form –1 & 1 a “vaastu viva”...
TRANSCRIPT
FORM –1 & 1 A
“VAASTU VIVA”
At S. No. 130/3/1, 130/3/2, 130/2/4(P); Village -
Wakad, Tehasil – Pimpri Chinchwad, District -Pune. State - Maharashtra.
By
M/s. B.U. Bhandari Vaastu
Form 1– “VAASTU VIVA”, M/s. B.U. Bhandari, Pune.
0
FORM –1
“VAASTU VIVA”
At
S. No. 130/3/1, 130/3/2, 130/2/4(P); Village - Wakad, Tehasil – Pimpri Chinchwad, District -Pune. State - Maharashtra.
By
M/s. B.U. Bhandari Vaastu
Form 1– “VAASTU VIVA”, M/s. B.U. Bhandari, Pune.
1
APPENDIX - I
(See paragraph - 6)
FORM 1
(I) Basic Information Sr.No. Item Details 1. Name of the project/s “Vaastu Viva”
2. S. No. in the schedule 8a (B2) 3. Proposed capacity/area/length/tonnage to
be handled/command area/lease area/number of wells to be drilled
Total Plot Area: 11,743.81 m2
4. New/Expansion/Modernization Expansion 5. Existing Capacity/ Area etc. EC obtained vide no. SEAC-III-2014/CR-326/TC-3
on Date: 16th March 2016, scheduled work has been initiated.
6. Category of project i.e.’ A’ or ‘B’ 8a (B2) 7. Does it attract the general condition? If
yes, please specify. Not Applicable
8. Does it attract the specific condition? If yes, please specify.
Not Applicable
9. Location Lat- 18°60'44.22"N. Lon- 73°75'41.79"E Plot/Survey/Khasra No. S. No. 130/3/1, 130/3/2, 130/2/4(P) Village Wakad Tehsil Haveli District Pune State Maharashtra
10. Nearest railway station Nearest airport
Aakurdi Railway Station: Approx 5.3 Km Pune Airport: Approx 17.30 Km
11. Nearest Town, city, District headquarters Along with distance in kms.
Pune
12. Village Panchayats, Zilla Parishad, Municipal Corporation, Local body (complete postal address with telephone nos. to be given)
Pimpri Chinchwad Municipal Corporation
13. Name of the applicant M/s. B. U. Bhandari Vaastu 14. Registered Address 1182/1/3, F.C. Road, Above HDFC Bank,
Shivajinagar, Pune-5 15. Address for correspondence 1182/1/3, F.C. Road, Above HDFC Bank,
Shivajinagar, Pune-5 Name Mr. Anuj M. Bhandari Designation (Owner/Partner/CEO) Partner. Address 1182/1/3, F.C. Road, Above HDFC Bank,
Shivajinagar, Pune-5 Pin Code 411005 E-mail [email protected] Telephone No. 020- 25521515/16/17 Fax No. 020-25521414
16. Details of Alternative Sites examined, if any. Location of these sites should be
Not Applicable
Form 1– “VAASTU VIVA”, M/s. B.U. Bhandari, Pune.
2
Sr.No. Item Details shown on a topo-sheet.
17. Interlinked Projects No 18. Whether separate application of
interlinked project has been submitted? Not Applicable
19. If yes, date of submission Not applicable 20. If no, reason Not applicable 21. Whether the proposal involves
approval/clearance under: if yes, details of the same and their status to be given. (a) The Forest (Conservation) Act, 1980? (b) The Wildlife (Protection) Act, 1972? (c) The C.R.Z Notification, 1991?
Not applicable
22. Whether there is any Government Order/Policy relevant/ relating to the site?
Not applicable
23. Forest land involved (hectares) Not applicable 24. Whether there is any litigation pending
against the project and/or land in which the project is propose to be set up?
(a) Name of the Court (b) Case No. (c) Order /directions of the Court, if any
and its relevance with the proposed project.
No
(II) Activity 1. Construction, operation or decommissioning of the Project involving actions, which will
cause physical changes in the locality (topography, land use, changes in water bodies, etc.)
Sr. No.
Information/Checklist confirmation
Yes / No
Details thereof (with approximate quantities /rates, wherever possible) with source of information data
1.1 Permanent or temporary change in land use, land cover or topography including increase in intensity of land use (with respect to local land use plan)
No
As per local land use plan, project falls under residential zone. Also, Development will be carried in line with the topography & without disturbing natural drainage pattern. Project falls under Residential Zone of Development Plan. Same is attached as Annexure-I
1.2 Clearance of existing land, vegetation and building?
No The land is empty.
1.3 Creation of new land uses?
No
There will be residential and commercial built-up infrastructure development on the empty land.
1.4 Pre-construction investigation e.g. bore houses, soil testing?
Yes Pre-construction investigation will be carried out as per relevant standards
1.5 Construction works? Yes As per EC Granted: 5 Nos. of buildings, Residential – total of 246 flats Commercial – Shops- 5 nos. Offices – 2 nos.
Proposed: 5 Nos. of buildings, Residential – total of 334 flats Commercial – Shops/ Showrooms– 16 nos.
Form 1– “VAASTU VIVA”, M/s. B.U. Bhandari, Pune.
3
Sr. No.
Information/Checklist confirmation
Yes / No
Details thereof (with approximate quantities /rates, wherever possible) with source of information data
1.6 Demolition works?
Yes There are 3 trees existing on site; NOC has been obtained for cutting them down for the proposed development.
1.7 Temporary sites used for construction works or housing of construction workers?
Yes Local labours shall be hired; hence no residential facilities required.
1.8 Above ground building, structures or earthworks including linear structures, cut and fill or excavations
Yes Excavation in the form of rubble and soil. Top soil will be reused for garden and remaining material will be used for back-filling and levelling. Constructional work would involve:
Residential Cum Commercial Development As per EC Obtained 2 Bldgs (A & C): LP+UP+10 1 Bldg (B): LP +UP +9 1 Bldg (E): MAHADA: P+6 ; G+0 Club House- G+1 Commercial (D): LP + UP +2
Proposed 2 Bldgs (A & C): LP+UP+12 1 Bldg (B): LP+UP+12 1 Bldg (E): LP+ UP/G + 11 Club House- G+1 Commercial (D): LP + UP +4
1.9 Underground works including mining or Tunneling?
No ---
1.10 Reclamation works? No. --- 1.11 Dredging? No. --- 1.12 Offshore structures? No. --- 1.13 Production and manufacturing
processes? No. ---
1.14 Facilities for storage of goods or materials?
Yes During construction phase temporary storing facilities will be created to store the construction raw material.
1.15 Facilities for treatment or disposal of solid waste or liquid effluents?
Yes
Facilities will provided for collection treatment and disposal for solid and liquid waste
1.16 Facilities for long term housing of operational workers?
No --
1.17 New road, rail, or sea traffic during construction or operation?
No ---
1.18 New road, rail, air waterborne or other transport infrastructure including new or altered routes and stations, ports, airports etc?
No --
1.19 Closure or diversion of existing transport routes or infrastructure leading to changes in traffic Movements?
No ---
1.20 New or diverted transmission lines or pipelines?
No ---
Form 1– “VAASTU VIVA”, M/s. B.U. Bhandari, Pune.
4
Sr. No.
Information/Checklist confirmation
Yes / No
Details thereof (with approximate quantities /rates, wherever possible) with source of information data
1.21 Impoundment, damming, culverting, realignment or other change to the hydrology of watercourses or aquifers?
No ---
1.22 Stream crossings? No ---
1.23 Abstraction or transfers of water from ground or surface waters?
No ---
1.24 Changes in water bodies or the land surface affecting drainage or run-off?
Yes By considering the runoff prior to development and runoff after development there is some increment in runoff of storm water.
1.25 Transport of personnel or materials for construction, operation or decommissioning?
Yes There will be transport of construction materials. Precautions will be taken to reduce the impact of the vehicular movement by trying to avoid the vehicular trips during peak hours.
1.26 Long-term dismantling or decommissioning or restoration works?
No ---
1.27 Ongoing activity during decommissioning which could have an impact on the environment?
No ---
1.28 Influx of people to an area in either temporarily or permanently?
Yes There will be influx of 1807 people in proposed project, which includes permanent (1670) & floating population (137). This is more than influx of 1325 people as per the EC granted.
1.29 Introduction of alien species? No --- 1.30 Loss of native species or genetic
diversity? No ---
1.31 Any other actions? No ---
2. Use of Natural resources for construction or operation of the Project (such as land, water, materials or energy, especially any resources which are non-renewable or in short supply):
Sr. No.
Information/checklist confirmation
Yes / No
Details thereof (with approximate quantities /rates, wherever possible) with source of information data
2.1 Land especially undeveloped or agricultural land (ha)
Yes Plot Area under development = 11,743.81 m2
2.2 Water (expected source & competing users) unit : KLD
Yes During construction: Potable water shall be supplied as per requirement. During Operation: Source of water: local authority Quantity of water: About ~7 m3/ day Source – From Local Body
2.3 Minerals (MT) No ---
Form 1– “VAASTU VIVA”, M/s. B.U. Bhandari, Pune.
5
Sr. No.
Information/checklist confirmation
Yes / No
Details thereof (with approximate quantities /rates, wherever possible) with source of information data
2.4 Construction material – stone, aggregates, and / soil (expected source – MT)
Yes List of raw materials used during construction phase is referred as an Annexure - 2
2.5 Forests and timber (source – MT)
No --
2.6 Energy including electricity and fuels (source, competing users) Unit: fuel (MT), energy (MW)
Yes Power Supply: • Total power consumption for residential buildings
Maximum Demand – 1215 KVA Connected Load : 972 KW Construction Load : 50 KW Source of Supply: MSEDCL. No. Of Transformers – 02 nos. 630 KVA
• DG Sets: Number and capacity of the DG sets to be used – 1 Nos. x 160 KVA
• Fuel Requirement (Diesel) - for 160 KVA 30 lit. /hr. at 75 % Load
• Total power consumption for club house and
commercial buildings: Considered in Residential
• Energy saving measures
The following Energy Conservation Methods are proposed in the project: The following Energy Conservation Methods are proposed in the project:
Energy Saving Measures Proposed:- Use of LED & CFL in Parking area, lift-lobby and
stair-case. Using Solar system in External Lighting (10%). &
Landscape lights with LED lamps. Using V3F drive for all lifts. As per MSEDCL requirements, we have planned to
use low loss Transformer. Losses for Transformer shall, in principal, comply to ECBC norms.
We are planning to attain power factor of the installation near unity.
LED & CFL types of light source are proposed for common Lobby, Lounge, and Staircase area.
Automatic time based controls are proposed for all outside lighting to save power by avoiding manual switching ON & OFF the lights.
Motion Sensors are proposed in Car Parking Areas & Lift lobbies.
