for official only - world bankdocuments.worldbank.org/curated/en/... · project description...

130
Document of The World Bank This document has a restricted distribution and may be used by recipients only in the performance o f their pffcial duties. Its contents may not otherwise be disclosed without World Bank authorization. FOR OFFICIAL USE ONLY Report No: 28926-CO PROJECT APPRAISAL DOCUMENT ON A PROPOSED LOAN IN THE AMOUNT OF US$250.0 MILLION TO THE REPUBLIC OF COLOMBIA FOR THE INTEGRATED MASS TRANSIT SYSTEMS PROJECT May 14,2004 Finance, Private Sector and Infrastructure Department Colombia and Mexico Country Management Unit Latin America and Caribbean Regional Office Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized

Upload: others

Post on 27-Jun-2020

0 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: FOR OFFICIAL ONLY - World Bankdocuments.worldbank.org/curated/en/... · Project description [one-sentence summary of each component] Re$ PAD B.3.a, Technical Annex 4 Component 1 -

Document o f The World Bank

This document has a restricted distribution and may be used by recipients only in the performance o f their pf fc ia l duties. I t s contents may not otherwise be disclosed without World Bank authorization.

FOR OFFICIAL USE ONLY

Report No: 28926-CO

PROJECT APPRAISAL DOCUMENT

O N A

PROPOSED LOAN

IN THE AMOUNT OF US$250.0 MILLION

TO THE

REPUBLIC OF COLOMBIA

FOR THE INTEGRATED MASS TRANSIT SYSTEMS PROJECT

May 14,2004

Finance, Private Sector and Infrastructure Department Colombia and Mexico Country Management Unit Latin America and Caribbean Regional Office

Pub

lic D

iscl

osur

e A

utho

rized

Pub

lic D

iscl

osur

e A

utho

rized

Pub

lic D

iscl

osur

e A

utho

rized

Pub

lic D

iscl

osur

e A

utho

rized

Pub

lic D

iscl

osur

e A

utho

rized

Pub

lic D

iscl

osur

e A

utho

rized

Pub

lic D

iscl

osur

e A

utho

rized

Pub

lic D

iscl

osur

e A

utho

rized

Page 2: FOR OFFICIAL ONLY - World Bankdocuments.worldbank.org/curated/en/... · Project description [one-sentence summary of each component] Re$ PAD B.3.a, Technical Annex 4 Component 1 -

CURRENCY EQUIVALENTS

AMCO Metropolitan Area o f Center-West APL Adaptable Program Lending BRTS 1

(Exchange Rate Effective 03/18/04)

ICB International Competitive Bidding IDB Inter-American Development Bank IDU Urban Development Institute

~

Currency Unit = Colombian peso CO$2648.8 = US$1

DNP ECOPETROL EIA EMP

-

FISCAL YEAR

Bogota )P ID Project Information Document Colombian Petroleum Company QAT Quality Assurance Team Environmental Impact Assessment QBS Quality Based Selection Environmental Management Plan QCBS Quality and cost based selection

~~

January 1 - December 3 1

ABBREVIATIONS AND ACRONYMS

i'""" International Bank for Reconstruction and ID evelopment

Vice President: David D e Ferranti

Sector Manager: Jose Luis Irigoyen Country ManagedDirector: Isabel Guerrero

Task Team Leader: Mauricio Cuellar

Page 3: FOR OFFICIAL ONLY - World Bankdocuments.worldbank.org/curated/en/... · Project description [one-sentence summary of each component] Re$ PAD B.3.a, Technical Annex 4 Component 1 -

FOR OJ?FlCIAL USE ONLY COLOMBIA

CO National Urban Transport

CONTENTS

Page

A. STRATEGIC CONTEXT AND RATIONALE ...................................................................................... 1

1. Country and sector issues ......................................................................................................................... 1 2. Rationale for Bank involvement .............................................................................................................. 2 3. Higher level objectives to which the project contributes ......................................................................... 3 B. PROJECT DESCRIPTION ..................................................................................................................... 3 1. Lending instrument .................................................................................................................................. 3

3. Project components .......................................................................... 4. Lessons learned and reflected in the project design .................................................. 5. Alternatives considered and reasons for rejection.. ....................

1. Partnership arrangements .... ....... .......................................... 2. Institutional and implementation arrangements ..................... 3. Monitoring and evaluation o f outcomes/results ............................................................ 4. Sustainability ..............................................................

2. Project development objective and key indicators ..... .......................................................................... 3 .................................................... 4

C. I M P L E M E N T A T I O N .. .....................................................................

................................. 7

5. Critical risks and possible controversial aspects ............................................................... 6. Loadcredit conditions and covenants .................................................................................................... 10

D. APPRAISAL S U M M A R Y

1. Economic and financial analyses .................................................................................. 2. Technical ...................................................................................... .............................................. 1 1 3. Fiduciary ........................... 4. Social .............................. 13 5. Environment. 6. Safeguard policies .................................................................................................................................. 15 7. Policy Exceptions and Readiness ............ ................................... 18

.............................................................................................

Annex I: Country and Sector or Program Background .............................................................................. 19

Annex 2: Major Related Projects Financed by the Bank and/or other Agencies ........................................ 26 ....................................... 27 Annex 3: Results Framework and Monitoring..

Annex 4: Detailed Project Description ............... .. 38

This document has a restricted distribution and may be used b y recipients only in the performance of their official duties. I t s contents may n o t be otherwise disclosed without W o r l d Bank authorization. __

Page 4: FOR OFFICIAL ONLY - World Bankdocuments.worldbank.org/curated/en/... · Project description [one-sentence summary of each component] Re$ PAD B.3.a, Technical Annex 4 Component 1 -
Page 5: FOR OFFICIAL ONLY - World Bankdocuments.worldbank.org/curated/en/... · Project description [one-sentence summary of each component] Re$ PAD B.3.a, Technical Annex 4 Component 1 -

COLOMBIA

INTEGRATED MASS TRANSIT SYSTEMS

PROJECT APPRAISAL DOCUMENT

LATIN AMERICA AND CARIBBEAN

LCSFT

Date: May 14,2004

BORROWER INTERNATIONAL BANK FOR RECONSTRUCTION AND DEVELOPMENT Total:

Country Director: Isabel M. Guerrero Sector MangedDirector: Danny M. Leipziger

214.00 0.00 214.00 147.00 103 .OO 250.00

361.00 103 .OO 464.00

Project ID: PO82466

Team Leader: Mauricio Cuellar Sectors: General transportation sector (90%);Central government administration (5 %);Sub-national government administration (5%) Themes: Access to urban services for the poor (P);Infrastructure services for private sector development (P);Municipal governance and institution building (P);Pollution management and environmental health (S);Other urban development (S) Environmental screening category: Partial Assessment

Lending Instrument: Specific Investment yoan

[XI Loan [ ]Credit [ ] Grant [ ]Guarantee [ ]Other:

Safeguard screening category: Limited impact

For Loans/Credits/Others: Total Bank financing (US$m.): 250.00

Borrower: Republic o f Colombia Ministerio de Hacienda y Credito Publico Carrera 7A No. 6-45 Bogota, D.C. Colombia Tel: (57 1) 297 13 10

Page 6: FOR OFFICIAL ONLY - World Bankdocuments.worldbank.org/curated/en/... · Project description [one-sentence summary of each component] Re$ PAD B.3.a, Technical Annex 4 Component 1 -

/sponsible Agency:

National Planning Department Calle 26 No. 13 - 19 Edificio Fonade Pisos Mezz a1 19-25 y 34-3 Bogota Colombia Tel: (57-1) 596-0300

FY 2005 2006 2007 Annual 29.00 59.00 80.00 Cumulative 29.00 88.00 168.00

Ministry o f Transport Av. El Dorado C A N Bogota, D.C. Colombia Tel: (57-1) 324-0800 [email protected]. co

2008 2009 75 .OO 7.00

243.00 250.00

FY 2005 2006 2007 Annual 29.00 59.00 80.00 Cumulative 29.00 88.00 168.00

Estimated disbursements (Bank FY/USSm) 2008 2009 75 .OO 7.00

243.00 250.00 ~

Project implementation period: Start September 30,2004 End: September 30, 2008 Expected effectiveness date: September 30, 2004 Expected closing date: March 31, 2009 Does the project depart from the CAS in content or other significant respects? Re$ PAD A.3 Does the project require any exceptions f rom Bank policies?

[ ]Yes [XINO

Re$ PAD D. 7 Have these been approved by Bank management?

[XIYes [ ] N o [XIYes [ ] N o

I s approval for any pol icy exception sought from the Board? Does the project include any critical risks rated “substantial” or “high”? Re$ PAD C.5 Does the project meet the Regional criteria for readiness for implementation? Re$ PAD D. 7 Project development objective Re$ PAD B.2, Technical Annex 3 The overall objective o f the project i s to improve long-term sustainability, efficiency and quality o f urban transport in selected cities by assisting the Government o f Colombia (GOC) in the implementation o f the National Urban Transport Program. The specific objectives are to: (i) implement high quality Bus Rapid Transit Systems (BRTs) in selected cities; (ii) improve accessibility to the poor through fare integration and; (iii) build greater institutional capacity at the national level to formulate urban transport policies and strategies (regulatory, operational, economic, environmental and social aspects), and at the local level for urban transport planning and traffic management.

[ ]Yes [XINO

[XIYes [ ] N o

[XIYes [ ] N o

Project description [one-sentence summary of each component] Re$ PAD B.3.a, Technical Annex 4 Component 1 - Capacity Building (US$2.3 million): This component wil l provide technical assistance and policy advice to GOC and participating municipal governments.

Component 2- BRTS Development (US$459.2 million, U S 2 4 7 .7 mil l ion IBRD): 1) Construction o f about 5 7 kilometers o f segregated transportation corridors in Participating

Cities, including, among others: (a) construction o f segregated busways; (b) repaving o f mixed- traffic lanes adjacent to new busways; (c) construction and installation o f bus stations and

Page 7: FOR OFFICIAL ONLY - World Bankdocuments.worldbank.org/curated/en/... · Project description [one-sentence summary of each component] Re$ PAD B.3.a, Technical Annex 4 Component 1 -

I terminals; and (d) paving o f feeder roads, and 2) Construction o f about 20 kilometers o f segregated corridors in the NQS Line o f the Bogota

Transmilenio, S.A., including, among other: (a) construction o f segregated busways; and (b) repaving o f mixed-traffic lanes adjacent to new busways.

Which safeguard policies are triggered, if any? Re$ PAD 0.6, Technical Annex 10 Environmental Assessment (OPIBPIGP 4.01)

Natural Habitats (OP/BP 4.04) Cultural Property (OPN 1 1.03, being revised as OP 4.1 1) Involuntary Resettlement (OP/BP 4.12)

Significant, non-standard conditions, if any, for: Re$ PAD C. 7 Board presentation: NONE

Loadcredit effectiveness: Effectiveness Conditions (i) the Operational Manual has been issued by the Borrower, through DNP, and approved by the

Bank; (ii) the terms o f reference for the hiring o f the independent auditors have been prepared by the Borrower, through DNP, and have been approved by the Bank; (iii) the P C U has been fully staffed and i s operational including among others a Financial Officer, Procurement Specialist and Resettlement Expert; (iv) the financial management system for the Project has been established;

Covenants applicable to project implementation: Subsidiary Agreements

The borrower, through the DNP (later MOT): a) wi l l assure the fulfillment, by the executing agencies, o f the obligations and procedures established in the Subsidiary Agreements and Project Operational Manual, including the fiduciary procedures and the information supply for implementation and follow up o f the BRTS' execution, and; b) wil l not modify Subsidiary Agreements without Bank's no-objection.

Monitoring and evaluation o f NUTP The Borrower, through DNP (later MOT), shall (a) maintain policies and procedures adequate

to enable it to monitor and evaluate on an ongoing basis the execution o f the Project and the NUTP and the achievement o f their objectives set forth in the Implementation letter; (b) prepare, under terms o f reference satisfactory to the Bank, and furnish to the Bank, each December 15 during Project implementation, starting with the report due not later than December 15, 2005, a report integrating the results o f the monitoring and evaluation activities performed pursuant to paragraph (a) o f this Section, on the progress achieved in the carrying out o f the Project during the calendar semester preceding the date o f presentation o f the report and setting out the measures recommended to ensure the efficient carrying out o f the Project and the achievement oi the objectives thereof during the fol lowing calendar semester; (c) review with the Bank, bq December 15 o f each year o f Project implementation, or such later date as the Bank shall agree. starting in year 2005, the pertinent reports referred to in paragraph (b) o f this Section, and.

Page 8: FOR OFFICIAL ONLY - World Bankdocuments.worldbank.org/curated/en/... · Project description [one-sentence summary of each component] Re$ PAD B.3.a, Technical Annex 4 Component 1 -

thereafter, take al l measures required to ensure the efficient completion o f the Project and the achievement o f the objectives thereof, based on the conclusions and recommendations o f said reports and the Bank's views on the matter; and d) carry out an in-depth review (the Mid-Term Review) joint ly with the Bank, by July 26, 2006 or such later date as the Bank shall agree, on the progress achieved in the implementation o f the Project.

The Borrower, through DNP (later MOT), wil l prepare, under terms o f reference satisfactory to the Bank, an assessment o f the impact o f NUTP in terms o f improved mobility to users, accessibility and affordability to the poor, and strengthening o f both policy and institutions. In order to do so, the borrower will finalized the construction o f a base line not later than six months after the effectiveness. The Technical Committee and participating cities will present the results at the annual review to be held in 2006 (the mid-term review) and in 2008 (project-end).

Page 9: FOR OFFICIAL ONLY - World Bankdocuments.worldbank.org/curated/en/... · Project description [one-sentence summary of each component] Re$ PAD B.3.a, Technical Annex 4 Component 1 -

A. STRATEGIC CONTEXT AND RATIONALE

1. Count ry and sector issues

L ike most Latin American countries in the last few decades, Colombia has experienced a sharp increase in population within i t s urban centers due to several economic and social factors. In addition, Colombia has also experienced several decades o f armed conflict, which have displaced approximately 2.5 mil l ion people from rural to urban areas. Fifty percent o f this displaced population has been relocated to Colombia’s four largest cities. As a result 75 percent o f the total population o f Colombia now lives in cities. This concentration process has moved poverty issues away from rural areas and into the cities, as i t i s now estimated that two thirds o f the Colombian population l iving below the poverty l ine i s located in urban areas. (World Bank Colombia Poverty Report. 2002).

Colombia’s largest urban agglomeration i s the city o f Bogotk with an estimated population o f 6.5 million, followed by Medellin and i t s metropolitan area with close to 3 million, and Cali and Barranquilla, each having close to 2 million. Pereira, Bucaramanga and Cartagena follow with populations ranging between 700,000 and 1 million. Given the present and foreseeable demographic trends and the fact that cities are becoming pillars o f productivity and economic growth as well as concentrations o f poverty related issues, the government has come to consider urban policies as a major component o f the national development strategy.

A large proportion o f the urban poor do not have access to reliable and affordable transportation, and as a result, remain excluded from employment opportunities, health facilities and interaction with the broader community. A transport system able to provide efficient mobility and accessibility for all inhabitants in the city i s a powerful tool to promote growth, alleviate poverty and achieve social and political integration, while improving environmental conditions and triggering an upgrade o f public space. Improving the quality o f l i fe in urban areas i s expected to contribute to building a more equitable society.

Colombian urban transport issues:

High dependency on public trunsportation systems by the poor. In Colombian cities three out o f four persons use public transportation to travel to work, study or leisure. Most o f these people live in the low- income neighborhoods o f Colombia’s cities. The poor spend around 25 percent o f their household income on public transportation, which i s high relative to regional standards. Despite this, urban infrastructure has been used inefficiently, as i t has traditionally favored the use o f private vehicles, which use 80 percent o f the space but only mobilize 25 percent o f the people traveling within the city.

Poor quality ofpublic trunsport systems. Bus transportation in Colombian cities i s o f low quality and low operating speed, resulting in excessive travel times, high levels o f congestion, high accident rates and elevated levels o f air and noise pollution. In the main transport corridors o f the largest cities, the average speed, at peak.hours, i s less than 10 km/hr, significantly lower than international benchmarks (around 20 Whr). This negatively affects the cities’ productivity, increases the emissions o f air pollutants, and raises the level o f exposure to those pollutants by the affected population. In terms o f safety, according to the Road Prevention Fund (Fond0 de Prevencidn Vial), nearly 40 percent o f all traffic accidents involve public transport vehicles.

Inadequate regulatory frumework. The current regulatory framework has failed to improve the quality o f service and has not contained the cost o f service provision. In most cities, municipal authorities grant permits to private enterprises allowing them to operate assigned routes. These companies do not own the buses they operate and their revenues rely on the number o f buses they affiliate to operate the system: the

1

Page 10: FOR OFFICIAL ONLY - World Bankdocuments.worldbank.org/curated/en/... · Project description [one-sentence summary of each component] Re$ PAD B.3.a, Technical Annex 4 Component 1 -

more buses, the higher the profits, resulting in an oversupply o f about 50 percent o f the needed seats. Bus owners pay a fixed rent to the affiliated company, which implies that their profit i s directly proportional to the number o f passengers they serve, generating what i s commonly known as the “penny war” (guerra del centavo). Consequently, the bus operation system i s a de facto unregulated system that promotes competition in the market (picking up passengers in the streets) and not for the market (for the routes that will provide the service under pre-established parameters).

Lack of institutional capacity to deal with the above issues. There i s weak institutional capacity at the national and municipal levels to formulate and coordinate policies aimed at improving transport planning and traffic management. In some cases, there i s duplication o f functions and responsibilities among several authorities. In general, operating licenses for transport companies are given without technical criteria to adhere to, and political interests and corruption prevail.

In order to address these problems, the Government o f Colombia (GOC) has already co-financed the infrastructure o f Bogota’s Integrated Mass Transit Systein ‘TransMilenio’. TransMilenio i s a Bus Rapid Transit System (BRTS), which has had a great impact in solving the above issues by using the new infrastructure to define a new regulatory framework that has eliminated the “penny war” and created the right capabilities within the local government to enforce this new regulatory framework (see Annex 16).

Due to TransMilenio’s substantial impact and despite great fiscal constraints, GOC has found fiscal space to consolidate the initially ad-hoc intervention in BogotB’s f irst phase into a National Urban Transport Program (NUTP). The NUTP i s an open-ended program that envisages GOC’s annual transfers until 2016 for the expansion within Bogota and into the cities targeted under the National Development Plan (NDP), namely: Cali, Pereira, Cartagena, Soacha, Bucaramanga, Barranquilla and Medellin.

The overall purpose o f the program i s to improve quality o f l i fe and increase urban productivity in those Colombian cities, and i t s design aims at: (i) improving the efficiency and safety o f public urban passenger transport services; (ii) providing reliable accessibility to the poor; (iii) enhancing private sector involvement in service provision; (iv) reducing air pollution and greenhouse gases -GHG- emissions; and (v) driving comprehensive urban development processes.

The NUTP represents a concrete effort between GOC and the cities, in which GOC will co-finance up to 70 percent o f the cost o f the infrastructure needed for the implementation o f integrated BRTS under a policy framework that addresses the above mentioned sector issues, within the limitations o f the current fiscal situation (annex 1 provides further details on the scope and building principles o f the NUTP).

2. Rationale for Bank involvement

The Bank has extensive experience in supporting urban transport projects in the region. For example, in Brazil, Peru and Chile, Bank projects supported implementing segregated bus lanes to improve the speed and overall quality o f service. In Bogota the Bank partially financed the construction o f the f i r s t phase o f TransMilenio under Loan 4021-CO (Bogota Urban Transport Project)), and i s supporting the second phase for the improvement o f the feeder routes o f the system under Project Loan 7162-CO (Bogotk Urban Services). These two projects reflect the strategic role o f the Bank in the implementation o f the BRTS in Bogota. The experience gained in this sector will be key in assisting GOC and the cities to improve the urban transport systems.

Bank involvement can enhance: (i) the structuring o f transport systems which provide direct benefits to low income groups through appropriate system design and fare integration arrangements; (ii) the institutional strengthening o f local urban transport authorities; (iii) the enhancement o f safeguards for the

2

Page 11: FOR OFFICIAL ONLY - World Bankdocuments.worldbank.org/curated/en/... · Project description [one-sentence summary of each component] Re$ PAD B.3.a, Technical Annex 4 Component 1 -

management o f employnient loss, the mitigation o f social impacts and environmental protection during the execution o f the civil works; and (iv) the integration and coordination between transport, land-use and environmental policies.

3. Higher level objectives to which the Project contributes

The proposed Project i s consistent with the Country Assistance Strategy (CAS) discussed by the Board on January 16, 2003. The CAS recognizes that to assist Colombia’s quest for peace, it i s necessary to achieve fast and sustainable growth. To reach such a goal the CAS gives high priority to the promotion o f competitiveness in the productive sector and to the improvement o f access to high quality basic public infrastructure services for the least privileged segments o f the population.

BRTSs are expected to foster productivity and competitiveness in participating cities, provide better services to the poor, and improve the quality o f l i fe in urban areas. A more reliable and quick public transport system i s expected to address the low level o f mobility o f the poor, by reducing their exclusion through improved access to services and opportunities at affordable prices and reasonable travel times, hence contributing to a more socially inclusive growth pattern.

B. PROJECT DESCRIPTION

1. Lending instrument

The GOC has requested a specific investment loan for $250 mill ion to finance the proposed Integrated Mass Transit Systems Project’. The loan will finance a time slice o f GOC’s transfers to cit ies to enable them to construct and implement Integrated Mass Transit Systems or BRTSs. The loan will also finance the strengthening o f the institutional capacity, both at the national and local level, to support the NUTP. The loan would be disbursed over 4 years (2004 -2008) and since the implementation o f the NUTP will continue beyond 2008, i t i s likely that GOC will request the Bank to provide a follow-on operation to continue supporting the program.

2. Project development objective and key indicators

The Project will support GOC implementation o f the NUTP. The development objectives o f the Project are to: i) develop high quality and sustainable BRTSs in selected medium and large cities to improve mobility along the most strategic mass transit corridors; ii) improve accessibility for the poor through feeder services and fare integration; and (iii) build greater institutional capacity at the national level in order to formulate integrated urban transport policies, and at the local level in order to improve urban transport planning and traffic management.

The proposed Project would: i) further expand BRTS schemes in Bogota; ii) introduce BRTS in medium and large size cities, replicating the experience o f Bogota but tailoring i t to specific conditions o f those selected cities; and iiij consolidate the initially ad-hoc intervention o f GOC in Bogota’s f i r s t phase into the NUTP. To achieve these objectives the Project relies on an effective public-private partnership for developing sustainable BRTSs in which the roles are assigned as follows: (i) the public sector finances and builds segregated busways and other related infrastructure through co-financing arrangement between

The Borrower informed the Bank during negotiations that the Borrower’s Inter-Parlamentary Commission (IC) authorized Negotiations of the Loan for this Project using a different name. Hence, the Bank and the Borrower agreed to change the name from National Urban Transport Project to “Integrated Mass Transit Systems Project”(the name used by the IC) in the Project Appraisal Document (PAD) and in the legal documents accordingly.

3

Page 12: FOR OFFICIAL ONLY - World Bankdocuments.worldbank.org/curated/en/... · Project description [one-sentence summary of each component] Re$ PAD B.3.a, Technical Annex 4 Component 1 -

municipal and central government; (ii) private sector operators provide the buses and operate a trunk- feeder system under a concession contract granted by the municipality; and (iii) each participating city creates a public agency to plan, regulate and control the operation o f the BRTS and sets the user tariff that will ensure the sustainability o f the system without operational subsidies. Annex 1 presents a more comprehensive description o f the policy around the NUTP.

Key performance indicators:

Improved mobility and quality o f public transport services in strategic transit corridors as measured by:

a) Reduction in generalized door-to-door travel cost (fare, time) to users;

b) Percentage o f people rating the system as being better than the previous system.

Improved accessibility to low-income populations as noted by:

a) Increased use by the poor (two poorest quintiles) o f public transport services along the area o f influence o f the planned corridors, with respect to the baseline without the mass transit system, both in absolute (number o f passenger) and relative terms (as percentage o f total number o f passengers).

Enhanced institutional capacity for urban transport policy formulation and system development, measured by:

a) At the local level, system occupation per square meter below a given threshold while maintaining no subsidies;

b) At the national level, at least three BRTS schemes operating successfully in participating cities and GOC systematically monitoring program performance and i t s impact, in line with the requirements o f the National Economic and Social Council (CONPES) documents on Poli'ticu Nacional de Transporte Masivo. Annex 3 provides detail information on the key performance indicators.

3. Project components

Component 1- Capacity Building (US2.3 million): This component will provide technical assistance and policy advice to GOC and participating municipal governments . The description o f this component follows:

Part A: Implementing Capacity Building

1. Strengthening the GOC's capacity to formulate national urban transport programs and strateges, through, among others: (a) the definition o f a national urban transport institutional map; (b) the formulation o f a transport sector policy; (c) the definition o f operational, regulatory, institutional, environmental, social and road safety strategies within the urban transport and urban development context; and (d) the identification o f appropriate mass transit solutions to improve transport and to improve traff'ic management. Improvement o f the institutional capacity o f transportation entities o f Participating Cities to ensure adequate implementation o f BRTS, through, among others: (a) the provision o f equipment and training; (b) the setup o f an operational structure able to program, monitor and

2.

4

Page 13: FOR OFFICIAL ONLY - World Bankdocuments.worldbank.org/curated/en/... · Project description [one-sentence summary of each component] Re$ PAD B.3.a, Technical Annex 4 Component 1 -

administer public transportation services; and (c) the implementation o f twinning arrangements between BRTS and BogotB TransMilenio S.A.

3. Strengthening o f the operational capacity o f participating cities with respect to the implementation o f urban development and transport strategies.

4. Provision o f support for overall Project coordination, evaluation, supervision and implementation, including, among other:

(a) (b) (c)

(d)

the strengthening o f the capacity o f the PCU to comply with i t s responsibilities; the carrying out o f audits; the carrying out o f Project studies, including, among others, performance reviews and impact evaluations; and the design and implementation o f a program to monitor and evaluate the carrying out o f the Project.

Component 2- BRTS Development (US$459.2 million, US$247.7 million IBRD):

Part B: BRTS Development

1. Construction o f about 57 lulometers o f segregated transportation corridors in Participating Cities, including, among others: (a) construction o f segregated busways; (b) repaving o f mixed-traffic lanes adjacent to new busways; (c) construction and installation o f bus stations and terminals; and (d) paving o f feeder roads. Construction of about 20 lulometers o f segregated corridors in the NQS Line in Bogota, including, among other: (a) construction o f segregated busways; and (b) repaving o f mixed- traffic lanes adjacent to new busways. Definition o f a new regulatory framework for the implementation o f BRTS in Participating Cities. Resettlement o f Affected Persons in connection with the carrying out o f Parts B. 1 and B.2 o f the Project. Design and implementation o f EMPs for the carrying out o f Parts B.l andor B.2 o f the Project.

2.

3.

4.

5.

4. Lessons learned and reflected in the project design

There is a role for the national governments in the implementation of urban transport reforms. Reforms in the sector normally require large investments and complex technical decisions. Given that municipalities lack both financial and technical resources, GOC’s participation becomes crucial in promoting reforms at the municipal level.

Reliablejunds are key to implement long-term reform. Urban transport financing should be seen as an “integrated whole”*, justifying the use o f taxes on auto users to provide a reliable and necessary source o f funds to implement public transport projects. In the case o f Colombian cities, the gasoline surtax, mostly paid by cars users, i s providing about 34 percent o f total NUTP cost and, more importantly, i s helping the municipalities to leverage funds from GOC.

The regulatory framework i J y key in advancing sound reform. Within the different planning stages for urban transport reforms, most o f the attention goes to the technical aspects o f the projects (engineering designs, technology, equipment, etc.), neglecting the regulatory design o f the operation. Given the crucial

Cities on the Move, A world Bank Urban Transport Strategy.

5

Page 14: FOR OFFICIAL ONLY - World Bankdocuments.worldbank.org/curated/en/... · Project description [one-sentence summary of each component] Re$ PAD B.3.a, Technical Annex 4 Component 1 -

role o f the private sector in the operation o f urban transport systems, the planning process should concentrate more on the definition o f several policies and processes that regulate the public-private partnership. Efforts should focus on improving the regulatory framework to encourage efficient and competitive bus operations.

Implementation strategy should have both high political involvement and strong technical support. O f the several lessons that arise from the successful implementation o f TransMilenio, two are particularly critical. The f i rst i s that the implementation o f such an initiative requires visionary leadership, leadership that i s willing to take risks and remains closely involved throughout the process. The second i s that there i s the need to create high-performance implementing agencies with strong technical capacity to design, plan, control and regulate the BRTS.

Transport Projects could have significant urban impact. Another lesson resulting from the TransMilenio experience i s that the Project cannot be limited solely to the construction o f BRTS. Instead, other complementary actions should be implemented to guarantee the completion o f the urban transport strategy within a comprehensive framework (reorganizing routes, implementing traffic management measures, developing measures to reduce the existing fleet, developing sense o f community, etc.). This demonstrates that the value added o f the TransMilenio Project goes far beyond the transport operation along the main corridors.

5. Alternatives considered and reasons for rejection

Mass transit solution: Metros. In the past, following the experience o f Medellin, Bogota and Cali argued in favor o f a metro system that would require very large subsidies from the central government. The successful example o f TransMilenio proved that BRTS i s as an affordable, cost-effective solution.

Financing BRTS infrastructure entirely by municipalities and GOC on lending. Under this alternative municipalities would be in charge o f financing the infrastructure, and the GOC could have had the Bank loan to assist them in defraying those costs. This was rejected for two reasons: first, municipalities lack the financial capacity to undertake the interventions on their own andor provide the necessary guarantee to the central government for repaying. Second, the GOC's partial and phased contribution provides the right incentive for municipalities to'focus on sound and long-term policy interventions.

Channeling ull GOC 's financial contributions to participating cities entirely during BRTS construction period. BRTS construction period in a given city takes between 12 and 18 months. Committing GOC funds to finance all the BRTS planned in such a period would demand funds well beyond the fiscal envelop assigned to the NUTP and force a delay in the implementation o f the proposed interventions in certain cities. Despite the fact that this alternative would lower financial costs, i t was rejected in favor of a phased financing arrangement in which GOC's contribution i s distributed over a number of years beyond the construction period (2-5 years). This financing scheme will enable GOC to implement the program within the fiscal space assigned to the program while increasing i t s leverage.

Selecting appropriate Bank instruments to Jinance the GOC transfers. The Project wil l promote institutional building and policy reform in the urban sector. However, despite this high reform content o f the program, the alternative of a Sector Adjustment Loan (SECAL) focused on those reforms was rejected due to the catalyzing role of the infrastructure assets that need to be created to implement and sustain the program. On the other hand, while the possibility o f a follow-on loan to continue supporting the program exists, an Adaptable Program Lending (APL) approach was rejected during the Project preparation phase. At that stage, i t was considered that the APL, through the definition o f the triggers, would most l ikely reduce flexibility in responding to the program needs.

6

Page 15: FOR OFFICIAL ONLY - World Bankdocuments.worldbank.org/curated/en/... · Project description [one-sentence summary of each component] Re$ PAD B.3.a, Technical Annex 4 Component 1 -

C. IMPLEMENTATION

1. Partnership arrangements

The NUTP i s an ambitious program in terms o f scope and funding requirements; and, therefore, i t s implementation will take more than a decade. The support to the BRTS in Bogota has already demanded transfers from GOC o f about US$120 millions over the past 4 years. With the structuring o f the NUTP under the National Development Plan and i t s expansion to new cities, those transfers will increase to about US$1.6 bil l ion over the next 12 years. GOC has requested IBRD, Interamerican Development Bank (IDB) and the Andean Finance Corporation (CAF) to participate in the financing o f i t s contributions under independent parallel arrangements. IDB wi l l support the BRTS in Cali, while CAF wi l l support the Suba corridor in Bogota. IBRD will play a broader role in supporting the program by providing technical assistance for institutional building as well as the development o f BRTS in Bogota, Pereira, and other cities included under the program.

2. Institutional and implementation arrangements

Znstitutionul set up und Policy ji-amework jor NUTP Building on legislation3 passed in 1996, two CONPES4 documents approved in 2002 and 2003 have established the policy and institutional framework for the NUTP. These policy documents: i) define policy goals, strategies and expected outcomes; ii) set a Technical Committee to monitor and evaluate execution o f the NUTP and performance o f the BRTS, iii) create the capacity building program; and iv) establish criteria for securing the financing for the BRTS by cities and the GOC.

.

A CONPES document, issued by GOC for each participating city, will detail the specific conditions and arrangements for BRTS intervention in that particular city. This document will provide the, basis for the Subsidiary Agreement to be signed by GOC, through the Ministry o f Finance and the city. It i s through the Subsidiary Agreement that the scope o f the intervention, the financial structure and the obligations o f the respective parties are formally established. In particular, the agreement: i) assigns overall responsibility for undertaking and financing any potential cost overrun and/or operational deficit o f the BRTS to the participating city; ii) defines the schedule o f GOC financial commitments by year, previously approved by CONFIS and recorded as future budgetary commitments (vigencius futurus) for proper fiscal accounting; iii) instructs the city to budget the funds to cover any cost overrun once they are identified; iv) establishes a trust fund to managed both GOC and city contributions for infrastructure; v) mandates the signing o f a contract between the GOC and the city, in which the city gives control o f the Board o f Directors o f the BRTS agency to the GOC during the time slice o f the contributions; and vi) makes mandatory the use o f fiduciary procedures o f the Multilateral Organizations involved in the Project.

Once all these conditions are met, GOC wi l l request the Bank to include the respective participating city BRTS to be finance by the loan, following the procedures stated in the Operational Manual (see Annex 6).

The current status o f BRTS schemes to be supported by the Bank project i s as follows: implementation o f the BRTS in Bogota (TransMilenio North Quito South corridor) i s underway; the Subsidiary Agreement

Law 86 1989 reformed by Law 310 1996 allows the GOC to co-finance infrastructure for mass transit systems in

Documents 31 67 “Politica para mejorar e l transporte urbano de pasajeros” May 2002 and 3260 “Politica Nacional Colombian cities

de Transporte Urbano y Masivo” December 2003.

7

Page 16: FOR OFFICIAL ONLY - World Bankdocuments.worldbank.org/curated/en/... · Project description [one-sentence summary of each component] Re$ PAD B.3.a, Technical Annex 4 Component 1 -

of the planned intervention in Pereira and Cartagena has been signed; and preparatory studies for planned interventions in Soacha, Barranquilla, Bucaramanga and Medellin are well advanced.

Executing agencies DNP, functioning as the Technical Secretariat o f the Technical Committee, will initially have overall responsibility for the execution o f the Project, will provide technical support to the NUTP and will be responsible for monitoring and evaluating program implementation. The other members o f the Technical Committee are the Ministry o f Finance (MHCP), in charge o f financial management o f resources, and the Ministry o f Transport (MOT), which has responsibility for the sector. During negotiations GOC informed the Bank that i t has been decided to transfer the responsibility o f the execution o f the Project to the Ministry o f Transport (MOT) in the short term. Therefore, upon compliance in a manner satisfactory to the Bank, with the conditions set forth in Annex 1 to the Implementation Letter, the Borrower shall carry out the Project, through MOT.

