1 TPDC Paper No. EHW 51/2016 For Consideration by The Environment, Housing and Works Committee on 13 July 2016 Food Waste/Sewage Sludge Anaerobic Co-digestion Pilot Trial - To Set Up a Food Waste Pre-treatment Facilities at Existing Shuen Wan Leachate Pre-treatment Plant 1. PURPOSE 1.1. This paper briefs Members on the proposed food waste pre-treatment facilities for the food waste/sewage sludge anaerobic co-digestion pilot trial to be built at the existing Shuen Wan leachate pre-treatment plant in Tai Po. 2. BACKGROUND 2.1. The Government has set out in the Food Waste & Yard Waste Plan for Hong Kong (the Food Waste Plan) unveiled in February 2014 that Hong Kong needs to build a network of around five to six organic waste treatment facilities (OWTFs) with a total recycling capacity of about 1,300 to 1,500 tonnes per day to recycle food waste to energy. 2.2. Apart from constructing new facilities, we are exploring the use of existing sewage treatment facilities for food waste/sewage sludge anaerobic co- digestion as an additional part of the network of OWTFs to help raise Hong Kong's food waste treatment capability. 2.3. As a new environmental protection initiative in the 2016 Policy Address and Policy Agenda, we will commence a food waste/sewage sludge anaerobic co- digestion pilot trial to confirm the feasibility of food waste/sewage sludge anaerobic co-digestion and determine the technical requirements for using such technology to convert food waste to energy. Results of the trial will provide the basis for our formulation of medium to long-term development roadmaps and action plans. 2.4. The pilot trial will be jointly carried out by the Drainage Service Department (DSD) and Environmental Protection Department (EPD). A food waste

Upload: doanngoc

Post on 16-Mar-2018

215 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Food Waste/Sewage Sludge Anaerobic Co-digestion Pilot ... · PDF file4.9. According to the Outline Zoning Plan of the project site, maximum the building height of the FWPF is limited

1

TPDC Paper No. EHW 51/2016 For Consideration by

The Environment, Housing and Works Committee on 13 July 2016

Food Waste/Sewage Sludge Anaerobic Co-digestion Pilot Trial - To Set Up a Food Waste Pre-treatment Facilities at Existing Shuen Wan Leachate Pre-treatment Plant

1. PURPOSE

1.1. This paper briefs Members on the proposed food waste pre-treatment

facilities for the food waste/sewage sludge anaerobic co-digestion pilot trial to be built at the existing Shuen Wan leachate pre-treatment plant in Tai Po.

2. BACKGROUND

2.1. The Government has set out in the Food Waste & Yard Waste Plan for Hong

Kong (the Food Waste Plan) unveiled in February 2014 that Hong Kong needs to build a network of around five to six organic waste treatment facilities (OWTFs) with a total recycling capacity of about 1,300 to 1,500 tonnes per day to recycle food waste to energy.

2.2. Apart from constructing new facilities, we are exploring the use of existing sewage treatment facilities for food waste/sewage sludge anaerobic co-digestion as an additional part of the network of OWTFs to help raise Hong Kong's food waste treatment capability.

2.3. As a new environmental protection initiative in the 2016 Policy Address and

Policy Agenda, we will commence a food waste/sewage sludge anaerobic co-digestion pilot trial to confirm the feasibility of food waste/sewage sludge anaerobic co-digestion and determine the technical requirements for using such technology to convert food waste to energy. Results of the trial will provide the basis for our formulation of medium to long-term development roadmaps and action plans.

2.4. The pilot trial will be jointly carried out by the Drainage Service Department

(DSD) and Environmental Protection Department (EPD). A food waste

Page 2: Food Waste/Sewage Sludge Anaerobic Co-digestion Pilot ... · PDF file4.9. According to the Outline Zoning Plan of the project site, maximum the building height of the FWPF is limited

2

pretreatment facilities will be set up at the existing Shuen Wan leachate pre-treatment plant site to provide up to 50 tonnes per day of pre-treated food waste to the existing sewage sludge anaerobic digestion systems at the Tai Po Sewage Treatment Works (STW) for co-digestion. For the site location, please refer to Appendix 1.