Form 1– “VAASTU VIVA”, M/s. B.U. Bhandari, Pune.
6
Sr. No.
Information/checklist confirmation
Yes / No
Details thereof (with approximate quantities /rates, wherever possible) with source of information data
The estimated saving in common area lighting consumption is up to 20% due to adopting above measures
%-age of Saving : 20 % Compliance of the ECBC guidelines: (Yes / No) (If yes then submit compliance in tabular form): Compliance with Energy Conservation Building Code (ECBC) 2007
# Section Requirement Remark
1 6.2.2 Equipment efficiency standards
Done
2 7.2 Lighting controls to be controlled by photo sensor or time switch
Done
3 7.2.1.4 Exterior lighting to be controlled by photo sensor or time switch
Done
4 7.3 Interior lighting power to be with in specific limits
Done
5 7.4 Exterior lighting power to be within specified limits
Done
6 8.2.1.1 Maximum allowable power loss from transformer
Done
7 8.2.3 Power factor be maintained between 0.95 and unity
Done
8 8.2.4 Check metering Done
9 8.2.5 Power distribution system losses to be maintained less than 1 %
Done
Budgetary allocation (Capital cost and O &M cost): Capital + O&M cost for solar PV cell Capital Cost : 6 Lakh O & M Cost : 0.5 Lakh Capital + O&M cost for solar HOT water system Capital Cost : 52 Lakh
Form 1– “VAASTU VIVA”, M/s. B.U. Bhandari, Pune.
7
Sr. No.
Information/checklist confirmation
Yes / No
Details thereof (with approximate quantities /rates, wherever possible) with source of information data
O & M Cost : 0.7 Lakh Number and capacity of the DG sets to be used: Residential : 01 Nos. x 160 KVA Stack Height: For 160 KVA: 02 Mtr. Diesel Consumption@ full Load for 160 KVA 36.40 lit. /hr, Electricity requirement from MSEDCL : 972 KW H.T. Line passing through the plot, if any: Yes/ No.
2.7 Any other natural resources (use appropriate standard units)
No --
Form 1– “VAASTU VIVA”, M/s. B.U. Bhandari, Pune.
8
3. Use, storage, transport, handling or production of substances or materials, which could be
harmful to human health or the environment or raise concerns about actual or perceived risks to human health.
Sr. No.
Information/Checklist confirmation
Yes / No
Details thereof (with approximate quantities/rates, wherever possible) with source of information data
3.1 Use of substances or materials, which are hazardous (as per MSIHC rules) to human health or the environment (flora, fauna, and water supplies)
No --
3.2 Changes in occurrence of disease or affect disease vectors (e.g. insect or water borne diseases)
No --
3.3 Affect the welfare of people e.g. by changing living conditions?
No --
3.4 Vulnerable groups of people who could be affected by the project e.g. hospital patients, children, the elderly etc.,
No --
3.5 Any other causes No ---
4. Production of solid wastes during construction or operation or decommissioning (MT/month):
Sr. No.
Information/Checklist confirmation
Yes / No
Details thereof (with approximate quantities / rates, wherever possible) with source of information data
4.1 Spoil, overburden or mine wastes
No ---
4.2 Municipal waste (domestic and or commercial wastes)
Yes Total solid waste Generation: As per EC Obtained 633.7 Kg/ Day
Proposed 802.5 Kg/Day
4.3 Hazardous wastes (as per Hazardous waste Management Rules)
No Being a construction project, no Hazardous Waste is expected.
4.4 Other industrial process wastes
No ---
4.5 Surplus product No --- 4.6 Sewage sludge or other sludge
from effluent treatment. Yes Dried sludge from STP will be used as manure for the
plants. 4.7 Construction or demolition
wastes. No --
4.8 Redundant machinery or equipment.
No ---
Form 1– “VAASTU VIVA”, M/s. B.U. Bhandari, Pune.
9
Sr. No.
Information/Checklist confirmation
Yes / No
Details thereof (with approximate quantities / rates, wherever possible) with source of information data
4.9 Contaminated soils or other materials.
No ---
4.10 Agriculture wastes. No --- 4.11 Other solid wastes. No ---
5. Release of pollutants or any hazardous, toxic or noxious substances to air (Kg/hr) : Sr. No.
Information/Checklist confirmation
Yes / No Details thereof (with approximate quantities/rates, wherever possible) with source of information data
5.1 Emissions from combustion of fossil fuels from stationary or mobile sources
Yes D.G. Sets as per CPCB norms will be used during power failure.
5.2 Emissions from production processes
No --
5.3 Emissions from materials handling including storage or transport
Yes
Fugitive dust emission due to handling and loading/unloading expected during construction. Frequent water sprinkling will be done to minimize the fugitive emissions
5.4 Emissions from construction activities including plant and equipment
Yes The project may cause rise in dust levels during construction phase. Precautions would be taken to reduce dust generation during construction phase: • Use of RMC will eliminate the handling of cement,
sand and concrete thus dust emission will be minimized.
• Water sprinkling will be done at regular intervals to reduce control of dust generation.
5.5 Dust or odours from handling of materials including construction materials, sewage and waste
Yes Dust generation will be controlled as described above. Proper ventilation will be provided around STP.
5.6 Emissions from incineration of waste
No --
5.7 Emissions from burning of waste in open air (e.g. slash materials, construction debris)
No ---
5.8 Emissions from any other sources
No ---
Form 1– “VAASTU VIVA”, M/s. B.U. Bhandari, Pune.
10
6. Generation of Noise and Vibration, and Emissions of Light and Heat:
Sr. No.
Information/Checklist confirmation
Yes / No Details thereof (with approximate quantities/rates, wherever possible) with source of information data
6.1 From operation of equipment e.g. engines, ventilation plant, crushers.
Yes During construction phase vibration & noise pollution may occur, necessary precaution shall be taken at source, along path & at receptor.
6.2 From industrial or similar processes.
No ---
6.3 From construction or demolition.
Yes During construction phase vibration & noise pollution may occur, necessary precaution shall be taken at source, along path & at receptor
6.4 From blasting or piling. No 6.5 From construction or
operational traffic. Yes There will be transport of materials for construction
work. Precautions will be taken to reduce the impact of the vehicular movement such as vehicular trips will not be at peak traffic hours.
6.6 From lighting or cooling systems.
No ---
6.7 From any other sources. No --
7. Risks of contamination of land or water from releases of pollutants into the ground or into sewers, surface waters, groundwater, coastal waters or the sea :
Sr. No.
Information/Checklist confirmation
Yes / No
Details thereof (with approximate quantities/rates, wherever possible) with source of information data
7.1 From handling, storage, use or spillage of hazardous materials.
No --
7.2 From discharge of sewage or other effluents to water or the land (expected mode and place of discharge).
No Sewage will be treated and reused for flushing and gardening within the premises. Excess treated sewage will be disposed to sewer line.
7.3 By deposition of pollutants emitted to air into the land or into water.
No --
7.4 From any other sources. No --- 7.5 Is there a risk of long term
build up of pollutants in the environment from these sources?
No ---
Form 1– “VAASTU VIVA”, M/s. B.U. Bhandari, Pune.
11
8. Risk of accidents during construction or operation of the Project, which could affect human
health or the environment : Sr. No.
Information/Checklist confirmation
Yes / No
Details thereof (with approximate quantities/rates, wherever possible) with source of information data
8.1 From explosions, spillages, fires etc from storage, handling, use or production of hazardous substances
No --
8.2 From any other causes. No --- 8.3 Could the project be
affected by natural disasters causing environmental damage (e.g. floods, earthquakes, landslides, and cloudburst)?
Yes On site/ Off site Emergency Plan shall be prepared in consultation with Local body, NGO’s, Stakeholders.
9. Factors which should be considered (such as consequential development) which could lead to environmental effects or the potential for cumulative impacts with other existing or planned activities in the locality:
Sr. No.
Information/Checklist confirmation
Yes / No
Details thereof (with approximate quantities/rates, wherever possible) with source of information data
9.1 Lead to development of supporting facilities, ancillary development or development stimulated by the project which could have impact on the environment e.g.:
•Supporting infrastructure (roads, power supply, waste or waste water treatment, etc.)
• housing development
• extractive industries
• supply industries
• other
Yes
Project will contribute to Infrastructure augmentation.
9.2 Lead to after-use of the site, which could have an impact on the environment
No ---
9.3 Set a precedent for later developments
Yes Irrespective of income grades, all must deserve to be residents of a clean and green society. This Expansion takes under consideration the Housing for Low Income Grades along with the other residents. However, LIG Housing is a popular term but not many follow it up.
Form 1– “VAASTU VIVA”, M/s. B.U. Bhandari, Pune.
12
Sr. No.
Information/Checklist confirmation
Yes / No
Details thereof (with approximate quantities/rates, wherever possible) with source of information data
9.4 Have cumulative effects due to proximity to other existing or planned projects with similar effects
Yes
Impacts on water availability, storm water drainage, availability of electricity, traffic congestion etc.
(III) Environmental Sensitivity Sr. No.
Areas Name/ Identity
Aerial distance (within 15 km.) from Proposed project location boundary
1 Areas protected under international conventions, national or local legislation for their ecological, landscape, cultural or other related value
No --
2 Areas which are important or sensitive for ecological reasons - Wetlands, watercourses or other water bodies, coastal zone, biospheres, mountains, forests
No --
3 Areas used by protected, important or sensitive species of flora or fauna for breeding, nesting, foraging, resting, over wintering, migration
No --
4 Inland, coastal, marine or underground waters
Pawna River Approx. 2 Km
5 State, National boundaries No --- 6 Routes or facilities used by the
public for access to recreation or other tourist, pilgrim areas
• NH 4 Abutting
7 Defence installations No --
8 Densely populated or built-up area Pimpari - Chinchawad 5.05 km.
9 Areas occupied by sensitive man-made land uses (hospitals, schools, places of worship, community facilities)
• School - • Pumpkin Patch
School & Day Care • College - • Indira College • Hospital – • Polaris Health
Clinic
• 2.0 km
• 0.35 km
• 1.15 km
10 Areas containing important, high quality or scarce resources (Ground water resources, surface resources, forestry, agriculture, fisheries, tourism, minerals)
No -
Form 1– “VAASTU VIVA”, M/s. B.U. Bhandari, Pune.
13
Sr. No.
Areas Name/ Identity
Aerial distance (within 15 km.) from Proposed project location boundary
11 Areas already subjected to pollution or environmental damage. (those where existing legal environmental standards are exceeded)
No ---
12 Areas susceptible to natural hazard which could cause the project to present environmental problems (Earthquakes, subsidence, landslides, erosion, flooding or extreme or adverse climatic conditions)
Yes ---
(VI) Proposed Terms of Reference for EIA studies: Not applicable
Form 1– “VAASTU VIVA”, M/s. B.U. Bhandari, Pune.