The BRTS agencies in the participating cities will be the executing agencies o f the BRTS Development Component. Some cities will rely on specialized municipal works agencies (i.e. IDU in the case o f Bogota and Soacha) to carry out the construction o f the BRTS infrastructure. For the technical assistance component, DNP , (later MOT) will be in charge o f managing the procurement o f goods and consultant services.

3. Monitoring and evaluation o f outcomeskesults

The national urban transport policy entrusted to the Technical Committee the responsibility o f monitoring and evaluating the implementation and outcomes o f the NUTP (see Annex 6). The various responsibilities assigned to this Committee fall into two categories: i) verification o f entry and eligibility conditions, and their compliance throughout Project implementation; and ii) monitoring o f the BRTS’ performance and evaluation o f i t s outcomes.

To ensure the monitoring and evaluation, the Committee wil l gather required information to evaluate the key performance indicators and collect other relevant information for policy evaluation (see detail list o f additional information in Annex 3). The Committee will then report to the Bank all relevant information. Data collection will be a shared responsibility between BRTS agencies and the DNP (later MOT). BRTS agencies will collect data related mostly to their own operations. In order to build the technical capabilities, the Project design contemplates that the T A wi l l include the design o f the monitoring system of those agencies (see Annex 4) and the measuring o f the indicators.

The information on key performance indicators, not reported by the BRTS agencies, will be provided through surveys and field studies directly contracted by the NUTP technical assistance-implementing agency. A description o f the required surveys and field studies i s presented in Annex 3.

Implementation reports with the available information will be submitted to the Bank through DNP (later MOT), each December 15 starting in 2005. These reports wil l also include an analysis and measures to be taken by GOC andor the implementing agencies to solve outstanding issues in Project development.

4. Sustainability

The sustainability o f the Project i s predicated on the basis o f the following grounds:

Institutional support: There i s a specific evidence o f political support at both the national and local level. City Councils in Bogota, Pereira and Cartagena have approved the required funding and the remaining participating cities are preparing the funding requirements for City Council approval.

8

Page 17: FOR OFFICIAL ONLY - World Bankdocuments.worldbank.org/curated/en/... · Project description [one-sentence summary of each component] Re$ PAD B.3.a, Technical Annex 4 Component 1 -

Ownership and sustainable commitment ut the higher government level. Municipalities and the central government are well aware o f the high visibility o f the proposed interventions and have a clear understanding o f the reforms required to put the system into operation, by involving all the key stakeholders (affiliated companies, bus owners, bus drivers, potential new operators, financial institutions and commercial sector).

Poor service performance o f the BRTS S The Project provides TA to further strengthen resulting from: (i) the inability o f BRTS institutional capacity at the local level in order to implementing agencies to enforce contracts, design the concession and reorganize the actual regulation and control the system; (ii) private routes. The bus concession scheme should operators fail to meet quality standards; and provide strong incentives for good performance, (iii) excessive competition and predatory practices by unregulated competing services.

Financial viability of the BRTS derives from: i) a policy decision to subsidize the infrastructure with identified public sources (gasoline surtax) to keep tariffs at an affordable level; ii) current tariff design covers operational cost; and iii) GOC has approved budgetary commitments for this program.

Access o f urban poor to BRTS constrained The proposed fares for the BRTS will consider the by: (i) unaffordable bus fares or excessive ability o f the poor to pay and they are targeted to travel costs; (ii) lack o f feeder service be set at about 90-100% o f the current bus fare. provision due to financial constraints. The BRTS includes the provision o f feeder bus

routes to serve targeted poor neighborhoods under an integrated flat fare system to ensure the poor have access to the improved system.

M

Existence of local “Know How”: The successful experience o f TransMilenio has proved that there i s a sustainable institutional arrangement for the provision o f urban transport services. This “know how’, was developed in Colombia and will be valuable to participating cities in the building o f operational capacity.

H

5. Critical risks and possible controversial aspects

Eligibility conditions to participate in the NUTP force municipal authorities to take decisions supporting the Project. Municipalities not complying with such requirements wil l not be able to s i g n the respective Subsidiary Agreement with GOC. Participation o f a critical mass o f cities (at least three: BogotB, Pereira and Cartagena) has been secured.

I Risk I Risk 1 Risk Mitigation Measure I

to implement the

1 Rating 1 -

From Outr>uts to Obiective

IFrom Components to Outputs back o f political support o f local authorities

: BRTS project.

9

Page 18: FOR OFFICIAL ONLY - World Bankdocuments.worldbank.org/curated/en/... · Project description [one-sentence summary of each component] Re$ PAD B.3.a, Technical Annex 4 Component 1 -

BRTS’ implementing agencies unable to: (i) finalize arrangements for execution and financing o f BRTS’ infrastructure; and (ii) concession BRTS‘ routes to private operators.

Private operators unable to organize themselves or unwilling to participate in the Project due to the fear o f changing the existing business structure.

S

S

Through the Subsidiary Agreement, GOC and the city w i l l allocate the required resources to the Project. Given the reliability o f such sources i t i s expected that commercial banks w i l l be keen tc finance the projects. In some cities local bu5 operators are already getting prepared tc participate in the bidding processes. Concession ol BRTS operation i s a required condition foi national funding. The experience o f TransMilenio operators serves as a positive incentive for local operators t c support and participate in the Project. The presence o f local operators i s a condition foi Project implementation.

6. Loadcredit conditions and covenants

Overall Risk Rating S

a. Effectiveness Conditions

(i) the Operational Manual has been issued by the Borrower, through DNP, and approved by the Bank; (ii) the terms o f reference for the hiring o f the independent auditors have been prepared by the Borrower, through DNP, and have been approved by the Bank; (iii) the PCU has been fully staffed and i s operational including among others a Financial Officer, Procurement Specialist and Resettlement Expert; (iv) the financial management system for the Project has been established;

b. Subsidiary Agreements

The borrower, through the DNP (later MOT): a) will assure the fulfillment, by the executing agencies, o f the obligations and procedures established in the Subsidiary Agreements and Project Operational Manual, including the fiduciary procedures and the information supply for implementation and follow up o f the BRTS’ execution, and; b) wi,ll not modify Subsidiary Agreements without Bank’s no-objection.

c, Monitoring and evaluation of NUTP

The Borrower, through DNP (later MOT), shall (a) maintain policies and procedures adequate to enable i t to monitor and evaluate on an ongoing basis the execution o f the Project and the NUTP and the achievement o f their objectives set forth in the Implementation letter; (b) prepare, under terms o f reference satisfactory to the Bank, and furnish to the Bank, each December 15 during Project implementation, starting with the report due not later than December 15, 2005, a report integrating the results o f the monitoring and evaluation activities performed pursuant to paragraph (a) o f this Section, on the progress achieved in the carrying out o f the Project during the calendar semester preceding the date o f presentation o f the report and setting out the measures recommended to ensure the efficient carrying out o f the Project and the achievement o f the objectives thereof during the following calendar semester; (c) review with the Bank, by December 15 o f each year o f Project implementation, or such later date as the Bank shall agree, starting in year 2005, the pertinent reports referred to in paragraph (b) o f this Section, and, thereafter, take all measures required to ensure the efficient completion o f the Project and the achievement o f the objectives thereof, based on the conclusions and recommendations o f said reports and

10

Page 19: FOR OFFICIAL ONLY - World Bankdocuments.worldbank.org/curated/en/... · Project description [one-sentence summary of each component] Re$ PAD B.3.a, Technical Annex 4 Component 1 -

the Bank's views on the matter; and d) carry out an in-depth review (the Mid-Term Review) jointly with the Bank, by July 26, 2006 or such later date as the Bank shall agree, on the progress achieved in the implementation o f the Project.

Project

Bogota TransMilenio NQS

The Borrower, through DNP (later MOT), will prepare, under terms o f reference satisfactory to the Bank, an assessment o f the impact o f NUTP in terms o f improved mobility to users, accessibility and affordability to the poor, and strengthening o f both policy and institutions. In order to do so, the borrower will finalized the construction o f a base line not later than six months after the effectiveness. The Technical Committee and participating cities w i l l present the results at the annual review to be held in 2006 (the mid-term review) and in 2008 (project-end).

Net Present Value 12% Socio-Economxnternal BenefitKOst Ratio US$ Mi l l ion Rate o f Return

163,7 2 1.40% 1.45

D. APPRAISAL SUMMARY

Pereira-Dosquebradas Megabus 12.8 16.45% 1.13

TOTAL 225.6 20.56% 1.345

1. Economic and financial analysis

A standard cost-benefit analysis was performed for the initial projects involved in the loan (Bogota NQS, Cartagena and Pereira), including all public and private costs for BRTS implementation and operation. Estimated benefits include travel time and cost savings for both BRTS users and private vehicle commuters using parallel niixed traffic lanes, efficiency improvement in transit operations with physical destruction o f obsolete units, as well as modal shift, trip generation, accident reduction and pollution abatements. Most benefits resulted from savings in operation costs due to the removal and scrapping o f obsolete buses. Another important source o f social benefits are the travel time savings to users, calculated through transportation planning models and using a value o f time set at US$0.75/hour.

Project evaluation indicators are summarized as follows (see Annex 9 for more detail):

artagena ranscaribe 54.9 20.33% 1.26

2. Technical

The proposed BRTS projects present no major technical difficulties in their design, construction or supervision. The required civi l works will most likely consist o f the construction o f segregated busways, stations and terminals, as well as the pedestrian infrastructure needed to access trunk-line stations. These works w i l l use standard construction procedures, available materials and machinery. The alignment o f the segregated busways, i t s insertion into the urban structure, and i t s relation to the existing road network wil l be incorporated in the design. In principle, the location o f the busways w i l l be in the center o f major arterial roads. The terminals are located at each end o f the busways and have especially designed areas for pedestrian and bus activity. During the construction period, a supervisor with specialized consultant f i r m s will be contracted to control the quality o f the works.

11

Page 20: FOR OFFICIAL ONLY - World Bankdocuments.worldbank.org/curated/en/... · Project description [one-sentence summary of each component] Re$ PAD B.3.a, Technical Annex 4 Component 1 -

3. Fiduciary

3.1 Procurement issues

The latest Country Procurement Assessment Report was done in 2000. For the T A component, DNP has extensive experience in procurement o f consultant services due to the implementation o f the Regulatory Reform Technical Assistance and other Bank projects. Therefore, no procurement problems are expected within this component. A capacity assessment will be conducted to MOT before it takes the management o f the Project.

For the BRTS Development component, the municipal civi l work agency or the BRTS implementing agency, depending o f the decisions made by each participating city, will be in charge o f the procurement of works, goods and consulting services financed under the proposed Project. The number o f contracts to be issued in each city i s small, and a threshold o f US$5 mill ion and US$250,000 will be applied to International Competitive Bidding (ICB) for works and goods, respectively. The contracts for the supervision during the construction w i l l be awarded under QCBS procedures. Those agencies have no experienced handling Bank procurement procedures, and i t will be necessary to train local staff in Bank procedures and to closely monitor each bidding process.

For the BRTS Bogota NQS corridor work, contracts have been awarded prior to considering the inclusion o f such investments in the loan. On January 28th 2004 OPRC approved case number 517 extending a waiver o f the US$Smillion maximum threshold applicable to National Competitive Bidding process (NCBs) in Colombia to enable the financing with Loan proceeds o f 5 contracts signed by IDU’. The waiver will only apply for the five lots procured for the Bogota NQS corridor, but not for BRTS in other cities, which should be procured under Bank procedures.

3.2 Financial Management (FM) issues

Financial Management design and oversight are complicated due to a number o f factors. These include: (i) the financial plan for the Project, under which expenditures take place over a short period o f time - most within the first half o f the Project implementation timeline - but national and municipal budget allocations are spread out over many years, extending beyond the projected closing date; and (ii) the involvement o f various cities, most through newly-created (BRTS) entities. These issues have been considered in the FM design o f the Project (see Annex 7 for a complete discussion o f financial management and disbursements).

In order to facilitate project implementation within an appropriate fiduciary framework, Bank financing for this project includes financing o f transfers to municipalities. This mechanism, similar to that employed in some Sector-wide Approaches (SWAPS), requires a particular emphasis on the fiduciary arrangements in place for the recipients o f the transfers (in this case, the municipal BRT entities), who must report on the use o f these funds as well as on the funds, which they provide, to the program. While the disbursement mechanism does in some way resemble that o f a SWAP operation, this operation i s not considered to be a SWAp, for the following reasons:

1) It does not have a diversity o f multiple donors;

Contract # lo5 signed with Societal de Futuras Concesiones Urbanas S.A.; Contract # lo6 signed With Sociedad Concesionaria Metrodistnto S A; Contract # 179 singed with Consorcio Troncal NQS Sur; Contract # 180 signed with TransMilenioNQS Sur S.A. and Contract # 242 signed with TransMilenio del Sur S.A.

12

Page 21: FOR OFFICIAL ONLY - World Bankdocuments.worldbank.org/curated/en/... · Project description [one-sentence summary of each component] Re$ PAD B.3.a, Technical Annex 4 Component 1 -

2) I t i s not a Borrower’s-managed approach by which development partners support a country led program;

3) Project preparation and future implementation did not and does not include uniform implementation structures and procedures o f several partners (i.e. joint appraisals, programming, review, and monitoring and evaluation);

4) There i s no pooling o f funds (i.e. pooling o f donor and govemment funds for disbursement through jointly agreed channels funds);

5) The Borrower under this Project will not use i t s fiduciary systems; and

6) The Borrower will use and follow Bank’s policies and procedures (Le. intev diu, for procurement, hiring o f consultants, and safeguard policies).

Moreover, eligibility o f expenditures under Transfers w i l l be determined through the equivalent to Statements o f Expenditures (SOEs) that in this Project are called Statements o f Transfers (SOT). Also progress reports and audits will be requested from entities receiving said Transfers to show, to the satisfaction o f the Bank, how the money was ultimately spent. To make sure that the Borrower complies with these requirements, the Loan Agreement for the Project envisages conditions o f disbursements tied to the disbursements o f said Transfers.

This project incorporates certain features o f the Expenditure Eligibility Policy approved by the Bank’s Board o f Directors on April 13, 2004. The application o f this new policy to this project i s consistent with the Colombia Country Financing parameters that have been approved by the LCR Regional Vice President.

4. Social

a. What are the opportunities, constraints, impacts and risks arising out o f the socio-cultural and political context?

The Project will improve the standard o f l iv ing o f the population o f Colombia’s main cities. Urban public transport users will have access to a safe and improved transit system. The BRTS wil l also allow the use o f mass transit to the disabled population, in the case o f TransMilenio in Bogota, 1 percent o f the users o f the system are disabled people. Currently, disabled people cannot use mass transit, given the characteristics o f the system.

The implementation o f Component 2, BRTS Development, will cause involuntary displacement in some cities. For this reason, a Resettlement Framework was developed according to Bank Operational Policy 4.12 (see Annex 10). All participating cities are aware o f the Resettlement Policy o f the Bank, and the local authorities as well as the responsible institutions are willing to adhere to this. Based on this Framework, each city w i l l design Resettlement Plans before the bidding process for the construction o f corridors. This resettlement framework will be a new practice for some cities. Under Component 1, “Implementation Capacity Building,” DNP (later MOT) will provide T A on this matter through consultants. This assistance wil l include preparation o f guidelines, technical workshops, and assistance during preparation and implementation o f resettlement plans. DNP (later MOT) wil l also review each

13

Page 22: FOR OFFICIAL ONLY - World Bankdocuments.worldbank.org/curated/en/... · Project description [one-sentence summary of each component] Re$ PAD B.3.a, Technical Annex 4 Component 1 -

Resettlement Plan, will send it to the Bank for no-objection and will follow up i t s implementation. Prior to project implementation, a Social Management Plan will be prepared by each city in order to inform the communities about the Project and its impacts, and also to mitigate any adverse social impact caused by the works. At the end o f the Project, GOC wi l l publish methodologies and results o f resettlement in each city and a guideline for resettlement in urban transport projects based on the lessons learned in this Project.

In the case o f Bogota, IDU initiated the construction o f the Bogota NQS TransMilenio corridor before these investments were included into the Project. IDU has already acquired more than 50 percent o f the affected properties and the displaced population has resettled on their own. IDU could not apply the resettlement standards o f Bank's policy because at that time the Bank was not involved in this BRTS. Currently, IDU i s interested in applying Bank's Policy, recognizing important advantages in using it in terms o f equity and facilitation o f project implementation. Therefore, IDU i s preparing an Action Plan to apply corrective measures for people that have already been displaced, and to apply the standards o f the Resettlement Framework for people to be displaced.

b. How have key stakeholders (civil society, business, public sector, social, or other non-governmental groups or individuals whose participation can positively or negatively affect Project outcomes) participated in Project preparation, and how wi l l they be involved i n implementation, monitoring and evaluation?

The participation o f the existing transport companies and operators in the new system i s strongly promoted. To enforce this participation a fundamental change in the structure o f the companies/operators i s needed to consolidate non-competitive enterprises into large operating companies, loohng for a "win- win" scheme, which allows the mitigation o f resistance from private bus operators.

c. Are any o f the following social issues important in the Project? If so, how? Differential access to Project benefits.

Although the proposed Project will have effects on different groups o f the population the Project aims to address mainly the needs o f low-income users, i.e. primary public transport passengers. Such users w i l l benefit especially from increased accessibility, lower travel times, and improved safety conditions. These users, o f whom approximately 70 percent come from the lowest income areas o f the cities, will also experience a reduction in the costs o f transportation due to the tariff integration provided by the system. On average, 25 percent o f total income i s currently allocated to transportation costs. With tariff integration (trunk-feeder integration), this percentage i s expected to decline to 18 percent for those users who have to make transfers. More generally, the population at large will experience enhanced overall urban mobility and improved environmental conditions, through the relief o f traffic congestion, reduction of accidents and air pollution. With the implementation o f the BRTS the cities will promote the renewal o f the existing bus fleet, reduction o f the bus over-supply, introduction o f cleaner fuels, reduction o f inefficient routes, and an increase in the operational speed o f the transport system. Other potential beneficiaries are the residents and businesses along the corridors, which are likely to see an increase in property value by having better accessibility and improved mobility options.

Positions o f expected winners and losers:

One o f the main issues to be solved by the proposed Project i s the current disarray o f the business structure in the public transport industry. For the operation o f BRTS, fundamental changes in the current bus operational scheme must be carried out. As in the TransMilenio system, the participation o f the existing transport companies and operators in the new system will be promoted.

14

Page 23: FOR OFFICIAL ONLY - World Bankdocuments.worldbank.org/curated/en/... · Project description [one-sentence summary of each component] Re$ PAD B.3.a, Technical Annex 4 Component 1 -

5. Environment

Are any of the following environmental issues important in the Project? If so: (i) how are they integrated in the Project to enhance i t s environmental benefits; and (ii) how wi l l the main environmental benefits be monitored?

0

and resource management, particularly in sectors that potentially affect the environment: Establishing policy, regulatory and institutional frameworks for environmentally sustainable growth

The public transport system will be restructured in all participating cities as a result o f developing BRTS. The actions required for enabling BRTS will generate long term environmental benefits, in addition to economic savings resulting from increased accessibility and reduced travel time and costs. These benefits will mainly arise from a decrease in fuel consumption, and in the energy intensity o f travel; less and more efficient buses carrying more people will reduce significantly the use o f fuel per passenger, implying less emissions o f air pollutants and greenhouse gases. Exposure to air pollutants will also be lowered as travel time decrease.

Existing high polluting buses and mini-buses will be replaced by newer vehicles, mostly new articulated buses in all trunk lanes. At the end, the overall fleet size will be reduced as a result o f achieved transport efficiency, where only the minimum needed number o f buses will be allowed to circulate, as part o f a cost-saving strategy from the new BRTS, complemented by scrapping regulation. Also, as the transport system becomes more efficient, congestion levels will be reduced, contributing even further to the reductions in emissions o f air pollutants, as increased average speeds will allow for more efficient combustion. Finally, upgrading existing urban roads to make space for BRTS in participating cities wil l generally involve urban space improvements in the form o f bikeways, upgraded pavements and adjacent green areas.

0 Protecting people’s health from environmental r isks and pollution:

Emission reductions imply less health related costs; there i s direct correlation between the reduction o f medical treatments and labor absenteeism. Reduction o f heath problems includes respiratory illnesses, and affection to the central nervous systems, normally stronger in children and the elderly. The Project wil l certainly contribute to improve air quality in all participating cities. Also, safety will be enhanced as a result o f Project implementation; passengers will only be allowed to enter the system on points safely away from cars to mitigate risk o f conflict. Disabled people wil l have special devices to allow them use the system. In addition, the country i s in the process o f improving fuels, reducing substantially the sulfur content in refined diesel and gasoline, which would enable the introduction o f vehicles complying with better emission standards.

0 Monitoring:

The T A component wil l help develop tools and mechanisms at the national and local level to adequately monitor not only the BRTS’s transport efficiency, but also the environmental and safety performance o f the Project. Baseline scenarios for emissions, noise, and safety will be established, and periodical monitoring will enable a close and timely evaluation o f the system.

6. Safeguard policies

a. What i s the safeguard-screening category ofthe Project? (SI, S2, S3, SF)

15

Page 24: FOR OFFICIAL ONLY - World Bankdocuments.worldbank.org/curated/en/... · Project description [one-sentence summary of each component] Re$ PAD B.3.a, Technical Annex 4 Component 1 -

s2

b. What i s the environmental screening category o f the Project? (A, B, C, FI)

B- Partial Assessment

c. If applicable, what are the key safeguard policy issues raised by the Project?

The Project triggers OP4.01 on Environmental Assessment; OP4.04 on Natural Habitats; OP4.12 on Resettlements; and OPN 1 1.03 on Cultural Property.

Overall, the Project will generate long-term positive impacts, as access and road safety i s improved, urban space enhanced, and emissions and exposure to air pollutants reduced. However, there are potential environmental effects linked to the upgrade and re-alignment o f existing roads. The works wil l include limited land acquisition and resettlements. The overall impacts on environment are expected to be minor and confined to the construction period.

OP4.0 1 i s triggered due to potential adverse environmental impacts associated with construction, in particular with regard to: (a) management o f materials and waste; (b) restriction o f traffic flows and access to homes and businesses; (c) increased noise and emission o f pollutants; (d) management o f work camp sites; (e) impact on green areas; and (0 interference with urban infrastructure (phone lines, piping, electricity wires, sewage).

OP4.04 i s triggered due to potential impact on nearby wetlands in Barranquilla and Soacha, in particular during the construction period.

OPN 1 1.03 i s triggered to potential impact on cultural heritage, as there i s potential for chance finds when upgrading some o f the roads in any o f the cities.

OP4.12 i s triggered due to involuntary resettlements in some cities, despite the positive social impacts o f the Project for the urban population.

d. If applicable, what are the main results o f any safeguard policy related studies, and how have they been incorporated into the Project?

Concept design studies for all potential participating cities already considered the environmental and resettlement dimensions. Considering the relatively low environmental impact associated to the Project, and that the environmental impacts were associated with upgrading existing roads, i t was decided during Project preparation that Guidelines for the design, construction, and monitoring o f urban infrastructure projects would be needed. The guidelines are aimed at setting measures to mitigate environmental r isks associated to the construction phase of the projects. Impacts not averted at the design stage would be mitigated at the construction stage with the existence o f adequate Environmental Management Plans (EMP). These will mitigate environmental r isks associated to OP4.01 (construction impact); OP4.04 (nearby wetlands); and OPN 1 1.03 (heritage and historic chance finds). The Guidelines were woduced, based on the existing guidelines and Procedures at IDU, and in coordination with the Ministry o f Environment, DNP, and the participating cities.

Basing on the Guidelines mentioned above, EMPs will be required for each city to mitigate the potential environmental impact on the Project sites and surrounding areas during construction. The EMPs will be carried out either by the same contractors in charge o f developing the final infrastructure designs, or as

16

Page 25: FOR OFFICIAL ONLY - World Bankdocuments.worldbank.org/curated/en/... · Project description [one-sentence summary of each component] Re$ PAD B.3.a, Technical Annex 4 Component 1 -

separate studies for each city, in close coordination with the specific designs. Considering that the participating cities would be at different levels o f preparedness, i t was agreed that one o f the cities' EMP would be prepared and submitted for Quality Assurance Team's (QAT) review before appraisal. Pereira, being the f i rs t city, prepared and submitted EMPs for the 6 segments to be built under the Proiect. Also, as Bogota has been added to the Proiect. the EA for the corridor NOS was evaluated before appraisal.

To mitigate the social impact o f involuntary resettlements, a Resettlement Framework Policv was developed, under the coordination o f DNP and with the participation o f candidate cities. Each city wil l develop a Census and Socioeconomic Study o f people to be resettled, and Resettlement Plans, before the bidding process starts. In the case o f Bogoth, an Action Plan to assist the people displaced and to be displaced was developed in appraisal. The Action Plan for people to be displaced will be consistent with the Resettlement Framework. The activities for the people already displaced will be designed based on the results o f an assessment o f the impacts caused by displacement.

e. What i s the borrower's capacity to implement the safeguard policies recommendations, and if the capacity i s insufficient, how wi l l this capacity be brought to the required level?

Environment As a principle, all EMPs wil l be implemented by the contractors in charge o f the civi l works, and i t s compliance will be ensured through the bidding documents and legal contracts. With the exception o f Bogota-Soacha, where IDU has a very good environmental capacity and where there i s experience in dealing with civil works required to implement TransMilenio, other cities have relatively low capacity to approve the EMPs required as a general condition for the projects. DNP (later MOT) wil l be the agency in charge o f monitoring implementation o f all projects, but i t s capacity to follow up EMPs needs to be re-strengthened. To mitigate the risk, during Project implementation all EMPs should be sent to the Bank for no objection. Complementarily, the Technical Assistance component will help build the needed capacity at the city level. The Subsidiary Agreements w i l l include provisions for ensuring that the EMPs are fully complied with, and that their implementation i s properly monitored and evaluated. All bidding documents for the infrastructure works will include not only the EMP, but also a Manual for monitoring their implementation.

Resettlement Under Component 1, DNP (Later MOT) will provide T A to formulate resettlement plans according to the resettlement framework approved by the Bank. DNP (Later MOT) will prepare technical guidelines in this matter and will promote workshops, and specific training. DNP (Later MOT) wil l also review each Resettlement Plan, will send it to the Bank for no-objection, and wil l follow up i t s implementation. . Each study will follow up the indications o f a Resettlement Plan framework prepared according to Bank Policy 4.12, which indicates that a Resettlement Plan wil l be approved by the Bank and adopted by each local entity.

What type o f consultations has been conducted related to safeguard issues? How did these consultations influence Project design'?

A Consultative Workshop on Safeguards took place during preparation, with the participation o f representatives from all candidate cities, the DNP, the Ministr ies o f Environment and Transport, and from the Bank's regional safeguard team. At the workshop, the Bank safeguard policies were made clear to all participating, as well as their application to the Project. Agreement on next steps for preparing the Project, and on environmental and social requirements for implementation were agreed at the workshop.

Stakeholders have been consulted by both the regional authorities and the consultants in charge o f developing the concept designs. The terms o f reference (TORS) for the EMPs w i l l include consultations with stakeholders so that their opinions can be incorporated as early as the design phase. The

17

Page 26: FOR OFFICIAL ONLY - World Bankdocuments.worldbank.org/curated/en/... · Project description [one-sentence summary of each component] Re$ PAD B.3.a, Technical Annex 4 Component 1 -

Resettlement Framework includes information and consultation activities for population to be resettled. These activities will be carried out during the preparation and implementation o f each Resettlement Plan

g. When were the safeguard studies made available at the InfoShop?

The EMP for Pereira, the Environmental Guidelines, the EA for NQS (Bogota), and the Resettlement Framework were available on March 19th, 2004.

h. When and where were safeguard studies made available in the cooperating country?

On March 19th, 2004

Safeguard Policies Triggered by the Project Yes N o Environmental Assessment (OP/BP/GP 4.0 1) [x 1 [I Natural Habitats (OP/BP 4.04) [x I 11 Pest Management (OP 4.09) [I [I Cultural Property (OPN 1 1.03, being revised as OP 4.1 1) [ X I 11 Involuntary Resettlement (OP/BP 4.12) [x 1 [I Indigenous Peoples (OD 4.20, being revised as OP 4.10) [I [I Forests (OP/BP 4.36) [I [I Safety o f Dams (OP/BP 4.37) [I [I Projects in Disputed Areas (OP/BP/GP 7.60) [I [I Projects on International Waterways (OP/BP/GP 7.50) [I [I

7. Policy Exceptions and Readiness

a. Does the Project require any exceptions from Bank policies? If so, what are they and how are they j us t i f i ed?

Yes.

For the BRTS Bogota NQS corridor work, contracts have been awarded prior to considering the inclusion o f such investments in the loan. On January 28" 2004 OPRC approved case number 517 extending a waiver o f the US$Smillion maximum threshold applicable to National Competitive Bidding process (NCBs) in Colombia to enable the financing with Loan proceeds o f 5 contracts signed by IDU6. The waiver w i l l only apply for the five lots procured for the Bogoth NQS corridor, but not for BRTS in other cities, which should be procured under Bank procedures.

b. Have these been approved by Bank management?

Yes

c. I s approval for any policy exception sought from the Board?

No

' Contract # l o 5 signed with Sociedad de Futuras Concesiones Urbanas S.A.; Contract #lo6 signed with Sociedad Concesionaria Metrodistnto S A ; Contract # 179 singed with Consorcio Troncal NQS Sur ; Contract # 180 signed with TransMilenioNQS Sur S.A. and Contract # 242 signed with TransMilenio del Sur S.A.

18

Page 27: FOR OFFICIAL ONLY - World Bankdocuments.worldbank.org/curated/en/... · Project description [one-sentence summary of each component] Re$ PAD B.3.a, Technical Annex 4 Component 1 -

Annex 1: Country and Sector or Program Background COLOMBIA: CO Integrated Mass Transit Systems

While urban population has grown in many developing countries due to social and economic reasons, Colombia has had a higher comparative rate due to the long lasting civi l conflict that has displaced more than 2.5 mil l ion people in the last two decades from the rural areas to the main cities. As conflict worsened in the late 1990’s, displacement to the cities has increased even further than before.

As a result Colombia has been transformed into a country with high urban population and with several large and medium size cities. While the urbanization rate i s high (75%), the capital city, Bogot6, accounts for 17 percent o f the population only; a low share comparing with other Latin American cities (Lima 34%, Buenos Aires 35% and Santiago 33%). There are 5 cities in the country with population o f one million or more, and 10 cities with more than 500.000 inhabitants.

On the poverty side, indicators have worsened in the last years due to the economic down fal l and today two thirds o f the people l iving below poverty l ine live in urban areas. According to the Colombian Poverty Report 200 1, the recession o f the late 90’s not only increased the number o f urban poor but the poor also became poorer.

Today, the inhabitants o f the periphery have increased the pressure on government to provide accessibility to downtown jobs and services. An inclusive transportation system, that provides low cost and fast mobility for low-income areas, i s crucial for the design o f a poverty reduction strategy.

Transportation systems in Colombian cities:

Urban Transport in Colombia i s mostly based on public transport. Car ownership i s very low: only 25 percent o f the households own a motor vehicle and only 14 percent o f commuters use private cars on a daily basis. In the 1990’s the number o f private vehicles increased by 125 percent, due to a sharp reduction in import tariffs (deregulation policies), however s t i l l today, 75 percent o f the population relay on public transportation.

Traditional policies to address urban transport problems have been based on infrastructure provision (new roads, more capacity o f the existing roads, and overpasses) This not only implies high expenses, but also benefits the car-owners, while neglecting 80 percent o f the population that uses public transportation.

The population, which i s unable to afford a car, has been left with the only alternative o f using low quality, slow, dangerous and polluting bus services. In the main transport corridors o f the largest cities, the average speed, in peak hours, i s less than 10 kidhr, significantly lower than international benchmarks (around 20 km/hr). This negatively affects the city’s productivity, increases emissions of air pollutants, and generates an incentive to private car commuting, which i s worsening the problem even further.

The current business scheme in the public transport industry in Colombia, promotes competition in the market (maximizing the number o f passengers picked up by a single unit) and not for the market (this means, for the routes that will provide the service under pre-established parameters). The local authority grants permits to transport companies enabling them to operate routes, but these companies do not exercise enough control over their buses during the phase o f provision o f services. The revenue o f these companies depends on the number o f buses they affiliate. The owner o f those affiliated vehicles receives a fixed rent from the bus drivers, who earn money according to the number o f passengers they serve, generating what i s commonly known as the “penny war” ( p e r m del centavo).

19

Page 28: FOR OFFICIAL ONLY - World Bankdocuments.worldbank.org/curated/en/... · Project description [one-sentence summary of each component] Re$ PAD B.3.a, Technical Annex 4 Component 1 -

The penny war has promo’ted an oversupply o f seats (around 50%)’ increasing the system’s overall operating cost and reducing the profitability o f the business. Operators therefore have no incentives for new investments, which leads to an increase in the average age o f the fleet and eliminates capital accumulation.

In addition, local traffic and transport authorities are often weak and do not have adequate tools for planning and managing the sector. During the 90’s the decentralization process in Colombia was deepening and National Government involvement in urban transport issues was abandoned. Only regulatory activities, such as the mechanisms to authorize companies, define fares and authorize vehicles, have remained at the national level. Municipalities have struggled to find their own solutions but they lack the financial and technical resources to produced feasible and affordable solutions tailored to their own needs. The existing regulatory framework also hinders innovative solutions for the traditional transport service provision.

The overall transport cost for society and particularly for the poor i s significant. The time lost every year in congestion represents 3.4[DHGl]% o f society’s income. Congestion increases fuel consumption and the level o f emissions.

I t i s expected that urbanization and motorization will deepen commuting problems generating new demand for services and public transportation. Rising congestion and time used in commuting have already become one o f the main issues in the agenda o f elected mayors. Realizing these issues, GOC has recently taken steps to focus more on these agglomerated areas, through actions and legal measures regarding the decentralization process, city-planning processes and specific sector policies.

The National Urban Transport Program -NUTP

Background

GOC involvement in urban transportation projects started with the experience o f the Medellin Metro at the beginning o f the 80’s’ where GOC guaranteed the city’s debt to build the infrastructure. After 12 years o f financial and legal problems, the Metro was inaugurated in 1994 resulting in an investment o f approximately US$3 .O billion. Today the Metro transports daily around 500.000 passengers.

After the experience o f Medellin, in 1998 GOC and the city o f BogotS, abandoned the idea o f building a rail-based metro and agreed to co-finance a Bus Rapid Transit System. The objective was a long term agreement that encompasses financial commitments o f about US$1.2 bil l ion up to the year 2016, to develop a system in the city that forecasts to reach 100 percent o f the city’s public transportation demand in that year.

At the end o f 2000, the first phase o f BogotS’s BRTS, TransMilenio started operations deriving in investments o f about US$400 mill ion dollars, US$lOO mill ion o f them covered by the private bus operators. In three years i t reached a daily demand o f 700.000 passengers or 15 percent o f the total public transportation trips.

