Forcing the lid: Calibrating HEC-HMS for flood management studies California Water & Environmental Modeling Forum May 28, 2008 David Ford David Ford Consulting Engineers, Inc.

Upload: nguyenquynh

Post on 02-Oct-2018

224 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Forcing the lid: Calibrating HEC-HMS for flood … · Forcing the lid: Calibrating HEC-HMS for flood management studies California Water & Environmental Modeling Forum May 28, 2008

Forcing the lid: Calibrating HEC-HMS for flood management studies

California Water & Environmental Modeling Forum

May 28, 2008

David Ford David Ford Consulting Engineers, Inc.

Page 2: Forcing the lid: Calibrating HEC-HMS for flood … · Forcing the lid: Calibrating HEC-HMS for flood management studies California Water & Environmental Modeling Forum May 28, 2008
Page 3: Forcing the lid: Calibrating HEC-HMS for flood … · Forcing the lid: Calibrating HEC-HMS for flood management studies California Water & Environmental Modeling Forum May 28, 2008

A system is a big black boxOf which we can't unlock the locks,And all we can find out about Is what goes in and what comes out.

Perceiving input output pairs Related by parameters Permits us, sometimes, to relate An input, output, and a state.

If this relation's good and stable,Then to predict we may be able. But if this fails us - heaven forbid We'll be compelled to force the lid!

---K. Boulding

Page 4: Forcing the lid: Calibrating HEC-HMS for flood … · Forcing the lid: Calibrating HEC-HMS for flood management studies California Water & Environmental Modeling Forum May 28, 2008

A system is a big black boxOf which we can't unlock the locks,And all we can find out about Is what goes in and what comes out.

Perceiving input output pairs Related by parameters Permits us, sometimes, to relate An input, output, and a state.

If this relation's good and stable,Then to predict we may be able. But if this fails us - heaven forbid We'll be compelled to force the lid!

---K. Boulding

HEC-HMS

Page 5: Forcing the lid: Calibrating HEC-HMS for flood … · Forcing the lid: Calibrating HEC-HMS for flood management studies California Water & Environmental Modeling Forum May 28, 2008

Application steps

• Identify decisions

• Determine info required

• Define, discretize time + space

• Identify models; select one

• Fit and verify

• Develop BC + IC

• Apply

• Check

• Get info from results

Page 6: Forcing the lid: Calibrating HEC-HMS for flood … · Forcing the lid: Calibrating HEC-HMS for flood management studies California Water & Environmental Modeling Forum May 28, 2008

Application steps

• Identify decisions

• Determine info required

• Define, discretize time + space

• Identify models; select one

• Fit and verify

• Develop BC + IC

• Apply

• Check

• Get info from results

Page 7: Forcing the lid: Calibrating HEC-HMS for flood … · Forcing the lid: Calibrating HEC-HMS for flood management studies California Water & Environmental Modeling Forum May 28, 2008
Page 8: Forcing the lid: Calibrating HEC-HMS for flood … · Forcing the lid: Calibrating HEC-HMS for flood management studies California Water & Environmental Modeling Forum May 28, 2008

Start

Finish

Yes

No

Collect rainfall & runoff data

Select starting

estimates of parameters

Simulate system behavior with

parameters

Improve parameter estimates

Compare computed hydrograph

with observed

Satisfied?

Page 9: Forcing the lid: Calibrating HEC-HMS for flood … · Forcing the lid: Calibrating HEC-HMS for flood management studies California Water & Environmental Modeling Forum May 28, 2008

Gotta have...

