follow-up to public information centre st. james street
TRANSCRIPT
_________________________________________________________________________________________________________
City Hall, 100 Wellington Square, Brantford, ON N3T 2M2 P.O. Box 818, Brantford, ON N3T 5R7
Phone: 519-759-4150, Fax: 519-754-0724 www.brantford.ca
May 15, 2020
Follow-Up to Public Information Centre
St. James Street (Brant Avenue to Pearl Street) Albion Street (Bedford Street to Henrietta Street)
Road, Sewer and Watermain Reconstruction Project
Dear All Area Residents/Business Owners/Tenants/Agencies: We would like to take this opportunity to provide you with an update on the proposed construction project for St. James Street and Albion Street. Due to delays in construction starts and a reduced construction season as a result of the COVID-19 pandemic, this project has been deferred and is now anticipated to be completed in 2021.
The project details were presented by staff at the Public Information Centre (PIC) held on February 5, 2020. Based on staff recommendation and feedback received at the PIC, bylaw amendments to be implemented following construction will be put before Council for the following:
a. Maximum speed limit reduction will be recommended on Albion Street as follows:
Reduction to 40km/h between Henrietta Street to St. James Street, and
Reduction to 30km/h north of St. James Street.
b. Designated bicycle lanes will be recommended to be implemented within the limits of the Albion Street construction from Henrietta Street to McMurray Street. (see Figure 1)
c. On-street parking on Albion Street will be recommended as follows (see Figure 2):
Parking to be permitted on the east side of the street and prohibited on the west side of the road at any time.
Existing parking prohibition on both sides of the street will be recommended to be extended south of Henrietta Street.
If you have any questions or comments, please contact Jacob McDonald, C.E.T., Transportation Technologist at 519-759-4150. Yours truly, Wendy Teufel Manager, Design & Construction Cc: Councillor John Sless, Councillor John Utley
Inderjit Hans, P. Eng., PMP, General Manager, Public Works Commission Russ Loukes, P. Eng., Director, Engineering Services Guangli Zhang, P. Eng., Design Engineer, Engineering Services James Clarke, C.E.T., Design Technologist, Engineering Services Jacob McDonald, C.E.T., Transportation Technologist, Engineering Services
WT/jm/jc
APPENDIX "E"
McMurray St
Pearl St
St. James St
Henrietta St
Bedford St
Young St
Sydenham St
Niagara St Al
bion St
William St
PearlSt
42
49
182
126
129
130
131
135
136
137
139
140
142
143
144
145
148
151
152
154
155
156
157
160
162
165
168
170
172
173
174
175
176
177 178
179
188
133 134
138
146
149
150
158
184
25 23
153
169
123
183
116
124
154
174
138
148
176
130
2226 2425
28
131
133
135
139
149
153
157
163
128
175
181
189
191
193
195
155
171
187
129
143
145
151
161
167
159
165
173
177
197
29
50
5355
47
30
32
45
52
185
199
8
120
126
128
132
133
134
135
136
139
140
142
146
147
149
150
153
157
186
190
192
118
Figure 2 - ALBION STREET Parking Recommendations
:
100
1020
305
1:2,000
Legend
Proposed No Parking
Prepared by: C. G. Kendrick