Page 1: Force workshop 6-7 Nov 2013 - Oljedirektoratet · Equipment Maintenance Continuous pumping operation for approx 4 months. The crew configuration, skills and available spares had to

Operational ExperiencesOperational Experiences

Force works

hop 6-7 Nov 2013

Page 2: Force workshop 6-7 Nov 2013 - Oljedirektoratet · Equipment Maintenance Continuous pumping operation for approx 4 months. The crew configuration, skills and available spares had to

Content

� Preparation and Mobilization

� Project Support

� Equipment and the Vessel

� Fluid Systems

� Logistics

2© 2012 HALLIBURTON. ALL RIGHTS RESERVED.

� Logistics

� Communication

Force works

hop 6-7 Nov 2013

Page 3: Force workshop 6-7 Nov 2013 - Oljedirektoratet · Equipment Maintenance Continuous pumping operation for approx 4 months. The crew configuration, skills and available spares had to

Preparation, Testing & Planning

• Large Scale Yard Testing of Equipment

• High Pressure Unit Rig-up

• Project Specific Rates and Pressures

• Personnel Meetings and Project Presentations

3© 2012 HALLIBURTON. ALL RIGHTS RESERVED.

Force works

hop 6-7 Nov 2013

Page 4: Force workshop 6-7 Nov 2013 - Oljedirektoratet · Equipment Maintenance Continuous pumping operation for approx 4 months. The crew configuration, skills and available spares had to

Mobilization of Equipment to Gdansk

• Transportation Logistics

• Cross Border and Customs

4© 2012 HALLIBURTON. ALL RIGHTS RESERVED.

Force works

hop 6-7 Nov 2013

Page 5: Force workshop 6-7 Nov 2013 - Oljedirektoratet · Equipment Maintenance Continuous pumping operation for approx 4 months. The crew configuration, skills and available spares had to

Installation, Testing and Commisioning

• Installation in co-operation with Knutsen,

Yard and Contractors

• Inspected, Tested and Approved

• Combined Halliburton and Knutsen

Commisioning phase

• Fluid Transfer

5© 2012 HALLIBURTON. ALL RIGHTS RESERVED.

• Fluid Transfer

• Mixing Simulation

• Pumping Tests

• Procedural SimulationForce works

hop 6-7 Nov 2013

Page 6: Force workshop 6-7 Nov 2013 - Oljedirektoratet · Equipment Maintenance Continuous pumping operation for approx 4 months. The crew configuration, skills and available spares had to

Equipment Layout

Power Generation

HCl Storage and Mixing

Chemicals, Waste & Filtration

Halliburton Control House

HP LinesFiltration

6© 2012 HALLIBURTON. ALL RIGHTS RESERVED.

Seawater Filtration &

Fresh Water Maker

Halliburton HP Pumping Equipment

HP Lines

Bow

Connector

Force works

hop 6-7 Nov 2013

Page 7: Force workshop 6-7 Nov 2013 - Oljedirektoratet · Equipment Maintenance Continuous pumping operation for approx 4 months. The crew configuration, skills and available spares had to

EOR Equipment

7© 2012 HALLIBURTON. ALL RIGHTS RESERVED.

Force works

hop 6-7 Nov 2013

Page 8: Force workshop 6-7 Nov 2013 - Oljedirektoratet · Equipment Maintenance Continuous pumping operation for approx 4 months. The crew configuration, skills and available spares had to

Snorre EOR Project Organisation Chart

Personnel Coordinator

Project Manager

Neil McIntosh

Performance Development

Coordinator

Dagfinn Selvik

Service Planner

Anne Jorunn Kettle

Management Team

Rolf VassbøTerje Lexau

Øyvind RakstangAmare Mebratu Procurement Specialist

Ann Elisabeth S. Godø

8© 2012 HALLIBURTON. ALL RIGHTS RESERVED.