14
FORM-1 A 1 LAND ENVIRONMENT Attach panoramic view of the project site and the vicinity Sr. No.
Particulars Remark
1.1 Will the existing land use get significantly altered from the project that is not consistent with the surroundings? (Proposed land use must conform to the approved Master Plan/ Development Plan of the area. Change of land use if any and the statutory approval from the competent authority are submitted). Attach Maps of (i) site location (ii) surrounding features
of the proposed site (within 500 meters)
(iii)The site (indicating levels & contours) to appropriate scales. If not available attach only conceptual plans
• Being in a Residential Zone of Planning Authority, No change
in existing land use. • Proposed Project falls under Residential Zone of Development
Plan. (Development Plan Attached Annex. -I of Form 1) • Google Image Annex III • Google Map – Annex. IV • Contour Plan Annex. V • Master layout Annex. VI • EC for construction on same land with capacity of 246 flats, 5
shops and 2 offices- has been received vide no. SEAC-III-2014/CR-362/TC-3; on date: 16th March 2016
• However, this proposal is for increased capacity; (Vertically) without increasing horizontal facilities.
1.2 List out all the major project requirements in terms of the land area, built up area, water consumption, power requirement, connectivity, community facilities, parking needs etc
Obtained as per EC • Area of Plot :11,743.81 m2 • Permissible FSI :
16,824.61 m2 • Total Construction BUA :
34,376.19 m2 • Water Consumption
• Power Requirement : Maximum demand Load : 825KW, 1030 KVA
• Connectivity: - Nearest Airport: Pune: 17.3 Km. Nearest Aakurdi Railway Station: 5.3 Km. NH-4: Abutting.
• Community Facility: -
Residential Domestic 117.50 m3/ day Flushing 57.33 m3/ day Gardening 6.90 m3/ day TOTAL 181.73 m3/ day
Commercial Fresh Water 9.40 m3/ day Recycled 1.08 m3/ day
Proposed • Area of Plot :11,743.81 m2 • Permissible FSI : 24,416
m2 • Total Construction BUA :
46,984.81 m2 • Water Consumption
• Power Requirement : Maximum demand Load : 972 KW
• Connectivity: - Nearest Airport: Pune: 17.3 Km. Nearest Aakurdi Railway Station: 5.3 Km. NH-4: Abutting.
• Community Facility: -
Residential Domestic 150.30 m3/ day Flushing 75.15 m3/ day Gardening 6.90 m3/ day TOTAL 232.35 m3/ day
Commercial Fresh Water 2.06 m3/ day Recycled 4.11 m3/ day
Form 1A– “VAASTU VIVA”, M/s. B.U. Bhandari Vaastu, Pune.
Amenity and Open Space will provide as per Local Rules, Convenient Shops etc. Parking
# Nos. 4 W 196 2W 544 Cycles 544
Amenity and Open Space will provide as per Local Rules, Convenient Shops etc. Parking
# Nos. 4 W 199 2W 767 Cycles 709
1.3 What are the likely impacts of the proposed activity on the existing facilities adjacent to the proposed site? (Such as open spaces, community facilities, details of the existing landuse, disturbance to the local ecology).
No, there will not be any significant long-term impacts on the existing facilities. Adequate measures are proposed to mitigate the negative impacts on community facilities.
1.4 Will there be any significant land disturbance resulting in erosion, subsidence & instability? (Details of soil type, slope analysis, vulnerability to subsidence, seismicity etc may be given).
No, there will not be any significant land disturbance.
1.5 Will the proposal involve alteration of natural drainage systems? (Give details on a contour map showing the natural drainage near the proposed project site)
No, the proposal won’t involve alteration of natural drainage systems.
1.6 What are the quantities of earthwork involved in the construction activity-cutting, filling, reclamation etc. (Give details of the quantities of earthwork involved, transport of fill materials from outside the site etc.)
Excavation top soil - For Landscaping Excavation lower layer –For Back filling
1.7 Give details regarding water supply, waste handling etc during the construction period
Potable water shall be arranged and supplied as per requirement. Solid waste will be handed over to authorised contractor & Mobile site sanitation.
1.8 Will the low lying areas & wetlands get altered? (Provide details of how low lying and wetlands are getting modified from the proposed activity)
No
1.9 Whether construction debris & waste during construction
No
Form 1A– “VAASTU VIVA”, M/s. B.U. Bhandari Vaastu, Pune.
cause health hazard? (Give quantities of various types of wastes generated during construction including the construction labour and the means of disposal)
2 WATER ENVIRONMENT 2.1 Give the total quantity of
water requirement for the proposed project with the breakup of requirements for various uses. How will the water requirement met? State the sources & quantities and furnish a water balance statement
As per EC Obtained:
Use Quantity m3/ day Source Domestic 117.50 Local authority Flushing/Utility 57.33 Recycled Gardening 6.90 Recycled
Proposed:
Use Quantity m3/ day Source Domestic 150.30 Local authority Flushing/Utility 75.15 Recycled Gardening 6.90 Recycled
2.2 What is the capacity (dependable flow or yield) of
Assured Supply of 117.50 m3/ day from local authority,
Reuse- 64.23
From local authority =117.50
Domestic 117.50
Flushing 57.33 Gardening 6.90
Sewage 165.89 (Treatment in STP)
Excess treated water 82m3/day will be drained off.
Reuse- 82.05
From local authority = 150.30
Domestic 150.30
Flushing- 75.15 Gardening 6.90
Sewage 208.45 (Treatment in STP)
Excess treated water 90 m3/day will be drained off.
Form 1A– “VAASTU VIVA”, M/s. B.U. Bhandari Vaastu, Pune.
the proposed source of water?
Revised capacity is of 150.30 m3/ day, This shall be sourced from the local body as well.
2.3 What is the quality of water required, in case, the supply is not from a municipal source? (Provide physical, chemical, biological characteristics with class of water quality)
Drinking water quality of Class A as per Indian Standard: (10500, 2012) from local authority.
2.4 How much of the water requirement can be met from the recycling of treated wastewater? (Give the details of quantities, sources and usage)
Total treated water available for recycled water 82.05 m3/ day Secondary requirements met:
• Flushing- 75.15 m3/ day • Gardening. 6.09 m3/ day • Excess treated waste water 90 m3/ day shall be
disposed off to sewer line. 2.5 Will there be diversion of
water from other users? (Please assess the impacts of the project on other existing uses and quantities of consumption)
No
2.6 What is the incremental pollution load from wastewater generated from the proposed activity? (Give details of the quantities and composition of wastewater generated from the proposed activity)
No increase in pollution load as wastewater shall be treated to MPCB standards. Table No.12: Untreated & Treated Sewage Quality
SR. NO.
DETAILS VALUES UNITS UNTREATED TREATED
1. pH 6.5 – 7.5 6.5 – 7.5 2. Total
Suspended solids
250-350 <10 mg/lit
3. Chemical Oxygen Demand
500-800 <30 mg/lit
4. BOD 250-400 <10 mg/lit 5. Oil &
Grease 25-30 10 mg/lit
2.7 Give details of the water requirements met from water harvesting? Furnish details of the facilities created.
Water harvesting system will be installed and the harvested water will be used to recharge the ground water.
2.8 What would be the impact of the land use changes occurring due to the proposed project on the runoff characteristics (quantitative as well as qualitative) of the area in the post construction phase on a long term basis? Would it aggravate the problems of flooding or water logging in
Total Runoff from the project site: Prior to Development = 0.2 m3/sec Total Runoff from the project site: After Development = 0.27 m3/sec Hence Incremental Run off = 0.27-0.07=0.2 m3/sec Capacity of external storm water drains is sufficient to take the runoff from the site. Management plan for Flood is as follows :
• Storm water drain shall be cleaned at regular interval.
• Mapping the areas within or leading to or out
Form 1A– “VAASTU VIVA”, M/s. B.U. Bhandari Vaastu, Pune.
any way? of the buildings that will be water logged, flooded or isolated due to the flood.
The areas will be marked after completion of the project (as final ground levels etc. will be available after completion).
2.9 What are the impacts of the proposal on the ground water? (Will there be tapping of ground water; give the details of ground water table, recharging capacity, and approvals obtained from competent authority, if any)
• Ground water table will increase due to proposed recharge pits/Bores.
• There will not be ground water tapping.
2.10. What precautions/measures are taken to prevent the run-off from construction activities polluting land & aquifers? (Give details of quantities and the measures taken to avoid the adverse impacts)
• Proper material stacking and storage will be maintained during rainy season
• Proposed to channelize the run off in to impervious pit for storage and use.
• During heavy rainfall, run-off will be drained to the nearest storm water drain.
2.11 How is the storm water from within the site managed?(State the provisions made to avoid flooding of the area, details of the drainage facilities provided along with a site layout indication contour levels)
Internal storm water drains will be constructed strictly in accordance to the governing authority regulations. The storm water collected through the storm water drains will be diverted to recharge pits.
2.12 Will the deployment of construction labourers particularly in the peak period lead to unsanitary conditions around the project site (Justify with proper explanation)
• During construction phase, temporary toilets with connection to municipal sewers shall be used. Hence there will not be unsanitary conditions around the project site.
• Regular segregation and disposal of solid waste generated by these workers shall be as per municipal corporation’s practices.
• First aid and medical facilities will be provided to all the concerned people working on the site.
Proper housekeeping will be maintained throughout the premises.
2.13 What on-site facilities are provided for the collection, treatment & safe disposal of sewage? (Give details of the quantities of wastewater generation, treatment capacities with technology & facilities for recycling and disposal)
• Sewage generated: 208.45 m3/ day • Treatment capacities with technology: MBBR
Facilities for recycling: Flushing, Gardening • Disposal: Surplus Treated waste water: 90 m3/ day,
Disposed off as per SPCB norms.
2.14 Give details of dual plumbing system if treated
Recycling of treated sewage for flushing with dual plumbing and gardening.
Form 1A– “VAASTU VIVA”, M/s. B.U. Bhandari Vaastu, Pune.
waste used is used for flushing of toilets or any other use.
Color coding for dual plumbing system shall be done as per standard practices.
3. VEGETATION 3.1 Is there any threat of the
project to the biodiversity? (Give a description of the local ecosystem with it’s unique features, if any)
There is no threat to the biodiversity due to the project under reference.
3.2 Will the construction involve extensive clearing or modification of vegetation? (Provide a detailed account of the trees & vegetation affected by the project)
3 trees are existing on site; NOC has been obtained for cutting them down.
3.3 What are the measures proposed to be taken to minimize the likely impacts on important site features (Give details of proposal for tree plantation, landscaping, creation of water bodies etc along with a layout plan to an appropriate scale)
Project proponents have proposed tree plantation on ground and around the periphery of the project site. Appropriate nos. of trees of indigenous species shall be planted all around the plot boundary.
