Michael Pacholok, Director
Purchasing and Materials Management Division City Hall, 18th Floor, West Tower 100 Queen Street West Toronto, Ontario M5H 2N2
Joanne Kehoe Manager Construction Services
May 4, 2016 Reply to: Michael Porcarelli Via Website Posting: 7 Pages Tel: (416) 338-5585
Addendum No. 1
Tender No. 194-2016
Re: New Emergency Gas Generator Installation at 12 Canterbury Place, Fire Hall 114, Toronto.
Closing Date: 12:00 P.M. Noon (Local Time), May 19, 2016
Please refer to the above Tender Call document in your possession and be advised of the following information: 1. General Clarifications To Questions From Bidders
Q1. For Drawing M-1, I have attached the mechanical iso. What is #2 not shown on
legend. #1 is a gas relief valve? If so does Enbridge supply with station?
A1. This scope is part of the Enbridge work in which the contractor will need to retain via the cash allowance.
Q2. On tender 194-2016 the fine print on drawings E-1 thru E-4 is not legible. Looks like it’s just from the copier. Could more clear drawings be distributed?
A2. Drawings E1-E4 are attached, all dated 2016/02/12. (Enclosed 4 pages)
Q3. Drawing M-1. If #1 is a pressure regulating valve please provide requirements (load and pressure drop).
A3. Same as above response A1. This scope is part of the Enbridge work in which the contractor
will need to retain via the cash allowance.
Continued on next page…
1 of 7
2. Additional Technical Information
Please refer to information in the attachment "MMM addendum #1" dated May 3, 2016. (1 page enclosed)
All other information regarding the call document is unchanged. All other terms and conditions remain the same. Should you have any questions regarding this addendum contact Michael Porcarelli, Corporate Buyer, at email [email protected]. Please attach this addendum to your Request for Tender document and be governed accordingly. Bidders must acknowledge receipt of all addenda on the space provided on the Tender Call Cover Page as per the Process Terms and Conditions, Section 1, Item 8 - Addenda, of the Tender Call document. All other aspects of the Tender remain the same.
Yours truly, Joanne Kehoe, Manager, Construction Services, Purchasing & Materials Management
2 of 7
OVERALL SITE PLAN, SEQUENCE OF IMPLEMENTATION, DRAWING LIST
AND SYMBOL LEGEND - ELECTRICAL
E-1
E-3 EXISTING ELECTRICAL ROOM AND NEW WORK GENERATOR LAYOUT -
POWER AND SIGNALS - ELECTRICAL
ELECTRICAL SINGLE LINE DIAGRAM.E-4
THE FOLLOWING IS A PROPOSED SEQUENCE IMPLEMENTATION, INTENDED TO GIVE A
DIAGRAMMATIC OVERVIEW OF THE PROPOSED SEQUENCE OF INSTALLATION FOR THIS
PROJECT. BE RESPONSIBLE TO CONFIRM THIS SEQUENCE, MAKE THE REQUIRED
MODIFICATION TO SUIT THE ANOMALIES OF THIS BUILDING AND COORDINATE THIS WHEN
PREPARING THE MASTER CONSTRUCTION SCHEDULE FOR THE IMPLEMENTATION OF ALL
WORK ASSOCIATED WITH THIS PROJECT.
PROPOSED SEQUENCE OF IMPLEMENTAION
ELECTRICAL
PREPARE SITE TO ACCOMMODATE THE NEW GENERATOR AND ANCILLARY
EQUIPMENT/DEVICES.
INSTALL NEW GENERATOR IN ITS PERMANENT LOCATION AND PROVIDE FEEDERS
AS SHOWN ON THE DRAWINGS.
CONFIRM SITE MEASUREMENTS AND ROUTINGS OF ALL FEEDERS AND PLACEMENT
LOCATIONS OF ALL COMPONENTS PRIOR TO COMMENCEMENT OF WORK.
FIRE STOP ALL NEW WALL PENETRATIONS.
WHEN ALL THE ELECTRICAL SERVICES HAVE BEEN INSTALLED, COMPLETED AND
COMMISSIONED:
COMPLETE AS-BUILTS, O&M MANUALS AND TURN OVER TO CONSULTANT.
