FORMER FORT DEVENS ARMY INSTALLATION PROJECT STATUS UPDATE September 2020

Upload: others

Post on 01-Oct-2020

10 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Fort Devens Project Status Update Sept 2020 · FORMER FORT DEVENS ARMY INSTALLATION PROJECT STATUS UPDATE September 2020. 2 AGENDA Per- and Polyfluoroalkyl Substances (PFAS) Investigation

FORMER FORT DEVENS ARMY INSTALLATIONPROJECT STATUS UPDATESeptember 2020

Page 2: Fort Devens Project Status Update Sept 2020 · FORMER FORT DEVENS ARMY INSTALLATION PROJECT STATUS UPDATE September 2020. 2 AGENDA Per- and Polyfluoroalkyl Substances (PFAS) Investigation

2

AGENDAPer- and Polyfluoroalkyl Substances (PFAS) Investigation and Sampling Updates –Community Involvement Plan–Sampling results for private drinking water wells and

community/non-community systems–Sampling results for municipal water supply wells–Municipal water supply well treatment–Remedial Investigation (RI)

Page 3: Fort Devens Project Status Update Sept 2020 · FORMER FORT DEVENS ARMY INSTALLATION PROJECT STATUS UPDATE September 2020. 2 AGENDA Per- and Polyfluoroalkyl Substances (PFAS) Investigation

3

COMMUNITY INVOLVEMENT PLANDescribes the Army’s community outreach program regarding the ongoing environmental investigations at Fort Devens.

Draft CIP – Submitted for review to 100 stakeholders

Schedule– Draft CIP issued Dec. 19 (completed)– Public review period until Mar. 9 (completed)– Response to comments May 26 (completed)– Draft Final CIP planned for September– Final CIP planned for November

Page 4: Fort Devens Project Status Update Sept 2020 · FORMER FORT DEVENS ARMY INSTALLATION PROJECT STATUS UPDATE September 2020. 2 AGENDA Per- and Polyfluoroalkyl Substances (PFAS) Investigation

4

SAMPLING UPDATE FOR COMMUNITY/ NON-COMMUNITY SYSTEMS AND PRIVATE WELLS

Army has been sampling nearby drinking water wells since 2018 out of an abundance of caution

Regulatory benchmarks

– 2016 EPA Lifetime Health Advisory (LHA) guidance value for drinking water is 70 ppt (sum of PFOS, PFOA)

– December 2019 MassDEP proposed maximum contaminant level (MCL) for drinking water is 20 ppt (sum of PFOS, PFOA, PFHpA, PFHxS, PFNA, PFDA)

– 2020 MassDEP GW-1 standard for groundwater is 20 ppt (sum of PFOS, PFOA, PFHpA, PFHxS, PFNA, PFDA)

– January 2020 MassDEP Office of Research and Standards Guideline (ORSG) guidance value for drinking water is 20 ppt (sum of PFOS, PFOA, PFHpA, PFHxS, PFNA, PFDA)

Page 5: Fort Devens Project Status Update Sept 2020 · FORMER FORT DEVENS ARMY INSTALLATION PROJECT STATUS UPDATE September 2020. 2 AGENDA Per- and Polyfluoroalkyl Substances (PFAS) Investigation

5

SAMPLING UPDATE FOR COMMUNITY/ NON-COMMUNITY SYSTEMS AND PRIVATE WELLS

2018 (summer) – Sampled 21 wells in Shirley & Harvard– PFAS detected in some wells, but below EPA’s LHA of 70 ppt and the Mass. 2018 ORSG

of 70 ppt for the sum of PFOS, PFOA, PFHpA, PFHxS, PFNA– Source of PFAS in the wells is uncertain based on hydrogeology

2018-2020 – Quarterly sampling of water supply wells in Ayer and Devens

2019 (spring) – Follow-up sampling of 3 locations in Harvard and sampling 1 location quarterly

Oct. 2019 to June 2020 – Sampling requested by Harvard Board of Health– Army contacted 196 well owners in Harvard in September 2019– 114 wells were sampled between October 2019 and June 2020– Resampled selected wells that had previous detections above MassDEP ORSG for PFAS

Page 6: Fort Devens Project Status Update Sept 2020 · FORMER FORT DEVENS ARMY INSTALLATION PROJECT STATUS UPDATE September 2020. 2 AGENDA Per- and Polyfluoroalkyl Substances (PFAS) Investigation

6

RESULTS OF SAMPLING OF WELLS IN HARVARD

No results exceeded the EPA LHA of 70 ppt

Page 7: Fort Devens Project Status Update Sept 2020 · FORMER FORT DEVENS ARMY INSTALLATION PROJECT STATUS UPDATE September 2020. 2 AGENDA Per- and Polyfluoroalkyl Substances (PFAS) Investigation

!A

!A

!A

!A

!A

!A

!A

!A

!A

!A

!A

!A

!A

!A

!A!A

!A

!A

!A 2125014-02G, HARVARD GREEN CONDOMINIUMS - WELL 2

2125012-01G, VANGUARD MEDICAL/RENAISSANCE

2125020-01G, SHAKER P LACE OFFICES

2125021-03G, AYER ROAD P ROP ERTIES LLC - WELL 3

2125013-01G, FOXGLOVE AP ARTMENTS

2125021-02G, AYER ROAD P ROP ERTIES LLC - WELL 22125021-04G, AYER ROAD P ROP ERTIES LLC - WELL 4

2125007-01G, THE AP P LEWORKS

2125014-01G, HARVARD GREEN CONDOMINIUMS - WELL 1

2125021-01G, AYER ROAD P ROP ERTIES LLC - WELL 1

HARVARDAYE

R

Grove P ond - Grove P ond Supply We lls

AOC 74 - Barnum Road Fire fig hting Exe rcise Site

AOC 57 - Build ing 3713 Fue l Oil SpillAOC 75 - Build ing T-1445 Ware house Fire

AOC 5 - She pleys Hill Land fill

AOC 32 - Form e r DRMO Yard

AOC 76 - De ve ns Fire Station

AOC 40

Form e rMain P ost

Form e rMain P ost

LANCASTER COUNTY

P ROSP ECT HILL ROAD

OLD MILL ROAD

AYER ROAD

AYER ROAD

OLD

BLANCHARD ROAD

DEP OT ROAD

ROAD

SHIRLEY

ROAD

MYRICK LANE

CEDAR LEDGE RDRT 110/111

RT 2

RT 2

Myrick Lane # of we lls sam ple d 21# of we lls ND 14# of we lls < 20 ppt 7# of we lls ≥ 20 ppt 0

Aye r Road # of we lls sam ple d 16# of we lls ND 6# of we lls < 20 ppt 8# of we lls ≥ 20 ppt 2

Old Mill Road # of we lls sam ple d 27# of we lls ND 13# of we lls < 20 ppt 14# of we lls ≥ 20 ppt 0

