STATE OF UTAHDEPARTMENT OF NATURAL RESOURCES
DIVISION OF OIL, GAS AND MINING
APPLICATION FOR PERMIT TO DRILL 1. WELL NAME and NUMBER
Federal 10-21-8-16
2. TYPE OF WORK
DRILL NEW WELL REENTER P&A WELL DEEPEN WELL 3. FIELD OR WILDCAT
MONUMENT BUTTE
4. TYPE OF WELLOil Well Coalbed Methane Well: NO
5. UNIT or COMMUNITIZATION AGREEMENT NAME
6. NAME OF OPERATORNEWFIELD PRODUCTION COMPANY
7. OPERATOR PHONE435 646-4825
8. ADDRESS OF OPERATORRt 3 Box 3630 , Myton, UT, 84052
9. OPERATOR [email protected]
10. MINERAL LEASE NUMBER(FEDERAL, INDIAN, OR STATE)
UTU-69060
11. MINERAL OWNERSHIP
FEDERAL INDIAN STATE FEE 12. SURFACE OWNERSHIP
FEDERAL INDIAN STATE FEE
13. NAME OF SURFACE OWNER (if box 12 = 'fee')Henderson Ranches LLC
14. SURFACE OWNER PHONE (if box 12 = 'fee')
15. ADDRESS OF SURFACE OWNER (if box 12 = 'fee')Route 3 Box 3671, ,
16. SURFACE OWNER E-MAIL (if box 12 = 'fee')
17. INDIAN ALLOTTEE OR TRIBE NAME(if box 12 = 'INDIAN')
18. INTEND TO COMMINGLE PRODUCTION FROMMULTIPLE FORMATIONS
YES (Submit Commingling Application) NO
19. SLANT
VERTICAL DIRECTIONAL HORIZONTAL
20. LOCATION OF WELL FOOTAGES QTR-QTR SECTION TOWNSHIP RANGE MERIDIAN
LOCATION AT SURFACE 2090 FSL 1941 FEL NWSE 21 8.0 S 16.0 E S
Top of Uppermost Producing Zone 2090 FSL 1941 FEL NWSE 21 8.0 S 16.0 E S
At Total Depth 2090 FSL 1941 FEL NWSE 21 8.0 S 16.0 E S
21. COUNTYDUCHESNE
22. DISTANCE TO NEAREST LEASE LINE (Feet)699
23. NUMBER OF ACRES IN DRILLING UNIT40
25. DISTANCE TO NEAREST WELL IN SAME POOL(Applied For Drilling or Completed)
2005
26. PROPOSED DEPTHMD: 6690 TVD: 6690
27. ELEVATION - GROUND LEVEL
5450
28. BOND NUMBER
WYB000493
29. SOURCE OF DRILLING WATER /WATER RIGHTS APPROVAL NUMBER IF APPLICABLE
43-7478
ATTACHMENTS
VERIFY THE FOLLOWING ARE ATTACHED IN ACCORCANCE WITH THE UTAH OIL AND GAS CONSERVATION GENERAL RULES
WELL PLAT OR MAP PREPARED BY LICENSED SURVEYOR OR ENGINEER COMPLETE DRILLING PLAN
AFFIDAVIT OF STATUS OF SURFACE OWNER AGREEMENT (IF FEE SURFACE) FORM 5. IF OPERATOR IS OTHER THAN THE LEASE OWNER
DIRECTIONAL SURVEY PLAN (IF DIRECTIONALLY OR HORIZONTALLY
DRILLED)
TOPOGRAPHICAL MAP
NAME Mandie Crozier TITLE Regulatory Tech PHONE 435 646-4825
SIGNATURE DATE 05/19/2009 EMAIL [email protected]
API NUMBER ASSIGNED
43013500330000
Permit Manager
APPROVAL
FORM 3
AMENDED REPORT
API Well No: 43013500330000 Received: 5/19/2009API Well No: 43013500330000 Received: 5/19/2009
FORM 3STATE OF UTAH
DEPARTMENT OF NATURAL RESOURCES AMENDED REPORTDIVISION OF OIL, GAS AND MINING
APPLICATION FOR PERMIT TO DRILL 1. WELL NAME andFeNdUeMa OR-21-8-16
2. TYPE OF WORK 3. FIELD OR WILDCATDRILL NEW WELLI REENTER P&A WELL DEEPEN WELL I MONUMENT BUTTE
4. TYPE OF WELL 5. UNIT or COMMUNITIZATION AGREEMENT NAMEOil Well Coalbed Methane Well: NO
6. NAME OF OPERATOR 7. OPERATOR PHONENEWFIELD PRODUCTION COMPANY 435 646-4825
8. ADDRESS OF OPERATOR 9. OPERATOR E-MAILRt 3 Box 3630 , Myton, UT, 84052 [email protected]
10. MINERAL LEASE NUMBER 11. MINERAL OWNERSHIP 12. SURFACE OWNERSHIP(FEDERAL, INDIAN, OR A69EO60
FEDERAL I INDIAN I STATE FEE FEDERAL INDIAN STATE I FEEl
13. NAME OF SURFACE OWNER (if box 12 = 'fee') 14. SURFACE OWNER PHONE (if box 12 = 'fee')Henderson Ranches LLC
15. ADDRESS OF SURFACE OWNER (if box 12 = 'fee') 16. SURFACE OWNER E-MAIL (if box 12 = 'fee')Route 3 Box 3671, ,
17. INDIAN ALLOTTEE OR TRIBE NAME 18. INTEND TO COMMINGLE PRODUCTION FROM 19. SLANT
(if box 12 = 'INDIAN')MULTIPLE FORMATIONS
YES (Submit Commingling Application) NO VERTICAL DIRECTIONAL HORIZONTAL I
20. LOCATION OF WELL FOOTAGES QTR-QTR SECTION TOWNSHIP RANGE MERIDIAN
LOCATION AT SURFACE 2090 FSL 1941 FEL NWSE 21 8.0 S 16.0 E S
Top of Uppermost Producing Zone 2090 FSL 1941 FEL NWSE 21 8.0 S 16.0 E S
At Total Depth 2090 FSL 1941 FEL NWSE 21 8.0 S 16.0 E S
21. COUNTY 22. DISTANCE TO NEAREST LEASE LINE (Feet) 23. NUMBER OF ACRES IN DRILLING UNITDUCHESNE 699 40
25. DISTANCE TO NEAREST WELL IN SAME POOL 26. PROPOSED DEPTH(Applied For Drilling or Completed) MD: 6690 TVD: 66902005
27. ELEVATION - GROUND LEVEL 28. BOND NUMBER 29. SOURCE OF DRILLING WATER /WATER RIGHTS APPROVAL NUMBER IF APPLICABLE
5450 WYBOOO493 43-7478
ATTACHMENTS
VERIFY THE FOLLOWING ARE ATTACHED IN ACCORCANCE WITH THE UTAH OIL AND GAS CONSERVATION GENERAL RULES
WELL PLAT OR MAP PREPARED BY LICENSED SURVEYOR OR ENGINEER COMPLETE DRILLING PLAN
AFFIDAVIT OF STATUS OF SURFACE OWNER AGREEMENT (IF FEE SURFACE) FORM 5. IF OPERATOR IS OTHER THAN THE LEASE OWNER
DIRECTIONAL SURVEY PLAN (IF DIRECTIONALLY OR HORIZONTALLY TOPOGRAPHICAL MAP
DRILLED)
NAME Mandie Crozier TITLE Regulatory Tech PHONE 435 646-4825
SIGNATURE DATE 05/19/2009 EMAIL [email protected]
API NUMBER ASSIGNED APPROVAL I
43013500330000
Permit
Proposed Hole, Casing, and Cement
String Hole Size Casing Size Top (MD) Bottom (MD)
Prod 7.875 5.5 0 6690
Pipe Grade Length Weight
Grade J-55 LT&C 6690 15.5
API Well No: 43013500330000 Received: 5/19/2009API Well No: 43013500330000 Received: 5/19/2009
Proposed Hole, Casing, and Cement
String Hole Size Casing Size Top (MD) Bottom (MD)
Prod 7.875 5.5 0 6690
Pipe Grade Length Weight
Grade J-55 LT&C 6690
Proposed Hole, Casing, and Cement
String Hole Size Casing Size Top (MD) Bottom (MD)
Surf 12.25 8.625 0 350
Pipe Grade Length Weight
Grade J-55 ST&C 350 24.0
API Well No: 43013500330000 Received: 5/19/2009API Well No: 43013500330000 Received: 5/19/2009
Proposed Hole, Casing, and Cement
String Hole Size Casing Size Top (MD) Bottom (MD)
Surf 12.25 8.625 0 350
Pipe Grade Length Weight
Grade J-55 ST&C 350
’APIWellNo:43013500330000’CD
T8S,
Ri B
E,S.
L.B
. &M
.N
EN'IE
LDPR
ON
CI'I
ON C
OX
PMyp
AR
a-w
---"
¯NW
ELL
LOC
ATI
ON
,FE
DER
AL
10-2
1--8
-16,
yB57
(Me°
'LO
CA
TED
AS
SHO
WN
INTH
EN
W1/
4SE
OL
800
yda
.-L
8&
MSE
DC
UT
OH
N2N
1EC
OSU
NR
EUTA
H.
LOT
157
4'4
yeas
oO
o2.
96'
(/
oo
o26
3LO
T2
---
---
-
LOT
3LO
T4
BA
RSC
ALE
ifELL
LOC
A71
0W:
FED
ERA
L10
-21-
8-16
iN
otes
:1.
The
foot
ages
are
rnea
sure
dEL
EXU
NG
RA
DED
GR
OU
ND
=54
49.9
;pyp
perp
endi
cula
rto
sect
ion
line.
Bra
ssc«
po
2.Th
ePr
opos
edW
ell
head
bear
s$7
353
'02"
W20
20.0
9'fr
omth
eig
7pEa
st1/
4C
orne
rof
Sect
ion
21.
THIS
ISTO
CER
TIFY
THA
Ag
WA
SPR
EPA
RED
FRO
MFI
ELD
FA
g,V
EYS
MA
DE
BY
ME
OR
UN
WTH
AT
THE
SAM
EA
RE
TRU
AA
iR
REC
TT
HT
OF
MY
KN
OW
LED
GE
AN
gi.N
o.18
9377
gST
AC
YW
.
Isto
isto
ISE
DN
L
scos
s cop
Bra
ssco
par
ms
cap
S39'
47'1
8"W
-
2637
03'
(Mea
s)
SB9
50'5
5"W
-
2609
.77'
(Mea
s.)TR
I STA
TELA
ND
SUR
V EY
ING
&C
ON
SULT
ING
589
50'W
-
79.9
0(G
.L.O
.)18
0N
OR
THV
ERN
AL
AV
E.-
VER
NA
L,U
TAH
8407
8(4
35)
781-
2501
\FED
ERA
L10
-21-
8-16
DA
TESU
RV
EYED
:=
SEC
TIO
NC
OR
NER
SLO
CA
TED
(Sur
face
Loco
tlan)
NA
DB
J01
-20-
09SU
RV
EYED
BY
:D
.G.
LA7/
TUD
E=
40'
0607
01"
DA
TED
RA
WN
:D
RA
WN
BY
:M
.WB
ASI
SO
FEL
EV;
LON
GIT
UD
E-
110°
07'
19.2
9"01
-27-
09U
.S.G
.S.
7-1/
2m
inQ
UA
D(M
YTO
NSE
)"E
Y'
SCA
LE:
1"=
’APIWellNo:43013500330000’'APIWellNo:43013500330000'
NEWFIELD PRODUCTION COMPANYFEDERAL 10-21-8-16
NW/SE SECTION 21, TSS, R16EDUCHESNE COUNTY, UTAH
ONSHORE ORDER NO. 1
DRILLING PROGRAM
1. GEOLOGIC SURFACE FORH4 TION:
Uinta formation of Upper Eocene Age
2. ESTIMATED TOPS OF IMPORTANT GEOLOGIC MARKERS:
Uinta 0' - 1832'Green River 1832'Wasatch 6690'Base of Moderately Saline Ground Water @352'
3. ESTIMATED DEPTHS OF ANTICIPATED WATER, OIL, GAS OR MINERALS:
Green River Formation 1832' - 6690' - Oil
4. PROPOSED CASING PROGRAM
Please refer to the Monument Butte Field Standard Operation Procedure (SOP).
5. MINIMUM SPECIFICATIONS FOR PRESSURE CONTROL:
Please refer to the Monument Butte Field SOP. See Exhibit "C".
6. TYPE AND CHARACTERISTICS OF THE PROPOSED CIRCULATION MUDS:
Please refer to the Monument Butte Field SOP.
7. AUXILIARY SAFETY EQUIPMENT TO BE USED:
Please refer to the Monument Butte Field SOP.
8. TESTING, LOGGING AND CORING PROGRAMS:
Please refer to the Monument Butte Field SOP.
9. ANTICIPATED ABNORH4L PRESSURE OR TEMPERATURE:
The anticipated maximum bottom hole pressure is 1800 psi. It is not anticipated that abnormaltemperatures will be encountered.
10. ANTICIPATED STARTING DATE AND DURATION OF THE OPERATIONS:
Please refer to the Monument Butte Field
’APIWellNo:43013500330000’'APIWellNo:43013500330000' 2-M SYSTEMBlowout Prevention Equipment Systems
s
EXHIBIT
’APIWellNo:43013500330000’'APIWellNo:43013500330000'
Brklgelatud
enIr
I
LLE
04mL) •\
0.3 mL )
See Topo ''8"0.5 mL ) Proposed Location
Federal10-21
L . 1 A
C
LegendExisting Road
..dra'Seryg Proposed Access\ (436) 781-2501180 Nords Vernal Ave. Vamal, Ulah ß4078Federal 10-21-8-16
, ... . - - -- -
SEC.21,TSS, Ri6E, S.L.B.&M. -...- "- "A"& $
’APIWellNo:43013500330000’'APIWellNo:43013500330000'
.-
I † ||l-|9ñr
0.5 mi.] *910'Proposed Location
Federal 10-21
e. I
I
Legendgas Existing Road
Adf y fx - Proposed Access(435)781-2501
180 North Wrnd Ave Vornal, Ulah 84078
Federal 10-21-8-16. ·•• - -
SEC. 21, TBS, R16E, S.L.B.&M. - 3 " 'g'•t i .
’APIWellNo:43013500330000’'APIWellNo:43013500330000'
Tle in at ExistingGas PipelineI
Tle in at Existing910 Waterline
±910'Proposed Location
Federal 10-21
|
Legend -
.. Roads- Proposed Gas Urte
--m==-I Proposed Water Line(435) 781-2501180 Nor Va alAve. Vernal Lheb 84078
Federal 10-21-8-16.
- .. - - -
SEC.21,T8S, R16E, S.L.B.&M. "- - " "g"E I
’APIWellNo:43013500330000’
Loca
tion
-
Surf
ace
Spud
9to
1011
7a
elo
11Il
Dril
ling
Wai
ting
onC
ompl
etio
nPr
oduc
ing
Oil
Wel
l-
Prod
ucin
gG
asW
ell
1716
a17
1&1;
lala
la17
141
laim
Wat
erin
ject
ion
Wel
-D
ryH
ole
Tem
pora
rily
Aba
ndon
ed-
Plug
ged
8A
band
oned
3Dat
ya
9,4
,la
A34
in40
-1n
sa/
Shut
in
,ß.
AA
93.
,_A
/W
ater
Sour
ceW
ell
Wte
rDis
posa
lW
ell
zitu
assa |
NEW
FIEL
D
RO
CK
YM
OU
NTA
INS
-_
Exhi
bitA
Due
box
&U
muh
Cou
nue
}12
76
127
1017
12
Iit
Iis
ni
to--
’APIWellNo:43013500330000’'APIWellNo:43013500330000'
g g[9 I 19 8 19 * JU A JO JO my ' JL o ' JO Al 50 * f
, 10 .LI 21
11 10 11 10 ru lo 9 10 20 9 10 1/ ld l a
MI e 29 I
T 76561 TV 748• I
e 11 ; ¿ e ro
I wkevero i ro 20 ao
, .. Proposed Locat >> a oI'TlL773 9 Federal10-21
ro I Jo 14 y , 11 4 11 I IJ 16
9 1 TI 77339 I
L g are 29 18 41 274 11 d; gr
l'ravis *nåte e e a e eI; ;9 I) ;9 9 9 59 IT1|I Il 28 9 B IJ 17 ¡¡ J
SL-07 t S72A· 11, - 26026.O O A 2. e e
tah JEWells I)gaw I Ig 'nit Monurne ie ese'egi 4 37 ) 5) J 91 1 21 ) 15 4 14 i b-0 2 to
M I,-21836 * 6 " "
Legend
LocationAgw4'Ser Ñrt O One-Mile Radius
\ (436) 781-2501r 180 Norill Vemal Ave Vomal. IJtub 84078
Federal 10-21-8-16 '. ...
SEC. 21, TSS, R16E, S.L.B.&M.
’APIWellNo:43013500330000’'APIWellNo:43013500330000'
NEWFIELD PRODUCTION COMPANYFEDERAL 10-21-8-16
Section 21, TBS, Ri6E, S.L.B.&M.
PROPOSED ACCESS /ROAD (Max. 6% Grade)
STA. 3+00
PIT ÖPSo/L ..
srocx tr .
/ S/opeSTA. 2+30
Top off swm Around rig - Cut Slope
120' •29
STA. 1+70
C/2. 7LARE
14ELL HEAD: Fir
UNGRAOED = 5449.9' N_oteEIN GRADE = 5448.0' E/ore pit /s to
· be /ocated aminimum of 80'EXCESS from well head.
STA 0+00 •
: srocxP/LE REFERENCE POINTS220' WESTERLY - 5451.2'270' WESTERLY - 5451.9'170' NORTHERLY - 5446.1'220' NORTHERLY - 5445.3'
SURVEYED BY: D.G, DATE SURVEYED: 01-20-09 i State 6""""'-2DRAWN BY: M.W. DATE DRAWN: 01-27-09 La,nd Surveying, Inc.SCALE: 1" = 50' REVISED: \ 180 NORTH VERNAL AVE. VERNAL, UTAH
’APIWellNo:43013500330000’'APIWellNo:43013500330000'
NEWFIELD PRODUCTION COMPANYCROSS SECTIONS
FEDERAL 10-21- 8-16
50' S M. 3+ 00
so' SM. 2+JO
EX/977NGF/N/SHED GRADEGRADE
-
WELL HEAD
so SM. 1+70
Y - so' SM. 0+00 ESTIMATEDEARTHWORKQUANTITIES(No Shrink or swell adjustments have been used)
(Expressed in Cubic Yards)ITEM CUT FILL 6" TOPSOIL EXCESS
NOTE: PAD 1,780 1,780 ToPsoil is OUNLESS OTHERWISE not includedNOTED ALL CUT/FILL PIT 640 0 in Pad cut 640SLOPES ARE AT 1.5:1 TOTALS 2,420 1,780 990 640
SURVEYED BY: D.G. DATE SURVEYED: 01-20-09 ri State """"'¯26 'DRAWN BY: M.W. DATE DRAWN: 01-27-09 Land Surveying, Inc.SCALE: 1" = 50' REVISED: s 180 NORTH VERNAL AVE. VERNAL, UTAH
’APIWellNo:43013500330000’'APIWellNo:43013500330000'
NEWFIELD PRODUCTION COMPANYTYPICAL RIG LAYOUT
FEDERAL 10-21-8-16
PROPOSED ACCESSROAD (Mox 6% Grade)
Emergency fuelSTORAGE shut downTANK r- ¯¯·-
---¯¯--i---
i -> o ,
RES VEP/T
¯- 120' --- 29 - (8' D'*PA-
îllikPIPE RACKS
¯EpiRE
PIPE RACKS ec.