2.5. EPD will be responsible for the food waste sourcing, pre-treatment facilities

construction and conveying the pre-treated food waste to a designated anaerobic digester at the Tai Po STW for co-digestion.

2.6. The pilot trial will last for about 6 years.

3. FOOD WASTE PRE-TREATMENT FACILITIES 3.1. The Investigation, Design and Construction (IDC) consultancy for the food

waste treatment facilities commenced on 14th October 2015. The consultant has completed the engineering feasibility study, environmental review and reference design, and is preparing the tender for the Design, Build and Operate (DBO) contract. The consultant will also carry out site supervision and project management, and undertake performance monitoring and review during the commissioning phase.

3.2. The food waste pre-treatment facilities (FWPF) will consist of the following

major components: Reception area; Shredder and impurity separation system; and Deodourisation system.

3.3. The FWPF will be implemented through a DBO contract arrangement. The

design and construction works will commence in the first half of 2017 for completion and commissioning in the first half of 2018. The pilot trial will last for 6 years until 2024.

3.4. During the first 2 to 3 years of operation, the amount of food waste to be treated would be about 20-30 tonnes per day on average to test for the mixing ratio of food waste and sewage sludge as well as various operation parameters; and gradually built up to a maximum of about 40-50 tonnes per day in the later stage of the pilot trial.

Page 3: Food Waste/Sewage Sludge Anaerobic Co-digestion Pilot ... · PDF file4.9. According to the Outline Zoning Plan of the project site, maximum the building height of the FWPF is limited

3

4. KEY FINDINGS OF THE ENVIRONMENTAL REVIEW 4.1. The Consultant has completed the environmental review and ascertained the

likely nature and extent of environmental impacts on air quality, water quality, landfill gas hazard, noise, landscape & visual arising from the FWPF. Where necessary, the environmental review has recommended mitigation and control measures to reduce the environmental impacts to acceptable levels.

4.2. Upon implementation of the recommended mitigation measures, the FWPF would be environmentally acceptable and no unacceptable residual impacts are anticipated. Regular monitoring of landfill gas concentration within the boundary of the FWPF site has also been specified in Environmental Monitoring & Audit (EM&A) section in the report.

Air Quality Impacts

4.3. Potential air pollution sources during construction phase arise mainly from dust emissions from the demolition and construction activities. With the implementation of the mitigation measures as stipulated under the Air Pollution Control (Construction Dust) Regulation, no adverse construction dust impact is anticipated.

4.4. During the operational phase, completely sealed bulk collection vehicles will

be used for food waste collection, which can prevent fugitive odour and leachate leakage on the delivery route to the FWPF. No adverse air quality impact from the induced traffic for food waste collection and delivery is anticipated.

4.5. Moreover, at-source mitigation measures will be implemented to minimize

the potential odour impact from the proposed facilities during operation to environmentally acceptable level. The mitigation measures include: Enclosing all potential odour sources for extraction; Maintaining negative pressure within the facilities to avoid odour

escape; Installation of deodouriser to control odour emission via ventilation

exhaust; Directing exhaust of deodouriser vertically upwards to avoid direct

discharge towards sensitive receivers; and

Page 4: Food Waste/Sewage Sludge Anaerobic Co-digestion Pilot ... · PDF file4.9. According to the Outline Zoning Plan of the project site, maximum the building height of the FWPF is limited

4

Regular inspection and maintenance of deodouriser.

Noise Impact

4.6. No representative noise sensitive receivers are identified within 300m of the FWPF boundary. The closest sensitive receiver identified is at least 400 m away from the project area. Potential noise impacts from both construction and operational phase are not anticipated. Water Quality Impact

4.7. During the construction phase, construction site runoff and sewage from site workforce are identified as potential water pollution sources. Mitigation measures including covering excavated materials, providing proper drainage systems and providing sedimentation tanks onsite, etc. have been recommended to mitigate any potentially adverse temporary water quality impacts.

4.8. During the operational phase, wastewater generated during the food waste pre-treatment process including equipment cleansing and floor cleansing will be diverted to the Tai Po STW for proper treatment. Therefore, no adverse water quality impacts are anticipated. Landscape and Visual

4.9. According to the Outline Zoning Plan of the project site, the maximum building height of the FWPF is limited to 2 storeys. The outlook design of the FWPF will blend with and be compatible with the surrounding environment. The residual landscape and visual impacts are expected to be insubstantial.

