forth replacement crossing › attachment › ?file=frc-constructio… · pier s1 jet grouting...

39
Contractor Project FORTH REPLACEMENT CROSSING Document title CONSTRUCTION NOISE MONITORING REPORT: AUGUST 2013 01 10/10/13 Minor updates to appendix ESE MWN MWN 00 13/09/13 First Revision ESE NAM MWN Rev Rev. Date Purpose of revision Made Checked Reviewed Document status FOR REVIEW Made by: Ellie Slee Checked By: Martin Wilson Initials: ESE Initials: MWN Document number Rev REP-00135 01 This document is intellectual property of FCBC Construction JV. Copying, distribution, usage, and information on contents of this are forbidden unless explicitly authorized.

Upload: others

Post on 03-Jul-2020

3 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: FORTH REPLACEMENT CROSSING › Attachment › ?file=FRC-Constructio… · Pier S1 jet grouting works Pier S4 airlifting Pier S5 airlifting & concrete works Society Road works M7 Butlaw

Contractor

Project FORTH REPLACEMENT CROSSINGDocument title

CONSTRUCTION NOISE MONITORING

REPORT: AUGUST 2013

01 10/10/13 Minor updates to appendix ESE MWN MWN

00 13/09/13 First Revision ESE NAM MWN

Rev Rev. Date Purpose of revision Made Checked Reviewed

Document status

FOR REVIEWMade by: Ellie Slee Checked By: Martin Wilson

Initials: ESE Initials: MWN

Document number Rev

REP-00135 01This document is intellectual property of FCBC Construction JV. Copying, distribution, usage, and information on contentsof this are forbidden unless explicitly authorized.

Page 2: FORTH REPLACEMENT CROSSING › Attachment › ?file=FRC-Constructio… · Pier S1 jet grouting works Pier S4 airlifting Pier S5 airlifting & concrete works Society Road works M7 Butlaw

Forth Crossing Bridge Constructors - A Joint Venture of Hochtief Solutions AG, American Bridge International,Dragados, S.A. and Galliford Try Infrastructure Limited (Trading as Morrison Construction)

Contents

1. Introduction

2. Noise Monitoring Locations

3. Noise Monitoring Results

Page 3: FORTH REPLACEMENT CROSSING › Attachment › ?file=FRC-Constructio… · Pier S1 jet grouting works Pier S4 airlifting Pier S5 airlifting & concrete works Society Road works M7 Butlaw

Forth Crossing Bridge Constructors - A Joint Venture of Hochtief Solutions AG, American Bridge International,Dragados, S.A. and Galliford Try Infrastructure Limited (Trading as Morrison Construction)

1 Introduction

1.1 Monitoring of construction noise is being undertaken by FCBC during the

construction of the new Forth Crossing and the associated road network. This

report covers the month of August 2013. The objective of this report is to detail

the monitoring that has been undertaken across the site during this period and

to present the construction noise monitoring results acquired for August 2013.

1.2 Monitoring of construction noise has been undertaken in accordance with the

Code of Construction Practice (CoCP) and the Noise and Vibration

Management Plan (NVMP).

Page 4: FORTH REPLACEMENT CROSSING › Attachment › ?file=FRC-Constructio… · Pier S1 jet grouting works Pier S4 airlifting Pier S5 airlifting & concrete works Society Road works M7 Butlaw

Forth Crossing Bridge Constructors - A Joint Venture of Hochtief Solutions AG, American Bridge International,Dragados, S.A. and Galliford Try Infrastructure Limited (Trading as Morrison Construction)

2 Noise Monitoring Locations

2.1 During August 2013, construction noise was monitored using permanent,

continuous noise monitoring devices at the locations listed in Table 1. The

majority of the monitors were installed throughout November and December

2011, with additional monitors installed at Scotstoun Park (Arup’s Office) and

Newton during February 2012 and a further sound level meter installed at

Whinny Hill during March 2012.

2.2 At some monitoring locations, the noise monitoring devices are accompanied

by associated weather stations. Weather stations are present at Echline Field,

Tigh-Na-Grian, Clufflat Brae, Dundas Home Farm, Butlaw Fisheries, Linn Mill

and Whinny Hill.

2.3 Various construction works were undertaken across the site during August

2013. The main construction activities undertaken in the locality of each of the

noise meters during the period have been listed in Table 1.

Page 5: FORTH REPLACEMENT CROSSING › Attachment › ?file=FRC-Constructio… · Pier S1 jet grouting works Pier S4 airlifting Pier S5 airlifting & concrete works Society Road works M7 Butlaw

Forth Crossing Bridge Constructors - A Joint Venture of Hochtief Solutions AG, American Bridge International,Dragados, S.A. and Galliford Try Infrastructure Limited (Trading as Morrison Construction)

Table 1: Monitoring Locations

Ref.MonitoringLocation

Crossing orNetwork

Main Construction Activities DuringAugust 2013

M1 Whinny Hill Network

Band drain works at King Malcolm DriveExcavation and breaking rock atCastlandhill Road and haulage to Ferrytoll

N.B. No evening, night time or Sundaydaytime construction in vicinity.

M3 Tigh-Na-Grian CrossingWorks within Central Tower cofferdamNorth Tower dewatering worksNorth Tower crane platform piling

M4 North Leg Crossing

Works within Central Tower cofferdamNorth Tower dewatering worksNorth Tower crane platform pilingSouth Tower excavation & airliftingSouth Tower underwater concrete pourPier S1 final caisson excavationPier S4 airlifting & underwater concretePier S6 backfillingPier S5 blinding, rebar & formwork

M6 Port Edgar Crossing

Works within Central Tower cofferdamSouth Tower excavation & airliftingPier S1 jet grouting worksPier S4 airliftingPier S5 airlifting & concrete worksSociety Road works

M7Butlaw

FisheriesCrossing

Works within Central Tower cofferdamSouth Tower excavation & airliftingPier S1 jet grouting worksPier S4 airliftingPier S5 airlifting & concrete worksPier S6 backfillingSociety Road works

M10Inchgarvie

LodgeCrossing

South Tower excavation & airliftingPier S1 jet grouting worksPier S4 airliftingPier S5 airlifting & concrete worksLaunch –fixing steel and erectingformwork, concrete pours, backfilling andassembly of stillagesScaffolding works, rebar, formwork andconcrete pours at S7/S8Society road works

M11 Linn Mill

Network(close

proximity toCrossing)

Launch –fixing steel and erectingformwork, concrete pours, backfilling andassembly of stillagesScaffolding works, rebar, formwork andconcrete pours at S7/S8Pier trials area works

Page 6: FORTH REPLACEMENT CROSSING › Attachment › ?file=FRC-Constructio… · Pier S1 jet grouting works Pier S4 airlifting Pier S5 airlifting & concrete works Society Road works M7 Butlaw

Forth Crossing Bridge Constructors - A Joint Venture of Hochtief Solutions AG, American Bridge International,Dragados, S.A. and Galliford Try Infrastructure Limited (Trading as Morrison Construction)

Society road works

M13 Clufflat Brae Crossing

Launch –fixing steel and erectingformwork, concrete pours, backfilling andassembly of stillagesScaffolding works, rebar, formwork andconcrete pours at S7/S8Pier trials area worksSociety road works

M14 Springfield Network

Launch –fixing steel and erectingformwork, concrete pours, backfilling andassembly of stillagesLoading tippers with clay for transport toDundasPier trials area worksGyratory – structures

N.B. No evening, night time or Sundaydaytime construction in vicinity.

M15 Echline Field Network

Launch –fixing steel and erectingformwork, concrete pours, backfilling andassembly of stillagesLoading tippers with clay for transport toDundasBulk excavation for mainlineStructures works at gyratory

N.B. No evening, night time or Sundaydaytime construction in vicinity.

M16 Scotstoun Network

Bus link works

N.B. No evening, night time or Sundaydaytime construction in vicinity.

M17Dundas Home

FarmNetwork

Utilities worksEnvironmental bund worksExcavation works for mainline

N.B. No evening, night time or Sundaydaytime construction in vicinity.

M18 Newton Network No works

Page 7: FORTH REPLACEMENT CROSSING › Attachment › ?file=FRC-Constructio… · Pier S1 jet grouting works Pier S4 airlifting Pier S5 airlifting & concrete works Society Road works M7 Butlaw

Forth Crossing Bridge Constructors - A Joint Venture of Hochtief Solutions AG, American Bridge International,Dragados, S.A. and Galliford Try Infrastructure Limited (Trading as Morrison Construction)

3 Noise Monitoring Results

3.1 All noise monitoring results for construction days have been presented in

charts using the template provided in the Construction Noise Monitoring

Information Note, as available on the project website

(http://www.transportscotland.gov.uk/files/documents/projects/forth-

replacement/FRC_Construction_Noise_Monitoring_Information_Note__2_.pdf).

All charts can be found in the appendices of this report.

3.2 With regard to the noise monitoring results charts, the following should be

noted:

All locations are considered as either ‘Main Crossing’ or ‘Network

Connections’, as set out in Table 1. Main Crossing works are

undertaken during the day, evening and night time periods. Network

connection works, however, are undertaken during the daytime only.

The inclusion of data in the graphs reflects this. Although Linn Mill is

considered as a network location, the potential for marine works near

the south shore to be heard has been recognised. As a result, evening

and night time data has been included for this location although no

network connection construction activities have been undertaken during

these periods.

Noise data for days, evening and nights on which no construction works

were conducted have been excluded from the monthly average results

presented in the graph. Additionally, no investigations into the LAFmax

exceedances during these periods have been made as they would have

been caused by non-construction related factors. However, noise

results (LAeq and LAFmax) for any days, evenings and nights on which no

construction works have been conducted have been presented in the

graphs in greyed out areas.

An average for Sunday construction noise data has been included on

the graphs where applicable; in locations where no Sunday works have

been undertaken no average is shown.

