Michael Pacholok, Director Purchasing and Materials Management Division City Hall, 18 th Floor, West Tower 100 Queen Street West Toronto, Ontario M5H 2N2 Joanne Kehoe Manager Construction Services May 4, 2016 Reply to: Michael Porcarelli Via Website Posting: 7 Pages Tel: (416) 338-5585 Addendum No. 1 Tender No. 194-2016 Re: New Emergency Gas Generator Installation at 12 Canterbury Place, Fire Hall 114, Toronto. Closing Date: 12:00 P.M. Noon (Local Time), May 19, 2016 Please refer to the above Tender Call document in your possession and be advised of the following information: 1. General Clarifications To Questions From Bidders Q1. For Drawing M-1, I have attached the mechanical iso. What is #2 not shown on legend. #1 is a gas relief valve? If so does Enbridge supply with station? A1. This scope is part of the Enbridge work in which the contractor will need to retain via the cash allowance. Q2. On tender 194-2016 the fine print on drawings E-1 thru E-4 is not legible. Looks like it’s just from the copier. Could more clear drawings be distributed? A2. Drawings E1-E4 are attached, all dated 2016/02/12. (Enclosed 4 pages) Q3. Drawing M-1. If #1 is a pressure regulating valve please provide requirements (load and pressure drop). A3. Same as above response A1. This scope is part of the Enbridge work in which the contractor will need to retain via the cash allowance. Continued on next page… 1 of 7

Upload: others

Post on 27-Jul-2020

2 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: For Drawing M-1, I have attached the mechanical iso. What is #2 … · 2020-07-14 · A2. Drawings E1-E4 are attached, all dated 2016/02/12. (Enclosed 4 pages) Q3. Drawing M-1. If

Michael Pacholok, Director

Purchasing and Materials Management Division City Hall, 18th Floor, West Tower 100 Queen Street West Toronto, Ontario M5H 2N2

Joanne Kehoe Manager Construction Services

May 4, 2016 Reply to: Michael Porcarelli Via Website Posting: 7 Pages Tel: (416) 338-5585

Addendum No. 1

Tender No. 194-2016

Re: New Emergency Gas Generator Installation at 12 Canterbury Place, Fire Hall 114, Toronto.

Closing Date: 12:00 P.M. Noon (Local Time), May 19, 2016

Please refer to the above Tender Call document in your possession and be advised of the following information: 1. General Clarifications To Questions From Bidders

Q1. For Drawing M-1, I have attached the mechanical iso. What is #2 not shown on

legend. #1 is a gas relief valve? If so does Enbridge supply with station?

A1. This scope is part of the Enbridge work in which the contractor will need to retain via the cash allowance.

Q2. On tender 194-2016 the fine print on drawings E-1 thru E-4 is not legible. Looks like it’s just from the copier. Could more clear drawings be distributed?

A2. Drawings E1-E4 are attached, all dated 2016/02/12. (Enclosed 4 pages)

Q3. Drawing M-1. If #1 is a pressure regulating valve please provide requirements (load and pressure drop).

A3. Same as above response A1. This scope is part of the Enbridge work in which the contractor

will need to retain via the cash allowance.

Continued on next page…

1 of 7

Page 2: For Drawing M-1, I have attached the mechanical iso. What is #2 … · 2020-07-14 · A2. Drawings E1-E4 are attached, all dated 2016/02/12. (Enclosed 4 pages) Q3. Drawing M-1. If

2. Additional Technical Information

Please refer to information in the attachment "MMM addendum #1" dated May 3, 2016. (1 page enclosed)

All other information regarding the call document is unchanged. All other terms and conditions remain the same. Should you have any questions regarding this addendum contact Michael Porcarelli, Corporate Buyer, at email [email protected]. Please attach this addendum to your Request for Tender document and be governed accordingly. Bidders must acknowledge receipt of all addenda on the space provided on the Tender Call Cover Page as per the Process Terms and Conditions, Section 1, Item 8 - Addenda, of the Tender Call document. All other aspects of the Tender remain the same.