4. FAUNA 4.1 Is there likely to be any
displacement of fauna- both terrestrial and aquatic or creation of barriers for their movement? Provide the details.
No
4.2 Any direct or indirect impacts on the avifauna of the area? Provide details
No
4.3 Prescribe measures such as corridors, fish ladders etc to mitigate adverse impacts on fauna
Not Applicable
5 AIR ENVIRONMENT 5.1 Will the project increase
atmospheric concentration of gases & result in heat islands? (Give details of background air quality levels with predicted values based on dispersion models taking into account the increased traffic generation as a result of the proposed constructions)
AVERAGE AMBIENT AIR QUALITY AT THE PROJECT SITE Period: May 2014
Table No.14: Average Ambient Air Quality at the Project Site
Monitoring Station
RSPM µg/m3
SO2 µg/m3
NOx µg/m3
Base station: Project Site 70.0 20.4 16.7
5.2 What are the impacts on generation of dust, smoke, odorous fumes or other hazardous gases? Give
During construction phase, air borne dust, is the main pollutant, which may be generated during construction activities. Other emissions, SO2NOx and CO, due to vehicular movement, construction machinery, etc are expected.
Form 1A– “VAASTU VIVA”, M/s. B.U. Bhandari Vaastu, Pune.
details in relation to all the meteorological parameters
However, it will be temporary. Proper upkeep and maintenance of vehicles, sprinkling of water on roads and construction site are some of the measures that would reduce the impact of dust during construction phase.
Sources of Air pollution during Operational phase : • The gaseous emissions from vehicles. • Emissions from DG set
Mitigation Measures: • The traffic congestion will be avoided by proper parking
arrangement. • Regular PUC checkup for vehicles. CPCB specs DG sets with tall stack. DG set will be maintained properly.
5.3 Will the proposal create shortage of parking space for vehicles? Furnish details of the present level of transport infrastructure and measures proposed for improvement including the traffic management at the entry & exit to the project site
No. Off Street Parking within Project Site will propose as per Prevailing Development Control Regulations. Project is abutting to 24mt.
5.4 Provide details of the movement patterns with internal roads, bicycle tracks, pedestrian pathways, footpaths etc., with areas under each category
Refer master layout indicating Traffic Movement Plan.
5.5 Will there be significant increase in traffic noise & vibrations? Give details of the sources and the measures proposed for mitigation of the above
Insignificant increase in noise level during construction period is expected but it will be for short duration. Post construction, no increase in Noise level is expected.
5.6 What will be the impact of DG sets & other equipment on noise levels & vibration in & ambient air quality around the project site? Provide details
D.G. Sets with inbuilt acoustic enclosures and roof top discharge meeting CPCB specs will be installed. Hence no increase in Noise or vibration is expected. Tree plantation would act as noise barrier and will reduce the noise level.
6. AESTHETICS 6.1 Will the proposed
constructions in any way result in the obstruction of a view, scenic amenity or landscapes? Are these considerations taken into account by the proponents?
No
6.2 Will there be any adverse impacts from new constructions on the existing structures? What are the
No
Form 1A– “VAASTU VIVA”, M/s. B.U. Bhandari Vaastu, Pune.
considerations taken into account?
6.3 Whether there are any local considerations of urban form & urban design influencing the design criteria? They may be explicitly spelt out
No, there are no such local considerations.
6.4. Are there any anthropological or archaeological sites or artifacts nearby? State if any other significant features in the vicinity of the proposed site have been considered.
No such site in the vicinity
7. SOCIO-ECONOMIC ASPECTS 7.1 Will the proposal result in
any changes to the demographic structure of local population? Provide the details.
As per EC Obtained Permanent Population: 1230 Floating Population: 86 + 9 (visitor users)
Proposed Permanent Population: 1670 Floating Population: 137
7.2 Give details of the existing social infrastructure around the proposed project.
School - Pumpkin Patch School & Day care – 2.0 Km College – Indira College-0.35 Km Hospital – Polaris Health Care– 1.15 Km Cosmodent Dental Clinic– 0.60 Km
7.3 Will the project cause adverse effects on local communities, disturbance to sacred sites or other cultural values? What are the safeguards proposed?
No
8. BUILDING MATERIALS 8.1 May involve the use of
building materials with high-embodied energy. Are the construction materials produced with energy efficient processes? (Give details of energy conservation measures in the selection of building materials and their energy efficiency)
No, Pozolona Portland Cement shall be used which contains 15% Fly ash. Construction materials from nearest source are chosen to minimize energy consumption for transportation.
8.2 Transport and handling of materials during construction may result in pollution, noise & public nuisance. What measures are taken to minimize the impacts?
• The construction material will be carried in properly covered vehicles.
• All the contractors / Vendors will be instructed to use vehicles having PUC certificates.
• Security staff presents at site will supervise loading and unloading of material at site.
• Construction material will be stored at identified site/ temporary godowns at site.
Form 1A– “VAASTU VIVA”, M/s. B.U. Bhandari Vaastu, Pune.
• Internal roads will be maintained in good conditions with regular sprinkling of water
5-meter high tin sheets will barricade the periphery of the plot. 8.3 Are recycled materials used
in roads and structures? State the extent of savings achieved?
Yes, Excavated earth and debris will be used as base for road.
8.4 Give details of the methods of collection, segregation & disposal of the garbage generated during the operation phases of the project
• Segregation of biodegradable and non biodegradable shall be done at source by means of provision of two garbage bins with different color.
• The non biodegradable garbage shall be put into separate bins and shall be handed over to Authorized Agency.
• Biodegradable garbage shall be treated in common solid waste management plant.
9. ENERGY CONSERVATION 9.1 Give details of the power
requirements, source of supply, backup source etc. What is the energy consumption assumed per square foot of built-up area? How have you tried to minimize energy consumption?
Power Requirement load 972 KW • Source: MSEDCL • Back-Up Source :- 1 DG Set of 160 KVA will
provided • Energy Saving Measures (20% energy saving) Energy Saving Measures Proposed:- Use of LED & CFL in Parking area, lift-lobby
and stair-case. Using Solar system in External Lighting (10%).
& Landscape lights with LED lamps. Using V3F drive for all lifts. As per MSEDCL requirements, we have planned
to use low loss Transformer. Losses for Transformer shall, in principal, comply with ECBC norms.
We are planning to attain power factor of the installation near unity.
LED & CFL types of light source are proposed for common Lobby, Lounge, and Staircase area.
Automatic time based controls are proposed for all outside lighting to save power by avoiding manual switching ON & OFF the lights.
Motion Sensors are proposed in Car Parking Areas & Lift lobbies.
The estimated saving in common area lighting consumption is up to 20% due to adopting above measures
9.2 What type of, and capacity of, power back-up to you plan to provide?
• 1 No. of 160kVA DG set based as per CPCB Norms.
9.3 What are the characteristics of the glass you plan to use? Provide specifications of its characteristics related to both short wave and long wave
Single glazed glass will be used.
Form 1A– “VAASTU VIVA”, M/s. B.U. Bhandari Vaastu, Pune.
radiation? 9.4 What passive solar
architectural features are being used in the building? Illustrate the applications made in the proposed project.
Maximize the use of natural lighting through design. Roof insulation for all the spaces. The recommended U-factor for roof shall be 0.409 W/m2 oC.
9.5 Does the layout of streets & buildings maximize the potential for solar energy devices? Have you considered the use of street lighting, emergency lighting and solar hot water systems for use in the building complex? Substantiate with details.
Yes Solar Water Heating System shall be provided.
9.6 Is shading effectively used to reduce cooling/heating loads? What principles have been used to maximize the shading of Walls on the East and the West and the Roof? How much energy saving has been effected?
Design is based on Passive Architectural Considerations.
9.7 Do the structures use energy-efficient space conditioning, lighting and mechanical systems? Provide technical details. Provide details of the transformers and motor efficiencies, lighting intensity and air-conditioning load assumptions? Are you using CFC and HCFC free chillers? Provide specifications.
Yes Following Energy conservation measures are proposed for Energy Saving:
Energy Saving Measures Proposed:- Use of LED & CFL in Parking area, lift-lobby
and stair-case. Using Solar system in External Lighting (10%).
& Landscape lights with LED lamps. Using V3F drive for all lifts. As per MSEDCL requirements, we have planned
to use low loss Transformer. Losses for Transformer shall, in principal, comply with ECBC norms.
We are planning to attain power factor of the installation near unity.
LED & CFL types of light source are proposed for common Lobby, Lounge, and Staircase area.
Automatic time based controls are proposed for all outside lighting to save power by avoiding manual switching ON & OFF the lights.
Motion Sensors are proposed in Car Parking Areas & Lift lobbies.
The estimated saving in common area lighting consumption is up to 20% due to adopting above measures
9.8 What are the likely effects of the building activity in altering the micro-climates?
No impact anticipated on micro-climate. No inversion or heat island effect expected.
Form 1A– “VAASTU VIVA”, M/s. B.U. Bhandari Vaastu, Pune.
Provide a self assessment on the likely impacts of the proposed construction on creation of heat island & inversion effects?
9.9 What are the thermal characteristics of the building envelope? (a) roof; (b) external walls; and (c) fenestration? Give details of the material used and the U-values or the R values of the individual components.
• Roof insulation for all the spaces. • The U-factor for roof shall be 0.409W/m2-0C and 0.44 W/m2-
OC for walls
9.10 What precautions & safety measures are proposed against fire hazards? Furnish details of emergency plans
As per the regulations of CFO NOC Provision of Fire Protection System. Provision of Fire Alarm System as per I.S code. Provision of Fire detection system. Provision of Wet risers, Fire hydrants, Fire pumps,
booster pumps, sprinkler pumps: Electric, supply independent circuit & fire hydrant line.
Provision of portable fire extinguishers of IS specification.
Provision of Automatic sprinkler system. Provision of refuge area. Adequate underground and overhead separate water
storage tanks.
9.11 If you are using glass as wall material provides details and specifications including emissivity and thermal characteristics.
No, Glass shall be used only for glazing work- for windows ONLY.
9.12 What is the rate of air infiltration into the building? Provide details of how you are mitigating the effects of infiltration
Design is based on Passive Architectural Considerations and Features.
9.13 To what extent the non-conventional energy technologies are utilized in the overall energy consumption? Provide details of the renewable energy technologies used.
Provision of Solar for common area lighting will reduce 20% of Overall Energy Consumption.
10. ENVIRONMENT MANAGEMENT PLAN The Environment Management Plan would consist of all mitigation measures for each item wise activity to be undertaken during the construction, operation and the entire life cycle to minimize adverse environmental impacts as a result of the activities of the project. It would also delineate the environmental monitoring plan for compliance of various environmental regulations. It will state the steps to be taken in case of emergency such as accidents at the site including fire.