As set out in the CoCP, the assessment time for evening, nights and

Sunday daytime is 1 hour periods. To present the construction noise

results for these periods, therefore, the maximum LAFmax (fast time

response) and maximum LAeq within the overall evening/night time

period has been taken. It should be noted, therefore, that the average

shown for these periods is an average of only the highest LAeq results.

Page 8: FORTH REPLACEMENT CROSSING › Attachment › ?file=FRC-Constructio… · Pier S1 jet grouting works Pier S4 airlifting Pier S5 airlifting & concrete works Society Road works M7 Butlaw

Forth Crossing Bridge Constructors - A Joint Venture of Hochtief Solutions AG, American Bridge International,Dragados, S.A. and Galliford Try Infrastructure Limited (Trading as Morrison Construction)

Where noise data is missing for days, evening or nights during which

construction works were conducted, this has been indicated. Data is

missing for the North Leg from the night period on 10 August to 21

August due to device error; the error was resolved as soon as

reasonably practicable, though the timescale was restricted due to the

limited accessibility to this device. A short period (2 days) is also

missing from Scotstoun due to device error.

3.3 Results demonstrate that the monthly average total construction noise results

for daytime were within the threshold limits for all monitoring locations for

August 2013, with the exception of Scotstoun. For the evening and night time

periods, all monitoring locations, with the exception of night time at Butlaw

Fisheries, were within the threshold limits. With regard to the Sunday averages

(for applicable monitoring locations), exceedances of the threshold were noted

for the Sunday daytime, evening and night time average at Butlaw Fisheries.

All other locations not listed were found to be within the Sunday average

threshold for all periods.

3.4 The exceedances at Butlaw are not thought to have been caused by increased

noise levels due to construction. The night time average was found to be

affected by increased noise levels due to waves breaking on the shore, as well

as bird calls at dawn. The exceedances of the Sunday averages are also not

thought to be due to construction works. Though audio is not available for all

the Sunday periods, no construction works were on-going at the time which

would have caused the elevated noise levels observed. Where audio is

available, it demonstrates that the increased levels were caused by birds and

waves. It should also be noted that screening and distance attenuation should

be considered as these factors result in a lowering of the noise levels to within

the threshold level at the nearest sensitive receptors; attended monitoring has

illustrated a drop of at least 5 – 10 dB from Butlaw Fisheries to the nearest

sensitive receptors with respect to noise generated around the south shore

area of the estuary. Furthermore, it should be noted that all the averages

reported for day time, evening, night time and Sunday periods, are based only

on the highest LAeq levels for 1 hour periods which can affect the averages.

3.5 The exceedance of the daytime average at Scotstoun is due to increased

background noise levels due to the location of the meter directly adjacent to the

road. The average for August is consistent with that recorded in previous

months.

Page 9: FORTH REPLACEMENT CROSSING › Attachment › ?file=FRC-Constructio… · Pier S1 jet grouting works Pier S4 airlifting Pier S5 airlifting & concrete works Society Road works M7 Butlaw

Forth Crossing Bridge Constructors - A Joint Venture of Hochtief Solutions AG, American Bridge International,Dragados, S.A. and Galliford Try Infrastructure Limited (Trading as Morrison Construction)

3.6 During August 2013, some exceedances of the maximum noise thresholds also

occurred. Each exceedance of the threshold was investigated using triggered

audio recordings, records of construction works (i.e. site programmes and

diaries and daily marine reports) and analysis of weather station data, where

required. A Noise and Vibration Investigative Report (NVIR) spread sheet has

been produced detailing the results of the investigation for each exceedance.

Where the exceedances are due to construction works, a detailed NVIR has

been completed which details the results of the investigation in addition to any

additional mitigation measures required.

3.7 Investigations of the exceedances of the maximum noise level thresholds show

the majority to have occurred as a result of non-construction related noise,

notably due to bird calls, some periods of adverse weather and localised noises

at nearby properties. At some locations, notably Scotstoun and Echline,

existing traffic noise had an effect on maximum noise levels during the period

covered in this report.

3.8 Where an exceedance due to construction works was identified, the works

were investigated as soon as practicably reasonable and a detailed NVIR was

completed, within which any additional mitigation measures were recognised

and subsequently implemented where practicable.

3.9 The daytime LAFmax threshold was exceeded during August on six occasions.

Four exceedances were recorded at Dundas and were found to be caused by a

tipper tipping material for the construction of the environmental bund in close

proximity to this monitoring station. A daytime construction related exceedance

was also recorded at Linn Mill which was caused by plant movements in

Echline field. A daytime exceedance was also recorded at Scotstoun, where

the construction of a fence in close proximity to the meter caused an

exceedance of the threshold. In addition to the daytime exceedance, three

night time exceedances were caused by the night works at Society Road; these

were recorded at Butlaw on one occasion and at Inchgarvie on two occasions.

All construction related exceedances were investigated and mitigation

measures implemented where possible; the relevant NVIRs provide more detail

with regard to each exceedance.

3.10 A summary of the findings for exceedances occurring at each of the locations

can be found in Table 2. All construction related exceedances are detailed in

Table 3; further information on related remedial actions is detailed in the

relevant NVIR.

Page 10: FORTH REPLACEMENT CROSSING › Attachment › ?file=FRC-Constructio… · Pier S1 jet grouting works Pier S4 airlifting Pier S5 airlifting & concrete works Society Road works M7 Butlaw

Forth Crossing Bridge Constructors - A Joint Venture of Hochtief Solutions AG, American Bridge International,Dragados, S.A. and Galliford Try Infrastructure Limited (Trading as Morrison Construction)

Table 2: Summary of Exceedances at Monitoring Locations

MonitoringLocation

Summary of Exceedance Details

ButlawFisheries

During August the maximum noise threshold was exceeded on 53occasions (daytime, 12; evening, 15; night time, 26). One night timeexceedance was caused by construction works at Society Road. Allother exceedances were attributed to a range of non-constructionfactors, but notably birds, waves and planes.

Clufflat Brae

During August the maximum noise threshold was exceeded on 41occasions (daytime, 10; evening, 12; night time, 19). Noexceedances were attributable to construction works. Exceedanceswere found to be largely due to birds, wind and residents at nearbyproperties.

InchgarvieLodge

During August the maximum noise threshold was exceeded on 45occasions (daytime, 12; evening, 14; night time, 19). Two night timeexceedances were found to be due to construction works at SocietyRoad. However, investigations found residents at the property andbirds to be the main contributing factors to the exceedances at thislocation.

Linn Mill

During August the maximum noise threshold was exceeded on 42occasions (daytime, 10; evening, 14; night time, 18). Oneexceedance was found to be due to plant movements in Echline filed.However, the majority of exceedances were caused by birds andresidents at nearby properties.

Tigh-Na-Grian

During August the maximum noise threshold was exceeded on 57occasions (daytime, 28; evening, 10; night time, 19). Exceedanceswere due to non-construction factors, notably birds.

DundasHome Farm

During August the maximum noise threshold was exceeded on 10occasions. Four exceedances were attributable to constructionworks (embankment works in close proximity to meter). Otherexceedances were largely due to a gardening works at the property.

Echline

During August the maximum noise threshold was exceeded on 27occasions. No exceedances at this location were due to constructionactivities. Exceedances were largely attributed to vehicles passing byon the adjacent roads.

Springfield

During August the maximum noise threshold was exceeded on 10occasions. The exceedances were not caused by construction worksat this location. The majority of exceedances were due to localresidents.

Scotstoun

During August the maximum noise threshold was exceeded on 25occasions. Exceedances were largely attributed to vehicles passingby on the adjacent road. However, one exceedance was found to bedue to the construction of a fence in close proximity to the meter.

Whinny Hill

During August the maximum noise threshold was exceeded on 8occasions. Exceedances were not due to construction activities. Arange of factors were found to cause exceedances at this location,including birds, dogs barking, wind and planes.

Page 11: FORTH REPLACEMENT CROSSING › Attachment › ?file=FRC-Constructio… · Pier S1 jet grouting works Pier S4 airlifting Pier S5 airlifting & concrete works Society Road works M7 Butlaw

Forth Crossing Bridge Constructors - A Joint Venture of Hochtief Solutions AG, American Bridge International,Dragados, S.A. and Galliford Try Infrastructure Limited (Trading as Morrison Construction)

Table 3: Summary of Construction Exceedances at MonitoringLocations

Date Monitor Period Description Lmax (dB(A)) Threshold (dB(A)) NVIR No.