I
SURVEYED BY: D.G. DATE SURVEYED: 01-20-09(4]S) 7ôl-2501
DRAWN BY: M.W. DATE DRAWN: 01-27-09 Land Surveying, Inc.SCALE: 1" = 50' REV\SED: > 180 NORTH VERNAL AVE. VERNAL, UTAH
’APIWellNo:43013500330000’'APIWellNo:43013500330000'
NEWFIELD PRODUCTION COMPANYFEDERAL 10-21-8-16
NWISE SECTION 21, T8S, R16EDUCHESNE COUNTY, UTAH
ONSHORE ORDER NO. 1
MULTI-POINT SURFACE USE & OPERATIONS PLAN
1. EXISTING ROADS
See attached Topographic Map "A"
To reach Newfield Production Company well location site Federal 10-21-8-16 located in the NW1/4 SE 1/4 Section 21, T8S, Rl6E, Duchesne County, Utah:
Proceed southwesterly out of Myton, Utah along Highway 40 - 1.4 miles ± to the junctionof thishighway and UT State Hwy 53; proceed southwesterly - 6.6 miles ± to it's junctionwith anexisting road to the east; proceed in an easterly direction - 0.5 miles ± to it's junctionwith anexisting road to the northeast; proceed northeasterly - 0.4 miles ± to ti's junctionwith an existingroad to the southeast; proceed southeasterly - 0.3 miles ± to it's junctionwith the beginning of theproposed access road; continue in a westerly direction along the proposed access road -910' ±tothe proposed well location.
2. PLANNED ACCESS ROAD
See Topographic Map "B" for the location of the proposed access road.
3. LOCATION OF EXISTING WELLS
Refer to Exhibit "B".
4. LOCATION OF EXISTING AND/OR PROPOSED FACILITIES
All permanent surface equipment will be painted Carlsbad Canyon.Please refer to the Monument Butte Field Standard Operating Procedure (SOP).
5. LOCATION AND TYPE OF WATER SUPPLY
Newfield Production will transport water by truck for drilling purposes from the following watersources:
Johnson Water DistrictWater Right : 43-7478
Neil Moon PondWater Right: 43-11787
Maurice Harvey PondWater Right: 47-1358
Newfield Collector WellWater Right: 41-3530 (A30414DV, contracted with the Duchesne County Conservancy District).
Please refer to the Monument Butte Field SOP. See Exhibit
’APIWellNo:43013500330000’'APIWellNo:43013500330000'
6. SOURCE OF CONSTRUCTIONMATERL4LS
Please refer to the Monument Butte Field SOP.
7. METHODS FOR HANDLING WASTE DISPOSAL
Please refer to the Monument Butte Field SOP.
8. ANCILLARY FACILITIES
Please refer to the Monument Butte Field SOP.
9. WELL SITE LAYOUT
See attached Location Layout Diagram.
10. PLANS FOR RESTORATION OF SURFACE
Please refer to the Monument Butte Field SOP.
11. SURFACE OWNERSHIP - Bureau Of Land Management (Proposed location and access roads
leading to).
12. OTHER ADDITIONAL INFORMATION
The Archaeological Resource Survey and Paleontological Resource Survey for this area are
attached. MOAC Report #08-295, 2/5/09. Paleontological Resource Survey prepared by, WadeE. Miller, 5/1/08. See attached report cover pages, Exhibit "D".
Newfield Production Company requests 910' of disturbed area be granted in Lease UTU-69060 toallow for construction of the planned access road. Refer to Topographic Map "B". Apermanent width of 30' and a running surface of 18' is proposed for the planned access road. Theconstruction phase of the planned access road will last approximately (5) days. The plannedaccess road will be an 18' crown road (9' either side of the centerline) with drainage ditches alongeither side of the proposed road whether it is deemed necessary in order to handle any run-off fromnormal meteorological conditions that are prevalent to this area. The maximum grade will be lessthan 8%. There will be no culverts required along this access road. There will be barrow ditchesand turnouts as needed along this road. There are no fences encountered along this proposed road.There will be no new gates or cattle guards required. All construction material for this access roadwill be borrowed material accumulated during construction of the access road.
Newfield Production Company requests 910' of disturbed area be granted in Lease UTU-69060 toallow for construction of the proposed surface gas lines. It is proposed that the disturbed area willtemporarily be 50' wide to allow for construction of a 10" or smaller gas gathering line, and a 3"poly fuel gas line, with a permanent width of 30' upon completion of the proposed gas lines. Theconstruction phase of the proposed gas lines will last approximately (5) days. Both lines will tie into the existing pipeline infrastructure. Refer to Topographic Map "C." For a ROW plan ofdevelopment, please refer to the Monument Butte Field SOP.
Newfield Production Company requests 910' of disturbed area be granted in Lease UTU-69060 toallow for construction of the proposed water lines. It is proposed that the disturbed area willtemporarily be 50' wide to allow for construction of a buried 3" steel water injection line and aburied 3" poly water return line, with a permanent width of 30' upon completion of the proposedwater return line. The construction phase of the proposed water lines will last approximately (5)days. Refer to Topographic Map "C." For a ROW plan of development, please refer to theMonument Butte Field SOP. In the event that the proposed well is converted to a water injectionwell, a separate injection permit will be applied for through the proper agencies.
’APIWellNo:43013500330000’'APIWellNo:43013500330000'
Water DisposalImmediately upon first production, all produced water will be confined to a steel storage tank. Ifthe production water meets quality guidelines, it is transported to the Ashley, Monument Butte,Jonah, and Beluga water injection facilities by company or contract trucks. Subsequently, theproduced water is injected into approved Class II wells to enhance Newfield's secondary recoveryproject.
Water not meeting quality criteria, is disposed at Newfield's Pariette #4 disposal well (Sec. 7, T9SRl9E), State of Utah approved surface disposal facilities, or Federally approved surface disposalfacilities.
Threatened, Endangered, And Other Sensitive SpeciesMountain Plover: If new construction or surface disturbing activities are scheduled to occurbetween May 15 and June 15, detailed surveys of the area within 0.5 mile of the proposed locationand within 300 feet of proposed access routes must be conducted to detect the presence of mountainplovers. All surveys must be conducted in accordance with the survey protocols outlined in the mostrecent USFWS Survey Protocol. Surveys must be completed prior to initiating new construction orsurface disturbing activities. No new construction or surface disturbing activities will be allowedbetween May 15 and June 15 within a 0.5 mile radius of any documentedmountain plover nest site.
Burrowing Owl: Due to the proximity of the location to active prairie dog towns, there is thepotential to encounter nesting burrowing owls betweenApril 1 and August 15. If new construction orsurface disturbing activities are scheduled between April 1 and August 15, pre-construction surveyswill be conducted to detect the presence of nesting burrowing owls within 0.5 mile of any newconstruction or surface disturbing activity (see Vernal BLM Field Office Protocol). No newconstruction or surface disturbing activities will be allowed between April 1 and August 15 within a0.5 mile radius of any active burrowing owl nest.
Reserve Pit LinerA 16 mil liner with felt is required. Please refer to the Monument Butte Field SOP.
Location and Reserve Pit ReclamationPlease refer to the Monument Butte Field SOP.
The following seed mixture will be used on the topsoil stockpile, to the recontoured surface of thereserve pit, and for fmal reclamation: (All poundages are in pure live seed)
Squirrell Tail Elymus Elymoides 6 lbs/acreSiberian Wheatgrass Agropyron Fragile 2 lbs/acreGardner Saltbush Atriplex Gardneri I lbs/acreShadscale Atriplex Confertifolia 1 lbs/acreFourwing Saltbush Atriplex Canescens ] lbs/acreScarlet Globemallow Sphaeralcea Conccinea 0.20 lbs/acreForage Kochia Kochia Prostrata 0.20 lbs/acre
Details of the On-Site InspectionThe proposed Federal 10-21-8-16 was on-sited on 3/12/09. The following were present; TimEaton (Newfield Production ), Brian Foote (Newfield Production ), Christine Cimiluca (Bureau ofLand Management), and James Herford (Bureau of Land Management). Weather conditions wereclear and ground cover was 100% open.
LESSEE'S OR OPERATORS REPRESENTATIVE AND CERTIFICATION
Representative
Name: Dave Allred
’APIWellNo:43013500330000’'APIWellNo:43013500330000'
Address: Route #3 Box 3630Myton, UT 84052
Telephone: (435) 646-3721
Certification
Please be advised that NEWFIELD PRODUCTION COMPANY is considered to be theoperator of well #10-21-8-16 NW/SE Section 21, Township 8S, Range 16E: Lease UTU-69060Duchesne County, Utah: and is responsible under the terms and conditions of the lease for theoperations conducted upon the leased lands. Bond coverage is provided by, Federal Bond#WYBOOO493.
I hereby certify that the proposed drill site and access route have been inspected, and Iam familiar with the conditions which currently exist; that the statements made in this plan are trueand correct to the best of my knowledge; and that the work associated with the operationsproposed here will be performed by Newfield Production Company and its contractors andsubcontractors in conformity with this plan and the terms and conditions under which it isapproved. This statement is subject to the provisions of 18 U.S.C. 1001 for the filing of a falsestatement.
Date Mandie CrozierRegulatory SpecialistNewfield Production Company
’APIWellNo:43013500330000’'APIWellNo:43013500330000'
Newfield Production CompanyProposed Site Facility Diagram
Federal 10-21-8-16
NW/SE Sec. 21, T8S, R16E
Duchesne County, Utah
UTU-69060
Wen Head 55 Gallons.
Methonol
Puniping Unit 150 Gallons LegendChemical Drums
Emulsion Line ······
Load Rack -----------
55 GallonsWater Line --· -· --· --· ---
MotorOil licater GasSales -- --· --··--··
Treater Oil Line
Gas Sales Meter.
I
Water Tank 6 - · -- ' -
200 bbl I Production Phase:I 1) Valves 1, 3, and 4 sealed closedI
2) Valves 2, 5, and 6 sealed open
I2
Sales Phase:4 Production Tank 3 - - 4 - - - - - - - - _ _
Load Rack
1) Valves 1, 2, 4, 5, and 6 sealed closed400 bbl 1 --. I
I | 2) Valve 3 openI
5Draining Phase:
2 1) Valves 1 and 6 open
Production Tank4
400bbl3 --U
l -·JDiked
’APIWellNo:43013500330000’'APIWellNo:43013500330000'
CULTURAL RESOURCE INVENTORY OF o ONEWFIELD EXPLORATION'S THREE BLOCK PARCELS
(T8S, R16E, SECTIONS 21, 22 AND 23)DUCHESNECOUNTY,UTAH
By:
Nicole Shelnut
Prepared For:
Bureau of Land ManagementVernal Field Office
Prepared Under Contract With:
Newfield Exploration CompanyRt. 3 Box 3630
Myton, UT 84052
Prepared By:
Montgomery Archaeological Consultants, Inc.P.O. Box 219
Moab, Utah 84532
MOAC Report No. 08-295
February 5, 2009
United States Department of Interior (FLPMA)Permit No. 08-UT-60122
State of Utah Antiquities Project (Survey)Permit No.
’APIWellNo:43013500330000’' PIWellNo:43013500330000'
NEWFIELD EXPLORATION COMPANY
li
PALEONTOLOGICAL SURVEY OF PROPOSEDPRODUCTION DEVELOPMENT AREAS,
DUCHESNE & DINTAB COUNTIES, UTAH
I Section 21, T 8 S, R 16 E [Entire section excluding NE/NW (3-21) & NW/NW(4-21)];
i Section 20, T 8 S, R 16 E [SW/NE (7-20), SE/NE (8-20), NE/SE (9-20), NW/SE (10-20),NE/SW (11-20), NW/SW (12-20), SW/SW (13-20), SE/SW (14-20), & SW/SE (15-20);
SE/SE, Section 32, T 8 S, R 18 E (16-32-8-18), NE/NE, Section 36, T 8 S, R 17 E (1-36-8-17),
i NE/NW & SW/NW, Section 18, T 9 S, R 19 E (3 & 5-18-9-19), and Proposed Water InjectionLine at SE/SW, Section 1, T 9 S, R 15 E (14-1-9-15).
IREPORT OF SURVEY
Prepared for:
Newfield Exploration Company
Prepared by:
I Wade E. MillerConsulting PaleontologistApril 30 & May 1, 2008
I
ª
ª
·
ª
·
ª
N
'N N
N
ª
¸ªN
N
¸
N
NN
'
ª
'
'
''
''
'
'
'
'
H
H
H
G
G
G
G
G
G
G
G
G
GG
G
G
G
GG
M O N U M E N T B U T T E F I E L DM O N U M E N T B U T T E F I E L D
P L E A S A N T V A L L E Y F I E L DP L E A S A N T V A L L E Y F I E L D
H A W K E Y E ( G R ) U N I TH A W K E Y E ( G R ) U N I T
T R A V I S U N I TT R A V I S U N I T
F E N C E L I N E U N I TF E N C E L I N E U N I T
22
21
272829
29
20
20 21 22
28
30
19
15
23
14
26
27
4301316208JENSEN 1
4301310387FEDERAL 1
4301330705FEDERAL 3-28
4301350008Moon 1-20-4-2
4301350007Moon 3-20-4-2
4301350006Moon 1-29-4-2
4301350005Moon 3-29-4-2
4301350004Moon 4-29-4-2
4301350003Moon 2-29-4-2
4301350002Moon 4-20-4-2
4301350001Moon 2-20-4-2
4301316207LAMBERT FED 1
4301330394PLEASANT VLY 1
4301310007(2) JENSEN A-1
4301331941TRAVIS FED 9-28
4301350032Federal 8-21-8-16
4301350031Federal 6-21-8-16
4301350030Federal 2-21-8-16
4301350025Federal 1-21-8-16
4301334178FEDERAL 2-29-8-16
4301334177FEDERAL 3-29-8-16
4301334174FEDERAL 6-29-8-16
4301334000FEDERAL 5-21-8-16
4301333997FEDERAL 7-20-8-16
4301333995FEDERAL 8-20-8-16
4301332334TRAVIS 12-28-8-16
4301332333TRAVIS 11-28-8-16
4301350034Federal 11-21-8-16
4301350033Federal 10-21-8-16
4301350029Federal 14-21-8-16
4301350028Federal 15-21-8-16
4301334173FEDERAL 11-29-8-16
4301333999FEDERAL 12-21-8-16
4301333998FEDERAL 13-21-8-16
4301333996FEDERAL 10-20-8-16
4301333994FEDERAL 11-20-8-16
4301333991FEDERAL 14-20-8-16
4301333990FEDERAL 15-20-8-16
4301332474FEDERAL 16-20-8-16
4301334241UTE TRIBAL 9-19-4-2
4301334211UTE TRIBAL 1-30-4-2
4301333634UTE TRIBAL 8-30-4-2
4301332123UTE TRIBAL 8-30-4-2
4301330856WEST MONUMENT 10-28
4301334036UTE TRIBAL 14-21-4-2
4301334035UTE TRIBAL 15-21-4-2
4301334034UTE TRIBAL 16-21-4-2
4301333946UTE TRIBAL 16-19-4-2
4301333890UTE TRIBAL 14-22-4-2
4301333636UTE TRIBAL 13-22-4-2
4301331904N MON BUTTE FED 9-27
4301331062W MONUMENT FED 11-28
4301330771WELLS DRAW FED 27-42
4301330865W MONUMENT BUTTE 9-28
4301330996PLEASANT VLY FED 12-27
4301331919MONUMENT BUTTE FED 12-27
4301331903N MONUMENT BUTTE FED 8-27
4301331905N MONUMENT BUTTE FED 10-27
Map Produced by Diana MasonMap Prepared:
Well Name: Federal 10-21-8-16API Number: 4301350033
Township 08.0 S Section 21Range 16.0 EMeridian: SLBM
F1,500 0 1,500750 Feet
1:15,543
UnitsSTATUS
ACTIVE
EXPLORATORY
GAS STORAGE
NF PP OIL
NF SECONDARY
PI OIL
PP GAS
PP GEOTHERML
PP OIL
SECONDARY
TERMINATED
FieldsSTATUS
ACTIVE
COMBINED
Sections
Wells Query Events
D <all other values>
GIS_STAT_TYPE
" <Null>
APD
H DRL
4 GI
!* GS
N LA
G NEW
7 OPS
ª PA
* PGW
' POW
O RET
¸ SGW
· SOW
6 TA
" TW
¸ WD
¸ WI
=* WS
Tooele
Millard
Iron
San Juan
Kane
Juab
Uintah
Box Elder
Emery
Garfield
Grand
Utah
Beaver Wayne
Duchesne
Sevier
Summit
Rich
Washington
Carbon
Sanpete
Cache
Piute
Davis
Wasatch
Weber
DaggettSalt Lake
Morgan
Location Map
Operator: NEWFIELD PRODUCTION COMPANY
’APIW
ellNo:43013500330000’
+M430n 520000472 M430n1 20000422 API Number: 4301350033UTE43RO13A3L4 119-4- Well Name: Federal 10-21-8-16
Township 08.0 S Range 16.0 E Section 21M430n1 20000482
430135
00143013 4 36 4301334035 4 0 333636 Meridian: SLBM
Moon2-20-4-2 UTETRIBAL14-21-4-2 UTETRIBAL15-21-42 UTETRIBAL13-3 43323890 Operator: NEWFIELD PRODUCTION COMPANY
UTET4 316
9-4- UTET4 106
1-4- UTE TRIBAL 14-22-4-2
Map Prepared:27 Map Produced by Diana Mason
4301334211 4301350004 14UTE TR BAL 1-30-4-M430n1 20900452
Moon 4-29-4-2 28 15
29 4301350030 NFsscoNo
Federal224136 Piol'
4301350006 43 1350025PPGAs
30 4301 2123 Moon1-29-4-2 4301350003 Federal1-21-8-1 FENCEL I NEUN IT43
36ETRIB L 8-30-4-2 Moon 2-29-4-2
c NoARY w
UTETRIBAL8-30-4-4301350032
TERMiNATeo . OP
4301316208Fedeml 8-21-8-1
4301333995 4301334000 JENSEN 1 AcTive
FEDERAL 8-20-8-16 FEDERALS-21-8-16
4301350031
coM so
4301333997 , Federal 6-21-8-16 3 sawFEDERAL 7-20-8-16 + 14
4301333999Fed4e3r -0201
8-1621Fed4e
I050201
-16 4301310007 PLE A S A NT VA LLEY F I ELDFED RL
1392048-16 FEDERAL 12-21-8-16 + (2) JENSEN A-
4301333996FEDERAL 10-20-8-16
20
4301333998 43013303944301333990 FEDERAL13-21-8-16 4301350029 4301350028 PLEASANTVLY 4301316207
4301333991 FEDERAL15-20-8-16 Federal14-21-8-16 Federal15-21-8-16 LAMBERTFED 1BoxElder
cache Location MapFEDERAL 14-20-8-16
WeberRich
4301332474 vis Aor i
FEDERAL 16-20-8-16 summi Daalt Lak
Taœ\e
MONUMENT BUTTE F I ELD SatC DuchesnUintah
4301334177 4301334178 4301310387FEDERAL 3-29-8-16 FEDERAL 2-29-8-16 þDERAL 1 Juab
4301330705 Carbon
FEDERAL 3-28
H A WKEYE ( GR ) UN IT
rdSan te
Emery Grand
FED4E36 2 - 6
284WEL3LS
OORD 2
Beaver Piute
n JuanN MONUMENT BUTTE FED 8-27
Washington Kane *
TRAVIS UNIT4101330865 4301331905 4301331904
FEDROA1L3 2938-16 4301332334 4301332333 WMONU v1ENT BUTTg9-28 N MONUMENT BUTTE FED 10-27N MON BUTTE FED 9-27 :As
TRAVIS 12-28-8-16 XTRAVIS 11-28-8-16 4301330996X 4301331062 X 4301331941 PLEASANT VLY FED 12/27
WMONUMENT FED 11-28 TRAVIS FED 9-28 43013319194301330856 XMONUMENT BUTTE FED 12-27
1 soo 750 a 1.500 FeetWEST MONUMENT 10-28
i
WORKSHEETAPPLICATION FOR PERMIT TO DRILL
APD RECEIVED: 5/19/2009 API NO. ASSIGNED: 43013500330000
WELL NAME: Federal 10-21-8-16
OPERATOR: NEWFIELD PRODUCTION COMPANY (N2695) PHONE NUMBER: 435 646-4825
CONTACT: Mandie Crozier
PROPOSED LOCATION: NWSE 21 080S 160E Permit Tech Review:
SURFACE: 2090 FSL 1941 FEL Engineering Review:
BOTTOM: 2090 FSL 1941 FEL Geology Review:
COUNTY: DUCHESNE
LATITUDE: 40.10196 LONGITUDE: -110.12101
UTM SURF EASTINGS: 574921.00 NORTHINGS: 4439234.00
FIELD NAME: MONUMENT BUTTE
LEASE TYPE: 1 - Federal
LEASE NUMBER: UTU-69060 PROPOSED PRODUCING FORMATION(S): GREEN RIVER
SURFACE OWNER: 1 - Federal COALBED METHANE: NO
RECEIVED AND/OR REVIEWED: LOCATION AND SITING:
PLAT R649-2-3.