Rev. 20.04.2013

Project Engineer

Ingrid Melien

Personnel Coordinator

Ingfrid Jekteberg

Service Coordinator

Idar Bjørknes

Supervisors

Tom Erik SjøflotKjell MikalsenJohnny Vestbø

Ståle FjerdingøyVidar Sætre

Magnar DidriksenPE Laboratory Manager

Iselin Klungland

Force works

hop 6-7 Nov 2013

Page 9: Force workshop 6-7 Nov 2013 - Oljedirektoratet · Equipment Maintenance Continuous pumping operation for approx 4 months. The crew configuration, skills and available spares had to

Crewing and Logistics

• Halliburton Crew:

• Dayshift: 8

• Nightshift: 8

• 2 week Rotational

• Helicopter Schedule

• Additional Availability

• Crew Overlap (continuity)

9© 2012 HALLIBURTON. ALL RIGHTS RESERVED.

• Crew Overlap (continuity)

• Spares and Consumables

• Supply Vessel Weekly

• Additional Availability

• Helicopter Option

Force works

hop 6-7 Nov 2013

Page 10: Force workshop 6-7 Nov 2013 - Oljedirektoratet · Equipment Maintenance Continuous pumping operation for approx 4 months. The crew configuration, skills and available spares had to

Pumping Schedule

No Stage Fluid Volume (m3)

0 Leak Test FW 0

1 Pre-Flush 1 Brine 60,000

2 Pre-Flush 2 Brine 30,000

10© 2012 HALLIBURTON. ALL RIGHTS RESERVED.

3 Pre-Flush 3 Brine 23,500

4 Main Treatment Silicate 240,000

5 Post Flush Brine 40,000

Note: Tracer A,B,C Pumped during Pre-Flush Stages

Tracer D Pumped during Post-Flush Stages

Caustic Solution available as contingency plan

Force works

hop 6-7 Nov 2013

Page 11: Force workshop 6-7 Nov 2013 - Oljedirektoratet · Equipment Maintenance Continuous pumping operation for approx 4 months. The crew configuration, skills and available spares had to

Vessel Fluid Loadout

Initial Loadout

11© 2012 HALLIBURTON. ALL RIGHTS RESERVED.

100% Brine Concentrate

50% Silicate Concentrate

100% HCl Concentrate

100% Tracers, Caustic

Batch #2 of Silicate Concentrate transferred

at Sea by Knutsen

Force works

hop 6-7 Nov 2013

Page 12: Force workshop 6-7 Nov 2013 - Oljedirektoratet · Equipment Maintenance Continuous pumping operation for approx 4 months. The crew configuration, skills and available spares had to

Brine Process

Brine System

R

O

R

O

R

O

10,000m3/day

6P Brine Mix m3

m3/day

4000m3/day

12© 2012 HALLIBURTON. ALL RIGHTS RESERVED.

4,000m3/day

5S FW m3 5P FW m3

1P Brine Conc m3

1S Brine Conc m3

m3/day

HALLIBURTON

HP PUMPS

QA/QC

� Circulation

� Sampling and Testing

� In-line Gauging

� Reporting

Force works

hop 6-7 Nov 2013

Page 13: Force workshop 6-7 Nov 2013 - Oljedirektoratet · Equipment Maintenance Continuous pumping operation for approx 4 months. The crew configuration, skills and available spares had to

Silicate Process

Silicate System

6S Silicate Conc m3

5S & 5P FW

m3/day

m3/day

QA/QC

� Circulation

� Sampling and Testing

� In-line Gauging

� Reporting

13© 2012 HALLIBURTON. ALL RIGHTS RESERVED.

3S Silicate Mix m3

3P Silicate Mix m3

5P Silicate Conc m3

5S Silicate Conc m3

1P Silicate Conc m3

1S Silicate Conc m3

HALLIBURTON

HP PUMPS

HCl Injection

In-Line Mixer

Force works

hop 6-7 Nov 2013

Page 14: Force workshop 6-7 Nov 2013 - Oljedirektoratet · Equipment Maintenance Continuous pumping operation for approx 4 months. The crew configuration, skills and available spares had to

HCl System

HCl m3

HCl m3

HCl m3

HCl m3

HCl m3

FWFrom 5P & 5SHCl System

High Concentration Storage Tanks

14© 2012 HALLIBURTON. ALL RIGHTS RESERVED.