09/08/2013Butlaw Fisheries

(South Shore)Night Society Rd Nightworks - Metal Clang 71.8 65.0 B.N.090813

09/08/2013 68.8 I.N.080813

10/08/2013 65.8 I.N.090813

12/08/2013 81.9 D.D.120813

13/08/2013 81.1 D.D.130813

14/08/2013 81.7 D.D.140813

23/08/2013 82.5 D.D.230813

17/08/2013Scotstoun

(Arup Office)Day Fence works adjacent to monitor 91.5 80.0 Sc.D.170813

20/08/2013Linn Mill

(Echline Field)Day Plant Moving Down Echline 88.6 80.0 L.D.200813

Day

Dundas Home

Farm

(South Network)

Tipper Tipping for Earthbund 80.0

Construction Related Noise Exceedances - August 2013

Society Rd Nightworks - Metal ClangNightInchgarvie Lodge

(Echline Field)65.0

Page 12: FORTH REPLACEMENT CROSSING › Attachment › ?file=FRC-Constructio… · Pier S1 jet grouting works Pier S4 airlifting Pier S5 airlifting & concrete works Society Road works M7 Butlaw

Forth Crossing Bridge Constructors - A Joint Venture of Hochtief Solutions AG, American Bridge International,Dragados, S.A. and Galliford Try Infrastructure Limited (Trading as Morrison Construction)

APPENDIX A

Page 13: FORTH REPLACEMENT CROSSING › Attachment › ?file=FRC-Constructio… · Pier S1 jet grouting works Pier S4 airlifting Pier S5 airlifting & concrete works Society Road works M7 Butlaw

30.0

35.0

40.0

45.0

50.0

55.0

60.0

65.0

70.0

75.0

80.0

85.0

90.0

95.0

100.0

105.00

1/0

8/2

01

3

02

/08

/20

13

03

/08

/20

13

04

/08

/20

13

05

/08

/20

13

06

/08

/20

13

07

/08

/20

13

08

/08

/20

13

09

/08

/20

13

10

/08

/20

13

11

/08

/20

13

12

/08

/20

13

13

/08

/20

13

14

/08

/20

13

15

/08

/20

13

16

/08

/20

13

17

/08

/20

13

18

/08

/20

13

19

/08

/20

13

20

/08

/20

13

21

/08

/20

13

22

/08

/20

13

23

/08

/20

13

24

/08

/20

13

25

/08

/20

13

26

/08

/20

13

27

/08

/20

13

28

/08

/20

13

29

/08

/20

13

30

/08

/20

13

31

/08

/20

13

No

ise

Le

vel,

dB

(A)

Measured Daytime Noise Levels at Butlaw Fisheries Measurement period: August 2013

Total daily noise level (noconstruction)Total daily noise level

Total daily constructionnoise levelDaily maximum noise level

Average Sundayconstruction noiseMonthly average totalconstruction noise level

Construction Noise Thresholds Maximum noise level Assessment Category Threshold

(n) = Investigation Report Number

Measured Noise Levels

Satu

rday

Su

nd

ay

Satu

rday

Su

nd

ay

Satu

rday

Su

nd

ay

Satu

rday

Su

nd

ay

(B.D

.04

08

13

) (B.D

.13

08

13

)

(B.D

.11

08

13

)

(B.D

.07

08

13

)

(B.D

.14

08

13

)

(B.D

.15

08

13

)

(B.D

.18

08

13

)

(B.D

.21

08

13

)

(B.D

.22

08

13

)

(B.D

.25

08

13

)

(B.D

.27

08

13

)

(B.D

.31

08

13

)

Page 14: FORTH REPLACEMENT CROSSING › Attachment › ?file=FRC-Constructio… · Pier S1 jet grouting works Pier S4 airlifting Pier S5 airlifting & concrete works Society Road works M7 Butlaw

30.0

35.0

40.0

45.0

50.0

55.0

60.0

65.0

70.0

75.0

80.0

85.0

90.0

95.00

1/0

8/2

01

3

02

/08

/20

13

03

/08

/20

13

04

/08

/20

13

05

/08

/20

13

06

/08

/20

13

07

/08

/20

13

08

/08

/20

13

09

/08

/20

13

10

/08

/20

13

11

/08

/20

13

12

/08

/20

13

13

/08

/20

13

14

/08

/20

13

15

/08

/20

13

16

/08

/20

13

17

/08

/20

13

18

/08

/20

13

19

/08

/20

13

20

/08

/20

13

21

/08

/20

13

22

/08

/20

13

23

/08

/20

13

24

/08

/20

13

25

/08

/20

13

26

/08

/20

13

27

/08

/20

13

28

/08

/20

13

29

/08

/20

13

30

/08

/20

13

31

/08

/20

13

No

ise

Le

vel,

dB

(A)

Measured Evening Noise Levels at Butlaw Fisheries Measurement period: August 2013

Total daily noise level (noconstruction)Total daily noise level

Total daily constructionnoise levelDaily maximum noise level

Average Sundayconstruction noiseMonthly average totalconstruction noise level

Construction Noise Thresholds Maximum noise level Assessment Category Threshold

(n) = Investigation Report Number

Measured Noise Levels

Satu

rday

Su

nd

ay

Satu

rday

Su

nd

ay

Satu

rday

Su

nd

ay

Satu

rday

Su

nd

ay

(B.E

.01

08

13

)

(B.E

.10

08

13

)

(B.E

.08

08

13

) (B.E

.06

08

13

)

(B.E

.03

08

13

)

(B.E

.02

08

13

)

(B.E

.13

08

13

)

(B.E

.12

08

13

)

(B.E

.11

08

13

)

(B.E

.15

08

13

)

(B.E

.14

08

13

)

(B.E

.16

08

13

)

(B.E

.18

08

13

)

(B.E

.20

08

13

)

(B.E

.26

08

13

)

Page 15: FORTH REPLACEMENT CROSSING › Attachment › ?file=FRC-Constructio… · Pier S1 jet grouting works Pier S4 airlifting Pier S5 airlifting & concrete works Society Road works M7 Butlaw

30.0

35.0

40.0

45.0

50.0

55.0

60.0

65.0

70.0

75.0

80.0

85.0

90.0

95.0

100.0

105.0

110.00

1/0

8/2

01

3

02

/08

/20

13

03

/08

/20

13

04

/08

/20

13

05

/08

/20

13

06

/08

/20

13

07

/08

/20

13

08

/08

/20

13

09

/08

/20

13

10

/08

/20

13

11

/08

/20

13

12

/08

/20

13

13

/08

/20

13

14

/08

/20

13

15

/08

/20

13

16

/08

/20

13

17

/08

/20

13

18

/08

/20

13

19

/08

/20

13

20

/08

/20

13

21

/08

/20

13

22

/08

/20

13

23

/08

/20

13

24

/08

/20

13

25

/08

/20

13

26

/08

/20

13

27

/08

/20

13

28

/08

/20

13

29

/08

/20

13

30

/08

/20

13

31

/08

/20

13

No

ise

Le

vel,

dB

(A)

Measured Night time Noise Levels at Butlaw Fisheries Measurement period: August 2013

Total daily noise level (noconstruction)

Total daily noise level

Total daily constructionnoise level

Daily maximum noise level

Average Sundayconstruction noise

Monthly average totalconstruction noise level

Construction Noise Thresholds Maximum noise level Assessment Category Threshold

(n) = Investigation Report Number

Measured Noise Levels

Satu

rday

Su

nd

ay

Satu

rday

Su

nd

ay

Satu

rday

Su

nd

ay

Satu

rday

Su

nd

ay

(B.N

.04

08

13

(B.N

.11

08

13

)

(B.N

.10

08

13

)

(B.N

.09

08

13

)

(B.N

.08

08

13

)

(B.N

.07

08

13

)

(B.N

.06

08

13

)

(B.N

.05

08

13

)

(B.N

.20

08

13

)

(B.N

.19

08

13

) (B.N

.18

08

13

)

(B.N

.17

08

13

)

(B.N

.16

08

13

)

(B.N

.15

08

13

)

(B.N

.14

08

13

)

(B.N

.13

08

13

)

(B.N

.12

08

13

)

(B.N

.28

08

13

)

(B.N

.26

08

13

)

(B.N

.25

08

13

)

(B.N

.24

08

13

)

(B.N

.23

08

13

)

(B.N

.22

08

13

)

(B.N

.21

08

13

)

(B.N

.31

08

13

)

(B.N

.30

08

13

)

Page 16: FORTH REPLACEMENT CROSSING › Attachment › ?file=FRC-Constructio… · Pier S1 jet grouting works Pier S4 airlifting Pier S5 airlifting & concrete works Society Road works M7 Butlaw

30

35

40

45

50

55

60

65

70

75

80

85

90

95

1000

1/0

8/2

01

3

02

/08

/20

13

03

/08

/20

13

04

/08

/20

13

05

/08

/20

13

06

/08

/20

13

07

/08

/20

13

08

/08

/20

13

09

/08

/20

13

10

/08

/20

13

11

/08

/20

13

12

/08

/20

13

13

/08

/20

13

14

/08

/20

13

15

/08

/20

13

16

/08

/20

13

17

/08

/20

13

18

/08

/20

13

19

/08

/20

13

20

/08

/20

13

21

/08

/20

13

22

/08

/20

13

23

/08

/20

13

24

/08

/20

13

25

/08

/20

13

26

/08

/20

13

27

/08

/20

13

28

/08

/20

13

29

/08

/20

13

30

/08

/20

13

31

/08

/20

13

No

ise

Le

vel,

dB

(A)

Measured Daytime Noise Levels at Clufflat Brae Measurement period: August 2013

Total daily noise level

Total daily constructionnoise level

Total daily noise (noconstruction)

Daily maximum noise level

Average Sundayconstruction noise

Monthly average totalconstruction noise level

Construction Noise Thresholds Maximum noise level Assessment Category Threshold

(n) = Investigation Report Number

Measured Noise Levels

Satu

rday

Su

nd

ay

Satu

rday

Su

nd

ay

Satu

rday

Su

nd

ay

Satu

rday

Su

nd

ay

(C.D

.03

08

13

)

(C.D

.30

08

13

)

(C.D

.29

08

13

)

(C.D

.25

08

13

)

(C.D

.21

08

13

)

(C.D

.18

08

13

)

(C.D

.11

08

13

) (C.D

.08

08

13

)

(C.D

.05

08

13

)

(C.D

.04

08

13

)

Page 17: FORTH REPLACEMENT CROSSING › Attachment › ?file=FRC-Constructio… · Pier S1 jet grouting works Pier S4 airlifting Pier S5 airlifting & concrete works Society Road works M7 Butlaw

30

35

40

45

50

55

60

65

70

75

80

85

90

95

100

1050

1/0

8/2

01

3

02

/08

/20

13

03

/08

/20

13

04

/08

/20

13

05

/08

/20

13

06

/08

/20

13

07

/08

/20

13

08

/08

/20

13

09

/08

/20

13

10

/08

/20

13

11

/08

/20

13

12

/08

/20

13

13

/08

/20

13

14

/08

/20

13

15

/08

/20

13

16

/08

/20

13

17

/08

/20

13

18

/08

/20

13

19

/08

/20

13

20

/08

/20

13

21

/08

/20

13

22

/08

/20

13

23

/08

/20

13

24

/08

/20

13

25

/08

/20

13

26

/08

/20

13

27

/08

/20

13

28

/08

/20

13

29

/08

/20

13

30

/08

/20

13

31

/08

/20

13

No

ise

Le

vel,

dB

(A)