Bond: FEDERAL - WYB000493 Unit:
Potash R649-3-2. General
Oil Shale 190-5
Oil Shale 190-3 R649-3-3. Exception
Oil Shale 190-13 Drilling Unit
Water Permit: 43-7478 Board Cause No: R649-3-2
RDCC Review: Effective Date:
Fee Surface Agreement Siting:
Intent to Commingle R649-3-11. Directional Drill
Commingling Approved
Comments: Presite Completed
Stipulations: 4 - Federal Approval - dmason 23 - Spacing - dmason
WORKSHEETAPPLICATION FOR PERMIT TO DRILL
I
I
APD RECEIVED: 5/19/2009 API NO. ASSIGNED: 43013500330000
WELL NAME: Federal 10-21-8-16
OPERATOR: NEWFIELD PRODUCTION COMPANY (N2695) PHONE NUMBER: 435 646-4825
CONTACT: Mandie Crozier
PROPOSED LOCATION: NWSE 21 0805 160E Permit Tech Review:
SURFACE: 2090 FSL 1941 FEL Engineering Review:
BOTTOM: 2090 FSL 1941 FEL Geology Review:
COUNTY: DUCHESNE
LATITUDE: 40.10196 LONGITUDE: -110.12101
UTM SURF EASTINGS: 574921.00 NORTHINGS: 4439234.00
FIELD NAME: MONUMENT BUTTE
LEASE TYPE: 1 - Federal
LEASE NUMBER: UTU-69060 PROPOSED PRODUCING FORMATION(S): GREEN RIVER
SURFACE OWNER: 1 - Federal COALBED METHANE: NO
I
RECEIVED AND/OR REVIEWED: LOCATION AND SITING:
PLAT R649-2-3.
Bond: FEDERAL - WYBOOO493 Unit:
Potash R649-3-2. General
Oil Shale 190-5
Oil Shale 190-3 R649-3-3. Exception
Oil Shale 190-13 Drilling Unit
Water Permit: 43-7478 Board Cause No: R649-3-2
RDCC Review: Effective Date:
Fee Surface Agreement Siting:
Intent to Commingle R649-3-11. Directional Drill
Commingling Approved
I
Comments: Presite Completed
Stipulations: 4 - Federal Approval - dmason23 - Spacing -
Permit To Drill
******************Well Name: Federal 10-21-8-16
API Well Number: 43013500330000
Lease Number: UTU-69060
Surface Owner: FEDERAL
Approval Date: 6/9/2009
Issued to:NEWFIELD PRODUCTION COMPANY , Rt 3 Box 3630 , Myton, UT 84052
Authority:Pursuant to Utah Code Ann. §40-6-1 et seq., and Utah Administrative Code R649-3-1 et seq., theUtah Division of Oil, Gas and Mining issues conditions of approval, and permit to drill the listedwell. This permit is issued in accordance with the requirements of R649-3-2. The expected producingformation or pool is the GREEN RIVER Formation(s), completion into any other zones will requirefiling a Sundry Notice (Form 9). Completion and commingling of more than one pool will requireapproval in accordance with R649-3-22.
Duration:This approval shall expire one year from the above date unless substantial and continuous operationis underway, or a request for extension is made prior to the expiration date
General:Compliance with the requirements of Utah Admin. R. 649-1 et seq., the Oil and Gas ConservationGeneral Rules, and the applicable terms and provisions of the approved Application for permit to drill.
Conditions of Approval:State approval of this well does not supercede the required federal approval, which must be obtainedprior to drilling.
This proposed well is located in an area for which drilling units (well spacing patterns) have not beenestablished through an order of the Board of Oil, Gas and Mining (the “Board”). In order to avoid thepossibility of waste or injury to correlative rights, the operator is requested, once the well has beendrilled, completed, and has produced, to analyze geological and engineering data generatedtherefrom, as well as any similar data from surrounding areas if available. As soon as is practicableafter completion of its analysis, and if the analysis suggests an area larger than the quarter-quartersection upon which the well is located is being drained, the operator is requested to seek anappropriate order from the Board establishing drilling and spacing units in conformance with suchanalysis by filing a Request for Agency Action with the Board.
Notification Requirements:
API Well No: 43013500330000API Well No: 43013500330000
State of UtahDEPARTMENT OF NATURAL RESOURCES
MICHAEL R. STYLER
JON M. HUNTSMAN, JR.Excutiw Drotor
sowror Division of Oil, Gas and MiningGARY R. HERRERT JOHN R. BAZALieuterant Gowrver D sion Director
Permit To Drillkkkkkkkkkkkkkkkkkk
Well Name: Federal 10-21-8-16API Well Number: 43013500330000
Lease Number: UTU-69060Surface Owner: FEDERALApproval Date: 6/9/2009
Issued to:NEWFIELD PRODUCTION COMPANY , Rt 3 Box 3630 , Myton, UT 84052
Authority:Pursuant to Utah Code Ann. §40-6-1et seq., and Utah Administrative Code R649-3-1 et seq., theUtah Division of Oil, Gas and Mining issues conditions of approval, and permit to drill the listedwell. This permit is issued in accordance with the requirements of R649-3-2. The expected producingformation or pool is the GREEN RIVER Formation(s), completion into any other zones will requirefiling a Sundry Notice (Form 9). Completion and commingling of more than one pool will requireapproval in accordance with R649-3-22.
Duration:This approval shall expire one year from the above date unless substantial and continuous operationis underway, or a request for extension is made prior to the expiration date
General:Compliance with the requirements of Utah Admin. R. 649-1 et seq., the Oil and Gas ConservationGeneral Rules, and the applicable terms and provisions of the approved Application for permit to drill.
Conditions of Approval:State approval of this well does not supercede the required federal approval, which must be obtainedprior to drilling.
This proposed well is located in an area for which drilling units (well spacing patterns) have not beenestablished through an order of the Board of Oil, Gas and Mining (the "Board"). In order to avoid thepossibility of waste or injury to correlative rights, the operator is requested, once the well has beendrilled, completed, and has produced, to analyze geological and engineering data generatedtherefrom, as well as any similar data from surrounding areas if available. As soon as is practicableafter completion of its analysis, and if the analysis suggests an area larger than the quarter-quartersection upon which the well is located is being drained, the operator is requested to seek anappropriate order from the Board establishing drilling and spacing units in conformance with suchanalysis by filing a Request for Agency Action with the
Notification Requirements:Notify the Division with 24 hours of spudding the well. • Contact Carol Daniels at (801) 538-5284.
Notify the Division prior to commencing operations to plug and abandon the well. • Contact Dustin Doucet at (801) 538-5281 office (801) 733-0983 home
Reporting Requirements:All required reports, forms and submittals will be promptly filed with the Division, including but notlimited to the Entity Action Form (Form 6), Report of Water Encountered During Drilling (Form 7),Weekly Progress Reports for drilling and completion operations, and Sundry Notices and Reports onWells requesting approval of change of plans or other operational actions.
Approved By:
For Gil HuntAssociate Director, Oil & Gas
API Well No: 43013500330000API Well No: 43013500330000
Notification Requirements:Notify the Division with 24 hours of spudding the well.
• Contact Carol Daniels at (801) 538-5284.
Notify the Division prior to commencing operations to plug and abandon the well.• Contact Dustin Doucet at (801) 538-5281 office (801) 733-0983 home
Reporting Requirements:All required reports, forms and submittals will be promptly filed with the Division, including but notlimited to the Entity Action Form (Form 6), Report of Water Encountered During Drilling (Form 7),Weekly Progress Reports for drilling and completion operations, and Sundry Notices and Reports onWells requesting approval of change of plans or other operational actions.
Approved By:
For Gil HuntAssociate Director, Oil &
API Well No: 43013500330000
STATE OF UTAHDEPARTMENT OF NATURAL RESOURCES
DIVISION OF OIL, GAS, AND MINING
FORM 9
5.LEASE DESIGNATION AND SERIAL NUMBER: UTU-69060
SUNDRY NOTICES AND REPORTS ON WELLSDo not use this form for proposals to drill new wells, significantly deepen existing wells below currentbottom-hole depth, reenter plugged wells, or to drill horizontal laterals. Use APPLICATION FOR PERMIT TODRILL form for such proposals.
6. IF INDIAN, ALLOTTEE OR TRIBE NAME:
7.UNIT or CA AGREEMENT NAME: GMBU (GRRV)
1. TYPE OF WELL Oil Well
8. WELL NAME and NUMBER: Federal 10-21-8-16
2. NAME OF OPERATOR: NEWFIELD PRODUCTION COMPANY
9. API NUMBER: 43013500330000
3. ADDRESS OF OPERATOR: Rt 3 Box 3630 , Myton, UT, 84052
9. FIELD and POOL or WILDCAT: MONUMENT BUTTE
4. LOCATION OF WELL FOOTAGES AT SURFACE: 2090 FSL 1941 FEL QTR/QTR, SECTION, TOWNSHIP, RANGE, MERIDIAN: Qtr/Qtr: NWSE Section: 21 Township: 08.0S Range: 16.0E Meridian: S
COUNTY: DUCHESNE
STATE: UTAH
11.
CHECK APPROPRIATE BOXES TO INDICATE NATURE OF NOTICE, REPORT, OR OTHER DATA
TYPE OF SUBMISSION TYPE OF ACTION
NOTICE OF INTENTApproximate date work will start:
6/1/2010
SUBSEQUENT REPORTDate of Work Completion:
SPUD REPORTDate of Spud:
DRILLING REPORTReport Date:
ACIDIZE ALTER CASING CASING REPAIR
CHANGE TO PREVIOUS PLANS CHANGE TUBING CHANGE WELL NAME
CHANGE WELL STATUS COMMINGLE PRODUCING FORMATIONS CONVERT WELL TYPE
DEEPEN FRACTURE TREAT NEW CONSTRUCTION
OPERATOR CHANGE PLUG AND ABANDON PLUG BACK
PRODUCTION START OR RESUME RECLAMATION OF WELL SITE RECOMPLETE DIFFERENT FORMATION
REPERFORATE CURRENT FORMATION SIDETRACK TO REPAIR WELL TEMPORARY ABANDON
TUBING REPAIR VENT OR FLARE WATER DISPOSAL
WATER SHUTOFF SI TA STATUS EXTENSION APD EXTENSION
WILDCAT WELL DETERMINATION OTHER OTHER:
12. DESCRIBE PROPOSED OR COMPLETED OPERATIONS. Clearly show all pertinent details including dates, depths, volumes, etc.
Newfield proposes to extend the permit to drill this well for one year.
NAME (PLEASE PRINT) Mandie Crozier
TITLE Regulatory Tech
SIGNATURE N/A
DATE 6/1/2010
PHONE NUMBER:435 646-4825 Ext
PHONE NUMBER435 646-4825
June 01, 2010
June 03, 2010
iPI Well No: 43013500330000
FORM 9
STATE OF UTAHDEPARTMENT OF NATURAL RESOURCES
DIVISION OF OIL, GAS, AND MINING EAS6E90D6EOSIGNATIONAND SERIAL NUMBER:
SUNDRY NOTICES AND REPORTS ON WELLS 6. IF INDIAN, ALLOTTEE OR TRIBE NAME:
Do not use this form for proposals to drill new wells, significantly deepen e×isting wells below currentbottom-hole depth, reenter plugged wells, or to drill horizontal laterals. Use APPLICATION FOR PERMIT TO 7.UNIT or CA AGREEMENT NAME:
DRILL form for such proposals. GMBU (GRRV)
1. TYPE OF WELL 8. WELL NAME and NUMBER:Oil Well Federal 10-21-8-16
2. NAME OF OPERATOR: 9. API NUMBER:NEWFIELD PRODUCTION COMPANY 43013500330000
3. ADDRESS OF OPERATOR: PHONE NUMBER: 9. FIELD and POOL or WILDCAT:Rt3 Box 3630 ,Myton,UT,84052 435 646-4825 Ext MONUMENT BUTTE
4.LOCATIONOFWELL COUNTY:FOOTAGES AT SURFACE: DUCHESNE
2090 FSL 1941 FELQTR/QTR, SECTION, TOWNSHIP, RANGE, MERIDIAN: STATE:
Qtr/Qtr: NWSE Section: 21 Township: 08.05 Range: 16.0E Meridian: S UTAH
11.CHECK APPROPRIATE BOXES TO INDICATE NATURE OF NOTICE, REPORT, OR OTHER DATA
TYPE OF SUBMISSION TYPE OF ACTION
ACIDIZE ALTER CASING CASING REPAIR
/ NOTICE OF INTENTApproximate date work will start: CHANGE TO PREVIOUS PLANS CHANGE TUBING CHANGE WELL NAME
6/1/2010CHANGE WELL STATUS COMMINGLE PRODUCING FORMATIONS CONVERT WELL TYPE
SUBSEQUENT REPORT DEEPEN FRACTURE TREAT NEW CONSTRUCTIONDate of Work Completion:
OPERATOR CHANGE PLUG AND ABANDON PLUG BACK
PRODUCTION START OR RESUME RECLAMATION OF WELL SITE RECOMPLETE DIFFERENT FORMATION
SPUD REPORTDate of Spud: REPERFORATE CURRENT FORMATION SIDETRACK TO REPAIR WELL TEMPORARY ABANDON
TUBING REPAIR VENT OR FLARE WATER DISPOSAL
DRILLING REPORT WATER SHUTOFF SI TA STATUS EXTENSION APD EXTENSIONReport Date:
WILDCAT WELL DETERMINATION OTHER OTHER:
12. DESCRIBE PROPOSED OR CC MPLETED OPERATIONS. Clearly show all pertinent details including dates, depths, volumes, etc.
Newfield proposes to extend the permit to drill this well for one year.Approved by theUtah Division of
Oil, Gas and Mining
Date 2010
NAME (PLEASE PRINT) PHONE NUMBER TITLEMandie Crozier 435 646-4825 Regulatory Tech
SIGNATURE DATEN/A 6/1/2010
RECEIVED June 01,
The Utah Division of Oil, Gas, and Mining
- State of Utah- Department of Natural Resources
Electronic Permitting System - Sundry Notices
Request for Permit Extension Validation Well Number 43013500330000
API: 43013500330000Well Name: Federal 10-21-8-16
Location: 2090 FSL 1941 FEL QTR NWSE SEC 21 TWNP 080S RNG 160E MER SCompany Permit Issued to: NEWFIELD PRODUCTION COMPANY
Date Original Permit Issued: 6/9/2009
The undersigned as owner with legal rights to drill on the property as permitted above, hereby verifies thatthe information as submitted in the previously approved application to drill, remains valid and does notrequire revision. Following is a checklist of some items related to the application, which should be verified.
If located on private land, has the ownership changed, if so, has the surface agreement beenupdated? Yes No
Have any wells been drilled in the vicinity of the proposed well which would affect the spacing orsiting requirements for this location? Yes No
Has there been any unit or other agreements put in place that could affect the permitting or operationof this proposed well? Yes No
Have there been any changes to the access route including ownership, or rightof- way, which couldaffect the proposed location? Yes No
Has the approved source of water for drilling changed? Yes No
Have there been any physical changes to the surface location or access route which will require achange in plans from what was discussed at the onsite evaluation? Yes No
Is bonding still in place, which covers this proposed well? Yes No
Signature: Mandie Crozier Date: 6/1/2010
Title: Regulatory Tech Representing: NEWFIELD PRODUCTION COMPANY
June 01, 2010
June 03, 2010
UTAH
DNR The Utah Division of Oil, Gas, and Mining'
- State of Utah- Department of Natural ResourcesElectronic Permitting System - Sundry Notices
OTI GAS MlNTNG
Request for Permit Extension Validation Well Number 43013500330000
API: 43013500330000Well Name: Federal 10-21-8-16
Location: 2090 FSL 1941 FEL QTR NWSE SEC 21 TWNP 0805 RNG 160E MER SCompany Permit Issued to: NEWFIELD PRODUCTION COMPANY
Date Original Permit Issued: 6/9/2009
The undersigned as owner with legal rights to drill on the property as permitted above, hereby verifies thatthe information as submitted in the previously approved application to drill, remains valid and does notrequire revision. Following is a checklist of some items related to the application, which should be verified.
•If located on private_land, has the ownership changed, if so, has the surface agreement beenupdated? I___|I Yes I_Ð_I No
• Have any wells been drilled in the vicinity of the_proposed well which would affect the spacing orsiting requirements for this location? I:___) Yes _®_) No
• Has there been any unit or other agreements put in place that could affect the permitting or operationof this proposed well? I i Yes i i No
• Have there been any changes to the access route including ownership, or rightof- way, which couldaffect the proposed location? I___) Yes I _I No
• Has the approved source of water for drilling changed? I __I Yes i i No
• Have there been any physical changes to the surface location or access route which will require achange in plans from what was discussed at the onsite evaluation? I___I Yes I®I No
Approved by the•Is bonding still in place, which covers this proposed well? I§|I Yes i i No Utah Division of
Oil, Gas and MiningSignature: Mandie Crozier Date: 6/1/2010
Title: Regulatory Tech Representing: NEWFIELD PRODUCTION COMPANY Date: June 03, 2010
By:
RECEIVED June 01,
STATE OF UTAHDEPARTMENT OF NATURAL RESOURCES
DIVISION OF OIL, GAS, AND MINING
FORM 9
5.LEASE DESIGNATION AND SERIAL NUMBER: UTU-69060
SUNDRY NOTICES AND REPORTS ON WELLSDo not use this form for proposals to drill new wells, significantly deepen existing wells below currentbottom-hole depth, reenter plugged wells, or to drill horizontal laterals. Use APPLICATION FOR PERMIT TODRILL form for such proposals.