COMPLETE ALL REMAINING REMEDIAL WORK, INCLUDING PATCHING WORK, FIRE
STOPPING, CEILING INSTALLATIONS, PAINTING, ETC. UPON COMPLETION OF
ELECTRICAL SERVICES.
WHEN ALL NEW WORK IS COMPLETE , AFTER-HOURS DICONNECT/SHUT-DOWN
EXISTING GENERATOR AND REMOVE EXISTING TRANSFER SWITCH. REMOVE AND
DELIVER GENERATOR OFF-SITE ONCE NO-LONGER REQUIRED AND ARRANGE
DELIVERY AS NOTED.
PREPARE AND SUBMIT SHOP DRAWINGS FOR NEW GENERATOR AND TRANSFER
SWITCH FOR REVIEW. ORDER EQUIPMENT AND COORDINATE DELIVERY AND
INSTALLATION.
TEST OPERATION OF NEW GENERATOR AND TRANSFER SWITCH. REFER TO
SPECIFICATION FOR DETAILS.
UTILIZE EXISTING OUTDOOR DIESEL GENERATOR AND ATS TO PROVIDE TEMPORARY
STAND BY EMERGENCY POWER DURING INSTALLATION OF NEW GENERATOR AND ATS.
PERFORM FUNCTIONALITY TEST INCLUDING START/STOP OF GENERATOR.
WATER SEAL ALL OPENINGS.
E-2 PART SITE PLAN AND DETAILS - ELECTRICAL
PROVIDE AS PART OF CASH ALLOWANCE TO
SUPPLY, DELIVER, CONNECT/ DISCONNECT AND
PROVIDE OFF-SITE REMOVAL OF TEMPORARY
GENERATOR INCLUDING DIESEL FUEL SUPPLY
TO SUIT SCHEDULED SHUT-DOWN DURATION.
INCLUDE EXTRA-LONG TEMPORARY CABLES TO
CONNECT TO EXISTING ATS. EXACT LOCATION
OF TEMPORARY GENERATOR TO BE APPROVED
BY OWNER PRIOR TO DELIVERY.
2
E-1
SCALE: 1:200
APPROXIMATE LOCATION OF
2ND FLOOR MECHANICAL
ROOM 212
AREA OF NEW GENERATOR
INSTALLATION
E-1
FIRE STATION No.114
1 2016/03/15 Issued For Tender
3 of 7
EXISTING AMBULANCE / FIRE STATION BUILDING
EXISTING FENCE TO REMAIN
1630
EXISTING GENERATOR GATE FENCE TO REMAIN
EXISTING GENERATOR CONCRETE PAD TO BE RETAINED FOR FUTURE USE.
MODIFY AS REQUIRED FOR NEW UNDERGROUND CONDUIT STUB-UPS.
EXISTING DIESEL GENERATOR BE REMOVED INCLUDING ASSOCIATED
ELECTRICAL AND FUEL SYSTEMS. ARRANGE DELIVERY TO OWNER'S SITE
WITHIN 80kM RADIUS OF PROJECT SITE.
780
LINE OF AMBULANCE VEHICLE ENTRY
UNDERGROUND CONDUITS TO TRANSITION ON SURFACE OF BUILDING
11000
14325
UNDERGROUND CONDUITS SHALL BE
DIRECT BURIED IN RIGID PVC. REFER
TO DETAIL 3/E-2 ON THIS DRAWING.
2
E-2
(DISCHARGE SIDE)(INLET SIDE)
1000
1m CLEARANCE FOR MAINTENANCE
NEW SKIN-TIGHT OUTDOOR AND
ACOUSTICALLY ENCLOSED NATURAL
GAS GENERATOR.
1500
PROVIDED WITH GENERATOR ENCLOSURE
OUTLINE OF NEW CONCRETE PAD.
REFER TO STRUCTURAL DRAWINGS.
PROTECTIVE BOLLARD WITH CONCRETE.
REFER TO STRUCTURAL DRAWINGS.