•Model

• Initial estimates of parameters

• Performance index

• Systematic procedure for correcting

• “Input output pairs”

Page 10: Forcing the lid: Calibrating HEC-HMS for flood … · Forcing the lid: Calibrating HEC-HMS for flood management studies California Water & Environmental Modeling Forum May 28, 2008
Page 11: Forcing the lid: Calibrating HEC-HMS for flood … · Forcing the lid: Calibrating HEC-HMS for flood management studies California Water & Environmental Modeling Forum May 28, 2008

• Univariant gradient method (Newton’s method)

• Nelder and Mead method

Objective function

Parameter value

Iteration 1

Best estimate

Iteration 2

Page 12: Forcing the lid: Calibrating HEC-HMS for flood … · Forcing the lid: Calibrating HEC-HMS for flood management studies California Water & Environmental Modeling Forum May 28, 2008

)*2/()( which in

*)()/1( Z minimize 2

1

avgavgii

ii

NQ

i

i

QOBSQOBSQOBSWT

WTQCOMPQOBSNQ

+=

−= ∑=

Page 13: Forcing the lid: Calibrating HEC-HMS for flood … · Forcing the lid: Calibrating HEC-HMS for flood management studies California Water & Environmental Modeling Forum May 28, 2008

How we force the lid

• I-O pairs aren’t representative

• Kidnapped by cookbookery, mathematistry, naïve trust

• Results aren’t confirmed

Page 14: Forcing the lid: Calibrating HEC-HMS for flood … · Forcing the lid: Calibrating HEC-HMS for flood management studies California Water & Environmental Modeling Forum May 28, 2008

from Dr. Dave Curtis

Page 15: Forcing the lid: Calibrating HEC-HMS for flood … · Forcing the lid: Calibrating HEC-HMS for flood management studies California Water & Environmental Modeling Forum May 28, 2008

• 132 sq mi watershed in Colorado R. basin (Texas)

• Surface rain observation and gage-corrected radar available

• HEC-HMS model used for real-time forecasting

Page 16: Forcing the lid: Calibrating HEC-HMS for flood … · Forcing the lid: Calibrating HEC-HMS for flood management studies California Water & Environmental Modeling Forum May 28, 2008

June 2007 storm data from Melinda Luna, LCRA

Page 17: Forcing the lid: Calibrating HEC-HMS for flood … · Forcing the lid: Calibrating HEC-HMS for flood management studies California Water & Environmental Modeling Forum May 28, 2008

RaingageOptimization start

Page 18: Forcing the lid: Calibrating HEC-HMS for flood … · Forcing the lid: Calibrating HEC-HMS for flood management studies California Water & Environmental Modeling Forum May 28, 2008

RadarOptimization start

Page 19: Forcing the lid: Calibrating HEC-HMS for flood … · Forcing the lid: Calibrating HEC-HMS for flood management studies California Water & Environmental Modeling Forum May 28, 2008

Best-fit parametersParameter

(1)Initial value(2)

Rain gage value(3)

Radar value(4)

Initial baseflow (cfs/mi2) 0.1 0.103 0.163

Constant loss rate (in/hr) 0.15 0.138 0.164

Initial deficit (in) 0.83 0.784 1.505

Max deficit (in) 4.583 3.192 4.230

Recession constant

1 1 1

Snyder peaking coefficient 0.70 0.605 0.398

Page 20: Forcing the lid: Calibrating HEC-HMS for flood … · Forcing the lid: Calibrating HEC-HMS for flood management studies California Water & Environmental Modeling Forum May 28, 2008

4.22 sq mi, urbanized

Page 21: Forcing the lid: Calibrating HEC-HMS for flood … · Forcing the lid: Calibrating HEC-HMS for flood management studies California Water & Environmental Modeling Forum May 28, 2008

Pre

cip

(in

)

0.00

0.04

0.08

0.12

12:00 15:00 18:00 21:00 00:00 03:00 06:00 09:00 12:00

22Jan1997 23Jan1997

Flo

w (

cfs

)

0

100

200

300

400

500

600

SAME ZONE OBSERVED PRECIP-INC OUTLET OBSERVED FLOW BASIN COMPUTED FLOW

Parameter “Optimized” estimate

tp, hr 2.33

cp 0.39

initial loss, in 0.49

uniform rate, in/hr 0.11

Page 22: Forcing the lid: Calibrating HEC-HMS for flood … · Forcing the lid: Calibrating HEC-HMS for flood management studies California Water & Environmental Modeling Forum May 28, 2008
Page 23: Forcing the lid: Calibrating HEC-HMS for flood … · Forcing the lid: Calibrating HEC-HMS for flood management studies California Water & Environmental Modeling Forum May 28, 2008