6. IF INDIAN, ALLOTTEE OR TRIBE NAME:
7.UNIT or CA AGREEMENT NAME: GMBU (GRRV)
1. TYPE OF WELL Oil Well
8. WELL NAME and NUMBER: FEDERAL 10-21-8-16
2. NAME OF OPERATOR: NEWFIELD PRODUCTION COMPANY
9. API NUMBER: 43013500330000
3. ADDRESS OF OPERATOR: PHONE NUMBER: Rt 3 Box 3630 , Myton, UT, 84052 435 646-4825 Ext
9. FIELD and POOL or WILDCAT: MONUMENT BUTTE
4. LOCATION OF WELL FOOTAGES AT SURFACE: 2090 FSL 1941 FEL QTR/QTR, SECTION, TOWNSHIP, RANGE, MERIDIAN: Qtr/Qtr: NWSE Section: 21 Township: 08.0S Range: 16.0E Meridian: S
COUNTY: DUCHESNE
STATE: UTAH
11.
CHECK APPROPRIATE BOXES TO INDICATE NATURE OF NOTICE, REPORT, OR OTHER DATA
TYPE OF SUBMISSION TYPE OF ACTION
NOTICE OF INTENTApproximate date work will start:
6/9/2011
SUBSEQUENT REPORTDate of Work Completion:
SPUD REPORTDate of Spud:
DRILLING REPORTReport Date:
ACIDIZE ALTER CASING CASING REPAIR
CHANGE TO PREVIOUS PLANS CHANGE TUBING CHANGE WELL NAME
CHANGE WELL STATUS COMMINGLE PRODUCING FORMATIONS CONVERT WELL TYPE
DEEPEN FRACTURE TREAT NEW CONSTRUCTION
OPERATOR CHANGE PLUG AND ABANDON PLUG BACK
PRODUCTION START OR RESUME RECLAMATION OF WELL SITE RECOMPLETE DIFFERENT FORMATION
REPERFORATE CURRENT FORMATION SIDETRACK TO REPAIR WELL TEMPORARY ABANDON
TUBING REPAIR VENT OR FLARE WATER DISPOSAL
WATER SHUTOFF SI TA STATUS EXTENSION APD EXTENSION
WILDCAT WELL DETERMINATION OTHER OTHER:
12. DESCRIBE PROPOSED OR COMPLETED OPERATIONS. Clearly show all pertinent details including dates, depths, volumes, etc.
Newfield proposes to extend the Application for Permit to Drill for one year.
NAME (PLEASE PRINT) PHONE NUMBER Mandie Crozier 435 646-4825
TITLE Regulatory Tech
SIGNATURE N/A
DATE 6/2/2011
06/06/2011
Jun. 02, 2011
Sundry Number: 15508 API Well Number: 43013500330000
FORM 9STATE OF UTAH
DEPARTMENT OF NATURAL RESOURCESDIVISION OF OIL, GAS, AND MINING 5.LEASE D6EOSIGNATION AND SERIAL NUMBER:
SUNDRY NOTICES AND REPORTS ON WELLS 6. IF INDIAN, ALLOTTEE OR TRIBE NAME:
Do not use this form for proposals to drill new wells, significantly deepen existing wells below currentbottom-hole depth, reenter plugged wells, or to drill horizontal laterals. Use APPLICATION FOR PERMIT TO 7.UNIT or CA AGREEMENT NAME:
DRILL form for such proposals. GMBU (GRRV)
1. TYPE OF WELL 8. WELL NAME and NUMBER:Oil Well FEDERAL 10-21-8-16
2. NAME OF OPERATOR: 9. API NUMBER:NEWFIELD PRODUCTION COMPANY 43013500330000
3. ADDRESS OF OPERATOR: PHONE NUMBER: 9. FIELD and POOL or WILDCAT:Rt 3 Bo× 3630 , Myton, UT, 84052 435 646-4825 E×t MONUMENT BUTTE
4.LOCATIONOFVVELL COUNTY:FOOTAGES AT SURFACE: DUCHESNE
2090 FSL 1941 FELQTR/QTR, SECTION, TOWNSHIP, RANGE, MERIDIAN: STATE:
Qtr/Qtr: NWSE Section: 21 Township: 08.05 Range: 16.0E Meridian: S UTAH
11.CHECK APPROPRIATE BOXES TO INDICATE NATURE OF NOTICE, REPORT, OR OTHER DATA
TYPE OF SUBMISSION TYPE OF ACTION
ACIDIZE ALTER CASING CASING REPAIR
/ NOTICE OF INTENTApproximate date work will start: CHANGE TO PREVIOUS PLANS CHANGE TUBING CHANGE WELL NAME
6/9/2011CHANGE WELL STATUS COMMINGLE PRODUCING FORMATIONS CONVERT WELL TYPE
SUBSEQUENT REPORT DEEPEN FRACTURE TREAT NEW CONSTRUCTIONDate of Work Completion:
OPERATOR CHANGE PLUG AND ABANDON PLUG BACK
PRODUCTION START OR RESUME RECLAMATION OF WELL SITE RECOMPLETE DIFFERENT FORMATION
SPUD REPORTDate of Spud: REPERFORATE CURRENT FORMATION SIDETRACK TO REPAIR WELL TEMPORARY ABANDON
TUBING REPAIR VENT OR FLARE WATER DISPOSAL
DRILLING REPORT WATER SHUTOFF SI TA STATUS EXTENSION APD EXTENSIONReport Date:
WILDCAT WELL DETERMINATION OTHER OTHER:
12. DESCRIBE PROPOSED OR C( MPLETED OPERATIONS. Clearly show all pertinent details including dates, depths, volumes, etc.
Newfield proposes to extend the Application for Permit to Drill for one year.
Approved by theUtah Division of
Oil, Gas and Mining
Date: 06/06/2011
By:
NAME (PLEASE PRINT) PHONE NUMBER TITLEMandie Crozier 435 646-4825 Regulatory Tech
SIGNATURE DATEN/A 6/2/2011
The Utah Division of Oil, Gas, and Mining
- State of Utah- Department of Natural Resources
Electronic Permitting System - Sundry Notices
Request for Permit Extension Validation Well Number 43013500330000
API: 43013500330000Well Name: FEDERAL 10-21-8-16
Location: 2090 FSL 1941 FEL QTR NWSE SEC 21 TWNP 080S RNG 160E MER SCompany Permit Issued to: NEWFIELD PRODUCTION COMPANY
Date Original Permit Issued: 6/9/2009
The undersigned as owner with legal rights to drill on the property as permitted above, hereby verifies thatthe information as submitted in the previously approved application to drill, remains valid and does notrequire revision. Following is a checklist of some items related to the application, which should be verified.
If located on private land, has the ownership changed, if so, has the surface agreement beenupdated? Yes No
Have any wells been drilled in the vicinity of the proposed well which would affect the spacing orsiting requirements for this location? Yes No
Has there been any unit or other agreements put in place that could affect the permitting or operationof this proposed well? Yes No
Have there been any changes to the access route including ownership, or rightof- way, which couldaffect the proposed location? Yes No
Has the approved source of water for drilling changed? Yes No
Have there been any physical changes to the surface location or access route which will require achange in plans from what was discussed at the onsite evaluation? Yes No
Is bonding still in place, which covers this proposed well? Yes No
Signature: Mandie Crozier Date: 6/2/2011
Title: Regulatory Tech Representing: NEWFIELD PRODUCTION COMPANY
Jun. 02, 2011
Sundry Number: 15508 API Well Number: 43013500330000
UTAH
DNR The Utah Division of Oil, Gas, and Mining'
- State of Utah- Department of Natural ResourcesElectronic Permitting System - Sundry Notices
OTI GAS Rr MlNTNG
Request for Permit Extension Validation Well Number 43013500330000
API: 43013500330000Well Name: FEDERAL 10-21-8-16
Location: 2090 FSL 1941 FEL QTR NWSE SEC 21 TWNP 0805 RNG 160E MER SCompany Permit Issued to: NEWFIELD PRODUCTION COMPANY
Date Original Permit Issued: 6/9/2009
The undersigned as owner with legal rights to drill on the property as permitted above, hereby verifies thatthe information as submitted in the previously approved application to drill, remains valid and does notrequire revision. Following is a checklist of some items related to the application, which should be verified.
•If located o_nprivate_land, has the ownership changed, if so, has the surface agreement beenupdated? I
_
i Yes igi No
• Have any wells been drilled in the vicinity of the_proposed well which would affect the spacing orsiting requirements for this location? :__I Yes g:I No
• Has there been any unit or other agreements put in place that could affect the permitting or operationof this proposed well? I:_:I Yes IÏiÏ:I No
• Have there been any changes to the access route including ownership, or rightof- way, which couldaffect the proposed location? I___I Yes igi No
• Has the approved source of water for drilling changed? I_
I Yes IÎiÏI No
• Have there been any physical changes to the surface location or access route which will require achange in plans from what was discussed at the onsite evaluation? __:I Yes ig:I No
• Is bonding still in place, which covers this proposed well? liiil Yes i i No
Signature: Mandie Crozier Date: 6/2/2011Title: Regulatory Tech Representing: NEWFIELD PRODUCTION COMPANY
ru 000 UNITED STATES RECE FORM APPROVEDDEPARTMÉNT OF THE INTERIOR OMB NO. 1004-0135
BUREAU OF LAND MANAGEMENT Î 5. Lease Ser!ExNpiresJuly 31, 2010
SUNDRY NOTICESANDREPORTS ON WELLS UTU69060
6. If Indian Allottee or Tribe Name
SUBMIT IN TRIPLICATE - Other instructions on reverse side. 7. If Umtor CA/Agreement, Name and/or No.UTU87538X
1. Type orWell 8. WellNaneand No.FEDERAL 10-21-8-16
Oil Well O Gas Well Other2. Name of operator CoÑút MANDII-HURUAÍH .
Al>l WellNo.NEWFIELD EXPLORATION COMPANW-Mail: [email protected] 43-013-50033-00-X1
3a. Address 3b. ½oneNo.(melude area code) 10. Beidand Pool,or ExploratoryROUTE 3 BOX 3630 Ph: 435-646-4825 MONUMENT BUTTEMYTON,UT 84052
4. Locationof Well (Footage, Sec., T, k, Ai.,or Survey bescnption 11. County or Parish,and State
Sec 21 T8S R16E NWSE 2090FSL 1941FEL . DUCHIËSNE COUNTY, UT
12. CHECK APPROPRIATE BOX(ES) TO INDICATE NATURE OF NOTICE, REPORT, OR OTHER DATA
TYPE OF SUBMISSION TYPE OF ACTION
Notice of IntentAcidize O Deepen 0 Production (Start/Resume) Water Shut-Off
O Alter casing 0 Fracture Treat 0 Reclamation 0 Well Integrity
0 Subsequent Report Casing Repair g New Construction 0 Recomplete Other
O Final Abandonment Notice Change Plans O Plug and Abandon g TemporarilyAbandon PDange to Original
O Convert to Injection Plug Back O Water Disposal
f3 besenbe Proposedor completedop rat on (clearly state all:pertment detais,meludmg estimated starting dateof any proposed work and approximate durationthereot.If the proposal is to deepen directionally or recomplete horizontally, give subsurface locations and measured and true vertical depths of alj pertinent markers and zones.Attach the Bond under which the work will be performed or provide the Bond No. on file with BLM/BIA. Required subsequent reports shall be filed within 30 daysfollowing completion of the involved operations. If the operation results in amultiple completion or recompletion in a new interval a Form 3160-4 shall be filed oncetesting has been completed. Final Abandonment Notices shall be filed only after all requirements, including reclamation, have been completed, and the operator hasdNe ed
qu
sSt
t
deyn
te ppl n for Permit to Drillthis well for two more years.
CONDITIONSOFAPPROVALATTACHEDREC
14. I herebycertify that the foregoingisrae and correct.Electronic Submission #123016 verifit i by the BLM Well Information System
For NEWFIELD EXPLORATIOA COMPANY, sent to the VernalCommitted to AFMSS for processing by ROE N R. HANSEN on 11/14/2011 (12RRHO641SE)
Name(Printed/Typed) MANDIE H CROZIER Title REGULATORYANALYST
Signature (Electronic Submission) Date 11/10/2011
THISSPACE FOR FEDERAL OR STATE OFFICE USE
Approved By Title NO"at8WRConditions of appr if y attached. Approval of this notice does not warrant orcertify that the a t ol egal or equitable title to those rights in the subject lease ass•nu A I I I C Iwhich would entiti the applicant to coriduct operations thereon Office VGrtlmL. I I I- I i
Title 18 U.S.C. Section .1001and Title 43 U.S.C. Section 1212, make it a crime for any person knowingly and willfully to make to any department or agency of the UnitedStates an fals , fictitious är fraudulent statements or representations as to any matter within its jurisdiction.
** BLM REVISED ** BLM REVISED ** BLM REVISED ** BLM REVISED** BLM REVISED
CONDITIONS OF APPROVAL
Newfield Exploration Company
Notice of IntentAPD Extension
Lease: UTU-69060Well: Federal 10-21-8-16Location: NWSE Sec 21-T8S-R16E
An extension for the referenced APD is granted with the following conditions:
1. The extension and APD shall expire on 12/15/2013.
2. No other extension shall be granted.
If you have any other questions concerning this matter, please contact Robin L Hansen of thisoffice at (435)
RECEIVED: May. 30, 2012
STATE OF UTAHDEPARTMENT OF NATURAL RESOURCES
DIVISION OF OIL, GAS, AND MINING
FORM 9
5.LEASE DESIGNATION AND SERIAL NUMBER: UTU-69060
SUNDRY NOTICES AND REPORTS ON WELLS
Do not use this form for proposals to drill new wells, significantly deepen existing wells belowcurrent bottom-hole depth, reenter plugged wells, or to drill horizontal laterals. Use APPLICATIONFOR PERMIT TO DRILL form for such proposals.
6. IF INDIAN, ALLOTTEE OR TRIBE NAME:
7.UNIT or CA AGREEMENT NAME: GMBU (GRRV)
1. TYPE OF WELL Oil Well
8. WELL NAME and NUMBER: FEDERAL 10-21-8-16
2. NAME OF OPERATOR: NEWFIELD PRODUCTION COMPANY
9. API NUMBER: 43013500330000
3. ADDRESS OF OPERATOR: PHONE NUMBER: Rt 3 Box 3630 , Myton, UT, 84052 435 646-4825 Ext
9. FIELD and POOL or WILDCAT: MONUMENT BUTTE
4. LOCATION OF WELL FOOTAGES AT SURFACE: 2090 FSL 1941 FEL QTR/QTR, SECTION, TOWNSHIP, RANGE, MERIDIAN: Qtr/Qtr: NWSE Section: 21 Township: 08.0S Range: 16.0E Meridian: S
COUNTY: DUCHESNE
STATE: UTAH
11.
CHECK APPROPRIATE BOXES TO INDICATE NATURE OF NOTICE, REPORT, OR OTHER DATA
TYPE OF SUBMISSION TYPE OF ACTION
NOTICE OF INTENTApproximate date work will start:
6 /9 /2012
SUBSEQUENT REPORTDate of Work Completion:
SPUD REPORTDate of Spud:
DRILLING REPORTReport Date:
ACIDIZE ALTER CASING CASING REPAIR
CHANGE TO PREVIOUS PLANS CHANGE TUBING CHANGE WELL NAME
CHANGE WELL STATUS COMMINGLE PRODUCING FORMATIONS CONVERT WELL TYPE
DEEPEN FRACTURE TREAT NEW CONSTRUCTION
OPERATOR CHANGE PLUG AND ABANDON PLUG BACK
PRODUCTION START OR RESUME RECLAMATION OF WELL SITE RECOMPLETE DIFFERENT FORMATION
REPERFORATE CURRENT FORMATION SIDETRACK TO REPAIR WELL TEMPORARY ABANDON
TUBING REPAIR VENT OR FLARE WATER DISPOSAL
WATER SHUTOFF SI TA STATUS EXTENSION APD EXTENSION
WILDCAT WELL DETERMINATION OTHER OTHER:
12. DESCRIBE PROPOSED OR COMPLETED OPERATIONS. Clearly show all pertinent details including dates, depths, volumes, etc.
Newfield proposes to extend the Application for Permit to Drill this wellfor one year.
NAME (PLEASE PRINT) PHONE NUMBER Mandie Crozier 435 646-4825
TITLE Regulatory Tech
SIGNATURE N/A
DATE 5 /30 /2012
June 04, 2012
Sundry Number: 26225 API Well Number: 43013500330000Sundry Number: 26225 API Well Number: 43013500330000
FORM 9STATE OF UTAH
DEPARTMENTOF NATURALRESOURCES5.LEASE DESIGNATION AND SERIAL NUMBER:DIVISION OF OIL, GAS, AND MINING UTU-69060
SUNDRY NOTICES AND REPORTS ON WELLS 6. IF INDIAN, ALLOTTEE OR TRIBE NAME:
Do not use this form for proposals to drill new wells, significantly deepen existing wells belowcurrent bottom-hole depth, reenter plugged wells, or to drill horizontal laterals. Use APPLICATION 7.UNITor CA AGREEMENT NAME:
FOR PERMIT TO DRILL form for such proposals. GMBU (GRRV)
1. TYPE OF WELL 8. WELL NAME and NUMBER:Oil Well FEDERAL 10-21-8-16
2. NAME OF OPERATOR: 9. API NUMBER:NEWFIELD PRODUCTION COMPANY 43013500330000
3. ADDRESS OF OPERATOR: PHONE NUMBER: 9. FIELD and POOL or WILDCAT:Rt 3 Box 3630 , Myton, UT, 84052 435 646-4825 Ext MONUMENT BUTTE
4. LOCATION OF WELL COUNTY:FOOTAGES AT SURFACE: DUCHESNE
2090 FSL 1941 FELQTRIQTR, SECTION, TOWNSHIP, RANGE, MERIDIAN: STATE:
QtrlQtr: NWSE Section: 21 Township: 08.0S Range: 16.0E Meridian: S UTAH
CHECK APPROPRIATE BOXES TO INDICATENATURE OF NOTICE, REPORT, OR OTHER DATA
TYPE OF SUBMISSION TYPE OF ACTION
ACI DIZE ALTER CASING CASING REPAIRNOTICE OF INTENT
Approximate date work will start: CHANGE TO PREVIOUS PLANS CHANGE TUBING CHANGE WELL NAME
6/9/2012CHANGE WELL STATUS COMMINGLE PRODUCING FORMATIONS CONVERT WELL TYPE
SUBSEQUENTREPORT DEEPEN FRACTURETREAT NEWCONSTRUCTIONDate of Work Completion:
OPERATOR CHANGE PLUG AND ABANDON PLUG BACK
PRODUCTION START OR RESUME RECLAMATION OF WELL SITE RECOMPLETE DIFFERENT FORMATIONSPUD REPORT
Date of Spud: REPERFORATE CURRENT FORMATION SIDETRACK TO REPAIR WELL TEMPORARY ABANDON
TUBING REPAIR VENT OR FLARE WATER DISPOSAL
DRILLING REPORT WATER SHUTOFF SI TA STATUS EXTENSION APD EXTENSIONReport Date:
WILDCAT WELL DETERMINATION OTHER OTHER:
12. DESCRIBE PROPOSED OR COMPLETED OPERATIONS. Clearly show all pertinent details including dates, depths, volumes, etc.
Newfield proposes to extend the Application for Permit to Drill this well Approved by thefor one year. Utah Division of
OFI, Gas and Mining
Date: June 04, 2012
By:
NAME (PLEASE PRINT) PHONE NUMBER TITLEMandie Crozier 435 646-4825 Regulatory Tech
SIGNATURE DATEN/A 5/30/2012
RECEIVED: May. 30,
RECEIVED: May. 30, 2012
The Utah Division of Oil, Gas, and Mining
- State of Utah- Department of Natural Resources
Electronic Permitting System - Sundry Notices
Request for Permit Extension Validation Well Number 43013500330000
API: 43013500330000Well Name: FEDERAL 10-21-8-16
Location: 2090 FSL 1941 FEL QTR NWSE SEC 21 TWNP 080S RNG 160E MER SCompany Permit Issued to: NEWFIELD PRODUCTION COMPANY
Date Original Permit Issued: 6 /9 /2009
The undersigned as owner with legal rights to drill on the property as permitted above, hereby verifies that theinformation as submitted in the previously approved application to drill, remains valid and does not require revision.Following is a checklist of some items related to the application, which should be verified.