Considering the success o f TransMilenio, which addresses most sector issues, the previous GOC administration re-negotiated a prior agreement to fund a rail based system in Cali and defined GOC’s financial commitments for about $241 mill ion dollars up to the year 2007 to develop the first phase o f a BRTS in Cali.

20

Page 29: FOR OFFICIAL ONLY - World Bankdocuments.worldbank.org/curated/en/... · Project description [one-sentence summary of each component] Re$ PAD B.3.a, Technical Annex 4 Component 1 -

When the new administration came to office in late 2002, GOC had already transferred US$120 mill ion to Bogota for the f i r s t phase o f TransMilenio and US$6 mill ion to Cali for the implementations o f the BRTS. With this background, the government decided to formalize Bogota and Cali’s arrangements into a program that will also include other large and medium sized cities in Colombia. Therefore, GOC included a fiscal envelop for the National Urban Transportation Program (NUTP) in i t s National Development Plan and a later CONPES document in 2003, further detailing the scope o f the program.

The NUTP

The overall purpose o f the NUTP i s to improve long-term sustainability, efficiency and quality o f urban transport in selected cities. The NUTP represents a concrete effort between GOC and participating cities, in which GOC wil l co-finance up to 70 percent o f the cost o f the infrastructure needed for the implementation o f integrated BRTS under a policy framework that addresses the sector issues within the limitations o f the current fiscal situation.

GOC has reserved a total fiscal envelop between 2004 and 2007 o f about US$688 million, that includes about US$500 mill ion for previously approved commitments (vigencias futuras) for Bogota and Cali, and about US$l80 for new projects in 6 candidate cities which are Pereira, Cartagena, Soacha, Bucaramanga, Barranquilla, Cali and Medellin. Currently, US$62 mill ion out o f the US$l80 mill ion have already been committed to Pereira and Cartagena through the approval o f “vigencias futuras”.

While CAF and IDB’s operations will finance GOC transfers for specific projects (Bogota’s Suba project and Cali, respectively), the proposed IBRD loan will have a broader and more flexible scope, financing the 2004 - 2008 “vigenciasfuturas” o f the GOC contributions to the NUTP. Since the implementation o f the NUTP will go beyond 2008, which i s the intended closing date o f the proposed Project, i t i s likely that the GOC will request the Bank to provide a follow on operation to continue supporting the program.

The chart summarized the cost o f the program as o f today.

21

Page 30: FOR OFFICIAL ONLY - World Bankdocuments.worldbank.org/curated/en/... · Project description [one-sentence summary of each component] Re$ PAD B.3.a, Technical Annex 4 Component 1 -

i i Participating city

/Total ,

I Completed 1999 - 2002 Bogota phase 1 + k mericas

2614.7

- Suba - NQS

Pereira Cartagena Soacha

BRTS nfra and inan cos’

500

135 400 32.7 82.0 23.3 40.7 61.1 60.0 345.0 934.9

hnicipalia

382.5

50 200 11.2 35.3

7 12.2 18.3 18.3 1 04 41.8

880.6

~

BRt -

0

0 150 21.5 1.6.7 3.3 28.5 0.0 0.0 0.0 0.0

,50.l -

GOC

IDB ___

0

0 0 0 0 0 0 0 0

200 0

200.0 -

somm

CAF

0

85 0 0 0 0 0 0 0 0 65

150.0

nents b GOC

Budget

117.5

0 0 0 0 0 0 0 0 41 0

158.5

source TBD

2008 - 2015

0

0 50 0 0

13.0 0 43 42 0

828.1

975.9

Total GOC

117.5

85.0 200.0 21.5 46.7 16.3 28.5 42.8 42.0 241 .O 893.1

1734.4

The institutional and policy frameworks:

The institutional and policy frameworks o f the NUTP have been described by two CONPES documents that have defined: i) policy goals, strategies and expected outcomes, setting a Technical Committee to monitor and evaluate execution o f the NUTP and performance o f the BRTS; ii) the responsibilities o f the key participants (Ministry o f Finance, DNP and participating cities); iii) the criteria for securing the financing o f the BRTS by the cities and GOC, and requirements for the flow o f funds; and iv) specific conditions for GOC participation, including eligibility criteria to be met by cities and BRTS. The CONPES document o f 2002 entrusts to the DNP the execution and supervision (involving participating cities) o f the preparatory studies for the design and the financial structuring o f the BRTS projects.

The CONPES documents also define the Program’s strategy as to: i) Financing infrastructure o f the BRTS in selected cities; ii) strengthening institutional capacity at local and national level in order to plan and operate urban transport systems; iii) establishing an eligibility criteria for GOC participation; iv) maximizing the impact on urban quality o f life, and social benefits; v) fostering civi l society participation; and vii) implementing follow up mechanisms.

a) Financing infrastructure of BRTS:

For GOC, the implementation o f the BRTS will be a building block to: i) Eliminate the “penny war” through a better reward system that integrates the operators into actual companies with bus ownership, rather than firms that only affiliate buses; ii) Reduce the excessive bus fleet currently operating in the main cities; iii) Operate the system on high capacity buses using low polluting technologes; iv) Increase average speed in the corridors through physical segregation o f bus lanes and general traffic, implementation o f stations and electronic fare collection systems; v) Integrate, physically, operationally

22

Page 31: FOR OFFICIAL ONLY - World Bankdocuments.worldbank.org/curated/en/... · Project description [one-sentence summary of each component] Re$ PAD B.3.a, Technical Annex 4 Component 1 -

and tariff wise, a large share o f city routes, sometimes even with buses out o f the BRTS; vi) Reorganize the existing routes to make them complementary to the new BRTS; vii) Promote a comprehensive urban development strategy, particularly in the management o f public spaces, and vii) Coordinate among local agencies.

GOC envisages that the BRTS would be privately operated and should seek the minimization o f the public expenditures. Private parties are expected to carry the cost o f the buses and i t s operation; fare collection systems; administrative expenditures o f the public agency in charge o f planning, developing and controlling the BRTS; infrastructure maintenance; reduction o f excessive bus fleet; and some components o f the infrastructure for future system expansion. All these investments will be covered through user fares, publicity, real state business or any other sources o f revenues, but not through government subsidies.

Public Funds for the infrastructure will come from both the national and local governments. The fact that both have fiscal constrains restricts the possibilities o f BRTS expansion in the short term. For that reason a bridge financing wil l be used and interest during construction wil l be considered as part o f the project cost. To structure the bridge financing, the national and the local Governments will use a budgetary mechanism to commit resources over several years called vigenciasJ&mzs. B y using this mechanism the disbursement o f public funds wi l l be programmed to occur during a period o f time that goes beyond the construction phase when all infrastructure investments will take place. GOC has defined that the Municipalities wil l be responsible to find the bridge financing, either through commercial banks or through contractors. In any case, as stated in the program, GOC funds disbursements will, be tied to the successful implementation o f the BRT system in each city. This bridge financing should have the same cost o f capital than the one that the Nation normally gets.

The funds provided by GOC should be spent only on the approved Project. The funds provided by municipalities should be 100 percent reliable and should have legal certification (gasoline tax, with destination to the BRTS approved by the city council as well as other existing funds). The development o f the Project should not jeopardize the financial situation o f the municipality; i t should follow the National regulatory framework on expenditure ceilings for municipalities and should not violate any previous Subsidiary Agreement with GOC.

GOC will not assume or guarantee any design, building or operational risk and will not cover any additional cost different to what was established in the CONPES document that approves central government participation in each project. Each municipality will establish the adjustment mechanisms in order to maintain the viability o f the Project when cost assumptions do not occur as foreseen. GOC w i l l provide technical assistance to municipalities in order to better assess project finance. N o operational subsidies will be considered for the BRTSs.

b) Requirements for GOC participation (eligibility criteria):

GOC has established several policy guidelines to define i t s participation in a given city. Criteria includes infrastructure, operational, institutional and financial requirements:

Infrastructure: i) building high capacity segregated corridors or mixed use according to the demand; ii) building adequate bus stops or stations; and iii) building integration terminals adequate to transfer between trunk line and feeder buses.

Operational: i) operation through high capacity new buses based on clean technologies; ii) inclusion o f mechanisms to reduce the bus oversupply; iii) modification andor cancellation o f existing routes in line with the design o f the system; and iv) fare integration including routes outside o f the BRTS.

23

Page 32: FOR OFFICIAL ONLY - World Bankdocuments.worldbank.org/curated/en/... · Project description [one-sentence summary of each component] Re$ PAD B.3.a, Technical Annex 4 Component 1 -

Institutional: i) private sector participation; ii) new structure o f the firms providing transport services; iii) operation and commercial risk assignment to private operators; iv) design o f legal mechanisms in order to have an autonomous, safe and independent fund management using trust funds; v) implementation o f mechanisms to incorporate land use changes in zoning plans; vi) coordination mechanisms within the local agencies; vii) use o f special procurement procedures when the multilateral finance institutions are involved; viii) information to the community throughout the process; and viii) permanent involvement o f the Technical Committee (formed by delegates o f DNP, MHCP and MT).

Financial: i) fulfill rules and regulations regarding fiscal responsibility o f local administrations; ii) preserve the fiscal responsibility status; iii) assign risks according to national rules and regulations; and iv) adopt the legal mechanisms to guarantee fare actualization (without political interference).

c) Maximization of impact on urban quality of life and social benefits:

The implementation o f the BRTS will seek to reduce accidents, improve street security, recover public spaces and increase citizen’s culture. In order to achieve this, municipalities will implement traffic measures such as improvement o f traffic lights; reorganization o f streets directions; establishment o f parking zones and schedules o f loading and unloading; building and reconstruction o f sidewalks, and restriction o f some commercial streets for pedestrian use only.

Additionally, municipalities wil l build infrastructure to facilitate the integration between the BRTS and other transportation modes such as bicycles and pedestrians. Finally, to reduce emissions GOC will promote the usage o f clean technologies as long as they don’t have a significant impact on operation cost.

Competitive bidding will be applied to allocate bus operation and fare collection contracts. Selection criteria will include economic factors (minimum 35%) as well as local experience, especially o f bus owners in an effort to mitigate eventual displacement. Mechanism o f external auditing will be applied to guarantee transparency and maximum participation o f stakeholders.

Additionally, in order to provide capital access to the current operators, GOC will promote the usage o f funds previously allocated to generate equipment replacement as part o f the equity o f the new enterprises. Finally, there will be support for programs seelung to re-integrate displaced operators to the labor market.

d) Fostering civil society participation:

The system will include surveys in order to find out if the system satisfies the users. The agencies in charge o f the BRTS will implement evaluation programs on the quality o f service, including parameters o f safety, speed and comfort. Additionally, the agencies wil l have to implement user attention offices and will have to steadily provide information regarding their activities to civil society.

e) Implementation of follow up mechanisms:

With the purpose o f keeping continuous track o f the advance o f the projects and the operation o f the systems, GOC will establish a Technical Committee. This committee w i l l be in charge of: 1) coordinating and certifying the fulfillment o f the policy requirements by the municipalities; 2) permanent tracking o f the financial situation o f the municipalities; 3) guaranteeing the follow up o f the technical agreements in each case and finally; and 4) analyzing all o f the information provided by the t rust funds and proposing measures for the right management o f the resources.

24

Page 33: FOR OFFICIAL ONLY - World Bankdocuments.worldbank.org/curated/en/... · Project description [one-sentence summary of each component] Re$ PAD B.3.a, Technical Annex 4 Component 1 -

Expected Policy Impact

GOC has included clear indicators to measure the success o f its program, these being: to reach 50 percent o f total public mode trips in participating cities; increase average speeds in the corridors (20% to 35%); 30 percent reduction in operational costs; 80 percent reduction in car accidents; 40 percent reduction in hold ups, 50 percent CO emissions reduction; between 30 percent and 45 percent reduction in Nox and 35 percent reduction in organic components. Additional positive impacts are: creation o f 146.000 new employments (mainly during construction), recovery o f public spaces; institutional improvements in the transport sector; the generation o f new business opportunities and real state activities, and finally, generation o f new sources o f funds for the municipalities.

To guarantee this impact, GOC has foreseen that a Technical Committee w i l l be in charge o f monitoring the implementation o f the BRTS and the overall progress o f the NUTP.

25

Page 34: FOR OFFICIAL ONLY - World Bankdocuments.worldbank.org/curated/en/... · Project description [one-sentence summary of each component] Re$ PAD B.3.a, Technical Annex 4 Component 1 -

Annex 2: M a j o r Related Projects Financed by the Bank and/or other Agencies C O L O M B I A : CO Integrated Mass Transit Systems

The proposed Project aims at improving long-term sustainability, efficiency and quality o f urban transport in selected cities by assisting GOC in the implementation o f the National Urban Transport Program. The Bogota Urban Transport Project (Loan 4021-C0), which financed part o f the construction o f the f i rs t phase o f TransMilenio, was closed and rated highly satisfactory in August 2002. This Project created the platform for the National Urban Transport Project, showing the possibility o f implementing cost-effective urban transit systems and to reform the existing inefficient public urban transport structure. The Bogota Urban Transport Project will serve as a successful experience to be implemented in other selected cities.

Bogoth Urban Transport Project facilitated the access o f public transport to areas containing low-income population by financing design, work and supervision o f access roads to those neighborhoods. In connection, Bogota Urban Services Project (Loan 7 162-CO) wil l ensure to provide efficient delivery o f transport services throughout the city o f Bogota by constructing bus-lanes, upgrading and rehabilitating feeder roads to connect marginal neighborhood, “barrios, ” to the trunk system. The Project will provide institutional strengthening by continuing the support provided initially by Bogota Urban Transport Project, to the Borrower’s institutions in charge o f planning, managing and maintaining transport infrastructure, that could also be replicated through the proposed Project.

Conceptual designs and project financial, legal and operational structuring o f the BRTS are being financed by the Regulatory Reform Technical Assistance Project (Loan 4138-CO). The loan i s also providing fundamental technical support for the preparation o f the National Urban Transport Program.

26

Page 35: FOR OFFICIAL ONLY - World Bankdocuments.worldbank.org/curated/en/... · Project description [one-sentence summary of each component] Re$ PAD B.3.a, Technical Annex 4 Component 1 -

Annex 3: Results Framework and Monitoring

COLOMBIA: CO Integrated Mass Transit Systems

Hierarchy of Objectives Key Performance Data Collection Strategy

Sector-related CAS Goal: Sector Indicators: Sector/ country reports: (from Goal to Bank Mission] Indicators Critical Assumptions

Achieve rapid and sustainable

Results Framework

The new urban transport system increases urban mobility, contributing to urbar productivity

The new urban transport scheme is accepted by the locz authorities, municipal council: the transport operators and other interest groups

L o w income people become regular users o f the BRTS

All the participating agencies have the sufficient capacities i order to sustain and extend tht objectives o f the project

- Strategy for and development Creation o f new operating o f the private sector

Supervision Mission Reports Reports o f local agencies f i rms o f the BRTS

Share the fruits o f growth: Poor neighborhoods covered user surveys Inclusion and enhancement o f by the BRTS capacities (empowerment)

Supervision Mission (in the mid term and by project closure)

Building o f an efficient, responsible and transparent government

Implementation o f operational Reports of local agencies and administrative manuals

Contracting based on transparent and open procedures

Global Objective: nprove the efficiency, quality nd sustainability o f the urban msport in the long term irough the improvement o f the iobility and accessibility of the oorest urban areas in order to nprove the urban productivity nd the quality o f l i f e in the ities

Output from each . Component:

Implementing agencies in ondition to provide service

Outcome / Impact Indicators: Project reports: (from Objective to Goal) 3 BRTS implemented in the Supervision Mission reports participating cities Local agencies reports development o f BRTS a

User surveys strategy for urban

Local governments find the

development. Citizens assume BRTS project: as theirs and use the massive transport systems in an anticipated way Private operators o f the BRTS participate in the new urban transport strategies BRTS are efficient, self sustainable and do not require operational subsidies

Output Indicators: Project reports: (from Outputs to Objective)

System occupation per square Periodic monitoring reports Implementing agencies have meter below a given threshold Reports o f local agencies. User the capacity to regulate and

27

Page 36: FOR OFFICIAL ONLY - World Bankdocuments.worldbank.org/curated/en/... · Project description [one-sentence summary of each component] Re$ PAD B.3.a, Technical Annex 4 Component 1 -

rocedures and processes) P Ihile maintaining no subsidies

ercentage o f people rating the ystem as being better than the nor system

icreased use o f public 'ansport services by the poor wo poorest quintiles) along le planned corridors, with :spect to the base l ine without i e mass transit system, both in bsolute (number o f passenger) nd relative terms (as ercentage o f total number o f assenger).

.eduction in generalized door door travel cost (fare, time)

) users before and after the roject

Inputs: (budget for each component)

reater accessibility to the pool I"

Surveys

Periodic monitoring reports Users surveys Reports by local agencies.

Periodic monitoring reports Users surveys Reports by local agencies.

Project reports:

I

Supervision Mission reports Periodic monitoring reports Local agencies reports

. BRTS under operation

plementation o f urban

. BRTS Development

59.2M (IBRD 247.7 M) Supervision Mission reports Periodic monitoring reports Local agencies reports

JS $2.3 M

tntrol the provision o f the :wice.

valuation, monitoring and semination systems itablished

he tariff i s kept on an xeptable level.

he BRTS are affordable for IW income users

he business arrangement and Le project implementation is mvenient for all the parties bperators obtain financing o f quipment

(from Components to Outputs)

'articipation o f different gencies linked to urban slanning, environment and ransport

'echnical assistance to the ities

'olitical w i l l heation o f the BRTS mplementation agency ;inancing o f the infi-astructurc

28

Page 37: FOR OFFICIAL ONLY - World Bankdocuments.worldbank.org/curated/en/... · Project description [one-sentence summary of each component] Re$ PAD B.3.a, Technical Annex 4 Component 1 -

B 2 5 b

6 ? 2 b 5

h h - K 2 v 4

d

n x m K 8 w

d5

r-

m"

W

8 m"

r-

8 m"

r-

8 m"

Page 38: FOR OFFICIAL ONLY - World Bankdocuments.worldbank.org/curated/en/... · Project description [one-sentence summary of each component] Re$ PAD B.3.a, Technical Annex 4 Component 1 -

h - h i m ?, b G d

V

t-

3 5 &

t-

e 5 c2

h

3 h

a 0 h

e 4

V

b

0 m

Page 39: FOR OFFICIAL ONLY - World Bankdocuments.worldbank.org/curated/en/... · Project description [one-sentence summary of each component] Re$ PAD B.3.a, Technical Annex 4 Component 1 -

Project Monitoring and Evaluation

The Project wil l be monitored through Key Performance Indicators, General Summary Indicators and Detailed System Follow-up Reports. Key Performance Indicators are intended to measure the most important results expected from the NUTP. General Summary Indicators are intended to show a synopsis o f relevant project characteristics and outcomes. Detailed System Follow-up reports are comprehensive characterizations o f the mass rapid transit systems, with a special focus on their impacts.

Key Performance Indicators

i) Improved mobility and quality o f public transport services in strategies mass transit corridors as measured by:

a) Reduction in total travel time cost from origin and destination:

To measure this, the average generalized cost for a sample o f origins and destinations within the area o f influence o f the Project wi l l be measured with and without Project. A field study will be conducted measuring the travel time and travel cost for a sample o f origins and destinations. This sample should be representative (around 300 0-D pairs) o f the travel patterns according to the origin and destination available information. Generalized cost includes walkmg, waiting, in-vehicle and transfer times and out o f pocket cost. Times are transformed into cost units using value o f time (e.g. US$ 0.75/hour for all trips purposes and types o f users, in order not to have any bias derived from higher income population using the mass transit system).

Estimated cost per measurement i s US$3,000. I t i s expected to have four measurements per city (1 before and 3 yearly surveys after implementation). If 5 cities become part o f the program total monitoring cost for this performance indicator will be US$60,000.

The Project will be considered successful in t h i s dimension if the generalized cost with Project i s at least 10 percent less than the generalized cost without Project.

b) Percentage o f people rating the system as being better than the previous system:

To monitor this indicator user surveys will be applied to mass transit system users asking whether or not the system i s better than the traditional public transportation service. A representative sample will consist in about 2,000 on board surveys categorized by income and origin (north, center, and south) applied during the morning peak.

Estimated cost per survey i s US$lO,OOO. I t i s expected to have four measurements per city (1 before and 3 yearly surveys after implementation). If 5 cities become part o f the program total monitoring cost for this performance indicator will be US$200,000.

The system wil l be considered successful in this dimension if the percentage o f people rating the system as being better than traditional service i s above 80 percent.

31

Page 40: FOR OFFICIAL ONLY - World Bankdocuments.worldbank.org/curated/en/... · Project description [one-sentence summary of each component] Re$ PAD B.3.a, Technical Annex 4 Component 1 -

ii) Improved accessibility to low income population as noted by:

a) Increased use by the poor (two poorest quintiles) o f public transport services along the area o f influence o f the planned corridors, with respect to the base line without the mass transit system, both in absolute (number o f passenger) and relative terms (as percentage o f total number o f passengers).

To measure this, the total number o f people from strata 1 and 2 (average income US$8 per day) using public transport in the area o f influence o f the mass transit system wil l be measured with and without the Project. This number will be divided by the total number o f public transport riders.

These numbers will be the result o f a household survey conducted in the area o f influence o f the mass transit system conducted before and after system implementation. The survey will determine the number o f trips per family in all modes (wallung, biking, public transport, other) and will be applied to households in the travel zones within 500 meters o f a system station or feeder l ine bus stop according to the transport demand models used in each city to estimate ridership.

At least 2,000 surveys will be applied in each city and each period, divided in three categories: high income (6 and 5), middle income (4 and 3) , low income (2 and 1) in three different zones o f the city (north, center and south). Extrapolation o f the survey will allow finding the total number o f trips in public transport and the total number o f trips by population in strata 1 and 2. The indicator will be trips by strata 1 and 2 divided by total trips in public transport. Estimated cost per survey i s US $20,000. It i s expected to have four measurements per city (1 before and 3 yearly surveys after implementation). If 5 cities become part o f the program total monitoring cost for this performance indicator will be U S $400,000.

The Project will be considered successful in this dimension if the percentage with Project i s higher than the percentage without Project.

iii) Enhanced Institutional capacity for urban transport policy formulation and system development, measured by:

a) At the local level: System occupation and sustainability.

To measure this, the total number o f passengers in the heaviest loaded section and the peak hour will be estimated (using visual occupation surveys andor data from the fare collection system if applicable). The number o f seated passengers wil l be discounted and the resulting figure will be divided by the area available for standees, this i s nuinber o f passengers per unit area (square meter). The number should be below 7 for Bogota (NQS) and 6 for other cities.

The visual occupation survey will be performed once a year by consultants retained by the National Planning Department. Estimated cost per measurement i s US$400 (3 hours boarding-alighting, 3 hours visual occupation, plus supervision and data analysis). It i s expected to have three measurements per c i ty (3 yearly field studies after implementation). If 5 cities become part o f the program, total monitoring cost for this indicator wil l be US$ 2,000. I t i s preferable to have an independent field study rather than having information provided by the monitored agencies.

Sustainability wi l l be measured by the amount o f operational subsidies paid by the cities to the private providers. I t i s expected, according to the national policy that there will be no operational subsidy. Hence the system will be considered successful if it has an occupation below a given threshold and i t does not have operational subsidies.

32

Page 41: FOR OFFICIAL ONLY - World Bankdocuments.worldbank.org/curated/en/... · Project description [one-sentence summary of each component] Re$ PAD B.3.a, Technical Annex 4 Component 1 -

b) At the National level: At least three systems are implemented with assistance o f this loan under NUTP

General Summary Indicators

Will be reported by the implementation agencies on a yearly basis (August). The purpose o f these indicators i s to provide general information about the characteristics and main impacts o f the BRT systems. I t i s important to have planning targets for each one o f the indicators, hence a report o f the expected outcomes and impacts will be provided by the implementing agencies to the NUTP Committee before August 2004 for each one o f the eligible

Type of Indicator Scope, physical goals

Impact, operational efficiency o f the transport system (operational savings for the community as a whole proxy)

Impact, change in commercial speed for public transport in the trunk l ine corridors (user travel time savings proxy) Impact, operational efficiency

Impact, private vehicle users attraction to public transit

Impact, system coverage in low income areas

Impact, generation o f employment

Indicator Length o f trunk lines

Length feeder l ines Number o f stations and terminals Number o f trunk l ine buses by type Number o f feeder buses by type Number o f substituted buses Trunk bus substitution factor (obsolete busesltrunk buses) Feeder bus substitution factor (obsolete buseslfeeder buses) Change in commercial speed in the trunk l ine corridors (commercial speed without Project minus commercial speed with Project)

Passenger per kilometer index (total number o f paid passengers divided by the number o f kilometers served) Percentage o f users that report having access to private vehicle that use the mass transit system Line kilometers o f trunk and feeder l ines in areas classed as stratum 1 and 2 Percent o f total system mileage in stratum 1 and 2 (kilometers in stratum 1 and 2 divided by total kilometers o f the system -trunk and feeder) Employment during construction

Net jobs generated for system operation (permanent jobs resulting fiom system implementation -drivers, fare collector, supervisors, maintenance, cleaning, security, etc., minus the jobs displaced -people

Measurement (units) Total Kilometers Lane Kilometers Kilometers Units Units Units Units Factor greater than 1

Factor greater than 1

kdhour

%

km

%

Number o f Jobs (full time employment) during a year Number o f Permanent Jobs (full time employment)

operating scratch vehicles)

Detailed System Planning and Follow-up Reports

The development o f bus rapid transit system i s an evolutionary process that currently has l imited information as long as only few projects have been completed. Despite the fact that bus priority schemes have been in place for many years in several cities, especially in Brazil, acknowledging that buses are a real l o w cost and high impact alternative i s a recent trend. Hence, i t i s very important to get and report information that makes i t easier to design bus rapid transit systems and make comparison with other mass transit alternatives. Additionally i t i s very important to have comparisons between planning and actual implementation, to be able to identify areas that may need strengthening. A l i s t o f ideal elements that are considered relevant at the Project and Implementation stages i s

33

Page 42: FOR OFFICIAL ONLY - World Bankdocuments.worldbank.org/curated/en/... · Project description [one-sentence summary of each component] Re$ PAD B.3.a, Technical Annex 4 Component 1 -

presented. Provided that resources are available this information would be gathered and reported by the local agencies in charge o f system development (TRANSMILENIO S.A., MEGABUS S.A., TRANSCARBE S.A., other) on a yearly basis and could be supervised by the GOC through NUTP Committee with the support o f the National Planning Department.

A. General Characteristics o f the Urban Area (overall information useful for understanding the urban framework where the system i s implemented)

1. City/Metropolitan Area

2. Total Population by Socioeconomic Strata

3. Urban Area (km2)

4. Density (People/km2)

5.

6.

Total motorized trips and total public transport trips

Implementation phase: Initial, Expansion o f existing system f i rs t implemented in <> year

B. System Description (very detailed characterization o f the system including infrastructure and equipment)

7. Infrastructure

a.

b.

C.

d.

e.

f.

g.

h.

1.

j.

Exclusive single carriageway (line km, width, lane-km)

Exclusive double carriageway (line km, width, lane-km)

Priority (non-exclusive) carriageway (line km, width, lane-km)

Number o f single stations -no integration with feeders (length, number o f buses able to dock simultaneously, width -passenger area; by station type)

Bus overtaking at stations (number o f single with bus overtaking over total number o f single stations)

Number o f intermediate stations with integration with feeder buses (total area, number o f platforms, platform length for trunk buses, platform length for feeder buses, mechanism to transfer -paid area, non paid with virtual integration -l ist each station)

Number o f terminal stations with integration with feeder and regional buses (total area, number o f platforms, platform length for trunk buses, platform length for feeder buses, mechanism to transfer -direct, overpass, tunnel -l ist each station)

Number o f bus depots (total area, number o f parking spaces by bus type - l is t each depot)

Feeder services length (line km and lane-km, number o f bus stops, bus stops spacing)

Land acquisition: number and total area o f plots acquired for infrastructure development for the mass transit system

8. Infrastructure costs

* a. Trunk corridors (US$2003, US$2003/lane-km)

b. Single Stations (US$ 2003, US$2003/station)

c. Intermediate and Terminal Integration Stations (US$ 2003, US$2003/integration station)

d. Depots infrastructure (US$2003, US$2003/depot, US$2003/parlung space)

e. Land acquisition (US$ 2003, US$/m2)

34

Page 43: FOR OFFICIAL ONLY - World Bankdocuments.worldbank.org/curated/en/... · Project description [one-sentence summary of each component] Re$ PAD B.3.a, Technical Annex 4 Component 1 -

f. Other costs - Project preparation, designs, etc. (US$ 2003)

g. Total costs (US$ 2003, US$/km)

9. Bus Fleet

a, Number o f trunk buses by type (articulated, large, conventional)

b. Number o f feeder buses by type (large, conventional, small, micro)

c. Substitution factor for trunk and feeder buses, number o f substituted buses

d. Estimated cost trunk line buses (includes substitution)

e. Estimated cost feeder buses (includes substitution and used buses)

10. Fare collection system

a.

b.

C.

d.

System type (manual, electronic with or without contact)

Number o f entry points to the system, number o f selling booths (inside and outside the stations), number o f one direction turnstiles, number o f two direction turnstiles, number o f turnstiles for people with disabilities -wheelchair access)

Estimated volume o f payment media (tickets, cards) by type

Estimated cost o f implementation o f fare collection system

1 1. Control system

a. System type (voice, data, combined, with or without automatic vehicle location, with or without advanced programming and real time control -operation aid system)

b. Workplaces in control centre (buses por puesto de trabajo)

c. Workplaces for on road or terminal control

d. Estimated control center cost -hardware and software plus locale adaptation and communications (US$2003, US$2003/bus, US$2003/passenger)

C. Implementation Mechanisms (description o f the operations contractual scheme, number o f contracts and details o f those contracts)

12. Private participation

a. Concession contracts for operations (average estimated investment per contract, length, payment mechanism -per kilometer, per passenger, share o f total income; segregate between operation (trunk, feeder, fare collection) and infrastructure contracts)

b. Acquisition and outsourcing contracts (list, cost)

c. Number o f shareholders o f concession contracts (total and small bus owners)

D. Outputs (detailed characteristics o f the planned and actual operations)

13. System

a.

b.

C.

Performance

Total demand (average passengers/workday, passengedyear)

Feeder service (average passengers/workday, passenger/year, % o f total)

Regional buses -if applicable ((average passengers/workday, passengedyear, % o f total)

35

Page 44: FOR OFFICIAL ONLY - World Bankdocuments.worldbank.org/curated/en/... · Project description [one-sentence summary of each component] Re$ PAD B.3.a, Technical Annex 4 Component 1 -

d.

e.

f.

g. h.

i.

J. k. 1.

m.

n.

0.

P.

9. r.

Bicycle integration (average passengersiworkday , passengeriyear, % o f total)

Capacity according to bus operational planning (passengerihourldirection maximum and average workday]

Usage according to frequency and occupation studies (passenger/hour/direction maximum observed and average workday observed)

Number o f trunk services (routes) by type o f day (workday, Saturday, Sunday and Holiday)

Total kilometers planned by type o f day (workday, Saturday, Sunday and Holiday)

Average hlometers per trunk bus (workday, year)

Number o f feeder services (routes) by type o f day (workday, Saturday, Sunday and Holiday)

Average lalometers per feeder bus (workday, year)

Coverage area (area within 500 m o f trunk stations and feeder bus stops)

Commercial speed trunk services (by type o f service local, express)

Trunk line frequency (by type o f service, peak, off-peak)

Commercial speed feeder services

Feeder l ine frequencies (by service, peak, of€-peak)

Average travel distance per passenger (integrated, non integrated)

Average time spent per passenger (integrated, non integrated)

E. Results (Performance o f the system in terms o f planned and actual reductions in travel time, travel cost, transit provision cost, accidents, pollution, safety, accessibility, usage by poor population, generation o f employment, modal shift and modal integration, and urban development; most o f the system impacts are included in the socio-economic evaluation, i t i s worthwhile to confront expected with actual results)

14. Impacts

a. Travel time (estimation o f the average minutes saved per passenger as a result o f system implementation, total and divided by socio-economic strata; estimation o f average minutes saved for users o f mixed traffic lanes)

b. Travel cost (estimation o f the average cost for passengers and users o f mixed traffic lanes, total and divided by socio-economic strata)

Transit provision cost (estimation o f the average transit provision cost savings resulting from scratching vehicles and implementing efficient operations)

d. Accidents (number o f accidents with fatalities, with injuries, simple crashes, number o f fatalities, number o f injured; by year, before and alter system implementation)

e. Pollution (measurements CO, NOx, COV on average in workday, before and alter system implementation in monitoring stations located close to the mass transit system; estimates o f net emissions with and without system implementation)

system with and without system implementation)

g. Attention to vulnerable population (preferably through user surveys in the traditional and mass transit public transport systems)

c.

f. ' Personal safety (muggings and homicides reported in the area o f influence o f the mass transit

i. Users with disabilities (motor, visual, hearing impaired; wheel chairs)

36

Page 45: FOR OFFICIAL ONLY - World Bankdocuments.worldbank.org/curated/en/... · Project description [one-sentence summary of each component] Re$ PAD B.3.a, Technical Annex 4 Component 1 -

ii. Users above 55 years

iii. Users below 15 years

iv. Users belonging to strata 1 and 2

h. Coverage in low income areas

i. Kilometers o f trunk line and feeder lines in areas classed as strata 1 and 2 and as a proportion o f the system total

ii. Coverage (area o f influence 500m) in areas classed as strata 1 and 2, and as a proportion o f the system total

111. Average travel time for population in strata 1 and 2

iv. Average travel cost for population in strata 1 and 2

v. Estimated cost savings for population in strata 1 and 2 (total and average per passenger)

...

f. Generation o f employment

a.2.1

a.2.2

a.2.3

Number o f construction employments (temporary)

Number o f permanent employments (drivers, fare collectors, maintenance, supervision, guides, etc.)

Number o f estimated displaced employments resulting from system implementation

i. Modal shift and modal integration

i. Users leaving their own vehicle and using the mass transit system (total workday, percent o f total users)

ii. Users accessing by foot (total workday, percent o f total users)

iii. Users accessing by bicycle (total workday, percent o f total users)

iv. Users accessing by individual public transport -taxi (total workday, percent o f total users)

v. Users accessing by public transportation, different than the mass transit system (total workday, percent o f total users)

j. Urban Development

i. Real state development projects in the area o f influence o f the mass transit system (census along the system)

ii. Land value changes along the mass transit system corridors (according to real state chamber -Lonja de Propiedad Raiz)

37

Page 46: FOR OFFICIAL ONLY - World Bankdocuments.worldbank.org/curated/en/... · Project description [one-sentence summary of each component] Re$ PAD B.3.a, Technical Annex 4 Component 1 -

Annex 4: Detailed Project Description COLOMBIA: CO Integrated Mass Transit Systems

The Project wil l finance GOC’s participation in the development o f BRTS in eligible cities. The proposed public transport system based on BRT technology i s cost effective and provides a service o f similar quality to other transport systems such as light trains or metros. However, compared to these systems, the costs o f BRTS are significantly lower. The BRTS to be implemented in the cities consists o f a trunk-and- feeder bus system, in which the trunk lines will operate on segregated busways according to the conceptual design o f each specific city (this infrastructure cannot be used by any other vehicle). In general, in Trunk lines, diesel/CNG buses with a capacity o f 160 passengers will be operated (Cartagena and Barranquilla will have gas buses), and conventional buses w i l l be used in feeder routes. Passengers wil l pay on the entry to the stations (stops), terminals or on feeder buses. The usage o f a “closed system” wil l allow interchange between trunk buses and feeders with the payment o f a single fare. Feeder buses wil l serve terminals located at the ends o f the busways and selected stations along the trunk lines.

