LLC Ener-holding is a fast developing construction & installation company having its core business in the sector of

construction and overhaul of power generating facilities.

The company top management team has a varied experience in supervising of energy facilities construction organizations

and participated in construction of such facilities as:

Bashkirskaya Nuclear Power Station (NPS);

Priufimskaya Heat-and-Power Plant (HPP) ;

Ufimskaya HPP-5;

Kazanskaya HPP-2;

Combined Cycle Gas Turbine (CCGT) -410 of NovoSalavatskaya HPP;

a number of Gas Turbine Power Generating Plants (GTPGPs) , Gas turbine plants (GTPs) ,

Gas Reciprocating Unit (GRUs) of HPPs;

Substations (SS) for 110-220 kW;

HVPLs (High voltage power line) -110, 220, 500 kW

LLC Ener-holding is a member of not-for-profit self-regulating organization Union of Builders of the Republic of

Bashkortostan, maintains the clearance certificate for execution of those types of works that affect security of capital construction

projects, and inter alia, for execution of general for up to 3 billion rubles, Certificate No. 0437.03-2011-0275075025-C-025 of

28.02.2013, SROR NP "Builders of Sverdlovsk Region" - The certificate about admissions to types of works on objects of use of

nuclear energy No. 0430.01-2013-0275075025-C-046. The right of works on objects of nuclear power is confirmed with existence

of the license of Rostekhnadzor No. BO-02-101-2591 of 14.05.2013

The enterprise has obtained the Certificate of conformity to the requirements of integrated management system GOST ISO

9001-2008, GOST ISO 14001 -2007, OHSAS 18001-2007 under No. РОС RU.ФК29.К001.

Dear colleagues!

For the purpose of securing strict compliance with the works schedules the Microsoft Project-based network planning was

implemented and online access was arranged to maintain control over the progress of works.

Currently the company has in-house personnel of 294 people including 41 engineers and technicians, all of them being the

Russian Federation nationals.

The company industrial and technical personnel makes it possible to resolve multiple and integrated tasks on a “turnkey”

basis, starting from design work, delivery of equipment, execution of construction work, overhaul and commissioning of power

generating facilities. For such purposes the enterprise has the required set of special plant & equipment and industrial facilities.

We stay always available for interaction with investors, customers and partners.

Construction of new facilities is a business requiring a high level of responsibility from the side of any organization and even from

a very experienced one. Our company undertakes such responsibility.

Sincerely yours,

Company Board of Directors

Construction of Bashkirskaya NPS in 1984-1990;

Construction of Shigily GTP of TPP for 4 megawatt in Bolsheust’ikinskoye village, (RB), 2001;

Construction of Agidel GTP of TPP for 2х4 megawatt in Agidel city, (RB), 2002;

Heat distribution unit high pressure steam pipe for 150 MPA at Priufimskaya TPP –OJSC Polief, 2002.

Construction of GRU of the HPP for 2х0.973 megawatt capacity equipped with Jenbacher plant units in Yangan-Tau and Krasnousolsk health resorts,

(RB), 2002;

Construction of GRU for the HPP for 1х0.973 megawatt capacity, equipped with Jenbacher plant unit in Yumatovo health resort located in Ufimsk

district (RB), 2003;

Construction of GRU for HPP for 2х1.03 megawatt capacity, equipped with Caterpillаr plant units in Assy health resort located in Beloretsk district

(RB), 2004;

Construction of GRU for the HPP for 10 х2.74 megawatt capacity, equipped with Jenbacher plant units at Zauralskaya HPP in Sibay town (RB), 2004;

Construction of GTPGP – 10/95BM , for 8 megawatt capacity in Shaksha microdistrict of Ufa city (RB), 2005;

Construction of GTPGP– 10/95BM , for 8 megawatt capacity in state-owned unitary enterprise Alekseyevskiy state farm in Ufimsk district (RB), 2007;

Construction of GRU for Meteli HPP for 6х2 megawatt capacity, equipped with Jenbacher plant units (RB), 2007.