Blanchard Road # of we lls sam ple d 16# of we lls ND 2# of we lls < 20 ppt 8# of we lls ≥ 20 ppt 6

Ce d ar Le d g e Road # of we lls sam ple d 2# of we lls ND 1# of we lls < 20 ppt 1# of we lls ≥ 20 ppt 0

Lancaste r County Road# of we lls sam ple d 10# of we lls ND 2# of we lls < 20 ppt 6# of we lls ≥ 20 ppt 2

P rospe ct Hill Rd # of we lls sam ple d 3# of we lls ND 3# of we lls < 20 ppt 0# of we lls ≥ 20 ppt 0

Old Shirle y Road # of we lls sam ple d 1# of we lls ND 1# of we lls < 20 ppt 0# of we lls ≥ 20 ppt 0

De pot Road # of we lls sam ple d 18# of we lls ND 9# of we lls < 20 ppt 8# of we lls ≥ 20 ppt 1

De ve ns MassDe ve lopm e nt

De ve ns MassDe ve lopm e nt

Aye r DP WWate rDivision

File:

RAB2

020_

Harva

rdPriv

Wells_

PFAS

Summ

ary_V

2.mxd

2019 and 2020 Summary of PFAS Results for Private WellsSampled in Harvard, MassachusettsFormer Army Installation Devens

Devens, Massachusetts

293 Boston Post Road West, Suite 100, Marlborough, MA 01752

Figure1

Date: 07/08/2020

0 1,500750

Feet

KOMAN Government Solutions, LLC

Source: Esri, DigitalGlobe, GeoEye, Earthstar Geographics, CNES/Airbus DS, USDA, USGS, AeroGRID, IGN, and the GIS User Community

Legend!A Select Public Supply Well!A

Area 1 - Grove Pond Supply Wells, AOCs 57, 74,and 75 to be addressed in the RI

!AArea 2 - MacPherson Water Supply Well, SHL,AOCs 32, 76, 43G and 43J to be addressed in theRI

!AArea 3 - AOCs 20, 21, 30, 31, and 50 to beaddressed in the RI

Devens - Census Designated PlaceCity/Town BoundaryNational Hydrography Dataset WaterbodyNational Hydrography Dataset Stream/RiverFormer Fort Devens Boundary

µ

P ublic Wate r Supply Se rvice Bound arie sAyer DPW Water Division Devens Mass Development

!A!A!A!A

!A!A

!A

!A!A!A

!A!A

!A

!A!A

!A !A AREAOF DETAIL

Notes:Proposed MassDEP PFAS (6) MCL is 20 ppt

ppt parts per trillionND Not Detected

Page 8: Fort Devens Project Status Update Sept 2020 · FORMER FORT DEVENS ARMY INSTALLATION PROJECT STATUS UPDATE September 2020. 2 AGENDA Per- and Polyfluoroalkyl Substances (PFAS) Investigation

8

WELL SAMPLING UPDATE FOR COMMUNITY/NON-COMMUNITY SYSTEMS AND PRIVATE WELLS

2020 – Sampling of private wells in Ayer and Shirley

– Located north and west of the former Army Airfield

– Army contacted 16 Ayer and 4 Shirley well owners in January 2020

– 13 wells were sampled between February and June 2020

Page 9: Fort Devens Project Status Update Sept 2020 · FORMER FORT DEVENS ARMY INSTALLATION PROJECT STATUS UPDATE September 2020. 2 AGENDA Per- and Polyfluoroalkyl Substances (PFAS) Investigation

9

WELL SAMPLING RESULTS IN AYER AND SHIRLEY

No results exceeded the EPA LHA of 70 ppt

Page 10: Fort Devens Project Status Update Sept 2020 · FORMER FORT DEVENS ARMY INSTALLATION PROJECT STATUS UPDATE September 2020. 2 AGENDA Per- and Polyfluoroalkyl Substances (PFAS) Investigation

James Brook Way # of wells sampled 3# of wells ND 1# of wells < 20 ppt 2# of wells ≥ 20 ppt 0

Great Road # of wells sampled 2# of wells ND 0# of wells < 20 ppt 1# of wells ≥ 20 ppt 1

Groton Shirley Road # of wells sampled 8# of wells ND 4# of wells < 20 ppt 4# of wells ≥ 20 ppt 0

AOC 50

KITTREDGE ROAD

LAWTON ROAD

GREAT ROAD

HAZEN ROAD

GREAT ROAD

ROSEWOOD AV ENUE

GROTON SCHOOL ROAD

GROTON SHIRLEY ROAD

SHADOW

LANE

AMANDREY WAY

VERNON STREET

JAMES BROOK WAY

SHIRLEY ROAD

FITCHBURG ROAD

GROTONSHI

RLEY

GROTON

AYER

SHIRLEYAYER

Devens MassDevelopment

Ayer DPWWaterDivision

ShirleyWaterDistrict

GrotonWater

Department

2020 Summary of PFAS Results for Private Wells Sampledin Ayer and Shirley, MassachusettsFormer Army Installation Devens

Devens, Massachusetts

293 Boston Post Road West, Suite 100, Marlborough, MA 01752

Figure2

Date: 07/08/2020

0 700350

Feet

KOMAN Government Solutions, LLC

File:

RAB2

020_

AyerS

hirley

PrivW

ells_

PFAS

Summ

ary_V

2.mxd

Source: Esri, DigitalGlobe, GeoEye, Earthstar Geographics, CNES/Airbus DS, USDA, USGS, AeroGRID, IGN, and the GIS User Community

µ!A!A!A!A

!A!A

!A

!A!A!A

!A!A

!A

!A!A

!A !A

AREAOF DETAIL

ppt parts per trillion

City/Town Boundary! ! ! ! ! ! !

! ! ! ! ! ! !

! ! ! ! ! ! !

! ! ! ! ! ! ! Public Water Supply Service BoundariesFormer Fort Devens Boundary

Notes:- Proposed MassDEP PFAS(6) MCL is 20 ppt- ppt = parts per trillion- ND = Not Detected

Legend!A

!A

Area 1 - Grove Pond Supply Wells, AOCs 57, 74, and 75 to be addressed in the RIArea 2 - MacPherson/Patton/Shabokin Water Supply Wells, SHL, AOCs 32, 76, 43G and 43J to be addressed in the RI

!AArea 3 - AOCs 20, 21, 30, 31, and 50 to beaddressed in the RINational Hydrography Dataset Stream/RiverNational Hydrography Dataset Waterbody

Devens - Census Designated Place

Ayer DPW Water Division Devens MassDevelopment Groton Water Department Shirley Water DistrictPublic Water Supply Service Boundaries

Page 11: Fort Devens Project Status Update Sept 2020 · FORMER FORT DEVENS ARMY INSTALLATION PROJECT STATUS UPDATE September 2020. 2 AGENDA Per- and Polyfluoroalkyl Substances (PFAS) Investigation

