foster in med pilot projects conference 28/06/2016: the pilot project in alexandria, egypt
TRANSCRIPT
FOSTEr in MED Pilot Project Presentation
28. June 2016, Cagliari
Confederation of Egyptian European Business Associations-CEEBA
28. June 2016, Cagliari
Confederation of Egyptian European Business Associations-CEEBA
The Selected Venue is the Site for:
• Business Matchmakings
• Business Delegations - Incoming & Outgoing
• Events, Conferences, Seminars & Workshops
• Heads of State’s, Ministers, Donors
• Media
Simply high capitalization and communication
MedDiet, GMI, SUSTEXNET and 18
others by our partners
28. June 2016, Cagliari
Confederation of Egyptian European Business Associations-CEEBA
CAPITALIZATION
The venue where Ministers, Ambassadors, Donors and Bussiness Meet
28. June 2016, Cagliari
Confederation of Egyptian European Business Associations-CEEBA
Heads of State, Donors and and EU 28
28. June 2016, Cagliari
Confederation of Egyptian European Business Associations-CEEBA
Presenting it Beyond the Mediterranean
28. June 2016, Cagliari
Confederation of Egyptian European Business Associations-CEEBA
Role in FOSTEr in MED
• Context Analysis:
In depth analysis performed in Alexandria to assess the
solar energy technical knowledge, its development
technological trends and the local regulation standards
in the area.
(Study available on the website)
28. June 2016, Cagliari
Confederation of Egyptian European Business Associations-CEEBA
Role in FOSTEr in MED
• Schools Involvement:
Organized workshops in schools to create awareness on
the importance of the use of solar energy as well
organized workshops and events for citizens.
(400 students have been involved)
28. June 2016, Cagliari
Confederation of Egyptian European Business Associations-CEEBA
Role in FOSTEr in MED
• Guidelines:
Our technical experts helped in the design of the
guidelines on building integration of PV in the
Mediterranean area
(Guidelines available on the website)
28. June 2016, Cagliari
Confederation of Egyptian European Business Associations-CEEBA
Role in FOSTEr in MED
• Training Paths:
3 training courses took place for designers and SMEs,
installers and students.
(300 have been trained)
28. June 2016, Cagliari
Confederation of Egyptian European Business Associations-CEEBA
Role in FOSTEr in MED
• Pilot Project:
Location:
Alexandria Chamber of Commerce: The building is
located in the City of Alexandria
It was constructed in 1922, hence integration into an
antique building was a true challenge
28. June 2016, Cagliari
Confederation of Egyptian European Business Associations-CEEBA
Role in FOSTEr in MED
• Pilot Project:
Design:
The PV was designed so it forms an integral part of the
building, yet collecting the maximum direct solar
radiation. Architects, PV experts and antiquities experts
were involved in the process.
Colored modules to match building architectural design
were used
28. June 2016, Cagliari
Confederation of Egyptian European Business Associations-CEEBA
Launch with Government and EU
28. June 2016, Cagliari
Confederation of Egyptian European Business Associations-CEEBA
Role in FOSTEr in MED
• Pilot Project:
Technical Data:
Number of Panels: 56 – colored modules
Total Peak Power: 13.72 KWp
Energy Yield Radiation: 1,444 kWh/KWp
Yearly Energy Yield: 19,813 KWH/Year
Average Monthly Energy Yield: 1,651 KWH/month
28. June 2016, Cagliari
Confederation of Egyptian European Business Associations-CEEBA
Role in FOSTEr in MED
• Pilot Project:
Technical Data:
Average Daily Energy Yield: 54 KWH/Day
Energy Yield within 25 years: 445,793 KWH
Yearly CO2 Emission Reduction: 11 Ton/Year
Natural Gas Saving Per Year: 155,696 Cubic Feet/Year
28. June 2016, Cagliari
Confederation of Egyptian European Business Associations-CEEBA