If located on private land, has the ownership changed, if so, has the surface agreement been updated? Yes No
Have any wells been drilled in the vicinity of the proposed well which would affect the spacing or sitingrequirements for this location? Yes No
Has there been any unit or other agreements put in place that could affect the permitting or operation of thisproposed well? Yes No
Have there been any changes to the access route including ownership, or rightof- way, which could affect theproposed location? Yes No
Has the approved source of water for drilling changed? Yes No
Have there been any physical changes to the surface location or access route which will require a change inplans from what was discussed at the onsite evaluation? Yes No
Is bonding still in place, which covers this proposed well? Yes No
Signature: Mandie Crozier Date: 5 /30 /2012
Title: Regulatory Tech Representing: NEWFIELD PRODUCTION COMPANY
Sundry Number: 26225 API Well Number: 43013500330000Sundry Number: 26225 API Well Number: 43013500330000
UTAH
DNR The Utah Division of Oil, Gas, and Mining'
- State of Utah- Department of Natural ResourcesElectronic Permitting System - Sundry Notices
OTI. EMI Pr N1NTrie
Request for Permit Extension Validation Well Number 43013500330000
API: 43013500330000Well Name: FEDERAL 10-21-8-16
Location: 2090 FSL 1941 FEL QTR NWSE SEC 21 TWNP 080S RNG 160E MER SCompany Permit Issued to: NEWFIELDPRODUCTION COMPANY
Date Original Permit Issued: 6/9/2009
The undersigned as owner with legal rights to drill on the property as permitted above, hereby verifies that theinformation as submitted in the previously approved application to drill, remains valid and does not require revision.Following is a checklist of some items related to the application, which should be verified.
* If located on private land, has the ownership changed, if so, has the surface agreement been updated? OYes No
• Have any wells been drilled in the vicinity of the proposed well which would affect the spacing or sitingrequirements for this location? O Yes No
• Has there been any unit or other agreements put in place that could affect the permitting or operation of thisproposed well? (_) Yes No
• Have there been any changes to the access route including ownership, or rightof- way, which could affect theproposed location? O Yes i No
· Has the approved source of water for drilling changed? O Yes No
• Have there been any physical changes to the surface location or access route which will require a change inplans from what was discussed at the onsite evaluation? Yes No
' Is bonding still in place, which covers this proposed well? Yes No
Signature: Mandie Crozier Date: 5/30/2012Title: Regulatory Tech Representing: NEWFIELDPRODUCTION COMPANY
RECEIVED: May. 30,
RECEIVED: Jun. 04, 2013
STATE OF UTAHDEPARTMENT OF NATURAL RESOURCES
DIVISION OF OIL, GAS, AND MINING
FORM 9
5.LEASE DESIGNATION AND SERIAL NUMBER: UTU-69060
SUNDRY NOTICES AND REPORTS ON WELLS
Do not use this form for proposals to drill new wells, significantly deepen existing wells belowcurrent bottom-hole depth, reenter plugged wells, or to drill horizontal laterals. Use APPLICATIONFOR PERMIT TO DRILL form for such proposals.
6. IF INDIAN, ALLOTTEE OR TRIBE NAME:
7.UNIT or CA AGREEMENT NAME: GMBU (GRRV)
1. TYPE OF WELL Oil Well
8. WELL NAME and NUMBER: FEDERAL 10-21-8-16
2. NAME OF OPERATOR: NEWFIELD PRODUCTION COMPANY
9. API NUMBER: 43013500330000
3. ADDRESS OF OPERATOR: PHONE NUMBER: Rt 3 Box 3630 , Myton, UT, 84052 435 646-4825 Ext
9. FIELD and POOL or WILDCAT: MONUMENT BUTTE
4. LOCATION OF WELL FOOTAGES AT SURFACE: 2090 FSL 1941 FEL QTR/QTR, SECTION, TOWNSHIP, RANGE, MERIDIAN: Qtr/Qtr: NWSE Section: 21 Township: 08.0S Range: 16.0E Meridian: S
COUNTY: DUCHESNE
STATE: UTAH
11.
CHECK APPROPRIATE BOXES TO INDICATE NATURE OF NOTICE, REPORT, OR OTHER DATA
TYPE OF SUBMISSION TYPE OF ACTION
NOTICE OF INTENTApproximate date work will start:
6 /9 /2013
SUBSEQUENT REPORTDate of Work Completion:
SPUD REPORTDate of Spud:
DRILLING REPORTReport Date:
ACIDIZE ALTER CASING CASING REPAIR
CHANGE TO PREVIOUS PLANS CHANGE TUBING CHANGE WELL NAME
CHANGE WELL STATUS COMMINGLE PRODUCING FORMATIONS CONVERT WELL TYPE
DEEPEN FRACTURE TREAT NEW CONSTRUCTION
OPERATOR CHANGE PLUG AND ABANDON PLUG BACK
PRODUCTION START OR RESUME RECLAMATION OF WELL SITE RECOMPLETE DIFFERENT FORMATION
REPERFORATE CURRENT FORMATION SIDETRACK TO REPAIR WELL TEMPORARY ABANDON
TUBING REPAIR VENT OR FLARE WATER DISPOSAL
WATER SHUTOFF SI TA STATUS EXTENSION APD EXTENSION
WILDCAT WELL DETERMINATION OTHER OTHER:
12. DESCRIBE PROPOSED OR COMPLETED OPERATIONS. Clearly show all pertinent details including dates, depths, volumes, etc.
Newfield proposes to extend the Application for Permit to Drill this wellfor on year.
NAME (PLEASE PRINT) PHONE NUMBER Mandie Crozier 435 646-4825
TITLE Regulatory Tech
SIGNATURE N/A
DATE 6 /4 /2013
June 05, 2013
Sundry Number: 38549 API Well Number: 43013500330000Sundry Number: 38549 API Well Number: 43013500330000
FORM 9STATE OF UTAH
DEPARTMENTOF NATURALRESOURCES5.LEASE DESIGNATION AND SERIAL NUMBER:DIVISION OF OIL, GAS, AND MINING UTU-69060
SUNDRY NOTICES AND REPORTS ON WELLS 6. IF INDIAN, ALLOTTEE OR TRIBE NAME:
Do not use this form for proposals to drill new wells, significantly deepen existing wells belowcurrent bottom-hole depth, reenter plugged wells, or to drill horizontal laterals. Use APPLICATION 7.UNITor CA AGREEMENT NAME:
FOR PERMIT TO DRILL form for such proposals. GMBU (GRRV)
1. TYPE OF WELL 8. WELL NAME and NUMBER:Oil Well FEDERAL 10-21-8-16
2. NAME OF OPERATOR: 9. API NUMBER:NEWFIELD PRODUCTION COMPANY 43013500330000
3. ADDRESS OF OPERATOR: PHONE NUMBER: 9. FIELD and POOL or WILDCAT:Rt 3 Box 3630 , Myton, UT, 84052 435 646-4825 Ext MONUMENT BUTTE
4. LOCATION OF WELL COUNTY:FOOTAGES AT SURFACE: DUCHESNE
2090 FSL 1941 FELQTRIQTR, SECTION, TOWNSHIP, RANGE, MERIDIAN: STATE:
QtrlQtr: NWSE Section: 21 Township: 08.0S Range: 16.0E Meridian: S UTAH
CHECK APPROPRIATE BOXES TO INDICATENATURE OF NOTICE, REPORT, OR OTHER DATA
TYPE OF SUBMISSION TYPE OF ACTION
ACI DIZE ALTER CASING CASING REPAIRNOTICE OF INTENT
Approximate date work will start: CHANGE TO PREVIOUS PLANS CHANGE TUBING CHANGE WELL NAME
6/9/2013CHANGE WELL STATUS COMMINGLE PRODUCING FORMATIONS CONVERT WELL TYPE
SUBSEQUENTREPORT DEEPEN FRACTURETREAT NEWCONSTRUCTIONDate of Work Completion:
OPERATOR CHANGE PLUG AND ABANDON PLUG BACK
PRODUCTION START OR RESUME RECLAMATION OF WELL SITE RECOMPLETE DIFFERENT FORMATIONSPUD REPORT
Date of Spud: REPERFORATE CURRENT FORMATION SIDETRACK TO REPAIR WELL TEMPORARY ABANDON
TUBING REPAIR VENT OR FLARE WATER DISPOSAL
DRILLING REPORT WATER SHUTOFF SI TA STATUS EXTENSION APD EXTENSIONReport Date:
WILDCAT WELL DETERMINATION OTHER OTHER:
12. DESCRIBE PROPOSED OR COMPLETED OPERATIONS. Clearly show all pertinent details including dates, depths, volumes, etc.
Newfield proposes to extend the Application for Permit to Drill this well Approved by thefor on year. Utah Division of
OFI, Gas and Mining
Date: June 05, 2013
By:
NAME (PLEASE PRINT) PHONE NUMBER TITLEMandie Crozier 435 646-4825 Regulatory Tech
SIGNATURE DATEN/A 6/4/2013
RECEIVED: Jun. 04,
RECEIVED: Jun. 04, 2013
The Utah Division of Oil, Gas, and Mining
- State of Utah- Department of Natural Resources
Electronic Permitting System - Sundry Notices
Request for Permit Extension Validation Well Number 43013500330000
API: 43013500330000Well Name: FEDERAL 10-21-8-16
Location: 2090 FSL 1941 FEL QTR NWSE SEC 21 TWNP 080S RNG 160E MER SCompany Permit Issued to: NEWFIELD PRODUCTION COMPANY
Date Original Permit Issued: 6 /9 /2009
The undersigned as owner with legal rights to drill on the property as permitted above, hereby verifies that theinformation as submitted in the previously approved application to drill, remains valid and does not require revision.Following is a checklist of some items related to the application, which should be verified.
If located on private land, has the ownership changed, if so, has the surface agreement been updated? Yes No
Have any wells been drilled in the vicinity of the proposed well which would affect the spacing or sitingrequirements for this location? Yes No
Has there been any unit or other agreements put in place that could affect the permitting or operation of thisproposed well? Yes No
Have there been any changes to the access route including ownership, or rightof- way, which could affect theproposed location? Yes No
Has the approved source of water for drilling changed? Yes No
Have there been any physical changes to the surface location or access route which will require a change inplans from what was discussed at the onsite evaluation? Yes No
Is bonding still in place, which covers this proposed well? Yes No
Signature: Mandie Crozier Date: 6 /4 /2013
Title: Regulatory Tech Representing: NEWFIELD PRODUCTION COMPANY
Sundry Number: 38549 API Well Number: 43013500330000Sundry Number: 38549 API Well Number: 43013500330000
UTAH
DNR The Utah Division of Oil, Gas, and Mining'
- State of Utah- Department of Natural ResourcesElectronic Permitting System - Sundry Notices
OTI. EMI Pr N1NTrie
Request for Permit Extension Validation Well Number 43013500330000
API: 43013500330000Well Name: FEDERAL 10-21-8-16
Location: 2090 FSL 1941 FEL QTR NWSE SEC 21 TWNP 080S RNG 160E MER SCompany Permit Issued to: NEWFIELDPRODUCTION COMPANY
Date Original Permit Issued: 6/9/2009
The undersigned as owner with legal rights to drill on the property as permitted above, hereby verifies that theinformation as submitted in the previously approved application to drill, remains valid and does not require revision.Following is a checklist of some items related to the application, which should be verified.
* If located on private land, has the ownership changed, if so, has the surface agreement been updated? OYes No
• Have any wells been drilled in the vicinity of the proposed well which would affect the spacing or sitingrequirements for this location? O Yes No
• Has there been any unit or other agreements put in place that could affect the permitting or operation of thisproposed well? (_) Yes No
• Have there been any changes to the access route including ownership, or rightof- way, which could affect theproposed location? O Yes i No
· Has the approved source of water for drilling changed? O Yes No
• Have there been any physical changes to the surface location or access route which will require a change inplans from what was discussed at the onsite evaluation? Yes No
' Is bonding still in place, which covers this proposed well? Yes No
Signature: Mandie Crozier Date: 6/4/2013Title: Regulatory Tech Representing: NEWFIELDPRODUCTION COMPANY
RECEIVED: Jun. 04,
State of UtahDEPARTMENT OF NATURAL RESOURCES
tensMICHAEL R. STYLER
GARY R. HERBERT Executive Director
covernor Division of Oil, Gas and MiningGREGORY S. BELL JOHN R. BAZALieutenant Governor Division Director
August 28, 2013
Mandie CrozierNewfield Production CompanyRoute #3 Box 3630Myton, UT 84052
Re: APDs Rescinded for Newfield Production Company,Duchesne County
Dear Ms. Crozier:
Enclosed find the list of APDs that you have asked to be rescinded. No drillingactivity at these locations has been reported to the division. Therefore,approval to drill these wells is hereby rescinded, effective August 27, 2013.
A new APD must be filed with this office for approval prior to thecommencement of any future work on the subject location.
If any previously unreported operations have been performed on this welllocation, it is imperative that you notify the Division immediately.
Sincerely,
l iana MasonEnvironmental Scientist
cc: Well FileBureau of Land Management, VernalSITLA, Ed Bonner
UTAH
DNR
1594 West North Temple, Suite 1210, PO Box 145801, Salt Lake City, UT 84114 -5801
telephone (801) 538-5340 • facsimile (801) 359-3940 •TTY (801) 538-7458 • www.ogm.utah.govOIL, GAS &
8/28/13 State of Utah Mail - APD's to Rescind
APD's to Rescind
Mandie Crozier <[email protected]> Tue, Aug 27, 2013 at 4:18 PMTo: "[email protected]' <[email protected]>
Newfield would like to have the followingApproved APD's Rescinded. (See attached list).Most of these APD's were permitted and approved in 2010 or earlier. We would like toemphasize thatthis is not an on-going issue and thatwe have drilled or plan to drill95% of theAPD's we've applied for in recent years. These were some areas and play typesthatwe wereassessing that we had to permit in advance due to long permit lag time -- thiscaused us to"over-permit" these areas/plays so that we would have options to drill if successful.