Pre

cip

(in

)

0.00

0.04

0.08

0.12

12:00 15:00 18:00 21:00 00:00 03:00 06:00 09:00 12:00

22Jan1997 23Jan1997

Flo

w (

cfs

)

0

100

200

300

400

500

600

700

SAME ZONE OBSERVED PRECIP-INC BASIN COMPUTED FLOW CORABELL OBSERVED FLOW

Parameter “Optimized” estimate

tp, hr 4.69

cp 0.73

initial loss, in 0.11

uniform rate, in/hr 0.09

Page 24: Forcing the lid: Calibrating HEC-HMS for flood … · Forcing the lid: Calibrating HEC-HMS for flood management studies California Water & Environmental Modeling Forum May 28, 2008

Calibration results from 5.51 sq mi watershed

ErrorIter. tP(hr)

CP Initialloss(in)

Uniformloss rate

(in/hr)Peak(%)

Volume(%)

Time ofpeak(hr)

Obj.function

0 1.06 0.48 0.48 0.13 . . . .

1 0.92 0.40 0.03 0.18 16.5 1.3 -0:20 72.1

2 0.81 0.33 0.02 0.18 12.1 -0.3 -0:20 67.5

3.

.

.

0.75.

.

.

0.30.

.

.

0.02.

.

.

0.18.

.

.

12.8.

.

.

0.8.

.

.

-0:20.

.

.

65.3.

.

.

Finaltrial

0.42 0.17 0.02 0.17 10.8 3.0 -0:40 51.2

Woo-hoo

Page 25: Forcing the lid: Calibrating HEC-HMS for flood … · Forcing the lid: Calibrating HEC-HMS for flood management studies California Water & Environmental Modeling Forum May 28, 2008

Calibration results from 5.51 sq mi watershed

ErrorIter. tP(hr)

CP Initialloss(in)

Uniformloss rate

(in/hr)Peak(%)

Volume(%)

Time ofpeak(hr)

Obj.function

0 1.06 0.48 0.48 0.13 . . . .

1 0.92 0.40 0.03 0.18 16.5 1.3 -0:20 72.1

2 0.81 0.33 0.02 0.18 12.1 -0.3 -0:20 67.5

3.

.

.

0.75.

.

.

0.30.

.

.

0.02.

.

.

0.18.

.

.

12.8.

.

.

0.8.

.

.

-0:20.

.

.

65.3.

.

.

Finaltrial

0.42 0.17 0.02 0.17 10.8 3.0 -0:40 51.2

Oops

Page 26: Forcing the lid: Calibrating HEC-HMS for flood … · Forcing the lid: Calibrating HEC-HMS for flood management studies California Water & Environmental Modeling Forum May 28, 2008

•Cookbookery. … to force all problems into … one or two routine techniques, insufficient thought being given to real objective … or to relevance of assumptions …

•Mathematistry. …development of theory for theory's sake, …tendency to redefine problem rather than solve it.

G.E.P. Box (1976) "Science and Statistics" J. Amer. Stat. Assoc. 71, 791-799.

Page 27: Forcing the lid: Calibrating HEC-HMS for flood … · Forcing the lid: Calibrating HEC-HMS for flood management studies California Water & Environmental Modeling Forum May 28, 2008

Verify or validate?

• “…determination that model indeed reflects behavior of real world” (US Dept. of Energy)

• Verification and validation impossible (Oreskes, et. al, Science, 1994) because:

•Hydrologic systems not closed(p ⇔ q)

•Model results non-unique

Page 28: Forcing the lid: Calibrating HEC-HMS for flood … · Forcing the lid: Calibrating HEC-HMS for flood management studies California Water & Environmental Modeling Forum May 28, 2008

Confirm

• Confirm partially by demonstration of agreement between observation and prediction