Form 1A– “VAASTU VIVA”, M/s. B.U. Bhandari Vaastu, Pune.
The Environment Management Plan would consist of all mitigation measures for each activity to be undertaken during the construction, operation and the entire life cycle to minimize adverse environmental impacts as a result of the activities of the project. It would also delineate the environmental monitoring plan for compliance of various environmental regulations. It will state the steps to be taken in case of emergency such as accidents at the site including fire.
ENVIRONMENTAL IMPACT AND MANAGEMENT PLAN FOR THE
PROJECT EMP for Construction Phase
Sr. no.
Component Activity Impacts Precautionary measures
1 Ambient Air Quality and Noise
• Site Clearance • Excavation • Construction of
Structures • Heavy vehicle
traffic • Use of DG Set • Open burning
of waste
• Increased level of dust and other air pollutants
• Increased Noise level.
For control of air pollution: • Water Sprinkling • Cover on trucks • Use of RMC • Vehicles with valid PUC • DG sets: CPCB
specification. For control of noise pollution: • Barricades along the
periphery of the site. • Ear plugs for Laborers • D.G. sets of CPCB specs • No noisy work in night
shifts. • Use power operated
equipment. 2 Water
• Use of fresh
water for Construction activity
• Wastewater generation
• Disposal of site run off into SWD
• Water logging
• Stress on the water supply in the vicinity
• Sedimentation and Pollution of nearby water courses.
• Unhygienic condition for surrounding residents.
• Use tanker water for construction. No burden on municipal supply
• Provision of temporary toilets for labor.
• Avoid water logging during construction
3 Soil • Preconstruction and excavation debris
• Storage of construction material/chemicals
• Residual paints Solvents/ bituminous material etc.
• Garbage generation by labour
• Loss of good fertile soil
• Soil erosion, Soil contamination due to mixing of construction material/ accidental spillage of chemicals /oils
• Recycle debris as far as possible in construction area.
• Disposal debris to authorized landfill sites
• Proper and separate storage of construction material
• Store petroleum products on impervious layers viz. concrete.
• Use of electrically operated machinery.
• Segregation of waste at Source
Form 1A– “VAASTU VIVA”, M/s. B.U. Bhandari Vaastu, Pune.
Even after taking precautions if soil is found to be contaminated, it shall be removed and disposed off to authorized site.
4 Ecology • Site clearance, Construction of structures, cutting of trees
• Disturbing natural flora and fauna
• Loss of vegetation from chemical spills from vehicles
• Plantation of local tree species on the Periphery of site
• Plantation of trees will start during construction phase.
• Regulation of vehicular trips and speed and proper maintenance of vehicle.
5 Safety & Hygienic Measures
Construction work Labor
• Positive impact : Employment generation
• Safety and hygiene at site may be affected during construction
• Adequate drinking water, toilet and bathing facilities.
• Regular analysis of drinking water.
• Personal protective and safety equipment will be provided.
• First aid facility. • Regular health check up • Regular pest control at site. • Educational and awareness
program on safety measures. EMP for Operation Phase 1 Ambient Air
Quality& Noise level
Increased vehicular trips, Use of DG sets
• Traffic congestion
• Air pollution • Increase in
noise level
• Adequate parking provision; well organized traffic management plan for smooth flow of vehicles.
• Regular PUC check-up for vehicles.
• DG sets: As per CPCB norms, Proper maintenance, Low sulphur fuel.
• Acoustic enclosures for DG sets
• Plantation of tress will reduce air pollution and also act as noise buffer.
2 Water
• Increased demand of water,
• Generation of wastewater
• Paved areas
• Stress on existing water supply,
• Pollution of water bodies
• Increased run off from site.
• Use of water saving practices
• Adoption of dual flush system
• Rain water harvesting • Plantation of less
water consuming trees.
• STP planned and treated sewage will
Form 1A– “VAASTU VIVA”, M/s. B.U. Bhandari Vaastu, Pune.
be used for secondary requirements like flushing and gardening.
3 Land • Solid waste generation,
• Transportation of hazardous material
• Increased paved structure
• Improper disposal of waste,
• accidental spillage of hazardous chemicals leads to soil contamination
• Increased run off from site.
• Waste minimization recovery and reuse
• Segregation at source for all solid waste streams
• Recycling of dry garbage
• Treatment of wet garbage by Organic waste converter and use as manure
• Use of dried STP sludge as manure
• Transportation, storage and handling, disposal of HW as per guidelines.
• Strom water drainage of adequate capacity.
Even after taking precautions if soil is found to be contaminated, it shall be removed and disposed off to authorized site
4 Ecology Introduction of new tree species
• Disturbing natural flora and fauna
• Increased exposure to anthropogenic activities.
• Plantation of local tree species only.
5 Safety & Hygienic Measures
Development of new land use, influx of people
• Stress on all utilities, risk and danger due to natural and manmade disaster
• Positive impact: Employment generation
• Emergency preparedness plan and DMP will be prepared and explained with the help of local NGOs, surrounding people and authority.
Note: Environmental monitoring plan will be prepared based on Environmental Management Plan. environmental parameters will be studied as and when required and based on analysis result mitigat measures will be implemented.
.
Form 1A– “VAASTU VIVA”, M/s. B.U. Bhandari Vaastu, Pune.
LIST OF RAW MATERIAL
Sr. No. Name Units
1 Cement bags
2 White Cement bags
3 Steel Metal tonnes
4 Metal cuft
5 Sand cuft
6 Bricks/siporex no.
7 Binding wire kg.
8 Tiles Granite/Marble sq.ft
9 Paint lts
10 Plaster sq.mtrs
11 Wood kg.
12 Aluminium kg.
SCALE 1 : 1000
TALUKA- MULSHI DIST- PUNE
OWNER :
TITLE :VILLAGE - WAKAD
DETAIL SURVEY FOR
ALL TYPES OF LAND SURVEYSHREE GANESH SURVEY
TBM-3TBM-5
TBM-6INVERD LEVEL
INVERD LEVEL95.077
97.017
TBM-1
PUNE
MUMBA
I HIGHWAY
SUBW
AY
LEGEND
PLOT AREA=49.07R
MR.SWAPNIL BU BHANDARI LANDMARKS
TBM-2
1
0
1
.0
0
1
0
1
.5
0
1
0
2
.0
0
1
0
2
.5
0
1
0
3
.0
0
1
0
3
.5
0
1
0
4
.0
0
1
0
4
.5
0
1
0
5
.0
0
1
0
5
.5
0
1
0
6
.0
0
1
0
0
.0
0
9
9
.5
0
9
9
.0
0
9
8
.5
0
9
7
.5
0
9
7
.0
0
9
8
.0
0
9
6
.5
0
9
6
.5
0
9
7
.0
0
9
7
.5
0
0
9
8
.0
0
98.00
97.50
97.00
97.00
97.00
96.50
96.00
9
5
.5
0
9
6
.0
0
9
6
.5
0
9
6
.0
0
9
6
.5
0
9
9
.5
0
9
9
.0
0
9
8
.5
0
9
7
.5
0
9
7
.0
0
9
8
.0
0
1
0
0
.0
0
1
0
1
.0
0
1
0
1
.5
0
1
0
2
.0
0
1
0
2
.5
0
103.00
104.00
104.50
105.00
105.50
105.00
106.00
SCALE 1 : 1000
TALUKA- MULSHI DIST- PUNE
OWNER :
TITLE :VILLAGE - WAKAD
DETAIL SURVEY FOR
ALL TYPES OF LAND SURVEYSHREE GANESH SURVEY
TBM-3TBM-5
TBM-6INVERD LEVEL
INVERD LEVEL95.077
97.017
TBM-1
PUNE
MUMBA
I HIGHWAY
SUBW
AY
LEGEND
PLOT AREA=49.07R
MR.SWAPNIL BU BHANDARI LANDMARKS
TBM-2
1
0
1
.0
0
1
0
1
.5
0
1
0
2
.0
0
1
0
2
.5
0
1
0
3
.0
0
1
0
3
.5
0
1
0
4
.0
0
1
0
4
.5
0
1
0
5
.0
0
1
0
5
.5
0
1
0
6
.0
0
1
0
0
.0
0
9
9
.5
0
9
9
.0
0
9
8
.5
0
9
7
.5
0
9
7
.0
0
9
8
.0
0
9
6
.5
0
9
6
.5
0
9
7
.0
0
9
7
.5
0
0
9
8
.0
0
98.00
97.50
97.00
97.00
97.00
96.50
96.00
9
5
.5
0
9
6
.0
0
9
6
.5
0
9
6
.0
0
9
6
.5
0
9
9
.5
0
9
9
.0
0
9
8
.5
0
9
7
.5
0
9
7
.0
0
9
8
.0
0
1
0
0
.0
0
1
0
1
.0
0
1
0
1
.5
0
1
0
2
.0
0
1
0
2
.5
0
103.00
104.00
104.50
105.00
105.50
105.00
106.00
EMP for Construction Phase
Sr.
no.
Component Activity Impacts Precautionary measures
1 Ambient Air
Quality and
Noise
• Site Clearance
• Excavation
• Construction of
Structures
• Heavy vehicle
traffic
• Use of DG Set
• Open burning of
waste
• Increased
level of dust
and other air
pollutants
• Increased
Noise level.
For control of air pollution:
•••• Water Sprinkling
•••• Cover on trucks
•••• Use of RMC
•••• Vehicles with valid PUC
•••• DG sets: CPCB
specification.
For control of noise
pollution:
•••• Barricades along the
periphery of the site.
•••• Ear plugs for Laborers
•••• D.G. sets of CPCB specs
•••• No noisy work in night
shifts.
•••• Use power operated
equipment.
2 Water
• Use of fresh
water for
Construction
activity
• Wastewater
generation
• Disposal of site
run off into
SWD
• Water logging
• Stress on the
water supply
in the vicinity
• Sedimentation
and Pollution
of nearby
water courses.
• Unhygienic
condition for
surrounding
residents.
• Use tanker water for
construction. No burden
on municipal supply
• Provision of temporary
toilets for labor.
• Avoid water logging
during construction
3 Soil • Preconstruction
and excavation
debris
• Storage of
construction
material/chemi
cals
• Residual paints
Solvents/
bituminous
material etc.
• Garbage
generation by
labour
• Loss of good
fertile soil
• Soil erosion,
Soil
contamination
due to mixing
of construction
material/
accidental
spillage of
chemicals /oils
• Recycle debris as far as
possible in construction
area.
• Disposal debris to
authorized landfill sites
• Proper and separate
storage of construction
material
• Store petroleum products
on impervious layers viz.
concrete.
• Use of electrically operated
machinery.
• Segregation of waste at
Source
Even after taking precautions if soil is found to be contaminated, it shall be removed
and disposed off to authorized site.