Under the proposed Project, these issues are going to be addressed through the implementation o f operational and financial schemes aimed to create a real public-private partnership in which each party assumes responsibilities and risks. In this sense, the proposed scheme anticipates that the infrastructure (bus corridors, stations, terminals, accesses, etc) w i l l be financed with public funds, and the rolling stock (buses) and fare collection will be provided by the private sector. The ratio o f public-private initial financing would be around 65%-35%. BRTS operation will be provided by the private sector worhng under strict controls included in the concession contracts. The bus operators will be comprised o f local transporters associated with investors, who will own and operate the buses, and hire the drivers and maintenance personnel- for both, trunk and feeder routes. The system will be awarded through concession contracts following competitive and open bidding processes. Payments to operators under the contract will be related to route hlometers served by each trunk line bus service operator. The operation costs will be covered through the fares, implying that there will be no subsidies for the operation o f the systems. Bus operators (private sector) will be assuming full commercial risk. The rules and regulations between the two parties are going to be clearly established in a contract stating the responsibilities and obligations o f each one. The participation o f both public and private sector guarantees the financing o f the systems and makes its implementation sustainable.

BRTS should also provide access to all users in a safe way. Passenger access to and from bus stations will vary depending on the location o f the stations and the availability o f space. However, passengers will only be allowed to enter the system on specific points safely away from cars. Disabled people will have special devices to allow them to use the system.

While the scope will vary depending on local conditions, implementing BRTS under the Project would entail: i) definition o f a new regulatory framework; ii) establishment o f new private operation enterprises, susceptible o f being controlled and regulated by new strong and capable local authorities; iii) operational savings through the reduction o f the oversupply, that allow private investors to do the acquisition o f a high capacity modern bus fleet finance through tariffs; and iv) infrastructure financed with public funds coming from the GOC and the municipalities.

Project components

A detailed description o f Project’s components i s the following:

Project Component 1 : Implementation Capacity Building - US$2.3 mill ion

38

Page 47: FOR OFFICIAL ONLY - World Bankdocuments.worldbank.org/curated/en/... · Project description [one-sentence summary of each component] Re$ PAD B.3.a, Technical Annex 4 Component 1 -

This component wil l provide technical assistance and policy advise to GOC and participating cities and i s aimed to provide support for the implementation and beginning o f the operation, strengthen GOC agencies in charge o f promoting mass transit projects, and to the cities in tahng advantages o f the urban, environmental and social benefits coming from the implementation o f an organized mass transit system.

The T A component has to be cost-effective, tahng advantage o f the economies o f scale generates by the fact that these transport systems w i l l be implemented almost at the same time in the different selected cities. For example, the same framework for all the projects could be established in the definition o f the organizational structure and manual o f functions, and the provision o f the software to program and supervise the operation o f the system. Also, sharing experiences between cities in workshops will be another strategy to develop technical capacity.

Another strategy o f this component i s to make use o f the experience o f TransMilenio in Bogota and replicate this experience, tahng into account the specificities o f each city, to the other BRTS projects. Twining arrangement with TransMilenio S.A. will be done to replicate procedures and to define the most suitable organization for the management and control o f the BRTS in each city.

Among the different levels, the T A component wi l l include the following:

At the National level this component wi l l develop the capacity o f the DNP and Ministry o f Transport to convert them into advisory unit o f the cities in the implementation o f mass transit systems. It w i l l also ensure the compliance with the Subsidiary Agreements signed by the GOC and the participating cities and the fulfillment o f the objectives. The tasks wi l l be the: (i) definition o f a national urban transport institutional map; (ii) formulation o f a sector policy and the definition o f operational, regulatory, institutional, environmental, social and road safety strategies within the urban transport and urban development context; (iii) creation o f a data collection system o f the operation o f the BRTS; (iv) monitoring o f the Subsidiary Agreements with the municipalities; (v) evaluation o f BRTS in other cities, improvement o f traffic management and the institutional strengthening o f local authorities, including the concept design, and the financial and technical structuring o f BRTS in new selected cities.

At the Local level, the component seeks to improve the institutional capacity o f the participating cities to ensure adequate implementation o f the BRTS by supporting the creation andor institutional strengthening o f the Project’s implementing agencies (BRTSs Agencies), including technical support to the these agencies for the decision-making process and follow up o f the implementation o f the transport system. For this sub-component the twining arrangement with TransMilenio S.A.) could be a very cost-effective strategy. The tasks w i l l be: (i) transport planning; (ii) supervision o f the construction o f infrastructure; (iii) legal advisory services in structuring the concession contracts for the operation; (iv) financial aspects o f the concessions contracts; and (v) support in the negotiations with the operators.

To the local transit authority technical assistance will be given for the restructuring o f the existing public transport route system in each city. It will include also the capacity development for the successful beginning o f the operation o f the new BRTS. This sub-component will take advantage o f the economy o f scale coming from the simultaneity o f the implementation o f the BRTS and by contracting consultants whose products wil l be useful for all the cities. The tasks will be: (i) definition o f the organizational structure and manual o f functions; (ii) preparation o f administrative procedures manual; (iii) definition o f the regulation o f the operation; (iv) establishment o f software for the supervision o f the operation; (v) impact mitigation to operators; and (vi) staff training

At the Local level, greater technical and operational capabilities w i l l be developed by the cities to implement urban development and transport strategies in areas such as land use developments, road safety, traffic management, and environmental and social management. The development o f a Strategic

39

Page 48: FOR OFFICIAL ONLY - World Bankdocuments.worldbank.org/curated/en/... · Project description [one-sentence summary of each component] Re$ PAD B.3.a, Technical Annex 4 Component 1 -

Environmental Assessment and the identification o f possible projects that can maximize the urban impact of the proposed corridors will also be included. The tasks will be: (i) definition o f a framework for strategic environmental assessment; (ii) identification o f opportunities for urban improvement throughout the proposed corridors; and (iii) development o f road safety initiatives with the support o f Fondo de Prevencidn Vial.

Component 2- B R T S Development US$459.2 million (IBRD US$247.7 million): This major component wil l support the development and implementation o f BRTS and feeder routes in selected medium and large-sized cities according with the eligibility conditions, i t i s estimated that approximately 77 km o f segregated corridors will be built in the participating cities. Candidate cities being targeted for the Project include Pereira (17 km), Barranquilla (10 km), Cartagena (12 km), Soacha (5 km), Bucaramanga (9 km), Medellin (9 km), and the NQS-Corridor o f the Bogota TransMilenio BRTS (15 km).

With the exception o f the NQS-Corridor o f the Bogota TransMileiiio BRTS, in which the loan will finance exclusively five construction contracts7 according to the OPRC waiver, for the other BRTS, the loan will finance GOC participation including: construction o f segregated busways, repaving o f mixed- traffic lanes adjacent to the new busways, bus stations and terminals, control center to monitor and direct operations on the busways, supervision o f the construction contracts, paving and other improvement o f feeder roads.

’ Contract # lo5 signed with Sociedad de Futuras Concesiones Urbanas S.A.; Contract # lo6 signed with Sociedad Concesionaria Metrodistrito S A; Contract # 179 singed with Consorcio Troncal NQS Sur; Contract # 180 signed with TransMilenioNQS Sur S.A. and Contract # 242 signed with TransMilenio del Sur S.A.

40

Page 49: FOR OFFICIAL ONLY - World Bankdocuments.worldbank.org/curated/en/... · Project description [one-sentence summary of each component] Re$ PAD B.3.a, Technical Annex 4 Component 1 -

Annex 5: Project Costs COLOMBIA: CO Integrated Mass Transit Systems

Total Project Cost By Component and/or

Activity

Local Foreign U S $million U S $million U S $million

1. Implementing Capacity 1.68 0.62 2.30 Building 2. BRTS Development - Bogotii 207.9 59.7 267.6 - Pereira 15.5 4.4 19.9 - Cartagena 44.1 12.7 56.8 - Other Cities 37.2 10.7 47.8 Total Baseline Cost 306.4 88.1 394.4 Physical Contingencies 19.8 5.6 25.4 Price Contingencies 32.4 9.3 41.7 Total Project Costs 358.6 103.0 461.5 Front-end Fee 0.0 0.0 2.5 Total Financing Required 358.6 103.0 464.0

Total U S % of Bank $million financing

Project Cost B y Bank Counterpart

Activity $million US$million Component and/or Financing US funds

1. Implementing Capacity 2.3 0.0 2.3 1 .o Building 2. BRTS Development - Bogota 150.0 163.0 3 13.0 0.4 - Pereira 16.4 6.9 23.1 0.7 - Cartagena 45.8 20.7 66.5 0.7 - Other Cities 35.5 21.2 56.7 0.6 Total Baseline Cost 250.0 21 1.8 461.5 0.5 Front-end Fee 0.0 2.5 2.5 1 .o Total Financing Required 250.0 214.3 464.0 0.5

41

Page 50: FOR OFFICIAL ONLY - World Bankdocuments.worldbank.org/curated/en/... · Project description [one-sentence summary of each component] Re$ PAD B.3.a, Technical Annex 4 Component 1 -

Annex 6: Implementation Arrangements COLOMBIA: CO Integrated Mass Transit Systems

Building on legislation* past in 1996, two CONPES documents approved in 2002 and 2003 have established the policy and institutional framework for the NUTP. These policy documents: i) defines policy goals, strategies and expected outcomes; ii) sets a Technical Committee to monitor and evaluate execution o f the NUTP and performance o f the BRTS; iii) creates the capacity building program; and iv) establishes the criteria for securing the financing for o f the BRTS by the cities and the GOC.

For a given city, the implementation arrangements begn with the preparation o f the conceptual design o f each Project (including technical, urban, environmental and social aspects, the evaluation o f the financial capacity o f the municipality, and the institutional assessment o f the local participating entities) and the verification o f technical and financial eligibility conditions. After this initial identification stage i s satisfied, detailed designs and project structuring begin (operational, financial and technical aspects o f the system). The CONPES document o f 2002 entrusts to DNP the execution and supervision (involving participating cities) o f the preparatory studies for design and financial structuring o f the BRTS projects. When detailed information becomes available, the scope and financial requirements o f the project are defined and the appraisal o f the Project i s submitted for approval to the Government. During this phase, after city council approval, the municipalities will create through “escritura publica” the implementing agency in charge o f planning control and developing o f the BRTS.

A CONPES document, issued by GOC for each participating city, will detail the specific conditions and arrangements for BRTS intervention in that particular city. This document will provide the basis for the Subsidiary Agreement to be signed by GOC, through the Ministry o f Finance and the city. I t i s through the Subsidiary Agreement that the scope o f the intervention, the financial structure and the obligations o f the respective parties are formally established. In particular, the agreement: i) assigns overall responsibility for undertaking and financing any potential cost overrun and/or operational deficit o f the BRTS to the participating city; ii) defines the schedule o f GOC financial commitments by year, previously approved by CONFIS and recorded as future budgetary commitments (vigencius futuras) for proper fiscal accounting; iii) instructs the city to budget the funds to cover any cost overrun once they are identified; iv) establishes a t rust fund to managed both GOC and city contributions for infrastructure; v) mandates the signing o f a contract between the GOC and the city, in which the city gives control o f the Board o f Directors o f the BRTS agency to the GOC during the time slice o f the contributions; and vi) makes mandatory use o f fiduciary procedures o f the Multilateral Organizations involved in the Project.

Once all these conditions are met, GOC will request the Bank to include the respective participating city BRTS to be finance by the loan, following the procedures stated in the Operational Manual (see Annex 6). Prior to requesting the Bank to finance a BRTS, the Borrower through DNP (later MOT) w i l l submit to the Bank for review:

(a) satisfactory evidence that the benefited city and BRTS have met the conditions for eligibility spelled out in the Project Operational Manual. These conditions include: (i) the Borrower, through DNP, has furnished to the Bank the economic analysis o f the proposed BRTS with an economic rate o f return greater than 12percent, and satisfactory environmental management (EMP) and resettlement action (RAP) plans prepared in line with the respective frameworks agreed upon with the Bank; (ii) the participating city, through i t s Council, has approved the BRTS in i t s Plan de Ordenamiento Territorial and the municipal development plan, and has issued the decrees/accords creating the BRTS agency and earmarking local funds from gasoline surcharges or other sources sufficient to cover the financial plan

* Law 86 1989 reformed by Law 3 10 1996 allows the GOC to co-finance infrastructure for mass transit systems in Colombian cities

42

Page 51: FOR OFFICIAL ONLY - World Bankdocuments.worldbank.org/curated/en/... · Project description [one-sentence summary of each component] Re$ PAD B.3.a, Technical Annex 4 Component 1 -

agreed with GOC; (iii) the participating city and the Borrower have signed a Subsidiary Agreement satisfactory to the Bank, establishing among other, the co-financing, fiduciary, safeguard and reporting arrangements for implementation and monitoring o f the BRTS; (iv) the Bank has satisfactorily appraised the capacity o f the municipal agencies involved to undertake procurement and financial management in line with the requirements o f the Project Operational Manual. b) for consecutive expenditures, certification that the parties are fulfilling their obligations under the co-financing agreement.

The current status o f BRTS schemes to be supported by the Bank project i s as follows: implementation o f the BRTS in Bogotk (TransMilenio NQS corridor) i s undeiway; the Subsidiary Agreement o f the planned intervention in Pereira and Cartagena have been signed; and preparatory studies for planned interventions in Soacha, Barranquilla, Bucaramanga and Medellin are well advanced.

Executing ugencies DNP functioning as the Technical Secretariat o f the Technical Committee, w i l l initially have overall responsibility for the execution o f the Project, will provide technical support to the NUTP and will be responsible for monitoring and evaluating program implementation. The other members o f the Technical Committee are the Ministry o f Finance (MHCP), in charge o f financial management o f resources, and the Ministry o f Transport (MOT), which has responsibility for the sector. During negotiations GOC informed the Bank that it has been decided to pass the responsibility o f the execution o f the Project to the Ministry o f Transport (MOT) in the short term. Therefore, upon compliance in a manner satisfactory to the Bank, with the conditions set forth in Annex 1 to the Implementation Letter, the Borrower shall carry out the Project, through MOT

The BRTS agencies in the participating cities wil l be the executing agencies o f the BRTS Development Component. Some cities w i l l rely on specialized municipal works agencies (i.e. TDU in the case o f Bogota and Soacha) to carry out the construction o f the BRTS infrastructure. For the technical assistance component, DNP, (later MOT) wi l l be in charge o f managing the procurement o f goods and consultant services.

With this institutional arrangement the GOC will promote the leadership o f the municipality in the planning, execution and control o f the system, while levering i t s role as policy regulator, through participation in the Board o f Directors o f the agencies in charge o f system development and control (BRTS agencies) and with the establishment o f a Technical Committee in charge o f trackmg the implementation process and the operational standards.

I s through the Technical Committee that the GOC: a) will request from the executing agencies the preparation and presentation, within three months o f establishment (or prior to disbursement for those already created), o f the financial sustainability and operational plans for the implementation and management o f BRTS, indicating among others the organizational structure, staffing levels and functions, institutional strengthening measures andor twining arrangements adopted to ensure the agency has the capacity to plan and regulate the provision o f the public transport services and equally includes the boundaries that wi l l determine the advancement o f the project according to the follow up system o f the DNP; and b) will verify the adoption and verification o f the corrective measures every time when important deviations wi l l be detected causing alerts in the follow up system.

DNP (Later MOP) a) w i l l prepare for the Bank the institutional, financial and operational plans to which we refer in the previous paragraph, first time and the subsequent updates within 30 days after the approval by the governing boards; and b) in case o f significant failure to fulfil the co-financing agreement’s obligations by the municipality, will notify the Bank within 30 days o f the application o f established remedies in the respective agreement.

43

Page 52: FOR OFFICIAL ONLY - World Bankdocuments.worldbank.org/curated/en/... · Project description [one-sentence summary of each component] Re$ PAD B.3.a, Technical Annex 4 Component 1 -

The following chart summarized the institutional arrangement of the NUTP:

DNP Carries out preparatoq studies - Prepare CONPES documents

for each participating city

monitoring and evaluation Leads Technical Committee for

Committee

/

I /

Ministry of Transportation Came out techcal assistance

component Participate in BRTS’s boards Participates m the Technical

comt tee Coordmates the Program

Defmes responsibilities o f the parties I n L - ~ - - I - L . - , 2 - 4 - D D T C 1 Defines flow o f fund and its destination

Signs the Financial Agreement I -

Participant City

Requests city council approval for BRTS and the Earmarking o f city funds

Sets up the BRTS agency Transfers funds to the

construction o f a trust fund

BRTS Agency Carries out operational plan for

development implementation of BRTS and rationalization of existing bus routes .Procures civil works contracts for BRTS .Awards and regulates bus operators and fare collector concessions .Plans, implements and controls the operation o f the BRTS *Sets up the trust f ind to receive GOC transfers

Reports to DNP the performance o f the system

44

Page 53: FOR OFFICIAL ONLY - World Bankdocuments.worldbank.org/curated/en/... · Project description [one-sentence summary of each component] Re$ PAD B.3.a, Technical Annex 4 Component 1 -

Annex 7: Financial Management and Disbursement Arrangements

COLOMBIA: CO Integrated Mass Transit Systems

Financial Management

Country Issues. A Country Financial Accountability Assessment (CFAA) for Colombia i s currently being carried out and i s expected to be completed by June 2004. The critical issues affecting projects include; the tight fiscal situation, budget and administrative processes that can cause delays in implementation, and the national chart o f accounts which extends to sub-national levels o f government. At the project level, the Bank i s currently engaged with the government to improve project’s financial management by: (i) improving the operation o f Special Accounts held in the central bank; (ii) decreasing the incentives to employ international cooperation agencies to manage Project funds; and (iii) improving and streamlining the accounting and reporting requirements, established in November, 2002 between the Bank and the country’s Accountant General and Auditor General’s office.

Overview. Financial management design and oversight are complicated due to a number o f factors. One important factor i s the financing scheme for the Project, under which expenditures take place over a short period o f time - most within the f irst half o f project implementation - but national and municipal budget allocations are spread over many years, extending beyond the project’s closing date. The involvement o f various cities, most through newly created “TransMilenio type” transport entities, also presents a challenge.

FMAssessment. The FM assessment took into account the challenges referred to above It ensured that project design allows for an appropriate level o f transparency, facilitated oversight and control, and supported smooth implementation. The conclusions o f the FM assessment are that: (i) FM design i s adequate and can be applied generally to any city entering the program; (ii) principal FM risk lies in the fact that almost all project funds will be managed within the involved municipalities, none o f which (besides Bogota) have experience with Bank projects; (iii) the FM arrangements for Bogota are sufficient but should be closely supervised given the large amount o f implementation over a short period o f time; (iv) other cities that enter the program should be assessed as they enter. Regarding this point, an initial FM assessment for Pereira considered their arrangements to s t i l l be in the preliminary stage, thus requiring a follow-up review at, or shortly after project appraisal; and (v) at the level o f the MHCP, the implementation arrangement i s yet to be established. I t i s critical that it i s established soon, and that i t includes a public accountant to manage project financial affairs, including overall project reporting (see below).

Flow of Funds and Information. As shown at the end o f this Annex, a number o f entities w i l l be involved in project implementation, oversight, and financial management. Ultimately, the vast majority (more than 90%) of project expenditures will be carried out at the Municipal level, with the BRTS entities having the principal responsibility for financial management.

For the municipal-level components, the national government’s portion, based on the vigencias futuvas (budgets spread over many years), will be transferred to the TransMilenio-type agency through monthly budget allocations. These funds, along with those o f the two municipal-level sources o f funds - the gasoline surtax and any commercial bank borrowing - will be deposited in separate accounts held by a financial agency (“fiducia” similar to a trust funds unit) within a commercial bank. These three accounts will be used to make the payments for the works, goods, and consultants employed under the BRTSs.

45

Page 54: FOR OFFICIAL ONLY - World Bankdocuments.worldbank.org/curated/en/... · Project description [one-sentence summary of each component] Re$ PAD B.3.a, Technical Annex 4 Component 1 -

For the TA component, consultants will be contracted and paid either via the Special Account or through an international cooperation agency. DNP will be responsible for implementing this component, and for preparing the information required for in MHCP to submit the Statements o f Expenditure to the Bank.

Information Systems. Except in the case o f the Bogota component, the Project will require new information systems to be established: (i) in the Technical Secretariat formed for the NUTP; and (ii) within the newly-created entities in the municipalities. The Technical Secretariat’s information system wil l attempt to draw on recent efforts to incorporate project accounting within the national government’s integrated financial management system (SIIF). However, if this i s not possible, an alternative, project- specific system may be required.

Written Procedures. Project financial procedures w i l l be documented in an Operational Manual, which will define the roles and responsibilities o f the Technical Secretariat and the municipalities. This manual should be submitted to the Bank for effectiveness and should include, among other financial procedures: (i) accounting policies and procedures, including basis o f accounting and chart o f accounts; (ii) the reporting requirements from the municipalities to the Technical Secretariat; (iii) formats o f the consolidated Financial Monitoring Reports for the program; (iv) internal controls including criteria and procedures for processing payments and transfers; (v) records management; and (vi) audit arrangements.

Financial Reporting. The Technical Secretariat will prepare quarterly Financial Monitoring Reports (FMRs) in accordance with Colombia’s Resolucion 380, which specifies accounting and report formats for all Bank-financed projects. The preparation o f these reports will rely heavily on the information provided by the municipalities, who will be managing most project funds, as well as handling most Project (especially civi l works) procurement and monitoring. The Technical Secretariat will therefore need to agree on the format o f reporting from the municipalities, so that it can prepare consolidated reports for project management and distribution to the various stakeholders, including national control entities and the Bank.

Audit. The financial statements o f the Project will be audited annually by an auditor acceptable to the Bank. This audit will take into consideration the annual financial review (similar to an audit) o f each TransMilenio-type entity, carried out by a revisorfiscal, which i s an audit firm selected by the entity’s shareholders.

Financial Management Action Plan. The FM action plan appears below, following section on Disbursements. The priority items are the establishment o f the institutional arrangements in MHCP and the documentation and agreement on audit and internal reporting procedures.

Disbursements

Eligibility Pilot. The Project incorporates the Bank‘s new policy, which changed the rules regarding expenditure eligibility. This policy, approved by the Bank‘s Board on April 13, 2004, provides greater flexibility for the Bank to finance some types o f expenditures, which previously had been considered ineligible. These items include taxes and recurrent costs. For this Project, the most important features o f the new policy are the financing o f interest during construction and taxes, as the sum o f both o f these costs represents a significant amount o f the municipal subprojects.

Special Account. The MHCP will manage a Special Account in the government’s central bank, in accordance with applicable Bank procedures. The account will have an authorized allocation o f US$25

46

Page 55: FOR OFFICIAL ONLY - World Bankdocuments.worldbank.org/curated/en/... · Project description [one-sentence summary of each component] Re$ PAD B.3.a, Technical Annex 4 Component 1 -

million, or 10 percent o f the loan amount;' however, the MHCP will be expected to only request the amount required for planned cash needs for a six-month period.

Disbursement Mechanisms and Documentation. The Bank will disburse to the national government based on periodic disbursement applications sent by the Technical Secretariat. The following describes the disbursement approach for the main activities:

For the BRTSs, Bank financing w i l l be based on the transfers made from the national government to the participating municipalities. These transfers wil l be made directly from the Special Account to the TM- type entities. The BRTSs will be primarily to finance works, but also goods (stations) and services (works supervision); in the case o f Bogota, the transfers will be solely to finance a portion o f the five construction contracts that had already been signed and o f appraised.9 Bank disbursement records wil l segregate the Bogota project in order to facilitate project supervision and audit. The Bank loan wil l finance 100 percent o f the transfers to municipalities, which given the counterpart contributions at the municipal level, and the atypical financing arrangements (through vigencias futurus - see next paragraph) of this operation, will represent less than 50 percent o f the total cost o f these local BRTSs." This total cost includes taxes and interest during construction, both o f which are eligible for financing as part o f the Eligibility pilot (see above). Expenditures considered ineligible for financing (such as interest after construction or land purchases) represent a small portion o f overall BRTS costs. Counterpart funding i s therefore clearly sufficient to be considered to cover all o f these ineligible expenditures as well as a substantial percentage o f the costs financed partially by the Bank.

For the TA component, disbursements will follow traditional Bank procedures. Consultants will be paid from the Special Account, and traditional disbursement documentation (SOEs or Summary Sheets) wil l have to be submitted for the SA to be replenished. Alternatively, the Bank or the government (via the Special Account) may advance funds to an international cooperation agency, which would: (i) contract the consultants andor make payments to them; and (ii) facilitate the preparation o f the relevant disbursement documentation for this component.

For other national-level or cross-municipality activities, disbursements wil l also follow traditional procedures.

Retroactive Expenditures. The Project w i l l be eligible for retroactive reimbursement o f expenditures totaling up to 10 percent o f the loan amount,'' incurred after March 26 but before the signing o f the loan agreement. Most o f these expenditures are expected to be related to the Bogota BRTS.

Use of Statements of Expenditure. Loan withdrawal applications will be supported by SOEs for all expenditures not requiring the Bank's prior review. For the transfer components the borrower will present to the Bank, statements o f transfers, for which format i s being agreed between the Bank and the Borrower. As stated above, the Bogota contracts generally fall above the prior review limits and thus wil l require more documentation. The Technical Secretariat will be expected to accumulate this information and prepare the consolidated withdrawal applications showing expenditures on the Bogota contracts, transfers to the other municipalities, consultant expenditures, and any other claims.

* T h e loan agreement may speci fy a lower initial allocation, applicable until loan disbursements reach a certain level. The transfers made from the national government to Bogoth for the Bank project w i l l be specifically segregated in the

government's budget, to distinguish these (Bank-financed) amounts from those used to finance other Transmilenio contracts. lo Bank financing for the BRTSs, w i l l be l imited by the amount o f the vigencias futuras (budget) that may have been allocated by the national government in a given year. Since these budgets are spread oyer many years, going beyond the implementation of the project, the national contribution during the project's l i f e w i l l be less than i t would be under normal budget arrangements.

I t is not expected that the amounts requested w i l l exceed 10% o f the loan amount.

47

Page 56: FOR OFFICIAL ONLY - World Bankdocuments.worldbank.org/curated/en/... · Project description [one-sentence summary of each component] Re$ PAD B.3.a, Technical Annex 4 Component 1 -

* Financial Management Action Plan

48

Page 57: FOR OFFICIAL ONLY - World Bankdocuments.worldbank.org/curated/en/... · Project description [one-sentence summary of each component] Re$ PAD B.3.a, Technical Annex 4 Component 1 -

49

Page 58: FOR OFFICIAL ONLY - World Bankdocuments.worldbank.org/curated/en/... · Project description [one-sentence summary of each component] Re$ PAD B.3.a, Technical Annex 4 Component 1 -

Annex 8: Procurement COLOMBIA: CO Integrated Mass Transit Systems

A. General

Procurement for the proposed Project would be carried out in accordance with the World Bank’s “Guidelines: Procurement Under IBRD Loans and IDA Credits” dated May 2004; and “Guidelines: Selection and Employment o f Consultants by World Bank Borrowers” dated May 2004, and the provisions stipulated in the Legal Agreement. For each contract to be financed by the Loadcredit, the different procurement methods or consultant selection methods, the need for pre-qualification, estimated costs, prior review requirements, and time frame are agreed between the Borrower and the Bank project team in the Procurement Plan. The Procurement Plan will be updated at least annually or as required to reflect the actual project implementation needs and improvements in institutional capacity.

Procurement of Works: Works contracts procured under this Project and financed fully or partially by the Bank will include the construction o f the BRTS and other eligible infrastructure works.

Civi l Works estimated to cost US$ 5,000,000 (equivalent) or above per contract should be procured following International Competitive Bidding (ICB) procedures. Civi l works contracts estimated to cost below US$ 5,000,000 equivalent should be procured through National Competitive Bidding (NCB) procedures (with the exception o f the Bogota civil works contracts already procured as explained below). Any other works contracts not financed fully or partially by the loan would be procured following the local law procedures. The procurement w i l l be done using the Bank‘s Standard Bidding Documents (SBD) for all ICB and National SBD agreed with (or satisfactory to) the Bank.

Small civi l works contracts estimated to cost less than $350,000 equivalent per contract, may be procured via shopping under lump-sum, fixed-price contracts awarded on the basis o f quotations obtained from at least three qualified domestic contractors in response to a written invitation. The invitation shall include a detailed description o f the works, including basic specifications, the required completion date, and a basic form o f agreement acceptable to the Bank, and relevant drawings, where applicable. The award shall be made to the contractor who offers the lowest price quotation for the required work, and who has the experience and resources to complete the contract successfully.

Any works contract not financed fully or partially by the loan may be procured following the local law procedures.

OPRC Waiver for financing civil works contracts in Bogoth: GOC had requested the Bank to finance i t s contribution to the Program, initially for six new cities joining the program. During preparation GOC requested the Bank to also include in the Project the financing o f the NQS TransMilenio corridor in Bogota. I t was necessary to seek a waiver from OPRC o f the bidding processes carried out by the “Znstituto de Desurvollo Urhano” IDU, to enable Bank financing o f this investments, tahng into account that the contracts for works (five in total) have been awarded prior to considering the inclusion o f such investments in the proposed Project.

The inclusion o f the NQS BRT corridor under the Bank’s project was agreed by Bank’s management, based on the following reasons: (i) to respond to the need o f a fiscally constrained client; (ii) to reduce project risk by having an experienced Bogota agency undertake a sizeable portion o f the Project; (iii) to enhance policy dialogue during project design and implementation.

50

Page 59: FOR OFFICIAL ONLY - World Bankdocuments.worldbank.org/curated/en/... · Project description [one-sentence summary of each component] Re$ PAD B.3.a, Technical Annex 4 Component 1 -

OPRC found that the bidding process conducted by IDU intended to have international bidders and used all available means to bring them to the process, including wide promotion and special clauses in the bidding documents (e.g., no discrimination o f foreign bidders, no prior registration requirements). Unfortunately, country factors may have constrained the government's capacity to attract foreign participants. The bid evaluation was performed in a transparent manner and there were no complains. Therefore, the OPRC agreed to consider the bidding process o f the NQS corridor as a National Competitive Bidding process, and to grant a waiver o f the US$5 million maximum threshold applicable to NCBs in Colombia (case number 517). The waiver will only apply for the five12 lots procured for the Bogotd NQS corridor, but not for BRTS in other cities, which w i l l be procured under the proposed Project. For the following bids, the project team will have to work with procurement specialists and the implementation units to prepare bidding documents, that do not include point-based evaluation or selection factors different than economic factors.

Procurement of Goods: Goods under this Project financed fully or partially by the Bank will include: software and hardware for the BRTS center o f control system and eligible goods and equipment.

Goods contracts estimated to cost US$250,000 and up wi l l be procured under ICB procedures; contracts estimated to cost more than US$50,000 equivalent but less than US$250,000 equivalent, may be procured using National Competitive Bidding (NCB) procedures and standard bidding documents previously agreed with the Bank. Under this method, all the special provisions agreed with the Colombian Government for procurement under Bank-financed loans, grants and credits will apply. The procurement will be done using Bank's Standard Bidding Documents for all ICB and National Standard Bidding Documents agreed with (or satisfactory to) the Bank.

Contracts for goods which cannot be grouped into larger bidding packages and estimated to cost less than US$50,000 per contract may be procured using shopping (NationaUInternational) procedures based on a model request for quotations satisfactory to the Bank

For National Competitive Bidding o f works and goods contracts, the following special provisions wil l be applied:

Goods estimated to cost less than US$250,000 equivalent per contract may be procured under contracts awarded in accordance with the provisions o f paragraphs 3.3 and 3.4 o f the Guidelines. Works estimated to cost less than US$5,000,000 equivalent per contract may be procured under contracts awarded in accordance with the provisions o f paragraphs 3.3 and 3.4 o f the Guidelines. Before issuing any invitation to bid, the Borrower shall prepare and furnish or cause to be prepared and furnished to the Bank for approval, appropriate model bidding documents. Once approved by the Bank, the Borrower shall use, or cause to be used, said model bidding documents, as approved for bidding under the Project. Any change or departure from the model approved shall require Bank's prior approval. All bidders, irrespective o f whether they are foreigners or Colombians, wil l be treated equally and, particularly, no preference will be granted to any bidder or group o f bidders for bid evaluation purposes. Bidders shall be allowed to submit their bids by hand or through the post office or private mailing services. There shall not be any requirement for any bidder to show evidence o f the bidder's registration in any public registry, chamber o f commerce or similar entity, whether in Colombia or elsewhere, or to appoint a representative domiciled in Colombia, unless and until such bidder i s awarded the corresponding contract. Bids shall be opened in a public meeting to which bidders and their representatives shall be allowed to attend if they so wish. Date, time and place for the opening meeting shall be set forth in the bidding documents. Bid opening shall

Contract #I05 signed with Sociedad de Futuras Concesiones Urbanas S.A.; Contract # lo6 signed with Sociedad Concesionaria Metrodistrito S A; Contract # 179 singed with Consorcio Troncal NQS Sur; Contract # 180 signed with TransMilenioNQS Sur S.A. and Contract # 242 signed with TransMilenio del Sur S.A.

5 1

Page 60: FOR OFFICIAL ONLY - World Bankdocuments.worldbank.org/curated/en/... · Project description [one-sentence summary of each component] Re$ PAD B.3.a, Technical Annex 4 Component 1 -

coincide with, or take place promptly after, the final date and time o f the period for bid submission stipulated in the bidding documents. Each bid shall be evaluated and the corresponding contract awarded to the responsive bidder who meets appropriate technical and financial standards o f capability and whose bid has been determined to be the lowest evaluated bid. Such determination shall be made exclusively on the basis o f the specifications, conditions and evaluation criteria stipulated in the bidding documents. If any factor additional to the amount or amounts o f each bid i s to be considered in bid evaluation, such factor or factors and the quantified manner on which they w i l l be applied for purposes o f determining the lowest evaluated bid shall be precisely stipulated in the bidding documents. For purposes o f bid evaluation and comparison, the only bid amount or amounts to be used as a factor shall be the bid amount or amounts as quoted in the corresponding bid, including correction o f arithmetic errors.

The provisions o f paragraph 2.46 o f the Guidelines shall fully apply and, more specifically, bids shall not be disclosed to persons other than the persons officially charged with the task o f comparing and/or evaluating the bids while they are performing their official duties, without the corresponding bidder’s written authorization. Moreover, bidders shall not be required to provide such authorization as a condition to be entitled to bid. This confidentiality requirement shall apply until the award o f contract i s notified to the successful bidder. Thereafter, confidentiality o f the bids shall be limited to those bid portions for which confidentiality has been specifically requested by the bidder in question.

