings an in IIOod ovanU condition. They ere located et ceiling level so the potential for further contact .._El., 111 Ulilllitllld.
!l!JS/!'t 45 23
55 23 .loll 21
CIIS/R (I 21
45 2l
0 23 DI! i(l
Cl
0
AIIEA TOTAL
357 Sl,IISS AU YMlt finger-let Flocr-Ccilinfll JII.IIEA AII.EIWil: % ASB • ~
on structurel suel I ·b<t- 181363·91 fl reproof 1119 !111164-91 fl reproof lne 187365·91 fl r aproofl 118 181366·91 flreproofh~ 187367-91 fireproof In; 187368-91 flreprooflne 187369-91 fireproof Ing
llNC
OKC
llNC
t'lMC
llNC
t'lMC
OHC
1215 sq. ft. 0
0 Cl
0
0
0
0
Al!EA TOTAL
tll $832 $46Z ,i,294
m UR UI $2,498 $1,•,67 S:S,965
IU IU
$3,330 $1,929 S5,Z59
$0 $0 so
HALl-KIMIIREll Ell\l!ROllltEIITAl SERVICES, INC-
A~bestos Assessment SUrvey
N-K 8uilding #: 21
AREA TEIIAll1 AREA DEsalll'TUlel
ti lOCATlotl Of INATEIUAL WIPLIE IIUleElt SlJU'. UMIPLE IIIESCIIPtlOIII
3511 SIIISS Alli Yest Fineer-bt Floor·tellir,e
offices 187080·0 drop or lay·ln pane\
359 SWISS AIR l!Gst Wine·1st Floor·Ceilins
360
front passenger loblby·peri•ter front pa11aenger lobby back offlees·thrcughout
111mn-o 187064H'& Ul7oa1·0
acoustic:al tile drop or ley·in pl!Ml drop or lmr in pmml
SlollSS AIR !Hist Wlng·1st 1Floor-llle911esc llendl Ing
throughout 1!17136·36 111jp on nan·suapect pipe cover 187117·36 111Jp on non-suspect pipe COYer 187138·36 ajp on nan·awpect pipe cover
throughout • 187143·38 111Jp on nan·1USp11Ct pipe cover 187144·3! 1111jp on non•suapect pipe ccwar 187145·38 1111jp on nan·auspect pipe cover
llui I ding l!Ullber: 050 Page 185
&wilding N-: iliTEltllATl!Ji!AL Al!RI \IALS IUIU>IIIG
JFIC AIIIPCll!l
lluHc:llns Typa: Tflt>IIIIAL
Constructed: 1957
inspected: 04/29/U h111peetcr: lryant/GldeGn
°"" 1111 n Of CODE QIW!i MEASURE
Pll'f
Iii> " fllf'
ASlil !POT Pl
IIEMGVAL lEPI.AICENEIIT cosrs costs
TOTAL
COSTS
AiEA AVERAGE I ASl!I · n
ClHS 800 sq.ft_ 0
AREA TOTAL $0 $0 ~-AREA AVERAGE% ASI - ox
QMG 220 &q-ft. 0
OIG 1925 sq-ft. 41
QMG 1550 sq_ ft- 0
AIIIEA TOTAL so so so
AREA AVERAGE I ASI - ltl
<W. 76, In. 0.0. MIR 45 23 IU $2,873 $1,596 5'.,69 <W. 55 2l IU (»IA 40 a JU <W. 1216 in. o.o. Olf,/'61_ 0 23 IU $937 5550 $1,4117 QIIA 45 23 Ill QIIA 0 2l BU
The lllUdded joint pacltinp are In 9C)Od canc:lhlan. The 11111chinery uy cause conteet dMa11e to N1teri111l. Noise AAEA JOlAL $3,810 SZ, 146 $5,956 frca jets andl 11111Ch1nery 111111y c-• looaenlng of 1111terial.
HALL·KHHSRELL ENVIRONll:NTAl SERVICES, IMC.
Asbestos Asses&IIICl\t Sut"vey
11-1:: Suilains #: 21
AREA TENANT Al!EA OESCIIPTIOU I lOCATIOOI OF JIIATER!Al
SAMPt.E IUIIIBER DULi( SAll'LE DEWIPTUlal •
361 SWISS AIR Liest uine·1at floor·•~ !!anal lne
on :.teel l·be- 1117363·91 fl reproofiins 181364·91 fireproofing
16ffl5·91 finprooflne 181366-91 flreprooflnt 181361·91 flreprooflne 117368-91 f lreproofine 117369·91 f I reproofing
362 $WISS Alit !Jest Wing·111t fioor·Abolle l>l"op Ceiling
on steel l·belil!IIII 181363-91 f lreprooten;
181364·91 flreprooflne 187365·91 .flrep!"ooflne 181366-91 flreprooflne 141367-91 flreprooflne
111368·91 fireproofln;
187369·91 flreproofil'l9
363 SWISS Alt Weet Wing·1st floor·Above Ceiling
iuilding !lil..aber: 050 Pm,ge Hl6
luildlnsa Nlllllll!l: INTEliUiATI061Al ARRIVALS IUllDING ,aFI( AIIIPOllT
lui ldll'IQ Type: TElfflUIAl
tonstructed: 1951 !nllpectcd: 04/29/88 Inspector: lrye,nt/Gide<ltl
Olli t!$1i'I' OF PI l!'E X EMS> IU:HOYAL IIEPI.ACEIIEIIT TOTAL
COSTS OOl>E QUANT MEASURE liJI ASi POT PL CO$Tlii COSTS
IIREA AVERAGE lit ASII • Cl
ate uzo isq.ft. 0 Ill«: 0
OtlC 0 OtlC 0
OIIC 0 <»4C 0
OltC 0
Al!EA TOTAL so so
AREA AVERAGE lit Ail • ~
(ICC 1925 sq.ft. 0
lli'IC 0 OMt 0
OMC 0
OltC 0
OMC 0
OIIC 0
.AAEA TOTAL so so
AREA AVERAGE X ASII · lllll:
so
so
leading to ren.-- 181'a36-11 111Jp on non-suspeet pipe cover ONA 187837·11 ajp on non-suspect pipe cover llllA
14 4 in. O.ll. Oil 10 u av z5 n nr
3529 $294 $823
HALl·(lMBREll ENVIR~ENTAl SERVICES, INC.
Asbestos Assessmient Survey
IHC llui I ding di: 21
AREA TENANT AREA DESCllPilC$11 ti LOCATIOII Of MURIAL
lellding to heaters
leaditlll to air hrmdlers
&All'LE
IUIBEII
18i'B38-11
IIIJI.IC SAMPLE l>IESCIUPTIOII
111jp on non·11uapnct pipe ~r
1117136-36 111jp on non·muspect pipe cover
Olli
CODE
QIIA
QIIA
1117137·36 111jp on non·11U11pnct pipe cover atA
181138·36 !llljp on non-suspact plp11 cowr CW.
1117143·38 111jp en non·suspact pipe cover OMA 187144-38 ajp on non-sU11p11Ct pipe cover ~ 187145·3!1 1111jp on non·11Uapc1:t pipe cover OMA
QIWIT
UIIIT Of
MEASURE
28 4 in. o.o.
10 6 in. O.ll.