Yours truly, Joanne Kehoe, Manager, Construction Services, Purchasing & Materials Management

2 of 7

Page 3: For Drawing M-1, I have attached the mechanical iso. What is #2 … · 2020-07-14 · A2. Drawings E1-E4 are attached, all dated 2016/02/12. (Enclosed 4 pages) Q3. Drawing M-1. If

OVERALL SITE PLAN, SEQUENCE OF IMPLEMENTATION, DRAWING LIST

AND SYMBOL LEGEND - ELECTRICAL

E-1

E-3 EXISTING ELECTRICAL ROOM AND NEW WORK GENERATOR LAYOUT -

POWER AND SIGNALS - ELECTRICAL

ELECTRICAL SINGLE LINE DIAGRAM.E-4

THE FOLLOWING IS A PROPOSED SEQUENCE IMPLEMENTATION, INTENDED TO GIVE A

DIAGRAMMATIC OVERVIEW OF THE PROPOSED SEQUENCE OF INSTALLATION FOR THIS

PROJECT. BE RESPONSIBLE TO CONFIRM THIS SEQUENCE, MAKE THE REQUIRED

MODIFICATION TO SUIT THE ANOMALIES OF THIS BUILDING AND COORDINATE THIS WHEN

PREPARING THE MASTER CONSTRUCTION SCHEDULE FOR THE IMPLEMENTATION OF ALL

WORK ASSOCIATED WITH THIS PROJECT.

PROPOSED SEQUENCE OF IMPLEMENTAION

ELECTRICAL

PREPARE SITE TO ACCOMMODATE THE NEW GENERATOR AND ANCILLARY

EQUIPMENT/DEVICES.

INSTALL NEW GENERATOR IN ITS PERMANENT LOCATION AND PROVIDE FEEDERS

AS SHOWN ON THE DRAWINGS.

CONFIRM SITE MEASUREMENTS AND ROUTINGS OF ALL FEEDERS AND PLACEMENT

LOCATIONS OF ALL COMPONENTS PRIOR TO COMMENCEMENT OF WORK.

FIRE STOP ALL NEW WALL PENETRATIONS.

WHEN ALL THE ELECTRICAL SERVICES HAVE BEEN INSTALLED, COMPLETED AND

COMMISSIONED:

COMPLETE AS-BUILTS, O&M MANUALS AND TURN OVER TO CONSULTANT.

COMPLETE ALL REMAINING REMEDIAL WORK, INCLUDING PATCHING WORK, FIRE

STOPPING, CEILING INSTALLATIONS, PAINTING, ETC. UPON COMPLETION OF

ELECTRICAL SERVICES.

WHEN ALL NEW WORK IS COMPLETE , AFTER-HOURS DICONNECT/SHUT-DOWN

EXISTING GENERATOR AND REMOVE EXISTING TRANSFER SWITCH. REMOVE AND

DELIVER GENERATOR OFF-SITE ONCE NO-LONGER REQUIRED AND ARRANGE

DELIVERY AS NOTED.

PREPARE AND SUBMIT SHOP DRAWINGS FOR NEW GENERATOR AND TRANSFER

SWITCH FOR REVIEW. ORDER EQUIPMENT AND COORDINATE DELIVERY AND

INSTALLATION.

TEST OPERATION OF NEW GENERATOR AND TRANSFER SWITCH. REFER TO

SPECIFICATION FOR DETAILS.

UTILIZE EXISTING OUTDOOR DIESEL GENERATOR AND ATS TO PROVIDE TEMPORARY

STAND BY EMERGENCY POWER DURING INSTALLATION OF NEW GENERATOR AND ATS.

PERFORM FUNCTIONALITY TEST INCLUDING START/STOP OF GENERATOR.

WATER SEAL ALL OPENINGS.