Selection of Consultants Firms Consultants contracts with firms wi l l include eligible support and Project related studies, design and supervision; training services, and specialized technical expertise and advisory.

Firms shall be selected for contracts financed under Bank financing using Bank Standard Request for Proposals and related formats.

Most contracts for f i r m s are expected to be procured using Quality Based Selection Method. Consultant assignments o f specific types, as agreed previously with the Bank in the Procurement Plan, may be procured with the use o f the following selection methods: (i) Quality Based selection (QBS); (ii) Selection under a Fixed Budget (SFB); (iii) Least Cost Selection (LCS); (iv) Selection Based on Consultants’ Qualifications (CQ), for contracts estimated to cost below U S $ 100,000 equivalent; and, exceptionally, with Bank’s prior No Objection, (v) Single Source Selection (SSS).

Individual Consultants.

Individual consultants will be hired to provide project support and specialized advisory services, after being selected in accordance with the provisions o f paragraphs 5.1 through 5.3 o f the Consultant Guidelines, or may be selected on a sole source basis in accordance with paragraph 5.4 o f the Consultant Guidelines (with prior No Objection by the Bank).

Training, The plan and budget for training and workshop activities will be reviewed and approved by the Bank at least annually.

Operational Costs: To be determined during appraisal.

52

Page 61: FOR OFFICIAL ONLY - World Bankdocuments.worldbank.org/curated/en/... · Project description [one-sentence summary of each component] Re$ PAD B.3.a, Technical Annex 4 Component 1 -

B. Assessment of the cauacitv to imulement urocurement Procurement CaDacitv Assessment of the Imulementation Agencies resuonsible for conducting procurement:

A central Coordination Unit for the Project will be set up at the premises o f the Ministry o f Transport (MITRANS) and amidst i t s functions i t will supervise the procurement activities financed under Bank procurement procedures in the participating cities, and also will procure some goods and consulting services for the “centralized” needs o f the Project. I t s procurement capacity has to be evaluated before the Project starts.

An assessment o f the capacity o f one o f the identified Implementing Agencies (in the city o f Pereira) to conduct procurement actions for the Project has been carried out by JosC M. Martinez, Procurement Specialist, during the pre-appraisal stage. The assessment reviewed the organizational structure and their staff preparation for implementing the Project.

Currently only IDU for Bogota, and MEGABUS for Pereira can be assessed. The proposed Implementation Agency for Cartagena i s not ready yet to be assessed due to the reorganization o f the proposed implementation agency TRANSCARIBE/EDURBE. The participation o f other cities in the Project wil l be confirmed later on, and their agencies then will be evaluated. However, the criteria used to assess MEGABUS in Pereira sets the framework for the procurement capacity assessment o f Cartagena and the remaining cities, when identified and approved.

Bogotsi. IDU i s the government agency that has been executing the procurement o f the contracts for the NQS corridor in Bogota and also responsible for the procurement under the Bogota Urban Transport Project (Loan 4021-CO and 7162-C0), with a high technical and administrative level. It could be possible that the IDU will be the agency that w i l l execute the extension o f TransMilenio to the municipality o f Soacha. When Soacha i s ready to join the Project, a procurement capacity assessment will be done to IDU or the agency, which will execute this BRTS.

Pereira. The implementing agency (Transmilenio-type entity) i s MEGABUS, and the BRTS will include a segment in the neighboring city o f Dosquebradas. In terms o f organization, MEGABUS, a local government agency with authority to deal with procurement issues in both cities, will be expanded and strengthened, so to become the Executing Agency and take over management and implementation responsibilities in the Pereira-Dosquebradas BRTS. In principle, it i s expected a total o f 3 civi l works tenders, 2 goods tenders and 3 works supervision consultants contracts financed under the Loan. MEGABUS does not have direct experience in procurement under Bank Guidelines, but the Agency’s Director, i t s Lawyer and some MEGABUS engineers and staff do have extensive experience in procurement o f civil works contracts under the Colombian Law.

Recommendations. In order to mitigate the risk posed by the fact that MEGABUS does not have direct experience in Bank-funded procurement operations, i t i s proposed to start intensively training relevant MEGABUS staff expected to be involved in procurement o f civi l works, goods and consulting services on Bank procurement procedures before the Project starts, thus reducing the risk o f failure in procurement-related activities. In order to facilitate a better understanding o f procurement operations, an Operations Manual with a Procurement Section will be prepared by the Borrower and reviewed and cleared by the Bank. Also, i t i s important to start information dissemination campaigns and seminars addressed to local business and political leaders aiming at clarifying procedures and requirements under Bank-financed procurement, specifically explaining that (i) there are many ways in which local bidders can associate amid themselves or/and with national and international bidders, and (ii) procurement packages will not have local preferences and cannot be artificially formed to ensure local participation while discouraging potential participation o f national and foreign bidders.

53

Page 62: FOR OFFICIAL ONLY - World Bankdocuments.worldbank.org/curated/en/... · Project description [one-sentence summary of each component] Re$ PAD B.3.a, Technical Annex 4 Component 1 -

Both the proposed high-risk category and the resulting procurement thresholds are subject to revision once the Bank determines that the required procurement capacity has been built in the MEGABUS.

The Bank and MEGABUS discussed alternatives to address these risks: (i) an early procurement training program for MEGABUS staff involved in procurement activities; (ii) to ensure direct consultation on procurement matters as part o f the supervision missions or with the Project Team through the TTL (email); (iii) improving the existing monitoring and control system o f the procurement actions.

C. Procurement Plan

A detailed procurement plan has been prepared for the city o f Pereira, which i s the most advanced city in the preparation o f the Bus Rapid Transit Systems (BTRS). During project implementation the procurement plan for each BRTS will be defined according to the stage o f preparation it has. Detailed Procurement Plans for each ci ty as well as updates, should be reviewed and agreed with the Bank for identifiable procurement as the cities will be joining the Project and their data will become available.

D. Frequency o f Procurement Supervision

The capacity assessment o f the Implementing Agency reviewed has recommended at least one supervision mission annually to both provide direct consultation on procurement matters and carry out post review o f procurement actions.

54

Page 63: FOR OFFICIAL ONLY - World Bankdocuments.worldbank.org/curated/en/... · Project description [one-sentence summary of each component] Re$ PAD B.3.a, Technical Annex 4 Component 1 -

Attachement 1

2

Details of the Procurement Arrangement involving international competition.

0

3 4

1. Goods and Works and non-consulting services.

(a) L i s t o f contract Packages that will be procured following ICB and Direct contracting:

7 1

Ref. No.

8 9

Review b y B a n k (Prior / Post)

Prior

Prior

Prior

Prior

Prior

Prior

Prior

Contract

Pereira civil

Expected Comments Bid- Opening Date

3 packages with slices Several packages

Several packages Several packages Several packages Several packages 1 package

works I I Cartagena civil works Bucaramanga civil works Barranquilla civil works Soacha civi l

57.4 ICB

15.0 ICB

30.0 ICB

16.3 ICB works Medellin civil works Pereira goods

Cartagena goods Bucarainanga goods Barranquilla civil works Soacha

Medellin

16.0 ICB

8.0 ICB

12.0 ICB

4.7 ICB

12.0 ICB

5

P-Q

No

No

No

No

No

No

No

No --

No

No

No

No

6

Domestic Preferenc e (yeslno)

No

No

No

No

No

No

No

No

No

No

No

No

I I

Prior I I Several packages

Prior Several packages

Prior Several

Prior Several

Prior Several packages

nackanes

(b) ICB Contracts estimated to cost above $5,000,000 for civil works and above $250,000 for goods, as well as all any Direct contracting w i l l be subject to prior review by the Bank.

55

Page 64: FOR OFFICIAL ONLY - World Bankdocuments.worldbank.org/curated/en/... · Project description [one-sentence summary of each component] Re$ PAD B.3.a, Technical Annex 4 Component 1 -

2. Consulting Services.

(a) L i s t o f Consulting Assignments with short-list o f international firms.

1 2 3

Ref. No. Description of Estimated

cost Assignment

Supervision $2.2 mill ion construction BRT Pereira Supervision $5.7 million construction

Expected Proposals

Submission Date

Comments

4

BRT Cartagena Supervision

Selection Method

QCBS

$1.5 mill ion

QCBS

QCB S

QCBS

QCBS

QCBS

Construction Bucaramanga Supervision

Construction Barranquilla Supervision Construction Soacha

5

$3.0 million

$1.6 mill ion

Review by Bank (Prior I

Post) Prior

Supervision Construction Medellin

Prior

$4.0 mill ion

Prior

Prior

Prior

Prior

1 Three contracts

Four contracts

Two Contracts

Four Contracts

Two Contracts

~

Four Contracts ' (b) Consultancy services by firms estimated to cost above $100,000 per contract and Single Source selection o f firms will be subject to prior review by the Bank. Consultancy services by individual consultants estimated to cost above $50,000 per contract and any Single Source selection o f individual consultants will be subject to prior review by the Bank.

(c) Short l ists composed entirely of national consultants: Short l is ts o f consultants for services estimated to cost less than $350,000 equivalent per contract, may be composed entirely o f national consultants in accordance with the provisions o f paragraph 2.7 o f the Consultant Guidelines.

56

Page 65: FOR OFFICIAL ONLY - World Bankdocuments.worldbank.org/curated/en/... · Project description [one-sentence summary of each component] Re$ PAD B.3.a, Technical Annex 4 Component 1 -

Annex 9: Economic and Financial Analysis

COLOMBIA: CO Integrated Mass Transit Systems

PUBLIC COSTS Studies and Project preparation Infrastructure Construction andor Rehabilitation Infrastructure Maintenance Control Center Implementation Control Center Operation Public Authority Costs PRIVATE COSTS Bus Acquisition Bus Operation Equipment for Bus Depots and Shops Bus Companies Operation Fare Collection Capital Costs Fare Collection Operation

Economic Analysis

This annex provides information on the detailed analysis performed for the SITMs o f the cities o f Bogota (TransMilenio NQS), Pereira-Dosquebradas (Megabus) and Cartagena (Transcaribe). Currently data i s not readily available for other eligible cities (Barranquilla, Medellin, Bucaramanga, Soacha). Similar analysis will be performed to these cities prior to their inclusion in the loan on a f i r s t come f i rs t served basis. The document includes a general methodology, data used and results. An analysis o f delay in project implementation i s also presented.

1. Methodology

Evaluation was performed using cost-benefit analysis for each one o f the projects in the program. Economic equivalent o f costs and benefits was estimated by comparing the situation with and without Project. Most information was provided by the National Planning Department, and comes from the conceptual design o f each project.

The following costs are identified, divided into public and private:

The following shadow price indexes are used to transform market prices (financial) to economic prices, in order not to double count internal transfers among economic sectors (taxes, tariffs, subsidies) and to correct market imperfections in labor and use o f foreign currency.

57

Page 66: FOR OFFICIAL ONLY - World Bankdocuments.worldbank.org/curated/en/... · Project description [one-sentence summary of each component] Re$ PAD B.3.a, Technical Annex 4 Component 1 -

I t e m Shadow Price Index Engineering design 0.6800 Road Infrastructure 0.8395 Stations 0.9500 Depots and terminals 0.8395 Pedestrian overpasses 0.8395 Maintenance 0.8395

Trained labor 0.6800 Land Acquisition 1 .oooo

Travel time savings in the Mass Transit System Travel time savings for private vehicles on mixed lanes Operation cost savings from substituted vehicles Operation costs savings for private vehicles on mixed lanes Generalized costs savings due to modal shifts Welfare increases due to generated trips Accident cost savings Air pollution cost savings

Source: PAD Proyecto de Servicios Urbanos para Bogota, 2003, Anexo 3

Benefits are identified for users and non-users o f the mass transit systems:

ISOCTO-ECONOMIC BENEFITS

Savings are the result of comparing the future situation with Project versus the expected situation without Project. The expected situation without Project considers an increase in travel time and travel costs o f 1 percent a year, due to congestion derived from increased motorization. This figure corresponds to a loss in average speed o f 0.2 ludh per year. An elasticity o f 1 .OO o f travel time and travel cost i s assumed. Travel demand i s estimated to grow 2 percent a year.

Travel time savings in the mass transit system come from transport models transformed in economic figures through the social value o f time (US$O.75/hour). This figure considers that 70 percent o f the users have an income o f US$212/month, and 30 percent o f the users have an income o f US$788/month, and that user value time at 40 percent o f the income. The same social value o f time i s used for all projects; despite there might be differences in average income among cities. In this way economic indicators do not show any preference for projects in cities with higher average income.

Travel time savings for private vehicles on mixed lanes are the result o f the segregation between general traffic and transit. Better traffic conditions also result in higher speed and hence, operation savings. Travel time losses due to congestion during construction o f the infrastructure are also estimated.

Operation cost savings from substituted vehicles are estimated using current operational cost figures for the vehicles that are replaced by the vehicles o f the new transit system. Current system has inadequate operation conditions (obsolete fleet, bad maintenance, excessive number o f lulometers per day), and some o f the vehicles are replaced by the trunk and feeder buses o f the mass transit system. The equivalent costs of operating such vehicles are savings for the society. Rate o f substitution depends on the possibilities o f each city.

Generalized cost savings due to modal shifts come from the'diversion o f passengers from individual automobiles to mass transit. Travel time and cost i s reduced as has been already observed in the

58

Page 67: FOR OFFICIAL ONLY - World Bankdocuments.worldbank.org/curated/en/... · Project description [one-sentence summary of each component] Re$ PAD B.3.a, Technical Annex 4 Component 1 -

TransMilenio System in Bogotd. come from private vehicles.

In this evaluation i t i s estimated that 5 percent o f the system riders

Welfare increases due to generated trim are the result o f the greater mobility opportunities provided b y the transit systems. In this evaluation i t i s estimated that 3.5 percent o f the system riders are trips not made under current conditions. Travel time and travel cost savings o f generated trips are half o f those obtained by existing trips (area under the supply curve).

Accident cost savings are a consequence o f better traffic conditions and improved incentives to bus operators. Economic equivalent comes from insurance averages: US$12,000 per disabling injury, US$42,000 per fatality, and US$1,200 per accident with property damage only. Reduction in each city depends on the local conditions.

Air pollution cost savings are a result o f new and more efficient vehicles, with fewer lulometers run per unit. Emission tables adapted to Colombia are used to estimate the change in conditions. Economic equivalents are estimated in US$0.714/Ton o f Carbon Oxides, US$103.92/Ton o f Nitrogen Oxides and US$8 1.79/Ton o f Hydrocarbon Volatile Conipounds.

2. Data

The following i s a general description o f the projects:

BogotB Pereira DQ Cartagena Component

Trunk roads 19.3 km 16.7 km 25.75 km Stations 22 37 23 Terminals 1 2 1 Depots 1 2 Not established Non at grade intersections 8 N o information None Pedestrian overpasses 25 6 Not established

Piers for Acuatic

Other Contact-less Fare Contact-less Fare Control Center;

TransMilenio NQS Megabus Transcaribe

Control Center Control Center Transport

Collection System Collection System Contact-less Fare Collection System

148 Trunk line Buses 100 (articulated) 56 articulated (90 articulated, 58

conventional) Feeder Buses 30 87 feeders 335

2005 2005 2006 Expected initial year of operation

240,000 77,000 130,000 Expected Demand first year o f operation (passengersiworkday)

59

Page 68: FOR OFFICIAL ONLY - World Bankdocuments.worldbank.org/curated/en/... · Project description [one-sentence summary of each component] Re$ PAD B.3.a, Technical Annex 4 Component 1 -

Estimated public costs in US$ Mil l ion are:

Bogota Pereira DQ Cartagena TransMilenio NQS Megabus Transcaribe Public Costs

Project Preparation Conceptual Design 2.64 0.29 0.29 Technical, Legal and Financial Studies 0.59 0.25 0.25 Other preparation costs 0.00 0.36 0.36 Infrastructure Construction and Rehabilitation 269.89 24.56 17.38 Infrastructure Maintenance (annual) 7.61 0.21 1.37 Control Center Capital Costs 2.22 0.58 1.48 Control Center Operation (annual) 0.31 0.09 0.09 Public Authority Operation (annual) 0.48 1.03 1.03 Investment 0.15 0.3 1 0.3 1

Sources: DNP (CONPES), Conceptual Designs, Information from TRANSMILENIO S.A., Estimations D. Hidalgo

The following data i s used for the estimation o f private capital and operation cost o f buses (including replacement o f obsolete units):

Bogota TransMilenio Pereira DQ Cartagena

Item NQS Megabus Transcaribe Articulated Buses Units 100 56 90 Large Buses (Padron) Units 0 0 58 Feeder Buses Units 30 87 335 Substitution Articulated Buses Per trunk bus 8.90 6.00 6.20 Substitution Large Buses 0.00 0.00 6.20 Substitution Feeder Buses Per feeder bus 3.00 1.50 0.00 Substituted Buses Units 980 46 7 918 Mileage Articulated Buses kmiyearibus 86,710 71,322 71,322 Mileage Large Buses kmiyearlbus 0 0 7 1,322 Mileage Feeder Buses kmiyearibus 86,710 54,427 54,427

Cost per Km Trunk $km 2,419 2,140 2,140 Mileage Current Buses kmiyearibus 90,000 53,222 53,343

Cost per Km Feeder $Am 2,154 8 70 974 Cost Km Current $Am 1,424 974 974 Articulated bus cost Col$2003ibus 610,626,320 610,626,320 610,626,320 Feeder bus cost Col$2003ibus 246,105,469 246,105,469 549,631,573 New buses for feeder services 1 Yes. 0 No 1 1 0 Cost substituted units Col$2003ibus 20,000,000 20,000,000 20,000,000

Sources: DNP (CONPES), Conceptual Designs, Information from TRANSMILENIO S.A., Estimations D. Hidalgo

60

Page 69: FOR OFFICIAL ONLY - World Bankdocuments.worldbank.org/curated/en/... · Project description [one-sentence summary of each component] Re$ PAD B.3.a, Technical Annex 4 Component 1 -

3. Benefits

Sources: D N P (CONPES), Conceptual Designs, Engineering Designs (NQS), Information from TRANSMILENIO S.A., Estimations D. Hidalgo

Additionally there are losses during construction due to congestion during system implementation equivalent to US$2,371,43 1 in Bogota and US$ 1,899,931 in Pereira and Cartagena.

4. Results

The following table summarizes the estimated present value o f the Project Costs and Benefits (12% US$ Million):

Pereira DQ Cartagena Megabus Transcaribe Bogota TransMilenio NQS

costs Project Preparation Ini?astructure Construction and Rehabilitation Infrastructure Maintenance Control Center Capital Costs Control Center Operation Public Authority Bus Acquisition Bus Operation Equipment for Bus Depots and Shops Bus Companies Operation Fare Collection Capital Costs

2.20 202.30 42.03 1.88 1.39 3.27

30.04 62.80 2.60 5.80 4.73

0.61 21.57 1.16 0.49 0.39 6.98 24.55 30.96 1.91 5.80 2.39

0.6 1 66.16 7.58 1.26 0.39 6.98 38.26 74.84 3.10 5.80 1.90

Fare Collcction Operation 7.56 3.81 3.03

61

Page 70: FOR OFFICIAL ONLY - World Bankdocuments.worldbank.org/curated/en/... · Project description [one-sentence summary of each component] Re$ PAD B.3.a, Technical Annex 4 Component 1 -

Pereira DQ Cartagena Megabus Transcaribe Bogota TransMilenio NQS

Total Costs 366.60 100.61 209.89 Socio-economic benefits Travel t ime savings in the Mass Transit System 87.23 20.79

12.51 3.81 Travel t ime savings for private vehicles on mixed lanes Travel t ime losses during construction -2.12

343.88 Operation cost savings from substituted vehicles Operation costs savings for private vehicles on mixed lanes Generalized costs savings due t o modal shifts Welfare increase due to generated trips Accident cost savings

5.49

47.79 4.66 18.71

89.27

13.15

-1.70 -1.70 66.91 131.38

2.74

14.54 1.21 4.02

2.74

24.56 2.29 1.16

Air pollution cost savings 12.18 1.12 1.99 Total Benefits 530.33 113.45 264.83 Net Present Value 12% (Benefits - Costs) 163.74 12.84 54.94 Internal Rate of Return 21.4OYo 16.45% 20.33% BenefitKOst ratio 1.447 1.128 1.262

Evaluation for other cities will be performed using the same methodology. Projects will be eligible if the NPV using 12 percent discount rate i s greater than 0 (ERR greater than 12%).

5. Analysis of Project Displacement Over Time

SITM Projects financed with the loan are expected to start operations between 2005 (Bogoth and Pereira) and 2006 (Cartagena). They will be partially financed by loans to the municipality from banks or constructors, which will be paid back using future budget authorizations (vigencius futurus). I t i s not possible to assign total budget required by the projects for construction in the f i rst year due to spending limits both at the local and national levels.

In case this mechanism i s not adopted, municipalities will be required to cap the capital investment to the available funds. In this case projects will be delayed four to five years. This is, instead o f developing the infrastructure in one year, construction will take four to five years, and benefits will only be received by the community at the end o f the construction period. There will also be losses due to congestion during the construction years.

This reduces de positive impact o f systems’ implementation (net value, benefit cost ratio, internal rate o f return). The impact of displacing investment (not using bridge financing o f future budgets -vigencius futurus) i s estimated as follows:

62

Page 71: FOR OFFICIAL ONLY - World Bankdocuments.worldbank.org/curated/en/... · Project description [one-sentence summary of each component] Re$ PAD B.3.a, Technical Annex 4 Component 1 -

Initial Year o f Operation 2005 2008 2009 Net Present Value 12% US$ Million 225.63 112.31 83.65 Reduction with respect to 2005 50.2% 62.9% Present Value Public Costs 12% USS Million 358.34 297.23 279.26 Reduction with respect to 2005 17.1% 22.1% Present Value Private Costs 12% US$ Million 296.27 210.88 188.29 Reduction with respect to 2005 28.8% 36.4% Present Value Social Benefits 12% USS Million 880.24 620.42 551.19 Reduction with respect to 2005 29.5% 37.4% BenefitKOst Ratio 1.345 1.221 1.179 Reduction with respect to 2005 9.2% 12.3% Socio Economic Rate of Return 20.6% 15.3% 13.8% Reduction with respect to 2005 25.8% 32.7%

The displacement in the investments causes reduction in all the project indicators. Net present value i s reduced 50 percent (US$ 1 13 Million) if operation only begins in 2008 and 63 percent (US$142 Mill ion) if operation only begins in 2009. Benefit cost ratio i s reduced to 1.22 and 1.18 while Socio economic rate o f return goes to 15.3 percent and 13.8 percent, respectively (more than 1% loss per year o f delay). This also jeopardizes the strategy o f generating employment in the construction industry and improving the quality o f l i fe o f poor communities in the short term.

6. Sensitivity Analysis

6.1. Sensitivity Analysis Bogotsi

NPV 12% Change NPV vs. Base US$ Million TIRE Case

Base 163.7 2 1.40% Demand growth 1% Demand gowth 0% Demand and congestion gowth 0% Value oftime -10% Value of time -20% Substitution rate -10% Substitution rate + lo% Other benefits -10% Other benefits -100% Public costs + lo% Total costs + I O %

140.7 119.2 101.0 153.4 143.1 128.3 199.2 152.7 64.5 138.4 127.1

20.53% 19.64% 18.79% 20.85% 20.30% 19.48% 23.28%

15.86% 20.81%

19.41% 18.77%

-14.08% -27.18% -38.34% -6.30%

-12.61% -21.66% 21.66% -6.71% -60.60% -15.46% -22.39%

63

Page 72: FOR OFFICIAL ONLY - World Bankdocuments.worldbank.org/curated/en/... · Project description [one-sentence summary of each component] Re$ PAD B.3.a, Technical Annex 4 Component 1 -

6.2. Sensitivity Analysis Pereira-Dosquebradas

NPV 12% Change NPV vs. Base US$ Million TIRE Case

Base 12.8 16.45% Demand growth I YO Demand growth 0% Demand and congestion growth 0% Value o f time -10% Value of time -20% Substitution rate -10% Substitution rate +lo% Other benefits -10%) Other benefits -100% Public costs -10% Total costs -I 0% No new feeder buses

9.6 7.2 4.4 10.5 8.1 6.0 19.6 10.2

-10.0 9.7 2.8 2.1

15.56% 14.82% 13.85% 15.67% 14.88% 14.14% 18.67% 15.57% 8.13% 15.24% 12.91% 12.86%

-25.52% -43.63% -65.75% -18.40% -36.80% -52.95% 52.95% -20.49% -178.06% -24.29% . -78.35% -83.74%

6.3. Sensitivity Analysis Cartagena

NPV (12%) Change NPV vs. Base US$ Million TIRE Case

Base 54.9 20.33% Demand growth 1% Demand growth 0% Demand and congestion growth 0% Value o f time -10% Value o f time -20% Substitution rate -10% Substitution rate +lo% Other benefits -10% Other benefits -100% Public costs +lo% Total costs +LO%

46.2 38.5 31.1 44.7 34.5 41.7 68.1 50.4 9.6

47.5 34.8

19.45% 18.58% 17.65% 18.87% 17.38% 18.43% 22.1 9% 19.68% 13.56% 18.85% 16.95%

-15.89% -29.99% -43.40% -18.60% -37.20% -24.04% 24.04% -8.25% -82.48% - 1 3.5 0% -36.60%

64

Page 73: FOR OFFICIAL ONLY - World Bankdocuments.worldbank.org/curated/en/... · Project description [one-sentence summary of each component] Re$ PAD B.3.a, Technical Annex 4 Component 1 -

Annex 10: Safeguard Policy Issues

COLOMBIA: CO Integrated Mass Transit Systems

Backmound

Project Development Objectives

The World Bank i s financing an urban transport investment project to: (i) develop high quality and sustainable Bus Rapid Transit Systems in selected medium and large cities in Colombia to improve mobility along the most strategic mass transit corridors; ii) improve accessibility to the poor through feeder services and fare integration and; (iii) build greater institutional capacity at the national level in order to formulate integrated urban transport policies, and at the local level in order to improve urban transport planning and traffic management. The Project will support the financing o f the National Urban Transport Program (NUTP), which main goal i s to improve long-term sustainability, efficiency and quality o f urban transport in Colombian cities in a multi year program lasting up till 2015.

Specifically, the proposed Project builds on the successful experience o f Bogota’s TransMilenio, and it w i l l contribute to: i) further expand BRTS schemes in Bogota; ii) introduce BRTS in medium and large size cities, replicating the experience o f Bogota but tailoring it to specific conditions o f those selected cities; and iii) consolidate the initially ad-hoc intervention o f the GOC in Bogota’s f i rst phase into the NUTP. To achieve the objective the Project relies on an effective public-private partnership for developing sustainable BRTSs in which the roles are assigned as follows: (i) the public sector finances and builds segregated bus ways and other related infrastructure through co-financing arrangement between municipal and central government; (ii) private sector operators provide the buses and operate a trunk-feeder system under a concession contract granted by the municipality; and (iii) each selected city creates a public agency to plan, regulate and control the operation o f the BRTS and sets the user tariff that will ensure the sustainability o f the system without operational subsidies.

While CAF and IDB’s operations wi l l finance GOC transfers for specific projects (BogotB’s Suba project and Cali, respectively), the proposed IBRD loan, will have a broader and more flexible scope, financing the 2004 - 2008 “vigenciusfutuuus” o f the GOC contributions to the NUTP. Since the implementation o f the NUTP will go beyond 2008, which i s the intended closing date o f the proposed Project, i t i s likely that the GOC wi l l request the Bank to provide a follow up operation to continue supporting the program.

Project Components

The Project will have two major components: (1) A Technical Assistance Component; and (2) an Investment Component. Under the Technical Assistance Component (Total cost: US$3.5 million; IRDB US$3.5 million), at the National level, the Project will support the government’s efforts to formulate national urban transport programs and strategies to improve public transport services in Colombian cities. This would include activities aimed at: (i) defining a national urban transport institutional map; (ii) formulating sector policy and the definition o f operational, regulatory, institutional, environmental, social and road safety strategies within the urban transport and urban development context; and (iii) identifying appropriate mass transit solutions to improve transport in other Colombian cities and to improve traffic management and the institutional strengthening o f local authorities. This component includes the concept design o f the projects as u7ell as the financial and technical structuring o f BRTS operations in new selected cities.

At the Local level, the component seeks to: improve the institutional capacity o f the participating cities to ensure adequate implementation o f the BRTS by supporting the creation andor institutional strengthening

65

Page 74: FOR OFFICIAL ONLY - World Bankdocuments.worldbank.org/curated/en/... · Project description [one-sentence summary of each component] Re$ PAD B.3.a, Technical Annex 4 Component 1 -

of the project’s implementing agencies. The component also includes the definition o f institutional organization, technical assistance, equipment and training. Also, the development o f greater technical and operational capabilities o f the cities to implement urban development and transport strategies in areas such as land use developments, road safety, traffic management, and environmental and social issues related to urban transport projects (environmental management plans, resettlement plans, etc.).

Under the Investment Component (Total Cost US$464.7 million; IRDB US$244 million), the Project will co-finance the development and implementation o f BRTS and feeder routes in selected medium and large cities according with the eligibility conditions (see Annex 1). This means that the participation o f al l candidate cities i s not certain, as key criteria and conditions have to be firstly met. It i s estimated that approximately 77 km o f segregated corridors w i l l be built in the participating cities. Candidate cities being targeted for the Project include Pereira (1 7 km), Barranquilla (1 5 km), Cartagena (12 km), Soacha (5 km), Bucaramanga (9 km), Medellin (14 km), and the NQS-Corridor o f the Bogoth TransMilenio BRTS (20 km).

With the exception o f the NQS-Corridor o f the Bogota TransMilenio BRTS, in which the loan will finance exclusively five construction contracts according to the OPRC waiver, for the other BRTS the loan will finance GOC participation including (i) construction o f segregated busways; (ii) repaving o f mixed-traffic lanes adjacent to the new busways; (iii) bus stations and terminals; (iv) control center to monitor and direct operations on the busways; (v) supervision o f the construction contracts; and (vi) paving and other improvement o f feeder roads.

Environmental Assessment

This Annex summarizes the findings o f a number o f environmental studies and analyses done during project preparation, including the: i) Development o f Guidelines for the Design, Environmental Management, and Monitoring and Evaluation o f urban infrastructure projects, drawing from the existing guidelines at the Institute for Urban Development o f Bogota -IDU (see Appendix 10.a); and (ii) the Environmental Management Plan for the project o f Pereira, coordinated b y AMCO (Metropolitan Area Coordinating Office).

Both the Environmental Guidelines for Urban Infrastructure Projects and the Environmental Management Plan for Pereira will be disclosed.

Long Term Environmental and Social Impacts

NUTP i s expected to provide net environmental benefits in the long run, derived from a cleaner, more modem and more energy-efficient transport system, with improved accessibility, and lower emissions o f air pollutants and greenhouse gases. In addition, the modernization o f public transport will bring lower congestion and increased safety for all transport users. Lower emissions o f air pollutants and GHG will result from a more efficient use o f the transport fleet, which will be further achieved with better technologies and fuels; a good and reliable public transport service will not only help access to work, leisure, and housing, but will enable modal shift from private cars and motorcycles. Provision o f good non-motorized transport facilities as safe and convenient bikeways and pedestrian space will also contribute to lower the energy intensity o f transport. NUTP implementation will include upgrading o f existing urban roads to enable an integrated system o f segregated trunk and mixed-traffic feeder routes, which in most cases will also result in urban space improvements in the form o f upgraded pavements and adjacent green areas. Reducing pollutant emissions in Bogota directly impacts the quality o f l i f e o f i t s citizens.

66

Page 75: FOR OFFICIAL ONLY - World Bankdocuments.worldbank.org/curated/en/... · Project description [one-sentence summary of each component] Re$ PAD B.3.a, Technical Annex 4 Component 1 -

The Project will improve the standards o f l i fe o f the population o f the main cities o f Colombia. Due to the implementation o f BRTS, and the fare integration, families wil l spend less o f their income on transportation. Additionally, the urban public transport users w i l l have access to a safe and improved transport system. Families w i l l be able to use the money and time that they currently spend in transport to satisfy other needs. The BRTS wi l l also allow the use o f mass transportation to the disabled population.

Environmental Baseline

The Project’s potential area o f influence varies from city to city. In Bogota, the Project will co-finance part o f the expansion o f the existing BRTS TRANSMILENIO, and i t s coverage will be limited to the 20 km o f the Norte Quito Sur corridor. In the medium cities the area o f influence will normally be associated with the existing main transport corridors. That i s the case o f the 30 de Agosto Avenue in Pereira; the Pedro de Heredia Avenue in Cartagena; or the Murillo Avenue in Barranquilla. In all cases, most works will involve upgrading o f existing roads, which are typically used for a combination o f public and private travel, hosting the main bus routes. These are consolidated areas around which a large part o f the population’s activity takes place.

Like most o f Latin American countries in the last decades, Colombia has experienced a high population increase in urban centers due to several economic and social factors. In addition, Colombia has also experienced several decades o f armed conflict that has displaced approximately 2.5 mill ion people from rural to urban areas, o f which 50 percent have been located in the four largest cities. As a result today 75 percent o f the total population o f Colombia live in cities. This concentration process has moved poverty issues away from rural areas into the cities, as i t i s now estimated that two thirds o f the Colombian population l iving below the poverty line i s located in urban areas. Colombia’s largest urban agglomeration i s the city o f Bogota with an estimated population o f 6.5 million, followed by Medellin and i t s metropolitan area close to 3 million, and Cali and Barranquilla, each having close to 2 million. Pereira, Bucaramanga and Cartagena follow with a populations ranging between 700 thousand and 1 mill ion inhabitants.

There i s a high dependency on public transport in all cities, as an average 75 percent o f people utilize public transportation. At the same time, the public transport systems in Colombian cities tend to be o f low quality, low operating speed, high levels o f congestion, high levels o f criminality, high accident rates and elevated levels o f air and noise pollution.

The relatively high levels o f emissions and concentrations o f airborne pollutants affect health and quality of life. Ozone, CO, and PMlo are the pollutants o f most concern in Bogota, as their concentrations exceed air quality standards. Besides their direct effect on health, PM10, NO, and SO, are major precursors for the formation o f PM2.5, which inflicts serious health impacts, including increased morbidity and mortality; and NO, and VOCs are also precursors for ozone formation, which has in it serious local social costs, while contributing to global warming.

Transportation i s a major source o f GHG, mostly in the form o f COZ, emitted as a direct result o f fossil fuel combustion; in Bogota, these emissions are mostly associated to the use o f gasoline and diesel. Thus, measures aimed at improving efficiency o f transport flows, at promoting modal shif ts to non-motorized, or to less energy intensive modes o f transport, w i l l not only help address local air pollution but will also reduce GHG emissions.

Safeguard Policies triggered

No significant or irreversible impacts are expected.