5. TRAFFIC IMPACT ASSESSMENT

5.1. During the construction phase, a maximum of 12 round trips of truck traffic

are expected to be generated per day and there should be no adverse impacts to the existing traffic.

5.2. In the early stage of operation, food waste will be collected from within the Tai Po Industrial Estate and the collection will gradually be extended to the

Page 5: Food Waste/Sewage Sludge Anaerobic Co-digestion Pilot ... · PDF file4.9. According to the Outline Zoning Plan of the project site, maximum the building height of the FWPF is limited

5

wet markets in Tai Po District. The food waste collection vehicles will enter the Shuen Wan leachate pre-treatment plant via Dai Li Street next to the Tai Po STW.

5.3. Most of the food waste will be collected by sealed bulk collection vehicles in order to minimize odour impact and leachate leakage. A small amount of food waste will be collected in 240L transit skips/ bins and delivered by heavy goods vehicles to the FWPF. Capacity per bulk collection vehicle is approximately 8 to 10 tonnes and about 10 to 14 round trips are required to deliver 50 tonnes of food waste to the FWPF. On the other hand, each heavy goods vehicles with 240L bins is able to handle 2-3 tonnes of food waste, about 34 to 50 round trips are required to deliver 50 tonnes of food waste.

5.4. Assessment of future traffic condition in the study area during construction and after commencement of operation of the facilities in Years 2018 and 2021 has been undertaken. All assessed junctions would be operating satisfactorily with ample capacity during both morning and evening peaks. In addition, it is likely that the peak food waste delivery to the FWPF would be during off-peak hours of commuter traffic. Therefore, the traffic impact induced by the FWPF will be insignificant.

6. WORKS PROGRAMME 6.1. We plan to invite tenders for the DBO contract for the FWPF in Q3 2016 and

commence the construction works in early 2017 for commissioning the co-digestion pilot trial in early 2018.

6.2. We will apply for revising the permitted land use of the subject site under the section 16 planning application of the Town Planning Ordinance (Cap.131) from “Leachate Pre-treatment Works” to “Leachate Pre-treatment Works cum Food Waste Pre-treatment Facilities” in end 2016 to allow co-use of the site for both leachate and food waste treatment.

7. ADVICE SOUGHT 7.1. Members are invited to provide comments on it.

Environmental Protection Department July 2016

Page 6: Food Waste/Sewage Sludge Anaerobic Co-digestion Pilot ... · PDF file4.9. According to the Outline Zoning Plan of the project site, maximum the building height of the FWPF is limited

Appendix 1

Page 7: Food Waste/Sewage Sludge Anaerobic Co-digestion Pilot ... · PDF file4.9. According to the Outline Zoning Plan of the project site, maximum the building height of the FWPF is limited

TS

¥Ã´I®e¾¹¡]­»

·sÀy½¦ºÞ

¬ü¨È¾T¼t

¬ü¤ß­¹

FC Packing (Hong Kong) Ltd.

Sunnyhose Co. Ltd.

Meyer

Maxim's Food Factory 2

1

3-5

8-10

2

ÅS¤Ñ

Open Storage

L

L

L

H

H

L

L

L

L

HL

L

L

L

L

H

¤j¶

DAI K

WAI S

TR

EE

T

±×

±×

Ramp

Ramp

5.5

5.8

5.8

5.9

6.0

6.1

6.4

¤j¶

©U§

Dai K

wai Street

Refuse

Collectio

n Point

PC3 Product Customization & Consolidation Centre

7

12

14-18

¤Ú¤h

ESS

Bus Terminus

Âo¤

Âo¤

Âo¤

Âo¤

¬

FilterBed

FilterBed

FilterBed

FilterBed

Tank

L

L

L

HL

L

L

L

L

L

H

L

HLL

L L

L

H

L

L

¤j¶

¹D

Road

5.4

5.4

5.5

5.6

5.6

5.6

5.6

5.65.6

5.6

5.7

5.7

5.8

5.8

6.3

6.3

7.0

7.5

7.6

8.2

TS

°ª¬ì¾ô¥ú³q

¬ü¨È¾T¼t

·sÀy½¦ºÞ

­»´ä¯q¤O¦h¨

©}¦Ú¤ó»]

Transtech Optical Communication Company Limited

Meyer Aluminium Limited

Sunnyhose Co., Ltd.