11SAMPLING OF MUNICIPAL (AYER) WATER SUPPLY WELLS DETECTIONS OF PFAS, JUNE 2020

Results show the detected PFAS out of 18 analytes tested. Yellow shading shows concentrations above the EPA LHA (Lifetime Health Advisory) (PFOS, PFOA of 70 ppt) and/or Massachusetts ORSG (Office of Research and Standards Guideline) for drinking water and the Massachusetts maximum contaminant level (MCL) for drinking water (PFOS, PFOA, PFHpA, PFNA, PFHxS of 20 ppt).ND = non-detect, J = estimated value

Page 12: Fort Devens Project Status Update Sept 2020 · FORMER FORT DEVENS ARMY INSTALLATION PROJECT STATUS UPDATE September 2020. 2 AGENDA Per- and Polyfluoroalkyl Substances (PFAS) Investigation

12

SAMPLING OF MUNICIPAL (AYER) WATER SUPPLY WELLSDETECTIONS OF PFAS, FEBRUARY 2020

Grove Pond Wellfield− Water from Well 8 is treated using a carbon filter. Pre- and post-treatment samples

are collected. The water is treated for PFAS before the water is combined with water from the other wells. The results from the Finished Water represent the combined water flow (wells 1, 6, 7, 8) that is entering the municipal water system for public use.

Spectacle Pond Wellfield− The PFAS impacts at these wells are not attributed to the Army.− The town of Ayer is pursuing treatment for PFAS at these wells and is working with

MassDEP to investigate the potential source of PFAS at these wells.

Page 13: Fort Devens Project Status Update Sept 2020 · FORMER FORT DEVENS ARMY INSTALLATION PROJECT STATUS UPDATE September 2020. 2 AGENDA Per- and Polyfluoroalkyl Substances (PFAS) Investigation

13

UPDATE ON GROVE POND WELLFIELD -TIME CRITICAL REMOVAL ACTION (TCRA)

Ongoing temporary treatment of Well #8 using granular activated carbon (GAC)– On-line since June 2019; pumping

approximately 200 to 300 gpm; over 135M gallons treated to date

– Winterized in November 2019

– Well #8 raw water was 277 ppt for the 6 OSRG PFAS compounds in June 2020

– Treated Well #8 water was non-detect (ND) forthe 6 OSRG PFAS compounds in June 2020

Page 14: Fort Devens Project Status Update Sept 2020 · FORMER FORT DEVENS ARMY INSTALLATION PROJECT STATUS UPDATE September 2020. 2 AGENDA Per- and Polyfluoroalkyl Substances (PFAS) Investigation

14

UPDATE ON GROVE POND WELLFIELD -ENVIRONMENTAL SERVICES COOPERATIVE

AGREEMENT (ESCA)Supported by federal ESCA grant ~ $4.4M signed September 5, 2019Permanent upgrade to Grove Pond Water Treatment Plant – New Ion Exchange (IX) System – Installation of IX begun: Sept. 2019– Anticipated completion: Fall 2020– Will treat up to 2 million gallons per day

Page 15: Fort Devens Project Status Update Sept 2020 · FORMER FORT DEVENS ARMY INSTALLATION PROJECT STATUS UPDATE September 2020. 2 AGENDA Per- and Polyfluoroalkyl Substances (PFAS) Investigation

15MASSDEVELOPMENT SAMPLING OF DEVENS WATER SUPPLY WELLS FOR PFAS

Yellow shading shows concentrations above the EPA LHA (Lifetime Health Advisory) (PFOS, PFOA of 70 ppt) and/or Massachusetts ORSG (Office of Research and Standards Guideline) for drinking water and the Massachusetts maximum contaminant level (MCL) for drinking water (PFOS, PFOA, PFHpA, PFNA, PFHxS of 20 ppt).ND = non-detect-- = not analyzed/not reported

Page 16: Fort Devens Project Status Update Sept 2020 · FORMER FORT DEVENS ARMY INSTALLATION PROJECT STATUS UPDATE September 2020. 2 AGENDA Per- and Polyfluoroalkyl Substances (PFAS) Investigation

16

PFAS RI AREAS OF INVESTIGATIONRI Areas of Investigation – the areas of investigation were divided into Areas 1, 2, and 3 to facilitate mobilizing into the field quicker back in 2018. Each area of investigation is shown on the map within the specified area.− Area 1 = yellow− Area 2 = red− Area 3 = blueThe initial field activities have been completed in the three areas. Additional activities have been identified based on the review of the results and are being conducted.

Page 17: Fort Devens Project Status Update Sept 2020 · FORMER FORT DEVENS ARMY INSTALLATION PROJECT STATUS UPDATE September 2020. 2 AGENDA Per- and Polyfluoroalkyl Substances (PFAS) Investigation

17

RECENT PFAS RI DRILLING AND SAMPLING ACTIVITIES

PFAS RI Activities Completed during Jan. 1 to May 15, 2020− 14 Vertical profiles conducted in Cold Spring Brook wetlands− 24 Monitoring wells and 17 piezometers installed− 2 Soil borings conducted− 43 Existing monitoring wells sampled− 30 New monitoring wells sampled− 1 Irrigation well sampled− 13 Surface water and sediment samples collected− 1 Staff gauge installed− 5 Synoptic water level surveys performed

Future PFAS RI Activities Planned in 2020− Vertical profiles− Piezometer installation− Bedrock well installation− Surface water and sediment sampling

Page 18: Fort Devens Project Status Update Sept 2020 · FORMER FORT DEVENS ARMY INSTALLATION PROJECT STATUS UPDATE September 2020. 2 AGENDA Per- and Polyfluoroalkyl Substances (PFAS) Investigation

18

VERTICAL PROFILES CONDUCTED IN COLD SPRING BROOK WETLANDS (MAR.-APR. 2020)

Vertical profiles were conducted within the wetlands on the west side of Cold Spring Brook to gather more information on the extent of PFAS in groundwater at AOC 74, AOC 57 Area 2, AOC 57 Area 3, and AOC 75 beneath the wetlands. (“Vertical profiles” are a one-time sampling of groundwater from multiple depths below ground surface.) – At AOC 57 Area 2, it was possible to use a drill rig to obtain groundwater profile samples

beneath the containment dam in the wetland area – At AOC 57 Area 3, AOC 74, and AOC 75 it was not possible to use a drill rig without

compromising the wetlands. Instead, the drill crew used hand-held equipment to collect groundwater profile samples.• The crew used a jack hammer to drive 1.5-inch rods driven into the wetland. Groundwater

samples were collected through the rods.• The crew waded into the brook/wetland from the shoreline but did not proceed further if the water

was deeper than knee height.

The profile results are shown on the following maps, which show the maximum concentration detected at each location regardless of depth.