67

Page 76: FOR OFFICIAL ONLY - World Bankdocuments.worldbank.org/curated/en/... · Project description [one-sentence summary of each component] Re$ PAD B.3.a, Technical Annex 4 Component 1 -

OP4.01 Environmental Assessment. The policv OP4.01 i s triggered due to the potential adverse environmental impacts associated to the construction phase o f the Project, related to (a) management o f materials and waste; (b) restriction o f traffic flows and access to homes and businesses; (c) increased noise and emission o f pollutants; (d) management o f work camp sites; and (e) interference with urban infrastructure (phone lines, piping, electricity wires, sewage).

Environmental Guidelines To facilitate the development o f EMP for each participating city, and ensure quality and consistency, Guidelines for Design, EMP, and Monitoring or urban infrastructure projects were developed during project preparation, using the existing Guidelines at TDU as a basis. (see Appendix 10.1). The guidelines include programs for (i) camp site management; (ii) archeological and heritage chance finds; (iii) management o f borrow materials and sites; (iv) management o f wastes and disposal; (v) traffic management; (vi) public participation; (vii) management o f green areas; (viii) risk and occupational health and safety; (ix) management o f drainage, pavements and concrete structures; (x) management o f chemicals, liquid waste, oils, and fuels; (xi) water management; (xii) management o f equipment and machinery; and (xiii) control o f emissions and noise. The DNP was in charge o f coordinating the development o f the guidelines in association with the Ministry o f Environment. For the case o f Bogota, I D U ’ s guidelines will be used.

Environmental Management Plans

Environmental Management Plans will be required for each city to mitigate the potential environmental impact on the Project sites and surrounding areas during construction, will be addressed to al l infrastructure works (trunk lanes, transfer stations, and bus stops), and will be aimed at integrating environmental criteria into the design phase. All potential impacts that cannot be averted in the design wil l have to be mitigated through EMPs. The EMPs will be carried out either by the same contractors in charge o f developing the final infrastructure designs, or as separate studies for each city, in close coordination with the specific designs. The EMPs w i l l follow the guidelines developed during preparation to ensure consistency amongst cities. DNP will ensure that an EMP i s prepared for each city and the environmental authority at each metropolitan area will be in charge o f leading the contracting and supervision o f their studies.

The Subsidiary Agreements w i l l include provisions for ensuring that the EMPs are fully complied with, and that their implementation i s properly monitored and evaluated. All bidding documents for the infrastructure works will require not only the EMP, but also plans for monitoring their implementation. Pereira has already prepared i t s EMP and has submitted i t for Bank’s review. The Environmental Management Plan for Pereira i s summarized in Appendix 10.2.

OP4.12 Involuntavy Resettlements. The project intervention triggers OP 4.12, the Resettlement Policy. Despite the positive social impacts o f the Project for the urban population, the Project will cause involuntary displacement in some cities. For the above reason, a Resettlement Framework wil l be developed according to the Bank Operational Policy 4.12. All the cities are aware o f the Resettlement Policy o f the Bank, and the local authorities as well as the responsible institutions are willing to adhere to the Resettlement Framework. Based on this Framework, each city w i l l design Resettlement Plans before the bidding process for the construction o f the corridors.

OP 4.04 on Natural Habitats, and OPN 1 1.03 on Cultural Property get triggered due to potential impact on wetlands in Barranquilla and Soacha; and to potential impact on cultural heritage in Cartagena. In the first case, the BRTS passes nearby body waters o f important natural ecosystems. In the second case, there i s potential for chance finds when upgrading some o f the roads in Cartagena. In both cases the Project i s not inflicting direct impact, but the construction works pose potential adverse impacts. To mitigate them,

68

Page 77: FOR OFFICIAL ONLY - World Bankdocuments.worldbank.org/curated/en/... · Project description [one-sentence summary of each component] Re$ PAD B.3.a, Technical Annex 4 Component 1 -

the Environmental guidelines for the Design, Construction, and Monitoring o f Infrastructure Projects prepared already have the right provisions for Environmental Management Plans.

triggered )P4.01 i s triggered

Conlpliance with Environmental and Social Safeguards- SUMMARY

Guidelines for the desigr

The net environmental impacts from implementing NUTP wi l l be positive, with substantial impacts on air quality and safety. The potential adverse impacts are related with the construction phase o f the BRTS. The Project i s a S IL Category B operation. The following matrix summarizes the compliance with the Safeguard Policies, and it i s consistent with the Concept Review meeting.

lP4.12 i s triggered

lP4.04 i s triggered

)PN 1 1.03 i s triggered

Potential Impact

Resettlement Policy Develop Framework Resettlement Plans

Action Plan for updating RP for Bogota (NQS)

Guidelines for the design, Develop EMP for environmental management each participating plans, and monitoring o f city, with special urban infrastructure works attention to the (See Manual summarized at projects o f Soacha, appendix) and Barranquilla

Guidelines for the design, Develop EMP for environmental management each participating plans, and monitoring o f city, special urban infrastructure works attention to the (See Manual summarized at project o f Cartagen; appendix).

for each city

Environment

Involuntary Resettlement

Natural Habitats

Cultural Property

Safeguard Policies I Disclosure requirement

managemer

nvironmental Managemer Plan for Pereira E

A for Bogota (NQS) E

Next Steps

)evelop EMP foi ach participating ity

69

Page 78: FOR OFFICIAL ONLY - World Bankdocuments.worldbank.org/curated/en/... · Project description [one-sentence summary of each component] Re$ PAD B.3.a, Technical Annex 4 Component 1 -

Public Consultation and Disclosure

A Consultative Workshop on Safeguards took place during preparation, with the participation o f representatives from all candidate cities, from DNP, the Ministr ies o f Environment, and Transport, and from the Bank’s regional safeguard team. At the workshop, the Bank safeguard policies were made clear to all participating, as well as their application to the Project. Agreement on next steps for preparing the Project, and on environmental and social requirements for implementation were agreed at the workshop.

The Project development has included in-depth interviews and consultation with stakeholders. Considered stakeholders included bus service operators and associations, and NGOs. Representatives from governmental agencies were consulted on a regular basis. At the national level, DNP i s disseminating the CONPES (document providing legal and budgetary support to NTUP) for NTUP and the different cities at its institutional page: http://www.dnu.gov.co. The Projects have been posted in the institutional websites o f the different managing agencies (created with similar role and mission o f TransMilenio), or municipal administrations. In the case o f Pereira, i t i s presented at the official website o f Pereira’s municipal government: http://www.uereira.gov.co/webvision/planes contenido transuorte masivo.isu.

Disclosure varies according to the maturity o f the city projects. For Bogota and Soacha, where IDU will be the implementing agency, the Guidelines have been long disclosed and are made available. IDU has a website on general environmental and social policies and requirements for (http://www.idu.nov.co/entidad/aestion ambiental.htm). There, all contractors’ environmental obligations are spelled out, and guidelines to develop Environmental Management Plans are clearly presented. The website has also additional environmental and risk prevention information to inform not only investors but the general public, as well as public forum space. DAMA has also additional guidelines for environmental licenses and permits associated with the civi l works at http://w.dama.gov.co/. Disclosure o f the Environmental Guidelines and Environmental Management Plans w i l l be done through the institutional websites o f the recently created managing agencies and through DNP.

Institutional Cauacitv to implement and monitor EMP

As a principle, all EMPs will be implemented by the contractors in charge o f the civi l works, and i t s compliance wil l be ensured through the bidding documents and legal contracts. With the exception o f Bogota-Soacha, the other cities have relatively low capacity to approve the EMPs required as a general condition for the projects. DNP will be the agency in charge o f monitoring implementation o f all projects, but i t s capacity to follow up EMPs needs to be re-strengthened. To mitigate the risk, during project implementation all EMPs should be sent to the Bank for no objection. Complementarily, the Technical Assistance component will help build the needed capacity a t the city level.

70

Page 79: FOR OFFICIAL ONLY - World Bankdocuments.worldbank.org/curated/en/... · Project description [one-sentence summary of each component] Re$ PAD B.3.a, Technical Annex 4 Component 1 -

Appendix 10.1

General Guidelines for the Design, Construction and Follow up of the Urban Transport Project of Colombia.

Introduction

The National Department o f Planning (DNP) and the Ministry o f Environment, Housing and Territorial have issued environmental guidelines to be applied to urban transport projects, based on the following environmental practices and guidelines: Guidelines for Environmental Management for Development o f Urban Infrastructure (2003), developed by IDU and DAMA; Environmental Guidelines for the Design o f Urban Infrastructure Projects, developed by IDU, DAMA, and the Botanical Garden o f BogotS; the Manual for Environmental Guidelines and Practice by IN VIAS; the Manual for Environmental Monitoring o f Projects by IDU; the Sectoral Environmental Guidelines from the Ministry o f Environment, Housing and Urban Development; and the Manual for Environmental Management, Citizen Participation, and Land Development developed and used by Chile’s Ministry o f Public Works.

This document must be part o f the contractual covenants, together with the Environmental Management Plans for the civil works. Not complying with i t should generate potential economic penalties.

Objective

The objective o f these guidelines i s to optimize the environmental management o f construction activities related to infrastructure for Bus Rapid Transit Systems (BRTS) in Colombia, providing guidance to (i) improve planning, design, construction and follow-up o f civi l works; (ii) facilitate the development o f environmental studies; (iii) establish environmental management guidelines; (iv) unify criteria for monitoring and evaluation; (v) strengthen environmental practice; (vi) optimize resources; and (vii) mitigate environmental impact.

Environmental Guidelines for the Design

The following table shows the main potential environmental impact resulting from building BRTS projects, to be considered at the design stage.

71

Page 80: FOR OFFICIAL ONLY - World Bankdocuments.worldbank.org/curated/en/... · Project description [one-sentence summary of each component] Re$ PAD B.3.a, Technical Annex 4 Component 1 -

~ _ _ _ ~

/Generation and or acceleration o f erosive process and instability oss o f organic layer

ges in the natural drainage system

ference and effectuation o f the utility services operation

xio-economic and ultural Dimension

entation o f the accidentally rate ctation over the safety and goods o f the vulnerable population on the project

ing o f urban perspective not under study

Sources: MAVDT, IDU, D N A , INVIAS.

The following table provides elements to be considered when designing BRTS, according to environmental objectives and type o f intervention.

1 = corridors 2 = intermediate stations 3 = main (head) stations 4 = maintenance workshops

72

Page 81: FOR OFFICIAL ONLY - World Bankdocuments.worldbank.org/curated/en/... · Project description [one-sentence summary of each component] Re$ PAD B.3.a, Technical Annex 4 Component 1 -

aintain permeable surfaces,

etter Soil I/ Slope, surfaces and drainage management,

Slope and structures adequately,

Selection o f vegetation cover. Respect natural water streams: Avoid to conduct activities near natural water streams. If i t i s a case that these take place, all precautions must be take in to

void rectifications on water streams, specially when i s the b ase o f a natural stream drain, !Maintain permeable surface drainage, complimented with adequate drainages along the way.

Minimize Conflicts with water bodies, by inadequate location,

Storms water storage systems,

Pollution control against o i l spills and lubricants: Storm, domestic and drainage water. Control and forecast atmospheric emissions on the source: Introduction o f clean fuels and efficient combustion processes,

Cleaner and more water &count to avoid pollution, for the future

i

educe noise at station floors, leaner air and less noise

Through the implementation o f protective measures protect the neighbors from the actions o f traffic, Identify, respect and enrich, if i t s necessary local biodiversity,

Find protection and enrichment o f the biodiversity at the corridor and surrounding sites,

Propose conservation and protection measures o f the biodiversity in urban areas during the construction o f the urban transport systems, enriching vegetative cover and the availability o f habitat,

Plant o f native species along the routes o f the transport systems. Avoid to the maximum extent the use and temporarily occupation o f green areas,

Compensate green areas intervened by the construction.

Pstablish association o f attractive species.

ore Biodiversity I 73

Page 82: FOR OFFICIAL ONLY - World Bankdocuments.worldbank.org/curated/en/... · Project description [one-sentence summary of each component] Re$ PAD B.3.a, Technical Annex 4 Component 1 -

Protection o f strategic ecosystems

Inventory and evaluation o f possible inventories.

Inventory and evaluation o f possible impacts,

of the esign of protection measures, istorical Heritage F ore and better public

It must be planned the use o f green areas and pu8blic areas,

ore and better public

important ecological

ake advantages o f the native vegetative species,

Increase the visual quality and the scenic value o f the surrounding vegetation,

etter urban Landscape

e occupying an

nalyze and forecast drainage management,

ess natural r isks

nalyze seismic risks,

Ian maintenance and repairmen o f infrastructure.

I

I

74

Page 83: FOR OFFICIAL ONLY - World Bankdocuments.worldbank.org/curated/en/... · Project description [one-sentence summary of each component] Re$ PAD B.3.a, Technical Annex 4 Component 1 -

Require signals, facilities, including signals hits,

Detailed analysis o f possible r isks and mitigation alternatives, Lees Technological Risks Plan sufficient budget,

Avoid interferences with signals and communication systems o f the operator. Have control on substances and hazard material. Apply regulations for storage, dispose and use hazardous materials, as domestic waste. lubricants, fuels, additives, batteries, etc.

Environmental Management Plan

.

In order to mitigate the environmental impacts o f the project, 2 1 environmental management programs have been designated for several activities o f the project. Every program, addresses regulatory framework, impacts to be mitigated, and management’s measures. The programs are as follows.

Progrum 1: munugement and disposal of solid wuste fi-om construction activities This program wi l l define the general environmental management framework for the disposal, selection and classification, o f solid waste resulted from digging and structural definitions. The impact that wil l be mitigated will be atmospheric pollution and noise, solids entering the drainage system, pedestrian inconveniences on the impacted area during construction, loss o f vegetative cover, landscape alteration and land slides, intervention o f sensitive hydrological zones. These guidelines wil l be applied on to intervened areas, demolitions, digging and construction on Annexes areas.

1. Management Measures

- Defines the procedures to manage and dispose construction waste. Establishing mechanisms to select temporal storage sites; - Defines activities to select areas for storage o f recyclable digging material, including the design o f measures to avoid degradation by the action o f wind and water; - Defines criterion to avoid the use on green areas for waste disposals; - Prohibits the disposal o f debris on Hydrological sensitive areas; - Informs that all vehicles need to comply with regulation 54 1/94 from the Ministry o f Environment anc they only w i l l be allowed to circulate for their activities on the schedule previously approved; - The disposal o f debris from construction activities will only be located at the previously authorized sites; - Vegetative inaterial and debris from tree elimination and relocation should be separated according to i t s size and general characteristics; - Vegetative cover should be retired from worlung area, vegetation as grass could be reused on site afte construction work have been finished; - Soil and other vegetative material can be deposited on areas where i s needed to recover the landscape and the lost o f vegetative aspects; - For complementary measures, see programs 3, 1 1, 12, 13.

75

Page 84: FOR OFFICIAL ONLY - World Bankdocuments.worldbank.org/curated/en/... · Project description [one-sentence summary of each component] Re$ PAD B.3.a, Technical Annex 4 Component 1 -

Program No. 2: Storage and management o f construction material

This program aims at setting guidelines on activities to dispose and manage sand, rocks and other construction material used on the implementation o f this project. The impact identified on this program is: atmospheric pollution and noise, solids entering the drainage system, pedestrian inconveniences, and occupation o f public space.

~

2. Management Measures

- Establishes measures for construction material as sand, rocks, asphalt, and other derivates from clay used at the construction site; - Establishes provisions for management o f asphalt and concrete. Measures as to manage the concrete over steel plates, and provisions in case o f spills. The use o f wood structures i s restricted; - Establishes provisions to use hot asphalt to cover gaps in concrete; - Establishes provisions to manage sand, rocks, aggregates and bricks; - Establishes temporary locations for the storage o f construction material to avoid i t s wash to drainage systems; - In case o f the construction material be provided by a public company, this material should be deposited at the front o f the construction site; - The vehicles used to work on the Project must use cover at all times while workmg at the construction site; - In case o f not having an adequate site for temporal construction material storage, in an exceptional mode green areas would be authorized to be used; - As complementary measures, see programs 8,9.

Program 3: Management o f Temporary office locations and construction site This component sets guidelines for site camp and storage location. The impacts to be mitigated are related to the construction and operation o f the site camp, as the removal o f vegetative cover, temporal changes on the use o f soil, gases and particles emission, noise, domestic waste water generation, fine particles and lubricants to water streams and drainage system, landscape variation, industrial and domestic solid waste, change o f day to day activities to householders, ut i l i t ies demand, and increase on the risk o f accidents.

3. Management Measures

- Generates guidelines for the location o f the site camp and existing locations, the site camp, should be located at green areas, public spaces, only when i s strictly necessary; - The temp site camp must be well illuminated, have external vigilance, and the contractor should request

local utility services permission to use i t s services; - The temporary site camp, must have on i t s own an area for bathroom in the proportion o f 1 for each 15 workers; - Recipients for solid waste management must be located at the temporary site camp, identifying i t s sources with different colors; - Every temporary site camp must show preventive signs to avoid accidents as a measure o f safety. Also every site, must have f ire extinguishers; - For complementary measures, see programs 4,6, 11, 12, 13, 17, 18.

Program 4: Management o f equipment, machinerv and Transport This program defines general guidelines for equipment to be use at the construction project. Major impacts will be caused by the operation o f the equipnients. Impacts as noise, gases and particles, o i l and grease spills, traffic alternations, increase on the risk o f accidents, water pollution, vibration o surrounding areas, deterioration on surrounding vegetation, are expected.

Page 85: FOR OFFICIAL ONLY - World Bankdocuments.worldbank.org/curated/en/... · Project description [one-sentence summary of each component] Re$ PAD B.3.a, Technical Annex 4 Component 1 -

4. Management Measures

- Establishes measures to work around hospitals, schools, and libraries, the schedule o f work will be 2 hours o f work, and two hours o f suspension o f activities; - Inforins that equipment maintenance will be a key element to mitigate air and noise emissions; - Informs that equipment and machinery washing activities must not be done at camp sites; - Recommends to use at the construction site, equipment recently built in order to comply with the law769102 for emissions; - Gives recommendation for loading and unloading equipments, these must be in stop position; - Recommends that, when works are conducted during night shift, equipment that produces levels o f noise above the required regulation o f the neighborhood or area can not be use; - As complementary measures, see programs 1,2, 5,6, 8 ,9.

Program 5: Air Oualitv This program aims at establishing necessary controls to reduce the emission o f particulate matter, polluted gases and noise. The major impact to mitigate with th i s program is: augmentation o f the level o f noise, particulate matter, gases (CO, Sox, Nox, C02).

5. Management measures

- Establishes conditions for the camp site; - Requires a program to moist the ground on dry seasons; - Requires that the speed o f the machinery and equipment at the construction site, should not exceed 20 kdH; - Suggest that the load must be well accommodated in to the transport systems; - Requires that equipment not being used, should be turn o f f while stopped; - Establishes conditions to manage materials at the construction site, as covers and moisture providers; - Requires at the construction site, burning waste i s prohibited; - Requires the contractor to be responsible to manage and control any emission source that arises from the construction activity; - Establishes guidelines to manage noise on sensitive areas, as hospitals, schools, etc. This includes night work activities; - For complementary measures, see programs 1,2, 4, 7,8, 10.

6. Management Measures

- Establishes provision that prohibits the washing and repairmen o f equipment and machinery at the camp site; - Establishes measures to manage oils and lubricants; - Establishes measures to manage sludge for construction activities; - Establishes measures to manage chemical substances; - As complementary measures, see programs 3,4, 5, 6,18.

Program 6: management o f Liauid waste, flammables, Oils and lubricants, and chemical substances. This program aims at managing oil, flammable substances, and lubricants. I t s impacts are, liquid waste to water streams and sewage systems, pollution o f surface water, odors, soils, work accidents and professional health problems.

77

Page 86: FOR OFFICIAL ONLY - World Bankdocuments.worldbank.org/curated/en/... · Project description [one-sentence summary of each component] Re$ PAD B.3.a, Technical Annex 4 Component 1 -

Program 7: Camp Site cleaning status This program i s aimed at having before and after the construction activities, clean conditions at the campsite. The impacts to be mitigated with this program are: air quality, solid waste to drainage system, landscape affectation.

- Establishes provisions for waste collection and management. This elements must be located at least every 200 mts; - Requires per every 1.000mts and every camp site have a team to do cleaning at the construction facilities; - Requires that recycling material must be storage separated; - For complementary measures, see programs 1 , 2, 3.

7. Management Measures

Program 8: Manapement o f traffic changes and flow o f traffic This program aims at managing traffic conditions at the area impacted with the construction works. The impacts are as follows: alternation o f the landscape, modification on daily behavior o f the community, pollution from atmospheric emissions, increase o f accidents, increase in particle concentration and gases.

8. Management Measures

- Establishes projects and programs to manage traffic on the direct and undirected affected areas; - Establishes an information campaign, including maps and graphs; - Suggests traffic management measures throughout the impacted area with construction works; - Requires the access to police station, fire department, health care centers, hospitals, and military locations, must be cleared and uninterrupted; - Establishes areas for pedestrian to mobilize during traffic intervention; - For complementary measures, see programs 1,2,9, 18.

Program 9: Signaling This program aims at placed s igns on roads that are under construction. The impacts o f this activity are alteration o f vehicular and pedestrian flow, increase in accidents and change on the behavior o f the community.

9. Management Measures

- Establishes provisions for signaling the work area; - Establishes a system with elements to mange and control the traffic and the protection o f civil works on urban areas; - Establishes the different types o f elements that must be used in the area o f construction to manage traffic and construction activities; - Establishes signs in temporary closed streets; - For complementary measures, see programs 1, 2,3,4,8, 10, 18.

Program 10: Construction works insulation This program aims at insulating construction areas to avoid the intromission o f unwanted personal on the site. The impacts to mitigate are; accidents, visual contamination, solid waste management, robbery and other related activities.

78

Page 87: FOR OFFICIAL ONLY - World Bankdocuments.worldbank.org/curated/en/... · Project description [one-sentence summary of each component] Re$ PAD B.3.a, Technical Annex 4 Component 1 -

10. Management Measures

- Establish provision for the installation o f a plastic barrier (Green Color ) to avoid the intromission o f people and other elements within the construction area; - For complementary measures, see programs 1, 2,9.

- Establishes rules for equipment mobilization within the project area; - Requires that the loss o f soil must be restricted at the construction site; - Requires that solid waste management at the construction site should be restricted and temporary; - Establishes that liquid waste should not be send to water streams and drainage systems; - Establishes activities in case o f having an o i l and solid waste spill; - Establishes activities when removing the vegetative layer; - For complementary measures, see programs 1, 2,3, 6, 12, 13, 14, 16, 18.

Program 1 1 : Ground management This program aims at protecting the soil on the direct influence area o f the Project. The major impacts are erosion and change in land use patterns.

12. Management Measures

- Establishes procedures for handling water streams near the construction site; - Establishes procedures for handling digging material, and to avoid it spills in to water streams and drainage systems; - Establishes procedures to handle waste at al l site camp locations; - Establishes measures to have on every camp site an adequate system to collect and manage water and liquid wastes; - Establishes provisions for temporal mechanical shops and management o f waste o f these facilities; - Establishes requirements to prohibit the washing o f vehicles at camp site; - Establishes requirements to manage surface waters at the construction site, including construction and maintenance o f drainage channels. I t i s required to apply Decree 154 1 de 1978; - For complementary measures, see programs 1,2,3,4,6,7.

1 1. Management Measures

This program aims at having adequate management o f liquid waste coming from campsites location and other sources. Also to prevent and mitigate the affectation o f the drain receptors systems during construction activities o f the Project. The impacts to be mitigated are: alteration o f the water quality, by oil, lubricants, solid waste, others.

Program 13: Management o f Vegetation This program aims at reducing the impact o f surrounding vegetation at the construction site. The impacts to be mitigated are: vegetation and habitat, soil alteration, landscape alteration, fauna and flora.

13. Management Measures

- Establishes environmental requirements for the removal and eradication o f tree vegetation; - Establishes procedures to remove and replant trees and vegetation; - Establish procedures to activities o f management o f organic cover; - For complementary measures, see programs 1,2,7, 9, 10, 11, 16.

79

Page 88: FOR OFFICIAL ONLY - World Bankdocuments.worldbank.org/curated/en/... · Project description [one-sentence summary of each component] Re$ PAD B.3.a, Technical Annex 4 Component 1 -

Program 14: Comuensatoni Tree and Vegetation Replant The objective o f the component i s to compensate the lost o f vegetation at the construction site. The impacts to be mitigated with this program are related to the loss o f vegetal cover and the loss o f trees due to construction activities.

17. Management Measures

- Establishes requirements for the implementation o f a program on preventive medicine; - Establishes guidelines for the development o f a program for hygiene and industrial safety; - For complementary measures, see programs 3,4,6,7,18.

14. Management Measures

- Establishes procedures to manage the cut and replant activities for new and replaced vegetation, including the identification o f areas selected for compensation; - Establishes measures for maintenance o f the compensated vegetation and its adaptation o f the new environment; - For complementary measures, see program 13.

Program 15: Management o f Archeological and Historical Sites This program aims at establishing basic guidelines to mitigate the impact over Archeological and Historical heritage at the construction site. The impacts identified for this activity are: the destruction or alteration o f the cultural and archeological heritage, and the lost o f cultural identity.

Program 16: Landscape management This program aims at achieving adequate management o f the landscape at the construction site. The impacts are associated to the alternation o f the visual o f the site, and the quality o f the landscape.

16. Management Measures

Establishes measures to manage in the most appropriate manner the landscape; Establishes criteria to include at the design stage measures to less affect the surrounding landscape; For complementary measures, see programs 1 1,12,13,14.

Program 17: Occuuational health and industrial safety This program aims at protecting construction workers, surrounding affected people, minimize the occurrence o f accidents, define the operative mechanisms, improve the quality o f l i fe and work environment at the construction site.

Program 18: Contingency Plan This plan does not have to be specific. The contractor must design a plan, which includes at least the following aspects: prevention, structure, operative, specific, and has a broad coverage. This program also requires, a plan for risk and vulnerability, plan o f action and other aspects to be taken in to account.

Program 19: Restitution o f affected locations This programs aims at mitigating the effects o f the construction activities at the surrounding areas o f the construction sites.

19. Management measures

80

Page 89: FOR OFFICIAL ONLY - World Bankdocuments.worldbank.org/curated/en/... · Project description [one-sentence summary of each component] Re$ PAD B.3.a, Technical Annex 4 Component 1 -

- Defines planning and work activities to be implemented i n conflictive zones; - Defines requirements for geomorphologic restoration; - Defines requirements for public space; - Proposes measures to mitigate the r isks and complains for the affected population; - For complementary measures, see programs 1,2,4,6,7,8,9.

20. Management Measures

- Identify and analyze measures to communicate in the most effective manner with the affected community; - Describes the mechanism to be used by the contractor to communicate changes and developments o f the works to the community; - For complementary measures, see programs 7,8,9,21.

Program 2 1 : Citizens participation Citizen participation i s a key element for the success o f any type o f projects. This mechanism used by communities to conduct i t s supervision, assume i t s role and take advantages o f the benefits o f the Project. The objective o f this participation i s to have a broad participation o f the involved and affected communities.

2 1. Management measures

- Establishes the identification o f formal mechanisms to communicate and to promote information exchange between interested parties; - Establishes the mechanisms for conflict resolution between communities and the site developer; - For complementary measures, see programs 7,8,9,2 1.

Environmental Follow UP

These guidelines provide mechanisms and questionnaire formats to conduct the environmental follow up o f the activities contained on the above programs. There are two stages: Environmental auditing; and supervision o f environmental compliance. The guidelines make a description o f the activities by the supervisor or auditor who w i l l be in charge o f monitoring EMP implementation, as well as the amount and type or report that the supervisor needs to present. Formats for every activity must be completed by the auditor and reported every agreed time to the construction authorities.

81

Page 90: FOR OFFICIAL ONLY - World Bankdocuments.worldbank.org/curated/en/... · Project description [one-sentence summary of each component] Re$ PAD B.3.a, Technical Annex 4 Component 1 -

Appendix 10.2

Environmental Management Plan for the construction of the Bus Rapid Transit System for Pereira and Dosquebradas

BACKGROUND

The Project wil l cover 2 municipalities, Pereira and Dosquebradas, forming a transport corridor that initiates at the Parque Cuba, goes along Avenida 30 de Agosto, continues around Parque Olaya to get to Avenida del Ferrocarril, crosses the Viaducto, continues on Avenida Simon Bolivar and ends at Paiios OMNES in Dosquebradas. Also, it will have a downtown circuit on Carrera 6" between calles 12 and 24; Carrera 7" between calles 24 and Turin; Carrera 8" between Turin and calle 24; Carrera 10 between calles 24 and 10; Carrera 9 bis between calle 10" and Avenida del Ferrocarril, calle 13 between Carreras 6" and IO"; Calle 10" from Carrera 10" and 9 bis; Calle 24 between Carreras 6" and 7"; Calle 24 between Carreras 8" and 10".

The Project wil l operate on articulated buses in exclusive lanes in most o f the corridors, and wil l include 2 terminals to interconnect with feeding and main routes, and bus stops. Feeding routes will be served by 30-40 passenger buses. Articulated buses w i l l have a capacity o f 160 passengers. There will be an integrated fare system to achieve transport cost reductions. The Project aims at achieving a new image o f public transport with a safe, reliable, efficient, and rapid bus system. The new system, MEGABUS, wil l generate about 3,000 employments. The road upgrades required include (i) bus lane widening and rehabilitation; and (ii) widening o f adjacent pavements, except in the downtown circuits. Also 40 bus stops located about every 500m from one another in the central separators; 2 terminal stations; bus storage and garages. See graph below for the location o f routes, bus stops, and terminals.

The Project was divided in 6 segments. Following i s a summary description o f the main civi l works involved in each:

(i) Parque de Cuba - San Fernando; widening and demolishing o f affected properties. (ii) San Fernando - Puente Avenida Las Americas; new bridge over River Consota and elevated passway over Avenida Las Americas. (iii) Avenida San Mateo y Serpentin; In Avenida San Mateo, modifying basin flow o f creek L a Dulcera, to build the structure to support the new elevated passway over Avenida Las Americas. In Serpentin, some minor repairs, and geometry corrections. (iv) Round Point de Cuba - Avenida 30 de Agosto - Viaducto; widening o f both lanes, modification o f median strips; and widening o f Turin elevated passway (bridge). (v) Viaducto - Avenida Sim6n Bolivar - Paiios OMNES; lanes widening, and modification o f median strips. And widening o f bridges over creeks Frailes, La Vibora, and Caiiaveral to build wide pavements. (vi) Downtown; upgrade o f paving structure on BRTS lane.

The following graphs illustrate the segments and location o f main interventions:

82

Page 91: FOR OFFICIAL ONLY - World Bankdocuments.worldbank.org/curated/en/... · Project description [one-sentence summary of each component] Re$ PAD B.3.a, Technical Annex 4 Component 1 -

UBICACIbN DEL CORREDOR VIAL DEL TRAM0 ROUND

S I T M MEGABdS, DENTRO DE LA CIUDAD DE PEREIRA POINT DE CUBA - AVENIDA 30 DE AGOSTO - VIADUCTO, DEL

I VIADUCTO I

CORREDOR VIAL -

lBICACIO\ DELCORREDOR \ 14LDELTR\\ lOA\ [ \ ID4 S4\ \MTEO \ SERPE\TI\ DEL SIT\I \IEG \BL C, DE\TRO DE LA c n ~ i ~ DE PEREIR~

ROUND POINT DE I CUBA AV. 30 DE AGOSTO

1 I

Corredor vial -

83

Page 92: FOR OFFICIAL ONLY - World Bankdocuments.worldbank.org/curated/en/... · Project description [one-sentence summary of each component] Re$ PAD B.3.a, Technical Annex 4 Component 1 -

lJBICACI6N DEL CORREDOR VIAL DELTRAMO SAN FERhANDO - PUEhTE AVENIDA LAS AMERICAS DEL SlTM MEGABUS, DENTRO DE LA CIUDAD DE PEREIRA

1 Av 30rfeAgosto I

- Corredor vial

UBICACIOX DEL CORREDOR VIAL DEL T R A M 0 PARQUE

DE LA CIUDAD DE PEREIRA DE CUBA - SAN FERNANDO DEL SITM MEGAB~S, DEPUTRO

Corredor vial -

84

Page 93: FOR OFFICIAL ONLY - World Bankdocuments.worldbank.org/curated/en/... · Project description [one-sentence summary of each component] Re$ PAD B.3.a, Technical Annex 4 Component 1 -

CORREDOK WAL

85

Page 94: FOR OFFICIAL ONLY - World Bankdocuments.worldbank.org/curated/en/... · Project description [one-sentence summary of each component] Re$ PAD B.3.a, Technical Annex 4 Component 1 -

SUMMARY OF IMPACTS

The Project has relatively low potential environmental impacts, mostly related to the construction phase. And all o f them can be adequately mitigated. The area o f influence i s a consolidated urban zone, highly changed by human activity and with very few natural environment left. Potential adverse environmental impact, additional to the impact from the construction period (Le. camp sites, wastes, noise and air pollution, traffic, water flows, service infrastructure, borrow materials and areas, soil stability, heritage chance finds) can be summarized as follows:

(i) Parque de Cuba - San Fernando. First, loss o f existing vegetal cover in Avenida de Cuba, both at the side green areas (where there will be lane widening) and in the median strip (where bus stops will be located); most affected trees are in very bad condition as they are not proper species for urban environment and due to aggressive pruning. Second, there will be involuntary resettlements, as there will be some houses that w i l l need to be demolished;

(ii) San Fernando - Puente Avenida Las Americas. Involuntary resettlement o f people at barrios Brisas del Consota and L a Playita;

(iii) Avenida San Mateo - Serpentin. Rectification o f La Dulcera creek bed on a lOOm stretch, which wil l partially affect a close bird habitat. Some isolated trees and some grass will also be eradicated. In the Serpentin area the environmental impact i s very low; this i s a temporal project while San Mateo i s constructed;

(iv) Round Point Cuba - Avenida 30 de Agosto - Viaducto. Forest specimens located in the median strip; and side green areas where widening o f lanes and pavements i s required, will be eradicated. Also at the places where the bus stops are to be located;

(v) Downtown area. Some forest specimens will be eradicated, and some partial affection o f properties i s expected;

(vi) Viaducto - Avenida Sim6n Bolivar - Paiios OMNES. Also, here the impact will be associated to the eradication o f forest specimens and green areas.