Measured Evening Noise Levels at Clufflat Brae Measurement period: August 2013

Total daily noise level

Total daily constructionnoise levelTotal daily noise level (noconstruction)Daily maximum noise level

Average Sundayconstruction noiseMonthly average totalconstruction noise level

Construction Noise Thresholds Maximum noise level Assessment Category Threshold

(n) = Investigation Report Number

Measured Noise Levels

Satu

rday

Su

nd

ay

Satu

rday

Su

nd

ay

Satu

rday

Su

nd

ay

Satu

rday

Su

nd

ay

(C.E

.01

08

13

)

(C.E

.30

08

13

)

(C.E

.29

08

13

)

(C.E

.28

08

13

)

(C.E

.26

08

13

)

(C.E

.17

08

13

)

(C.E

.09

08

13

) (C.E

.08

08

13

)

(C.E

.06

08

13

)

(C.E

.04

08

13

) (C.E

.03

08

13

)

(C.E

.02

08

13

)

Page 18: FORTH REPLACEMENT CROSSING › Attachment › ?file=FRC-Constructio… · Pier S1 jet grouting works Pier S4 airlifting Pier S5 airlifting & concrete works Society Road works M7 Butlaw

30.0

35.0

40.0

45.0

50.0

55.0

60.0

65.0

70.0

75.0

80.0

85.0

90.0

95.0

100.0

105.0

01

/08

/20

13

02

/08

/20

13

03

/08

/20

13

04

/08

/20

13

05

/08

/20

13

06

/08

/20

13

07

/08

/20

13

08

/08

/20

13

09

/08

/20

13

10

/08

/20

13

11

/08

/20

13

12

/08

/20

13

13

/08

/20

13

14

/08

/20

13

15

/08

/20

13

16

/08

/20

13

17

/08

/20

13

18

/08

/20

13

19

/08

/20

13

20

/08

/20

13

21

/08

/20

13

22

/08

/20

13

23

/08

/20

13

24

/08

/20

13

25

/08

/20

13

26

/08

/20

13

27

/08

/20

13

28

/08

/20

13

29

/08

/20

13

30

/08

/20

13

31

/08

/20

13

No

ise

Le

vel,

dB

(A)

Measured Night-time Noise Levels at Clufflat Brae Measurement period: August 2013

Total daily noise level (noconstruction)Total daily noise level

Total daily constructionnoise levelDaily maximum noise level

Average Sundayconstruction noiseMonthly average totalconstruction noise level

Construction Noise Thresholds Maximum noise level Assessment Category Threshold

(n) = Investigation Report Number

Measured Noise Levels

Satu

rday

Su

nd

ay

Satu

rday

Su

nd

ay

Satu

rday

Su

nd

ay

Satu

rday

Su

nd

ay

(C.N

.03

08

13

) (C.N

.31

08

13

)

(C.N

.30

08

13

)

(C.N

.29

08

13

)

(C.N

.26

08

13

)

(C.N

.24

08

13

)

(C.N

.23

08

13

)

(C.N

.22

08

13

)

(C.N

.21

08

13

)

(C.N

.19

08

13

)

(C.N

.18

08

13

)

(C.N

.17

08

13

)

(C.N

.16

08

13

)

(C.N

.15

08

13

)

(C.N

.13

08

13

)

(C.N

.12

08

13

)

(C.N

.08

08

13

)

(C.N

.06

08

13

)

(C.N

.05

08

13

)

Page 19: FORTH REPLACEMENT CROSSING › Attachment › ?file=FRC-Constructio… · Pier S1 jet grouting works Pier S4 airlifting Pier S5 airlifting & concrete works Society Road works M7 Butlaw

30

35

40

45

50

55

60

65

70

75

80

85

90

95

100

1050

1/0

8/2

01

3

02

/08

/20

13

03

/08

/20

13

04

/08

/20

13

05

/08

/20

13

06

/08

/20

13

07

/08

/20

13

08

/08

/20

13

09

/08

/20

13

10

/08

/20

13

11

/08

/20

13

12

/08

/20

13

13

/08

/20

13

14

/08

/20

13

15

/08

/20

13

16

/08

/20

13

17

/08

/20

13

18

/08

/20

13

19

/08

/20

13

20

/08

/20

13

21

/08

/20

13

22

/08

/20

13

23

/08

/20

13

24

/08

/20

13

25

/08

/20

13

26

/08

/20

13

27

/08

/20

13

28

/08

/20

13

29

/08

/20

13

30

/08

/20

13

31

/08

/20

13

No

ise

Le

vel,

dB

(A)

Measured Daytime Noise Levels at Dundas Home Farm Measurement period: August 2013

Total daily noise level

Total daily construction noiselevelDaily Noise Level (Noconstruction)Daily maximum noise level

Monthly average totalconstruction noise level

Note: The grey areas of the chart represent days on which no construction works have been conducted. The Sunday average has not been included as no Sunday works have been conducted at this location.

Construction Noise Thresholds Maximum noise level Assessment Category Threshold

(n) = Investigation Report Number

Measured Noise Levels

Satu

rday

Su

nd

ay

Satu

rday

Su

nd

ay

Satu

rday

Su

nd

ay

Satu

rday

Su

nd

ay

(D.D

.05

08

13

)

(D.D

.30

08

13

)

(D.D

.26

08

13

)

(D.D

.23

08

13

)

(D.D

.22

08

13

)

(D.D

.19

08

13

)

(D.D

.14

08

13

)

(D.D

.13

08

13

)

(D.D

.12

08

13

)

(D.D

.09

08

13

)

Page 20: FORTH REPLACEMENT CROSSING › Attachment › ?file=FRC-Constructio… · Pier S1 jet grouting works Pier S4 airlifting Pier S5 airlifting & concrete works Society Road works M7 Butlaw

30

35

40

45

50

55

60

65

70

75

80

85

90

95

100

105

1100

1/0

8/2

01

3

02

/08

/20

13

03

/08

/20

13

04

/08

/20

13

05

/08

/20

13

06

/08

/20

13

07

/08

/20

13

08

/08

/20

13

09

/08

/20

13

10

/08

/20

13

11

/08

/20

13

12

/08

/20

13

13

/08

/20

13

14

/08

/20

13

15

/08

/20

13

16

/08

/20

13

17

/08

/20

13

18

/08

/20

13

19

/08

/20

13

20

/08

/20

13

21

/08

/20

13

22

/08

/20

13

23

/08

/20

13

24

/08

/20

13

25

/08

/20

13

26

/08

/20

13

27

/08

/20

13

28

/08

/20

13

29

/08

/20

13

30

/08

/20

13

31

/08

/20

13

No

ise

Le

vel,

dB

(A)

Measured Daytime Noise Levels at Echline Measurement period: August 2013

Total daily noise level

Total daily construction noiselevelDaily Noise Level (Noconstruction)Daily maximum noise level

Monthly average totalconstruction noise level

Note: The grey areas of the chart represent days on which no construction works have been conducted. The Sunday average has not been included as no Sunday works have been conducted at this location.

Construction Noise Thresholds Maximum noise level Assessment Category Threshold

(n) = Investigation Report Number

Measured Noise Levels

Satu

rday

Su

nd

ay

Satu

rday

Su

nd

ay

Satu

rday

Su

nd

ay

Satu

rday

Su

nd

ay

(E.D

.01

08

13

)

(E.D

.31

08

13

)

(E.D

.30

08

13

)

(E.D

.29

08

13

)

(E.D

.28

08

13

)

(E.D

.27

08

13

)

(E.D

.26

08

13

)

(E.D

.24

08

13

)

(E.D

.23

08

13

)

(E.D

.22

08

13

)

(E.D

.21

08

13

)

(E.D

.20

08

13

) (E.D

.19

08

13

)

(E.D

.17

08

13

)

(E.D

.16

08

13

)

(E.D

.15

08

13

)

(E.D

.14

08

13

)

(E.D

.13

08

13

)

(E.D

.12

08

13

)

(E.D

.10

08

13

)

(E.D

.08

08

13

)

(E.D

.07

08

13

)

(E.D

.06

08

13

)

(E.D

.05

08

13

)

(E.D

.03

08

13

)

(E.D

.02

08

13

)

(E.D

.09

08

13

)

Page 21: FORTH REPLACEMENT CROSSING › Attachment › ?file=FRC-Constructio… · Pier S1 jet grouting works Pier S4 airlifting Pier S5 airlifting & concrete works Society Road works M7 Butlaw

40.0

45.0

50.0

55.0

60.0

65.0

70.0

75.0

80.0

85.0

90.0

95.0

100.0

105.00

1/0

8/2

01

3

02

/08

/20

13

03

/08

/20

13

04

/08

/20

13

05

/08

/20

13

06

/08

/20

13

07

/08

/20

13

08

/08

/20

13

09

/08

/20

13

10

/08

/20

13

11

/08

/20

13

12

/08

/20

13

13

/08

/20

13

14

/08

/20

13

15

/08

/20

13

16

/08

/20

13

17

/08

/20

13

18

/08

/20

13

19

/08

/20

13

20

/08

/20

13

21

/08

/20

13

22

/08

/20

13

23

/08

/20

13

24

/08

/20

13

25

/08

/20

13

26

/08

/20

13

27

/08

/20

13

28

/08

/20

13

29

/08

/20

13

30

/08

/20

13

31

/08

/20

13

No

ise

Le

vel,

dB

(A)