Hong Kong Yakult Co. Ltd.

Watsons Water Centre

5

1-3

6

4

¤j®H¤

º̄ Âo¦Ã¤ô¹

TAI PO INDUSTRIAL ESTATE

ES

S

Leachate

Pre-treatment Works

Âo¤¬

Âo¤Âo¤

·Ï

WT

WT

Filter BedTank

Filter Bed Chimney

Filter Bed

WT

Chimney

L

L

H L

L

ETL

L

HH

H

L

L

LLL

H H

H

H

¤j§ DAI LI STREET

¹D

ªd

ªd

¹D

FP

Road

Track

Track

Road

8.52 8.46

EXI

STI

NG

BO

X

CU

LV

ER

T

1 : 25

1 IN 32

ACCE

SSROAD

7.00

8.20

6.25

8.96

11.69

15.73

18.97

8.42

8.37

8.45

8.44

8.46

8.468.44

8.50

5.83

5.83

5.87

6.73

6.64

5.76

5.82

5.86 5.90

5.88 5.63 5.615.95 5.92 5.90 6.11

6.16

8.51

8.56

8.51

1 : 40

1 : 40

TYPE I

VALVE CHAMBER

TYPE II

VALVE CHAMBER

TYPE III

VALVE CHAMBER

TYPE IV

VALVE CHAMBER

TYPE III

VALVE CHAMBER

8.45

8.43

8.45

8.46

8.54

8.56

9.50

10.77

11.57 13.3514.84

16.49

17.97

19.14

20.538.51

8.38

8.35

8.36

8.39

7.87

6.84

5.80

5.81

5.79

5.86

5.85

6.66

7.27

7.59

7.86

8.16

8.44

8.51

9.48

10.49

10.11

9.09

8.31

8.17

8.10

7.85

7.49

7.15

6.64

6.20

5.81

11.38 13.02

15.37

16.87

18.52

19.28

20.30

TS

TS

TS

²îÆWªh®ðShuen Wan Landfill

Gas Treatment Plant

RETAINING WALL

5.65.8

5.9

5.9

6.0

6.1

6.1

6.1

6.5

6.6

7.2

8.1

8.3

8.5

8.5

8.6

8.6

8.7

9.6

10.8

11.0

11.5

12.1

12.7

13.3 15.6

16.6

17.2

17.8

18.0

18.0

18.2

18.2

18.4

18.9

19.2

19.3

20.0

20.3

20.5

22.5

23.1

23.7

23.8

23.8

24.0

24.1

24.4

24.5

24.6

26.0

26.4

26.4

26.4

26.5

27.2

27.9

33.1

34.6

35.3

35.5

35.6

35.6

35.7

35.7

36.5

TS

TS

TS

¦æ¬

ºû­×

²Ä¤@±±¨î¤¤ ¦æ¬F

³ï¥æ¤¤

²Ä¤

@¤J¤ô¤f

±±¨

¹q¾¹

¦^¬y²Jªd

¤¤¥¡±±¦Ã¤ô¤

¾÷ª

¤¤¼°Ê¾

²Ä¤@¤G´

±Æ©ñ¤²Jªd¬¼ö¤ô

Old AdministrationBuilding

Maintenance Building

ServiceTower

BuildingStage I/IIControl Building

AdministrationBuildingIn

let

Works

(Stage I/II)

Scre

w

Pu

mp

Control R

oo

m

Electrical Workshop

Return ActivatedSludge Pumping

Station

Inlet Works

Central Building Complex

LubricantOil Store

Blower House (Stage I/II)