The ilUdded joint packings ere fot.nd above the drop cell inss- The qu&ntlth1s given are euiaiates tram inspection meesuree:nts.
Bui ldi!'lil ll!Ulioer: 050 Page 187
Buildl09 Nam,,e: IMJERIIATIOIIAL AARIVALS BUILDING JFIC AIIIPOIIT
Bui I cling Type: TEIIHUIAL Constructed: 1951
Inspected: 04/29/88
lospector: Sryll,llt/Gideon
PIPE
Ul
X EXP REIIOVAl REPLAOENEMT ASlil POT Pl COSTS COSTS
20 n IV 1!1.1$/1! 45 11 IV s1,osa S51111
55 11 IV 40 u 111
C\IS/R 0 u Ill S520 S306 45 11 IV
0 11 IV
AAEA TOTAL S2,107 S1, 1M
TOTAL
COSTS
S1,6'6
$826
S3,295'
HALl·KIM8RELL ENVJROIIHENTAl SERVICES, INC.
Asbestos Assessinent St.Jr-vcy
H·K Building Ill: 21
AREA TENANT AREA DESCRIPTi09! I lOCATIOII Of l'lATEIUAl
SAHPU: flUll!EII IM.IC $AIIIPLE DEliCIIPTIDII
o&M UIIIIT Of
CODE QUAIIJ 1'1EASURE
lliuHdilllil ~: 050 PaQe 188 lliuiidil'l!I N111111e: INTEftNATIOllAL ARRl~ALS BUILDING
JflC AlllPOl!J
lliuildlll!I Type; TEftHUiAl
Coostructltd: 1957
IMpected: 04/29/88 .inspector: llrycntJGldeon
PIPE X l:Xf REMOVAL IEPLACEMEIIT TOTAL ilib ASS POT Pl COSTS COSTS COST&
~ALL·KIHBRELL EIIVl~NTAl SERVJCES. INC.
Asbestos Assess111>ent Survey
M·IC Building M: 21
AREA TENANT AREA DESCIIIPTIOIN M lOCATIOlt Of NA.lEtlAl
WIPlE liUIIIEl IIULIC SAMPLE DESCIUPTlotl
D&II U&l 11' OF
COOE Cl!JAIIIT MEASURE
BuHdins NU'llber: 050 Page 189 BuildfnQ illlllle: INTERNATIONAL ARRIVALS IUILDIMG
Jflt Al RPO!IT
Bui I ding Type: TElfflllW.
Consu-uc:ted: 1957
Inspected: 04129/88 Inspector: Bryant/Gideon
PIPE :l EXP REMIO'IAI. REPLACEMENT 10 ASS POT l>L COSTS COSTS
lOTAl COSTS
MALL-KIMIIRfLl ENVIRONMENTAL SERVICES, ISIC.
Asbestos Assessment Survey
K-K Building S: 21
AREA TENANT AREA DfSCG!IPTICllill S lOCATIOII Of MATERIAL
SAIIIPLIE
8Ulllifll IIUUC SANl'Lf 0£SCIUPTI081 GUI UIIH Of
CUle QUANT MEASURE
luHdi!'III l!t.!l®er: OSO P1199 190 Buildl!l'llll N111111e: INTERMAllOSIAL Alll!VALS IUILOING
Jfl( Allll'Oftl
Building TllJlC: TfRHIWAl Cooatructed; 1957
in11pected: 04/29/118
lnapector: llryMt/Gideon
PIIPE I Elli" llfNOVM. WLACENENT TOTAL 11'1 AH POT PL COSTS COSTS COSTS
HALL·KIHBl!fLL ENVIR<JelMEIITAL SERVICES, IIIC.
Asbestos AssesSl!lent Survey
H·iC Building#: 21
AID TEIIAIIT AREA OESQIPHOti
" LOCAHOII Of MTEJUAL WIPLE
IUIIIElt IUL.iC SABIPLE IDE$CIIIPtlOlf
373 TIUAIIGLE E!Dllt finger-1st Floor·Ce!llna
office area restrOOIII
locker r00<11
37' TIIIAIIGLE
locker roam
office area
375 TIUAliGle
on !·beams
187325·0 drop or lay-in panel
187325·0 drop or lay-in panel
187325·0 drop or lay-In panel
Eau finger-ht Floor-Hoer
East Fln;er·ht Floor
187370·0 vinyl floor tile 187370·0 vl'!Yl floor tile
187363-91 firee,-ooflng 18136'·91 fireproofing 181365-91 ti reproofing 11!17366-91 f ireprooffing 187367·91 fireproofing 187368-91 f ireprooffns
OU4 UIIIT Of
lllui I ding NIS!llber: 050 Page 191
Building 11eiae: IMTERIIATIOl!Al ARRIVALS BUILDING Jl'iC AHPOH
iuildlng Typci,: TERNIIIAl Constructed: 1957
lru;pectecl: 04/29/88
Inspector: lllryant/Gidem
IIEMOVAL ltEPlACSIEJIT TOTAL COOE WAIIJ ~ASIJIIE
PIPE
ID
% ElCP
ASll POT Pl COSTS COST$ costs
AREA AVERAGE% ASII • 0%
Ol4G 396 sq.ft. II
QHG 120 sq. ft. ll
Ol4G 280 aq. ft. II
AREA TOTAL so so so
AREA AVERAGE % ASII • 0%
Oil 200 sq.ft. 0
Oil 396 sq.ft. 0
~~~~~~~~~- -~~~~-
ABIIEA UITAL so so so
AllEA A VERA GE % AS& • °" OHC 280 sq. ft. 0
ate 0 OIIC 0
OIIC 0 QIC 0 Ole 0
Al!EA TOTAL so so so
HALL·iCIHBRElL ENVIRIJIIHENJAL SERVICES, INC.
A~bestos A&sessnient Survey
H·( Building#: 21
AREA TENAIIT AREA DESCRIPTIOIIII
" lOCAllllli OF MATERIAL SNIPLE
DUelflll tl!UI.K SAKPLE DESCl!lPT!OII °'" UIIIT Of
CODE QUANT IIIEASIJRE
llullding lh.mber: 050 Page 192 Building Naime: JNlfRNATICltilAL ARRIVALS IIUILDING
JFiC AlRl'<lU lui ldi!lGI Type: TIEIIIIINAL
Constructed: 1957 ln:ipectcd: 04/29/lla
INpectcr: !llry111nt/liidecn
PIPE so
l fJ(II RIE)l(l'{Al IIIEPLACEMENT TOTAL AS!i POT Pl COSTS COSTS COSTS
TENANT· TRIANGLE TOTAL $0 $0 $0
HALl·Kll4811£ll ENVIROIIIIIENTAL SERVICES, IIIC.