Measured Daytime Noise Levels at Inchgarvie Measurement period: August 2013

Total daily noise level (noconstruction)Total daily noise level

Total daily constructionnoise levelDaily maximum noise level

Average Sundayconstruction noiseMonthly average totalconstruction noise level

Construction Noise Thresholds Maximum noise level Assessment Category Threshold

(n) = Investigation Report Number

Measured Noise Levels

Satu

rday

Su

nd

ay

Satu

rday

Su

nd

ay

Satu

rday

Su

nd

ay

Satu

rday

Su

nd

ay

Measured Noise Levels

Measured Noise Levels

(I.D

.04

08

13

)

(I.D

.13

08

13

)

(I.D

.12

08

13

)

(I.D

.11

08

13

)

(I.D

.14

08

13

)

(I.D

.18

08

13

)

(I.D

.19

08

13

)

(I.D

.21

08

13

)

(I.D

.23

08

13

)

(I.D

.31

08

13

)

(I.D

.28

08

13

)

(I.D

.25

08

13

)

Page 22: FORTH REPLACEMENT CROSSING › Attachment › ?file=FRC-Constructio… · Pier S1 jet grouting works Pier S4 airlifting Pier S5 airlifting & concrete works Society Road works M7 Butlaw

30.0

35.0

40.0

45.0

50.0

55.0

60.0

65.0

70.0

75.0

80.0

85.0

90.0

95.0

100.0

105.00

1/0

8/2

01

3

02

/08

/20

13

03

/08

/20

13

04

/08

/20

13

05

/08

/20

13

06

/08

/20

13

07

/08

/20

13

08

/08

/20

13

09

/08

/20

13

10

/08

/20

13

11

/08

/20

13

12

/08

/20

13

13

/08

/20

13

14

/08

/20

13

15

/08

/20

13

16

/08

/20

13

17

/08

/20

13

18

/08

/20

13

19

/08

/20

13

20

/08

/20

13

21

/08

/20

13

22

/08

/20

13

23

/08

/20

13

24

/08

/20

13

25

/08

/20

13

26

/08

/20

13

27

/08

/20

13

28

/08

/20

13

29

/08

/20

13

30

/08

/20

13

31

/08

/20

13

No

ise

Le

vel,

dB

(A)

Measured Evening Noise Levels at Inchgarvie Measurement period: August 2013

Total daily noise level (noconstruction)Total daily noise level

Total daily constructionnoise levelDaily maximum noise level

Average Sundayconstruction noiseMonthly average totalconstruction noise level

Construction Noise Thresholds Maximum noise level Assessment Category Threshold

(n) = Investigation Report Number

Measured Noise Levels

Satu

rday

Su

nd

ay

Satu

rday

Su

nd

ay

Satu

rday

Su

nd

ay

Satu

rday

Su

nd

ay

(I.E

.06

08

13

)

(I.E

.03

08

13

)

(I.E

.02

08

13

)

(I.E

.01

08

13

)

(I.E

.08

08

13

)

(I.E

.13

08

13

)

(I.E

.12

08

13

)

(I.E

.11

08

13

)

(I.E

.10

08

13

)

(I.E

.18

08

13

)

(I.E

.23

08

13

)

(I.E

.22

08

13

)

(I.E

.21

08

13

)

(I.E

.28

08

13

)

Page 23: FORTH REPLACEMENT CROSSING › Attachment › ?file=FRC-Constructio… · Pier S1 jet grouting works Pier S4 airlifting Pier S5 airlifting & concrete works Society Road works M7 Butlaw

30.0

35.0

40.0

45.0

50.0

55.0

60.0

65.0

70.0

75.0

80.0

85.0

90.0

95.0

100.0

105.00

1/0

8/2

01

3

02

/08

/20

13

03

/08

/20

13

04

/08

/20

13

05

/08

/20

13

06

/08

/20

13

07

/08

/20

13

08

/08

/20

13

09

/08

/20

13

10

/08

/20

13

11

/08

/20

13

12

/08

/20

13

13

/08

/20

13

14

/08

/20

13

15

/08

/20

13

16

/08

/20

13

17

/08

/20

13

18

/08

/20

13

19

/08

/20

13

20

/08

/20

13

21

/08

/20

13

22

/08

/20

13

23

/08

/20

13

24

/08

/20

13

25

/08

/20

13

26

/08

/20

13

27

/08

/20

13

28

/08

/20

13

29

/08

/20

13

30

/08

/20

13

31

/08

/20

13

No

ise

Le

vel,

dB

(A)

Measured Night-time Noise Levels at Inchgarvie Measurement period: August 2013

Total daily noise level (noconstruction)

Total daily noise level

Total daily constructionnoise level

Daily maximum noise level

Average Sundayconstruction noise

Monthly average totalconstruction noise level

Construction Noise Thresholds Maximum noise level Assessment Category Level

(n) = Investigation Report Number

Measured Noise Levels

Satu

rday

Su

nd

ay

Satu

rday

Su

nd

ay

Satu

rday

Su

nd

ay

Satu

rday

Su

nd

ay

(I.N

.01

08

13

)

(I.N

.02

08

13

)

(I.N

.07

08

13

)

(I.N

.06

08

13

)

(I.N

.05

08

13

)

(I.N

.04

08

13

)

(I.N

.03

08

13

)

(I.N

.08

08

13

)

(I.N

.09

08

13

)

(I.N

.13

08

13

)

(I.N

.14

08

13

)

(I.N

.17

08

13

)

(I.N

.18

08

13

)

(I.N

.22

08

13

)

(I.N

.25

08

13

)

(I.N

.27

08

13

)

(I.N

.31

08

13

)

(I.N

.29

08

13

)

(I.N

.28

08

13

)

Page 24: FORTH REPLACEMENT CROSSING › Attachment › ?file=FRC-Constructio… · Pier S1 jet grouting works Pier S4 airlifting Pier S5 airlifting & concrete works Society Road works M7 Butlaw

30.0

35.0

40.0

45.0

50.0

55.0

60.0

65.0

70.0

75.0

80.0

85.0

90.0

95.0

100.0

105.00

1/0

8/2

01

3

02

/08

/20

13

03

/08

/20

13

04

/08

/20

13

05

/08

/20

13

06

/08

/20

13

07

/08

/20

13

08

/08

/20

13

09

/08

/20

13

10

/08

/20

13

11

/08

/20

13

12

/08

/20

13

13

/08

/20

13

14

/08

/20

13

15

/08

/20

13

16

/08

/20

13

17

/08

/20

13

18

/08

/20

13

19

/08

/20

13

20

/08

/20

13

21

/08

/20

13

22

/08

/20

13

23

/08

/20

13

24

/08

/20

13

25

/08

/20

13

26

/08

/20

13

27

/08

/20

13

28

/08

/20

13

29

/08

/20

13

30

/08

/20

13

31

/08

/20

13

No

ise

Le

vel,

dB

(A)

Measured Daytime Noise levels at Linn Mill Measurement period: August 2013

Total daily noise level (noconstruction)

Total daily noise level

Total daily constructionnoise level

Daily maximum noise level

Average Sundayconstruction noise

Monthly average totalconstruction noise level

Construction Noise Thresholds Maximum noise level Assessment Category Level

(n) = Investigation Report Number

Measured Noise Levels

Measured Noise Levels

Measured Noise Levels

Satu

rday

Su

nd

ay

Satu

rday

Su

nd

ay

Satu

rday

Su

nd

ay

Satu

rday

Su

nd

ay

(L.D

.01

08

13

)

(L.D

.25

08

13

)

(L.D

.21

08

13

)

(L.D

.20

08

13

)

(L.D

.18

08

13

)

(L.D

.12

08

13

)

(L.D

.11

08

13

)

(L.D

.10

08

13

)

(L.D

.07

08

13

)

(L.D

.02

08

13

)

Page 25: FORTH REPLACEMENT CROSSING › Attachment › ?file=FRC-Constructio… · Pier S1 jet grouting works Pier S4 airlifting Pier S5 airlifting & concrete works Society Road works M7 Butlaw

30.0

35.0

40.0

45.0

50.0

55.0

60.0

65.0

70.0

75.0

80.0

85.0

90.0

95.0

100.0

105.00

1/0

8/2

01

3

02

/08

/20

13

03

/08

/20

13

04

/08

/20

13

05

/08

/20

13

06

/08

/20

13

07

/08

/20

13

08

/08

/20

13

09

/08

/20

13

10

/08

/20

13

11

/08

/20

13

12

/08

/20

13

13

/08

/20

13

14

/08

/20

13

15

/08

/20

13

16

/08

/20

13

17

/08

/20

13

18

/08

/20

13

19

/08

/20

13

20

/08

/20

13

21

/08

/20

13

22

/08

/20

13

23

/08

/20

13

24

/08

/20

13

25

/08

/20

13

26

/08

/20

13

27

/08

/20

13

28

/08

/20

13

29

/08

/20

13

30

/08

/20

13

31

/08

/20

13

No

ise

Le

vel,

dB

(A)

Measured Evening Noise Levels at Linn Mill Measurement period: August 2013

Total daily noise level (noconstruction)

Total daily noise level

Total daily constructionnoise level

Daily maximum noise level

Average Sundayconstruction noise

Monthly average totalconstruction noise level

Construction Noise Thresholds Maximum noise level Assessment Category Level

(n) = Investigation Report Number

Measured Noise Levels

Satu

rday

Su

nd

ay

Satu

rday

Su

nd

ay

Satu

rday

Su

nd

ay

Satu

rday

Su

nd

ay

(L.E

.01

08

13

)

(L.E

.30

08

13

)

(L.E

.26

08

13

)

(L.E

.19

08

13

)

(L.E

.17

08

13

)

(L.E

.14

08

13

)

(L.E

.13

08

13

)

(L.E

.12

08

13

)

(L.E

.11

08

13

)

(L.E

.10

08

13

)

(L.E

.08

08

13

)

(L.E

.06

08

13

)

(L.E

.03

08

13

)

(L.E

.02

08

13

)