Effluent Pumping StationSludge Pumping

Station and

¤j®H¦Ã¤

Tai Po SewageTreatment Works

ESS

¬Âo¤

Âo¤¬

¬¬ Âo¤

Âo¤

Âo¤

¬¬Âo¤Âo¤

Âo¤Âo¤ Âo¤

Âo¤ Âo¤Âo¤

Âo¤Âo¤ Âo¤Âo¤

Âo¤Âo¤

Âo¤Âo¤Âo¤ Âo¤Âo¤

Âo¤

Âo¤ Âo¦

Âo¤

Âo¤Âo¤Âo¤ Âo¤ Âo¤ Âo¤

Âo¤Âo¤ Âo¤

Âo¤

Âo¤Âo¤

Âo¤Âo¤

Âo¤ Âo¤ Âo¤Âo¤

Âo¤

Âo¤Âo¤ Âo¤ Âo¤

¬

TankFilter Bed

Filter Bed

GTTank

Tank Tank Filter Bed

Filter Bed

FilterBeds

GTTankTank

Filter Bed Filter Bed

Filter BedFilter Bed Filter Bed

FilterBed Filter

Bed FilterBed

Filter Bed Filter Bed

Filter BedFilter BedFilter

Bed

Filter BedFilter Bed

FilterBed

Filter Bed

FilterBed

Filter Bed

FilterBed

Filter Bed

Filter Bed Filter BedFilter

BedFilterBedFilter

BedFilter Bed

WT

Filter BedFilterBed

Filter Bed

Filter Bed

Filter Bed

Filter Bed

Filter Bed Filter BedFilter

Bed Filter Bed

FilterBed

Filter Bed

FilterBed

Filter Bed Filter BedFilter Bed

Tank

GT

´

´

Nullah

Nullah

H

H

H

H

HH

H

H

H H

H

H

¹D¹D

¹D

¹D

¹D

¹D

¹D

¹D

¹D

¹D

¹D

¹D

¹D

¹D

¹D

¹D

RoadRoad

Road

Road

Road Road

Road

Road

Road

Road

Road

Road

Road

Road

Road

5.3

5.4

5.4

5.4

5.4

5.5

5.5

5.55.5

5.6

5.6

5.6

5.7

5.7

5.7

5.7

5.7

5.7

5.7

5.7

5.8

5.8

5.8

5.8

5.8

5.9

5.9

5.9

5.9

6.0

6.0

6.0

6.1

6.3

6.3

6.4

6.4

6.4

6.5

6.8

6.9

6.9

6.9

7.4

8.5

12.7

12.9

19.4

19.4

19.6

23.1

23.1

23.2

23.5

32.3

ENVIRONMENTAL

PROTECTION DEPARTMENT

GOVERNMENT OF THE HKSAR

Filena

me :

J:\

24

6190\

AR

UP\

CIVIL\

24

6190-S

K-

Z-001.d

gn

4/25/2016

Printed by :

Rev.

Status

Rev DateByDescription

Drawn

Drawing no.

Date Checked

Drawing title

Scale

Consultant

Approved

COPYRIGHT RESERVEDCOPYRIGHT RESERVED

Contract No. and Title

c OVE ARUP & PARTNERS HONG KONG LIMITED.

ALL RIGHTS RESERVED.

DO NOT SCALE DRAWING. CHECK ALL DIMENSIONS ON SITE.

Investigation, Design and Construction

Co-digestion Pilot Trial -

Sewage Sludge Anaerobic

Facilities for Food Waste /

Food Waste Pre-treatment

Agreement No. CE 16/2015 (EP)

TS

TS

TS

TS

TS

PH

TS

TS

TS

TS

¢°¢±

¢² ¢²¢

¢°¢¢°¢ ¢´ ¢µ

¢°¢¢¶

¢·¢°¢® ¢°¢ ¢¸ ¢°¢¢±

®¢°¢

¢±®

¢°¢¢°¢ ¢°¢

¢±¢¢±¢

¢±¢ ¢±¢ ¢±¢¢±¢

®

¤j®HªF

©_µØ¶°¹Î

°ª¬ì¾ô¥ú³q

¬ü¨È¾T¼t

·sÀy½¦ºÞ

­»´ä¯q¤O¦h¨

©}¦Ú¤ó»]

16

15Block

14

Block

13

Block Block3A

12 10Block11

11Block 6

BlockBlock12

Block13

BlockBlockBlock

13ABlock

15Block Block

10Block

27

Block28

Block18

Block 16Block19

Block17

Block20 Block

21Block

22Block

23Block23A

Block25

Tai Po East Fire Station

Kee Wah Group Limited

Transtech Optical Communication Company Limited

Meyer Aluminium Limited

Sunnyhose Co., Ltd.

