form-a-squeeze - brochure alpine mud products

2
PEAK PERFORMANCE ADDITIVES Product Description · Physical Appearance: gray coarse powder · Specific Gravity: 2-2.5 · Contains natural fibers, minerals and poly- saccharides · Packaged in 40 lb. bags · Environmentally acceptable Function · To squeeze out fluid phase and solid plug, bridging inside and across loss circula- tion zones, i.e. vugular, fractures, perfora- tions or casing leaks Benefits · Quick acting loss circulation plug · Single sack mix · Extremely easy to mix through standard rig hopper in both water, brine or base oil/syn- thetic · No spacer is required; contaminant friendly to both water base or non aqueous base fluids · Unique flow properties allow mixing even up to 18.0 ppg slurries · Can be used in whole circulation system up to 10 lb/bbl for seepage loss · No risk of side tracking hole (as with ce- ment) · Temperature stable up to 450° F Slurry Mixing Recommendations · The recommended concentration of slurry is 80 lb/bbl (28 kg/ m3) in either water or base oil/synthetic. If required, weight up to desired density with barite or calcium carbonate. · Simply add two sacks of per bbl of fluid (Do not mix less than 50 bbl slurry). Do not use whole mud (It has low fluid loss). · Mix pill in this order: Prepare calculated vol- ume of fluid in a clean mixing tank, add 2/3 of the sacks and then add the required barite to desired density. Then add the remaining 1/3 quantity of ; mix for 15-20 minutes. Pump and HOUSTON, TX 713-688-9144 BELLE CHASSE, LA 504-394-5870 Available in 40 lb. bags 50 bags / pallet Actual Product High-Fluid Loss/High-Solids Slurry Lost Circulation Plug

Upload: milapgoud

Post on 12-Mar-2015

119 views

Category:

Documents


6 download

TRANSCRIPT

Page 1: FORM-A-SQUEEZE - Brochure Alpine Mud Products

P E A K P E R F O R M A N C E A D D I T I V E S

Product Description· Physical Appearance: gray coarse powder· Specific Gravity: 2-2.5· Contains natural fibers, minerals and poly-

saccharides· Packaged in 40 lb. bags· Environmentally acceptable

Function· To squeeze out fluid phase and solid

plug, bridging inside and across loss circula-tion zones, i.e. vugular, fractures, perfora-tions or casing leaks

Benefits· Quick acting loss circulation plug· Single sack mix · Extremely easy to mix through standard rig

hopper in both water, brine or base oil/syn-thetic

· No spacer is required; contaminant friendly to both water base or non aqueous base fluids

· Unique flow properties allow mixing even up to 18.0 ppg slurries

· Can be used in whole circulation system up to 10 lb/bbl for seepage loss

· No risk of side tracking hole (as with ce-ment)

· Temperature stable up to 450° F

Slurry Mixing Recommendations· The recommended concentration of slurry is 80 lb/bbl (28 kg/

m3) in either water or base oil/synthetic. If required, weight up to desired density with barite or calcium carbonate.

· Simply add two sacks ofper bbl of fluid (Do not mix less than 50 bbl slurry). Do not use whole mud (It has low fluid loss).

· Mix pill in this order: Prepare calculated vol-ume of fluid in a clean mixing tank, add 2/3 of the sacks and then add the required barite to desired density. Then add the remaining 1/3 quantity of

; mix for 15-20 minutes. Pump and

HOUSTON, TX 713-688-9144 BELLE CHASSE, LA 504-394-5870

Available in 40 lb. bags50 bags / pallet

Actual Product

High-Fluid Loss/High-Solids SlurryLost Circulation Plug

Page 2: FORM-A-SQUEEZE - Brochure Alpine Mud Products

P E A K P E R F O R M A N C E A D D I T I V E S

ALPINE MUD PRODUCTS P.O. BOX 970 BELLE CHASSE, LA 70037 HOUSTON 713-688-9144 BELLE CHASSE 504-394-5870 www.alpinemud.com© 2000 Alpine Mud Products Corporation Alpine is a trademark of Alpine Mud Products Corporation

Squeeze Procedure· Determine as closely as possible location of loss zone. · Calculate volume of the slurry to cover at least 50% excess the loss zone. (50 bbl Mini-

mum)· Place bottom of drill pipe or bit at depth that will allow an equivalent open hole vol-

ume to remain across the loss zone. · Spot the pill and pull up slowly 90-ft above the pill or into the last casing. · Close the annular preventer and apply gentle squeeze 100-300 psi to maximum of an-

ticipated mud weight required for the interval, holding the pressure for 10-20 minutes. · Break circulation slowly with slow pump rates washing to bottom. Then resume drill-

ing operations.

A mixture of 80 ppb was mixed in water and blended for 10 minutes in a Hamilton Beach Mixer, weighted up with barite to 17.5 ppg and an API test (100 psi at room temperature) was run using screen only -250 micron size as the filter medium.Fluid phase was squeezed out leaving the resulting LC plug cake shown above.

High-Fluid Loss/High-Solids SlurryLost Circulation Plug

LC Plug Compressibility Comparison• Each product, 80 ppb in water(Each sample dewatered within 90 seconds)

Product A

Product BLC Plug / 17.5 ppg

Note: More compacted