Construction of SS for 220/20 kilovolt in Yashino, Moscow, 2008;

Construction of SS for 220/110/35 kilovolt in Nikulino, Moscow, 2008;

Construction of Ibragimovskaya SS 110 for 2*40 megawatt, 2008;

Construction of HVPL - 220 kilovolt SS Ufimskaya-500 – SS Amet, 2008;

Construction of block gas boiler house in Energetic Health and Recreation resort, Energetic Children’s Health Centre, 2008;

Construction of GTP for 25 megawatt capacity at Ufimskaya HPP-1, 2009;

Construction of Zaton SS 220 for 2*125 megawatt, 2010;

Construction of HVPL-110 kilovolt «SS Zaton – SS Krasnodonskaya» (RB), 2010;

Extension of Zauralskaya HPP by construction of two boilers and GTPGP for 16 megawatt in Sibay town, 2011;

Construction of CCGT block for 60 megawatt at Ufimskaya HPP-2, (RB), 2011;

Construction of block gas boiler house in Yuruzan micro district, Ufa city (RB), 2011.

Experiences of the executives in management of construction and commissioning

of power generating facilities

Construction of Ufimskaya HPP-5, 2009;

Construction of Substation SS for 110/6 kilovolt Krasnodonskaya, Ufa city, 1998;

Construction of Substation SS for 110/10/6 kilovolt Druzhnba, Ufa city, 2001;

Construction of Ishimskaya substation SS for 110/6 kilovolt in Ufa city, 2005;

Construction of Solnechnaya substation SS for 110/6 kilovolt in Ufa city, 2007;

Construction of Elektrozavodskaya substation SS for 110/6 kilovolt in Ufa city, 2006;

Supplying complete sets of high-voltage equipment for OJSC Bashkirenergo facilities, 2008;

Construction of Cable pole line (CPL) 110 kilovolt SS Glumilino - SS Krasnodonskaya in Ufa city, 2009;

Construction of CPL 110 kilovolt SS Ibragimovskaya, Ufa city, 2009.

31 44 43 36 41 42 43

127

218 241 253 253 267 250

0

50

100

150

200

250

300

350

2011 2012 2013 2014 2015 2016 2017

Labor

Engineers

158

284 294 309

Number of personnel

262 288

Приложение №1

к приказу №96 от 01.09.2015 г. -

-

-

-

-

-

-

-

-

Приложение №2

к приказу №97 от 01.09.2015 г. - -

-

-

-

Construction and installation works, million rub.

87,4

590,2

1 462,7

1 169,4

673,3

887,9 912,7

0,0

200,0

400,0

600,0

800,0

1 000,0

1 200,0

1 400,0

1 600,0

2011 2012 2013 2014 2015 2016 2017

Constructed industrial facilities

Project for construction of the polypropylene manufacturing complex with output of 500 th. tons per year. Propane Dehydration Plant (PDP).

Construction of SS-103001, SS-103002 electrical substations. Tobolsk, LLC "Tobolsk-Polymer"

List of performed works:

Erection of the frameworks of substations buildings of prefabricated reinforced concrete;

Construction of cast-in-situ reinforced concrete transformer chambers and inter-floor constructions with the use of large-form shutters;

Steelwork erection;

Installation of siding on the buildings facades;

Roofing;

Structural work;

Electrical installation works and fit-out/finishing works.

Project for construction of polypropylene manufacturing complex for 500 th. tons annual output. Polypropylene manufacturing plant (PMP).

List of works performed. Tobolsk, LLC "Tobolsk-Polymer"

Installation of steelworks for SK 1704, SK 1705 facilities, extrusion building; SK 1702 metal frame for unloading operations; CA 1400 Flare stack; CA

1401 Flare separator structure; Erection of wall sandwich panels for SK 1706 facilities – Extrusion building; SK1206, SK1306 Catalyzer building.

Kazanskaya HPP-2. Construction of CCGT for 220 megawatt

List of works performed:

Common construction work by general contracting method.

OJSC Gazprom neftekhim Salavat

List of performed works:

Reconstruction of the plant for hydro-treatment of diesel fuel L-24-6 (GO-2) of Oil Refinery;

Construction of central control station;

Retrofitting of the chemical plant treatment facilities for treatment of salt containing wastewater;

Plant for treatment of sulfide-alkaline wastewater of the oil refinery and Monomer factory;

Erection of foundations for equipment.