(TYPICAL)
GENERATOR SHORE PANEL. PROVIDED WITH
GENERATOR ENCLOSURE.
GENERATOR CONTROL PANEL AND EPO.
PROVIDED WITH GENERATOR ENCLOSURE.
WP/
CG
1000
1500
300 M
IN
300 MIN
PARKING LOT BUILDING AREA
FINISHED GROUND LEVEL
EXISTING GRADE
TOP OF GROUND LEVEL
BOTTOM OF 2ND LEVEL
TOP OF 2ND LEVELEXISTING ELECTRICAL ROOM
GLAZING
EXISTING BUILDING
OUTLINE OF NEW OUTDOOR GENERATOR
MODIFY EXISTING OPENING TO SUIT NEW CONDUIT PENETRATIONS
NEW ATS START/STOP SIGNAL AND EPO SIGNAL
NEW SHORE PANEL FEEDER TO NEW 3 POLE CIRCUIT BREAKER
IN EXISTING PANEL
NEW EMERGENCY FEEDER TO NEW ATS VIA NEW DISCONNECT SWITCH.
NEW GENERATOR ANNUNCIATOR LOW VOLTAGE SIGNALS AND
EPO SIGNAL TO GROUND FLOOR EXISTING PHONE ROOM.
SPARE EMPTY CONDUIT TO BE TERMINATED IN ELECTRICAL ROOM.EXISTING GENERATOR FENCE OUTLINE.
GALVANIZED UNISTRUT SUPPORT FOR RIGID PVC
SURFACE CONDUITS FASTENED TO WALL. (TYPICAL)
1. CONFIRM AND SITE VERIFY PROPOSED CONCEPTUAL CONDUIT
ROUTING OF ELECTRICAL FEEDERS AND CONFIGURATION.
GLAZING
E-2
FIRE STATION No.114
1 2016/03/15 Issued For Tender
1
E-2
SCALE: 1:50
2
E-2
SCALE: N.T.S.
NOTES:
OUTLINE OF NEW GENERATOR ENCLOSURE IS BASED ON A SPECIFIC MANUFACTURER. BE
RESPONSIBLE FOR EXACT PLACEMENT, INSTALLATION AND COORDINATION OF CONNECTING
SERVICES. BE RESPONSIBLE FOR THE SET-UP, INSTALLATION AND CONNECTION OF LOAD
BANK FOR ON-SITE TESTING. CABLING AND LOAD BANK WILL BE SUPPLIED BY GENERATOR
MANUFACTURER. UPON COMPLETION OF SITE TESTING, DISCONNECT LOAD BANK AND
CABLING AND PREPARE FOR PICK UP BY GENERATOR MANUFACTURER.
ROUTING OF ALL SERVICES ARE DIAGRAMMATIC. BE RESPONSIBLE TO CONFIRM EXACT
ROUTING AND TERMINATIONS ON SITE PRIOR TO FABRICATION OR ROUGH-IN AND INCLUDE
FOR REQUIRED OFFSETS, TRANSITIONS ETC. AS REQUIRED FOR A COMPLETE INSTALLATION.
ALL PENETRATIONS THROUGH WALLS AND CEILINGS SHALL BE FIRE STOPPED WITH 3m FIRE
STOP MATERIAL. REFER TO SPECIFICATIONS FOR DETAILS.
PROVISION OF ALL PENETRATIONS AND OPENINGS 50mm (2") AND LESS IN SIZE SHALL BE
THE RESPONSIBILITY OF THE ELECTRICAL TRADE. REFER TO SPECIFICATIONS FOR DETAILS.
COORDINATE TRENCHING / EXCAVATION OF SURFACES TO SUIT NEW GENERATOR
SERVICES. REPLACE WITH NEW SURFACES AND MATCH BASE BUILDING MATERIALS.
CONFIRM AND MARK ON SITE ALL EXISTING SITE SERVICE LOCATIONS WITHIN AREA OF
INSTALLATION. REFER TO SPECIFICATION.
PLAN VIEW
ELEVATION
50 DURO MASON SUPER W PAD
1/4" STEEL PLATES
SCALE: N.T.S.