Page 19: Fort Devens Project Status Update Sept 2020 · FORMER FORT DEVENS ARMY INSTALLATION PROJECT STATUS UPDATE September 2020. 2 AGENDA Per- and Polyfluoroalkyl Substances (PFAS) Investigation

19

RESULTS OF VERTICAL PROFILES CONDUCTED IN COLD SPRING BROOK WETLANDS – AOC 75

− Three vertical profiles were conducted starting at the edge of the wetlands. Samples were collected down to 32 and 35 ft below the top of the sediment.

− PFAS concentrations greater than the EPA LHA (70 ppt) and MassDEP GW-1 standard (20 ppt) were observed at all three locations. Concentrations decreased with distance from the shoreline (i.e., toward the center of the brook). The higher PFAS concentrations were shallower with increasing distance from the shoreline. These observations support our understanding that the groundwater from AOC 75 discharges to Cold Spring Brook/wetlands.

− The highest concentrations were detected at sample locations 75VP-20-02 at 8-10 ft below the top of the sediment (PFOA + PFOS = 320 ppt and the sum of the six MassDEP GW-1 standard compounds is 1,010 ppt)

Page 20: Fort Devens Project Status Update Sept 2020 · FORMER FORT DEVENS ARMY INSTALLATION PROJECT STATUS UPDATE September 2020. 2 AGENDA Per- and Polyfluoroalkyl Substances (PFAS) Investigation

M=

M=

M=

M=

M=

M=

M=

M=

M=

M=

M=

M=

M=

M=

M=

M=

M=

M=

M=

M=

M=

M=

M=

M=M=

M=

M=

M=

M=M=M=

M=M=

M=

L=

L=

L=

L=

L=

L=

L=

L=

L=

L=

L=

L=

L=

L=

L=

L=

L=

L=

L=

L=

L=

L=

L=

L=L=

L=

L=

L=

L=L=L=

L=L=

L=

=

=

=

=

=

=

=

=

=

=

=

=

=

=

=

=

=

=

=

=

=

=

=

==

=

=

=

===

==

=

L=L=L=

M=M=M=

===

75PZ-20-07

75MW-19-04B75MW-19-04A

75MW-19-02BR75MW-19-02C75MW-19-02B75MW-19-02A

75MW-19-01BR

75VP-20-01

75VP-19-09

75VP-19-08

75VP-19-07

75VP-19-06

75VP-19-05

75VP-19-04

75VP-19-03

75VP-19-02

75VP-19-01

75VP-18-13

75VP-18-12

75VP-18-11

75VP-18-10

75VP-18-09

75VP-18-08

75VP-18-07

75VP-18-06

75VP-18-05

75VP-18-04

75VP-18-03

75VP-18-02

75VP-18-01

SA75-17-04

SA75-17-03SA75-17-02

SA75-17-01

Saratoga Blvd Saratoga St

Grove Pond Rd

245 234

233 232

231 228

227

226

225

224

230

223

229

75VP-20-0275VP-20-03

75VP-20-04

µ

AOC 75 Ground wate r Re sultsDe ve ns PFAS RI - Are a 1 PSCS, CSB Ad d e nd um

293 Boston Post Road W e st, Suite 100, Marlb orough, MA 01752

Figure 3

Date : 06/05/2020

0 300150

Fe e t

Form e r Fort De ve ns Arm y InstallationDe ve ns, Massac huse tts

KOMAN Government Solutions, LLC

Ae rial Sourc e : USGS, MassGIS Orthoim age ry 2019

L e ge nd= Monitoring W e ll/V e rtic al Profiling L oc ation

EPA LHA(sum of PFOA and PFOS) (ng/L)

L= EPA L HA ≥ 70 ng/LL= EPA L HA < 70 ng/LL= EPA L HA No d e te c tion

MassDEP(sum of PFOS + PFOA + PFDA + PFHpA + PFHxS + PFNA) (ng/L)

M= MassDEP ≥ 20 ng/LM= MassDEP < 20ng/LM= MassDEP no d e te c tion

Ground wate r Contour (ft NAV D 88)(Contour Inte rval = 1 Foot) - Marc h 2020Form e r Fort De ve ns Bound ary

File : PFAS_RI_A1_PSCAd d _CSB_AOC75_GW Re sults.mxd

M=

M=

M=M=

M=

M=

L=

L=

L=L=

L=

L=

=

=

==

=

=

DETAIL

75VP-18-06

SA75-17-0275MW-19-02A75MW-19-02B

75MW-19-02C

75MW-19-02BR

M=M=M= L=L=L= ===

DETAIL

75VP-18-1175MW-19-04A

75MW-19-04B

H

H

Note s:Sam ple s c olle c te d d uring the PFAS SI (e .g., SA75-17-01 through -04) we re not analyze d for PFDA.MassDEP GW -1 = sum of PFOS + PFOA + PFDA + PFHpA + PFHxS + PFNAMassDEP Exc e e d anc e Crite ria is d e fine d as e qual to or gre ate r than 20 ng/LEPA L HA (L ife tim e He alth Ad visory) = sum of PFOA and PFOSEPA L HA Exc e e d anc e Crite ria is d e fine d as e qual to or gre ate r than 70 ng/L

KThomas
Oval
KThomas
Callout
new vertical profiles conducted in the Cold Spring Brook wetlands
KThomas
Callout
Cold Spring Brook
Page 21: Fort Devens Project Status Update Sept 2020 · FORMER FORT DEVENS ARMY INSTALLATION PROJECT STATUS UPDATE September 2020. 2 AGENDA Per- and Polyfluoroalkyl Substances (PFAS) Investigation

21

RESULTS OF VERTICAL PROFILES CONDUCTED IN COLD SPRING BROOK WETLANDS – AOC 57 AREA 2

– Four vertical profiles were conducted on the containment dam starting at the edge of the wetlands. Samples were collected down to 52 to 54 ft below the top of the dam. PFAS concentrations greater than the EPA LHA were observed at two locations and greater than the MassDEP GW-1 standard at all four locations.

– The highest concentrations were detected at 5702VP-20-02 at 10-14 ft below the top of the sediment (PFOA + PFOS = 769 ppt, the sum of the six MassDEP GW-1 standard compounds is 1,990 ppt).

– Concentrations were lowest at the location farthest from the shoreline (closest to the center of the brook).The highest concentrations in each profile became shallower with increasing distance as the profiles approached the center of the brook. These observations support our understanding that the groundwater from AOC 57 Area 2 is discharging to the brook/wetland.

– Upward vertical gradients measured in monitoring wells and piezometers at the shoreline also support our understanding that groundwater at AOC 57 Area 2 discharges to the brook/wetland.