4 Ecology • Site clearance,
Construction of
structures,
cutting of trees
• Disturbing
natural flora
and fauna
• Loss of
vegetation from
chemical spills
from vehicles
• Plantation of local tree
species on the Periphery of
site
• Plantation of trees will start
during construction phase.
• Regulation of vehicular
trips and speed and proper
maintenance of vehicle.
5 Safety &
Hygienic
Measures
Construction work
Labor
• Positive
impact :
Employment
generation
• Safety and
hygiene at site
may be
affected
during
construction
• Adequate drinking water,
toilet and bathing facilities.
• Regular analysis of drinking
water.
• Personal protective and
safety equipment will be
provided.
• First aid facility.
• Regular health check up
• Regular pest control at site.
• Educational and awareness
program on safety
measures.
EMP for Operation Phase
1 Ambient Air
Quality &
Noise level
Increased
vehicular trips,
Use of DG sets
• Traffic
congestion
• Air pollution
• Increase in
noise level
• Adequate parking
provision; well
organized traffic
management plan
for smooth flow of
vehicles.
• Regular PUC
check-up for
vehicles.
• DG sets: As per
CPCB norms,
Proper
maintenance, Low
sulphur fuel.
• Acoustic
enclosures for DG
sets
• Plantation of tress
will reduce air
pollution and also
act as noise buffer.
2 Water
• Increased
demand of
water,
• Generation of
wastewater
• Paved areas
• Stress on
existing water
supply,
• Pollution of
water bodies
• Increased run
off from site.
• Use of water saving
practices
• Adoption of dual
flush system
• Rain water harvesting
• Plantation of less
water consuming
trees.
• STP planned and
treated sewage will
be used for
secondary
requirements like
flushing and
gardening.
3 Land • Solid waste
generation,
• Transportation
of hazardous
material
• Increased paved
structure
• Improper
disposal of
waste,
• accidental
spillage of
hazardous
chemicals leads
to soil
contamination
• Increased run
off from site.
• Waste
minimization
recovery and reuse
• Segregation at
source for all solid
waste streams
• Recycling of dry
garbage
• Treatment of wet
garbage by Organic
waste converter
and use as manure
• Use of dried STP
sludge as manure
• Transportation,
storage and
handling, disposal
of HW as per
guidelines.
• Strom water
drainage of
adequate capacity.
Even after taking precautions if soil is found to be contaminated, it shall be removed
and disposed off to authorized site
4 Ecology Introduction of
new tree species • Disturbing
natural flora
and fauna
• Increased
exposure to
• Plantation of local tree
species only.
anthropogenic
activities.
5 Safety &
Hygienic
Measures
Development of
new land use,
influx of people
• Stress on all
utilities, risk
and danger
due to natural
and manmade
disaster
• Positive
impact:
Employment
generation
• Emergency
preparedness plan
and DMP will be
prepared and
explained with the
help of local NGOs,
surrounding people
and authority.
Note: Environmental monitoring plan will be prepared based on Environmental Management
Plan. All environmental parameters will be studied as and when required and based on analysis
result mitigation measures will be implemented.
Environmental Management Plan for Hazardous Waste Generation
Construction Phase:
Sr.
No.
Source of Hazardous
Waste Generation
Mitigation Measures
1 Leakages and spillage oil or
fuel
* Contaminated soil if any shall be disposed off to
Authorized Disposal Site.
* Bituminous materials /any other chemicals shall not
be allowed to leach into the soil.
Operational Phase:
1 Residual Paints/Solvents --do--
2 Waste Oil from D.G Sets Waste oil will be handed over to authorized recyclers.
Other hazardous wastes, if any, shall also be handled in the similar way through
authorized dealers only.
SITE SPECIFIC EXECUTABLE ENVIRONMENT MANAGEMENT PLAN
1
Table of Contents
1. ORGANIZATION & ENVIRONMENT MANAGEMENT CELL ............................................................... 3
2. COMPLIANCE SCHEDULE ................................................................................................................. 4
3. EXECUTABLE EMP ........................................................................................................................... 5
3.1 WATER REGIME ............................................................................................................................. 5
3.1.1 CONSTRUCTION PHASE ................................................................................................... 5
3.1.2 OPERATION PHASE .......................................................................................................... 7
3.2 AIR REGIME ................................................................................................................................... 9
3.2.1 CONSTRUCTION PHASE .......................................................................................................... 9
3.2.2 OPERATION PHASE ............................................................................................................... 10
3.3 SOLID WASTE .............................................................................................................................. 11
3.3.1 CONSTRUCTION PHASE ........................................................................................................ 11
3.3.2 OPERATION PHASE: .............................................................................................................. 11
3.4 SOIL AND GREENING ................................................................................................................... 12
3.4.1 CONSTRUCTION PHASE ........................................................................................................ 12
3.4.2 OPERATION PHASE ............................................................................................................... 13
3.5 NOISE REGIME ............................................................................................................................. 13
3.5.1 CONSTRUCTION PHASE ........................................................................................................ 13
3.5.2 OPERATION PHASE ............................................................................................................... 14
3.6 SOCIO ECONOMIC REGIME ......................................................................................................... 14
3.6.1 CONSTRUCTION PHASE ........................................................................................................ 14
3.6.2 OPERATION PHASE ............................................................................................................... 15
4. EMERGENCY RESPONSE PLAN....................................................................................................... 15
5. FUNDS FOR MANAGEMENT & MONITORING FUNDING .............................................................. 22
5.1 DURING CONSTRUCTION PHASE .................................................... Error! Bookmark not defined.
5.2 ENVIRONMENTAL MONITORING PLAN .......................................... Error! Bookmark not defined.
5.2.1 During Construction Phase – Per year .................................... Error! Bookmark not defined.
5.2.2 During Operational Phase ....................................................... Error! Bookmark not defined.
5.3 ENVIRONMENTAL MANAGEMENT PLAN WITH BUDGETARY ALLOCATION .. Error! Bookmark not defined.
5.3.1 During Operational Phase ........................................................... Error! Bookmark not defined.
2
1. ORGANIZATION & ENVIRONMENT MANAGEMENT CELL
No. Designation Qualification Facet Responsibility 1 Site Manager B. E. (Five
yearexperience) Construction Phase – Site in-charge
Material waste minimization, labour camp sanitation, Noise, oil grease & vibration nuisance control, accident prevention.
2 Environmental Manager
M. Sc. / M. Tech. (Environmental Science) Two year experience in Environmental Monitoring and reporting.
Air Monitoring PUC control, Noise &odour mitigation measures
Water Water budget, O&M of water supply & Monitoring functioning of waste water treatment plant.
Solid waste Monitoring Segregation, collection, composting & disposal
Greening Monitoring tree plantation, Lawn development, storm water management
Monitoring Field observation, Laboratory tests, interpretation & reporting.
Compliance Reporting
Six monthly post EC compliance and State Pollution Control Board consents
Public relation & Press
Documentation, training
3 Operators – 2 No.s (more for large projects)
B. Sc. equivalent
Field work and sampling
Operation and sampling of environmental facilities and reporting to Environmental Coordinator
3
2. COMPLIANCE SCHEDULE
2.1 STATUTORY COMPLIANCES
ACT Responsibilities under section Penalties under section
Water (Prevention & Control Of Pollution) ACT, 1974 (No. 6 of 1974)
19, 20(2) & (3), 21(3)(e), 23, 24(1) (a), 24(1) (b), 25(1) & 26, 25(4) & 26, 27(2), 28, 29, 31(1), 32(1)(c), 33(3)(l), 33 A
41(1), 41(2), 42(1), 42(2), 43, 44, 45, 45A
Environment (Protection) Act, 1986 (No. 29 of 1986)
5, 7, 8, 9(1), 9(3), 10(1), 10(2), 11(1)
15, 26
2.2 COMPLIANCE SCHEDULES:
There will be three facets to design and follow the schedules viz.: (A) for compliance of responsibilities (B) for day-to-day operation and management of STP, ECE, solid waste management facility (C) for routine environmental monitoring to assess the impact and take timely warning.
The schedule:
Daily Compliance:
Take the meter readings - initial and final, for checking the water consumption.
Maintain the electricity consumption record for pollution control facilities.
Monthly Compliance:
Monitor ambient air periodically as per Consent.
Monitor the emission sources through the competent authority and submit the analysis reports to the board.
Quarterly Compliance:
Monitor ambient/work zone noise levels & ensure conformance
Review the Water Reuse performance.
Half Yearly compliance:
Submit the post Environment clearance report to the regional office Bhopal of MoEF& Climate Change along with the state pollutioncontrol board as may be prescribed in the prior EC every June & December.
4
Yearly Compliance:
Carryout “Environmental Audit Statement” of various environmental aspects, review the environmental policies with the help of experts and make the up gradation /changes accordingly.
Submit the “Environmental Statement” to the State Pollution Control Board in Form V under Rule 14 of the Second Amendment Rules 1992 of the Environment (Protection) Act, 1986.
Renew the Consent to Operate under the Water and Air Acts.
File the CESS returns to the State PCB under the Water (Prevention and Control of Pollution) CESS Act, 1977.
3. EXECUTABLE EMP
3.1 WATER REGIME
3.1.1 CONSTRUCTION PHASE
Construction Phase Water regime
Responsibility Ground work Assigned to
Report to / Corrective action
Installing water meter, take regular readings, record in the register and avoid water wastage.
Contractor Operator If wastage is observed report to the management for caution & correction.
Provision of mobile toilets to the construction workers and staff on site. Looking after its operation & maintenance.
Contractor in consultation with Site manager
Mobile toilet agency
Site manager to take corrective actions if required
Taking periodical environmental samples to assess the quality as per IS 10500, maintaining records.
Environmental Engineer
MoEF approved Laboratory
Reporting any abnormality in the monitoring & reporting to Site in charge for rectification
Provision of potable water for workers and staff as per IS 10500.
Contractor Site Manager Site manager to take corrective actions if required
Keeping a daily watch on sanitation facilities, drains & good housekeeping.
Environmental Engineer
Environmental manager
Inform management periodically regarding site sanitation status
Using screens and silt traps to avoid sedimentation in drains.
Contractor in consultation with Site manager
Labour Site manager to take corrective actions if required
5
Proper management and channelization of water to avoid water logging at site. During construction, Contractor to ensure that erosion control structures-either permanent or temporary are installed prior to commencement of construction.
Contractor + Site Manager + Environmental Engineer
Site Manager Site manager to take corrective actions if required
3.1.1.1 Water Circulation Details Source of Water:
All values are in KLD
From Tanker = 11
Domestic = 11 Flushing = 7
Total Sewage = 17 PP will provide Mobile Toilets
Treated Sewage water will be Managed by Mobile Toilet Vendor
6
3.1.2 OPERATION PHASE
Operation Phase Responsibility Ground work Assigned to
Report to/Corrective action
Installing water meters, taking regular readings, maintaining the register.