Page 26: FORTH REPLACEMENT CROSSING › Attachment › ?file=FRC-Constructio… · Pier S1 jet grouting works Pier S4 airlifting Pier S5 airlifting & concrete works Society Road works M7 Butlaw

30.0

35.0

40.0

45.0

50.0

55.0

60.0

65.0

70.0

75.0

80.0

85.0

90.0

95.0

100.0

105.00

1/0

8/2

01

3

02

/08

/20

13

03

/08

/20

13

04

/08

/20

13

05

/08

/20

13

06

/08

/20

13

07

/08

/20

13

08

/08

/20

13

09

/08

/20

13

10

/08

/20

13

11

/08

/20

13

12

/08

/20

13

13

/08

/20

13

14

/08

/20

13

15

/08

/20

13

16

/08

/20

13

17

/08

/20

13

18

/08

/20

13

19

/08

/20

13

20

/08

/20

13

21

/08

/20

13

22

/08

/20

13

23

/08

/20

13

24

/08

/20

13

25

/08

/20

13

26

/08

/20

13

27

/08

/20

13

28

/08

/20

13

29

/08

/20

13

30

/08

/20

13

31

/08

/20

13

No

ise

Le

vel,

dB

(A)

Measured Night-time Noise Levels at Linn Mill Measurement period: August 2013

Total daily noise level (noconstruction)

Total daily noise level

Total daily constructionnoise level

Daily maximum noise level

Average Sundayconstruction noise

Monthly average totalconstruction noise level

Construction Noise Thresholds Maximum noise level Assessment Category Threshold

(n) = Investigation Report Number

Measured Noise Levels

Satu

rday

Su

nd

ay

Satu

rday

Su

nd

ay

Satu

rday

Su

nd

ay

Satu

rday

Su

nd

ay

(L.N

.01

08

13

)

(L.N

.31

08

13

)

(L.N

.30

08

13

)

(L.N

.27

08

13

)

(L.N

.26

08

13

)

(L.N

.24

08

13

)

(L.N

.23

08

13

)

(L.N

.21

08

13

)

(L.N

.18

08

13

)

(L.N

.17

08

13

)

(L.N

.15

08

13

)

(L.N

.13

08

13

)

(L.N

.12

08

13

)

(L.N

.10

08

13

)

(L.N

.06

08

13

)

(L.N

.05

08

13

)

(L.N

.04

08

13

)

(L.N

.03

08

13

)

Page 27: FORTH REPLACEMENT CROSSING › Attachment › ?file=FRC-Constructio… · Pier S1 jet grouting works Pier S4 airlifting Pier S5 airlifting & concrete works Society Road works M7 Butlaw

30.0

35.0

40.0

45.0

50.0

55.0

60.0

65.0

70.0

75.0

80.0

85.0

90.0

95.0

100.0

105.0

110.0

115.00

1/0

8/2

01

3

02

/08

/20

13

03

/08

/20

13

04

/08

/20

13

05

/08

/20

13

06

/08

/20

13

07

/08

/20

13

08

/08

/20

13

09

/08

/20

13

10

/08

/20

13

11

/08

/20

13

12

/08

/20

13

13

/08

/20

13

14

/08

/20

13

15

/08

/20

13

16

/08

/20

13

17

/08

/20

13

18

/08

/20

13

19

/08

/20

13

20

/08

/20

13

21

/08

/20

13

22

/08

/20

13

23

/08

/20

13

24

/08

/20

13

25

/08

/20

13

26

/08

/20

13

27

/08

/20

13

28

/08

/20

13

29

/08

/20

13

30

/08

/20

13

31

/08

/20

13

No

ise

Le

vel,

dB

(A)

Measured Daytime Noise Levels at Newton Measurement period: August 2013

Total daily noise level (noconstruction)

Total daily noise level

Total daily constructionnoise level

Daily maximum noise level

Monthly average totalconstruction noise level

Note: The grey areas of the chart represent days on which no construction works have been conducted. It should be noted that the measured noise levels Mon - Fri can not be attributed to construction works due to the considerable distance (1.75 kilometers) between this monitoring location and the closest construction works.

Construction Noise Thresholds Maximum noise level Assessment Category Threshold

(n) = Investigation Report Number

Measured Noise Levels

Measured Noise Levels

Satu

rday

Su

nd

ay

Satu

rday

Su

nd

ay

Satu

rday

Su

nd

ay

Satu

rday

Su

nd

ay

Page 28: FORTH REPLACEMENT CROSSING › Attachment › ?file=FRC-Constructio… · Pier S1 jet grouting works Pier S4 airlifting Pier S5 airlifting & concrete works Society Road works M7 Butlaw

40.0

45.0

50.0

55.0

60.0

65.0

70.0

75.0

80.0

85.0

90.0

95.0

100.0

105.00

1/0

8/2

01

3

02

/08

/20

13

03

/08

/20

13

04

/08

/20

13

05

/08

/20

13

06

/08

/20

13

07

/08

/20

13

08

/08

/20

13

09

/08

/20

13

10

/08

/20

13

11

/08

/20

13

12

/08

/20

13

13

/08

/20

13

14

/08

/20

13

15

/08

/20

13

16

/08

/20

13

17

/08

/20

13

18

/08

/20

13

19

/08

/20

13

20

/08

/20

13

21

/08

/20

13

22

/08

/20

13

23

/08

/20

13

24

/08

/20

13

25

/08

/20

13

26

/08

/20

13

27

/08

/20

13

28

/08

/20

13

29

/08

/20

13

30

/08

/20

13

31

/08

/20

13

No

ise

Le

vel,

dB

(A)

Measured Daytime Noise Levels at North Leg Measurement period: August 2013

Total daily noise level (noconstruction)

Total daily noise level

Total daily constructionnoise level

Daily maximum noise level

Sunday Averageconstruction noise

Monthly average totalconstruction noise level

Construction Noise Thresholds Maximum noise level Assessment Category Threshold

(n) = Investigation Report Number

Measured Noise Levels

Satu

rday

Su

nd

ay

Satu

rday

Su

nd

ay

Satu

rday

Su

nd

ay

Satu

rday

Su

nd

ay

Note: Data is missing for this location between 11/08/13 and 21/08/13 due to device error; the error was resolved as soon as reasonably practicable, however this was restricted due to the limited accessibility to this device.

Page 29: FORTH REPLACEMENT CROSSING › Attachment › ?file=FRC-Constructio… · Pier S1 jet grouting works Pier S4 airlifting Pier S5 airlifting & concrete works Society Road works M7 Butlaw

30.0

35.0

40.0

45.0

50.0

55.0

60.0

65.0

70.0

75.0

80.0

85.0

90.0

95.0

100.0

105.00

1/0

8/2

01

3

02

/08

/20

13

03

/08

/20

13

04

/08

/20

13

05

/08

/20

13

06

/08

/20

13

07

/08

/20

13

08

/08

/20

13

09

/08

/20

13

10

/08

/20

13

11

/08

/20

13

12

/08

/20

13

13

/08

/20

13

14

/08

/20

13

15

/08

/20

13

16

/08

/20

13

17

/08

/20

13

18

/08

/20

13

19

/08

/20

13

20

/08

/20

13

21

/08

/20

13

22

/08

/20

13

23

/08

/20

13

24

/08

/20

13

25

/08

/20

13

26

/08

/20

13

27

/08

/20

13

28

/08

/20

13

29

/08

/20

13

30

/08

/20

13

31

/08

/20

13

No

ise

Le

vel,

dB

(A)

Measured Evening Noise Levels at North Leg Measurement period: August 2013

Total daily noise level (noconstruction)Total daily noise level

Total daily constructionnoise levelDaily maximum noise level

Average Sundayconstruction noiseMonthly average totalconstruction noise level

Construction Noise Thresholds Maximum noise level ASsessment Category threshold

(n) = Investigation Report Number

Measured Noise Levels

Satu

rday

Su

nd

ay

Satu

rday

Su

nd

ay

Satu

rday

Su

nd

ay

Satu

rday

Su

nd

ay

Note: Data is missing for this location between 11/08/13 and 21/08/13 due to device error; the error was resolved as soon as reasonably practicable, however this was restricted due to the limited accessibility to this device.

Page 30: FORTH REPLACEMENT CROSSING › Attachment › ?file=FRC-Constructio… · Pier S1 jet grouting works Pier S4 airlifting Pier S5 airlifting & concrete works Society Road works M7 Butlaw

30.0

35.0

40.0

45.0

50.0

55.0

60.0

65.0

70.0

75.0

80.0

85.0

90.0

95.0

100.0

105.00

1/0

8/2

01

3

02

/08

/20

13

03

/08

/20

13

04

/08

/20

13

05

/08

/20

13

06

/08

/20

13

07

/08

/20

13

08

/08

/20

13

09

/08

/20

13

10

/08

/20

13

11

/08

/20

13

12

/08

/20

13

13

/08

/20

13

14

/08

/20

13

15

/08

/20

13

16

/08

/20

13

17

/08

/20

13

18

/08

/20

13

19

/08

/20

13

20

/08

/20

13

21

/08

/20

13

22

/08

/20

13

23

/08

/20

13

24

/08

/20

13

25

/08

/20

13

26

/08

/20

13

27

/08

/20

13

28

/08

/20

13

29

/08

/20

13

30

/08

/20

13

31

/08

/20

13

No

ise

Le

vel,

dB

(A)

Measured Night-time Noise Levels at North Leg Measurement period: August 2013

Total daily noise level (noconstruction)Total daily noise level

Total daily constructionnoise levelDaily maximum noise level

Average Sundayconstruction noiseMonthly average totalconstruction noise level

Construction Noise Thresholds Maximum noise level Assessment Category Threshold

(n) = Investigation Report Number

Measured Noise Levels

Satu

rday

Su

nd

ay

Satu

rday

Su

nd

ay

Satu

rday

Su

nd

ay

Satu

rday

Su

nd

ay

Note: Data is missing for this location between 10/08/13 and 21/08/13 due to device error; the error was resolved as soon as reasonably practicable, however this was restricted due to the limited accessibility to this device.