E-2 PART SITE PLAN AND DETAILS - ELECTRICAL

PROVIDE AS PART OF CASH ALLOWANCE TO

SUPPLY, DELIVER, CONNECT/ DISCONNECT AND

PROVIDE OFF-SITE REMOVAL OF TEMPORARY

GENERATOR INCLUDING DIESEL FUEL SUPPLY

TO SUIT SCHEDULED SHUT-DOWN DURATION.

INCLUDE EXTRA-LONG TEMPORARY CABLES TO

CONNECT TO EXISTING ATS. EXACT LOCATION

OF TEMPORARY GENERATOR TO BE APPROVED

BY OWNER PRIOR TO DELIVERY.

2

E-1

SCALE: 1:200

APPROXIMATE LOCATION OF

2ND FLOOR MECHANICAL

ROOM 212

AREA OF NEW GENERATOR

INSTALLATION

E-1

FIRE STATION No.114

1 2016/03/15 Issued For Tender

3 of 7

Page 4: For Drawing M-1, I have attached the mechanical iso. What is #2 … · 2020-07-14 · A2. Drawings E1-E4 are attached, all dated 2016/02/12. (Enclosed 4 pages) Q3. Drawing M-1. If

EXISTING AMBULANCE / FIRE STATION BUILDING

EXISTING FENCE TO REMAIN

1630

EXISTING GENERATOR GATE FENCE TO REMAIN

EXISTING GENERATOR CONCRETE PAD TO BE RETAINED FOR FUTURE USE.

MODIFY AS REQUIRED FOR NEW UNDERGROUND CONDUIT STUB-UPS.

EXISTING DIESEL GENERATOR BE REMOVED INCLUDING ASSOCIATED

ELECTRICAL AND FUEL SYSTEMS. ARRANGE DELIVERY TO OWNER'S SITE

WITHIN 80kM RADIUS OF PROJECT SITE.

780

LINE OF AMBULANCE VEHICLE ENTRY

UNDERGROUND CONDUITS TO TRANSITION ON SURFACE OF BUILDING

11000

14325

UNDERGROUND CONDUITS SHALL BE

DIRECT BURIED IN RIGID PVC. REFER

TO DETAIL 3/E-2 ON THIS DRAWING.

2

E-2

(DISCHARGE SIDE)(INLET SIDE)

1000

1m CLEARANCE FOR MAINTENANCE

NEW SKIN-TIGHT OUTDOOR AND

ACOUSTICALLY ENCLOSED NATURAL

GAS GENERATOR.

1500

PROVIDED WITH GENERATOR ENCLOSURE

OUTLINE OF NEW CONCRETE PAD.

REFER TO STRUCTURAL DRAWINGS.

PROTECTIVE BOLLARD WITH CONCRETE.

REFER TO STRUCTURAL DRAWINGS.

(TYPICAL)

GENERATOR SHORE PANEL. PROVIDED WITH

GENERATOR ENCLOSURE.

GENERATOR CONTROL PANEL AND EPO.

PROVIDED WITH GENERATOR ENCLOSURE.

WP/

CG

1000

1500

300 M

IN

300 MIN

PARKING LOT BUILDING AREA

FINISHED GROUND LEVEL

EXISTING GRADE

TOP OF GROUND LEVEL

BOTTOM OF 2ND LEVEL

TOP OF 2ND LEVELEXISTING ELECTRICAL ROOM

GLAZING

EXISTING BUILDING

OUTLINE OF NEW OUTDOOR GENERATOR

MODIFY EXISTING OPENING TO SUIT NEW CONDUIT PENETRATIONS

NEW ATS START/STOP SIGNAL AND EPO SIGNAL

NEW SHORE PANEL FEEDER TO NEW 3 POLE CIRCUIT BREAKER

IN EXISTING PANEL

NEW EMERGENCY FEEDER TO NEW ATS VIA NEW DISCONNECT SWITCH.