Asbestos AssessDeOt Survey
H·K Building#: 21
AREA TENAJ!l AREA DESCIIIIPTIOII # LOCAilllGI Of li'IATEIIIAL
SAN'LIE
Mllll!IEIII auu: SAHl't.E DESCIIPTlllell
o&H tlll!IT OF
CODE QUAlll MEASURE
Sui lding liud:>er: 050 Page 193 Buildill!il N11t11e: lMJfRNATICNAL ARRIVALS BUllDING
JflC JUIIPOU Bui ldil'l!il iype: TEIIMINAL
Constn.u:tecl: 1957 lmpectecl: 04/29/SS ln11pector: lryant/Gideon
PIH % Elli> REKOVAL REPLACEMIENT UI ASIII POJ Pl. COSTS C0$1S
TOJAl
COSTS
376 U.S. CUSTOMS C1111ter section-1st Floor·Abov• ceiling AREA A\IEIIAGE X ASlil • 331
laading to restrOOA1S 187846·12 111jp on non·IUlpect pipe cover OMA M 4 in. O.ll. DIJ 30 14 187847-tZ 111jp on non-suspect pipe cover OKA 40 14
187848-12 111Jp on non-suspect pipe cover OMA 40 14 leading to radiators 151136·36 1111jp on non-suspect pipe cover OKA 96° 4 fn. O.D. lll,IS/11 45 1'
187137-36 ajp on non-suspect pipe caver illllA SS 1, 1871311-36 1111jp .on non-11uspect pipe cover OMA 40 14
leading to air handlers 187143-38 1111jp en non·auspect pipe cover illllA 38 6 in. O.D. a.IS/I! 0 1" 157144·31 1111jp on non-suspect pipe cover illllA 45 1, 187145·38 111jp on nan-suspect pipe cover illllA 0 14
The 1n11terial h; in fair to eood condition throughout area above cell lngs. The quantities given are based on inspection counts.
AREA TOTAL
371 U.S. CUSTOMS C41nter Section-ht Ftoor·Above teilil'llil
on steel 1-be1111111 157363-91 fireprooflne 187364·91 fireproofing
187365-91 fl reprooflne 187366·91 fireproofing 181367-91 fireproofing 187368-91 fireproofing 1873~9-91 fireproofing
CIMC
OHC
OHC
OIC
Ole
OHC
~
AIIEA II VERA.GE X ASII • OX
· 4950 sq.ft. o 0
0 0
0
0
0
AREA JOTAl
IV $3,326 S1,1148 S5, 174 IV Ill
IV $3,629 S2,016 SS,645 IV IV IV $1,978 Sl, 162 S3, 140 IV IV
Sl!,933 SS,026 S13,959
Sil so $0
HALL-KIMBRELL EMVIROIIHENTAL SERVICES, !NC- lluilcii 119 NUl!bc:r: 050 Page 194
Asbestos Assessilient Survey iulldlne N11111e: JNTERIIATJOIIAI. ARRIVALS BUILO!NG
Jfl( AlllPOIIT
iluil dine Type: TEIRHUIAL
Coostructed: 1957
H·IC Buildins #: 21 lllllpected: 04/29/&a
Inspector: lryent/Gidcon
AREA TENANT AREA DESCR!PTBOII I LOCATIOII Of MATERIAL
SMPLE
JflNEt o&N UNIT Of Piff X W REJIO\IAL Rf Pu.cElllEJtJ
&uU: SAIIPLE DESCIUPJI061 COOE QUAIIT l'IEASUIIE ID A!iii POT Pl
378 U.S. CUSTOMS Center iecticn-1st floor AliEA A VERA GE 1' Ail - 261
electrical clomct 187S46-12 llllJp on non·auapect pipe cover OMA Ul 4 in. O.D. 1)4,i 30 22 Hi
air handl ins rCO!ii 1:1)( b.sggq11 d11i111 li4 117846-12 aJp on non·f'~t plpt cover OM 1D 4 in. O.D. il!.I 30 22 m Ul72147-12 111Jp on non·muapKt pipe cover OMA 40 22 RU 187848-12 1111jp on non·111.1Spott pipe cover OMA 40 22 Iii
eir hand! ins room 1:1)( baefl•li'I chl1111 1114 117141-38 1111jp on non·suspact pipe cover OMA 12 4 in. o.o. Cl.IS/II 0 22 Ill 187144-18 1111jp on non·111uapcct pipe cOl/er OMA .. s 22 UI 187145-Ja 111jp on non-suspect pipe cC\fer OMA 0 22 ii I
The mudded joint pacl:insm are in socd condition with only 111inor contact da.age viitlble. MEA TOTAL
379 U.S. CUSTOMS
im!gretion hallways offices
Center Sectlcm-bt floor-Floor
18700!l·O vinyl floor tile 181323·0 vinyl floor tll111
OMZ otlZ.
AREA A11ERAGE % AA - 3%
2r.i0 sq. ft. 14250 11q. ft.
6 6 ....
0
1i'be ~terilll le in fDir conditl0111. ltmn aroae which are eicpo11GCII 11hoi, contact ~- Allilll>ilt the !'f}tire area lies been covered whh new 1'id' tiles. Tha quantltiti 11lvm are eztl11111tn b&11cd on 11111asuresient taken l.lpCll
inspect loo.
AREA TOTAL
380 U.S. CUSTONS Center Sectl0ill•111t floor·Cellll'IIIS
front officez-thrOUQhout
l11111i11ratlon araa·thrOU9hout 111en•11 locker rom-throuilbout electrical rOOIII 122-rhrous!lout
187007·0 drop or lay-In plllMl
167007·0 drop or lay-In penal 1!17009·0 drop or lay-In penel 1871110·0 drop or tay-in panel
ONG ONG
CMG
ONG
AIIEA A Vi:RAGE % ASI! - ox
1'00 sq.ft. 0
26830 eq.ft. 0
1100 It<!· ft. 0
200 sq.ft. 0
---··-~---- --
COSTS COSTS
Sl18 S37ll
$454
$1,210
:12.,85
$12.485
ll210
$210
11252
un
$9,460
$9,460
TOTAL COSTS
$585
ssaa
5706
$1,IMIZ
:2t.94s
$21.945
HALL·KIH!IIRELL ENVJRONMENlAL SERVICES, Ille.
• Aslbesto$ Assessment Survey
H·K Building M: 21
AREA TENANT AREA DESCl!IPTJ«II
• LOCATIOM OF IIATEIIAL
361 U.S. CUSTOMS Center Section·1at Floor
above checlc cOLnters
UIIIPLE lllNElt IIIJUC SAIIPI..E CESQIPTIOII
187De!9·112 sprayed acoustical plaster 157090-82 sprayed acowatlcel plaster· 187091-52 sprayed acoustical plaster
Oii! UIIIJ Of
CODE QUAIIT · 141:ASURE
Building llulriber: OSO Page 19S
eu;ldins Ne41!1e: INlfRNAllOOIAL ARRIVALS IUILOING JFK Ailltl'Olll
Buildlns lype: TERNIIIIAl Corultructed: 1957
Inspected: 04/29/M
Inspector: lrymt/Gtdeon
PIPE
ill " E.111'
REMOYA!. REPUCEINEIIT TOTAL ASS POi Pl COSTS COSTS COSTS
AREA TOTAL $0 so $0
AREA AIIERAGE 1'. ASB • 15lll
OMO
OMO
OMD
3500 sq.ft. 15 21 II I $105,000 . $29,925 $134,925
15 21 Ill 1s 21 m
The anat.erial Is located above cuetCIIIIS bll11g119e check counters. They 11re blaclt panels which aro in good condition and are well covered by the.paint.
