for sale - loopnet...k2 k3 k4 k5 l1 l2 l3 l4 l5 m1 m2 m3 m4 m5 a1 a2 a3 a4 a5 a6 a7 a8 a9 gds trash...
TRANSCRIPT
For Sale1821 Highway 19 SouthBryson City, NC 28713
273,282 s.f. plastic injection molding facility on 20.29 AcresIdeal asset for any injection modeling company
Robin Boylan CCIM, SIOR+1 828 258 [email protected]
Matt Rakowich+1 773 632 [email protected]
Competitive advantagesINJECTION MOLDING “PLUG AND PLAY”: Significant machinery and equipment to support an injection molding operation will remain in place during the initial marketing of the property and presents a “plug and play” opportunity for another injection molding operator.
AVAILABLE MANUFACTURING LABOR: The current unemployment rate in Swain County is now up to 7.3% which represents approximately 450 workers without jobs and over 3,704 workers without jobs in a regional commute radius.
AGGRESSIVE INCENTIVES: Swain County is a Tier-1 designation which qualifies for the highest level of grants and incentives in the state of North Carolina, including JDIG (Jobs Development Investment Grants) and the One NC Fund. As such, manufacturers locating in Swain County qualify for the highest level of grants in the state’s incentive program.
Base building & landAsking price: $4,750,000.00 ($17.38 per s.f.)Ownership willing to sell machinery at additional cost. See page 2.Tax assessment: $5,428,720Property taxes (2017): $72,912
TRUCK BAY
SHIPPING (72)
DATE REVISED: 09-01-11REVISED BY:
CLOS
ET
DOCK
S
R R
R RR R
PlantManager'sOffice
FrontConference Room
Office
Office
EngineeringPrint
storage
EngineeringManager's Office
Receptionist
Women'sRestroom
IT Server
Controller
Closet
Men'sRestroom
CustomerService
CHILLER
A1 A2 A3 A4 A5 A6 A7 A8 A9 A10 A11 A12 A13 A14 A15 A16 A17 A18 A19 A20 A21
B1 B2 B3 B4 B5 B6 B7 B8 B9 B10 B11 B12 B13 B14 B15 B16 B17B18 B19
B20B21
C2C1
C3
C4 C5 C6 C7 C8 C9 C10 C11 C12 C13 C14 C15 C16 C17 C18 C19 C20C21
D20 D21D19D18D17D16D15D14D13D12D11D10D9D8D7D6D5D4D3D2
E2 E3 E4 E5 E6 E7 E8 E9 E10 E11E12 E14E13 E15 E16 E17 E18 E19 E20 E21
F21F20F19F18F17F16F15F14F13F12F11F10F9F8F7F6F5F4F3F2F1
E1
G2 G3G1 G4G5 G6 G7 G8 G9 G10 G11 G12 G13
G14 G15 G16 G17 G18 G19 G20 G21
MOLDING (52)
R R
COOLINGTOWER
RIM AREA (80)
PACK LINE 2PACK LINE 1
PAINT LINE 1 PAINT LINE 2
FINISHING (54)
RECE
IVIN
G
ELEC 1ELEC2
ELEC3
ELEC4
DRY 3
DRY 4OIL OIL
OILOIL
OIL OIL
OILOIL
TOOLING
SANDINGPROCESS
RACK96x42
RACK96x42
RACK96x42
OIL OIL
OILOIL
OIL OIL
OILOIL
OILROOM
CHRIS SMITH
OFFI
CE96
x 1
44OF
FICE
96 x
144
LT P
NLW
H-B
FIRE
DOO
R
450 x 200
WHSE 200' x 450' = 90,000 Sq. Ft.
157,634 Sq. Ft. Manufacturing Floor
4,663 Sq. Ft. Front Office5,008 Sq. Ft. Oil Room
1,287 Sq. Ft. Compressor Room
90,000 Sq. Ft. Warehouse
In Addition:
DOCK
LEVE
LER
ROLL UP
ROLL
UP
ROLL
UP
COMPRESSORROOM
Engineering OfficeArea
Room
Purchasing
SCREWSBARRELS
OFFICE
OFFICE
OFFICE
OFFICE
DOW
NSTA
IRS
UPOF
FICE
OFFI
CEOF
FICE
OFFICEOFFICE
RESTROOMRESTROOM
PAINT MIXAREA
UP
PAINT STORAGE
AREA
GUARDSTATION
MAI
N GA
TE
CONMET GENERAL LAYOUT
Fork Lift
NC357147NC365498NC365496
NC376101
NC374398
NC307038NC357148
NC296723
NC365416NC376102
NC365497 (Removed)
COMP 7
COMP 6
RACK108 x 42
NC307035
NC365417
NC385416
NC35
2839
NC35
7149
NC35
7150
3 OUTSIDE N2 STORAGETANKS NEXT TO COMP ROOM
RACK108 x 42
RACK108 x 42
RACK108 x 42
RACK
108
x 42
RACK108 x 42
RACK108 x 42
RACK108 x 42
RACK108 x 42
1
2
RACK 102 x 42END SECTION
RACK 102 x 42INSIDE SECTION
RACK 102 x 42INSIDE SECTION
RACK 102 x 42END SECTION
RACK 102 x 42END SECTION
RACK 102 x 42END SECTION
RACK
102
x 4
2EN
D SE
CTIO
NRA
CK 1
02 x
42
END
SECT
ION
RACK 102 x 42END SECTION
RACK 102 x 42END SECTION
RACK 102 x 42END SECTION
RACK 102 x 42END SECTION
RACK 102 x 42END SECTION
RACK 102 x 42END SECTION
POWERMATIC
ECONOMIZER
JAN/STOR.
