fort buchanan’s water harvesting initiatives · 2016-08-18 · old dpw site) ecm 12.1 water...

12
Rhode Island Convention Center • Providence, Rhode Island Fort Buchanan’s Water Harvesting Initiatives Session: Alternative Water Resources Mr. Anibal Negron USAG Fort Buchanan PR August 10, 2016

Upload: others

Post on 08-Aug-2020

3 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Fort Buchanan’s Water Harvesting Initiatives · 2016-08-18 · Old DPW Site) ECM 12.1 Water Conservation Initiatives: 1. Leak Detection Analysis 2. Rain Water Harvesting (9 Buildings

Rhode Island Convention Center • Providence, Rhode IslandRhode Island Convention Center • Providence, Rhode Island

Fort Buchanan’s Water Harvesting Initiatives

Session: Alternative Water Resources

Mr. Anibal NegronUSAG Fort Buchanan PR

August 10, 2016

Page 2: Fort Buchanan’s Water Harvesting Initiatives · 2016-08-18 · Old DPW Site) ECM 12.1 Water Conservation Initiatives: 1. Leak Detection Analysis 2. Rain Water Harvesting (9 Buildings

Rhode Island Convention Center • Providence, Rhode Island

Fort Buchanan Net Zero Water Strategy

Issues / Actions

Photos 1. ESPC Project 1:1a. High Efficiency Fixtures (toilets, urinals, showerheads) : Completed

1b. DFMWR Well Water Fed Irrigation System : 100% completed

2. ESPC Project 2:2a. Leak Detection Survey: Performed , 8 leaks found & repaired

2b. Water Harvesting: Completed , Includes 9 Buildings (330KSF)

2c. Potable Water Well Construction: Completed & Operating.

3. Facility Reduction Program:3a. 118,454 SF (FY11), 62,931 SF (FY13), and 36,024 SF (FY14)

4. Advanced Metering System:4a. All Buildings above 20KSF. ECD by 1st QTR FY16 (95% completion rate)

5 . PNNL Water Balance Study and Net Zero Roadmap completed

Current Status

Roadmap Way-Ahead1. Issues:

1a. No treatment facilities on Post and aged Water Distribution System

2. Actions:2a. Hydraulic Modeling Study managed by USACE-Mobile District Office is ongoing to determine Water Distribution System condition and provide upgrade/repair recommendations. ECD: 1st QTR FY172b. PNNL completed (4th QTR FY15) a Feasibility Study (FS) for a Waste Water Treatment Plant (WWTP) & Reclaim Water Reuse Strategy. FS concluded that the project is feasible and complies with Savings to Investment Ratio (SIR) of 1 and 19 years of Simple Payback. USACE Mobile will conduct a planning Charrette for a WWTP design including a 2nd Well. Estimate Implementation cost is approx. $5M. EST: FY17 / ECD: FY19.

Lake for Golf CourseIrrigation System

Final Road Map

FY20

FY12

FY15

FY14

FY13

FY16

FY17

FY18FY19

Water Balance

ESPC Project 2

Facility Reduction Plan

ESPC Project 3 (TBD)

Meet NZW 60% reduction goal

EMAP No 4 (Water Conservation) approved by GC

ESPC Project 1

Advanced Metering System

Future New Construction and Demolitions (TBD)

Hydraulic Modeling study

Page 3: Fort Buchanan’s Water Harvesting Initiatives · 2016-08-18 · Old DPW Site) ECM 12.1 Water Conservation Initiatives: 1. Leak Detection Analysis 2. Rain Water Harvesting (9 Buildings

Rhode Island Convention Center • Providence, Rhode Island

ID DESCRIPTION

ECM 2.1 Air Cooled Chillers Replacement

ECM 3.1 Energy Management Control Systems (EMCS)

ECM 4.1 HVAC System and Split AC Systems Retrofit

ECM 5.1 Lighting Upgrades and Occupancy Sensors

ECM 5.2 Street Lighting Upgrades to LED

ECM 10.1 Solar Photovoltaic Systems: Roof mounted at 606 and 689.

ECM 10.2 Solar Thermal Water Heating

ECM 10.3 Wind Power Generation: (3 turbines @ 275 kW each)

ECM 12.1

Water Conservation Initiatives:

1. DFMWR Irrigation System

2. Building Water fixtures

ECM 14.1 Retro Commissioning Services

ID DESCRIPTION

ECM 3.1 Energy Management Control Systems

ECM 4.1 HVAC System and Split AC Systems Retrofit

ECM 5.1 Lighting Upgrades and Occupancy Sensors

ECM 5.2 Street Lighting Upgrades

ECM 10.1Solar Photovoltaic Systems (Parking Canopy @ Buildings 689, 353, 161, and Old DPW Site)

ECM 12.1

Water Conservation Initiatives:

1. Leak Detection Analysis

2. Rain Water Harvesting (9 Buildings with a combined total area of 337,227sf)

ECM 12.2 Ground Water Well for Potable Usage

COMBINED TOTAL (ESPC Project 2 only)

Project 1 MOD: ECM 6.1

Building 689 reflective Roofing

Project 1 Mod: ECM 10.1

Ground Mounted PV System at Bldgs 21, 556, and 538

ESPC 1 ESPC 2

ECM: Energy Conservation Measure

Energy Saving Performance Contract (ESPC)

Page 4: Fort Buchanan’s Water Harvesting Initiatives · 2016-08-18 · Old DPW Site) ECM 12.1 Water Conservation Initiatives: 1. Leak Detection Analysis 2. Rain Water Harvesting (9 Buildings

Rhode Island Convention Center • Providence, Rhode Island

Fort Buchanan’s Net Zero Water Road Map

Page 5: Fort Buchanan’s Water Harvesting Initiatives · 2016-08-18 · Old DPW Site) ECM 12.1 Water Conservation Initiatives: 1. Leak Detection Analysis 2. Rain Water Harvesting (9 Buildings

Rhode Island Convention Center • Providence, Rhode Island

PXTra Water Harvesting4,400 GalPXTra Water Harvesting4,400 Gal

Middle School Water Harvesting4,400 GalMiddle School Water Harvesting4,400 Gal

Fort Buchanan’s Rainwater Harvesting Systems

Page 6: Fort Buchanan’s Water Harvesting Initiatives · 2016-08-18 · Old DPW Site) ECM 12.1 Water Conservation Initiatives: 1. Leak Detection Analysis 2. Rain Water Harvesting (9 Buildings

Rhode Island Convention Center • Providence, Rhode Island

Fort Buchanan’s Rainwater Harvesting Sites (continued)

Bowling Center Water Harvesting 4,400 GalBowling Center Water Harvesting 4,400 Gal

High School Water Harvesting 9,000 GalHigh School Water Harvesting 9,000 Gal

Page 7: Fort Buchanan’s Water Harvesting Initiatives · 2016-08-18 · Old DPW Site) ECM 12.1 Water Conservation Initiatives: 1. Leak Detection Analysis 2. Rain Water Harvesting (9 Buildings

Rhode Island Convention Center • Providence, Rhode Island

Fort Buchanan’s Rainwater Harvesting Savings (continued)

Annual SavingsImplementation Cost

Simple Payback of 5.78 Years

Page 8: Fort Buchanan’s Water Harvesting Initiatives · 2016-08-18 · Old DPW Site) ECM 12.1 Water Conservation Initiatives: 1. Leak Detection Analysis 2. Rain Water Harvesting (9 Buildings

Rhode Island Convention Center • Providence, Rhode Island

Fort Buchanan’s Rainwater Harvesting Savings

Design Capacity

Annual Savings

Page 9: Fort Buchanan’s Water Harvesting Initiatives · 2016-08-18 · Old DPW Site) ECM 12.1 Water Conservation Initiatives: 1. Leak Detection Analysis 2. Rain Water Harvesting (9 Buildings

Rhode Island Convention Center • Providence, Rhode IslandEnergy Exchange: Federal Sustainability for the Next Decade9

Page 10: Fort Buchanan’s Water Harvesting Initiatives · 2016-08-18 · Old DPW Site) ECM 12.1 Water Conservation Initiatives: 1. Leak Detection Analysis 2. Rain Water Harvesting (9 Buildings

Rhode Island Convention Center • Providence, Rhode Island

Proposed Onsite Reclaimed Wastewater

Membrane Bioreactor (MBR):• MBR technology to treat wastewater to non‐

potable standards• Application for reclaimed water: golf course 

irrigation• Offset the use of groundwater• Potential savings: 11 million gallons per year

Page 11: Fort Buchanan’s Water Harvesting Initiatives · 2016-08-18 · Old DPW Site) ECM 12.1 Water Conservation Initiatives: 1. Leak Detection Analysis 2. Rain Water Harvesting (9 Buildings

Rhode Island Convention Center • Providence, Rhode Island

U.S

. Arm

y ph

oto

by S

GT

Jam

es S

eles

nick

Mr. Anibal Negron, Chief Environmental Division, 787‐707‐3575, [email protected]

Mr. Keith Grezlik, Environmental Protection Specialist, 787‐707‐3579, [email protected]

Ms. Wanda B. Robles, Environmental Compliance 787‐707‐3572, [email protected]

Mr. Derrick Stepanof, Installation Restoration 787‐707‐3573, [email protected]

Mr. Victor Rodriguez, Environmental Conservation787‐707‐3508, [email protected]

Mr. Francisco J. Méndez, SEMS Coordinator787‐707‐3522, [email protected]

Mr. Osvaldo Fantauzzi, New Pollution Prevention787‐707‐2553, [email protected] 

Mr. Dmitrii Cordero, Resource Efficiency Manager787‐707‐3894, [email protected]