AREA TOTAL $105,000 129,925 $134,925 ,
382 U.S. CUSTOHS East & ldest finger-1st 4'loor~ceil Ina
· west flng,er-lll!llligratlon corr!~ ea,t flnger·i111migratlan corrl~
!57311·0 acoustical tile
187311·0 acoustical tile
363 U.S. CUSlOMS Center Sectlon·2nd floor-Floor
woonen• s locker rooai
·east office west off ice
1117l33·0
181333-0
1!17333-0
vinyl floor tile
vinyl floor Ula
vinyl floor tile
AREA AVERAGE 1'. AS8 •
OIIC 48-40 sq.ft. OIIC 4646 sq.ft.
AREA AVERAGE X ASS ·
OIIZ soo sq.ft.
OK? 300 sq.ft. OIZ 300 sq.ft.
ox
0
0
AIIEA TOTIIL $0 $0 $0
2%
2 6 lll SZ,210 s1.no $3,990 2 6 111 $1,362 $1,032 S2,l94 2 6 Ill $1,362 S1,03Z S2,394
HAll·KIHBRELl ENVIR£lljllqfNYAl SERVICES, IMC.
Asbestos Assessoaent Survey
H·II( Building#: 21
AREA TENANT AREA DESC!ilPTIOIII $ LOCATION Of MATERIAL
The 11111terlal is in good condition.
UIIIPLIE !Qllflll IIULIC SAMPLE DESCIUPTIQII
o.&&i UII IT OF
COOf CIIJAIU MEASURE
Sulldinsi Number: 050 Page 196 Building Nas,e: INTEllliAT!ONAL ARRIVAL$ IUILDING
JFK JUIIPOili
Building Type: TEIIIHIIIAl
Constructed: 1957
Inspected: Olo/'l'i/88 Inspector: lrymnt/Gideon
PIPE l IEIIP REHOIIAI. IIEPUICEMEIIT TOTAL II) ASIII l'OT PL COSTS COSTS . COSTS
Jl\lRIEA lOTAl V.,994 U,784 "1,77a
HAtl·OCIKBRELL EIIVIRONIIEIITAL SERVICES, IJIC.
Asbestos Assessment Survey
H·K Building I; 21
AREA TENAJIT AREA OESCRIPTIOII I lOCATIOII OF MATEftlAl
SAIIPlE IIIIMllEI llllt: $AMPLE DEliCltll'UOII
OU@ ',Jiiii Of
COOE QIJAIIT HEASUf!E
liuHdlns !lumber: 050 P11u 197 . . lluildling lllllllle: UITIEl!liAHOIIAl. ARRIVALS lklllOJIIG
,.!fl( Al ltl'OaT
IIIUi!ding Type: JEIIIUIIIAL
Constructed: 1957 Inspected: 04/~/S/!. Inspector; Bryant/Gideon
PJPIE 1' EXP REHO\IAL IU:PlACENENT ID ASS POT Pl COSTS COSTS
TOTAL
COSTS
ffALL·KIMSRElL ENVIRO!IMENJAL SERVICES. !NC.
Asbestos Assessment Survey
H·IC llluilding a: 21
AREA TENAIIT AREA OESCltlPTJON # LOCATION OF IIATEUAL
IWIPLE
IIIMIER IIU.IC Ul'll'I.E OHQIPTIOII
o&N Ullll OF
cooe QUANT MEASURE
iiui ldi119 Hudler: 050 Pase 196
Building Na.tme: lNTERNATIO!,IAI. ARRIVALS BUILDING
JFIC Alllll'Olll
Building type: TERMINAL Constructed: 1951
ll'll'f
JII)
i.Mpected: 04/29/!la Inspector: lllry11.nt/Gidecin
X EXI" REMOVAi. REPLACEMENT ASi fOl Pl COSTS COSTS
TOTAL COSTS
MALL-KIHBRELL ENVIROIINEIITAL SERVICES, IIIC-
Asbestos A5ses~t Survey
K-K Building#: 21
AREA TEIIAIIT AREA DE5CJUPUOIII
I LOCATIOIII Of MATEilAl $.WILE IU!l8!:R
392 VARIG. East fil'l!ler-1at f(OOl'·Above C4tiling
.on steel I ·bceims 11!17363-91 187364-91 187365-91
187366·91 187367-91 167368-91
187369-91
393 VAIUG. East Yins-1st floor-leggage Handling
lltl l·beBIJllS 187363-91
181364-91
187365-91
181366-91
till~ SA)l!'LE CESCltlPJIOI
fireproofing f heproofl ng
fireproofil'lll fl reproofi119 fireproof Ing flreprooflllllll fl reproofing
f I reproofing fireproofing fireproofing fireproofing
o&N UIIIl Of
COOE QUAIIJ flEASURE
Building l,lumber: 050 Pqe 199
Building Nllffle: !IITERNATIOIIAL ARRIVALS BUILDING JflC AIRPORT
lluHding i)lpll: iER!<illllAl
Clll13tructed: 1951
Inspected: 04/Z9/8a
inspector: lrys,nt/Gideon
PIPE l EICi> REMOVAL REPLACENEMI ID ASII POT PL COSTS COSTS
TOTAL
COSTS
Al!EA A\IERAGE % ASII • n
CIIC 3285 sq. ft . ii
OHC 0
OIIC 0 ooc 0
OIIC 0
me ii
Cll!C 0
AREA JOT.Ill so so
AREA AVERAGE% ASS - ox
OIIC 2360 sq.ft. 0
Ol4C Cl OIIC Cl
QIC 0
so
KALL·tlMBREll EWVIRONf!ENTAL SERVICES, !IIC.
Asbe&tos AssesSllleflC Survey
M·~ Building 6: 21
AREA TENANT . AIU l>ESCIUPHO!d SAJlllllE OCH
II lOCAHOtl Of KAiEll!IAl IIIN~lt BIJl . .l( SAMPLE OESCalPTIOII CODE
187367-91 flreproofine OIIC
UJn6a·91 flreprooflne ONC 167369·91 f !reproof tna O!tC
394 VAIIIG. East Wins-1st flOOl"·Baggaga Handlin&
11t celling 187!49·13 t111Jp an non·suspec:t pipe cover QIA
at cell Ing 187849·13 t111Jp an nan·11u11pad pipe ccwar au. 187850·13 ajp an non·SU8p8Ct pipe cover CHA
187851-13 ajp an non·auspact pipe cover CHA
at cell Ing 187852-14 ajp an non·auopect pipe COVtDr CJIIIA
at celling 187852·14 ajp an non·auapec1: pipe cover GIA
187853-14 ajp an non·11U11pCtCt pipe CCMlr OIA
187854-14 1111Jp an non-suspect pipe COVllr OIA
uelli OF QUANT HEASURE
liui laing Mumbcr: 050 Page 200
luildlll!il Nase: lllTEIIIIIAIIOIIIAI. ARRIVALS IIUILOIKG JFI( AHPOR'I'
llui!din; rype: JEMIIIAl
Constructed: 1951
Inspected: 04/29/118 ll!lllpector: l!lrymntJGlcleon
Pli!'f
ID
l EIIP IEIIOVAL IEPLACENEMT TOTAL ASli POT Pl.
(l
0
II
AIIU iO'l'Ai.