HCl Mix Tank 50m3HCl Day Tank

15m3

Gravity Feed

Injection to Silicate Manifold

QA/QC

� Circulation

� Sampling and Testing

� In-line Gauging

� Reporting

Force works

hop 6-7 Nov 2013

Page 15: Force workshop 6-7 Nov 2013 - Oljedirektoratet · Equipment Maintenance Continuous pumping operation for approx 4 months. The crew configuration, skills and available spares had to

Control of Operations Offshore

• Knutsen Cargo Control Room:

Bulk Fluid Transfer, Mixing &

Circulation & Monitoring

• Halliburton Operations Control Room:

15© 2012 HALLIBURTON. ALL RIGHTS RESERVED.

HCl Mixing, Fluid Monitoring, HP

Pumping & Rate Control

• Snorre CCR:

Well Control, Monitoring

Force works

hop 6-7 Nov 2013

Page 16: Force workshop 6-7 Nov 2013 - Oljedirektoratet · Equipment Maintenance Continuous pumping operation for approx 4 months. The crew configuration, skills and available spares had to

Equipment Maintenance

Continuous pumping operation for approx 4 months.

The crew configuration, skills and available spares had to therefore be tailored to

meet the project demands.

Highest consumers of standard and schedule maintenance as well as un-planned

maintenance were the following:

Reverse Osmosis Plant:

• Operational & Maintenance Personnel Assigned

16© 2012 HALLIBURTON. ALL RIGHTS RESERVED.

• Operational & Maintenance Personnel Assigned

• Overhauls

• Replacment items

Halliburton HP Pumps:

• Operational Personnel & Mechanics Assigned

• Continuous Maintenance Program

• Replacement Units and Items

Force works

hop 6-7 Nov 2013

Page 17: Force workshop 6-7 Nov 2013 - Oljedirektoratet · Equipment Maintenance Continuous pumping operation for approx 4 months. The crew configuration, skills and available spares had to

Waste Management

• Waste Products Transferred to shore

by Supply Vessel

• Levels of Waste:

Low

• Wood, metal, rubber, rags, etc

17© 2012 HALLIBURTON. ALL RIGHTS RESERVED.

• Wood, metal, rubber, rags, etc

Medium

• Lubricants & Oils

High

• Filter Cartridges

Force works

hop 6-7 Nov 2013

Page 18: Force workshop 6-7 Nov 2013 - Oljedirektoratet · Equipment Maintenance Continuous pumping operation for approx 4 months. The crew configuration, skills and available spares had to

Communication

• Primary, Secondary and Back-up lines of

communication established and maintained

throughout the operation

• Main Communication hubs were:

• Statoil Operations Forus

• Snorre Control Offshore

18© 2012 HALLIBURTON. ALL RIGHTS RESERVED.

• Snorre Control Offshore

• Vessel Bridge and Cargo Room

• Halliburton Control Room

• Lines of Communication

• Telephone, Conference Link

• UHF Radio

• PA System (onboard)

• VHF

Force works

hop 6-7 Nov 2013

Page 19: Force workshop 6-7 Nov 2013 - Oljedirektoratet · Equipment Maintenance Continuous pumping operation for approx 4 months. The crew configuration, skills and available spares had to

De-Mobilization

• De-Mobilization to be performed in 2 stages

(1) Halliburton Equipment Removal in Risavika

(2) Knutsen Opeartions in Haugesund

19© 2012 HALLIBURTON. ALL RIGHTS RESERVED.

Note Thsi slide is not yet complete!!!!!!Force

workshop 6-7 Nov 2

013