SCALE: N.T.S.
SCALE: N.T.S.
OUTLINE OF GENERATOR BASE
61
"
44"35"
"X
"
"X"
3/4
"
2"
2"
4"
18"
3/4"
3/4
"
18"
4"
2"
2"
3/4
"
GENERATOR BASE (ISOLATION LAYOUT)
SUPER W PAD (ISOLATION DETAIL)
SUPER W PAD W/ HOLE (ISOLATION DETAIL)
PLAN VIEW
ELEVATION
REFER TO SHOP
DRAWINGS
4"x18" 50 Duro Super W Pad Isolators
4
E-2
SCALE: N.T.S.
FINISHED GRADE
50mm (2") RIGID PVC CONDUIT
FOR SHORE PANEL FEEDER
3
E-2
SCALE: N.T.S.
TRENCHING AND
BACKFILL AS REQUIRED.
YELLOW MARKING TAPE,
THE FULL LENGTH &
WIDTH OF TRENCH
TRENCH
63mm (2.5") RIGID PVC CONDUIT
FOR EMERGENCY FEEDER
MIN.
300
(12")
MIN.
915
(36")
50mm (2") RIGID PVC CONDUIT
FOR EPO WIRING AND ATS
START/STOP WIRING
50mm (2") RIGID PVC CONDUIT
(SPARE) CAP AT BOTH ENDS
WITH PULL STRING
50mm (2") RIGID PVC CONDUIT
FOR EPO/ANNUNCIATOR WIRING
MIN.
190
(7.5")
190mm
190mm
190mm
4 of 7
PROPOSED GENERATOR
ANNUNCIATOR / EPO CABLE IN
CONDUIT ROUTING. SITE VERIFY.
TO NEW
GENERATOR
EPO
NEW WALL MOUNTED GENERATOR
ANNUNCIATOR PANEL SUPPLIED
WITH GENERATOR. COORDINATE
PREFERRED LOCATION WITH FIRE
STATION PERSONNEL.
EXISTING MAIN ELECTRICAL ROOM.
EXISTING PANEL 'HA'
EXISTING PANEL 'AA'
EXISTING 400A, 120/208V, 3Ø, 4W
SPLITTER AND DISCONNECT SWITCH
EXISTING 225A, 120/208V, 3Ø, 4W
EMERGENCY PANEL
EXISTING 75kVA TRANSFORMER
EXISTING MECH.
RM. 212
EXISTING ATS TO BE REMOVED
EXISTING 200A, 347/600V, 3Ø, 4W
SPLITTER AND DISCONNECT SWITCH
EXISTING TRANSFORMER UP HIGH
EXISTING GENERATOR CABLING TO BE
REMOVED. MODIFY TO SUIT NEW
GENERATOR FEEDER REQUIREMENTS.
EXISTING MAIN ROOM
DISCONNECT SWITCH
EXISTING HYDRO METER
M
HWT
HWT
EXISTING
MECH. RM.
212
EXISTING PANEL 'HA'
EXISTING PANEL 'AA'
EXISTING 400A, 120/208V, 3Ø, 4W
SPLITTER AND DISCONNECT SWITCH
EXISTING 225A, 120/208V, 3Ø, 4W
EMERGENCY PANEL. PROVIDE NEW
CIRCUIT BREAKER TO FEED
GENERATOR SHORE PANEL.
EXISTING 75kVA TRANSFORMER
EXISTING 200A, 347/600V, 3Ø, 4W
SPLITTER AND DISCONNECT SWITCH
EXISTING TRANSFORMER UP HIGH
HWT
EXISTING MAIN ROOM
DISCONNECT SWITCH
EXISTING HYDRO METER
M
NEW UNFUSED DISCONNECT FOR INCOMING
GENERATOR POWER.
SHORE PANEL FEEDER
EMERGENCY FEEDER
ATS START/STOP SIGNAL AND EPO SIGNAL
EPO
NEW ATS. PROVIDE UNISTRUT
ASSEMBLY TO SUPPORT NEW ATS
AND SECURE ACCORDINGLY.