UP
VENDING STORAGE
CAFETERIA
EWC
UPUP
LABQA
Server
Men'sRestroom
Women'sRestroom
(70)
JANITOR
QCManager CMM
ICE
RACK 102 x 42END SECTION
RACK 102 x 42END SECTION
RACK 102 x 42END SECTION
RACK 102 x 42END SECTION
DOCK
LEVE
LER
STRETCH WRAP
RECE
IVIN
GSH
IPPI
NG
RACK 102 x 42END SECTION
RACK
102
x 4
2EN
D SE
CTIO
NRA
CK 1
02 x
42
END
SECT
ION
RACK
102
x 4
2EN
D SE
CTIO
NRA
CK 1
02 x
42
END
SECT
ION
RACK 102 x 42END SECTION
RACK 102 x 42END SECTION
RACK 102 x 42END SECTION
Wal5 Area
BREA
K AR
EA
O Row
RACK 102 x 42END SECTION
RACK 102 x 42END SECTION
RACK 102 x 42INSIDE SECTION
RACK 102 x 42INSIDE SECTION
RACK 102 x 42INSIDE SECTION
RACK 102 x 42INSIDE SECTION
RACK 102 x 42INSIDE SECTION
RACK 102 x 42INSIDE SECTION
RACK 102 x 42INSIDE SECTION
RACK 102 x 42INSIDE SECTION
A1 A2 A3 A4 A5
B1 B2 B3 B4 B5
C1 C2 C3 C4 C5
D1 D2 D3 D4 D5
E1 E2 E3 E4 E5
F1 F2 F3 F4 F5
G1 G2 G3 G4 G5
H1 H2 H3 H4 H5
I1 I2 I3 I4 I5
J1 J2 J3 J4 J5
K1K2 K3
K4K5
L1 L2 L3 L4 L5
M1 M2 M3 M4 M5
A1 A2 A3 A4 A5 A6 A7 A8 A9
GDS
COM
PACT
OR #
1
TRAS
H
HYD
OIL OIL
OILOIL
FILT
ERS
COM
PACT
OR
CONCRETEASPHAULT
ROOF SLANTDN UP
N2N2
2K G
al T
ank
RACK
SRA
CKS
RACK
S
RAM
P 84
" x 3
5'
Fork Lift
PIT 58'x26'x7'
GRAVEL
DOCK
LEVE
LER
DOCK
LEVE
LER
GRAVEL
GRAVEL
GRAVEL
OUTS
IDE
DOCK
S
ROOFLINE
RACK
102
x 4
2EN
D SE
CTIO
NRA
CK 1
02 x
42
END
SECT
ION
RACK
102
x 4
2EN
D SE
CTIO
NRA
CK 1
02 x
42
END
SECT
ION
RACK
102
x 4
2EN
D SE
CTIO
N
RACK 102 x 42END SECTION
RACK 102 x 42END SECTION
RACK 102 x 42END SECTION
RACK 102 x 42END SECTION
RACK 102 x 42END SECTION
RACK 102 x 42END SECTION
RACK 102 x 42END SECTION
RACK 102 x 42END SECTION
RACK 102 x 42END SECTION
BAIL
ER
ROOF
LINE
SILO
S
1
2
3
4
8
9
N2 FARM
SILOS
COVER
NC365420NC365421NC365422NC365418
INSIDE SHOP
H
H
H
H
H
H
H
H H
H
H
ADT PAD
CULVERT CULVERT
CULVERT
MaskWasher
PaintKitchen
Pro MixPro Mix
BURNER
GAS TRAINPaintKitchen
PAINT BOOTH 2
PAINT BOOTH 1
PAINT BOOTH 4
PAINT BOOTH 3
EXHAUST
EXHAUST
EXHAUST
EXHAUST
NEG AIR PRESSURE
NEG AIR PRESSURE
NEG AIR PRESSURE
NEG AIR PRESSURE
PRES
SURE
CTR
L UP
DOWN
DOWN
UP
LOAD PARTS
LOWER OVEN
LOAD PARTS
UPPER OVEN
FLASH ROOM FLASH ROOM
DOW
N
UP
DOW
N
UP
#7 #8 #10
#16#17
#19#20
#22
#23#28#29#30#32#33#34
#1 INVE
RTER
Fork
Lift
TOYO
TA
Fork LiftNISSAN
OIL OIL
OILOIL
NEW
DRAI
N
PUM
PHA
ND
OIL
OIL
OIL
GALL
ON
OIL
RAM
P
RAM
P
SPIGOT
OIL
GALL
ON DRUM
#18
BLENDER
REGR
IND
AREA
GRINDINGROOM
ELECT.PANEL
CLOS
ET
OFFICE
OFFICE
OFFICE
DOW
NSTA
IRS
UP
H
H
CAGEAREA
CAGE3 LOCKER
18 x 363 LOCKER
18 x 363 LOCKER
18 x 363 LOCKER
18 x 36
3 LO
CKER
18 x
36
3 LO
CKER
18 x
36
3 LO
CKER
18 x
36
3 LO
CKER
18 x
36
WATER LINE
3 LO
CKER
18 x
36
3 LO
CKER
18 x
36
3 LO
CKER
18 x
36
GREEN LINE IS CL of CRANE HOOK LIMITS
8011
428586
411351
4415-16
610080
GREEN LINE IS CL of CRANE HOOK LIMITS
33 L
OCKE
RS T
OTAL 3
SETS
REM
OVAB
LE R
AILS
WATER LINE
3
3
AISL
E
TOOLINGENTRANCE
TOOLING CAGE