Page 31: FORTH REPLACEMENT CROSSING › Attachment › ?file=FRC-Constructio… · Pier S1 jet grouting works Pier S4 airlifting Pier S5 airlifting & concrete works Society Road works M7 Butlaw

40.0

45.0

50.0

55.0

60.0

65.0

70.0

75.0

80.0

85.0

90.0

95.0

100.0

105.00

1/0

8/2

01

3

02

/08

/20

13

03

/08

/20

13

04

/08

/20

13

05

/08

/20

13

06

/08

/20

13

07

/08

/20

13

08

/08

/20

13

09

/08

/20

13

10

/08

/20

13

11

/08

/20

13

12

/08

/20

13

13

/08

/20

13

14

/08

/20

13

15

/08

/20

13

16

/08

/20

13

17

/08

/20

13

18

/08

/20

13

19

/08

/20

13

20

/08

/20

13

21

/08

/20

13

22

/08

/20

13

23

/08

/20

13

24

/08

/20

13

25

/08

/20

13

26

/08

/20

13

27

/08

/20

13

28

/08

/20

13

29

/08

/20

13

30

/08

/20

13

31

/08

/20

13

No

ise

Le

vel,

dB

(A)

Measured Daytime Noise Levels at Port Edgar Measurement period: August 2013

Total daily noise level (noconstruction)Total daily noise level

Total daily constructionnoise levelDaily maximum noise level

Sunday Averageconstruction noiseMonthly average totalconstruction noise level

Construction Noise Thresholds Maximum noise level Assessment Category Threshold

(n) = Investigation Report Number

Measured Noise Levels

Satu

rday

Su

nd

ay

Satu

rday

Su

nd

ay

Satu

rday

Su

nd

ay

Satu

rday

Su

nd

ay

Page 32: FORTH REPLACEMENT CROSSING › Attachment › ?file=FRC-Constructio… · Pier S1 jet grouting works Pier S4 airlifting Pier S5 airlifting & concrete works Society Road works M7 Butlaw

30.0

35.0

40.0

45.0

50.0

55.0

60.0

65.0

70.0

75.0

80.0

85.0

90.0

95.0

100.0

105.00

1/0

8/2

01

3

02

/08

/20

13

03

/08

/20

13

04

/08

/20

13

05

/08

/20

13

06

/08

/20

13

07

/08

/20

13

08

/08

/20

13

09

/08

/20

13

10

/08

/20

13

11

/08

/20

13

12

/08

/20

13

13

/08

/20

13

14

/08

/20

13

15

/08

/20

13

16

/08

/20

13

17

/08

/20

13

18

/08

/20

13

19

/08

/20

13

20

/08

/20

13

21

/08

/20

13

22

/08

/20

13

23

/08

/20

13

24

/08

/20

13

25

/08

/20

13

26

/08

/20

13

27

/08

/20

13

28

/08

/20

13

29

/08

/20

13

30

/08

/20

13

31

/08

/20

13

No

ise

Le

vel,

dB

(A)

Measured Evening Noise Levels at Port Edgar Measurement period: August 2013

Total daily noise level (noconstruction)Total daily noise level

Total daily constructionnoise levelDaily maximum noise level

Average Sundayconstruction noiseMonthly average totalconstruction noise level

Construction Noise Thresholds Maximum noise level ASsessment Category threshold

(n) = Investigation Report Number

Measured Noise Levels

Satu

rday

Su

nd

ay

Satu

rday

Su

nd

ay

Satu

rday

Su

nd

ay

Satu

rday

Su

nd

ay

Page 33: FORTH REPLACEMENT CROSSING › Attachment › ?file=FRC-Constructio… · Pier S1 jet grouting works Pier S4 airlifting Pier S5 airlifting & concrete works Society Road works M7 Butlaw

30.0

35.0

40.0

45.0

50.0

55.0

60.0

65.0

70.0

75.0

80.0

85.0

90.0

95.0

100.0

105.00

1/0

8/2

01

3

02

/08

/20

13

03

/08

/20

13

04

/08

/20

13

05

/08

/20

13

06

/08

/20

13

07

/08

/20

13

08

/08

/20

13

09

/08

/20

13

10

/08

/20

13

11

/08

/20

13

12

/08

/20

13

13

/08

/20

13

14

/08

/20

13

15

/08

/20

13

16

/08

/20

13

17

/08

/20

13

18

/08

/20

13

19

/08

/20

13

20

/08

/20

13

21

/08

/20

13

22

/08

/20

13

23

/08

/20

13

24

/08

/20

13

25

/08

/20

13

26

/08

/20

13

27

/08

/20

13

28

/08

/20

13

29

/08

/20

13

30

/08

/20

13

31

/08

/20

13

No

ise

Le

vel,

dB

(A)

Measured Night-time Noise Levels at Port Edgar Measurement period: August 2013

Total daily noise level (noconstruction)

Total daily noise level

Total daily constructionnoise level

Daily maximum noise level

Average Sundayconstruction noise

Monthly average totalconstruction noise level

Construction Noise Thresholds Maximum noise level Assessment Category Threshold

(n) = Investigation Report Number

Measured Noise Levels

Satu

rday

Su

nd

ay

Satu

rday

Su

nd

ay

Satu

rday

Su

nd

ay

Satu

rday

Su

nd

ay

Page 34: FORTH REPLACEMENT CROSSING › Attachment › ?file=FRC-Constructio… · Pier S1 jet grouting works Pier S4 airlifting Pier S5 airlifting & concrete works Society Road works M7 Butlaw

30.0

35.0

40.0

45.0

50.0

55.0

60.0

65.0

70.0

75.0

80.0

85.0

90.0

95.0

100.0

105.0

110.0

115.00

1/0

8/2

01

3

02

/08

/20

13

03

/08

/20

13

04

/08

/20

13

05

/08

/20

13

06

/08

/20

13

07

/08

/20

13

08

/08

/20

13

09

/08

/20

13

10

/08

/20

13

11

/08

/20

13

12

/08

/20

13

13

/08

/20

13

14

/08

/20

13

15

/08

/20

13

16

/08

/20

13

17

/08

/20

13

18

/08

/20

13

19

/08

/20

13

20

/08

/20

13

21

/08

/20

13

22

/08

/20

13

23

/08

/20

13

24

/08

/20

13

25

/08

/20

13

26

/08

/20

13

27

/08

/20

13

28

/08

/20

13

29

/08

/20

13

30

/08

/20

13

31

/08

/20

13

No

ise

Le

vel,

dB

(A)

Measured Daytime Noise Levels at Scotstoun Measurement period: August 2013

Total daily noise level (noconstruction)

Total daily noise level

Total daily constructionnoise level

Daily maximum noise level

Monthly average totalconstruction noise level

Note: The grey areas of the chart represent days on which no construction works have been conducted. The monthly average construction noise for Sunday has not been included as no Sunday works have been conducted at this location . Data is missing for this location for 13/08/13 and 14/08/13 due to device error.

Construction Noise Thresholds Maximum noise level Assessment Category Threshold

(n) = Investigation Report Number

Measured Noise Levels

Satu

rday

Su

nd

ay

Satu

rday

Su

nd

ay

Satu

rday

Su

nd

ay

Satu

rday

Su

nd

ay

(Sc.

01

08

13

)

(Sc.

31

08

13

)

(Sc.

30

08

13

)

(Sc.

29

08

13

)

(Sc.

28

08

13

)

(Sc.

27

08

13

)

(Sc.

26

08

13

)

(Sc.

24

08

13

)

(Sc.

23

08

13

)

(Sc.

22

08

13

)

(Sc.

21

08

13

)

(Sc.

20

08

13

)

(Sc.

19

08

13

)

(Sc.

17

08

13

)

(Sc.

16

08

13

)

(Sc.

15

08

13

)

(Sc.

12

08

13

)

(Sc.

10

08

13

)

(Sc.

09

08

13

)

(Sc.

08

08

13

)

(Sc.

07

08

13

)

(Sc.

06

08

13

)

(Sc.

05

08

13

)

(Sc.

03

08

13

)

(Sc.

02

08

13

)

Page 35: FORTH REPLACEMENT CROSSING › Attachment › ?file=FRC-Constructio… · Pier S1 jet grouting works Pier S4 airlifting Pier S5 airlifting & concrete works Society Road works M7 Butlaw

40.0

45.0

50.0

55.0

60.0

65.0

70.0

75.0

80.0

85.0

90.0

95.0

100.0

105.00

1/0

8/2

01

3

02

/08

/20

13

03

/08

/20

13

04

/08

/20

13

05

/08

/20

13

06

/08

/20

13

07

/08

/20

13

08

/08

/20

13

09

/08

/20

13

10

/08

/20

13

11

/08

/20

13

12

/08

/20

13

13

/08

/20

13

14

/08

/20

13

15

/08

/20

13

16

/08

/20

13

17

/08

/20

13

18

/08

/20

13

19

/08

/20

13

20

/08

/20

13

21

/08

/20

13

22

/08

/20

13

23

/08

/20

13

24

/08

/20

13

25

/08

/20

13

26

/08

/20

13

27

/08

/20

13

28

/08

/20

13

29

/08

/20

13

30

/08

/20

13

31

/08

/20

13

No

ise

Le

vel,

dB

(A)

Measured Daytime Noise Levels at Springfield Measurement period: August 2013

Total daily noise level (noconstruction)

Total daily noise level

Total daily constructionnoise level

Daily maximum noise level

Monthly average totalconstruction noise level

Note: The grey areas of the chart represent days on which no construction works have been conducted. The monthly average construction noise for Sunday has not been included as no Sunday works have been conducted at this location.