Page 22: Fort Devens Project Status Update Sept 2020 · FORMER FORT DEVENS ARMY INSTALLATION PROJECT STATUS UPDATE September 2020. 2 AGENDA Per- and Polyfluoroalkyl Substances (PFAS) Investigation

M=

M=

M=

M=

M=

M=

M=

M=

M=

M=

M=M=

M=

M=

M=

M=M=

M=

M=

M=

M=

M=

M=

M=

M=

M=

M=

L=

L=

L=

L=

L=

L=

L=

L=

L=

L=

L=L=

L=

L=

L=

L=L=

L=

L=

L=

L=

L=

L=

L=

L=

L=

L=

=

=

=

=

=

=

=

=

=

=

==

=

=

=

==

=

=

=

=

=

=

=

=

=

=

L=

L=

L=

L=

M=

M=

M=

M=

=

=

=

=

221

220

222

219

57M-03-01X

57M-03-02X

57M-03-03X

57M-03-04X

57M-03-05X

57M-03-06X

57M-95-05X

57M-95-06X

57M-95-07X 57WP-06-02

5702MW-20-01A5702MW-20-01B

5702MW-20-02A

5702MW-20-03A

5702MW-20-04A

5702MW-20-05A

5702MW-20-05B

5702MW-20-06A

5702MW-20-07A

5702VP-18-01

5702VP-18-02

5702VP-18-03

5702VP-18-04

5702VP-18-05

5702VP-18-06

5702VP-18-07

5702VP-18-08

5702VP-20-01

5702VP-20-02

5702VP-20-03

5702VP-20-04µ

AOC 57 Are a 2 Ground wate r Re s ultsDe ve ns PFAS RI - Are a 1 PSCS, CSB Ad d e nd um

293 Bos ton Pos t Road W e s t, Suite 100, M arlborough, M A 01752

Figure 4

Date : 06/05/2020

0 6030

Fe e t

Forme r Fort De ve ns Army Ins tallationDe ve ns , M as s ac hus e tts

KOMAN Government Solutions, LLC

Ae rial Sourc e : USGS, M as s GIS Orthoimage ry 2019

Le ge nd= M onitoring W e ll/Ve rtic al Profiling Loc ation

EPA LHA(sum of PFOA and PFOS) (ng/L)

L= EPA LHA ≥ 70 ng/LL= EPA LHA < 70 ng/LL= EPA LHA No d e te c tion

MassDEP(sum of PFOS + PFOA + PFDA + PFHpA + PFHxS + PFNA) (ng/L)

M= M as s DEP ≥ 20 ng/LM= M as s DEP < 20ng/LM= M as s DEP no d e te c tion

Shallow Ground wate r Contour - M arc h 2020(ft NAVD88) (Contour Inte rval = 1 ft)Infe rre d Shallow Ground wate r Contour - M arc h 2020(ft NAVD88) (Contour Inte rval = 1 ft)

File : PFAS_RI_A1_PSCAd d _ CSB_AOC57-2_GW Re s ults .mxd

Note s:M as sDEP GW -1 = s um of PFOS + PFOA + PFDA + PFHpA + PFHxS + PFNAM as sDEP Exc e e d anc e Crite ria is d e fine d as e qual to or gre ate r than 20 ng/LEPA LHA (Life time He alth Ad vis ory) = s um of PFOA and PFOSEPA LHA Exc e e d anc e Crite ria is d e fine d as e qual to or gre ate r than 70 ng/L

KThomas
Oval
KThomas
Callout
new vertical profiles conducted in the Cold Spring Brook wetland
Page 23: Fort Devens Project Status Update Sept 2020 · FORMER FORT DEVENS ARMY INSTALLATION PROJECT STATUS UPDATE September 2020. 2 AGENDA Per- and Polyfluoroalkyl Substances (PFAS) Investigation

23

RESULTS OF VERTICAL PROFILES CONDUCTED IN COLD SPRING BROOK WETLANDS – AOC 57 AREA 3

− Four vertical profiles were conducted starting at the edge of the wetlands. Samples were collected down to 32 and 37 ft below the top of the sediment. None of the locations had PFAS concentrations greater than the EPA LHA. Three locations had concentrations greater than the MassDEP GW-1 standard.

− The highest concentrations were detected at 5703VP-19-01 at 30-32 ft below the top of the sediment (PFOA + PFOS = 28.0 ppt, the sum of the six MassDEP GW-1 standard compounds is 93.9 ppt).

− Concentrations decreased with distance from the shoreline (i.e., toward the center of the brook) and higher concentrations became shallower with increasing distance from the shoreline. Both of these observations support our understanding that the groundwater from AOC 57 Area 3 discharges to the brook/wetlands.

− Upward vertical gradients measured in monitoring wells and piezometers at the shoreline support our understanding that groundwater at AOC 57 Area 3 is discharging to the brook/wetlands.

Page 24: Fort Devens Project Status Update Sept 2020 · FORMER FORT DEVENS ARMY INSTALLATION PROJECT STATUS UPDATE September 2020. 2 AGENDA Per- and Polyfluoroalkyl Substances (PFAS) Investigation

M= M=

M=

M=

M=

M=M=

M=

M=

M=

M=

M=

M=

M=

M=

M=

M=

M=M=

M=

M=

M=L= L=

L=

L=

L=

L=L=

L=

L=

L=

L=

L=

L=

L=

L=

L=

L=

L=L=

L=

L==

=

=

===

=

=

=

=

=

=

=

=

=

=

==

=

=

=

L=

L=

L=

L=

M=

M=

M=

M=

=

=

=

=

5703MW-20-02A 57M-95-03X

57M-96-11X57M-96-12X

57M-96-13X

57P-98-03X57P-98-04X57WP-06-03

5703VP-18-01

5703VP-18-02

5703VP-18-03

5703VP-18-04

5703VP-18-055703VP-18-06

5703VP-18-07

5703VP-18-08

5703VP-18-09

5703MW-20-01A 5703MW-20-01B

5703MW-20-03A

5703MW-20-04A

5703VP-20-01

5703VP-20-02

5703VP-20-03

5703VP-20-04

219

218

223

221

222

220

µ

AOC 57 Are a 3 Ground wate r Re s ultsDe ve ns PFAS RI - Are a 1 PSCS, CSB Ad d e nd um

293 Bos ton Pos t Road W e s t, Suite 100, M arlborough, M A 01752

Figure 5

Date : 06/05/2020

0 6030

Fe e t

Forme r Fort De ve ns Army Ins tallationDe ve ns , M as s ac hus e tts

KOMAN Government Solutions, LLC

Ae rial Sourc e : USGS, M as s GIS Orthoimage ry 2019

Le ge nd= M onitoring W e ll/Ve rtic al Profiling Loc ation

EPA LHA(sum of PFOA and PFOS) (ng/L)

L= EPA LHA ≥ 70 ng/LL= EPA LHA < 70 ng/LL= EPA LHA No d e te c tion

MassDEP(sum of PFOS + PFOA + PFDA + PFHpA + PFHxS + PFNA) (ng/L)