NEW GENERATOR ANNUNCIATOR LOW VOLTAGE SIGNALS AND

EPO SIGNAL TO GROUND FLOOR EXISTING PHONE ROOM.

SPARE EMPTY CONDUIT TO BE TERMINATED IN ELECTRICAL ROOM.EXISTING GENERATOR FENCE OUTLINE.

GALVANIZED UNISTRUT SUPPORT FOR RIGID PVC

SURFACE CONDUITS FASTENED TO WALL. (TYPICAL)

1. CONFIRM AND SITE VERIFY PROPOSED CONCEPTUAL CONDUIT

ROUTING OF ELECTRICAL FEEDERS AND CONFIGURATION.

GLAZING

E-2

FIRE STATION No.114

1 2016/03/15 Issued For Tender

1

E-2

SCALE: 1:50

2

E-2

SCALE: N.T.S.

NOTES:

OUTLINE OF NEW GENERATOR ENCLOSURE IS BASED ON A SPECIFIC MANUFACTURER. BE

RESPONSIBLE FOR EXACT PLACEMENT, INSTALLATION AND COORDINATION OF CONNECTING

SERVICES. BE RESPONSIBLE FOR THE SET-UP, INSTALLATION AND CONNECTION OF LOAD

BANK FOR ON-SITE TESTING. CABLING AND LOAD BANK WILL BE SUPPLIED BY GENERATOR

MANUFACTURER. UPON COMPLETION OF SITE TESTING, DISCONNECT LOAD BANK AND

CABLING AND PREPARE FOR PICK UP BY GENERATOR MANUFACTURER.

ROUTING OF ALL SERVICES ARE DIAGRAMMATIC. BE RESPONSIBLE TO CONFIRM EXACT

ROUTING AND TERMINATIONS ON SITE PRIOR TO FABRICATION OR ROUGH-IN AND INCLUDE

FOR REQUIRED OFFSETS, TRANSITIONS ETC. AS REQUIRED FOR A COMPLETE INSTALLATION.

ALL PENETRATIONS THROUGH WALLS AND CEILINGS SHALL BE FIRE STOPPED WITH 3m FIRE

STOP MATERIAL. REFER TO SPECIFICATIONS FOR DETAILS.

PROVISION OF ALL PENETRATIONS AND OPENINGS 50mm (2") AND LESS IN SIZE SHALL BE

THE RESPONSIBILITY OF THE ELECTRICAL TRADE. REFER TO SPECIFICATIONS FOR DETAILS.

COORDINATE TRENCHING / EXCAVATION OF SURFACES TO SUIT NEW GENERATOR

SERVICES. REPLACE WITH NEW SURFACES AND MATCH BASE BUILDING MATERIALS.

CONFIRM AND MARK ON SITE ALL EXISTING SITE SERVICE LOCATIONS WITHIN AREA OF

INSTALLATION. REFER TO SPECIFICATION.

PLAN VIEW

ELEVATION

50 DURO MASON SUPER W PAD

1/4" STEEL PLATES

SCALE: N.T.S.

SCALE: N.T.S.

SCALE: N.T.S.

OUTLINE OF GENERATOR BASE

61

"

44"35"

"X

"

"X"

3/4

"

2"

2"

4"

18"

3/4"

3/4

"

18"

4"

2"

2"

3/4

"

GENERATOR BASE (ISOLATION LAYOUT)

SUPER W PAD (ISOLATION DETAIL)

SUPER W PAD W/ HOLE (ISOLATION DETAIL)

PLAN VIEW

ELEVATION

REFER TO SHOP

DRAWINGS

4"x18" 50 Duro Super W Pad Isolators

4

E-2

SCALE: N.T.S.

FINISHED GRADE

50mm (2") RIGID PVC CONDUIT

FOR SHORE PANEL FEEDER

3

E-2

SCALE: N.T.S.

TRENCHING AND

BACKFILL AS REQUIRED.