Hong Kong Yakult Co. Ltd.

Watsons Water Centre

46

B46

A

101

1-3

¤U

¦Ê¬

´ë°¥Å¨¤­¸¹

¤j®H¤

º¯Âo¦Ã¤ô¹

²îÆWªh®ð

HA HANG

Casa Brava

ESS

Ha HangTelephoneExchange

ESS

Drainage Services DepartmentTing Kok Road

Pumping Station No.5

TAI PO INDUSTRIAL ESTATE

ES

S

LeachatePre-treatment Works

Shuen Wan LandfillGas Treatment Plant

¹Ó

Âo¤

¬Âo¤

Âo¤·Ï

CUL

Graves

WT

WT

Filter BedTank

Filter BedChimney

Filter Bed

WT

Chimney

Ž¸

¥Å¨

¥Å̈

¤j§

TING KOK ROAD

TING KOK ROAD

DAI LI STREET

¹D

³æ¨

³æ̈

¹D

³æ̈

¹D

ªd

ªdªd

¹D

FP

FP

FP

Road

Cycling TrackFP

FPEW

Road

Cycling Track

FP

FP

FP

Cycling Track

Road

FP

Track

Track

Track

Road

3.9

4.1

4.1

4.7

5.0

5.0

5.2

5.3

5.3

5.6

5.6

5.8

5.8

5.9

5.9

5.9

5.9

5.9

5.9

5.9

6.0

6.0

6.0

6.0

6.0

6.0

6.1

6.1

6.1

6.1

6.1

6.1

6.1

6.3

6.4

6.5

6.6

6.8

7.1

7.2

7.2

7.6

7.8

7.8

7.8

7.9

8.1

8.1

8.3

8.4

8.5

8.5

8.5

8.5

8.6

8.6

8.6

8.6

8.6

8.6

8.7

9.3

9.5

9.6

10.2

10.7

10.8

11.0

11.2

11.3

11.5

11.6

12.0

12.1

12.1

12.7

12.7

13.3

13.6

13.8

14.3

14.5

14.9

15.5

15.6

15.8

15.9

16.2

16.6

16.7

17.0

17.0

17.1

17.2

17.8

18.0

18.0

18.0

18.2

18.2

18.4

18.4

18.4

18.4

18.4

18.5

18.6

18.6

18.8

18.8

18.9

18.9

18.9

19.1

19.2

19.2

19.3

19.5

20.0

20.3

20.5

21.0

21.8

22.1

22.3

22.5

23.1

23.5

23.7

23.7

23.8

23.8

24.0

24.1

24.4

24.5

24.6

25.4

25.4

25.6

26.0

26.1

26.3

26.3

26.4

26.4

26.4

26.4

26.5

27.1

27.2

27.6

27.9

31.0

33.1

33.1

33.5

33.7

33.8

33.8

34.0

34.2

34.6

35.3

35.5

35.6

35.6

35.7

35.7

36.5

38.5 38.7

38.9

40.9

41.0

41.3

41.5

45.8

46.0

49.2

67.4

69.8

89.0

89.3

89.7

89.8

91.8

93.5

94.0

94.4

94.5

94.5

94.5

94.6

94.6

94.7

94.8

94.8

94.9

94.9

94.9

94.9

95.0

95.0

95.3

95.4

96.0

96.2

96.3

101.2

TS

TS

TS

TS

¦æ¬

ºû­×

²Ä¤@±±¨î¤¤ ¦æ¬F

³ï¥æ¤¤

²Ä

¤@

¤J

¤ô

¤f

±±¨

¹q¾¹

¦^¬y²Jªd

¤¤¥¡±±¦Ã¤ô¤

¾÷ª

¤¤¼°Ê¾

²Ä¤@¤G´

Old AdministrationBuilding

Maintenance Building

ServiceTower

BuildingStage I/IIControl Building

AdministrationBuildingIn

let

Works

(Stage I/II)

