forwards insp repts 50-390/84-55 & 50-391/84-43 on 840716 ...auc2. ~ uf" *d 17c:sj r1,0...

2
AIJZ Ten:.1664t Valley Authority ATTN: Mr. N. G. Parris Ninager of Power and Engineering 500A Che stnut Street Tower 1 Chattanooga, TN 37401 Bent leieui: SUBJECT: REPORT MOS. 50-390/84-55 ANO 50-391/94-43 00 July 16-20, 1984, NRC inspec by NC Liens NO$. CPPR-91 and CPPR-92 for o~eb R ies Inspections the findings were di :ts -r aiiy At the conclusion of the idmntified in the enclosed iflspect~f scs"6 eber of your staff Areas examined during the inspection are Identifiedinterpt. ihites areas, the inspection Consisted of selective eaIn thes reoft Withinduhesen representative records, irviswtherOnne, ndtiobseato O f Pr ctdutesan Is progress. RrlwsWt sf1, dobevtoOfaiiis Within the scope of the inSPtctic., DO Violations or deviations were identified. In accordance wiloh 10 CFR 2.1() a copy of this latter and enclosuro will be placed In the NRC public Document Room unless You motIf'y this office by telephone within 10 days of the date of this letter and submit written application to withhold inforeatio, contained therein within 30 days of the date of this letter. Such Application Must be consistent with the requirements of 2.790(b)(1). Should you have any questions concerning this letter, please contact us. Sincere ly, David M. Verrelli, Chief Reactor Projects Breach 1 Division of Reactor Projects Enclosure: Inspection Report No&. 50-390/84-55 and 50-391/84-43 8(808180299 880718 PDR FOIA R ,;ONES88-9.- P~

Upload: others

Post on 23-Sep-2020

1 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Forwards Insp Repts 50-390/84-55 & 50-391/84-43 on 840716 ...AUC2. ~ UF" *d 17C:Sj r1,0 Tennfessee Va&i.0, Authority W /encl: Plant Site Directto *R. Ennit ar Nuclear P, e Aatige,

AIJZ

Ten:.1664t Valley Authority ATTN: Mr. N. G. Parris

Ninager of Power and Engineering 500A Che stnut Street Tower 1 Chattanooga, TN 37401

Bent leieui:

SUBJECT: REPORT MOS. 50-390/84-55 ANO 50-391/94-43 00 July 16-20, 1984, NRC inspec by NC Liens NO$. CPPR-91 and CPPR-92 for o~eb R ies Inspections the findings were di :ts -r aiiy At the conclusion of the idmntified in the enclosed iflspect~f scs"6 eber of your staff Areas examined during the inspection are Identifiedinterpt. ihites areas, the inspection Consisted of selective eaIn thes reoft Withinduhesen representative records, irviswtherOnne, ndtiobseato O f Pr ctdutesan Is progress. RrlwsWt sf1, dobevtoOfaiiis Within the scope of the inSPtctic., DO Violations or deviations were identified. In accordance wiloh 10 CFR 2.1() a copy of this latter and enclosuro will be placed In the NRC public Document Room unless You motIf'y this office by telephone within 10 days of the date of this letter and submit written application to withhold inforeatio, contained therein within 30 days of the date of this letter. Such Application Must be consistent with the requirements of 2.790(b)(1). Should you have any questions concerning this letter, please contact us.

Sincere ly,

David M. Verrelli, Chief Reactor Projects Breach 1 Division of Reactor Projects

Enclosure: Inspection Report No&. 50-390/84-55 and 50-391/84-43

8(808180299 880718 PDR FOIA R ,;ONES88-9.- P~

Page 2: Forwards Insp Repts 50-390/84-55 & 50-391/84-43 on 840716 ...AUC2. ~ UF" *d 17C:Sj r1,0 Tennfessee Va&i.0, Authority W /encl: Plant Site Directto *R. Ennit ar Nuclear P, e Aatige,

U

AUC2.

~

F"

U

*d 17C:Sj r1,0

Tennfessee Va&i.0, Authority

W /encl:

Plant Site Directto ar Nuclear *R. Ennit P, e Aatige, W h. Anderson n aae of fice sf Mandfager. Of CuvQullity

Assurance

Project Mana'ger. Nula lant L. NUCJ,1,. P L.c~ l I.~ Jr-., Suprio IgSection E. Teamo, Project Engineer.

lafliger'z Construction, Project

Resident Znsoco ime Cnt rSt~ *e of onr Os

Ubck WRR/CHEB

TCOR Ian 7/;, /84 A#rdt A

Z/f

r/8

w

W

Aur 'q