86

Page 95: FOR OFFICIAL ONLY - World Bankdocuments.worldbank.org/curated/en/... · Project description [one-sentence summary of each component] Re$ PAD B.3.a, Technical Annex 4 Component 1 -

MITIGATION MEASURES

The following table summarizes the main mitigation measures included in the EMP:

.Program for rastes, borrow iaterials, scavations, nd demolitions

ust be protected against dispersion by wind and water igging and demolishing only during daytime se o f water to moist work sites twice a day achinery with noise control devices e oise

ito water streams outside work area

ehicles transporting wastes, incl. Standards

collection o f waste material after digging and g and prompt transport to disposal sites

aterial removed to be reutilized ite not to be used in deep pilot structures

n to affected community stretches o f 100 m to be affected at a time to avoid

OP$1,594 ii l l ion

87

Page 96: FOR OFFICIAL ONLY - World Bankdocuments.worldbank.org/curated/en/... · Project description [one-sentence summary of each component] Re$ PAD B.3.a, Technical Annex 4 Component 1 -

IWastes, and effect /Concrete mix over metal sheets into water streams

not be used for concrete melting te cleaning o f equipment material to be used as waste s to follow specifications o f program 1

ty and contingency must be available

porous materials such as brick, concrete

tect sinks with adequate materials iodical cleaning o f sinks per disposal and handling o f liquid waste ctices for handling rainfall water

ation must be as far as possible from sed to avoid dispersion

lOP$135 i i l l ion

:OP$42.7 nillion

20P$460 ni l l ion

88

Page 97: FOR OFFICIAL ONLY - World Bankdocuments.worldbank.org/curated/en/... · Project description [one-sentence summary of each component] Re$ PAD B.3.a, Technical Annex 4 Component 1 -

. Program for quipment and lac hi nery

Noise, vibration, and air pollution

Good maintenance o f engines, mechanical component, and tires Diesel engine vehicles must have exhaust at min. 3 m height Use o f modern vehicles and machinery Emissions checlung and control devices Night shifts according to noise levels Works close to schools, libraries, and hospitals must limit to maximum alternating periods o f 2 hours, to be concerted with affected

Contamination due Maintenance and service in authorized centers to spillage o f fuels and oils

Alteration o f Same vehicle and people transit Increase in accidents risk Loss and Same deterioration o f

Adequate gear and noise protection devices

Social conflict Sowing, planting, and replanting coordinated with CARDER k regional environmental agency) and IMPAR for trees

vegetal cover

use Noise and air pollution

Liquid wastes, o i l and fuels into sewage network

Plan for avoiding potential stealing Inventory o f forest specimens before start and identification o f site Landscape

Pictures o f sites before and after Protect green areas as per P-9

Restoration o f camp site after construction Adequate cover o f materials Proper storage areas Access pathways for material s’ transport Connection to local sewage Proper labeling, handling, and storage o f residuals, chemicals

Location in existing lots o f properties, avoid roads

iA icluded in ivi l works osts

:OP$l05

89

Page 98: FOR OFFICIAL ONLY - World Bankdocuments.worldbank.org/curated/en/... · Project description [one-sentence summary of each component] Re$ PAD B.3.a, Technical Annex 4 Component 1 -

elated illnesses

aintain adequate moisture to avoid particle

uate measures for covering and handling demolitions are prohibited in open spaces

id storage o f organic material

afety

lcommunity . Program for blteration o f hdequate signaling practices and procedures bOP$662

-training o f equipment and vehicle operators Work medicine program -Exams and tests -Emergency practices Hygiene and industrial safety program -Sport activities -Good equipment maintenance -Safety gear and equipment

vehicle and people o f signs and labels i l l ion transit people transit under safe conditions

storage o f materials and waste in front o f work sites

ood illumination traffic management

ignaling

90

Page 99: FOR OFFICIAL ONLY - World Bankdocuments.worldbank.org/curated/en/... · Project description [one-sentence summary of each component] Re$ PAD B.3.a, Technical Annex 4 Component 1 -

JA

:OP$335 i i l l i on

The EMP also includes Contingency Plans, and Monitoring Plans.

91

Page 100: FOR OFFICIAL ONLY - World Bankdocuments.worldbank.org/curated/en/... · Project description [one-sentence summary of each component] Re$ PAD B.3.a, Technical Annex 4 Component 1 -

Annex 11: Project Preparation and Supervision

COLOMBIA: CO Integrated Mass Transit Systems

Planned Actual PCN review Init ial PID to PIC

~~ ~~~

09/04/2003 09/04/2003 09/17/2003 09/10/2003

Init ial ISDS to PIC Appraisal Negotiations BoardRVP approval Planned date o f effectiveness Planned date o f mid-term

Key institutions responsible for preparation o f the Project: National Planning Department - Departamento Nacional de Planeacion (DNP) Ministry o f Finance - Ministerio de Hacienda y CrCdito PLiblico (MNCP)

09/ 17/2003 03/12/2004 03/23/2004 04130/2004 04/29/2004 05/27/2004 06/10/2004 09/30/2004 09/3 0/2004 07/26/2006 07/26/2006

Bank staff and consultants who worked on the Project included:

review Planned closing date 03/3 1/2009 03/3 1/2009

I Eduardo Bayon I Consultant

92

Name Title Mauricio Cuellar Task Team Leader! Transport

Unit LCSFT

Page 101: FOR OFFICIAL ONLY - World Bankdocuments.worldbank.org/curated/en/... · Project description [one-sentence summary of each component] Re$ PAD B.3.a, Technical Annex 4 Component 1 -

Bank funds expended to dale on Project preparation: Bank resources: US$207’538.13 Trust funds: us$o.oo Total: US$207’S38.13

Estimated Approval and Supervision costs: Remaining costs to approval: US$60’000.00 Estimated annual supervision cost: US$83’900.00

93

Page 102: FOR OFFICIAL ONLY - World Bankdocuments.worldbank.org/curated/en/... · Project description [one-sentence summary of each component] Re$ PAD B.3.a, Technical Annex 4 Component 1 -

Annex 12: Documents in the Project File

COLOMBIA: CO Integrated Mass Transit Systems

A. Project Implementation Plan

Subsidiary Agreement o f the Metropolitan Area (Pereira - Dosquebradas) for the BRT System

B. Bank Staff Assessments

OPRC Case Recommendation and Review Report, January 2004 Jose Martinez - Procurement Capacity Assessment, February 2004 Daniel Boyce - Financial Management Capacity Assessment Juan Lopez - Environmental Assessment BTOR - Quality Assurance Team (QAT) - Client Safeguard Training Workshop, Environmental and Social Aspects o f the Colombia Urban Transport Project

C. Other

World Bank - Aide Memoire and BTOR o f Identification and Preparation Mission, February 2003, March 2003, September 2003

World Bank - Minutes o f PCD Review Meeting - October 2003

Diario Oficial. Ai io CXXXII, No. 42853. 12 Agosto, 1996. Pag. 1 - Ley 310 de 1996 (Agosto 6) por medio de la cual se modifica la Ley 86 de 1989.

Diario Oficial. Aiio CXXXIIT, No. 43205, 31 de Diciembre, 1997. Pag 41 - Decreto Nuniero 3109 de 1997 (Diciembre 30) por el cual se reglamenta la habilitation, la prestacion del servicio publico de transporte masivo de pasajeros y la utilizacion de 10s recursos de la Nacion.

Contrato No. 017 de 2003, de concesion para la prestacion del Servicio Publico de Transporte Terrestre masivo urban0 de pasajeros en el Sistema TransMilenio, suscrito entre la empresa de transporte del Tercer Milenio, S.A. " Transmilenio, S.A." y S I 02 S.A.

DNP - Documento CONPES 3220, Sistema Integrado del Servicio PLiblico Urbano de Transporte Masivo de Pasajeros del Area Metropolitana del Centro Occidente

DNP - Documento CONPES 3167, Politica para mejorar el Servicio de Transporte Publico Urbano de Pasajeros

DNP - Documento CONPES 3259, Sistema Integrado del Servicio Publico Urbano de Transporte Masivo de Pasajeros del Distrito de Cartagena - Transcaribe

DNP - Documento CONPES 3260, Politica Nacional de Transporte Urbano y Masivo, version aprobada Diciembre 15, 2003

IDU - Presentacion Poder point del Esquema Concesiones Troncales, NQS y SUBA

IDU - Presentation Power point Adecuacion a1 Sistema TransMilenio de la Troncal Norte Quito Sur, Carrera Sector Norte (Junio 2003)

94

Page 103: FOR OFFICIAL ONLY - World Bankdocuments.worldbank.org/curated/en/... · Project description [one-sentence summary of each component] Re$ PAD B.3.a, Technical Annex 4 Component 1 -

DNP - Presentacidn Power point CONPES, Politica Nacional para el Desarrollo de sistemas Integrados de Transporte Masivo - SITM (Abril2003)

CNP - Presentacibn Power point - Sistemas Integrados de Transporte Masivo SITM

Literature:

GWILL IAM Ken. - Cities on the move: a World Bank Urban Transport Strategy Review. - The World Bank, 2002.

TRANSMILENIO, S.A. - Instituto de Desarrollo Urban0 - Plan Marco Sistema TransMilenio, Noviembre de 2003.

95

Page 104: FOR OFFICIAL ONLY - World Bankdocuments.worldbank.org/curated/en/... · Project description [one-sentence summary of each component] Re$ PAD B.3.a, Technical Annex 4 Component 1 -

Annex 13: Statement of Loans and Credits

COLOMBIA: CO Integrated Mass Transit Systems ~

Project ID FY PO77757 2004

PO74138 2003

PO74726 2003

PO57369 2002

PO57692 2002

PO65937 2002

PO41642 2002 PO69964 2001

PO40109 2001

PO63317 2001 PO44140 2000

PO68762 2000

PO57326 2000

PO50578 2000 PO06861 1998 PO06891 1998 PO53243 1998

PO06884 1997

PO40102 1997 PO06894 1996 PO06880 1995

Difference between expected and actual disbursements

Purpose IBRD IDA SF GEF Cancel. Undisb. Orig. Frm. Rev’d CO: CUND,MARCA EDUCATION 15.00 0.00 0.00 0.00 15.00 0.00 0.00

Original Amount in US$ Millions

QUALlTY IMPROVE CO-Higher Education - Improving 200.00 Access Colombia-Bogota Urban Services 100.00 Project CO Judicial Resolution Improvement 5.00

CO 2nd Magdalena Medio Project 5.00

CO WATER SECTOR REF 40.00 ASSISTANCE PROJECT CO PRODUCTIVE PARTNERSHIPS 32.00 CO- Human Capital Prot.- Cash Transfers CO PUBLIC FINANC. 35.47 MANAGEMENT PROJECT I1 GEF CO-HIGH ANDES 0.00 CO CARTAGENA WTR SUPPLY & 85.00 SEWERAGE ENV. CO- COMMUNITY WORKS 100.00 (MANOS A L A OBRA) CO SIERRA NEVADA 5.00 SUSTAINABLE DEVELOPMEN CO RURAL EDUCATION 20.00 CO URBAN INFRASTRUCTURE 75.00 CO ANTIOQUIA EDUCATION 40.00 CO PEASANT ENTERPRISE ZONES 5.00

CO FINANCIAL MARKETS 15.00 DEVELOPMENT CO REG.REF.TA 12.50 CO SANTAFE T (Waterisupply) 145.00

Prj .

(LE)

150.00

(LE)

0.00

0.00

0.00

0.00

0.00

0.00 0.00

0.00

0.00 0.00

0.00

0.00

0.00 0.00 0.00 0.00

0.00

0.00 0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00 0.00

0.00

0.00 0.00

0.00

0.00

0.00 0.00 0.00 0.00

0.00

0.00 0.00

0.00

0.00

0.00

0.00

0.00

0.00 0.00

0.00

15.00 0.00

0.00

0.00

0.00 0.00 0.00 0.00

0.00

0.00 0.00

0.00

0.00

0.00

0.00

0.00

10.00 0.00

0.00

0.00 0.00

0.00

0.00

0.00 26.00 0.00 0.00

5.50

0.00 0.00

191.01

94.29

3.76

1 .oo 36.70

18.09 87.96

30.09

13.53 57.89

72.98

2.26

15.19 6.10 3.66 1.21

1.47

2.52 23.73

9.50

2.62

1.96

0.34

18.95

-3.91 -62.04

-5.38

6.98 50.14

72.98

1.02

13.61 32.10 3.66 1.21

6.97

2.52 23.73

0.00

0.00

0.00

0.00

0.00

-0.34 0.00

0.00

0.00 0.00

0.00

0.00

0.00 -4.23 3.66 1.07

1.47

0.00 0.00

COAGRICULTURETECHNOLO 51.00 0.00 0.00 0.00 3.50 0.17 3.67 -11.03 Total: 1,135.97 0.00 0.00 15.00 45.00 678.61 180.63 - 9.40

COLOMBIA STATEMENT OF IFC’s Held and Disbursed Portfolio In Millions o f U S Dollars

Committed Disbursed IFC IFC

FY Approval Company Loan Equity Qu asi Partic. Loan Equity Q uasi Partic. 2002 BCSC 0.00 . 7.00 0.00 0.00 0.00 7.00 0.00 0.00 2002 Bavaria 70.00 0.00 30.00 145.00 70.00 0.00 30.00 145.00 1969/85/88/93/95 CF del Valle 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 2001 CHMC 3.21 9.68 0.00 0.00 0.93 4.02 0.00 0.00 1974101 Cementos Caribe 4.05 0.00 10.00 10.36 4.05 0.00 10.00 10.36 1963!68/69190 Coltejer 6.02 0.00 0.00 0.00 6.02 0.00 0.00 0.00 199999 Corfinsura 25.00 0.00 25.00 0.00 0.00 0.00 25.00 0.00 2002 Inversura 0.00 15.00 0.00 0.00 0.00 15.00 0.00 0.00 2002 Omimex Oi l 30.00 0.00 5.00 0.00 10.70 0.00 5.00 0.00 1987 PRODESAL 0.00 0.59 0.00 0.00 0.00 0.59 0.00 0.00 1977/89!92:94196 Promigas 3.75 0.00 0.00 4.17 3.75 0.00 0.00 4.17 0194195 Pronlisan 0.00 0.20 0.00 0.00 0.00 0.20 0.00 0.00 2002 Proteccion 0.00 10.00 0.00 0.00 0.00 10.00 0.00 0.00 1996 Proyectos 0.00 5.00 0.00 0.00 0.00 5.00 0.00 0.00 2002 S IG 25.29 0.00 50.00 0.00 25.29 0.00 50.00 0.00 1999 Surenting 0.00 5.10 0.00 0.00 0.00 2.50 0.00 0.00 2001 Tolcemento 3.33 0.00 0.00 7.11 0.00 0.00 0.00 0.00

Total portfilio: 170.65 52.57 120.00 166.64 120.74 44.31 120.00 159.53

96

Page 105: FOR OFFICIAL ONLY - World Bankdocuments.worldbank.org/curated/en/... · Project description [one-sentence summary of each component] Re$ PAD B.3.a, Technical Annex 4 Component 1 -

Approvals Pending Commitment

FY Approval Company Loan Equity Quasi Partic. 2001 CHMC 0.00 0.02 0.00 0.00

2004 Caribbean Coal 0.03 0.00 0.00 0.00 2004 Cartones America 0.02 0.00 0.00 0.00

2003 DAVIVIENDA I 0.00 0.00 0.01 0.00

Total pending commitment: 0.05 0.02 0.01 0.00

97

Page 106: FOR OFFICIAL ONLY - World Bankdocuments.worldbank.org/curated/en/... · Project description [one-sentence summary of each component] Re$ PAD B.3.a, Technical Annex 4 Component 1 -

Annex 14: Country at a Glance COLOMBIA: CO Integrated Mass Transit Svstems

POVERTY and SOCIAL Colombia

2002 Population, m id-year (millions) GNI per capita (Atlas method, US$) GNI (Atlas method, U S $ billions)

Average annua l g rowth , 1996-02

Population I%) Labor force (%)

Mos t recent est imate (latest year available, 1996-02) Poverty (% of population below national poverty line) Urban population (% o f total population) Life expectancy at birth (years) I

Infant mortality (per 1,000 live births) Child malnutrition I% of children under 5) Access to an improved water source (% ofpopulabon) Illiteracy (% ofpopulation age 15+) Gross primary enrollment I% ofschool-age population)

Male Female

KEY ECONOMIC RATIOS and LONG-TERM TRENDS

1982

GDP (US$ billions) Gross domestic investmentiGD P Exports of goods and servicesiGDP Gross domestic savingsiGDP Gross national savingsiGDP

Current account balancelG DP Interest paymentsiGDP Total debtiGDP Total debt serviceiexports Present value of debtiGDP Present value of debtiexports

39.0 20.5 10.9 16.3 13.6

-8.4 1.8

26.4 27.8

1982-92 1992-02 (average annual growth) GDP 4.0 2.0 GDP per capita 1.9 0.1

43.7 1,830 80.1

1.8 2.6

76 72 19 7

91 8

112 113 112

1992

49.2 16.7 17.7 18.7 18.4

1.8 2.6

35.1 38.8

2001

1.4 -0.3

Lat in America B Carib.

527 3,280 1,727

1.5 2.2

76 71 27

9 86 11

130 131 128

2001

82.4 14.9 19.4 15.3 14.3

-2.2 3.0

44.5 36.1 45 6

215.5

2002

1.5

Lower- middle- income

2,411 1,390 3,352

1 .o 1.2

49 69 30 11 8 1 13

111 111 110

2002

82.2

-2.2 2.4

2002-06

0.4 -0.1 -1.1

Development diamond^

Life expectancy

T Gross

primary capita

i

Access to imoroved water source

- Colombia - Lower-middle-income arouR

Economic ratios'

Trade

Investment + Domestic savings

Indebtedness

Colombia - I - Lower-middle-income orouI) 1 I I

STRUCTURE of the ECONOMY

(% of GDP) Agriculture Industry

Services

Private consumption General government consumption Imports of goods and services

Manufacturing

(average annual growth) Agriculture Industry

Services

Private consumption General government consumption Gross domestic investment Imports of goods and services

Manufacturing

1982 1992 2001 2002 [Growth of investment and GDP (Oh) 1 20

19.3 15.8 13.0 31.8 35.0 29.9 21.8 19.8 16.3 48.9 49.3 57.1 -40

72.8 71.8 63.6

GDI -GDP 10.9 9.5 21.1 - 15.2 15.8 19.0 I

2o02 Growth of exports and imports (%) 1982-92 1992-02 2001

3.5 -1.4 0.1 2o T 5 .O 0.7 -0.1 4 .2 -2.1 -0.8 3.5 3.4 2.1

2.9 1.5 1.9 .20 -- 4.8 9.6 0.3 .. -30 1 1 .o -2.9 9.6 - Expoiis &Imports 2.9 3.1 11.2 I

* T h e diamonds show four kev indicators in the cauntrv (in bold) comoared with its income-arouo averaae. If data are missina. the diamond will be incomnlete

98

Page 107: FOR OFFICIAL ONLY - World Bankdocuments.worldbank.org/curated/en/... · Project description [one-sentence summary of each component] Re$ PAD B.3.a, Technical Annex 4 Component 1 -

Colombia P R I C E S a n d G O V E R N M E N T F I N A N C E

D o m e s t i c p r i c e s (%change) Consumer prices ’ 24.6 Implicit G D P def lator 24.8

1982

G o v e r n m e n f f inance (“A o f GDP, includes current grants) Current revenue Current budget balance Overall surplusidef ic i t

T R A D E

(US$ mill ions) T o tal exports ( fob)

Co f fee Petroleum Manufactures

T o tal im PO rts (cif) F o o d Fue land energy Cap i ta lgoods

Export price index (895=100) import price index (1995=100) Terms o f trade (7995=100)

1982

3,264 1,562

2 15 837

5,478 303 659

2,048

9 8

115

B A L A N C E o f P A Y M E N T S 1982

(US$ mill ions) 4,785

Imports o f g o o d s and services 7,052 Resource balance -2,267

Exports o f g o o d s and services

Ne t i ncome N et current transfers

-1,184 17 1

Current account balance -3,280

Financing i tems (net) Changes in net reserves

2,930 350

M e m o : Reserves including gold (US$ mill ions) Convers ion rate (DEC,local/US$) 64.1

E X T E R N A L D E B T and R E S O U R C E F L O W S

(US$ mill ions) To ta l debt outstanding and disbursed

1982

10,306 IB R D 1,346 ID A 20

To ta l debt service IB R D ID A

Compos i t ion o f net resource flows Official grants Official credit0 rs Pr ivate creditors Foreign direct investment Por t fo l io equity

World Bank program Commi tments Disbursements Principal repayments

1,491 187

1

12 403 856 366

0

738 277

93

1992

25.1 23.6

13.7 3.0 -1.9

1992

7,263 1,259 1,396

2,272 6,627

450 344

2,255

63 69 91

1992

9,257 8,262

994

-1,852 1,734

876

450 -1,326

681.0

1992

17,277 3,195

13

4,008 959

1

89 -4 13

- 12 729

0

466 262 681

2001

6.5 7.6

13.3 -5.0 -6.1

2 0 0 1

12,309 764

3,083 5,606

12,834 1,578

189 4,468

243 209 116

2 0 0 1

14,932 15,840

-908

-2,975 2,094

-1,789

2,956 -1,166

10,245 2.299.8

2 0 0 1

36,699 2,006

7

6,297 365

1

86 1,083 1,312

2,328 -4 3

636 368 233

2002

6.0 7.0

13.6 -3.7 -4.6

2 0 0 2

11,903 991

3,037 6,156

13,026 1,161 233

4,528

2 0 0 2

l4,439 16,077 -1,639

-2,525 2,335

-1,828

1,323 505

10,649 2,504.2

2 0 0 2

1 In f la t ion ( O h ) 1

97 98 99 00 01

-GDP deflator -CPI

Expor t and impor t leve ls ( U S $ mil l . )

!o.ooo T 15.000

10.000

5,000

n

96 97 98 49 00 01 02

nExports Imports

Current a c c o u n t ba lance to G D P ( % )

‘ T

: o m p o s i t i o n o f 2 0 0 1 d e b t ( U S $ mill.)

A : 2 , 0 0 6 G: 3,738 B : ?

F: 24 ,369

2 - IBRD 3 - IDA D - Other multilateral F - Private 2 - I M F G - Short-teri

E - Bilateral

99

Page 108: FOR OFFICIAL ONLY - World Bankdocuments.worldbank.org/curated/en/... · Project description [one-sentence summary of each component] Re$ PAD B.3.a, Technical Annex 4 Component 1 -

Annex 15: Poverty Impact Assessment COLOMBIA: CO Integrated Mass Transit Systems

Fighting Poverty with BRTS: Experience o f Bogoth’s TransMilenio and lessons for other cities.

Summary

Bogota’s urban poor, with an average income o f US$5.63 per day, represent 44 percent o f the population, and the number i s increasing due to a high unemployment rate (17.4%), which slows down overall economic growth and increases migration from the country side. Most o f the urban poor live in the periphery and have deficient transport infrastructure and transit services.

The TransMilenio BRT system i s helping in the strategy o f poverty alleviation. I t provides an adequate access from the periphery to working places, which includes provision o f pedestrian and bicycle facilities, and improvement o f labor conditions through formalization o f unregulated services. Phase I implementation (41 km busways and 305 km feeder lines) allowed 59 traditional companies to participate in the provision o f the system (out o f 64), and included US$7.5 mill ion in payment to small owners to scrap obsolete buses. Phase I1 (40 km busways and 200 km feeder lines) bidding processes included higher points to companies with large participation o f small owners. A total o f 6,835 small owners are shareholders o f the concessionaries. Total payment for scrapped buses to small owners i s estimated being US$ 1 1.7 million.

Usage by low-income population has increased over time due the to expansion o f feeder routes in the periphery; 37 percent o f the daily riders (278,000 trips per day) are people in strata 1 and 2 (income US$5.63/day). They have benefited through high travel time savings (16 minutes per trip), and travel cost reductions (US$0,60 per day due to fare integration). Additionally traffic accidents and air pollution have been reduced, and feeling o f pride and belonging, has increased.

Catchment area for the TransMilenio System (Phases I and 11) involves 2,463,746 persons in strata 1 and 2, this i s 85 percent o f the total population belonging to this strata. Access opportunities to jobs have greatly increased, as the system covers the main areas o f employment (central zone, main commercial area, financial district and part o f the industrial zone).

Introduction There are some specific transport policies that help fighting poverty and improve l iving standards o f the people in the developing cities. This Annex shows how the City o f Bogota has implemented this type o f policies, especially with the TransMilenio BRT System, and indicates some impacts on the poor. This has helped to find lessons for other cities. The expected impact on poverty for TransMilenio Phase I1 (including NQS line) and Pereira BRT projects are presented in the final two sections.

Poverty in Bogoth Like any major city in a developing country, poverty i s a serious concern in Bogota. A recent document prepared by the program ‘‘Bogotk iC6mo V a m ~ s ? ” ’ ~ indicates that the city had a great improvement over the last decade, but still has very important challenges in overcoming poverty and reducing social exclusion. The main socioeconomic indicators that allow a poverty profile for the city o f Bogota are14:

l 3 “La Pobreza en BogotB” Casa Edtor ia l El Tiempo-Fundacion Corona-Camara de Comercio de Bogota, Agosto 20 de 2003, available in htt~://eltiemoo.terra.com.co/PROYECTOS/RELCOMIRESCON/ BOTCOM/home/ARCHIVO/ARCHIVO- 123 3 060-O.odf l4 Compiled by the referred study &om various sources, including the District Departments o f Planning and Welfare, and Secretary o f Finance, as wel l as the National Department o f Statistics among others.

100

Page 109: FOR OFFICIAL ONLY - World Bankdocuments.worldbank.org/curated/en/... · Project description [one-sentence summary of each component] Re$ PAD B.3.a, Technical Annex 4 Component 1 -

Stratum l-2I5 US$5.63/day 43,73% 1 2002 1 Stratum 3-4 50,02% I 2002 I US$13.17/day Stratum 5-6 5,25% 2002

The geographic distribution o f socioeconomic strata i s presented in Figure 1. Poor families (Stratum 1 - average income US$4.2/day in red and Stratum 2-average income US$5.9/day in light yellow) are mostly located in the periphery, especially in the south and western areas o f the city. Extreme poverty (Stratum 1-red) i s concentrated in certain areas to the south, southwest, west and northeast o f the city.

The city i s divided into 20 localities for administrative purposes. Nine o f them concentrate 93 percent o f the urban poor: Ciudad Bolivar (south), Bosa (south-west), San Cristobal (south-east), Kennedy (south- west), Suba (north-west) Usme (south), Rafael Uribe Uribe (south-east), Tunjuelito (south) and Engativa (west).

Despite the efforts o f the local administration to increase coverage o f utilities, education and health and improving urban physical infrastructure over the last decade, poverty i s increasing due to external factors. The national economic situation has strong impacts on income and employment, and i t i s shown in the deterioration o f poverty indexes.

l5 Stratum is a socio-economic classification related to income and quality o f housing for fiscal and utility pricing (cross-subsidy) purposes. Stratum 1 is the lowest and Stratum 6 the highest

Index related to hunlan capital, material goods, surrounding infrastructure, and social capital, calculated by the National Planning Department using thc Households Survey by DANE l7 Calculated by Secretary o f Finance

l9 Similar to human devclopment index, for women only

16

Includes l i f e expectancy, alphabetization, GDP per capita; DNP based on DANE

Population not able to acquire a normal basket o f goods, DNP based on Households Survey by DANE Population not able to acquire a minimum basket o f goods for survival, D N P based on DANE

22 Indicator o f wealth distribution, higher means more concentration in the richest portion o f the population, DNP based on DANE 23 DANE

101

Page 110: FOR OFFICIAL ONLY - World Bankdocuments.worldbank.org/curated/en/... · Project description [one-sentence summary of each component] Re$ PAD B.3.a, Technical Annex 4 Component 1 -

Engativa

Tx

Figure 1. Socioeconomic Strata Distribution Source: DAPD

The perception o f the people on the economic situation i s also in decline. According to the survey o f “Bogota iC6mo Vamos?” families reported that economic situation was deteriorating between 200 1 and 2002 (48% worst, 35% same, 16% better).

Another external condition had impact on poverty i s the increase o f displaced families in the city, due to violence in the country side. CODHES24 estimates that 480,000 displaced people have settled in Bogota since 1985. A specialized unit o f the local admin i~ t ra t ion~~ provided assistance to 8,362 displaced families (35,000-t individuals) between May 1999 and August 2002.

Accessibility has not been recognized as an important issue in poverty studies and indexes. The document cited before only reports on accessibility in an indirect way through an indicator o f paved roads within the

Consultoria para 10s Derechos Humanos y el Desplazamiento, data since 1985 24

25 Unidad de Atencion Integral a la Poblacion Desplazada del Distrito Capital - UAID

102

Page 111: FOR OFFICIAL ONLY - World Bankdocuments.worldbank.org/curated/en/... · Project description [one-sentence summary of each component] Re$ PAD B.3.a, Technical Annex 4 Component 1 -

community. This indicator i s a proxy for the quality o f accessibility but does not reflect actual travel time and cost, as well as access to urban opportunities o f work, social services and recreation. Paved access was provided to 82 percent o f the city, but only 69 percent to the poor communities (stratum 1 and 2)26, according to the survey by “Bogota iC6mo Vamos?”. Additionally, the Institute o f Urban Development reported that, 17 percent o f the road network was in good shape, 25 percent was fair and 58 percent was damaged by the end o f 2002.

Transport Policy in Bogota (The TransMilenio BRT System)

Starting January 199827 the city o f Bogota designed and implemented a sustainable transport strategy based on non-motorized transportation, automobile use restriction and bus transit improvements. The main aspects o f this strategy have continued under succeeding administrations2*. The most relevant and visible aspect o f the strategy has been the initial implementation and further expansion o f the TransMilenio BRTS, which shows respect for diversity, low cost and sustainability as key principles, which directly impact the urban poor.

The Bogota strategy, especially TransMilenio BRT, embraces many aspects o f the recommended policies to help the poor to be included in “Sustainable Transport: Priorities for Policy Reform”29:

1. Provide Adequate Public Transport to Places of Employment

TransMilenio BRT was designed and implemented to reduce travel time and cost o f city dwellers, especially those living in the periphery. The system was introduced in the most dense south-north public transportation corridor (Avenida Caracas) with extensions to the north (Autopista Norte), and northwest (Calle 80). The intention was to provide improved mobility to public transportation commuters, which usually belong to medium and low-income communities. A public transportation origin-destination matrix was used to determine the priority corridors and feeder areas. Feeder areas are only located in the periphery, where stratum 1, 2 and 3 are located. In this way, the system provides access to employment opportunities to some o f the poorest areas in the city.

Attention to the poor i s not provided through operations subsidized externally, there i s an internal cross subsidy from short trips to long trips through a flat fare structure that includes feeder services (full fare integration). The system was financially structured in such a way that the initial fare was the same charged by the highest quality public transit service (the “executive service” at US$0,35). This fare reflects all the operational costs and equipment capital costs o f the system agents and i s updated according to contract formula. If the city authority i s willing to keep low fares, i t i s needed to come up with a budget to do so. Given that there i s no fiscal space for this type o f subsidy, revenue to cost ratios needs to be balanced at all times.

There i s a periodic competition for non-exclusive concession contracts for trunk services, feeder areas and fare collection. I t i s required to provide service measured served on kdometers given certain levels o f service (minimum frequency, maximum occupation). In this way, the system can balance supply and demand on a dynamic way, by providing an adequate combination o f cost, coverage and service quality.

The institutional framework i s set up in such a way that the public sector i s concerned on maximizing service quality and the private sector on maximizing revenues, but each one has the right incentives in binding contracts. The public institution in charge o f planning, developing and controlling the system was set up to a fairly and effectively administration o f the tendering and financing arrangements. All these elements constitute an adequate scheme to serve the poor, while keeping a financially sustainable service.

26 Annual survey by “Bogota iC6mo Vamos?“ 2002 27 Mayor Enrique PeAalosa, see City Development Plan 1998-200 1 “Por l a Bogota que Queremos” 28 Mayor Antanas Mockus, see City Development Plan 2001’2004 “Bogota para Vivir: Todos d e l Mismo Lado”, and camping program o f Mayor Luis Garzon (2004-2008) 29 http:llwww.worldbank. orgltransportlpol-ecodtsr. htm

103

Page 112: FOR OFFICIAL ONLY - World Bankdocuments.worldbank.org/curated/en/... · Project description [one-sentence summary of each component] Re$ PAD B.3.a, Technical Annex 4 Component 1 -

2. Eliminate impediments to non-motorized transportation

The BRT system implementation includes provision o f pedestrian facilities (safe crossing, including not at grade; sidewalks and plazas) as well as bicycle facilities (bikeways and parking spaces in selected stations). The facilities for non-motorized transportation are aimed to segregate flows, minimizing conflicts with autoinobiles and between pedestrians and bike riders.

Non-motorized transportation has also been important in the overall mobility strategy, with construction o f pedestrian and bicycle infrastructure, and activities like the Car Free Day. These policies benefit specially the poor, which have safer and better accessibility at a low cost, while reducing the need for less efficient motorized modes.

3. Mobilize the potential of the informal sector

Transit provision in the city o f Bogota was unregulated, control o f permits was not practical and many services were and st i l l are provided informally. While this scheme allowed relatively low-cost fares and provided opportunities for informal employment, i t comprised several inefficiencies. Competition in the market (to pick up every passenger) resulted in high accident rates and uncomfortable rides. Inadequate incentives lead to overcapitalization (more vehicles than required) with strong effects on congestion and pollution.

Hence, the city, rather than maintaining informality, decided to change incentives to provide high quality, low cost, and sustainable services by formalizing service provision using the right incentives. More effective control over informal services was also introduced, to improve safetyness, and reduce congestion and pollution.

The effort to formalize informal service providers included incentives for small owners to participate with stock in the firms providing services in the TransMilenio system. Better labor conditions, with social benefits established in by law, also benefit drivers and support personnel, many o f them formerly engaged in long journeys without formal employment.

As indicated above, mitigation measures have been placed to involve traditional service providers. Phase I resulted in the participation o f 59 out o f 63 traditional bus companies in four new mass transit corporations (trunk line), and five feeder bus consortiums. Some o f these companies (two o f the trunk line, and four o f the feeder bus consortiums) gave priority to existing drivers o f traditional services when retaining personnel.

Impacts on the Poor of the TransMilenio System (Phase I, 1998-2002)

Direct impacts on the poor are associated with travel time and travel cost savings and job accessibility. Indirect impacts are associated with accident and pollution reductions and increase in the feeling o f pride and belonging.

TransMilenio was serving an average o f 750,000 tripslworkday in the second semester 2003. Saturday service i s 70 percent o f week day, and Sundays and Holidays 50 percent. The TransMilenio user profile as reported by the latest available survey by TRANSMILENIO S.A. (November 200330) i s the following:

j0 2640 interviews by “Market Team” Investigaciones for TRANSMILENIO S.A.

104

Page 113: FOR OFFICIAL ONLY - World Bankdocuments.worldbank.org/curated/en/... · Project description [one-sentence summary of each component] Re$ PAD B.3.a, Technical Annex 4 Component 1 -

The socioeconomic distribution o f riders is:

This indicates that TransMilenio users do not exactly reflect the socio-economic d.istribution o f the city; employees and students belonging to stratum 3 constitute most o f the rides. Nevertheless, there has been an important increase in usage by strata 1 and 2 over the first three years o f operation, from 17 percent to 37 percent (278,000 work day trips). Hence, impacts o f the BRT system implementation to the poor are very important, especially on the medium and long term as a result o f improved accessibility to the periphery.

1. Travel Time Inipacts

A study made by Tito Yepes from LCSFP-World Bank (see presentation in appendix 1) with data from TRANSMILENIO S.A., DAPD and the Household Surveys by DANE, shows that the implementation o f the system resulted in higher travel time savings for poor people that the rest o f the population (Figure 2). Users o f stratum 1 save 18 minutes per trip, while users o f stratum 4 save 10 minutes per trip (80% more savings).