«Complex for storing, sorting, packing and commodity processing of fruits with capacity approx. 6 800 tons», Abinsk.

The complex was constructed by the general contractor on the turnkey basis

List of performed works:

sorting block - 2 137 m2;

storing block - 5 646 m2;

administrative building - 424 m2.

«Transformer Substation 47-SS-01» project «ZapSibNeftechim» Tobolsk

List of performed works :

Cast in situ concrete structures: columns, beams, floor slabs;

Performing of cast in situ transformer rooms and floor slabs using large-scale framework;

Installation of steel structures of roof, stairs, fence;

Installation of wall sandwich panels;

Roofing;

Civil works;

Paving and plarforms;

Backfilling;

electrical and finishing works.

OJSC Kuibyshevsky refinery.

List of performed works :

Erection of cast-in-situ floors of postament №1 of the system for storage, gasification and release of nitrogene, trestlework, production plant;

Сonstruction of the equipment operating building and the pumping station building.

OJSC Novoil. Hydrogene production plant

List of performed works :

Сonstruction of SS-152 substation;

Erection of cast-in-situ foundations and erection of the metal frame of the Postament with the pumping station and Pressure Swing Adsorber (PSA) М-002

Plant.

Reconstruction of biological refining facilities (BOS) on the territory of the Branch of “ANK “Bashneft” OJSC «Bashneft – Ufaneftechim»

Receiving tank, Mixer-regulator tank, Emergency tank, Substation 6/0,4 kV . Industrial building of Mesh filters, Receiving tank of Excess activated sludge.

List of performed works:

construction of cast in situ tank;

construction of cast in situ extended foundations;

installation of precast concrete foundation, columns, floor slabs;

installation of steel structures;

masonry works of internal and external walls;

roofing;

installation of false floor.

Construction of Multi-purpose Research Nuclear reactor on Fast neutrons MBIR, Dimitrovgrad

Foundation slab, walls, floor slabs of Reactor block (blocks №3, 4), Block SAOT№1, Block SIO№1, Industrial site GNC NIIAR;

Construction base, stores №1,2,3.

List of performed works:

Cast in situ lean concrete;

Reinforcement, installation of formwork;

Cast in situ concrete works.

Construction of TEC “Akademicheskaya" (power plant). Second Starting complex, Ekaterinburg

Gas turbine foundation; Foundations of accessory foundations of gas turbine; Circulation pump station (construction on “turn key” basis); Fire pump station;

KRUE-110 kV (electrical switchgear); Technological overpass; Concrete floor slabs of Main building; Emergency oil drain tank; Drainage tank of network

pipelines; Foundations of BPPG (Block gas preparation station).

List of performed works:

Soil excavation and backfilling works;

Cast in situ constructions;

Installation of steel structures

Installation of wall sandwich panels;

Installation of technological pipelines and equipment;

Installation of cable structures and cabling;

HVAC systems;

Installation of low-current networks;

Instrumentation;

Finishing works.

Project «Construction of Substation110/35/10 kV «Zubovo», Ufa district, PO «UGES»

The complex was constructed by the general contractor on the turnkey basis

Improvement of the adjacent area, improvement of Ufa-Arena multi-purpose sport arena in Sovetsky district of Ufa city district of the Republic of

Bashkortostan.

Land improvement works were performed by the general contractor on the turnkey basis.

Constructed sport facilities

Sports and Recreation Center Toros in Neftekamsk town of the Republic of Bashkortostan;

The complex was constructed by the general contractor on the turnkey basis.

Roofed training skating ring with artificial ice coating in Neftekamsk town of the Republic of Bashkortostan.

The complex was constructed by the general contractor on the turnkey basis.

Sports and Recreation Center BRGI№1 Rami Garipova from Ufa, RB.

The complex was constructed by the general contractor on the turnkey basis.

Contact information

LLC Ener-holding

450076, 105, Gafuri St, Ufa city, ,

Тel. (fax): 8(347)269-40-60, 269-40-51

E-mail: [email protected]

Сайт: www.enerholding.ru