Mandie CrozierRegulatory Specialist.Office: 435-646-4825Mobile: 435-401-8335
NEWFIELD
APD's to Rescind_001.pdf194K
https://mail.google.com/maillul0/?ui=2&ik=8d7a8b69b3&Mew-pt&search=inbox&msg=140c1db73e13a3ed
Cas
eN
umbe
rW
ell N
ame
Num
Leas
eTY
PEC
omm
ent
UTU
8753
8XFE
DER
AL
10-2
1-8-
16U
TU69
060
4043
0135
0033
UTU
8753
8XH
AW
KEY
EFE
DER
AL
10-2
2-8-
16U
TU73
088
4043
0135
0094
UTU
8753
8XFE
DER
AL
11-2
1-8-
16U
TU69
061
4043
0135
0034
UTU
8753
8XFE
DER
AL
11-2
2-8-
16U
TU77
339
4043
0135
0085
UTU
B75
38X
HA
WK
EYE F
EDER
AL
11-2
7-8-
16U
TU73
088
4043
0135
0057
UTU
8753
8XFE
DER
AL
11-3
5-8-
15U
TU67
168
4043
0133
4252
i
UTU
8753
8XST
ATE
11-3
6-8-
15ST
ATE
4043
0133
4225
UTU
8753
8XFE
DER
AL
1-21
-8-1
6U
TU69
060
4043
0135
0025
UTU
8753
8XFE
DER
AL
12-2
2-8-
16U
TSLO
6591
440
4301
3500
86
UTU
8753
8XFE
DER
AL
12-2
5-8-
15U
TU67
168
4043
0135
0048
UTU
8753
8XH
AW
KEY
EFE
DER
AL
12-2
7-8-
16U
TU73
088
4043
0135
0056
UTU
8753
8XFE
DER
AL
1-25
-8-1
5U
TU67
168
4043
0135
0027
UTU
B75
38X
HA
WK
EYE F
EDER
AL
1-27
-8-1
6U
TU73
088
4043
0135
0040
UTU
8753
8XFE
DER
AL
1-29
-8-1
6U
TU69
061
4043
0135
0144
iU
TU87
538X
FED
ERA
L1-
30-8
-16
UTU
8100
040
4301
3341
92
UTU
8753
8XFE
DER
AL
13-1
9-8-
16U
TU73
089
40
UTU
8753
8XFE
DER
AL
14-K
i-8-1
6U
TU73
089
4043
0133
4169
UTU
8753
8XFE
DER
AL
14-2
1-B
-16
UTU
6906
140
4301
3500
29
UTU
8753
BX
FED
EIL4
L14
-22-
8-16
UTU
7733
940
4301
3501
00
UTU
8753
8XTR
AV
ISFE
DER
AL
14-2
7-8-
16U
TU62
848
4043
0135
0055
UTU
8753
8XFE
DER
AL
15-1
9-8-
16U
TU73
089
4043
0133
4168
UTU
8753
8XFE
DER
AL
15-2
1-8-
16U
TU69
060
4043
0135
0028
UTU
8753
8XFE
DER
AL
16-K
i-8-1
6U
TU73
089
4043
0133
4167
UTU
8753
8XFE
NC
ELIN
EFE
DER
AL
1A-2
2-8-
16U
TU74
868
4043
0135
0090
UTU
8753
8XFE
DEI
LAL
2-21
-8-1
6U
TU69
060
4043
0135
0030
UTU
8753
8XFE
NC
ELIN
EFED
EILA
L2-
22-8
-16
UTU
7486
840
4301
3508
91
UTU
8753
8XH
AW
KEY
EFED
ERA
L2-
27-8
-16
UTU
7308
840
4301
3500
41
UTU
8753
8XFE
DEF
U\L
2-29
-8-1
6U
TU69
061
4043
0133
4178
WES
TPO
INT
UTU
8753
8X2-
31-8
-16
UTU
7438
940
4301
3342
00FE
DEF
LAL
UTU
8753
8XFE
DEI
LAL
3-22
-8-1
6U
TU76
561
4043
0135
0082
UTU
8753
8XFE
DEI
LAL
3-29
-8-1
6U
TU69
060
4043
0133
4177
UTU
8753
8XFE
DER
AL
3-30
-8-1
6U
TUB
1000
4043
0133
4190
UTU
8753
8XFE
DEI
LAL
4-22
-8-1
6U
TU76
561
40
UTU
8753
8XFE
NC
ELIN
EFED
ERA
L4-
23-8
-16
UTU
7486
840
4301
3501
30
UTU
8753
8XFE
DEF
U\L
4-27
-8-1
6U
TU77
339
4043
0135
0062
UTU
8753
8XFE
DEF
LAL
4-29
-8-1
6U
TU69
060
4043
0133
4176
UTU
8753
8XFE
DER
AL
5-22
-8-1
6U
TU76
561
4043
0135
0083
UTU
8753
8XFE
NC
ELIN
EFED
ERA
L5-
23-8
-16
UTU
7486
840
4301
3501
33
UTU
B75
38X
HA
VV
KEY
EFED
ERA
L5-
27-8
-16
UTU
7308
840
4301
3500
63
IU
TU87
538X
FED
EFL4
L5-
30-8
-16
UTU
S100
040
4301
3341
89
VV
ESTP
OIN
TU
TU87
538X
5-31
-8-1
6U
TU74
389
4043
0133
4197
FED
ERA
L
UTU
8753
8XFE
DEF
LAL
6.-2
1-8-
16U
TU69
060
4043
0135
0031
UTU
8753
8XFE
DER
AL
6-22
-8-1
6U
TU76
561
4043
0135
0084
UTU
8753
8XH
AW
KEY
EFE
DER
AL
6-27
-8-1
6U
TU73
088
4043
0135
0064
UTU
8753
8XFE
DER
AL
6-30
-8-1
6U
TU81
000
4043
0133
4188
VV
ESTP
OIN
TU
TUB
7538
X6:
-31-
8-16
UTU
7438
940
4301
3341
96FE
DER
AL
UTU
8753
8XFE
DER
AL
6-35
-8-1
5U
TU67
168
4043
0133
4247
UTU
8753
8XFE
NC
ELIN
EFED
ERA
L7-
22-8
-16
UTU
7486
840
4301
3500
91
UTU
8753
8XH
AW
KEY
EFE
DER
AL
7-27
-8-1
6U
TU73
088
4043
0135
0058
UTU
8753
8XFE
DER
AL
7-35
-8-1
5U
TU67
168
40
UTU
8753
8XFE
DER
AL
8-21
-8-1
6U
TU69
060
4043
0135
0032
UTU
8753
8XFE
NC
ELIN
EFED
EIL4
L8-
22-8
-16
UTU
7486
840
4301
3500
92
IU
TU87
S38X
FED
EFU
kL8-
35-8
-15
UTU
6716
840
4301
3342
49
UTU
8753
8XFE
DEP
AL
9-20
-8-1
6U
TU77
339
4043
0135
0089
UTU
8753
8XH
AW
KEY
EFE
DER
AL
9-22
-8-1
6U
TU73
088
4043
0135
0093
UTU
8753
8XFE
DER
AL
9-35
-8-1
5U
TU67
168
4043
0133
4250
UTU
8753
8XG
.MB
UG
i-32-
8-16
STA
TE20
4301
3508
35
UTU
8753
8XG
IMB
UH
-32-
8-16
STA
DE
2043
0135
0836
UTU
8753
8XG
MB
UL-
32-8
-16
STA
3T20
4301
3508
37
UTU
8753
8XG
MB
UQ
-32-
8-16
STA
TE20
4301
3508
38
UTU
8753
8XG
MB
UR
-32-
B-1
6ST
ATE
2043
0135
0839
I
Form3160-3FORM APPROVED(August2007)OMBNo.1004-0137
• ExpiresJuly31,2010UNITED STATESDEPARTMENTOF THE INTERIOR 5. LeaseSerialNo.BUREAUOF LAND MANAGEMENT UTU-69060
APPUCATION FOR PERMIT TO DRILL OR REENTER 6. IfInd ,Allotee orTribeName
la. Typeof work: DRILL O REENTER 2 ÏfUnitor CAAgreement,NameandNo.
8. Lease Nameand WellNo.lb. TypeofWell: 0 I Well GasWell Other SingleZone MultipleZone Federal 10-21-8-162. Nameof0perator Newfield Production Company 9. API WellNo.3a. Address Route #3 Box 3630, Myton UT 84052 3b. PhoneNo.(include area code) 10 FiefdantfPool,orExploratory(435) 646-3721
Monument Butte4. Locationof Well(Reportlocationclearly and in acœrdance with anyMaterequirements.*) 11 Seo.,T.R. M. or Blk.andSurveyorAreaAt surface NWISE 2090' FSL 1941' FELSec. 21, T8S R16EAt proposedprod.zone
14. Distancein milesanddirectionfrom nearesttownorpostoffice Ïi Countyor Parish 13.StateApproximately9.4 miles southwest ofMyton, UT Duchesne UT15. Distancefromproposed*16.No.of acresin lease 17. SpacingUnitdedicatedto thiswelllocationtonearest
propertyor leaseline,it. Approx. 699' f/lse, NA' flunit1130.40(Alsotonearestdrig.unit line,ifany) 40 Acres
18.Distancefrompo osedlocation* 19.ProposedDepth 20. BLM/BIABondNo.on fileapppnlotoro this
eng, ompleted, Approx. 2005' 6,690' WYBOOO49321. Elevations(ShowwhetherDF,KDB,RT,4 etc.) 22. Appr imatedateworkwillstart* 23. Estimatedduration5450' GL
(7) days from SPUD to rig release24. Attachments
Thefollowing,completedinaccordancewith therequirementsof OnshoreOilandGasOrderNo.l, mustbe attachedto thiiform:1. Wellplatcertifiedby a registeredsurveyor. 4. Bond tocover the operationsunlesscovered byan existingbondon file (see2. ADrillingPlan. Item20 above).3. A SurfaceUsePlan (if the location is on National Forest SystemLands, the 5. OperatorcertificationSUPO mustbe filedwith theappropriateForest ServiceOffice) 6. Suchothersite specificinfórmationand/orplansas mayberequiredbythe25 S Nme (ePrint ed) Da
TitleRegulatory Specialist
Approyedby (Si Name (Printed/Typed) Date
Title ASSIS eld ager officeVERNALFIELDOFFICEAppicationappr doesnot warfalifoT olds legal
°o"si"$o°a's°2°pr
fnany,areattached. 00N0m0NSOFAPPROVALATTACHED
Title 18U.S.C.Section1001andTitle43 U.S.C.Section1212,make ita crime foranypersonknowinglyandwillfullytomaketoany departmentor agencyofthe UnitedStatesanyfalse,fictitiousor fraudulentstatementsor representationsasto anymatterwithin itsjurisdiction.(Continued on page 2) *(Ïnstructionon page 2)
NOTICEOFAPPROVAL MM2 2 2009 NOS N'"9DEC22 2009DIV.0F0lk GAS&MININGE 1, g
O OUNITED STATES DEPARTMENT OF THE INTERIOR
BUREAU OF LAND MANAGEMENT• • VERNAL FIELD OFFICE
' 170 South 500 East VERNAL, UT 84078 (435) 781-4401
CONDITIONS OF APPROVAL FOR APPLICATIONFOR PERMITTO DRILL
Company: Newfield Production Company Location: NWSE, Sec. 21, TSS, R16E
Well No: Federal 10-21-8-16 Lease No: UTU-69060
API No: 43-013-50033 Agreement: Greater Monument Butte (GR)
OFFICE NUMBER: (435) 781-4400OFFICE FAX NUMBER: (435) 781-3420
A COPY OF THESE CONDITIONS SHALL BE FURNISHED TO YOURFIELD REPRESENTATIVE TO INSURE COMPLIANCE
All lease and/or unit operations are to be conducted in such a manner that full compliance is made with theapplicable laws, regulations (43 CFR Part 3160), and this approved Application for Permit to Drill includingSurface and Downhole Conditions of Approval. The operator is considered fully responsible for the actions
of his subcontractors. A copy of the approved APD must be on location during construction, drilling, and
completion operations. This permit is approved for a two (2) year period, or until lease expiration,
whichever occurs first. An additional extension, up to two (2) years, may be applied for by sundry
notice prior to expiration.
NOTIFICATION REQUIREMENTS
Location Construction - Forty-Eight (48) hours prior to construction of locatio¾(Notify Environmental Scientist) access roads.
Location Completion - Prior to moving on the drilling rig.
(Notify Environmental Scientist)
Spud Notice -Twenty-Four (24) hours prior to spudding the well.
(Notify Petroleum Engineer)
Casing String & Cementing - Twenty-Four (24) hours prior to running casing and
(Notify Supv. Petroleum Tech.) cementing all casing strings to: ut vn [email protected].
P & Related Equipment Tests -Twenty-Four (24) hours prior to initiating pressure tests.
(Notify Supv. Petroleum Tech.)
First Production Notice - Within Five (5) business days after new well begins or
(Notify Petroleum Engineer) production resumes after well has been off production formore than ninety (90) days.
DEC22 2009DIV.OFOlL,GAS&
O O Page 2 of 9Well: Federal 10-21-8-16
12/9/2009
SURFACE USE PROGRAMCONDITIONS OF APPROVAL (COAs)
• All new and replacement internal combustion gas field engines of less than or equal to 300 design-rated horsepower must not emit more than 2 gms of NOx per horsepower-hour. This requirement
does not apply to gas field engines of less than or equal to 40 design-rated horsepower.
• All and replacement internal combustion gas field engines of greater than 300 design ratedhorsepower must not emit more than 1.0 gms of NOx per horsepower-hour.
• If there is an active Gilsonite mining operation within 2 miles of the well location, operator shallnotify the Gilsonite operator at least 48 hours prior to any blasting during construction.
• If paleontological materials are uncovered during construction, the operator is to immediately stopwork and contact the Authorized Officer (AO). A determination will be made by the AO as to whatmitigation may be necessary for the discovered paleontologic material before construction cancontinue.
SITE SPECIFIC COAs:
CONDITIONS OF APPROVAL:
• Construction and drilling is not allowed from May 1 - June 15 to minimize impacts during mountain plovernesting.
• Construction and drilling is not allowed from March 1 - August 31 to minimize impacts during burrowingowl nesting.
• If it is anticipated that.construction or drilling will occur during any of the given timing restrictions, a BLM orqualified biologist shall be notified so surveys can be conducted. Depending upon the results of the surveys,permission to proceed may or may not be granted by the BLM Authorized Officer.
Reclamation
Interim Reclamation:
Interim reclamation of the surface environment shall take place after drilling and completion and the well isplaced into production. At a minimum, this will include the stabilization of the soil surface during construction,re-contouring of the unused pad area, and the reserve pit to the original contour to the extent possible, and the re-
spreading of the top soil after re-contouring takes place, up to the rig anchor points and any area not needed forproduction. Buried pipelines will be re-contoured, the salvaged topsoil redistributed and reseeded. The outside
borrow of the access road will have the top soil salvaged and re-spread and reseeded. The area will be reseeded
using appropriate seeding methods, which includes, but is not limited to, the drill seeding method (see below).Any adjustments, due to site specific production concerns, to the reclamation COAs in this document can besubmitted on Sundry form 3160-5.
The reclamation objective is to establish a desired self-perpetuating diverse plant community. The objective is to
attain 75% basal cover based on similar undisturbed adjacent native vegetativegggogprised of
DEC22 2009DIV.0FOIL,GAS&
O O Page 3 of 9Well: Federal 10-21-8-16
12/9/2009
desired species and/or seeded species within 5 years of initial reclamation action. However if after three (3)growing seasons there is less than 30% of the basal cover based on similar undisturbed native vegetative
community, then the Authorized Officer may require additional seeding efforts.
Topsoil will be segregated from the subsoil (without mixing them), stockpiled separately from other soilmaterials, and maintained for future use in rehabilitating the locations.
• Topsoil piles stored beyond one growing season will be stabilized and seeded to prevent erosion.
• Topsoil storage areas will be identified with appropriate signage, so it is easily identifiable where topsoil is onlocation.
• Noxious and invasive weeds will be inventoried and monitored. Noxious and invasive weeds will be controlledthrough integrated weed management including chemical, mechanical, and biological control methods. Anapproved Pesticide Use Proposal (PUP) is required for all herbicide applications.
• All trash and waste materials not needed for production will be removed immediately.
• Earth work for interim and final reclamation must be completed within 6 months following well completion or
well plugging (weather permitting).
• Salvaged topsoil will be re-distributed evenly, and to pre-disturbance depths, over the surfaces to be revegetated.
• The soil surface will be prepared to provide a seedbed for re-establishment of desirable vegetation. Sitepreparation may include gouging, scarifying, dozer track-walking, mulching, hydro mulching, contour
furrowing, water terracing, fertilizing, disking, soil additives or other approved methods. The seedbed
preparations will be determined to accomplish the reclamation objectives above.
• The seeding contractor will provide all seed tags to the appropriate SMA prior to seeding efforts.
• Seeding will occur after August 15 and prior to winter freezing of the soil.
• Drill seeding will be used except in areas where topography or substrate composition (rock) precludes the use of
the drill. If drill seeding is not possible, broadcast seeding will be implemented. If the broadcast method is used(such as on slopes of 40 percent or greater), the seed rates established for drill seeding will be doubled and seedwill be immediately covered to prevent seed desiccation or predation by birds or rodents. The seeds can becovered in several ways including spreading and crimping straw over the seeded area, raking the area by hand, ordragging a chain or chain-linked fence over the seeded area.
• Any altered drainages or water courses will be stabilized through rip rap, berming, seeding, matting, or otherapproved methods, and will be reconstructed to have the characteristics and features of nearby functionaldrainages. Any disturbance to "dashed line" drainages as depicted on USGS 1:24,000 topographic maps will becoordinated with the corps of engineers prior to disturbance.
Final Reclamation:
Final Reclamation will be similar to interim reclamation except, all disturbance associated with the well location,access road and pipeline will be reclaimed. The seed mix may include more shrubs and native species. The visual
composition will be reestablished to blend with the natural surroundings through re-co to eæg.
DEC22 2009DIV.0F OIL,GAS&
Page 4 of 9Well: Federal 10-21-8-16
12/9/2009
e After pipeline installation is complete, all disturbed areas will be reseeded. The seed mixtures to be used will besimilar to the vegetation of the surrounding areas and may consist of grasses, forbs, or shrubs. A recommended
seed mixture is provided in the table below.
Monitoring:
• The initial monitoring report will include but is not limited to: when the re-contouring and seeding was
completed. The seed applied, the amounts, and the depth of application. Seedbed preparation such as disking ,
mulching, etc. Seed application such as drilling or broadcast seeding. Are there any soil amendments,fertilizers, watering, etc. The amounts of noxious and invasive weeds. Are any fencing requirenients needed.
• Prior to any surface disturbance, vegetative monitoring locations and reference sites will be identified by theoperator and approved by the BLM Authorized Officer.
• Vegetation monitoring protocol will be developed by the operator and approved by the BLM Authorized Officer
prior to implementation of re-vegetation techniques and will be designed to monitor % basal vegetative cover.
• Reclamation areas will be inspected annually and monitored to document location and extent of areas with
successful re-vegetation. Monitoring will continue until the site is considered a success by the authorized officer
and the objectives established in the Green River District Guidelines. A reclamation report will be submitted
electronically to the Authorized Officer by March 31 of each year.
• On Federal lands, the reclamation objective will be a vegetation community that within 5 years is comprised of
desired and/or seeded species, where the basal vegetative cover is 75 percent of a similar undisturbed adjacentnative vegetation community. If after 3 years basal cover is less than 30 percent, then additional seeding and
reclamation efforts may be required.
Seed mix (Interim and Final Reclamation):
Common name Latin name lbs/acre Recommended seedplantingdepth
Squirreltail grass Elymus elymoides 3.0 ¼ - ½"Siberian wheatgrass. Agropyron fragile 1.0 ½"Shadscale saltbush Atriplex confertifolia 2.0 ½"Four-wing saltbush Atriplex canescens 2.0 ½"Gardner's saltbush Atriplex gardneri 2.0 ½"Scarlet globemallow Sphaeralcea coccinea 1.0 ¼ - ¼"
• All pounds are pure live seed.• All seed and mulch will be certified weed free.• Rates are set for drill seeding; double rate if broadcasting.• Reseeding may be required if initial seeding is not successful.
RECEIVEDDEC22 2009
DIV.0FOIL,GAS&
- O O Page 5 of 9Well: Federal 10-21-8-16
12/9/2009
DOWNHOLE PROGRAMCONDITIONS OF APPROVAL (COAs)
SITE SPECIFIC DOWNHOLE COAs:
• Newfield Production Co. shall adhere to all referenced requirements in the SOP (version: June 24,2008) ) along with all Oil and Gas rules and requirements listed in the Code of Federal Regulationsand all Federal Onshore Oil and Gas Orders.
All provisions outlined in Onshore Oil & Gas Order #2 Drilling Operations shall be strictly adheredto. The following items are emphasized:
DRILLING/COMPLETION/PRODUCING OPERATING STANDARDS
• The spud date and time shall be reported orally to Vernal Field Office within 24 hours of spudding.
• Notify Vernal Field Office Supervisory Petroleum Engineering Technician at least 24 hours inadvance of casing cementing operations and BOPE & casing pressure tests.
• All requirements listed in Onshore Order #2 III. E. Special Drilling Operations are applicable for airdrilling of surface hole.
• Blowout prevention equipment (BOPE) shall remain in use until the well is completed or abandoned.Closing unit controls shall remain unobstructed and readily accessible at all times. Choke manifoldsshall be located outside of the rig substructure.
• All BOPE components shall be inspected daily and those inspections shall be recorded in the dailydrilling report. Components shall be operated and tested as required by Onshore Oil & Gas OrderNo. 2 to insure good mechanical working order. All BOPE pressure tests shall be performed by atest pump with a chart recorder and NOT' by the rig pumps. Test shall be reported in the driller'slog.
• BOP drills shall be initially conducted by each drilling crew within 24 hours of drilling out fromunder the surface casing and weekly thereafter as specified in Onshore Oil & Gas Order No. 2.
• Casing pressure tests are required before drilling out from under all casing strings set and cementedin place.
• No aggressive/fresh hard-banded drill pipe shall be used within casing.
• Cement baskets shall not be run on surface casing.
• The operator must report all shows of water or water-bearing sands to the If flowing water isencountered it must be sampled, analyzed, and a copy of the analyses sub i VernalField Office DEC22 2009
DIV.0FOlL,GAS&
Page 6 of 9Well: Federal 10-21-8-16
12/9/2009
• The operator must report encounters of all non oil & gas mineral resources (such as Gilsonite, tarsands, oil shale, trona, etc.) to the Vernal Field Office, in writing, within 5 working days of eachencounter. Each report shall include the well name/number, well location, date and depth (from KBor GL) of encounter, vertical footage of the encounter and, the name of the person making the report(along with a telephone number) should the BLM need to obtain additional information.
• A complete set of angular deviation and directional surveys of a directional well will be submitted tothe Vernal BLM office engineer within 30 days of the completion of the well.