COSTS COSTS COSTS
so so so
AREA AVERAGE X ASII · 247'
9S 4 in. 0.0. liiJS/ll 0 35 6 In. o.o. IM/111 II
II
II
55 6 In. o.o. Cl.IS/I! 50 2S Ul i?,862 at,681 54,543 40 8 in. 0.0. CldS/R 50 25 Ill S2,590 51,523 S4,113
40 25 HI 50 25 UI
The 111111:erlal in this area is in fair c:on:Ution, with SQIIIC 1111.Jdded joint packings showing isililflll of 111inM cornact AltfA JOTAI. $5,452 $3,204 18,656 and water ciM119e.
395 VAIUG. E1111t Wing-1st ftoor·Office Area Al!fA AVERAGE X ASS - 2%
operations offices \81319·0 vinyl floor tile OHZ 1575 sq.ft. 2 6 IV Si', 150 $5,418 $12,568
The 111&terial is in good condition. AREA TOTAL S1, 150 S5,4ta $12,568
HAt.L·KIIIIIRELL fNVJR~NiAL SERVICES, B&IC.
Asbestos Assessment Survey
H·IC Building S: 21
AREA TENAIIT AREA OEStalP'l'ICli °'" UIIH Of
llui hling &!Ulllber: 050 Paae 201
liluHding 11.lllllC: IIIJEIIDHO.W. ARRIVALS IUILOING JFIC AIDO!t'I'
Buiidi1111 Type: TERMINAL Constructed: 1957
Inspected: 04/29/BS irnipector: l!lry1111t/Gideon
% EKP REIIOIIAL IIIEl'lACEIIIENT TOTAL
• LOCATJOl,I Of HATElll2Al SAAPLE IIIUl8£111 IIULIC SMIP&.E OESCIIPTICII CIQl)f QUANT NEASUIIE
PIPE ID ASB POi Pl COSTS COUS costs
396 VARIG, E1111t Wing·1at flocr·Ofttc:e Celllns AREA AIIEIIAGE % ASI · 117'
operations offices 187325-ll drop or lay-in p.enel Qlf(i 1575 sq.h. 0
AREA TOTAi. '° ',$0 so
397 VARIG. East Wing-1st floor·Lc:ibby Area-Ceiling AREA A\IERAGE % ASB • 1X
at ceiling Ul7326·84 sprayed KOUBtic:al plaster ONO 1800 sq.ft. 8 ZS UI SS8,l92 517, 136 $75,528 11!17327·64 sprayed acoustical pleater OIID 5 25 IU
1117326·84 sprayed 11COU11tlc:al plaster Ol4D 4 25 JU 1117329-84 sprayed ac:OU11tlcal pluter OIID II 2S IU 1SIDll·64 sprayed ac:oust teat pl aster ONO a ZS IU
the 111&terial la in eood condition and ill encap111!11tlld whh paint. MIU TOTAi. $58,392 $17, 136 $75,SZS
398 VARIG. East Wine-~at floor-Above Cellil'IG AIIEA AI/EltAGE l: Asa • 3$%
leadil'l9 to heaters 181836·11 11jp on non·wspect pipe C:0\18r OKA 23 4 fn. 0.11. 1)1,1 70 15 1\1 $869 t,483 $1,352 1ann-n 111Jp on ncn·auepect pipe cover OKA 25i 15 l\l 1arua-u 111jp on non·auspect pipe cover QMA 20 15 1\1
The l!lilterial is above drop ceiling. the quantity given is en eui•te baaed '4'0n ln&pec:tion. AREA JOTA!.. $869 Sloal $1,352
ii
~ "'. ~ ;: ... ...
i1 "" ... ~ cc :,.. ;: ; ... " ... "' :,, .. ... I 3 ...
u i (II "' .. ... ... "" 1'i 0
> i 0 .. .,; ~ ~ .... "' ...
~ ...: ..., f ~ ..., .. ... .. !!
... ~ "' ...: ; ! ...
~ ;:; 0 w ... .. ,_ ... J "! ...: ~ ... .. "' "' .. "' "' cc
HAll·KIHSRELL EHVIROOIHENTAl SElVICES, IIIC.
Asbestos Assessment Survey
H·K Building 6: 21
AREA IEWANT AREA OESCII IPUOII I LOCATIOII Of OOATEalAl
SAHi'!.!
IUISElt Ill.ILK SAMPLE DESCUPTlOII O&H urm OF
£00£ IIUAIIT l!EASURE
Sulld!ng lllunt.er: 050 P111e 203 Building Ill'""'": IMTERNATIOIIAL ARRIVALS IIUILDIMG
.me AIRPORT Building Type: TERMINAL
COfflltructed: 1957
I nspmcted: 04/29/88 inspector: lryant/Gldeon
PIPE le EXP l!EHOVAl IIEPUCEIEIT TOTAL ID ASII POT PL COSTS COSTS COSTS
HAl.L·KIHBRELl ENVIRONHEIITAL SERVICES, INC.
Asbestos Assessment Survey
H·K Building S: 21
AREA TEIIAHT AREA DESCllPJ1€lll
I LOCATIOII Of HATEIWU.
...
SANPI.E IIUIW:lt 8\lllC SMPLIE Demll'HCIC
OlM llll!H OF
CllDE WAIIT HEASURE
111.1ild!<19 Number: oso Pave 204
Bulldlng llaae: JIITERMATIOIIAl ARRfVALS BUILDING JFK Al'IIPORT
Bulldlng Type: TE~HlldAL Constructed: 1957
ll'll'lp,teted: 04/29!88 11111;,ec:tor: lllryant!Gidcon
Pl!'!: X EXP liEIIOYAL REPLACl:l!EIIT Hl ASS POT Pl. COSTS COSTS
tOIAL COSTS
'·
t I
·I lm
11 I J IB i ,~ Ii ·U Ii """"" ;_; :1 .. f' ·i ! ;I i n
! I
= ... ,. ~ 1111 !ii ~
e ... ... ! 13
I . I I
11.ua un
AS OF 10/21/97
Ct Dept Facility
1 AVIATION JFK
1 AVIATION JFK
1 AVIATION JFK
1 AVIATION JFK
Area
ROOM
CONCOURSE
LEVEL EXTERIOR VESTIBULES
DELTA AIR
DELTA
AIRLINES
EAST CONCOURSE
STATION OPERATIONS
OFFICE
Building Estquant Actquant
JFK-053 2700SF
JFK-053,054 71310SF
JFK-053 7000SF
JFK-053 3300SF/4200S
CONTENTS OF IRA.DBF PART 1
Jobnum Worknum Contnum Contype
215.218 Y-6522A TAA
215.221 Y-6526A TAA
215.222 Y-6529A TAA
215.223 Y-6533A TAA
Page 20
Status
PROGRESS
PLANNING
PROGRESS
Product
R/PIPE
FITTINGS/B
REECH ING
FP
CEILING
FP
VAT/FP
EDP 007589
Contractor Estcost Bestcost
ATC
HAZARDOUS ELIMINATIO
N
100000
270000
88562
80000
0
0
0
0
,.s OF 10/21/97
ct Dept Facility
1 AVIATION JFK
1 AVIATION JFK
1 AVIATION JFK
Area
PLASTER CEILINGS THROUGHOUT BLDG.