M= M as s DEP ≥ 20 ng/LM= M as s DEP < 20ng/LM= M as s DEP no d e te c tion

Shallow Ground wate r Contour - M arc h 2020(ft NAVD88) (Contour Inte rval = 1 ft)Infe rre d Shallow Ground wate r Contour - M arc h 2020(ft NAVD88) (Contour Inte rval = 1 ft)

File : PFAS_RI_A1_PSCAd d _ CSB_AOC57-3_GW Re s ults .mxd

Note s:M as sDEP GW -1 = s um of PFOS + PFOA + PFDA + PFHpA + PFHxS + PFNAM as sDEP Exc e e d anc e Crite ria is d e fine d as e qual to or gre ate r than 20 ng/LEPA LHA (Life time He alth Ad vis ory) = s um of PFOA and PFOSEPA LHA Exc e e d anc e Crite ria is d e fine d as e qual to or gre ate r than 70 ng/L

KThomas
Oval
KThomas
Callout
new vertical profiles conducted in the Cold Spring Brook wetland
KThomas
Callout
Page 25: Fort Devens Project Status Update Sept 2020 · FORMER FORT DEVENS ARMY INSTALLATION PROJECT STATUS UPDATE September 2020. 2 AGENDA Per- and Polyfluoroalkyl Substances (PFAS) Investigation

25

RESULTS OF VERTICAL PROFILES CONDUCTED IN COLD SPRING BROOK WETLANDS – AOC 74

− Three vertical profiles were conducted starting at the edge of the wetlands. Samples were collected down to 27 to 37 ft below the top of the sediment. None of the locations had PFAS concentrations greater than the EPA LHA. All three locations had concentrations greater than the MassDEP GW-1 standard.

− Concentrations were lowest at the location farthest from shore and higher concentrations became shallower with increasing distance from the shoreline. Both of these observations support our understanding that the groundwater from AOC 74 is discharging to the brook/wetland.

− The highest concentrations (PFOA + PFOS = 68.4 ppt, the sum of the six MassDEP GW-1 standard compounds is 102 ppt) were detected at 74VP-20-03 at 15-17 ft below the top of the sediment.

− Upward vertical gradients measured in monitoring wells and piezometers at the shoreline support our understanding that groundwater at AOC 74 is discharging to the brook/wetland.

Page 26: Fort Devens Project Status Update Sept 2020 · FORMER FORT DEVENS ARMY INSTALLATION PROJECT STATUS UPDATE September 2020. 2 AGENDA Per- and Polyfluoroalkyl Substances (PFAS) Investigation

L=

L

L

L

L

=

=

=

=

M

M

M

M

M

=

=

=

=

=

=

=

=

=

=

L=

L

L

LL

L

L

L

L

L

L

L

L

L

L

L

LL

L

L

L

L

L

L

L

L

L

L

=

=

==

=

=

=

=

=

=

=

=

=

=

=

==

=

=

=

=

=

=

=

=

=

=

L

LL

L

L

L

L

L

L

L

L

LL

L

L

L

L

L

L

L

L

==

=

=

=

==

=

=

=

==

=

=

=

==

=

=

=

=

M=

M

M

M

M

M

M

M

M

M

=

=

=

=

=

=

=

=

=

M

M

M

M

M

MM

M

M

M

M

M

M

M

M

M

M

M

M

M

M

M

M

M

MM

M

M

M

M

M

M

M

M

M

M

M

M

M

=

==

=

=

==

=

=

=

=

=

=

=

=

=

=

=

=

=

==

=

=

==

=

=

=

=

=

=

=

=

=

=

=

=

=

=

==

=

=

=

==

=

=

=

=

=

=

=

=

=

=

=

=

=

=

=

=

==

=

=

=

==

==

=

=

=

=

=

=

=

=

=

=

=

=

=

==

=

L=L=

L=

M=M=

M=

==

=

FormerBuilding3773

Cold Spri

ng Broo

k

223

222

221

220

219

225

224

218

217 217

GPVP-19-03GPVP-19-04

GPVP-19-05

GPVP-19-09

74VP-20-0274VP-20-03

74VP-20-04

SA74-17-02

SA74-17-05

74VP-18-01

74VP-18-0274VP-18-03

74VP-18-0574VP-18-07

74VP-18-08

74VP-18-10

74VP-18-11

74VP-18-12

74VP-18-13

74VP-19-01

74VP-19-02

74VP-19-03

SA74-17-01SA74-17-03

SA74-17-04

74VP-18-04 74VP-18-04A

74VP-18-0674VP-18-09

74VP-19-0474VP-20-0174IG-01

74MW-19-04A

µ

AOC 74 Ground wate r Re sultsDe ve ns PFAS RI - Are a 1 PSCS, CSB Ad d e nd um

293 Boston Post Road W e st, Suite 100, Marlb orough, MA 01752

Figure 6

Date : 06/05/2020

0 200100

Fe e t

Form e r Fort De ve ns Arm y InstallationDe ve ns, Massac huse tts

KOMAN Government Solutions, LLC

Ae rial Sourc e : USGS, MassGIS Orthoim age ry 2019

L e ge nd= Monitoring W e ll/V e rtic al Profiling L oc ation

EPA LHA(sum of PFOA and PFOS) (ng/L)

L= EPA L HA ≥ 70 ng/LL= EPA L HA < 70 ng/LL= EPA L HA No d e te c tion

MassDEP(sum of PFOS + PFOA + PFDA + PFHpA + PFHxS + PFNA) (ng/L)

M= MassDEP ≥ 20 ng/LM= MassDEP < 20ng/LM= MassDEP no d e te c tion

Ground wate r Contour (ft NAV D 88)(Contour Inte ral = 1 Foot) - Marc h 2020Form e r Fort De ve ns Bound ary

File : PFAS_RI_A1_PSCAd d _CSB_AOC74_GW Re sults.mxd

Note s:Sam ple s c olle c te d d uring the PFAS SI (e .g., SA74-17-01 through -05) we re not analyze d for PFDA.MassDEP GW -1 = sum of PFOS + PFOA + PFDA + PFHpA + PFHxS + PFNAMassDEP Exc e e d anc e Crite ria is d e fine d as e qual to or gre ate r than 20 ng/LEPA L HA (L ife tim e He alth Ad visory) = sum of PFOA and PFOSEPA L HA Exc e e d anc e Crite ria is d e fine d as e qual to or gre ate r than 70 ng/L

KThomas
Oval
KThomas
Callout
new vertical profiles conducted in the Cold Spring Brook wetland
Page 27: Fort Devens Project Status Update Sept 2020 · FORMER FORT DEVENS ARMY INSTALLATION PROJECT STATUS UPDATE September 2020. 2 AGENDA Per- and Polyfluoroalkyl Substances (PFAS) Investigation

27

SURFACE WATER AND SEDIMENT SAMPLING

Ten surface water and sediment samples were collected from Mirror Lake, Cold Spring Brook Pond, and Cold Spring Brook in March 2020.