• While actively drilling, chronologic drilling progress reports shall be filed directly with the BLM,Vernal Field Office on a weekly basis in sundry, letter format or e-mail to the Petroleum Engineersuntil the well is completed.
• A cement bond log (CBL) will be run from the production casing shoe to the top of cement and shallbe utilized to determine the bond quality for the production casing. Submit a field copy of the CBLto this office.
• Please submit an electronic copy of all other logs run on this well in LAS format toUT [email protected]. This submission will supersede the requirement for submittal ofpaper logs to the BLM.
• There shall be no deviation from the proposed drilling, completion, and/or workover program asapproved. Safe drilling and operating practices must be observed. Any changes in operation must
have prior approval from the BLM Vernal Field Office.
RECElVEDDEC22 2009
DIV.0FOIL,GAS&
· O O Page 7 of 9Well: Federal 10-21-8-16
12/9/2009
OPERATING REQUIREMENT REMINDERS:
• All wells, whether drilling, producing, suspended, or abandoned, shall be identified in accordancewith 43 CFR 3162.6. There shall be a sign or märker with the name of the operator, lease serialnumber, well number, and surveyed description of the well.
• In accordance with 43 CFR 3162.4-3, this well shall be reported on the "Monthly Report ofOperations" (Oil and Gas Operations Report ((OGOR)) starting with the month in which operationscommence and continue each month until the well is physically plugged and abandoned. This reportshall be filed in duplicate, directly with the Minerals Management Service, P.O. Box 17110, Denver,Colorado 80217-0110, or call 1-800-525-7922 (303) 231-3650 for reporting information.
• Should the well be successfully completed for production, the BLM Vernal Field office must benotified when it is placed in a producing status. Such notification will be by written communicationand must be received in this office by not later than the fifth business day following the date onwhich the well is placed on production. The notification shall provide, as a minimum, the followinginformational items:
o Operator name, address, and telephone number.
o Well name and number.
o Well location (¼¼,Sec., Twn, Rng, and P.M.).
o Date well was placed in a producing status (date of first production for which royalty will bepaid).
o The nature of the well's production, (i.e., crude oil, or crude oil and casing head gas, ornatural gas and entrained liquid hydrocarbons).
o The Federal or Indian lease prefix and number on which the well is located; otherwise thenon-Federal or non-Indian land category, i.e., State or private.
o Unit agreement and/or participating area name and number, if applicable.
o Communitization agreement number, if applicable.
• Any venting or flaring of gas shall be done in accordance with Notice to Lessees (NTL) 4A andneeds prior approval from the BLM Vernal Field Office.
• All undesirable events (fires, accidents, blowouts, spills, discharges) as specified in NTL 3A will bereported to the BLM, Vernal Field Office. Major events, as defined in NTL3A, shall be reportedverbally within 24 hours, followed by a written report within 15 days. "Other than Major Events"will be reported in writing within 15 days. "Minor Events" will be reported on the Monthly Reportof Operations and Production. RECEIVED
DEC22 2009DIV.0FOIL,GAS&
Page 8 of 9Well: Federal 10-21-8-16
12/9/2009
• Whether the well is completed as a dry hole or as a producer, "Well Completion and RecompletionReport and Log" (BLM Form 3160-4) shall be submitted not later than 30 days after completion ofthe well or after completion of operations being performed, in accordance with 43 CFR 3162.4-1.
Two copies of all logs run, core descriptions, and all other surveys or data obtained and compiledduring the drilling, workover, and/or completion operations, shall be filed on BLM Form 3160-4.
Submit with the well completion report a geologic report including, at a minimum, formation tops,and a summary and conclusions. Also include deviation surveys, sample descriptions, strip logs,core data, drill stem test data, and results of production tests if performed. Samples (cuttings, fluid,and/or gas) shall be submitted only when requested by the BLM, Vernal Field Office.
• All off-lease storage, off-lease measurement, or commingling on-lease or off-lease, shall have priorwritten approval from the BLM Vernal Field Office.
• Oil and gas meters shall be calibrated in place prior to any deliveries. The BLM Vernal Field OfficePetroleum Engineers will be provided with a date and time for the initial meter calibration and allfuture meter proving schedules. A copy of the meter calibration reports shall be submitted to theBLM Vernal Field Office. All measurement facilities will conform to the API standards for liquidhydrocarbons and the AGA standards for natural gas measurement. All measurement points shall beidentified as the point of sale or allocation for royalty purposes.
• A schematic facilities diagram as required by Onshore Oil & Gas Order No. 3 shall be submitted tothe BLM Vernal Field Office within 30 days of installation or first production, whichever occurs
first. All site security regulations as specified in Onshore Oil & Gas Order No. 3 shall be adhered to.All product lines entering and leaving hydrocarbon storage tanks will be effectively sealed inaccordance with Onshore Oil & Gas Order No. 3.
• Any additional construction, reconstruction, or alterations of facilities, including roads, gatheringlines, batteries, etc., which will result in the disturbance of new ground, shall require the filing of asuitable plan and need prior approval of the BLM Vernal Field Office. Emergency approval may beobtained orally, but such approval does not waive the written report requirement.
• No location shall be constructed or moved, no well shall be plugged, and no drilling or workover
equipment shall be removed from a well to be placed in a suspended status without prior approval ofthe BLM Vernal Field Office. If operations are to be suspended for more than 30 days, priorapproval of the BLM Vernal Field Office shall be obtained and notification given before resumptionof operations.
• Pursuant to Onshore Oil & Gas Order No. 7, this is authorization for pit disposal of water producedfrom this well for a period of 90 days from the date of initial production. A permanent disposalmethod must be approved by this office and in operation prior to the end of this 90-day period. Inorder to meet this deadline, an application for the proposed permanent disposal method shall besubmitted along with any necessary water analyses, as soon as possible, but no later than 45 daysafter the date of first production. Any method of disposal which has not been approved prior to theend of the authorized 90-day period will be considered as an Incident of Nonc gggill begrounds for issuing a shut-in order until an acceptable manner for disposing o sai water is providedand approved by this office DEC22 2009
DIV.0FOlL,GAS&
O O Page 9 of 9Well: Federal 10-21-8-16
12/9/2009
• Unless the plugging is to take place immediately upon receipt of oral approval, the Field OfficePetroleum Engineers must be notified at least 24 hours in advance of the plugging of the well, inorder that a representative may witness plugging operations. If a well is suspended or abandoned, allpits must be fenced immediately until they are backfilled. The "Subsequent Report ofAbandonment" (Form BLM 3160-5) must be submitted within 30 days after the actual plugging ofthe well bore, showing location of plugs, amount of cement in each, and amount of casing left inhole, and the current status of the surface restoration.
RECEIVEDDEC22 2009
DIV.OFOIL,GAS&
Form3160-3FORM APPROVED(August2007)OMBNo.1004-0137
• ExpiresJuly31,2010UNITED STATESDEPARTMENTOF THE INTERIOR 5. LeaseSerialNo.BUREAUOF LAND MANAGEMENT UTU-69060
APPUCATION FOR PERMIT TO DRILL OR REENTER 6. IfInd ,Allotee orTribeName
la. Typeof work: DRILL O REENTER 2 ÏfUnitor CAAgreement,NameandNo.
8. Lease Nameand WellNo.lb. TypeofWell: 0 I Well GasWell Other SingleZone MultipleZone Federal 10-21-8-162. Nameof0perator Newfield Production Company 9. API WellNo.3a. Address Route #3 Box 3630, Myton UT 84052 3b. PhoneNo.(include area code) 10 FiefdantfPool,orExploratory(435) 646-3721
Monument Butte4. Locationof Well(Reportlocationclearly and in acœrdance with anyMaterequirements.*) 11 Seo.,T.R. M. or Blk.andSurveyorAreaAt surface NWISE 2090' FSL 1941' FELSec. 21, T8S R16EAt proposedprod.zone
14. Distancein milesanddirectionfrom nearesttownorpostoffice Ïi Countyor Parish 13.StateApproximately9.4 miles southwest ofMyton, UT Duchesne UT15. Distancefromproposed*16.No.of acresin lease 17. SpacingUnitdedicatedto thiswelllocationtonearest
propertyor leaseline,it. Approx. 699' f/lse, NA' flunit1130.40(Alsotonearestdrig.unit line,ifany) 40 Acres
18.Distancefrompo osedlocation* 19.ProposedDepth 20. BLM/BIABondNo.on fileapppnlotoro this
eng, ompleted, Approx. 2005' 6,690' WYBOOO49321. Elevations(ShowwhetherDF,KDB,RT,4 etc.) 22. Appr imatedateworkwillstart* 23. Estimatedduration5450' GL
(7) days from SPUD to rig release24. Attachments
Thefollowing,completedinaccordancewith therequirementsof OnshoreOilandGasOrderNo.l, mustbe attachedto thiiform:1. Wellplatcertifiedby a registeredsurveyor. 4. Bond tocover the operationsunlesscovered byan existingbondon file (see2. ADrillingPlan. Item20 above).3. A SurfaceUsePlan (if the location is on National Forest SystemLands, the 5. OperatorcertificationSUPO mustbe filedwith theappropriateForest ServiceOffice) 6. Suchothersite specificinfórmationand/orplansas mayberequiredbythe25 S Nme (ePrint ed) Da
TitleRegulatory Specialist
Approyedby (Si Name (Printed/Typed) Date
Title ASSIS eld ager officeVERNALFIELDOFFICEAppicationappr doesnot warfalifoT olds legal
°o"si"$o°a's°2°pr
fnany,areattached. 00N0m0NSOFAPPROVALATTACHED
Title 18U.S.C.Section1001andTitle43 U.S.C.Section1212,make ita crime foranypersonknowinglyandwillfullytomaketoany departmentor agencyofthe UnitedStatesanyfalse,fictitiousor fraudulentstatementsor representationsasto anymatterwithin itsjurisdiction.(Continued on page 2) *(Ïnstructionon page 2)
NOTICEOFAPPROVAL MM2 2 2009 NOS N'"9DEC22 2009DIV.0F0lk GAS&MININGE 1, g
O OUNITED STATES DEPARTMENT OF THE INTERIOR
BUREAU OF LAND MANAGEMENT• • VERNAL FIELD OFFICE
' 170 South 500 East VERNAL, UT 84078 (435) 781-4401
CONDITIONS OF APPROVAL FOR APPLICATIONFOR PERMITTO DRILL
Company: Newfield Production Company Location: NWSE, Sec. 21, TSS, R16E
Well No: Federal 10-21-8-16 Lease No: UTU-69060
API No: 43-013-50033 Agreement: Greater Monument Butte (GR)
OFFICE NUMBER: (435) 781-4400OFFICE FAX NUMBER: (435) 781-3420
A COPY OF THESE CONDITIONS SHALL BE FURNISHED TO YOURFIELD REPRESENTATIVE TO INSURE COMPLIANCE
All lease and/or unit operations are to be conducted in such a manner that full compliance is made with theapplicable laws, regulations (43 CFR Part 3160), and this approved Application for Permit to Drill includingSurface and Downhole Conditions of Approval. The operator is considered fully responsible for the actions
of his subcontractors. A copy of the approved APD must be on location during construction, drilling, and
completion operations. This permit is approved for a two (2) year period, or until lease expiration,
whichever occurs first. An additional extension, up to two (2) years, may be applied for by sundry
notice prior to expiration.
NOTIFICATION REQUIREMENTS
Location Construction - Forty-Eight (48) hours prior to construction of locatio¾(Notify Environmental Scientist) access roads.
Location Completion - Prior to moving on the drilling rig.
(Notify Environmental Scientist)
Spud Notice -Twenty-Four (24) hours prior to spudding the well.
(Notify Petroleum Engineer)
Casing String & Cementing - Twenty-Four (24) hours prior to running casing and
(Notify Supv. Petroleum Tech.) cementing all casing strings to: ut vn [email protected].
P & Related Equipment Tests -Twenty-Four (24) hours prior to initiating pressure tests.
(Notify Supv. Petroleum Tech.)
First Production Notice - Within Five (5) business days after new well begins or
(Notify Petroleum Engineer) production resumes after well has been off production formore than ninety (90) days.
DEC22 2009DIV.OFOlL,GAS&
O O Page 2 of 9Well: Federal 10-21-8-16
12/9/2009
SURFACE USE PROGRAMCONDITIONS OF APPROVAL (COAs)
• All new and replacement internal combustion gas field engines of less than or equal to 300 design-rated horsepower must not emit more than 2 gms of NOx per horsepower-hour. This requirement
does not apply to gas field engines of less than or equal to 40 design-rated horsepower.
• All and replacement internal combustion gas field engines of greater than 300 design ratedhorsepower must not emit more than 1.0 gms of NOx per horsepower-hour.
• If there is an active Gilsonite mining operation within 2 miles of the well location, operator shallnotify the Gilsonite operator at least 48 hours prior to any blasting during construction.
• If paleontological materials are uncovered during construction, the operator is to immediately stopwork and contact the Authorized Officer (AO). A determination will be made by the AO as to whatmitigation may be necessary for the discovered paleontologic material before construction cancontinue.
SITE SPECIFIC COAs:
CONDITIONS OF APPROVAL:
• Construction and drilling is not allowed from May 1 - June 15 to minimize impacts during mountain plovernesting.
• Construction and drilling is not allowed from March 1 - August 31 to minimize impacts during burrowingowl nesting.
• If it is anticipated that.construction or drilling will occur during any of the given timing restrictions, a BLM orqualified biologist shall be notified so surveys can be conducted. Depending upon the results of the surveys,permission to proceed may or may not be granted by the BLM Authorized Officer.
Reclamation
Interim Reclamation:
Interim reclamation of the surface environment shall take place after drilling and completion and the well isplaced into production. At a minimum, this will include the stabilization of the soil surface during construction,re-contouring of the unused pad area, and the reserve pit to the original contour to the extent possible, and the re-
spreading of the top soil after re-contouring takes place, up to the rig anchor points and any area not needed forproduction. Buried pipelines will be re-contoured, the salvaged topsoil redistributed and reseeded. The outside
borrow of the access road will have the top soil salvaged and re-spread and reseeded. The area will be reseeded
using appropriate seeding methods, which includes, but is not limited to, the drill seeding method (see below).Any adjustments, due to site specific production concerns, to the reclamation COAs in this document can besubmitted on Sundry form 3160-5.
The reclamation objective is to establish a desired self-perpetuating diverse plant community. The objective is to
attain 75% basal cover based on similar undisturbed adjacent native vegetativegggogprised of
DEC22 2009DIV.0FOIL,GAS&
O O Page 3 of 9Well: Federal 10-21-8-16
12/9/2009
desired species and/or seeded species within 5 years of initial reclamation action. However if after three (3)growing seasons there is less than 30% of the basal cover based on similar undisturbed native vegetative
community, then the Authorized Officer may require additional seeding efforts.
Topsoil will be segregated from the subsoil (without mixing them), stockpiled separately from other soilmaterials, and maintained for future use in rehabilitating the locations.
• Topsoil piles stored beyond one growing season will be stabilized and seeded to prevent erosion.
• Topsoil storage areas will be identified with appropriate signage, so it is easily identifiable where topsoil is onlocation.
• Noxious and invasive weeds will be inventoried and monitored. Noxious and invasive weeds will be controlledthrough integrated weed management including chemical, mechanical, and biological control methods. Anapproved Pesticide Use Proposal (PUP) is required for all herbicide applications.
• All trash and waste materials not needed for production will be removed immediately.
• Earth work for interim and final reclamation must be completed within 6 months following well completion or
well plugging (weather permitting).
• Salvaged topsoil will be re-distributed evenly, and to pre-disturbance depths, over the surfaces to be revegetated.
• The soil surface will be prepared to provide a seedbed for re-establishment of desirable vegetation. Sitepreparation may include gouging, scarifying, dozer track-walking, mulching, hydro mulching, contour
furrowing, water terracing, fertilizing, disking, soil additives or other approved methods. The seedbed
preparations will be determined to accomplish the reclamation objectives above.
• The seeding contractor will provide all seed tags to the appropriate SMA prior to seeding efforts.
• Seeding will occur after August 15 and prior to winter freezing of the soil.
• Drill seeding will be used except in areas where topography or substrate composition (rock) precludes the use of
the drill. If drill seeding is not possible, broadcast seeding will be implemented. If the broadcast method is used(such as on slopes of 40 percent or greater), the seed rates established for drill seeding will be doubled and seedwill be immediately covered to prevent seed desiccation or predation by birds or rodents. The seeds can becovered in several ways including spreading and crimping straw over the seeded area, raking the area by hand, ordragging a chain or chain-linked fence over the seeded area.
• Any altered drainages or water courses will be stabilized through rip rap, berming, seeding, matting, or otherapproved methods, and will be reconstructed to have the characteristics and features of nearby functionaldrainages. Any disturbance to "dashed line" drainages as depicted on USGS 1:24,000 topographic maps will becoordinated with the corps of engineers prior to disturbance.
Final Reclamation:
Final Reclamation will be similar to interim reclamation except, all disturbance associated with the well location,access road and pipeline will be reclaimed. The seed mix may include more shrubs and native species. The visual
composition will be reestablished to blend with the natural surroundings through re-co to eæg.
DEC22 2009DIV.0F OIL,GAS&
Page 4 of 9Well: Federal 10-21-8-16
12/9/2009
e After pipeline installation is complete, all disturbed areas will be reseeded. The seed mixtures to be used will besimilar to the vegetation of the surrounding areas and may consist of grasses, forbs, or shrubs. A recommended
seed mixture is provided in the table below.
Monitoring:
• The initial monitoring report will include but is not limited to: when the re-contouring and seeding was
completed. The seed applied, the amounts, and the depth of application. Seedbed preparation such as disking ,
mulching, etc. Seed application such as drilling or broadcast seeding. Are there any soil amendments,fertilizers, watering, etc. The amounts of noxious and invasive weeds. Are any fencing requirenients needed.
• Prior to any surface disturbance, vegetative monitoring locations and reference sites will be identified by theoperator and approved by the BLM Authorized Officer.
• Vegetation monitoring protocol will be developed by the operator and approved by the BLM Authorized Officer
prior to implementation of re-vegetation techniques and will be designed to monitor % basal vegetative cover.
• Reclamation areas will be inspected annually and monitored to document location and extent of areas with
successful re-vegetation. Monitoring will continue until the site is considered a success by the authorized officer
and the objectives established in the Green River District Guidelines. A reclamation report will be submitted
electronically to the Authorized Officer by March 31 of each year.
• On Federal lands, the reclamation objective will be a vegetation community that within 5 years is comprised of
desired and/or seeded species, where the basal vegetative cover is 75 percent of a similar undisturbed adjacentnative vegetation community. If after 3 years basal cover is less than 30 percent, then additional seeding and
reclamation efforts may be required.
Seed mix (Interim and Final Reclamation):
Common name Latin name lbs/acre Recommended seedplantingdepth
Squirreltail grass Elymus elymoides 3.0 ¼ - ½"Siberian wheatgrass. Agropyron fragile 1.0 ½"Shadscale saltbush Atriplex confertifolia 2.0 ½"Four-wing saltbush Atriplex canescens 2.0 ½"Gardner's saltbush Atriplex gardneri 2.0 ½"Scarlet globemallow Sphaeralcea coccinea 1.0 ¼ - ¼"
• All pounds are pure live seed.• All seed and mulch will be certified weed free.• Rates are set for drill seeding; double rate if broadcasting.• Reseeding may be required if initial seeding is not successful.