Building
JFK-IAB
JFK-IAB
WEST FINGER, JFK-IAB 2ND FLOOR:
Estquant Actquant
8000SF
700SF/#10
CONTENTS OF IRA.DBF PART 1
Jobnum Worknum Contnum Con type Status
215.636 JFK-215. 590 CALLIN
215.637 JFK-215.590 CALLIN
215.639 JFK-215. 590 CALLIN
Page 52
Product
PLASTER CEILING
CEILING PATCHES
VAT/PIPE ELBOWS &
EDP 007621
Contractor Estcost Bestcost
ACS 25000 0
ACS 100000 0
ACS 11000 0
\
.. ( ~ .................... .. The P. J. Carlin Construction Company and Atlas Tile and Marble Works, Inc.
CARLIN-ATLAS A JOINT VENTURE 41-17 Crescent Street, Long Island City, New York 11101 • (212) 892-4080
January 24, 1969
Port Authority Administration Bldg. (#141) John F. Kennedy International Airport Jamaica, New York 11430
Attention: Mr. I. Dornfeld, Manager Plant & Structures Division
Kennedy Internati. onal Airport
International Arrivals .-~p~ :.:. --·---~ Airline Wing Buildig.,.9s:.r~ .. · --~~ Contract Number JFie'::-4tO. 058 ./
i .. l- . /
··,"----___....---:::::::-..-Gentlemen:
As per your request, enclosed is a list 0£ qualifications £or each 0£ the below listed Subcontractors we have submitted £or approval on the captioned project:
r Marion& DiBono Plastering Co., Inc. - C1...i..,
V Cord Contracting Co., Inc.
With regard to your request £or a list 0£ qualifications £or Close-0-Matic Door Controls, Inc., please be advised that we have notified them 0£ this requirement and that this list is forthcoming.
Also, please advise us as to whether or not you have an / . J approval £or Pioneer Industries, Inc. (Pioneer Fireproof Door 4ll ·o f./4 fG;
Corp.).
~---Your prompt approval 0£ the above listed proposed S~gptl;fu~}~Rci11.1ft' will be appreciated. -Tl-IE pQR'I' Of Nf~i\ONAL ,-1RPOR'I'
;. f K._1t--1'1'ER~NG\NEER - \A.6 QE.S\Dt.NRi e:.cEWED
Very truly yo rs,
CARLIN
cc: E. Rigaut, Res. Eng.
~ 5-63
..,rtl 3 1 1969
~: .. · ~--:{) ,·
:·~~:·,,·:;~:,:*~r~::. -:~'.. -::: ~-· -~
.. ·.,., , .. Jlt--:&~~1a • .... .,..., ~ .· . -. -:- . ,{J:·_ · .tt1-:• ltM.~•i'.;11.fll!~· ·. \)}t· · , ~;~~~~~s,~r'< ~ · · ~~f :~rtiii~.~eve4{f11~1-1.f:_·._fY .. ~.·-···· ;6'•·.~tt·
-. •.· .. • --~ ... ' -~ - ,-. J\{ : ·,._-.. •. .. . - -~· ;'• .
\
- .... .. -~.
__ £,
;'_-_
;,,-.
44. PLAS:rERING.
~ . '
Except as otherwise· specified herein.or shown on the C~mtract Dra.wip.gs, -plastering shall.be·iat least equal to the:
- '·applicable requirements of' the Amer"ican ;Standard Specifications - for Gyp~um Pla.~tering (Designation: ASA~ No··.: A42 .1-1955).
Materials-
Materials· for use in plastering:, with the exception of sa.IJ.d, shall be delivered to the construction site in sealed· c;ontainers or bags and shall_ be.' stored in a dry, well ventilated space, under cover and off the ground; until used in the preparation of plaster. ·
Aggregates· f'9r pla.i;;te~ shall conform:to the Tentative Specifications f'or Inorganic Aggr-egates .. :for Use in Interior
~Plast~r (A.S.T.M. Designa.t~on: C35 ). ,·· ._,
Water shall be clean,.- fresh water· suitable for drinking purpe>_ses.
Gypsum plaster and calcined gypsum shall conform to the require}Ilents for gyp13um neat plaster and: gypsum gaugirig, · plaster for finishing'coat of' the Standard Specification~ for Gypsum Plasters (A.S .T .·M. Designation: C28) ·. !
Quicklime shall pass a thirty-mesh sieve and sli~l conform to the requirements for calcium lime. of the~: ·' Stanciard Specifications for .QUicklime ·for.'Structural · Purpo13es (A.S .T ~-M. ·Designa.tign: c5..:26 )· of the Amer;ica:I! Society for Testing Materials, except that 1-ime putti(. .formed from the above specified quicklime. shall have a .plasticity figure of not·less than 400 when tested in . accord.a.nee with the Standard ).fethods of Physical Testing of Quicklime and Hydrated Lime (A.S.ToM. Designation: -CllO) . .
J.
. ·-..,.
p 778,95Ei
135· -•• ,. 2
- _.;: ....
-.i Hydrated Lime shall conform tQ· ~he Standard Spec:i:ficatfons for -Special Fintshing Hydrated Lime (A.S;T.M. D~signation: C2d6-49) •
. Fiber shall be wood; pure.__.manila or-other approved fiber, onehalf of an inch to two inches_. long, free' from grease, oil, dirt and other impurities and shall be comp'letely soaked in water and sep,arated before b_eing mixed in plaster. -
Proportions for.Gypsum Plaster
-· Gypsum plaster shall consist of a-mixture of gypsum plasxer and
s~d mixed in the following proportio~s by'volume:
(a) The first· or scratch coat on metal" lath shall be mixed in the proportion of'one~part of gypsum neat plaster-to two parts of sand. If the plaster_ fo_r the scratch coat. is . unfibered, ~ne bushel of fiber shall be added-fqr each cubic yard of sand used.
(b) The brown: coat, or'base coat· ~n masonry ~urfaces shall be mixed· in the proportion of one p~rt of gypsum neat plaster to three parts of sand. If _-'tge plaster for the brown coat is unfiber~d, one-half bushei" of '._fiber shalr be added for-· each cubic 'yard of sarid used. Tlie. finish coat for gypsuni plaster shall be mixed in th~ proportion, by ··volume, of three parts of lime putty to one :part of calcined gypsum.
Proportions fo·r Vermiculite Gypsum Plaster,
Verpu.culi_te gypsum -shall con_sist. of a mixture o_f gypsum p:J_°aster and apprdveq ligh-t weight aggregate -mixe·d _ in the foli'owing_ proportions:
(a) The first· or scratch .coat on metal lath shall be mi,xed in the prop"ortion of two cubic f_eet of a·ggregate ,~o one hundred pounds of gypsum neat plaster.
(b) _T~e.second coat on metal lath and the base coat on masonr'y surfaces shall be mixed. in the -proportiori ·of. three cubic feet of aggi;-egate to Olli;! hundre·d .pounds -of. gypsum . . _neat plaster.
A finish coat will not be, required for Vermiculite· gypsum plaster. The: finished surfaces of the-brown ~oat 0 or base coat shall. be cork. -floated and lig~tly -tr_oweled to a true; even surface.with all angles.
,plumb and square.
/~-- - -------
p 778956 --~
. ~ -'; -
.... 136 ...-..,.;' -~-~ .. - ~~-< ..(::.~. ,-
;·~ .
' ., ; ,- ._,_
~ - ' ... "';,. "-}.,
""' \. ~~ ~ .;;- ' -__ ;,-:,.,
.."-: ,,.
-~' ..