Environment manager
plumber/ security staff
If wastage is observed reporting to the management for caution & correct Environmental Engineer
Keeping daily watch on pH, BOD, COD and TSS of the STP outlet to ensure good treatment of waste water and its reuse.
Environment manager
Lab (Outsourced)/STP operators
Results to be maintained for EC compliance and corrective actions to be taken in consultation with Environment Manager
It is proposed to install STP of capacity 140 m3 for treatment of sewage to meet the standards prescribed in E(P)Act, 1986.
STP vendor STP operator Environment Manager to take corrective action if required
Back wash of swimming pool water is diverted to STP for treatment and reuse.
Plumbing consultant
Plumber Environment Manager to take corrective action if required
Treated sewage to be used for flushing and gardening within the premises.
Plumbing consultant
Plumber Environment Manager to take corrective action in consultation with Plumbing consultant if required
Any erosion channels developed during the construction period or during the operational period will be backfilled and consolidated immediately and the area restored to the proper condition. All erosion damage will be repaired as soon as possible. Displaced topsoil will be replaced from approved borrow pits.
Site Manager Labour Site Engineer to handover the site management report to the Environment Manager
Stormwater management structures must be maintained and cleaned to minimise erosion that could result in the siltation of aquatic systems. This requires regular inspection of the stormwater drainage system to confirm its functionality and instituting maintenance as and when required to remove any blockages and repair broken pipes.
Storm water vendor in consultation with Environment Manager
Labour Environment Manager to take corrective action in consultation with Plumbing consultant if required
7
Surface runoff water will be diverted from SWD to rainwater harvesting unit. The surface rainwater to be passed through oil & grease trap & de-silting chamber and then transferred to recharging pit with bore-well through gravitational force.
Storm water vendor in consultation with Environment Manager
Operator on site to ensure cleaning and maintenance of SWD
Environment Manager to take corrective action in consultation with Rain Water Harvesting consultant if required
The parameters & analysis of water regime are based on the guidelines given by Central pollution Control Board (CPCB)
Environment manager
MoEF& CC approved laboratory
Environment Manager to maintain the report and take corrective action in consultation with Environment Consultant in presence of management representative.
3.1.2.1 Water Circulation Details Source of Water:
Make-up volume required for Swimming pool & source:
8
3.2 AIR REGIME
3.2.1 CONSTRUCTION PHASE Construction Phase Air Regime
Responsibility Ground work Assigned to
Report to / Corrective action
Water sprinkling for dust suppression (20,000liters of water &20 Tankers) will be used during excavation.
Site Manager in consultation with Environment Manager
Contractor and water tanker vendor
Environment Manager to ensure dust level is below limit and arrange water sprinkling before excavation & dry conditions.
Covering sheets to be used while transporting the material.
Contractor Transportation agency (Driver & accompanying person)
Contractor in charge & Environment Manager to ensure the compliance.
Use of ready mix concrete (RMC) through concrete batching at a place secluded, barricaded by trees and precautions taken of dust suppression by sprinkling. Logbooks to be maintained for RMC trucks haulage. When the trucks are washed, the waste water to be sent for reuse or treatment.
Site Manager in consultation with Environment Manager & RMC contractor
Contractor and RMC vendor. Sprinkling to be arranged in coordination with water tanker vendor
Site Manager to ensure compliance to this point and corrective measures if any, can be taken in consultation with Environment Manager
For use as backup power, DG sets with foundation and acoustic enclosures is to be installed as per suppliers specification and stacks height to be kept as per CPCB norms
Site Manager in consultation with Environment Engineer
Contractor labour Environment Manger to ensure compliance and corrective actions if any, to be taken in consultation with contractor & DG vendor
Proper traffic arrangement for the construction vehicles.
Site Manager to plan traffic arrangements in consultation with Environment Manager
Site security to ensure traffic arrangements are followed
Site manager to make necessary changes and ensure smooth traffic management.
Entry to vehicles with valid PUC certificate
Site manager in consultation with transport vehicle contractor
Site security to maintain a record and prevent entry of vehicles not having valid PUC
Site Manager to maintain a record and share it with Environment Manger for EC compliance
9
Labour camp to be arranged away from project site and open burning of solid waste will be prohibited.
Labour Contractor in consultation with Site manager and Environment manager
Labour Contractor Environment Manger to ensure compliance and corrective actions if any, to be taken in consultation with contractor & if necessary involve Management representative
Use of the standard personal protective equipment like –masks, goggles etc.
Labour Contractor and Environment Manager
Labour Contractor Environment Manger to ensure compliance and corrective actions if any, to be taken in consultation with contractor & if necessary involve Management representative
3.2.2 OPERATION PHASE
Operation Phase Air Regime
Responsibility Ground Work Assigned to
report to/Corrective action
For use as backup power, DG sets (3 Nos. Of 600 KVA ) with foundation and acoustic enclosures is to be installed as per suppliers specification and stacks height to be kept as per CPCB norms
DG Vendor and Environment manger
DG set Operator or Site Security
Environment Manager to maintain records of events and report to EC compliance team.
Periodic monitoring of TPM and SO2 concentration and thereby schedule and implement proper maintenance of DG sets
Laboratory in-charge / Monitoring team leader in coordination with Environment manager
Trained laboratory monitoring team
Environment Manager to maintain records of events and report to EC compliance team.
Trees (proposed 160tree no.s) to be planted with special care to mitigate dust and noise.
Landscape designer to plan tree plantation
Landscape maintenance team / Gardner
Environment Manager to maintain records and ensure trees are in healthy condition and number is as mentioned in EC
The parameters & analysis of Air regime are based on the guidelines given by Central pollution Control Board (CPCB)
Laboratory in charge / Monitoring team leader in coordination with Environment manager
Trained laboratory monitoring team
Environment manager to maintain records and report to EC compliance team
10
3.3 SOLID WASTE
3.3.1 CONSTRUCTION PHASE Construction Phase Responsibility Ground work
Assigned to Report to / Corrective action
Training will be given to the subcontractor & to the workers for waste collection, segregation and sanitation
Environment manager and Labour Contractor
Team members of Environment management Cell
Environment manager and maintain records and documentary evidence.
Separate bins will be provided for collection of waste.
Labour contractor along with Site Manager
Team members of Environment management Cell to ensure compliance
Environment Manager and maintain records and documentary evidence.
Isolated storage of construction raw material such as paint, varnishes etc.
Site manager along with labour contractor. Environment manager to ensure that it is handed over to Authorised vendor for reuse/disposal
Site Manager Environment manager and maintain records and documentary evidence.
Segregated garbage to be handed over to local body.
Environment manager and Labour Contractor
Site Manager Environment manager and maintain records and documentary evidence.
Empty containers of paints, pesticides & fluorescent tube lights to be collected at one place & send to authorized agency for safe disposal
Site manager along with labour contractor. Environment manager to ensure that it is handed over to Authorised vendor for reuse/disposal
Team members of Environment management Cell to ensure compliance
Environment manager and maintain records and documentary evidence.
3.3.2 OPERATION PHASE:
Operation Phase Solid Waste
Responsibility Ground work Assigned to
Report to / Corrective action
Informing and educating occupants to ensure segregation of waste in colour coded barrels.
Environment manager
Team members of Environment management Cell
Environment manager and maintain records and documentary evidence and involve society representative
11
E-Waste and other waste (excluding bio-degradable and non-biodegradable waste)
Environment manager
Team members (Operator) of Environment management Cell
Environment manager and maintain records and documentary evidence. Receipts of authorised vendor/recycler to be maintained
Segregated garbage will be handed over to SWACH for final disposal
Environment manager
Team members (Operator) of Environment management Cell
Environment manager and maintain records and documentary evidence and involve society representative
For treatment of biodegradable waste (276kg/day) to be sent to the composting.
Environment manager in consultation with Vendor
OWC Operator Environment manager and maintain records and documentary evidence and involve society representative. Corrective measures to be taken, if required in consultation with OWC Vendor
space for composting for all clusters is earmarked. This includes the space required for treatment, curing and storage of manure.
Architect to plan & provide space required in consultation with OWC Vendor and Environment Manager to ensure the adequacy
OWC Vendor Environment Manager to ensure compliance and involve Management representative, if necessary
Non-biodegradable waste (184 kg/day) to be sent to Pune Municipal Corporation’s waste disposal facility.
Environment Manager & Authorised Agency representative
Operator and Collection agency representative
Environment manager and maintain records and documentary evidence and involve society representative
STP sludge (17kg/day) to be dewatered & will be used as manure. In addition to manure given by own in-vessel compost.
Environment Manager
Operator and Gardner
Environment manager and maintain records and documentary evidence
3.4 SOIL AND GREENING
3.4.1 CONSTRUCTION PHASE Construction Phase Responsibility Ground work
Assigned to Report to / Corrective action
Preservation of Topsoil (10,220 m3) from the excavated area for re-usage in landscaping.
Site Manager and landscape consultant
Labours Site Manager to assign area and maintain record of excavated soil
12
The excavated material to be kept at project site and covered with polyethylene sheets.
Site Manager and landscape consultant
Labours Site Manager to assign area, demarcate it on layout and maintain record and conditions of excavated soil
Avoiding Excavation during high windy and heavy monsoon day.
Site manager and Environment Manager
Site Manager Site Manager to ensure the compliance and report to management representative
Plan for excavated materials management for re-usage of the same within the premises or off site and disposal
Environment Manager and Site Manager
Labour Contractor Environment manager to ensure compliance and maintain records
Storm water drains to be maintained to avoid water logging & soil erosion on site.
Site Manager in consultation with Labour contractor
Labours Site manager to ensure the compliance and report to Environment manager
Saplings will be purchased from nursery and planted alongthe project site boundary.
Landscape consultant along with Environment Manager
Gardner Environment manager to ensure compliance and maintain records
3.4.2 OPERATION PHASE Operation Phase Responsibility Ground work
Assigned to Report to / Corrective action
Plantation of fruit and flower bearing trees of native species
Landscape designer and Environment Manager
Gardner Environmental Engineer to maintain records
The trimming to be conducted routinely & especially at the advent of monsoon.
Environment manager
Gardner Environmental Engineer to maintain records
Funds to be earmarked for the maintenance of lawn & plantation with provision of work force, tools & watering arrangement.
Environment Manager and Management representative
Environment manager
Environmental Engineer to maintain records and involve Society representative
3.5 NOISE REGIME
3.5.1 CONSTRUCTION PHASE Construction phase Responsibility Ground work
Assigned to Report to / Corrective action
13
Barricading the construction site along the periphery to avoid noise nuisance to the surrounding areas.
Contractor and Site manager
Contractor Environment manager
Regular noise monitoring to be scheduled to maintain the noise level within the levels prescribed by MPCB during day and night time.