Scre

w

Pu

mp

Control Roo

m

Electrical Workshop

Return ActivatedSludge Pumping

Station

Inlet Works

Central Building Complex

LubricantOil Store

Blower House (Stage I/II)

¬ÄÄR°ªº¸¤Ò²y·|

¤j®H¦Ã¤

Golf Park Golf Driving Range

Tai Po SewageTreatment Works

¬Âo¤

Âo¤¬

¬¬ Âo¤

Âo¤

Âo¤

¬¬Âo¤Âo¤

Âo¤Âo¤ Âo¤

Âo¤ Âo¤Âo¤

Âo¤Âo¤ Âo¤Âo¤

Âo¤Âo¤

Âo¤Âo¤Âo¤ Âo¤Âo¤

Âo¤

Âo¤ Âo¦

Âo¤

Âo¤Âo¤Âo¤ Âo¤ Âo¤ Âo¤

Âo¤Âo¤ Âo¤

Âo¤

Âo¤Âo¤

Âo¤Âo¤

Âo¤ Âo¤ Âo¤Âo¤

Âo¤

TankFilter Bed

Filter Bed

GTTank

Tank Tank Filter Bed

Filter Bed

FilterBeds

GTTankTank

Filter Bed Filter Bed

Filter BedFilter Bed Filter Bed

FilterBed Filter

Bed FilterBed

Filter Bed Filter Bed

Filter BedFilter BedFilter

Bed

Filter BedFilter Bed

FilterBed

Filter Bed

FilterBed

Filter Bed

FilterBed

Filter Bed

Filter Bed Filter BedFilter

BedFilterBedFilter

BedFilter Bed

WT

Filter BedFilterBed

Filter Bed

Filter Bed

Filter Bed

Filter Bed

Filter Bed Filter BedFilter

Bed Filter Bed

FilterBed

Filter Bed

´

´

Nullah

Nullah

¹D¹D

ªd

¹D

¹D

¹D

¹D

¹D

¹D

¹D

¹D

¹D

¹D

¹D

RoadRoad

Road

Road

Track

Road Road

Road

Road

Road

Road

Road

Road

Road

Road

5.4

5.4

5.4

5.4

5.5

5.6

5.6

5.7

5.7

5.7

5.7

5.7

5.7

5.7

5.8

5.8

5.8

5.8

5.8

5.9

5.9

5.9

5.9

6.0

6.0

6.1

6.3

6.3

6.4

6.4

6.4

6.5

6.8

6.9

6.9

6.9

7.4

8.5

12.9

19.4

19.6

23.1

23.1

23.2

23.5

32.3

37.5

38.2

38.4

38.7

39.3

39.7 40.0

¥­

¥­

TSZ

TS

RCP

RCP

Podium

TS

Podium

µ§§J

ªø¦¿¥Í

­»´äÁp¦X§Q

¤j§

°·¥þ­¹«~¤u·~¿³µØ¥

¼Ú¤ÆÃÄ·~¦¤j´Iµó

¥Ã´I®e¾¹¡]­»

¿³¦t¨T¨®±Æ®ð

¬üºû¬ì§Þ¶°

ªF¤è¬õ¢Õ

Ÿ

²^¤Æ¤j¦P­¹

·sÀy½¦ºÞ

¬ü¨È¾T¼t

¨ô¶V¥ú±»¼

¼w©÷¹q¾÷¤u·~»¤j®a¼Ö¤¤¥

¼Ý¿³ÃC±M

µØ¤j°ò¦]­»´ä¬ã

¬ü¤ß­¹

­}·R¥Íª¡]­»´ä¡^

¤j®a¼Ö¤¤¥¥Ã«n­¹«~

Pico House

CK Life Sciences

Unilever Hong Kong Limited

Fairwood

Convenience Foods International Ltd.RCL Semiconductors Ltd.

Europharm Laboratories Company LimitedDai Fu Street Substation

FC Packing (Hong Kong) Ltd.

Hing Yu Metal Works Limited

Meadville Technologies Group Limited

Tung Fong Hung GMP Centre

Maxim's

Amoy Food Limited

Sunnyhose Co. Ltd.

Meyer

Remarkable Mask Tech. Co. Ltd.