31 TRANSMILENIO S.A., Encuesta de Mercadeo y Satisfacci6n de Usuarios, 12 de Octubre de 2001, 1080 interviews.

105

Page 114: FOR OFFICIAL ONLY - World Bankdocuments.worldbank.org/curated/en/... · Project description [one-sentence summary of each component] Re$ PAD B.3.a, Technical Annex 4 Component 1 -

UBICACIO\ DEL CORREDOR VIAL DEL TRAMO: PARQUE DE CUBA - S A Y PERYANDO DEL SITM M E G A B ~ S , D E ~ T R O DE L A CIUDAD DE PEREIRA

0

Corredor vial -

FIGURE 2. TRAVEL TIME BEFORE AND AFTER TRANSMILENIO BY SOCIOECONOMIC STRATUM

(Source: Yepes, 2003 with dntafronz TRANSMILENIO S.A.)

Total travel time savings in the TransMilenio System Phase I are estimated in 136.750 hourdday. Travel time savings for strata 1 and 2 are estimated in 32.250 hourslday (23,6%).

2. Travel Cost Impacts

The integrated fare structure resulted in lower travel costs for people in the periphery with access to the TransMilenio System. By the second semester 2003, 5 1 percent o f the trips were integrated (use feeders either at the beginning or the end o f the trip); this i s close to 382,000 trips per weekday. Many o f these trips formerly required two public transport vehicles to complete a trip from origin to destination, with payment in each bus o f about US$0,30. Total daily savings for these users i s then US$0,60, which represents 14 percent o f the average daily income o f a person in stratum 1 and 10 percent o f the average daily income o f a person in stratum 2. These savings are now available for other household expenses (housing, food, health, education, recreation).

3. Job Accessibility

The TransMilenio system was planned according to the existing origin-destination matrix32. Since this matrix i s for actual trips (mostly work and study trips) this has been reflected on the usage across different strata. There has been a very important decrease in travel time for the periphery (Figure 3) and job opportunities became accessible to more people, especially to the poor.

32 Init ially surveyed in a study by the Japan International Cooperation Agency in 1995, updated through the operational design studies by Steer Davies Gleave in 1998

106

Page 115: FOR OFFICIAL ONLY - World Bankdocuments.worldbank.org/curated/en/... · Project description [one-sentence summary of each component] Re$ PAD B.3.a, Technical Annex 4 Component 1 -

Average Commuting Time 1999 Average Commuting Time 2002

Figu

Improvements in accessibility 1999-2002

Means higher X change

? 3. Spatial Improvements in A cessibility 1999-2002 (Source, Yepes 2063 with data from TRANSMILENIO S.A.)

I t i s important to highlight that, even job opportunities became closer, education, opportunities are being affected and unfortunately in the short tem, poor areas wi l l have comparatively low education levels (Figure 4).

Another factor hindering the effect o f accessibility i s rural migration. Settlement o f displaced people due to violence in the countryside concentrates in the poorest communities o f Ciudad Bolivar and Bosa. Ski l ls and education o f these migrants do not match the job market needs, and usually they end up informally employed or not employed at all.

107

Page 116: FOR OFFICIAL ONLY - World Bankdocuments.worldbank.org/curated/en/... · Project description [one-sentence summary of each component] Re$ PAD B.3.a, Technical Annex 4 Component 1 -

Average Years of Education

0 FIGURE 4. AVERAGE YEARS OF EDUCATION

Source: Yepes, 2003, with data of the Household Survey by DANE)

4. Indirect Impacts

Traffic accident and pollution reduction due to the mobility strategy implementation, and especially by the TransMilenio BRT System also benefit the poor.

Traffic accidents are declining in the city. The Secretary o f Government33 reported a 6.9 percent reduction from 2002 to 2001 with 297 cases in 2002. Most o f the deaths are affecting pedestrians (63%), followed by passengers o f motor vehicles (12%) and cyclists (1 1%). There i s no socio-economic breakdown o f these figures, but most pedestrian and cyclist victims o f traffic accidents are poor.

TransMilenio has been a great contributor to accident reduction. Only 8 traffic accident deaths were registered in 2002 in the TransMilenio corridors, from a previous figure o f 66 in 1998 (88% reduction); one o f the deceased was a passenger, the other was pedestrians and bicyclists. Weekly crashes went down from 26 to 5 and injuries from 18 to 4.

Emissions have been reduced, decreasing the vulnerability o f city inhabitants to particularly the poor, to respiratory deceases. The number o f kilometers run per passenger went from 1,0 in the traditional system to 5,3 in the TransMilenio trunk services. A total o f 1,500 o ld buses were scrapped and replaced with 470 articulated buses and 235 conventional buses (with Euro I1 Diesel technology). Reduction o f contaminants i s evident in the TransMilenio corridors; nevertheless the total level o f pollutants, especially particulate matter, has not been impacted substantially yet34.

5. Sentiment of Pride and Belonging

Emotional aspects have been recognized as important development drivers. The sentiments o f pride and belonging have increased substantially as a result o f physical improvements and community activities (car free days, weekend road closings for bikeways, summer festival, free cultural events in public spaces, Christmas lights and bike-nights, among many others). The mobility strategy has been relevant in

33 http:llwww.suivd.gov.colBoletin/sitio-boletines/l bol.htm 34 See data from the Air Quality Network 1998-2002 available at www.dama.gov.co

108

Page 117: FOR OFFICIAL ONLY - World Bankdocuments.worldbank.org/curated/en/... · Project description [one-sentence summary of each component] Re$ PAD B.3.a, Technical Annex 4 Component 1 -

improving the attitude o f the city dwellers by providing respectful high quality infrastructure for pedestrian, bikers and transit users. Fast, safe and convenient transit service also increases pride and sense o f belonging.

“Bogota LComo Vamos?” annual survey shows a steady increase in pride, from an average rating o f 3,72 in 2000 to 3,79 in 2002; 37 percent o f the persons answering the survey report being very proud o f Bogota in 2002 as opposed to 26 percent in 2000. Mobility i s recognized as the 7th biggest problem (unemployment being the first) in 2002; i t was the second in 1998 after safety.

TransMilenio receives an average rating o f 4,05, while traditional transit services receive average ratings from 3,l to 3,4. High quality vehicles, cleanness, safety and adequate driving are the top reasons for good ratings to the BRT System. Complaints come from overload on the peak periods, lack o f coverage for all the city, and bad personal attention and delays (card acquisition), mainly.

TransMilenio perception was extremely positive during the f i r s t months o f operation (above 90% rated the system as being good or very good), as people compared the new system with the traditional services. Ratings have declined, but s t i l l are very high (above 70% rated the system as being good or very good). The challenge for TransMilenio administrators i s to increase the level o f acceptance o f the users by continuously improving service provision.

TransMilenio rapidly became an icon for the city for i t s innovation and service. Cultural change was not only the result o f system implementation; there were activities aimed to promote the system and educate the users, through mass media campaigns (specially in local radio heard by middle and low income households), community education (neighborhood centers, schools) and guides at the stations.

Lessons for other cities

The Bogota transport policy, specifically the implementation o f the TransMilenio BRT System, has clear equity and poverty alleviation elements that have resulted in positive impacts on poor segments o f the population. The main lessons o f the process are summarized as follows:

Act on several elements o f sustainable transportation at the same time: Non-motorized transportation (pedestrian, bicycles); restriction to indiscriminate use o f automobiles; and integrated BRTS. Create awareness on the transport system that the city deserves for current and future generations. Promote cultural changes with education procedures; and generate sense o f belonging and pride. Incorporate improved accessibility to the periphery, using a flat fare structure. Generate mechanisms to mitigate negative effects on certain sectors o f the society. Create methods to facilitate the participation o f transit vehicle owners and transportation companies and displaced population due to road widening. Incorporate the adequate institutional and management mechanisms. Coordination mechanisms with the several local and national agencies; contract knowledgeable consultants in order to solve how (technical, financial, legal and management issues) to achieve quality and credibility and facilitate the participation o f national and international investors; and form a local team working with the consultants to generate knowledge and technology transfer. Review and get to know other cities’ experiences. Visit other cities with sustainable transportation programs, especially BRT, adapting to local conditions and not repeating negative elements. Do not save on projects’ preparation; make detailed studies based towards implementation, especially to estimate demand and costs. Have a very responsible financial planning (good cost estimates and finding definitions).

109

Page 118: FOR OFFICIAL ONLY - World Bankdocuments.worldbank.org/curated/en/... · Project description [one-sentence summary of each component] Re$ PAD B.3.a, Technical Annex 4 Component 1 -

Bogota experience could not be transferred directly to other cities without careful adaptation to local conditions; nevertheless there are some universal principles:

Put equity as the driver force o f the change process (benefiting the community at large i s more important than catering for the needs o f minority groups o f the society); have a continuous process with clear objectives and strategies from the beginning;

(c) generate coordination mechanisms and institutional arrangements; (d) dedicate sufficient technical and financial resources for project preparation and execution; (e) include stakeholders in the process; (f) think long term, with specific short term actions that have immediate demonstrative effects; (g) assure financial sustainability, using measures that reinforce the principles even if they are

unpopular (e.g. gasoline taxes, value capture, private vehicle restrictions); (h) leave the operation to the private sector, but with adequate incentives (performance based

contracts with periodic competition).

Impact on the Poor of TransMilenio BRT Phase 2 (NQS)

The extension o f the TransMilenio BRT system wi l l increase coverage especially in medium and low- income areas. Figure 5 shows the trunk lines o f the system after completion o f Phase I1 with the socioeconomic distribution o f wealth.

Spatial Distribution of Wealth

-.I Phase1 --**m- Phase II Americas-Suba I” w. 5 Phase II NQS

I ” 3 4 5 Public Sewices Billing Strata

i 6

Figure 5. TransMilenio BRT System Trunk Lines and Distribution o f Wealth (Source: Adapted from Yepes, 2003)

Area o f catchments for NQS trunk line i s extended to the whole system. Origins in the vicinity o f N Q S are able to reach destinations in al l the other trunk lines and feeder service areas. Origins in the other trunk lines and feeder service areas are also able to reach destinations in the vicinity o f NQS. According to this, the potential users in the catchments area are 2,463,746 persons belonging to strata 1 and 2, that i s 85 percent o f the total population belonging to these strata.

110

Page 119: FOR OFFICIAL ONLY - World Bankdocuments.worldbank.org/curated/en/... · Project description [one-sentence summary of each component] Re$ PAD B.3.a, Technical Annex 4 Component 1 -

The NQS trunk line greatly improves the number o f potential users from the lowest strata. Phase I offers potential service to 1,145,400 (39%), and Phase I1 (Americas-Suba) to 1,861,186 (64%). Detail geographical coverage by Locality i s presented in the following table.

1 Phase I1 (Americas- I Phase I1 I

The only locality, not covered by the system expansion with high participation o f strata 1 and 2, i s San Crist6bal. I t i s worth to mention that not all the potential users w i l l be actual riders o f the BRT System; nevertheless, the additional accessibility provided by the system may benefit a large proportion o f this population, as long as the generalized cost o f travel (time and out o f pocket expenses) are better than available alternatives.

Figure 6 shows the concentration o f destinations according to the Origin-Destination Matrix. I t i s clear that most o f the more important destinations are in the area o f influence o f the system.

Destinations

Figure 6. TransMilenio BRT System Trunk Lines and Trip Destinations (Source: Adapted from Yepes, 2003)

111

Page 120: FOR OFFICIAL ONLY - World Bankdocuments.worldbank.org/curated/en/... · Project description [one-sentence summary of each component] Re$ PAD B.3.a, Technical Annex 4 Component 1 -

Annex 16: TransMilenio at Glance COLOMBIA: CO Integrated Mass Transit Systems

Zxclusive bus lanes (km.) Teeder lines (km.) Stations

Bogota’s TransMilenio i s the f irst Bus Rapid Transit System in Colombia. It has been recognized as an outstanding example for the implementation o f high-capacity and low-cost transport solutions, under urban and environmental sustainability with social justice3’. The system’s f irst phase was completed between 1998 and 2002, and a second phase i s under implementation until year 2005. Expansion will continue as local and national grants and local funds have been earmarked until year 20 16.

41 43 309 200 61 55

The TransMilenio System i s part o f the mobility strategy set forth by the local administration to overcome the city’s outstanding transportation problems in and effective and progressive way’6. I t s design and implementation follow principles o f respect to life, human diversity, and people’s travel time, while pursuing high quality, consistency and financial feasibility. The system comprises specialized infrastructure for bus rapid transit, organized trunk and feeder bus operations, an advanced fare collection system, and a new public authority in charge o f planning, developing and controlling system’s operation^^^. The most relevant characteristics o f the TransMilenio BRT System are presented in the following table:

htegration facilities 4rticulated Buses 7eeder Buses ’assengers per weekday 7eeder service participation Zitywide transport share Vlaximum load (paxlhourldirection) rrunk routes 7eeder routes infrastructure Cost (Public Capital

8 5 470 335 24 1 172

750,000 650,000 5 1% 50% 16% 14%

3 5,000 30,000

39 28 US$ 240 Mi l l ion US$530 Mi l l ion

12 (3 local, 9 express) 10 (3 local, 7 express)

[nves tment) Zquipment Costs (Private Capital ,nvestinent

US$5.85/km. US$12.33/km. US$ 100 Mi l l ion US$85 Mi l l ion

US$2.43 MWkm. US$ 1.98 M M h .

TransMilenio System implementation i s based on a very clear definition o f the role and management mechanisms o f the public sector and an effective participation o f the local private sector, in an effort to transform the traditional public transportation industry in Bogota.

The implementation process included detailed preparation o f the technical, financial, legal and institutional component; the creation o f a local public authority in charge o f the system (TRANSMILENIO S.A.); a great deal o f work to make possible the traditional local transport industry participation; effective bidding processes for infrastructure development and fast construction; successful

35 See for example “Cities on the Move: A World Bank Urban Transport Strategy Review”; ‘‘Sustainable urbanisation: bridging the green and brown agendas” UN-Habitat- Development Planning Unit -University College London; “Stockholm Partnerships for Sustainable Cities”, awards 2002 in http://www.partnerships.stcckholm.se/. 36 The system idea was first proposed and implemented by Mayor Enrique Peiialosa (1998-2000); sustainable transport concepts have been followed by Mayor Antanas Mockus (2001-2003) and Mayor Luis Garzon (2004-2008). 37 See www.Transmilenio.ciov.co

112

Page 121: FOR OFFICIAL ONLY - World Bankdocuments.worldbank.org/curated/en/... · Project description [one-sentence summary of each component] Re$ PAD B.3.a, Technical Annex 4 Component 1 -

private participation processes for the operations components (trunk and feeder bus operators, fare collection system contractors, and control center developers); obtaining local and national funds for system expansion and maintenance, and a citizen appropriation process as well as promotion o f cultural changes in the commuting habits o f the people o f Bogota.

Despite i t s complexity and the fact that many public and private agents were part o f the process, Phase 1 only took 35 months from idea to initial commissioning (this includes 12 months for preparation and retaining consulting services for operational design and project structuring). Total implementation time for Phase 1 took 54 months. Phase 2 would take 5 years to be fully implemented, with the first 12 km in year 3 (Americas Trunkway, which started operations in December 2003). All this was possible due to the strong political will o f the city mayors, financial support from the national and local government, the technical and result oriented team formed to develop the projects, the right definition o f elements o f the financial structure, and the effective participation o f traditional public transportation companies.

Both trunk and feeder services are provided by private operators, paid and controlled according to ru les and regulations established in binding contracts. Fare box collection i s also conceded to private operators, in charge o f implementing and operating the fare collection system. Revenues from the fares are deposited daily in a t rust fund, which distributes it to the system agents according to the contract clauses. To control, the public company in charge o f the system operates an advanced control center, supported in information technologies (automatic vehicle location, voice and data communications, and on line control).

Some salient elements in the Bogota experience include, among others:

Transforming the economic structure o f transit provision through adequate incentives. Open, competitive and transparent bidding processes o f all the system components (infrastructure, buses, fare collection systems, control center, and additional elements). Involvement o f private operators formed from the traditional urban transport industry, including companies and vehicle owners. Strengthening o f the private service providers through association o f small companies in larger economic units, capitalization, direct ownership o f the bus fleet, improvement in the labor conditions o f drivers and support personnel. Unification o f fare collection under a single treasury, which generates predictable cash f low allowing financial planning and management o f the private agents. Inclusion o f advanced technologies for buses, fare collection and operations control. High quality and efficient service, with intrinsic mechanisms that promote continued improvement. Elevated social impact in reducing user travel time, traffic accidents and pollution, as well as substantial urban improvements along the system corridors and feeder zones. Priority attention to areas with medium and low income, generating travel cost savings for inhabitants in surrounding zones as well as access to employment, education, health, social services and recreation opportunities.

The Bogota experience i s a development o f the bus systems implemented in Brazil (Curitiba, Goiania, Blumenau, Brasilia) and Ecuador (Quito), and from the contractual schemes for private provision o f bus services in Chile and Argentina. The Bogota System generates advancements in risk assignment and mitigation for concessions in public transport; implementation o f real time control for buses; implementation o f modern planning and scheduling systems; and use o f advanced fare collection technologies. The experience accumulated in TransMilenio planning, implementation, follow up and expansion can be very useful in designing BRT systems in other developing cities.

113

Page 122: FOR OFFICIAL ONLY - World Bankdocuments.worldbank.org/curated/en/... · Project description [one-sentence summary of each component] Re$ PAD B.3.a, Technical Annex 4 Component 1 -

Annex 17: Pereira’s Mass Transit System Project C O L O M B I A : CO Integrated Mass Transit Systems

Pereira i s the gth largest city in Colombia and i s the capital o f the province o f Risaralda. It i s located 359 km west o f Bogota in the valley o f the Otun river, Pereira has around 500.000 inhabitants. Along with i t s neighbor municipalities, Dos Quebradas and L a Virginia, Pereira forms the “Area Metropolitana de Centro Occidente” (AMCO) o f more than 700.000 inhabitants. Around 35 percent o f the urban population i s categorized in strata 1 and 2 (Average income US$8 per day).

The AMCO has sharply increased i t s economic and demographic growth in the last two decades. Population wise, the city has grown at a rate o f 2.94 percent since the beginning o f the eighties, while the city perimeter has not change significantly. Therefore, city density has highly increased in the last decade reaching around 180 inhabitants per hectare, a high standard for Latin America (Lima 100, Caracas 178 Qutio 57).

Population and urban growth have increased the pressure on the public transportation system, generating longer travel distances and times. Speed has reduced to 5 km per hour in the most congested areas. At the same time, transit services have decreasing quality (average waiting time i s between 9 and 12 min). Low- income population i s settled mostly in the periphery, suffering the most with bad quality transit services.

Pereira’s transportation service provision shows similar characteristics than other cities in Latin America, very much the same exhibited by Bogota before TransMilenio implementation. The organization o f the transportation system, based on individual operators affiliated to transport companies, i s very informal and chaotic. There are more than 500.000 daily trips, 66 percent o f them in public transportation. There are approximately 57 different routes without any type o f hierarchy and many o f them overlap in downtown streets. The average length o f the routes i s 28 km, which i s surprising giving the fact that the City i s only 15 km long. Bus fleet, owned by individuals rather than transit companies, consists o f 1069 buses with capacity between 30 and 60 passengers and with an average age o f 17 years. There i s an estimated oversupply o f seats o f around 40 percent and current operators carry 2 passengers per kilometers served (TransMilenio trunk buses carry over 5 passengers per kilometer served).

Population and local economy i s expected to continue growing. Nevertheless, supply o f physical infrastructure and urban expansion i s restricted due to geographical restrictions. Hence, congestion and deterioration o f transit services i s expected in the short term. The proposed mass transit project i s intended to address these issues.

INTEGRATED MASS TRANSIT SYSTEM (SITM MEGABUS) FOR THE AMCO

Modeled after Bogota’s TransMilenio, the proposed system will imply a complete physical and institutional reorganization o f the actual service. The system foresees a public-private partnership in which the provision, operation and maintenance o f the equipment (and perhaps a small share o f the infrastructure) will be in charge o f the private operators while public funds wi l l finance the most o f the infrastructure provision and maintenance. Planning and system regulation will remain a responsibility o f the local government, through a newly created MEGABUS company. Nevertheless, the rules and regulations o f the new system will completely change the incentives for service provision and will be instrumented through binding contracts rather than general permits and decrees.

The following table summarizes the system characteristics

114

Page 123: FOR OFFICIAL ONLY - World Bankdocuments.worldbank.org/curated/en/... · Project description [one-sentence summary of each component] Re$ PAD B.3.a, Technical Annex 4 Component 1 -

Component Subcomponent Description

Infrastructure Trunk roads 16.7 km Stations 37

Terminals 2 Depots 2

Pedestrian overpasses 6 Non at grade intersections

Other

No information

Control Center, Contact-less Fare Collection Syste

Bus Operations Trunk line Buses 56 articulated Feeder Buses 87 feeders

THE INFRASTRUCTURE

The system encompasses 16 km o f longitudinally segregated busways for trunk line services, using various existing corridors in Pereira. Most length o f the busways will be exclusive, but short sections in the CBD where there i s not enough road section to provide full segregation. Buses will use central lane and median stations as much as possible, to minimize conflicts with general traffic. Segregated corridors will have one lane per direction with an additional lane in each bus stop in order to have express buses overtaking local-service buses.

The main corridor runs in the east-west direction along avenues 30 de Agosto, Ferrocarril and Cuba and provides access to the airport. As shown in the Pereira map the busway w i l l almost go through the whole city, giving access to almost 48 percent o f the population.

Passenger’s access will be possible through 37 dedicated stations, separated 450 meters on average. To maximize commercial bus speeds and throughput capacity, fares wil l be paid before entering the stations, which will have high platform (90 cm) allowing level boarding. Stations will be located mostly in the median o f the street and some in the left sidewalk (one way streets).

Feeder routes will transport passengers to two integration terminals providing easy transfer to the trunk system and serving around 50 percent o f total users, mostly low income in growth areas at AMCO’s edges. Feeders w i l l provide service i n specific locations, especially Cuba (medium and low income population) and Dosquebradas (low income and industrial zone). Each lntegration terminal will bave around 6.700 square meters and will be located one in the South Western extreme o f the AMCO in the Cuba sector and the other one in Northeastern at the Administrative Municipal Center. Al l the stations will be accessible to handicapped, elderly, very young and pregnant women.

Infrastructure also includes components to improve accessibility and the urban environment around stations such as 3.8 to 4 meters wide sidewalks, 6 pedestrian bridges and horizontal and vertical signaling system infrastructure also includes 2 depots with maintenance facilities for trunk and feeder service buses. I t i s envisioned that plot acquisition and depots construction wil l be included in the operations concessions.

Given the size o f the operation the implementation o f an advanced control center have not been included in the implementation plans.

The Service

The system wi l l include 56 articulated buses based on clean technologies for 5 trunk routes and 87 small buses for 23 feeder routes. There will also be complementary routes, serving unattended demand within the area o f influence o f the project in highly active sectors such as

115

Page 124: FOR OFFICIAL ONLY - World Bankdocuments.worldbank.org/curated/en/... · Project description [one-sentence summary of each component] Re$ PAD B.3.a, Technical Annex 4 Component 1 -

Ticket fare i s expected to be at the same level o f the current service and in any case no more than US$ 0.3 per trip. Current design guarantees the physical, operational and fare integration between trunk and feeder routes and operational integration with complementary routes. Tariff integration with the later would be also possible one year after first trunk-line implementation.

I US$ Million

Total expected daily demand i s 150,800 reaching 30 percent o f daily total trips for the trunk-feeder system and 90 percent including the complementary system.

% Source

cost

jInfras tructure Depots Trunk Buses

eeder Buses Fare Collection jProject Preparation

The estimated capital cost o f the project i s US$ 51.29 Million. Public investment i s estimated in US$ 24.56 (47.8% o f the system total) for infrastructure implementation and project preparation. Private capital investment, to be paid with user fares using a 12-year concession, i s estimated in US$ 26.73 (52.2%) for buses (trunk and feeder), fare collection system and depots areas and construction. It i s expected to have two bus operators (combined trunk and feeder) and fare collection system concessionary.

25,46 46.1 Yo Public 1.95 3.7% Private (fares) 12.21 22.9% Private (fares) 7.65 14.4% Private (fares) 5.97 1 1.2% Private (fares) 0.90 1.7% Public

Capital cost breakout is:

lTotal 53.24 100%

In addition there will be financial costs for infrastructure implementation. Financial costs are due to bridge financing the difference between available budget and infrastructure capital costs. Financial costs are estimated in US$ 8.08 million. Total public costs wil l be US$ 32.64, 66 percent o f which wil l be paid by the GOC, 41 percent by the municipality o f Pereira and 3 percent by the municipality o f Dosquebradas. Local funds come from a gasoline surcharge.

Operational costs are estimated in US$ 7.9 mill ion annually, o f which US$ 1.3 mill ion i s public (16.8%) and US$ 6.6 million will be private (83.2%). These costs will be covered with user fares (including the share for the public company MEGABUS).

116

Page 125: FOR OFFICIAL ONLY - World Bankdocuments.worldbank.org/curated/en/... · Project description [one-sentence summary of each component] Re$ PAD B.3.a, Technical Annex 4 Component 1 -

The following table summarizes the estimated net present value o f the Project costs:

costs Net Present Value 12% Participation US$ Million

Project Preparation 0.61 0.6% Infrastructure Construction and Rehabilitation 21.57 21.4% Infrastructure Maintenance 1.16 I .2% Control Center Capital Costs 0.49 0.5% Control Center Operation 0.39 0.4% Public Authority 6.98 6.9% Bus Acquisition 24.55 24.4% Bus Operation 30.96 30.8%

Bus Companies Operation 5.80 5.8% Fare Collection Capital Costs 2.39 2.4% Fare Collection Operation 3.81 3.8% Total 100.61

Equipment for Bus Depots and Shops 1.91 1.9%

100.0%

Implementation

Project i s currently under implementation. The National Council for Economic and Social Policy approved the nation’s participation in April 2003. The bidding process for the bus operation started in December 2003, and the bidding process for infrastructure components will start in the f i rst semester o f 2004. Resources from the national and local governments are already committed trough future budget authorizations (vigenciasfutuvns), The system i s expected to be in operation in 2005.

Expected Benefits and net socio-economic evaluation Benefits come from user travel time savings, mixed traffic travel time and cost savings, public transport operation cost reduction, savings due to modal shift, increased welfare coming from generated trips, traffic accident reductions and pollution abatement. Economic equivalent o f these benefits i s as follows:

117

Page 126: FOR OFFICIAL ONLY - World Bankdocuments.worldbank.org/curated/en/... · Project description [one-sentence summary of each component] Re$ PAD B.3.a, Technical Annex 4 Component 1 -

etative 2%; congestion

5% of the demand

- Travel time losses during construction herat ion cost savings from substituted vehicles

The estimated net present value o f the project benefits is :

1

-I .70 11.5% 66.91 /59.0%

Net Present Value 12% US% Million p0.79 11 8.3% b.81

Participation Socio-economic benefits

ravel time savings in the Mass Transit System ravel time savings for Drivate vehicles on mixed lanes b .4%

Operation costs savings for private vehicles on mixed lanes Generalized costs savings due to modal shifts 14.54 12.8% Welfare increase due to generated trips 1.21 1.1% Accident cost savings 4.02 3.5%

2.74 2.4%

ir pollution cost savings 11.12 11 .O% 1113.45 /100% i

Summary evaluation indicators for Pereira:

Present Value 12% Private Costs 69.42 Present Value 12 % socio-economic benefits 113.45 Net Present Value 12% (Benefits - Costs) 12.84 Intemal Rate o f Retum 16.45% BenefitKOst ratio 1.128

The Project i s acceptable f rom the socio-economic point o f view; i t generates more benefits than a l l the estimated costs. The net present value using a 12 percent rate o f discount i s US$12.84 million, the socio- economic internal rate o f return i s 16.5 percent and the benefit to cost ratio i s 1.128 (above one).

Additionally the project i s expected to generate around 1,200 permanent direct jobs and 1,600 indirect jobs, as wel l as 4,000 jobs during construction. Also the project wil l have distributional effects as low- income population might reduce expenses associated with transportation for low-income population ( 18 percent reduction).

118

Page 127: FOR OFFICIAL ONLY - World Bankdocuments.worldbank.org/curated/en/... · Project description [one-sentence summary of each component] Re$ PAD B.3.a, Technical Annex 4 Component 1 -

A sensitivity analysis i s performed to highlight the most important effects:

NPV 1294 TIRE Change NPV vs. Base Case

Base 12.8 16.45% Demand growth 1 % 9.6 15.56% -25.52% Demand growth 0% 7.2 14.82% -43.63 Yo Demand and congestion growth 0% 4.4 13.85% -65.75% Value o f time - 10% 10.5 15.67% -18.40% Value o f time -20% 8.1 14.88% -36.80% Substitution rate - 10% 6.0 14.14% -52.95% Substitution rate +lo% 19.6 18.67% 52.95% Other benefits -10% 10.2 15.57% -20.49% Other benefits -1 00% -10.0 8.13% -178.06% Public costs -1 0% 9.7 15.24% -24.29% Total costs -10% 2.8 1 2.9 1 Yo -78.35% No new feeder buses 2.1 12.86% -83.74%

In conclusion the project has favorable indicators under the assumptions made and data provided. Changes in key variables have a very important impact on the results, in few cases reducing the return to unacceptable levels for projects in Colombia (12%).

Demand growth and congestion assumptions do not have important impact on project evaluation. Value o f time has more than proportional impact on the project evaluation indicators. Even though, travel timesavings might be small per user (around 5 minutes), they are relevant in travel journey (20%).

The most important contribution i s made by the rate o f substitution for existing buses (about 60% o f the socioeconomic benefits). It i s recommended to seek substitution rate maximization and effective controls, so the substitution i s actually completed.

The other benefits are calculated on the conservative side and help the overall evaluation. Benefits from modal shift can be increased by public policy decisions (e.g. vehicle restrictions using plate numbers, more taxes on fuel consumption, urban tolls). The benefits for private vehicle users are small but relevant. They are higher than the losses during construction.

Impacts on poverty

Pereira’s low-income population i s concentrated in the city center and in the outskirts o f the urban area. Dosquebradas does not have strata 5 and 6. I t s low-income population i s concentrated in the border wi th Pereira, and the north east o f the urban area. According to information provided by the Municipalities o f Pereira and Dosquebradas (Secretary and Office o f Municipal Planning), 42 percent o f the population i s classified in Strata I and 2 (Average Income US$8/day), mainly in the communities o f Centro, Rio Ohin (north), San Joaquin (south-east), Cuba (south-east), and Comunas I and 2 o f Dosquebradas (border with Pereira).

119

Page 128: FOR OFFICIAL ONLY - World Bankdocuments.worldbank.org/curated/en/... · Project description [one-sentence summary of each component] Re$ PAD B.3.a, Technical Annex 4 Component 1 -

PEREIRA 01 V I L L A SANTANA 02 R I O O T U N 03 CENTRO 04 VILLAVlCENCIO 05 ORIENTE 06 UNIVERSIDAD 07 BOSTON 08 JARDIN 09 CUBA 10 CONSOTA 11 OLIMPICA 12 FERROCARRIL 13 SANJOAQUIN 14 PERLA DEL OTUN 15 ELOSO 16 SANNICOLAS 17 ELROCIO 18 DELCAFE 19 ELPOBLADO

Population

17,324 45,982 44,161 18,990 17,017 11,606 29,338 11,108 25,850 19,732 17,709 9,985 26,120 12,005 18,047 9,571

13,521 15,846

2,002

Influence

0 37,952 44,161 11,870 2,404 3,687 8,986 4,381

25,850 19,732 17,709 5,617

26,120 12,005 18,047

0 0 0 0

Share

0.0% 82.5% 100.0% 62.5% 14.1% 3 1.8% 30.6% 39.4% 100.0% 100.0% 100.0% 56.3% 100.0% 100.0% 100.0% 0.0% 0.0% 0.0% 0.0%

Stratum 1&2 Influence 1&2

17,324 0 18,499 11,350

820 820 490 120

6,878 1,428 788 54

7,058 688 59 0

7,159 7,159 16,263 16,263

0 0 8,920 4,552 17,042 17,042 10,779 10,779 9,034 9,034 5,900 0 2,002 4,506 10,700 0 4,367 0

Share

0.0% 6 1.4% 100.0% 24.5Yo 20.8% 6.9% 9.7% 0.0%

100.0% 100.0%

51.0% 100.0% 100.0% 100.0% 0.0%

225.1% 0.0% 0.0% -

Subtotal Pereira 365,915 238,521 65.2% 144,083 83,795 58.2% DOSQUEBRADAS COMLJNA 1 16,033 0 0.0% 16,033 0 0.0% COMUNA 2 28,447 28,447 100.0% 20,744 20,744 100.0% COMUNA 3 15,952 15,952 100.0% 8,680 8,680 100.0% COMUNA 4 10.964 10,964 100.0% 218 218 100.0% COMUNA 5 15,887 15,887 100.0% 1,812 1,812 100.0% COMLJNA 6 17,408 17,408 100.0% 8,952 8,952 100.0% COMUNA 7 14,887 14,887 100.0% 1,936 1,936 100.0% COMUNA 8 15,732 15,732 100.0% 5,492 5,492 100.0% COMUNA 9 17,463 0 0.0% 14,982 0 0.0% COMUNA 10 21,398 0 0.0% 4,019 0 0.0% COMUNA 11 10,338 0 0.0% 1,624 0 0.0% Subtotal Dosquebradas 184,509 119,277 64.6% 84,492 47,834 56.6% TOTAL 550,424 357,798 65.0% 228,575 131,629 57.6% Source: Data provided by the Secretary o f Planning Pereira, and Of i ce o f Planning Dosquebradas, calculations by D. Hidalgo

The catchments area o f the SITM covers 65% o f the urban population o f Pereira and Dosquebradas and 58% o f the population in Strata 1 and 2. Around 37% o f the total passengers o f the S ITM are expected to belong to strata 1 and 2.

The system will provide travel time and cost savings to low-income population, and most important, accessibility to jobs and social services. Journey times are currently 45 minutes from the outskirts to the city center, with very long waiting (around 10 minutes). The implementation o f the SITM i s expected to reduce average waiting times to 2 minutes in the peak hour and 5 minutes o f f peak. Travel speed wil l also be increased, reducing the journey in 6 minutes (average). Hence, for low-income population l iving in the outslurts and working in the city center travel times are expected to be reduced to 3 1 minutes (by 3 1%) mainly benefiting low-income population. Travel costs are also expected to decrease. A flat fare will reduce average travel cost from COP 770 to COP 750 (2.6%).

Benefits for low-income population will also be derived from accident reduction, pollution abatement and better quality jobs (drivers w i l l have 8 hour journeys and benefits).

120

Page 129: FOR OFFICIAL ONLY - World Bankdocuments.worldbank.org/curated/en/... · Project description [one-sentence summary of each component] Re$ PAD B.3.a, Technical Annex 4 Component 1 -

MAP SECTION

Page 130: FOR OFFICIAL ONLY - World Bankdocuments.worldbank.org/curated/en/... · Project description [one-sentence summary of each component] Re$ PAD B.3.a, Technical Annex 4 Component 1 -