' -;.: ~:i;"" . "'ii..'
:Mixing
·. Except as otherwi~e,a.pp~oyed ·or when-han~ mixing !s.-permitte<:'., pl'aster. shali' be mixed -.in ,a :batch . t·ype mixer i1t the. construction . site. Ji'rozen, ·caked or lumpy materials shall notcl?e ·us~d. The ...
. mixer shall be ~leaned of a.11 ~set or hardened .ma:t~rie.1: before mater -ials for the next batch are loaded. When ·the mixer is used inter -mittently, s~d and water shall be ruzj. in the mixer f9r a few ·minutes after.each batch and the mixer are completely emptied,
,./ Each batch of pla.s:ter shall be mixed s·eparateJ,.y. Plaster shall be thoroughly mixed to obtain uniformity of color and worka.ble consistency'of mass, and only in suchcquantities' as- will be used before it has . started 'to set ~-. ~etempering of plaster which has started to set will not. l?e permitted and·plaster· wh.ich has
·. set shall be discarded. ·. -: " · · · -,':-" ~
When hand _mixing is· permitted, the mixing boxes .shall .be watertight and sha.ll'be tl:ioroughly cieaiied of set or hardened
· ~terial prior to placing cf fresh materials _for each pa.tc:h. Only one batch at a time shal:;I. be mixed in .a box. Waterproof'
· protection shall be provided under: each .,box and water . barrel •. - Tools shai1 be cleaned after-·m:i.xing each batch. .
Application
Except as otherwise required. by the.C~n~ract Drawings, _or specified herein, plaster shall be.-not less· than five-eighths of an ·inch thick measured.from the outer':surfaGe:of.t:tie.metal \ _lath or from the--:surface of the masotjry base. -·.Where,.; in certain :<:as~s_gypsum pl~s:ter.is to be applied. in·a ~hiclqle~s of.m<;5re than five-eighths of an i;ich, th~ s_cratch coat;, or ;case .coat; shall be appiie4 to the required thickness in -increments not exceeding one-half inch. . .
Surfaces to re~eive plaster sha).l be clean and free from· loose. material, dirt. and foreign or objectionable matter-. ''i'he· exterior openings to spaces wh~re plastering wili be performed: - - - -. - ·-
-: ·shaj.l be kept closed, if required by. the Engineer, to prop~rly · regulate drying and i curing of the pla.stef_., -Plaster shalt ·'be: · protected :f'rom rapid drying and from· frost._ ,:--
,·
P 778957
137 _, --~: \~
- ,.. "~· .
. . :.:;-
. I
~:.
Unless otherwise specified herein,_ plaster on :netal lath shall be applied·,in three coats. 'rt .. e scratch ~ - :. on· metal lath shall be applied with. enpugh· pressure -·fill .the meshes and satisfa<;!'torily key the' :plaste-:-. ~, ,-, scratch coat shall be brought up to a thickness equal to approximately one-half of the ~otal thi.cknes's ·of plaster re~uired. The .scratch coat shall be crqss·scra~ched . diagonally to a rough texture £:or application of· ·the brol-m coat. After the scratch coat hus ·-hardened but
. before 1 t has dried, the brown' coat shall .be""applied. The brown coat shall be to such~ th:l.ckne'ss· as to finish
·,.,flush with screeds a~d grounds· and; unl:ess·'oth~~ise _ _'specified herein, shall· be r9dded and brought to a true,
uniform surface, shall be lightly broomed and' a.llowed'to . set and dry befor.e. the _-finish :coat· is applied. .The gypsum.
lime putty white finish coat shall-be applied, allowed to .dry and thEtn brus_hed with water: and troweled to a smooth, glossy finish.· The finished plaster sliall be true and out ·of wind, with all angles plumb, true a.n!i s_quare, troweled to an even surface' wi_thout waves, "i·stains, cracks or· defacement: of ariy sort.: · :' ~ _
' Plas~·er on· masonry surface§- shall be applied in two coats by the ' 11double-up 11 method:-. The· base coat shall be applied with sufficient. ·force and thickness· to form a
•sa:tfsfactory hond; then: doubled'back to finish flush with s_creeds and grounds. · Unless otherwise specified herein ~~e P+~ster shall be·straightened to a true su.r
. face with J;'Od ~nd darby and left. rough to rec el ve _· the fin~~~ coat.· The finish coat shalil. be'appliei in the. maruier specified for· plaster _·finish ·coat OD; metal lath.
·Portland Cement Plaster
Portland ~ement plaster sha.11 conf,list of .. a mixture.-"¢.f Por.tlarid cement and sand .. applied in thre.e · coats on metal lE1,th: a: scratGh coat, a· brown coat and a finish ,coa,t, or applJed in two coats on masonry surfaces.: a bro~n· coat ·a.nd. a finish coat.
Portland cement;shall conform.to the requirements for Type. I cement of the Standard Specifications for Portland\Cement (A;S. T ."M.· Designation: . Cl50~52) of th~·-p~merican· Soctety for Testing Mat~rials. "" · ·
Portland cement plaster s·hall ,be mixed in_ t_he, propor~ion:, ·-by._ volume, of one part of Portland cement to three parts of sand, to which is added ~ime putty in an amount equal to twenty=five p~r cent_ of the volume ·of.Po'rtland cement •. The·· scratch coat of Portland~ceme_nt plaster applied to metal :1ath sha·n.: contain one po~!ld of
-:fiber for ea.ch sa'ck of Portland.cement.used. ·-.The brown coat for two coat Portland cement plast:er'shall be similarly fibere·a..
-------·-- ~·
P 778958 ._,-: 138 .,_ ~- --- - - -
,.=:-~ ..... ..i'- -
- ~-' . . ~· ._~,.. - -
~ y· -
•. ,/..£;!: ;~ ~~--· - :.
. '
_?-
':--- \.
' '
·- .... _.,. ..... -.. ;,_•." .:. ...... :··.:.. •.
I ,·
·::·:"'· ·:.. . • •• ·111..
··.:=-·~~~-: ·~··.
PA 98554
• 'Die tdepbom ....,.r of the IDlenlped f.•
Dat .. , r .2. i 7-<../ It
(Acllllawledpwnc of •tpatur• to be taun on proper fona on followtq P•1•)
NOTICI TO IIDDDS:
UaleH tlw follovtns auuranc:• of trrnocabf.Uty ta alao •S.pied, the abov• Propo••l S.• not r••pon•1v• to the Authorf.ty'1 iav1tatioD to bid.
CERTIFICATE a, .AtmtORITY, IS A COUOR.AtIOII
<•) It ProPo••l 1• •1gn•d by •n off1c•r _or •1•at. gtv• tltl• and addr•••·
- 9 -
,c: .. -?Yl:' .5!£!4? .Tt4 .. ?- ;.1 .. AJ-:-q-· z __ z;;;cc.-•---
PA 98555
I .