YELLOW MARKING TAPE,

THE FULL LENGTH &

WIDTH OF TRENCH

TRENCH

63mm (2.5") RIGID PVC CONDUIT

FOR EMERGENCY FEEDER

MIN.

300

(12")

MIN.

915

(36")

50mm (2") RIGID PVC CONDUIT

FOR EPO WIRING AND ATS

START/STOP WIRING

50mm (2") RIGID PVC CONDUIT

(SPARE) CAP AT BOTH ENDS

WITH PULL STRING

50mm (2") RIGID PVC CONDUIT

FOR EPO/ANNUNCIATOR WIRING

MIN.

190

(7.5")

190mm

190mm

190mm

4 of 7

Page 5: For Drawing M-1, I have attached the mechanical iso. What is #2 … · 2020-07-14 · A2. Drawings E1-E4 are attached, all dated 2016/02/12. (Enclosed 4 pages) Q3. Drawing M-1. If

PROPOSED GENERATOR

ANNUNCIATOR / EPO CABLE IN

CONDUIT ROUTING. SITE VERIFY.

TO NEW

GENERATOR

EPO

NEW WALL MOUNTED GENERATOR

ANNUNCIATOR PANEL SUPPLIED

WITH GENERATOR. COORDINATE

PREFERRED LOCATION WITH FIRE

STATION PERSONNEL.

EXISTING MAIN ELECTRICAL ROOM.

EXISTING PANEL 'HA'

EXISTING PANEL 'AA'

EXISTING 400A, 120/208V, 3Ø, 4W

SPLITTER AND DISCONNECT SWITCH

EXISTING 225A, 120/208V, 3Ø, 4W

EMERGENCY PANEL

EXISTING 75kVA TRANSFORMER

EXISTING MECH.

RM. 212

EXISTING ATS TO BE REMOVED

EXISTING 200A, 347/600V, 3Ø, 4W

SPLITTER AND DISCONNECT SWITCH

EXISTING TRANSFORMER UP HIGH

EXISTING GENERATOR CABLING TO BE

REMOVED. MODIFY TO SUIT NEW

GENERATOR FEEDER REQUIREMENTS.

EXISTING MAIN ROOM

DISCONNECT SWITCH

EXISTING HYDRO METER

M

HWT

HWT

EXISTING

MECH. RM.

212

EXISTING PANEL 'HA'

EXISTING PANEL 'AA'

EXISTING 400A, 120/208V, 3Ø, 4W

SPLITTER AND DISCONNECT SWITCH

EXISTING 225A, 120/208V, 3Ø, 4W

EMERGENCY PANEL. PROVIDE NEW

CIRCUIT BREAKER TO FEED

GENERATOR SHORE PANEL.

EXISTING 75kVA TRANSFORMER

EXISTING 200A, 347/600V, 3Ø, 4W

SPLITTER AND DISCONNECT SWITCH

EXISTING TRANSFORMER UP HIGH

HWT

EXISTING MAIN ROOM

DISCONNECT SWITCH

EXISTING HYDRO METER

M

NEW UNFUSED DISCONNECT FOR INCOMING

GENERATOR POWER.

SHORE PANEL FEEDER

EMERGENCY FEEDER

ATS START/STOP SIGNAL AND EPO SIGNAL

EPO

NEW ATS. PROVIDE UNISTRUT

ASSEMBLY TO SUPPORT NEW ATS

AND SECURE ACCORDINGLY.

HWT

1m

B

SPARE CONDUIT

FEED NEW BATTERY LIGHTING FROM

AVAILABLE NEW LOCK TYPE CIRCUIT

BREAKER IN EXISTING EMERGENCY

PANEL AND FEED WITH 2#12+G IN 13mmC.

CONCRETE PAD

NEW ATS-1 MOUNTED TO

UNISTRUT ASSEMBLY

SITE FABRICATED.