– The location at Mirror Lake was collected near the beach.

– The three locations in Cold Spring Brook Pond were to assess potential impact to the pond that may have been caused by contamination associated with AOC 40. • AOC 40 was an informal disposal area along Patton Road on the south side of Cold Spring Brook Pond. The disposed materials

primarily consisted of construction debris (masonry, asphalt, wire, and metal), ash, stumps, and logs. Some drums were also found that had held antifreeze, but the drums had been painted and reused. The disposal area was remediated in 2000 through the removal of debris, contaminated soil, and contaminated sediment. The wetlands were also restored. PFAS was not a known contaminant at the time the remediation was conducted.

– Most of the locations in Cold Spring Brook were collected in areas where groundwater from the AOC 57 Area 2, AOC 57 Area 3, AOC 74, and AOC 75 are thought to be discharging to the brook/wetland.

– The results are shown on the following maps, along with previously collected samples.

Page 28: Fort Devens Project Status Update Sept 2020 · FORMER FORT DEVENS ARMY INSTALLATION PROJECT STATUS UPDATE September 2020. 2 AGENDA Per- and Polyfluoroalkyl Substances (PFAS) Investigation

!<

!<

!<

!<

!<

!<

!A

!A

OLD MILL

ROAD

BARNUM ROAD

Bulge Road

Patton Road

BLANCHARDROAD

Marn

eSt

Mirror Lake

Robbins Pond

COLD

SPRI

NGBR

OOKWILL

OW BROOK

CP-20-01

CP-20-02CP-20-03

CSB-20-01

ML-20-01

PATTONWELL

CSB-18-01

µ

File: PFAS_RI_A1_PSC_South_ColdSpringBrook_SWSD_Results.mxd

293 Boston Post Road We st, Suite 100, Ma rlb oroug h , MA 01752Fig ure Da te :

05/05/2020 0 600300

Fe e t

Form e r Fort De ve ns Arm y Insta lla tionDe ve ns, Ma ssa ch use tts

KOMAN Government Solutions, LLC

Le g e nd!< Surfa ce Wa te r a nd Se dim e nt Sa m ple Loca tion!A Pub lic Wa te r Supply We ll

Form e r Fort De ve ns Bounda ry

South e rn Exte nt Cold Spring Brook, Cold Spring Brook Pond, a nd Mirror La ke

PFAS Re sults in Surfa ce Wa te r a nd Se dim e nt Sa m ple sDe ve ns PFAS RI - Are a 1 PSCS

Ae ria l Source s: 2019, USGS, Ma ssGIS

CSB-18-01Sa m ple 9/27/20189/27/2018Units: ng /L ug /kgPFBS 1.60 J 2.50 UPFO S 4.10 6.90 UPFO A 4.50 2.50 J

Note s:Pe rfluoroocta ne Sulfonic Acid (PFO S)Pe rfluoroocta noic Acid (PFO A)Pe rfluorob uta ne sulfonic a cid (PFBS)ng /L = na nog ra m s pe r lite r (Surfa ce Wa te r Re sult Va lue )µg /kg = m icrog ra m pe r kilog ra m (Se dim e nt Re sult va lue )J = e stim a te d re sultU= not de te cte d a b ove th e re porte d sa m ple qua ntita tion lim itBold = de te ction

EPA PFAS Site Specific Screening Levels forFormer Fort Devens

Surfa ce Wa te rUnits: ng /LPFO A 2,030PFO S 2,030PFBS 2,030,000

Se dim e ntUnits: μg /kgPFO A 609PFO S 609PFBS 609,000

ML-20-01Sa m ple 3/30/20203/30/2020Units: ng /L ug /kgPFBS 1.10 J 0.230 UPFO S 11.0 0.630 UPFO A 12.0 0.250 U

CP-20-01Sa m ple 3/27/2020(3/27/2020) FD3/27/2020(3/27/2020) FDUnits: ng /L ng /L ug /kg ug /kgPFBS 2.60 2.60 0.450 U 0.470 UPFO S 7.40 7.70 1.00 J 0.910 JPFO A 60.0 54.0 0.400 J 0.310 J

CP-20-03Sa m ple 3/30/20203/30/2020Units: ng /L ug /kgPFBS 1.80 0.270 UPFO S 5.70 0.740 UPFO A 57.0 0.230 J

CP-20-02Sa m ple 3/27/20203/27/2020Units: ng /L ug /kgPFBS 2.20 0.230 UPFO S 5.50 0.340 JPFO A 67.0 0.250 J CSB-20-01

Sa m ple 3/27/20203/27/2020Units: ng /L ug /kgPFBS 3.20 0.370 UPFO S 2.20 J 1.00 UPFO A 8.60 0.270 J

JRopp
Callout
Cold Spring Brook Pond
JRopp
Typewritten Text
7
Page 29: Fort Devens Project Status Update Sept 2020 · FORMER FORT DEVENS ARMY INSTALLATION PROJECT STATUS UPDATE September 2020. 2 AGENDA Per- and Polyfluoroalkyl Substances (PFAS) Investigation

!<

!<

!<

!<

!<

!<

!<

!<

!<

!<

!<

!<

BARNUM ROAD

AYER

ROAD

COLD SPRING

BROO

K

BOWERS BROOK

CSB-20-02CSB-20-03

CSB-20-04

CSB-20-05

CSB-20-06

CSB-18-08

CSB-18-03

CSB-18-02

CSB-18-05

CSB-18-04

CSB-18-06

CSB-18-07

µ

File: PFAS_RI_A1_PSC_North_ColdSpringBrook_SWSD_Results.mxd

293 Boston Post Road We st, Suite 100, Ma rlb oroug h , MA 01752Fig ure Da te :

05/05/2020 0 400200

Fe e t

Form e r Fort De ve ns Arm y Insta lla tionDe ve ns, Ma ssa ch use tts

KOMAN Government Solutions, LLC

Le g e nd!< Surfa ce Wa te r a nd Se dim e nt Sa m ple Loca tion

Form e r Fort De ve ns Bounda ry

North e rn Exte nt Cold Spring BrookPFAS Re sults in Surfa ce Wa te r a nd Se dim e nt Sa m ple s

De ve ns PFAS RI - Are a 1 PSCS

Ae ria l Source s: 2019, USGS, Ma ssGIS

CSB-18-03Sa m ple 9/27/20189/27/2018Units: ng /L ug /kgPFBS 3.60 0.390 UPFO S 16.0 5.60PFO A 22.0 2.40

CSB-18-04Sa m ple 9/27/20189/27/2018Units: ng /L ug /kgPFBS 4.20 0.390 UPFO S 16.0 1.10 UPFO A 45.0 0.430 U

