forecasting uncertainty related to ramps of wind power production

23
dra ft Forecasting Uncertainty Related to Ra of Wind Power Production hur Bossavy, Robin Girard, Georges Kariniotakis ter for Energy and Processes ES-ParisTech/ARMINES European Wind Energy Conference, Warsaw, 20-23 April 2010

Upload: aletha

Post on 23-Feb-2016

49 views

Category:

Documents


0 download

DESCRIPTION

Forecasting Uncertainty Related to Ramps of Wind Power Production. European Wind Energy Conference, Warsaw, 20-23 April 2010. Arthur Bossavy , Robin Girard, Georges Kariniotakis Center for Energy and Processes MINES- ParisTech /ARMINES. Introduction. - PowerPoint PPT Presentation

TRANSCRIPT

Page 1: Forecasting Uncertainty Related to Ramps of Wind Power Production

Forecasting Uncertainty Related to Rampsof Wind Power Production

Arthur Bossavy, Robin Girard, Georges KariniotakisCenter for Energy and ProcessesMINES-ParisTech/ARMINES

European Wind Energy Conference, Warsaw, 20-23 April 2010

Page 2: Forecasting Uncertainty Related to Ramps of Wind Power Production

draftIntroduction

• Need to improve wind power forecasting with focus on extreme situations– Various temporal/space scales– Focus on uncertainty and weather predictability– Distribution tail events

• To contribute to– An increased and more secure wind integration to power

grid– Lower costs (i.e: reduced imbalances)– …

2

Page 3: Forecasting Uncertainty Related to Ramps of Wind Power Production

draftIntroduction

Centered prediction intervals of coverage:

predictionsobservations

A problem with usual wind power forecasts

Page 4: Forecasting Uncertainty Related to Ramps of Wind Power Production

draftObjectives of the work

4

1. Improve the reliabilityof usual confidence

intervalsw.r.t ramp events

2. Forecast confidence intervals to estimate the

uncertainty of ramps timing

Page 5: Forecasting Uncertainty Related to Ramps of Wind Power Production

draftOutline

1. A methodology for ramps detection

2. A probabilistic model using ramps information

3. Forecast of ramps timing using ensembles

Page 6: Forecasting Uncertainty Related to Ramps of Wind Power Production

Detection of ramps

FILTERING

THRESHOLDING

Threshold

intensity

timing

Rampdetected

Page 7: Forecasting Uncertainty Related to Ramps of Wind Power Production

draftDetection of ramps

• Evolution of the ramp intensity

through Denmark

7

Page 8: Forecasting Uncertainty Related to Ramps of Wind Power Production

draftOutline

1. A methodology for ramps detection

2. A probabilistic model using ramps information

3. Forecast of ramps timing using ensembles

Page 9: Forecasting Uncertainty Related to Ramps of Wind Power Production

draftA probabilistic model using ramps information

Objective:

Produce more reliable probabilistic forecasts by using information on forthcoming ramps

9

Page 10: Forecasting Uncertainty Related to Ramps of Wind Power Production

draft3-stage forecasting process using ramps information

Production of spot forecasts

SCADA

NWP

Spot

forecasting

model

Ramps detection

forecasts

spot

Thresholding

Filtering Ramps• TIMING• INTENSITY

Probabilistic processing

Probabilisticforecasting

model

NWPSCADA

TIMING

INTENSITYRamps

Information

Page 11: Forecasting Uncertainty Related to Ramps of Wind Power Production

draftCase-studies

• 1 wind farm in Ireland, 1 in Denmark

• 18 months of data (02/01-08/02 and 01/03-07/04)

• Hourly power measures

• Hourly wind speed/direction NWP forecasts (10m height).

• Probabilistic model based on the Quantile Regression Forests procedure

Page 12: Forecasting Uncertainty Related to Ramps of Wind Power Production

draftEvaluation measures

12

Reliability:

Sharpness:

Page 13: Forecasting Uncertainty Related to Ramps of Wind Power Production

draftResults

• Forecasts underestimate quantiles

• Reliability improved for highest quantile forecasts

• Sharpness remains unchanged

Wind farm in Denmark Wind farm in Ireland

Page 14: Forecasting Uncertainty Related to Ramps of Wind Power Production

draftResults

14

• Estimation of the uncertainty may be improved at ramps

• Need of more tests: other quantile estimation methods

Page 15: Forecasting Uncertainty Related to Ramps of Wind Power Production

draftOutline

1. A methodology for ramps detection

2. A probabilistic model using ramps information

3. Forecast of ramps timing using ensembles

Page 16: Forecasting Uncertainty Related to Ramps of Wind Power Production

draftForecast of ramps timing using ensembles

Objective:

Aggregate ramps information provided by members of a wind power forecasts ensemble

16

Page 17: Forecasting Uncertainty Related to Ramps of Wind Power Production

draftForecast of ramps timing using ensembles

Filtering members of a forecasts ensemble

More than 35over 51

members predicting this

ramp

h1h3

h2

Page 18: Forecasting Uncertainty Related to Ramps of Wind Power Production

draftForecast ramps timing using ensembles

Proposal for a probabilistic forecast of ramps timing– Mean value for the ramp timing:

– Confidence intervals:

Page 19: Forecasting Uncertainty Related to Ramps of Wind Power Production

draftCase-studies and evaluation results

• Case-studies: 3 wind farms in France– Wind speed forecasts ensemble (51 members from the EPS

system of ECMWF)– Random Forest procedure

• Evaluation of forecast probabilities:

Brier Skill Scorew.r.t Climatology:

Brier Score:

Page 20: Forecasting Uncertainty Related to Ramps of Wind Power Production

Visualization of confidence intervals

20

• 39 members predicting the increasing ramp

• 15 members predicting the decreasing ramp

43%

70%

39%

57%

65%28%

Page 21: Forecasting Uncertainty Related to Ramps of Wind Power Production

draftConclusions

• The probabilistic model using ramps information may be valuable when estimating the highest quantiles

• The approach based on ensembles provide confidence intervals to forecast ramp occurrence.

Reliability w.r.t Climatology is improved

Need of more experiments

Page 22: Forecasting Uncertainty Related to Ramps of Wind Power Production

draftAcknowledgments

• Project SAFEWIND: « Multi-scale data assimilation, advanced wind modelling and forecasting with emphasis to extreme weather situations for a safe large-scale wind power integration »

• Industrial partners of the project for providing data

Page 23: Forecasting Uncertainty Related to Ramps of Wind Power Production

draftThank you for your attention!

29