100

CLEAR

SLOPED ROOF DECK

SIDE VIEW OF

EXISTING MAIN

DISCONNECT

SWITCH

838.2

WIDTH

AVAILABLE

12

19

mm

HE

IG

HT

AV

AIL

AB

LE

PROPOSED GENERATOR

ANNUNCIATOR / EPO CABLE IN

CONDUIT ROUTING. SITE VERIFY.

TO NEW

GENERATOR

EPO

NEW WALL MOUNTED GENERATOR

ANNUNCIATOR PANEL SUPPLIED

WITH GENERATOR. COORDINATE

PREFERRED LOCATION WITH FIRE

STATION PERSONNEL.

EXISTING MAIN ELECTRICAL ROOM.

E-3

4E-3

SCALE: 1:100

3E-3

SCALE: 1:100

FIRE STATION No.114

1 2016/03/15 Issued For Tender

1ALL EXISTING ELECTRICAL DEVICES ARE EXISTING TO REMAIN UNLESS OTHERWISE

NOTED.

2

CAP OFF AND FIRE STOP ALL FLOOR/WALL CONDUIT STUB-UPS UPON REMOVAL OF

FEEDERS.

1

2

3

7E-3

SCALE: 1:50

5E-3

SCALE: 1:50

6E-3

SCALE: 1:50

ROUTING OF ALL SERVICES ARE DIAGRAMMATIC. BE RESPONSIBLE TO CONFIRM

EXACT ROUTING AND TERMINATIONS ON SITE PRIOR TO FABRICATION OR ROUGH-IN

AND INCLUDE FOR REQUIRED OFFSETS, TRANSITIONS ETC. AS REQUIRED FOR A

COMPLETE INSTALLATION.

ALL PENETRATIONS THROUGH WALLS AND CEILINGS SHALL BE FIRE STOPPED WITH

3m FIRE STOP MATERIAL. REFER TO SPECIFICATIONS FOR DETAILS.

PROVISION OF ALL PENETRATIONS AND OPENINGS 50mm (2") AND LESS IN SIZE SHALL

BE THE RESPONSIBILITY OF THE ELECTRICAL TRADE. REFER TO SPECIFICATIONS FOR

DETAILS.

2E-3

SCALE: 1:100

1E-3

SCALE: 1:400

5 of 7

Page 6: For Drawing M-1, I have attached the mechanical iso. What is #2 … · 2020-07-14 · A2. Drawings E1-E4 are attached, all dated 2016/02/12. (Enclosed 4 pages) Q3. Drawing M-1. If

E-4

FIRE STATION No.114

1 2016/03/15 Issued For Tender

6 of 7

Page 7: For Drawing M-1, I have attached the mechanical iso. What is #2 … · 2020-07-14 · A2. Drawings E1-E4 are attached, all dated 2016/02/12. (Enclosed 4 pages) Q3. Drawing M-1. If

Page 1

CITY OF TORONTO FIRE STATION NO. 114 – 12 CANTERBURY PL., TORONTO, ON

MMM Project No. 1815301-000

Addendum No. 1

May 3, 2016

INCLUDE IN YOUR BID AMOUNT FOR THE FOLLOWING ITEMS OF ADDITION, DELETION OR CLARIFICATION. INDICATE IN THE SPACE PROVIDED ON THE BID FORM THAT YOU HAVE RECEIVED AND INCLUDED FOR THE REQUIREMENTS OF THIS ADDENDUM.

1. SPECIFICATION

1.1 SECTION 26 32 00 - POWER GENERATION (NOT ISSUED HEREWITH)

1.1.1 Item 2.13. Revise to include Gal Power and Kohler as acceptable Genset Manufacturer/Supplier. Please note the successful contractor is responsible in ensuring the generator manufacturer meets the design intent and specifications. The successful contractor is responsible for any additional accessories, installation requirements that are associated with the selection of the alternate generator manufacturers.

2. DRAWINGS

2.1 DRAWING NO. E-2 (NOT ISSUED HEREWITH)

2.1.1 Remove detail 4/E-2.

END OF ADDENDUM