CSB-18-05Sa m ple 9/27/2018(9/27/2018) FD9/27/2018(9/27/2018) FDUnits: ng /L ng /L ug /kg ug /kgPFBS 5.10 4.90 0.340 U 0.360 UPFO S 15.0 15.0 0.940 U 1.00 UPFO A 40.0 41.0 0.370 U 0.400 U

CSB-18-06Sa m ple 9/27/20189/27/2018Units: ng /L ug /kgPFBS 1.60 J 0.520 UPFO S 3.20 J 1.90 JPFO A 7.90 1.70

CSB-18-07Sa m ple 9/26/20189/26/2018Units: ng /L ug /kgPFBS 1.70 0.370 UPFO S 3.60 1.00 UPFO A 9.50 0.410 U

CSB-18-08Sa m ple 9/26/20189/26/2018Units: ng /L ug /kgPFBS 1.50 J 0.360 UPFO S 3.10 J 1.00 UPFO A 13.0 0.400 U

Note s:Pe rfluoroocta ne Sulfonic Acid (PFO S)Pe rfluoroocta noic Acid (PFO A)Pe rfluorob uta ne sulfonic a cid (PFBS)ng /L = na nog ra m s pe r lite r (Surfa ce Wa te r Re sult Va lue )µg /kg = m icrog ra m pe r kilog ra m (Se dim e nt Re sult va lue )J = e stim a te d re sultU= not de te cte d a b ove th e re porte d sa m ple qua ntita tion lim itBold = de te ction

CSB-18-02Sa m ple 9/27/20189/27/2018Units: ng /L ug /kgPFBS 4.10 0.700 UPFO S 10.0 1.90 UPFO A 12.0 0.630 J

CSB-20-04Sa m ple 3/26/20203/26/2020Units: ng /L ug /kgPFBS 11.0 0.210 UPFO S 35.0 2.20PFO A 190 0.940

CSB-20-05Sa m ple 3/26/20203/26/2020Units: ng /L ug /kgPFBS 8.90 0.570 UPFO S 2.80 J 1.60 UPFO A 80.0 0.460 J

CSB-20-06Sa m ple 3/26/20203/26/2020Units: ng /L ug /kgPFBS 0.800 J 0.280 UPFO S 4.10 0.530 JPFO A 26.0 0.310 U

EPA PFAS Site Specific Screening Levels forFormer Fort Devens

Surfa ce Wa te rUnits: ng /LPFO A 2,030PFO S 2,030PFBS 2,030,000

Se dim e ntUnits: μg /kgPFO A 609PFO S 609PFBS 609,000

CSB-20-02Sa m ple 3/27/20203/27/2020Units: ng /L ug /kgPFBS 4.30 0.680 UPFO S 41.0 4.40PFO A 28.0 1.10

CSB-20-03Sa m ple 3/26/2020(3/26/2020) FD3/26/2020(3/26/2020) FDUnits: ng /L ng /L ug /kg ug /kgPFBS 3.30 3.40 0.480 U 0.530 UPFO S 33.0 31.0 1.30 U 1.50 UPFO A 22.0 21.0 0.540 U 0.590 U

JRopp
Typewritten Text
8
JRopp
Callout
AOC 57 Area 1
JRopp
Callout
AOC 57 Area 2
JRopp
Callout
AOC 57 Area 3
JRopp
Callout
AOC 74
Page 30: Fort Devens Project Status Update Sept 2020 · FORMER FORT DEVENS ARMY INSTALLATION PROJECT STATUS UPDATE September 2020. 2 AGENDA Per- and Polyfluoroalkyl Substances (PFAS) Investigation

30

SURFACE WATER AND SEDIMENT SAMPLING RESULTS• PFAS concentrations did not exceed EPA’s site-specific screening levels which are:o Surface water screening levels: PFOA = 2,030 ppt, PFOS = 2,030 ppt, PFBS = 2,030,000 ppto Sediment screening levels: PFOA 609 µg/kg, PFOS = 609 µg/kg, PFBS = 609,000 µg/kg

• Mirror Lake (1 location)o Surface water: PFOA = 12 ppt, PFOS = 11 ppt, PFBS = 1.1 ppto Sediment: PFAS was non-detect

• Cold Spring Brook Pond (3 locations)o Surface water maximum: PFOA = 67 ppt, PFOS = 5.7 ppt

• Cold Spring Brook (6 locations)o Surface water maximum: PFOA = 190 ppt, PFOS = 41 ppt, PFBS = 11 ppto Sediment maximum: PFOA = 1.1 µg/kg, PFOS = 4.4 µg/kg, PFBS = non-detecto Five of the locations were positioned in areas where groundwater from the AOC 57 Area 2, AOC 57 Area 3,

AOC 74, and AOC 75 are thought to be discharging to the brook. The concentrations at these locations (CSB-20-02 through -06) had higher concentrations than other samples collected in the brook. The results suggest that groundwater from AOC 57 Area 2, AOC 57 Area 3, AOC 74, and AOC 75 is discharging to the brook/wetland.

o CSB-20-01 had low PFAS concentrations indicating a minimal impact from PFAS at this location.

Page 31: Fort Devens Project Status Update Sept 2020 · FORMER FORT DEVENS ARMY INSTALLATION PROJECT STATUS UPDATE September 2020. 2 AGENDA Per- and Polyfluoroalkyl Substances (PFAS) Investigation

31

PFAS RI DRILLING ACTIVITIESMonitoring wells and piezometers were installed in numerous AOCs across Fort Devens. The piezometers are used to assess water levels. Monitoring wells are used to collect groundwater samples and to assess water levels.Monitoring Wells

− 9 monitoring wells installed at AOC 57 Area 2− 5 monitoring wells installed at AOC 57 Area 3− 5 monitoring wells installed at AOC 75− 1 monitoring well installed in the Grove Pond Area− 1 monitoring well installed in the Shabokin well area− 3 monitoring wells installed at AOC 43G

Piezometers− 5 piezometers installed at AOC 74− 7 piezometers installed at AOC 75− 4 piezometers installed in the Shabokin well area− 1 piezometer installed in the Patton well area

Page 32: Fort Devens Project Status Update Sept 2020 · FORMER FORT DEVENS ARMY INSTALLATION PROJECT STATUS UPDATE September 2020. 2 AGENDA Per- and Polyfluoroalkyl Substances (PFAS) Investigation

32

NEXT STEPSPFAS RI – Continue sampling efforts in Areas 1, 2, and 3 including installation of bedrock wells– Review the Remedial Investigation data collected to date with the regulatory agencies

PFAS sampling/treatment− Submit private well sampling results to stakeholders− Fourth Quarter 2020 (December) sampling of municipal (Ayer) water supply wells− Continued operation of municipal treatment system at Ayer’s Grove Pond Well #8− MassDevelopment continuing sampling and treatment at MacPherson, Patton, and Shabokin

water supply wells

Community Involvement Plan– Draft Final CIP planned for September 2020