TOOLING CAGE
SS
MAINT.
A400
NGP DASH CELL
KW DOOR SILHEAT STAKE
PB GB ASSY
SECO
NDAR
YAS
SY
Infrastructure details
Buildingspaces key
Production Area
Warehouse Space
Office Space
Existing machinery includes:
- 18 Toshiba presses ranging in capacity from 120 to 2750 ton capacity, 13 of which are robot operated
- 19 Resin Dryers with capacity of 220 - 60000 lbs. of material per hour
- Heavy Cranes in Place (Demag) - One (1) 10 ton crane – 400’ travel; hook to floor length of 17’-8” - One (1) 20 ton crane – 285’ travel; hook to floor length of 16’-5” - Two (2) 25 ton cranes – 400’ travel - 14’ -9.5” and 15’-5” hook to floor lengths - One (1) 30 ton crane – 400’ travel; hook to floor length of 17’-3”
- IMS Resin Dumping Station with 2500 lbs. max load
- 6 Resin Silos - Three (3) 7010 cubic ft. capacity resin silos - One (1) 3710 cubic ft. capacity resin silo - One (1) 1425 cubic ft. Resin
- 2016 Novatec Material Resin Conveyance System
Additional Paint Line, Skin Cell and RIM Cell infrastructure also for sale.
Building specs
- 273,282 s.f. of space available
- 4,284 s.f. 2-story office space
- 21’ - 27’ clear height
- Renovated in 2004 (built in 1979)
- 8 exterior docks (9’x10’)
- 1 dock high loading door (9’x10’)
- 2 drive-in doors (10’x14’)
- 5 roll up doors
- Wet sprinklers with 8” fire loop
- 6” reinforced concrete floors
- Fully sprinklered
- 176 paved, marked, lighted spaces
Heavy Power
- Primary distribution line of 12,470 volts
- 8,000 Amps / 480v 3P (4 panels)
- Four 2000kVA pad mounted transformers
- Four internal square D switchgears (2000 amps)
Column Spacing
- 25’x50’ (main production area)
- 40’x50’ (warehouse addition)
Utilities
- Gas: 6” high pressure main and 2” line - PSNC Energy
- Water/Sewer: 8” mains and 6” lines - town of Bryson City
DISCLAIMER: Although information has been obtained from sources deemed reliable, Owner, Jones Lang LaSalle, and/or their representatives, brokers or agents make no guarantees as to the accuracy of the information contained herein, and offer the Property without express or implied warranties of any kind. The Property may be withdrawn without notice. If the recipient of this information has signed a confidentiality agreement regarding this matter, this information is subject to the terms of that agreement. ©2018. Jones Lang LaSalle. All rights reserved.
4-lane highway accessBryson City
19
74
1318
1309
191.5 mi. | 2 min. to US 74
Nashville249 miles
Chattanooga136 miles
Knoxville92 miles
840
40
65
24
40
65
75
75
Asheville68 miles
26
2681
Bryson City
40
74
Although truck traffic must wind the final mile through local traffic, the subject facility is within one (1) minute of a 4-lane divided highway and just 35 minutes from I-40 and I-26 connectors.
Robin Boylan CCIM, SIOR+1 828 258 [email protected]
Matt Rakowich+1 773 632 [email protected]