Construction Noise Thresholds Maximum noise level Assessment Category Threshold

(n) = Investigation Report Number

Measured Noise Levels

Satu

rday

Su

nd

ay

Satu

rday

Su

nd

ay

Satu

rday

Su

nd

ay

Satu

rday

Su

nd

ay

(S.D

.02

08

13

)

(S.D

.30

08

13

)

(S.D

.26

08

13

)

(S.D

.23

08

13

)

(S.D

.19

08

13

)

(S.D

.16

08

13

)

(S.D

.15

08

13

)

(S.D

.13

08

13

)

(S.D

.12

08

13

)

(S.D

.08

08

13

)

Page 36: FORTH REPLACEMENT CROSSING › Attachment › ?file=FRC-Constructio… · Pier S1 jet grouting works Pier S4 airlifting Pier S5 airlifting & concrete works Society Road works M7 Butlaw

40.0

45.0

50.0

55.0

60.0

65.0

70.0

75.0

80.0

85.0

90.0

95.0

100.0

105.0

110.00

1/0

8/2

01

3

02

/08

/20

13

03

/08

/20

13

04

/08

/20

13

05

/08

/20

13

06

/08

/20

13

07

/08

/20

13

08

/08

/20

13

09

/08

/20

13

10

/08

/20

13

11

/08

/20

13

12

/08

/20

13

13

/08

/20

13

14

/08

/20

13

15

/08

/20

13

16

/08

/20

13

17

/08

/20

13

18

/08

/20

13

19

/08

/20

13

20

/08

/20

13

21

/08

/20

13

22

/08

/20

13

23

/08

/20

13

24

/08

/20

13

25

/08

/20

13

26

/08

/20

13

27

/08

/20

13

28

/08

/20

13

29

/08

/20

13

30

/08

/20

13

31

/08

/20

13

No

ise

Le

vel,

dB

(A)

Measured Daytime Noise Levels at Tigh-Na-Grian Measurement period: August 2013

Total daily noise level (nocontruction)Total daily noise level

Total daily constructionnoise levelDaily maximum noise level

Average Sundayconstruction noiseMonthly average totalconstruction noise level

Construction Noise Thresholds Maximum noise level Assessment Category Threshold

(n) = Investigation Report Number

Measured Noise Levels

Satu

rday

Su

nd

ay

Satu

rday

Su

nd

ay

Satu

rday

Su

nd

ay

Satu

rday

Su

nd

ay

(T.D

.01

08

13

)

(T.D

.07

08

13

)

(T.D

.06

08

13

)

(T.D

.05

08

13

)

(T.D

.04

08

13

)

(T.D

.02

08

13

)

(T.D

.08

08

13

) (T.D

.11

08

13

)

(T.D

.10

08

13

)

(T.D

.09

08

13

)

(T.D

.14

08

13

)

(T.D

.13

08

13

)

(T.D

.12

08

13

)

(T.D

.15

08

13

)

(T.D

.17

08

13

) (T.D

.16

08

13

)

(T.D

.21

08

13

)

(T.D

.20

08

13

)

(T.D

.18

08

13

)

(T.D

.23

08

13

)

(T.D

.22

08

13

)

(T.D

.30

08

13

)

(T.D

.29

08

13

)

(T.D

.28

08

13

)

(T.D

.27

08

13

)

(T.D

.26

08

13

)

(T.D

.25

08

13

)

(T.D

.24

08

13

)

Page 37: FORTH REPLACEMENT CROSSING › Attachment › ?file=FRC-Constructio… · Pier S1 jet grouting works Pier S4 airlifting Pier S5 airlifting & concrete works Society Road works M7 Butlaw

40.0

45.0

50.0

55.0

60.0

65.0

70.0

75.0

80.0

85.0

90.0

95.0

100.0

105.00

1/0

8/2

01

3

02

/08

/20

13

03

/08

/20

13

04

/08

/20

13

05

/08

/20

13

06

/08

/20

13

07

/08

/20

13

08

/08

/20

13

09

/08

/20

13

10

/08

/20

13

11

/08

/20

13

12

/08

/20

13

13

/08

/20

13

14

/08

/20

13

15

/08

/20

13

16

/08

/20

13

17

/08

/20

13

18

/08

/20

13

19

/08

/20

13

20

/08

/20

13

21

/08

/20

13

22

/08

/20

13

23

/08

/20

13

24

/08

/20

13

25

/08

/20

13

26

/08

/20

13

27

/08

/20

13

28

/08

/20

13

29

/08

/20

13

30

/08

/20

13

31

/08

/20

13

No

ise

Le

vel,

dB

(A)

Measured Evening Noise Levels at Tigh-Na-Grian Measurement period: August 2013

Total daily noise level (noconstruction)Total daily noise level

Total daily constructionnoise levelDaily maximum noise level

Average Sundayconstruction noiseMonthly average totalconstruction noise level

Construction Noise Thresholds Maximum noise level Assessment category threshold

(n) = Investigation Report Number

Measured Noise Levels

Satu

rday

Su

nd

ay

Satu

rday

Su

nd

ay

Satu

rday

Su

nd

ay

Satu

rday

Su

nd

ay

(T.E

.02

08

13

)

(T.E

.06

08

13

)

(T.E

.04

08

13

)

(T.E

.03

08

13

)

(T.E

.08

08

13

)

(T.E

.10

08

13

)

(T.E

.11

08

13

)

(T.E

.16

08

13

) (T.E

.20

08

13

)

(T.E

.25

08

13

)

Page 38: FORTH REPLACEMENT CROSSING › Attachment › ?file=FRC-Constructio… · Pier S1 jet grouting works Pier S4 airlifting Pier S5 airlifting & concrete works Society Road works M7 Butlaw

30.0

35.0

40.0

45.0

50.0

55.0

60.0

65.0

70.0

75.0

80.0

85.0

90.0

95.0

100.0

105.0

01

/08

/20

13

02

/08

/20

13

03

/08

/20

13

04

/08

/20

13

05

/08

/20

13

06

/08

/20

13

07

/08

/20

13

08

/08

/20

13

09

/08

/20

13

10

/08

/20

13

11

/08

/20

13

12

/08

/20

13

13

/08

/20

13

14

/08

/20

13

15

/08

/20

13

16

/08

/20

13

17

/08

/20

13

18

/08

/20

13

19

/08

/20

13

20

/08

/20

13

21

/08

/20

13

22

/08

/20

13

23

/08

/20

13

24

/08

/20

13

25

/08

/20

13

26

/08

/20

13

27

/08

/20

13

28

/08

/20

13

29

/08

/20

13

30

/08

/20

13

31

/08

/20

13

No

ise

Le

vel,

dB

(A)

Measured Night-time Noise Levels at Tigh-Na-Grian Measurement period: August 2013

Total daily noise level (noconstruction)Total daily noise level

Total daily constructionnoise levelDaily maximum noise level

Average Sundayconstruction noiseMonthly average totalconstruction noise level

Construction Noise Thresholds Maximum noise level Assessment Category threshold

(n) = Investigation Report Number

Measured Noise Levels

Satu

rday

Su

nd

ay

Satu

rday

Su

nd

ay

Satu

rday

Su

nd

ay

Satu

rday

Su

nd

ay

(T.N

.01

08

13

)

(T.N

.07

08

13

)

(T.N

.05

08

13

)

(T.N

.03

08

13

)

(T.N

.02

08

13

)

(T.N

.08

08

13

)

(T.N

.10

08

13

)

(T.N

.11

08

13

)

(T.N

.12

08

13

)

(T.N

.20

08

13

)

(T.N

.16

08

13

)

(T.N

.14

08

13

)

(T.N

.13

08

13

)

(T.N

.21

08

13

)

(T.N

.31

08

13

)

(T.N

.29

08

13

)

(T.N

.26

08

13

)

(T.N

.25

08

13

)

(T.N

.30

08

13

)

Page 39: FORTH REPLACEMENT CROSSING › Attachment › ?file=FRC-Constructio… · Pier S1 jet grouting works Pier S4 airlifting Pier S5 airlifting & concrete works Society Road works M7 Butlaw

30.0

35.0

40.0

45.0

50.0

55.0

60.0

65.0

70.0

75.0

80.0

85.0

90.0

95.0

100.0

105.00

1/0

8/2

01

3

02

/08

/20

13

03

/08

/20

13

04

/08

/20

13

05

/08

/20

13

06

/08

/20

13

07

/08

/20

13

08

/08

/20

13

09

/08

/20

13

10

/08

/20

13

11

/08

/20

13

12

/08

/20

13

13

/08

/20

13

14

/08

/20

13

15

/08

/20

13

16

/08

/20

13

17

/08

/20

13

18

/08

/20

13

19

/08

/20

13

20

/08

/20

13

21

/08

/20

13

22

/08

/20

13

23

/08

/20

13

24

/08

/20

13

25

/08

/20

13

26

/08

/20

13

27

/08

/20

13

28

/08

/20

13

29

/08

/20

13

30

/08

/20

13

31

/08

/20

13

No

ise

Le

vel,

dB

(A)

Measured Daytime Noise Levels at Whinny Hill Measurement period: August 2013

Total daily noise level (noconstruction)

Total daily noise level

Total daily constructionnoise level

Daily maximum noise level

Monthly average totalconstruction noise level

Average Sundayconstruction noise

Construction Noise Thresholds Maximum noise level Assessment Category Threshold

(n) = Investigation Report Number

Measured Noise Levels

Note: The grey areas of the chart represent days on which no construction works have been conducted.

Satu

rday

Su

nd

ay

Satu

rday

Su

nd

ay

Satu

rday

Su

nd

ay

Satu

rday

Su

nd

ay

(W.D

.05

08

13

)

(W.D

.30

08

13

)

(W.D

.28

08

13

)

(W.D

.24

08

13

)

(W.D

.21

08

13

)

(W.D

.14

08

13

)

(W.D

.12

08

13

)

(W.D

.08

08

13

)