• Options

•Split record

• Independent estimate

Page 29: Forcing the lid: Calibrating HEC-HMS for flood … · Forcing the lid: Calibrating HEC-HMS for flood management studies California Water & Environmental Modeling Forum May 28, 2008

USGS photo

Page 30: Forcing the lid: Calibrating HEC-HMS for flood … · Forcing the lid: Calibrating HEC-HMS for flood management studies California Water & Environmental Modeling Forum May 28, 2008

USGS photo

Page 31: Forcing the lid: Calibrating HEC-HMS for flood … · Forcing the lid: Calibrating HEC-HMS for flood management studies California Water & Environmental Modeling Forum May 28, 2008

CN

Page 32: Forcing the lid: Calibrating HEC-HMS for flood … · Forcing the lid: Calibrating HEC-HMS for flood management studies California Water & Environmental Modeling Forum May 28, 2008

“Calibrated”HEC-HMSmodel

“Calibrated”HEC-HMSmodel

Annual exceedence probability

DischargeRainfall depth

Time

Page 33: Forcing the lid: Calibrating HEC-HMS for flood … · Forcing the lid: Calibrating HEC-HMS for flood management studies California Water & Environmental Modeling Forum May 28, 2008

map from USGS, Open-File Report 2008-1084

12.5 sq mi + upstream watershed; no gage;

Good rainfall data for 1986 event; used as pattern for 3-day design event

Page 34: Forcing the lid: Calibrating HEC-HMS for flood … · Forcing the lid: Calibrating HEC-HMS for flood management studies California Water & Environmental Modeling Forum May 28, 2008

100-yr 72-hr storm peaks

2296NT Drain

1973Spanish Springs outflow

Q100 with CN (cfs)

Location

Not consistent with Q/A for nearby gaged

watersheds

Page 35: Forcing the lid: Calibrating HEC-HMS for flood … · Forcing the lid: Calibrating HEC-HMS for flood management studies California Water & Environmental Modeling Forum May 28, 2008

Green-Ampt model

Page 36: Forcing the lid: Calibrating HEC-HMS for flood … · Forcing the lid: Calibrating HEC-HMS for flood management studies California Water & Environmental Modeling Forum May 28, 2008

Green-Ampt model parameters

Flood Control District of Maricopa County

Page 37: Forcing the lid: Calibrating HEC-HMS for flood … · Forcing the lid: Calibrating HEC-HMS for flood management studies California Water & Environmental Modeling Forum May 28, 2008

100-yr 72-hr storm peaks

14022296NT Drain

8271973Spanish Springs outflow

Q100 with G-A (cfs)

Q100 with CN (cfs)

Location

DRAFT

Page 38: Forcing the lid: Calibrating HEC-HMS for flood … · Forcing the lid: Calibrating HEC-HMS for flood management studies California Water & Environmental Modeling Forum May 28, 2008

Should we ever force the lid?

Page 39: Forcing the lid: Calibrating HEC-HMS for flood … · Forcing the lid: Calibrating HEC-HMS for flood management studies California Water & Environmental Modeling Forum May 28, 2008
Page 40: Forcing the lid: Calibrating HEC-HMS for flood … · Forcing the lid: Calibrating HEC-HMS for flood management studies California Water & Environmental Modeling Forum May 28, 2008

Time of forecast

“Look back” period Forecast

Page 41: Forcing the lid: Calibrating HEC-HMS for flood … · Forcing the lid: Calibrating HEC-HMS for flood management studies California Water & Environmental Modeling Forum May 28, 2008

Time of forecast

“Look back” period Forecast

Page 42: Forcing the lid: Calibrating HEC-HMS for flood … · Forcing the lid: Calibrating HEC-HMS for flood management studies California Water & Environmental Modeling Forum May 28, 2008

Time of forecast

“Look back” period Forecast

Page 43: Forcing the lid: Calibrating HEC-HMS for flood … · Forcing the lid: Calibrating HEC-HMS for flood management studies California Water & Environmental Modeling Forum May 28, 2008

• Use I-O pairs that are representative

• Don’t be kidnapped by cookbookery, mathematistry, naïve trust

• Confirm results