- ., .: I:
· Tiie Port Authority of New York and New Jersey 111.E•t;t:PIA .. nue, No• ~c••. NY. 10011
John,. 11 ...... .,, --·-Al,i,od Jaff\a1C•. Nhr Yor• 11430
Moni1S10.,. Grrierar M.anaoer _ 12,2, 656-4300
I. J Dornfeld Ma••• Pla•I I Sir-Olvilion 12121151-4'80
Neat A M~ul Director
Cllf'IIU B P.a'!Ur,n1 -DNIUI)" Di,~tN
C!R.TlnCATE OP COMPLETION OP WOllt or'cONTRACT JFK-410.092
INTERNATIONAL ARIIVALS BUILDING• JQSC!UANEOUS ALTERATIONS • PHASE l
I KENNEDY INTERNATIONAL AIRPORT
To: Tbe Port Authority of Nev York •nd Nev .Jer•ey
HARVY CONSTRUCTION CORPORAffON
.--.,·• . ~-.... ~.·! ·, · ...
Avlalion Dell.,._
Punu•nt to Cl•u•e 28, Ch•pter IV I P•ge 54 of Tbe Port Authority of
• P:': : .. ---,;; .. :·.-
Nev York •od Hew .Jer•eJ Contr•ct JFK-410.092 with Harv:, Construction Corpor•tioa for the Intern•tional Arriv•l• Building - Kiscell•neous Alteratiooa • Phase I. I bereb:, certify that •ucb tests •nd inspectioos •s were nece•s•rJ or desfr•ble have ••ti•fied me with respect to the extent, nature •ad quailitJ of the Work performed by Harvy CoDStructlon Corpor•tlon, •• contr•ctor under .. id contract •nd that, in •Y opinion, •11 of the Work under said contract. has been completed in accordance with the Cont~•ct Dr.wings •nd Specific•tions •od requirements of the Engineer, and -was so completed on August 1, 1973_.
~~' ·- .. ·- -" .
n t ~I I{, [.: t) . _.,,. · Manager, Plant 6~uctures
{·' Kennedy I11terneti0Ml Airport
PA 98556
?
_.-_' ~:..:·.. : ·.
The Port Authority Aviation Dopa-.,,
of New York and New Jersey 111 E•f1"1,.A\enue t•e"' Y,·•k. N 'I'. 10011
John f. K111111dr 1n1e, ... ,_ Airport J8ffl81CI. NPw York 11•30
tAMfll 51C'IB"8 GP"rrai M~n•oer f;t,:'• 6Mi·•JOO
I J Dornlolcl M•n•ger • Planl & Structure1 Divlaion (212) &56-43111
Nr-.,, A IA .'.'\fttanu1 Due,t:.r
CAC'!.3' 8 P1t1a11n1 OrPUt, O,rec1("1r
CDTlFICAff OF CONPUTION or SALi or:coNTRACT JFK-410.092 .____ . - ----.
lKT!RNATIONAL .AUIVAJ.S BtJIU)lHG -NISC!UAN&OUS ALTERATIO!iS -:. lHASI l
KENNEDY DITIRNATIONAL AUPORT
To: 'l'be Port Authority of Nev York •ad Nev .Jeney
HARVY CONSTRUCTION COIU'01tATION
Purewint to Clause 27, Cb•pter IV, Page 54 of The Port Authority of · Nei, York and New Jersey Contr•ct JPl:·410.092 with Barvy Construction Corporation for the _lnteroatioaal Arrivals Building - Klacellaaeou• Alterations• Phase I, I hereby certify that such test8 and fnapectione as were neceaaary or desirable have eatiefled me with respect to the Kateriala, including Extra Materials required to be sold by Harvy Conatruct-ion Corporation, as contractor under aaid contract aod thac,·1a •7 opinion, all of the Material• under said contract bave been deliv•red in accordance vitb the Contract Drawings and Specifications and requireiaenta of the Engineer, and such delivery vaa ao completed on Augiat 1. 1973.
."") ,.,. l-.
/· Manager, Plant & tructures ~eanedy International Airport
--.-.. -~;.,
PA 98557
..
:"{"\ _,.· ·,• a·• -
"··'.' ,-• -' \_.';~-:;t~:--)~~~i~,~-::~:~~:.i :~;·/: /7/,/ i-+_~;· '~\:-;•:,~·>._·.v::F-/! 0.1;• l
. ·~~-•:::. r,'im.'11'·,jfi; n·aw·ifiia•i·.avTmGiliii'i'i; • t"_ •· -·
@ l;L~i:. L.S~H.
, ....
.. ••
. .
..
-,
-·. .~.' . . .•
: ....
JOHNF. KENNEDY INTERNATIONALAIRPORT .
INTERNATIONAL ARRIVAL BUILDING
'
EXPANSION AND ALTERATION
-CONTRACT JFK-410; 087 BOOK 2 OF 2·
... . ~ '.· ,: ·:· .. •,
' .. . . '
. -' . ·;• ...
. • I_
.;,- '
·~ -,..,'-.: _. -·~ . .
, .••. ,,·,•.,,,'.,','',',' f ' ,r;: -fr·· ;.< ;;:;:·
..
•
. . Tile ttlephimi'•mmher of theunderaij:licl ill 212. ·. 292· z.2..5-c/
- -,·
OCf'·Bt:i.ig+ t '. <ifii:me of. corporation ai partuer1hip or
lign&ture of individual)
,·. !:1:::::r:io~::zr:!:~). officer, partne4 .
· (Acla\c,i,ledpent of. aignai:~re. to be tiitcen on' proper form' on following •. paae) .
NOTICB 1'0 BIDDERS: .
.•
\/.·~.~. ( 1t~l-1$rPtJ(lQQf)l;c/r>: ', __ ,_ - -- .> ·- , -,Y
" : .";. -. . . .:_;.. :• i I :· ._._;- --.:..;;.;_:,,:_ ·
i~~-it'-(df}lli.,:~.4,,J,~.-.·'· ..s~---~--re~~i:·--·
. Unleaa 1:M' following a11urance of irrevocability ia ala~ 1ign!'d, the above Propoaal 11 not reaponaive to the-Authority'• invitation to bid. · · ·
·,· ·,, 'l'he . foregoing offer •hall, be irrevocable for 45 ·. daya a'fter · .. the date on .which 'l'he Port of Nev York Authority open1 tbi1 Propoaal •. . ;· . . ·- - - ' / .· . ,., --· ,
. · (Signature of ~gent{ partner or · , ',··,,·,,• , ••. , ·,·,.,·,.•. ,'. ,·' ·, ,·, Pt zn 1i 'j;:_ t , ... ,·.·•,. ,·,. ·,·. - .. corporate officer aigning above) ... .d4: Jt." /:,( Ci 4?)111 ): ~·...:..· · ·
CERTIFICATE OF AUTHORl'l'Y, IP Bll>DE~\ . IS A CORPORATION ..• -· !·
. .· 1,· the ~ndel'lli~d I aa· Secret~ry of. the corporation ~tibmittf.as the. foregoing Propo1al, hereby certify that Ul\der and purauant to the by-lava and. re1olution1 of 1ald • cotj,oration, each officer. who ha.a. lill:led aaid. · Propo11l on behalf of the.corporation, includingthe.foregoina aaaurance of irrevocability 1 ia fully and cmpletely a~thoriaed 10 to do. · . . . ~J· .... ·/)·· /?'. It .·. -..... · .. ~-· ·_· . - -t_•· _1_ . : . . ·~ ~.'('; ~{;.,,/,;;i,1~.~ (Ccirpor•te S•ai)
(*) If Propoaal 11 1igned by· an officer or agent, aive · title and addreaa,. ·
- 11-