Ming Fong Packaging & Chemicals Ltd.

Johnson Electric Industrial Mfy., Ltd.Cafe de Coral

Central Processing Plant 2

NHH Coltec Ltd.

BGI Hong Kong Co. Limited

Maxim's Food Factory 2

DIC Graphics(Hong Kong) Limited

Winner Food Products Ltd.Cafe de Coral

Central Processing Plant 1

30517A

14A16F

16D

16G

15A

15B

12A

11B

11A

3-5

11-15

8-10

16

A

22-6

13-11

°±¨

°±¨

¤U§|§ø

¤j®H¤

ÅS¤Ñ

Car Park

Car P

ark

Ha Hang Village Sitting-out Area

TAI PO INDUSTRIAL ESTATE

Open Storage

CU

L

WIP

Aug 2

015

CUL

SHR

¥Å

¼

¥Å

¼

¤j´

¤j¶

¤j¶

¤j´

¤j¶

TING

HING

ROAD

TIN

G

HIN

G

RO

AD

TIN

G

KO

K

RO

AD

DAI FU STREET

DAI F

U

ST

RE

ET

DAI S

HU

N

ST

RE

ET

DAI K

WAI S

TR

EE

T

DAI SHUN STREET

¹D

ªd

³æ¨

³æ¨

³æ̈

±×

±×

±×

Road

Track

FP

Cycling Track

Cycling Track

FP

Cycling Tra

ck

CW

FP

Ra

mp

Ramp

Ramp

3.9

4.0

4.0

4.1

4.1

4.3

4.4

4.4

4.6

4.7

4.8

4.9

4.9

4.9

5.0

5.0

5.0

5.2

5.2

5.4

5.4

5.4

5.45.4

5.4

5.5

5.5 5.5

5.6

5.6

5.6

5.6

5.7

5.7

5.7

5.7

5.7

5.7

5.7

5.7

5.7

5.8

5.8

5.8

5.8

5.8

5.9

5.9

5.9

5.9

5.9

5.9

5.9

5.9

5.9

5.9

5.9

5.9

5.9

5.9

6.0

6.0

6.0

6.0

6.0

6.0

6.0

6.0

6.0

6.0

6.0

6.0

6.1

6.1

6.1

6.26.2

6.2

6.2

6.3

6.3

6.4

6.4

6.4

6.4

6.4

6.4

6.5

6.5

6.5

6.5

6.6

6.6

6.6

6.6

6.7

9.19.5

9.7

17.4

36.9

TS

TS

¥²µoºë¿i¿û

ªF¤è³ø

«n¶¶

¤j¶

©U

§

¨È¬w¹qµø¤é²M¦³­­

C.A.Picard Far East Ltd

Oriental Press Centre

Lam Soon Building

Dai K

wai Street

Refuse

Collectio

n Point

PC3 Product Customization & Consolidation Centre

Asia Television Company Limited

Nissin Foods

¤Ú¤h

ESS

Bus Terminus

Âo¤

Âo¤

Âo¤

Âo¤

FilterBed

FilterBed

FilterBed

FilterBed

¤j´

¤j©

¤j²

¤j¶

DAI F

U

ST

RE

ET

DAI CHEONG STREET

DAI S

HIN

G

ST

RE

ET

¹D

Road

5.4

5.4

5.4

5.5

5.5

5.5

5.5

5.5

5.5

5.6

5.6

5.6

5.6

5.6

5.6

5.6 5.6

5.65.6

5.6

5.75.7

5.7

5.7

5.7

5.7

5.75.7

5.8

5.8

5.8

5.8

5.85.9

6.0

6.1

6.2

6.3

7.0

7.5

7.6

8.2

¥Å¨ TING KOK ROAD

KEY LOCATION PLAN

ANG04/16

-

DPSYU

LEGEND:

N 835600

N 835400

N 835200

E 837400

E 837600

E 837800

E 838000

THE SITE

1:1000 @A1

METRES

1 : 1000

10 20 30 40 500

PROPOSED SITE

SITE LOCATION PLAN

-

246190/SK/Z/001

user
多邊形線段
user
打字機文字
Site boundary of the proposed food waste pre-treatment facilities