Environment manager in consultation with Environment Monitoring laboratory
Monitoring team
Environment manager to maintain records and use for EC Compliance
Make provision of ear plugs for construction labour and staff & insist its use.
Labour contractor Contractor Environment manager to maintain records and ensure compliance
DG sets to be provided with CPCB approved acoustic enclosures
Environment manager in consultation with DG Vendor
DG Vendor Environment manager to ensure compliance and maintain records
3.5.2 OPERATION PHASE Operation phase Responsibility Ground work
Assigned to Report to / Corrective action
Acoustic enclosure for DG set to be maintained.
DG Vendor in consultation with Environment Manager
DG Operator Environment Manager to maintain records
Traffic management plan to be prepared to avoid traffic congestion and thereby reducing noise
Environment Manager in consultation with Traffic expert
Site Security Environment Manager to maintain records
3.6 SOCIO ECONOMIC REGIME
3.6.1 CONSTRUCTION PHASE Operation phase Responsibility Ground work
Assigned to Report to / Corrective action
During Initial Phase of the project, information regarding the proposed development plan to be communicated to the local community in the form of booklets and posters
Site manager and Project Proponent
Project Proponent representative
Project Proponent
Provision of adequate drinking water, toilet and bathing facilities to be made available on project site for the families of construction workers.
Contractor + Site manager In consultation with Environment Manager
Contractor Environment Manager to maintain records & ensure compliance
14
Proper Training and awareness programme to be carried out so that the workers understand the importance of wearing personal protective equipment.
Site manager and labour contractor
Labour contractor
Labour contractor to ensure compliance and report to management representative
First aid and medical facilities to be provided on site
Site manager and Environment manager
Site Manager Site manager to ensure that First Aid kits and medical facilities are adequate and replaced periodically.
Arrangement of Day care facility/crèche
Site Manager & Management representative
Site Manager Site manager to report to management representative
3.6.2 OPERATION PHASE
Operation phase Responsibility Ground work Assigned to
Report to / Corrective action
In a township job opportunities will be generated for skilled and unskilled. Additional employment by way of cleaners, drivers and security guard, etc.
Management representative to arrange for publicity
Management representative
Management representative to be kept informed along with Site security agency
Increased business opportunities viz. market, trade and commerce
Adhere to the high standard of maintenance and services for consistency of the economic development
Site management facility
Workers Site management facility to keep management informed
Improvement in changes in the aesthetic quality of the locality/area.
Management + Environmental Engineer
Top level authorities/ GM
4. EMERGENCY RESPONSE PLAN
Sno. Emergency Response Plan
Emergency Probable reason
Immediate Action Report To Precautionary Action
A Due to Anthropogenic Activities
15
Sno. Emergency Response Plan
Emergency Probable reason
Immediate Action Report To Precautionary Action
1 Structure collapse
Improper fitting of the objects; Materials used; quality etc.
Evacuate the portion/ floor at an immediate intimation; Walk away from the structure falling; count the number of people; if any one missing- report immediately; if injuries/ fatalities, take them to nearby hospital; Keep first aid box handy
Labour Supervisor, Site Manager
Engage Sirens as a sign of danger; Evacuation area must be clear and well maintained; Maintain a book of Incidents, note the reason, impact and thecauses.
2 Heavy objects slipping/ falling off
Careless placing/ improper placing of objects/ angles etc.
Walk away from the portion/ area, where the objects are falling from;
Labour Supervisor and Site Engineer
Evacuation area must be clear and well maintained; Maintain a book of Incidents, note the reason, impact and the mistake; Avoid placing heavy objects at a risky, slippery, or slanted plane; always check before leaving the site if there is any such possible threat.
16
Sno. Emergency Response Plan
Emergency Probable reason
Immediate Action Report To Precautionary Action
3 Bombing by anti-social groups/ Incident involving immediate firing, explosions etc.
Riots, national/ state issue
Safe underground/ nearby store rooms must be provided (they must have, radio, any mode of communication, first aid kits, food and water storages); keep Safety manual and First aid handy; Count the total number of workers present; help others to move from the site if possible.
Security Officer; Chief Controller/ Engineer
Keep the area fenced to protect from any unwanted activity; keep the security tight in order to get the first information; keep an eye on unattended objects and report to the police the moment they are seen; if any person looks suspicious, immediately ask for the identity card else wise inform the nearbypolice station; during and after the incident always consider children, ladies, elderly and then men but before make sure you yourself are safe.
b Due to Natural Calamities 1 Earthquake/
Land slide Nature Keep all the
inflammatory liquids and heavy machines/ materials at a safe place always in advance*;Walk away from the structure; Move to a safe, underground/ nearby store room (they must have, radio, any mode of communication, first aid kits, food
Rescue/ Evacuation Squad; First Aid squad (emergency helplines); Chief Engineer/ Controller
Engage Sirens as a sign of danger; decide a place for gathering; A safety room is must where there is adequate amount of packed food, water, medicines, radios and communication devices; Everyone must be aware of the regional warnings via e
17
Sno. Emergency Response Plan
Emergency Probable reason
Immediate Action Report To Precautionary Action
and water stored); Don’t come out till the tremors are over; in case of landslide move away to a safer place; cover your head; help other to move as well; keep information updated on radio/ mobile/ television about any continued occurrence or issue.
media/ print media/ etc.
2 Flood/ Cloud Burst
Nature Keep all the inflammatory liquids, chemical components and heavy machines/ materials at a safe place always in advance*; Shut down the main power; Move to a safe nearby store room (it must have, radio, any mode of communication, first aid kits, food and water stored); Don’t let the water stay in and around (Keep mopping it towards drains/ ducts etc.); watchout for snakes, bugs etc. keep information updated on radio/ mobile/ television about any continued occurrence or issue.
Fire Fighting Squad; First Aid squad (emergency helplines); Chief Engineer/ Controller
Engage Sirens as a sign of danger; decide a place for gathering; A safety room is must where there is adequate amount of packed food, water, medicines, radios and communication devices; Everyone must be aware of the regional warnings via e media/ print media/ etc.
18
Sno. Emergency Response Plan
Emergency Probable reason
Immediate Action Report To Precautionary Action
3 Tornados/ Storms/ lightening
Nature Keep all the inflammatory liquids, chemical components and heavy machines/ materials at a safe place always in advance*; Shutdown the main power; Move to a safe nearby store room (it must have, radio, any mode of communication, first aid kits, food and water stored); watch out for snakes, bugs etc. keep information updated on radio/ mobile/ television about any continued occurrence or issue.
Rescue Squad; First Aid squad (emergency helplines); Chief Engineer/ Controller
Engage Sirens as a sign of danger; decide a place for gathering; A safety room is must where there is adequate amount of packed food, water, medicines, radios and communication devices; Everyone must be aware of the regional warnings via e media/ print media/ etc.
4 Draught Nature Transport water from the available source; use water efficiently; restrict to dry and less work; maintain a water conservation practice, so that it can be utilised in such situation; wear wet angocha/ towel on head to avoid sudden energy loss; incase of excessive heat/ fatigue or no water condition stop the work and relocate workers for a limited period of time till he water is not availed at that
Contractor; Chief Controller/ Engineer
Engage Sirens as a sign of danger; decide a place for gathering; A safety room is must where there is adequate amount of packed food, water, medicines, radios and communication devices; Everyone must be aware of the regional warnings via e media/ print media/ etc.
19
Sno. Emergency Response Plan
Emergency Probable reason
Immediate Action Report To Precautionary Action
place. c Due to other reasons 1 Fire in Camp/
site Keep all the
inflammatory liquids, chemical components and heavy machines/ materials at a safe place always in advance*; Call the nearest fire station as soon as possible; Evacuate Move to a safe nearby store room (it must have, radio, any mode of communication, first aid kits, food and water stored); watch out for snakes, bugs etc. keep information updated on radio/ mobile/ television about any continued occurrence or issue.
Fire Fighting Squad; First Aid squad (emergency helplines); Chief Engineer/ Controller
Engage Sirens as a sign of danger; decide a place for gathering; A safety room is must where there is adequate amount of packed food, water, medicines, radios and communication devices; ONLY fire fighting Squad is to be allowed to extinguish the fire.
2 Worker falling off a height, drowning in tank, slipping from the raft while working etc.
Rush to pick up the person/ persons; first aid (if needed); Call the ambulance ASAP;
Contractor; Site Manager/ project Engineer
Wear Safety helmets; keep safety equipment (rope, torch etc. handy); make sure in advance that the pulley, work space etc. is perfect for performing the task whatsoever; keep away from the danger zones without precautions and other workers.
20
Sno. Emergency Response Plan
Emergency Probable reason
Immediate Action Report To Precautionary Action
3 Epidemic Outburst
stored water; garbage dumping/ unmanaged waste; Unhygienic surroundings; alien microbial growth etc.
(Malaria, plague etc.) Keep medicines handy; try and avoid using infected clothes, utensils, areas and contacts; If outburst is prolonged, then evacuate as soon as possible and return when ambiance is back to normal; maintain self and the site in a hygienic and clean manner.
Chief Engineer/ Controller
Site must be cleaned and managed properly incase of disposal of garbage etc.; open pits must be closed; stagnant water in tyres/ drums/ logged water must be cleared off ASAP; a book must be maintained for noting down the probable cases and then discuss with authorities for the probable solution in order to avoid more such incidences.
4 Any Particular disease
Seasonal; unhygienic conditions; communicated from elsewhere; occupational diseases; immunity issues etc.
(Diarrhoea, food poisoning, typhoid, amoebiosis etc.) infected person/ persons must be taken to nearby hospitals; must be given proper drugs for the treatment; if the disease is communicable (Conjunctivitis, viral etc.) , it is advisable to not to use infected persons' clothes/ utensils/ personal stuff (razor, food items etc.); if the disease comes under occupational disease- asbestosis, asthma, broadspectrum infection, psoriasis etc.
Contractor/ Labour Supervisor
On site usually there could be two reasons : Water borne diseases- Potable water must be provided to all the workers; active educational trainings/ sessions of 15 20 minutes must be provided to all, having subject like washing hands before eating; drinking water must be clean, sanitation and hygiene practices.
21
Sno. Emergency Response Plan
Emergency Probable reason
Immediate Action Report To Precautionary Action
5 Mob/ Fight/ strike etc.
Unresolved issue, Disambiguate; due/ pending wages; unattended grievances etc.
If any gathering or a group seems suspicious inform the security guard; try to sort out the matter if possible; if there are uncontrolled situations, inform the police at the earliest; Ask the others who are not related to the discussion to leave the place.
Contractor/ Labour Supervisor, Site Manager, Security Officers
Contractor must see into the matter of any unresolved issues; proper answer to any grievance/ demands must be given with appropriate logics;
FUNDS FOR MANAGEMENT & MONITORING FUNDING: will be provided
22