Form works & Brick works
NM.RaneesB/QS/14/08/04
Form work
Introduction Loads on form work Requirements of a good form work
Materials for form work
Plywood Plastic Hard board Timber Steel
Propping and Centering
Shuttering
Provision of camber
Cleaning and surface treatment
Process of form work
Column form work
Column form work includes Sheathing (panels) Yokes Wedges
In my site
Form work for beamBeam form work has 2 partsInvert panel ( Soffit shuttering)Hanging panel
In my site
Its likes wise beam form work but soffit shuttering is larger than beam form work
In preparing form work 1. plywood supported by 2” * 2” timber
2. 2” diameter GI pipes3. Over 4” * 2” timber joists
Slab form work
In my site
Form work for stair cases
Its containts1.Planks2.Plank connectors3.Skirting board4.Soffit board
In my site
Brick work Brick
This is the unit of walling Its made by moulding clay
Bonds
Strecher bond
Header bond
Flemish bond
English bond
Herring bone bond
(Strecher bond)(Header bond)
(Flemish bond)
(English bond)
(Hering bone bond)