HWT
1m
B
SPARE CONDUIT
FEED NEW BATTERY LIGHTING FROM
AVAILABLE NEW LOCK TYPE CIRCUIT
BREAKER IN EXISTING EMERGENCY
PANEL AND FEED WITH 2#12+G IN 13mmC.
CONCRETE PAD
NEW ATS-1 MOUNTED TO
UNISTRUT ASSEMBLY
SITE FABRICATED.
100
CLEAR
SLOPED ROOF DECK
SIDE VIEW OF
EXISTING MAIN
DISCONNECT
SWITCH
838.2
WIDTH
AVAILABLE
12
19
mm
HE
IG
HT
AV
AIL
AB
LE
PROPOSED GENERATOR
ANNUNCIATOR / EPO CABLE IN
CONDUIT ROUTING. SITE VERIFY.
TO NEW
GENERATOR
EPO
NEW WALL MOUNTED GENERATOR
ANNUNCIATOR PANEL SUPPLIED
WITH GENERATOR. COORDINATE
PREFERRED LOCATION WITH FIRE
STATION PERSONNEL.
EXISTING MAIN ELECTRICAL ROOM.
E-3
4E-3
SCALE: 1:100
3E-3
SCALE: 1:100
FIRE STATION No.114
1 2016/03/15 Issued For Tender
1ALL EXISTING ELECTRICAL DEVICES ARE EXISTING TO REMAIN UNLESS OTHERWISE
NOTED.
2
CAP OFF AND FIRE STOP ALL FLOOR/WALL CONDUIT STUB-UPS UPON REMOVAL OF
FEEDERS.
1
2
3
7E-3
SCALE: 1:50
5E-3
SCALE: 1:50
6E-3
SCALE: 1:50
ROUTING OF ALL SERVICES ARE DIAGRAMMATIC. BE RESPONSIBLE TO CONFIRM
EXACT ROUTING AND TERMINATIONS ON SITE PRIOR TO FABRICATION OR ROUGH-IN
AND INCLUDE FOR REQUIRED OFFSETS, TRANSITIONS ETC. AS REQUIRED FOR A
COMPLETE INSTALLATION.
ALL PENETRATIONS THROUGH WALLS AND CEILINGS SHALL BE FIRE STOPPED WITH
3m FIRE STOP MATERIAL. REFER TO SPECIFICATIONS FOR DETAILS.
PROVISION OF ALL PENETRATIONS AND OPENINGS 50mm (2") AND LESS IN SIZE SHALL
BE THE RESPONSIBILITY OF THE ELECTRICAL TRADE. REFER TO SPECIFICATIONS FOR
DETAILS.
2E-3
SCALE: 1:100
1E-3
SCALE: 1:400
5 of 7
E-4
FIRE STATION No.114
1 2016/03/15 Issued For Tender
6 of 7
Page 1
CITY OF TORONTO FIRE STATION NO. 114 – 12 CANTERBURY PL., TORONTO, ON
MMM Project No. 1815301-000
Addendum No. 1
May 3, 2016
INCLUDE IN YOUR BID AMOUNT FOR THE FOLLOWING ITEMS OF ADDITION, DELETION OR CLARIFICATION. INDICATE IN THE SPACE PROVIDED ON THE BID FORM THAT YOU HAVE RECEIVED AND INCLUDED FOR THE REQUIREMENTS OF THIS ADDENDUM.
1. SPECIFICATION
1.1 SECTION 26 32 00 - POWER GENERATION (NOT ISSUED HEREWITH)
1.1.1 Item 2.13. Revise to include Gal Power and Kohler as acceptable Genset Manufacturer/Supplier. Please note the successful contractor is responsible in ensuring the generator manufacturer meets the design intent and specifications. The successful contractor is responsible for any additional accessories, installation requirements that are associated with the selection of the alternate generator manufacturers.
2. DRAWINGS
2.1 DRAWING NO. E-2 (NOT ISSUED HEREWITH)
2.1.1 Remove detail 4/E-2.
END OF ADDENDUM
7 of 7