RECEIVEDDEC22 2009
DIV.0FOIL,GAS&
- O O Page 5 of 9Well: Federal 10-21-8-16
12/9/2009
DOWNHOLE PROGRAMCONDITIONS OF APPROVAL (COAs)
SITE SPECIFIC DOWNHOLE COAs:
• Newfield Production Co. shall adhere to all referenced requirements in the SOP (version: June 24,2008) ) along with all Oil and Gas rules and requirements listed in the Code of Federal Regulationsand all Federal Onshore Oil and Gas Orders.
All provisions outlined in Onshore Oil & Gas Order #2 Drilling Operations shall be strictly adheredto. The following items are emphasized:
DRILLING/COMPLETION/PRODUCING OPERATING STANDARDS
• The spud date and time shall be reported orally to Vernal Field Office within 24 hours of spudding.
• Notify Vernal Field Office Supervisory Petroleum Engineering Technician at least 24 hours inadvance of casing cementing operations and BOPE & casing pressure tests.
• All requirements listed in Onshore Order #2 III. E. Special Drilling Operations are applicable for airdrilling of surface hole.
• Blowout prevention equipment (BOPE) shall remain in use until the well is completed or abandoned.Closing unit controls shall remain unobstructed and readily accessible at all times. Choke manifoldsshall be located outside of the rig substructure.
• All BOPE components shall be inspected daily and those inspections shall be recorded in the dailydrilling report. Components shall be operated and tested as required by Onshore Oil & Gas OrderNo. 2 to insure good mechanical working order. All BOPE pressure tests shall be performed by atest pump with a chart recorder and NOT' by the rig pumps. Test shall be reported in the driller'slog.
• BOP drills shall be initially conducted by each drilling crew within 24 hours of drilling out fromunder the surface casing and weekly thereafter as specified in Onshore Oil & Gas Order No. 2.
• Casing pressure tests are required before drilling out from under all casing strings set and cementedin place.
• No aggressive/fresh hard-banded drill pipe shall be used within casing.
• Cement baskets shall not be run on surface casing.
• The operator must report all shows of water or water-bearing sands to the If flowing water isencountered it must be sampled, analyzed, and a copy of the analyses sub i VernalField Office DEC22 2009
DIV.0FOlL,GAS&
Page 6 of 9Well: Federal 10-21-8-16
12/9/2009
• The operator must report encounters of all non oil & gas mineral resources (such as Gilsonite, tarsands, oil shale, trona, etc.) to the Vernal Field Office, in writing, within 5 working days of eachencounter. Each report shall include the well name/number, well location, date and depth (from KBor GL) of encounter, vertical footage of the encounter and, the name of the person making the report(along with a telephone number) should the BLM need to obtain additional information.
• A complete set of angular deviation and directional surveys of a directional well will be submitted tothe Vernal BLM office engineer within 30 days of the completion of the well.
• While actively drilling, chronologic drilling progress reports shall be filed directly with the BLM,Vernal Field Office on a weekly basis in sundry, letter format or e-mail to the Petroleum Engineersuntil the well is completed.
• A cement bond log (CBL) will be run from the production casing shoe to the top of cement and shallbe utilized to determine the bond quality for the production casing. Submit a field copy of the CBLto this office.
• Please submit an electronic copy of all other logs run on this well in LAS format toUT [email protected]. This submission will supersede the requirement for submittal ofpaper logs to the BLM.
• There shall be no deviation from the proposed drilling, completion, and/or workover program asapproved. Safe drilling and operating practices must be observed. Any changes in operation must
have prior approval from the BLM Vernal Field Office.
RECElVEDDEC22 2009
DIV.0FOIL,GAS&
· O O Page 7 of 9Well: Federal 10-21-8-16
12/9/2009
OPERATING REQUIREMENT REMINDERS:
• All wells, whether drilling, producing, suspended, or abandoned, shall be identified in accordancewith 43 CFR 3162.6. There shall be a sign or märker with the name of the operator, lease serialnumber, well number, and surveyed description of the well.
• In accordance with 43 CFR 3162.4-3, this well shall be reported on the "Monthly Report ofOperations" (Oil and Gas Operations Report ((OGOR)) starting with the month in which operationscommence and continue each month until the well is physically plugged and abandoned. This reportshall be filed in duplicate, directly with the Minerals Management Service, P.O. Box 17110, Denver,Colorado 80217-0110, or call 1-800-525-7922 (303) 231-3650 for reporting information.
• Should the well be successfully completed for production, the BLM Vernal Field office must benotified when it is placed in a producing status. Such notification will be by written communicationand must be received in this office by not later than the fifth business day following the date onwhich the well is placed on production. The notification shall provide, as a minimum, the followinginformational items:
o Operator name, address, and telephone number.
o Well name and number.
o Well location (¼¼,Sec., Twn, Rng, and P.M.).
o Date well was placed in a producing status (date of first production for which royalty will bepaid).
o The nature of the well's production, (i.e., crude oil, or crude oil and casing head gas, ornatural gas and entrained liquid hydrocarbons).
o The Federal or Indian lease prefix and number on which the well is located; otherwise thenon-Federal or non-Indian land category, i.e., State or private.
o Unit agreement and/or participating area name and number, if applicable.
o Communitization agreement number, if applicable.
• Any venting or flaring of gas shall be done in accordance with Notice to Lessees (NTL) 4A andneeds prior approval from the BLM Vernal Field Office.
• All undesirable events (fires, accidents, blowouts, spills, discharges) as specified in NTL 3A will bereported to the BLM, Vernal Field Office. Major events, as defined in NTL3A, shall be reportedverbally within 24 hours, followed by a written report within 15 days. "Other than Major Events"will be reported in writing within 15 days. "Minor Events" will be reported on the Monthly Reportof Operations and Production. RECEIVED
DEC22 2009DIV.0FOIL,GAS&
Page 8 of 9Well: Federal 10-21-8-16
12/9/2009
• Whether the well is completed as a dry hole or as a producer, "Well Completion and RecompletionReport and Log" (BLM Form 3160-4) shall be submitted not later than 30 days after completion ofthe well or after completion of operations being performed, in accordance with 43 CFR 3162.4-1.
Two copies of all logs run, core descriptions, and all other surveys or data obtained and compiledduring the drilling, workover, and/or completion operations, shall be filed on BLM Form 3160-4.
Submit with the well completion report a geologic report including, at a minimum, formation tops,and a summary and conclusions. Also include deviation surveys, sample descriptions, strip logs,core data, drill stem test data, and results of production tests if performed. Samples (cuttings, fluid,and/or gas) shall be submitted only when requested by the BLM, Vernal Field Office.
• All off-lease storage, off-lease measurement, or commingling on-lease or off-lease, shall have priorwritten approval from the BLM Vernal Field Office.
• Oil and gas meters shall be calibrated in place prior to any deliveries. The BLM Vernal Field OfficePetroleum Engineers will be provided with a date and time for the initial meter calibration and allfuture meter proving schedules. A copy of the meter calibration reports shall be submitted to theBLM Vernal Field Office. All measurement facilities will conform to the API standards for liquidhydrocarbons and the AGA standards for natural gas measurement. All measurement points shall beidentified as the point of sale or allocation for royalty purposes.
• A schematic facilities diagram as required by Onshore Oil & Gas Order No. 3 shall be submitted tothe BLM Vernal Field Office within 30 days of installation or first production, whichever occurs
first. All site security regulations as specified in Onshore Oil & Gas Order No. 3 shall be adhered to.All product lines entering and leaving hydrocarbon storage tanks will be effectively sealed inaccordance with Onshore Oil & Gas Order No. 3.
• Any additional construction, reconstruction, or alterations of facilities, including roads, gatheringlines, batteries, etc., which will result in the disturbance of new ground, shall require the filing of asuitable plan and need prior approval of the BLM Vernal Field Office. Emergency approval may beobtained orally, but such approval does not waive the written report requirement.
• No location shall be constructed or moved, no well shall be plugged, and no drilling or workover
equipment shall be removed from a well to be placed in a suspended status without prior approval ofthe BLM Vernal Field Office. If operations are to be suspended for more than 30 days, priorapproval of the BLM Vernal Field Office shall be obtained and notification given before resumptionof operations.
• Pursuant to Onshore Oil & Gas Order No. 7, this is authorization for pit disposal of water producedfrom this well for a period of 90 days from the date of initial production. A permanent disposalmethod must be approved by this office and in operation prior to the end of this 90-day period. Inorder to meet this deadline, an application for the proposed permanent disposal method shall besubmitted along with any necessary water analyses, as soon as possible, but no later than 45 daysafter the date of first production. Any method of disposal which has not been approved prior to theend of the authorized 90-day period will be considered as an Incident of Nonc gggill begrounds for issuing a shut-in order until an acceptable manner for disposing o sai water is providedand approved by this office DEC22 2009
DIV.0FOlL,GAS&
O O Page 9 of 9Well: Federal 10-21-8-16
12/9/2009
• Unless the plugging is to take place immediately upon receipt of oral approval, the Field OfficePetroleum Engineers must be notified at least 24 hours in advance of the plugging of the well, inorder that a representative may witness plugging operations. If a well is suspended or abandoned, allpits must be fenced immediately until they are backfilled. The "Subsequent Report ofAbandonment" (Form BLM 3160-5) must be submitted within 30 days after the actual plugging ofthe well bore, showing location of plugs, amount of cement in each, and amount of casing left inhole, and the current status of the surface restoration.
RECEIVEDDEC22 2009
DIV.OFOIL,GAS&
7°" United States Department of the InteriorBUREAU OF LAND MANAGEMENT
Green River DistrictVernal Field Office
s, 170 South 500 EastVernal, UT 84078
http://www.blm.gov/ut/st/en/fo/vernal.html
IN REPLY REFER TO: Û ËÛ3M1a6nOdie
C
oOze1r
Newfield Production CompanyRoute 3, Box 3630Myton, UT 84052
Re: Request to Rescind Approved APD
Well No. Federal 10-21-8-16NWSE, Sec. 21, T8S, R16EDuchesne County, UtahLease No. UTU-69060
Dear Ms. Crozier:
The Application for Permit to Drill (APD) for the above-referenced wellwas approved onDecember 15, 2009. This office is rescinding its approval of the referenced ApplicationforPermit to Drill per your request to thisoffice in an email message to Land Law Examiner RobinHansen received on August 27, 2013. Ifyou intend to drill at this location in the future, a newApplication for Permit to Drill must be submitted.
This office requires a letter confirming that no surface disturbance has been made for this drillsite. Any surface disturbance associated with the approved location of thiswell is to berehabilitated. A schedule for this rehabilitation must be submitted to thisoffice. Yourcooperation in this matter is appreciated.
Ifyou have any questions regarding APD processing, please contact Leslie Buhler at (435) 781-3432.
Sincerely,
Assistant Field ManagerLands & Resource
Division of Oil, Gas and Mining
Operator Change/Name Change Worksheet-for State use only
Effective Date : 112412020 -, FORMER OPERATOR: NEW OPERA TOR: Newfield Production Company Ovintiv Production, Inc.
Groups: Greater MOIIUIDeIIlBulle , ~:<,
WELL INFORMATION: WeU Name See Attached List
Total Well Count: OPERATOR CHANGES DOCUMENTATION: I. Sundry or legal documentation was received from the FORMER operator on : 2. Sundry or legal documentation was received from the NEW operator on: 3. New operator Division of Corporations Business Number:
REVIEW: Receipt of Acceptance of Drilling Procedures for APD on: Reports current for Production/Disposition & Sundries: OPS/SIIT A well(s) reviewed for fuU cost bonding: Approved by Dustin
UIC5 on all disposaVinjection/storage well(s) Approved on: Approved by Dayne Surface Facility(s) included in operator change: State 11-32 Pipetine
Monument Butte St 10-36 GB Fed 13-20-8-17 Call1l8Sback Fed 1-22-8-17 Ashley Fed 8-14-9-15 PIpeline
NEW OPERATOR BOND VERIFICATION: State/fee well(s) covered by Bond Number(s):
DATA ENTRY: Well(s) update in the RBDMS on: Group(s) update in RDBMS on: Surface Facilities update in RBDMS on: Entities Updated in RBDMS on:
COMMENTS:
west Iateral4C SIus Catcher (2-5-3-3) West latent Phase 5 Slug Catcher Bar F SIua Catcher Dart SIui CetdIer Mullins SIu& CatdIer Temporary PnIducecI Water Conditioning Site
Dart Temporary Produced w.rter FacUity EariT ra waterJreatment aclllty
1/1412021 111412021 1/1412021
755627-0143
3/1612020 ____ .... 3/1612020
.--=-=:-__ 91212020 111412021 1212112020 312512020
I
I
Status
2/23/2021
STATE OF UTAH DEPARTMENT OF NATURAL RESOURCES
DIVISION OF OIL, GAS AND MINING
SUNDRY NOTICES AND REPORTS ON WELLS
Do not use this lonn lor proposals to drill new wells, significantly deepen existing wells below current bottom-hole depth, reenter plugged wells, or to drill horizontsl lstersls. Use APPLICA nON FOR PERMIT TO DRILL form for such proposals.
1. TYPE OF WELl. OIL WELL 0 GAS WELL 0 OTHER ______________________ __
2 . NAM E OF OPERATOR:
Newfield Production Company 3. ADDRESS OF OPERATOR:
4 Waterway Square Place Sl CIT'! The Woodlands SiME TX 21P 77380 4. LOCATION OF WELL
FOOTAGES AT SURFACE:
QTR/OTR, SECTION, TOWNSHIP, RANGE, MERIDIAN:
FORM 9
5. LEASE DESIGNATION AND SERIAL NUMBER'
see attached list 6. IF INDIAN, ALLOTTEE OR TRIBE NAME:
see attached 7 UNIT or CA AGREEMENT NAME'
8. 'Mi:LL NAME and NUMBER '
see attached 9 API NUMBER:
attached 10. FIELD AND POOL, OR WILDCAT:
attached
COUNTY'
STATE:
UTAH
11 . CHECK APPROPRIATE BOXES TO INDICATE NATURE OF NOTICE, REPORT, OR OTHER DATA
TYPE OF SUBMISSION TYPE OF ACTION
Q] 0 ACIDIZE 0 DEEPEN 0 REPERFORATE CURRENT FORMATION NOTICE OF INTENT
(Submit in fluplir.ate) 0 ALTER CASING 0 fRACTURE TREAT 0 SIDETRACK 1'0 REPAIR WELL
ApproxllTlatA cjijte wOlk Will staft 0 CASING REPAIR 0 NEW CONSTRUCTION 0 TEMPORARIL Y ABANDON
D CHANGE TO PREVIOUS f'LANS fZl OPERATOR CHANGE 0 fUSING Rt:PAIf<
0 CHANGE TUBING 0 PLUG AND ABANDON 0 VENT OR FI.ARE
[ J SUBSEQUENT REPORT 0 GrIANGE WELL NAME 0 PLUG SACK 0 WATER DISPOSAL (Submit Original Form Only)
0 0 0 CHANGE WELL STATUS PRODUCTION (START/RESUME) WATER SHIJT -OFF Datn of work completion
0 0 0 COMMINGLE PRODUCING FORMATIONS RECLAMATION OF WELL SITE OTHER
0 CONVERT WELL TYPE 0 RECOMPLETE - DIFFERENT FORMATION
12 DESCRIBE PROPOSED OR COMPLETED OPERATIONS, Clearly show all pertinent details including dates , depths, VOlumes, etc,
This sundry is serve as notification of the formal corporate name change of Newfield Production Company to Ovintiv Production Inc, Attached is a list of all wells wells that will be operated under Ovintiv Production Inc effective January 24, 2020,
PREVIOUS NAME: Newfield Producion Company 4 Waterway Square Place Suite 100 The Woodlands, TX 77380 (435)646-4825
(This space ror State U5. only)
(ti/2000)
NEW NAME: Ovintiv Production Inc, 4 Waterway Square Place Suite 100 The Woodlands, TX 77380 (435)646-4825
flT l E Regulatory Manager, Rockies
DATE 3/16/2020
STATE OF UTAH DEPARTMENT OF NATURAL RESOURCES
DIVISION OF OIL, GAS AND MINING
SUNDRY NOTICES AND REPORTS ON WELLS
Do not use this form lor proposals 10 drill new wells. significantly deepen existing wells below current bottom-hal. depth, reenter plugged wells, or to drill horizontal laterals. Use APPLICATION FOR PERMIT TO DRILL form for such proposals.
1. TYPE OF WEll. OIL WELL 0 GAS WELL 0 OTHER ______________________ __
2. NAME OF OPERATOR:
Newfield Production Company 3. ADDRESS OF OPERATOR:
4 Waterway Square Place SL CIT" The Woodlands smE TX 2iP 77380 4. LOCATION OF WELL
FOOTAGES AT SURFACE:
OTR/OTR. SECTION, TOWNSHIP, RANGE, MERIDIAN:
FORM 9
5. LEASE DESIGNATION AND SERIAL NUMBER
see attached list 6. IF INDIAN. ALLOTTEE OR TRIBE NAME:
see attached 7 UNIT or CA AGREEMENT NAME'
8. V',ELL NAME and NUMBER'
see attached 9 API NUMBER:
attached 10. FIELD AND POOL, OR 'M'-DCAT:
attached
COUNTY'
STATE: UTAH
11 . CHECK APPROPRIATE BOXES TO INDICATE NATURE OF NOTICE, REPORT, OR OTHER DATA
TYPE OF SUBMISSION TYPE OF ACTION
121 0 ACIDIZE 0 DEEPEN 0 REPERFORATE CURRENT FORMATION NOTICE OF INTENT
(Submit in Duplicate) 0 ALTER CASING 0 FRACTURE TREAT 0 SIDETRACK 1'0 REPAIR WELL
ApproXimate elale work will start: 0 CASING REPAIR 0 NEW CONSTRUCTION 0 TEMPORARIL Y ABANDON
0 CHANGE TO PREVIOUS PLANS 121 OPF.RATOR CHANGE 0 rUSING REPAlil
0 CHANGE TUBING [J PUJG AND ABANDON D VENT OR FLARE
[J SUBSEQUENT REPORT D OIANGE WELL NAME 0 PLUG BACK 0 WATER DISPOSAL (Submit Original Form Only)
D D 0 CHANGE WELL STATUS PRODUCTION (START/RESUME) WATER SHtH .oF" Of:lln of work completion
0 0 0 COMMINGLE PRODUCING FORMATIONS RECLAMATION OF WEl.L SITE OTHER.
0 CONVERT WELL TYPE 0 RECOMPLETE· DIFFERENT FORMATION
t2 DESCRIBE PROPOSED OR COMPLETED OPERATIONS. Clearly show all pertinent details including dates, depths, volumes, etc.
This sundry is serve as notification of the formal corporate name change of Newfield Production Company to Ovintiv Production Inc. Attached is a list of all wells wells that will be operated under Ovintiv Production Inc effective January 24, 2020.
PREVIOUS NAME: Newfield Producion Company 4 Waterway Square Place Suite 100 The Woodlands, TX 77380 (435)646-4825
(This space 1M State us. only)
(tiI2000)
NEW NAME: Ovintiv Production Inc. 4 Waterway Square Place Suite 100 The Woodlands, TX 77380 (435)646-4825
TITLE Regulatory Manager, Rockies
DArE 3/16/2020