fp7-infra-2011-2.1.1 : design studies for european research infrastrutures
DESCRIPTION
“Gliders for Research, Ocean Observation and Management” General Assembly. FP7-Infra-2011-2.1.1 : Design studies for European Research Infrastrutures 1st October 2011 – 30th september 2014 Duration 36 months – Periods : 2 (month 18 – month 36) - PowerPoint PPT PresentationTRANSCRIPT
FP7-Infra-2011-2.1.1 : Design studies for European Research Infrastrutures
1st October 2011 – 30th september 2014
Duration 36 months – Periods : 2 (month 18 – month 36)
Grant Agreement No: 284321 ; Total budget : 3,5 M€
http://www.groom-fp7.eu
19 partners from cy, de, fr, gr, it, no, es, uk
“Gliders for Research, Ocean Observation and Management”General Assembly
WP6 – Project Management
WP leader: UPMC
WP1 Project
S/T Coordination
WP1 Project
S/T Coordination
WP4 Targeted
Experiments
WP4 Targeted
Experiments
WP5Observatory
Infrastructure
WP5Observatory
Infrastructure
WP3 Scientific
Innovation
WP3 Scientific
Innovation
WP2 Integration in the GOOS
WP2 Integration in the GOOS
WP2.1 Assessment
of a glider component in the GOOS
WP2.2 Legal framework
WP2.3 Financial framework
WP3.3Capacity building
and training, outreach
WP3.2Data flow
and processing
WP3.1New contributions
of glider for marine research
WP4.2Fleet missions
WP4.1Endurance lines
WP5.3Mission planning
and analysis
WP5.2Glider payload
assessment
WP5.1Ground segment
description
WP1.1Project coordination
WP5.4Estimated
setup and running costs
WP1.2Internal & external
communication
WP4.3Synergies
with other platforms
WP6 Project
Management
WP6 Project
Management
Status of the 1st periodic report
• Period covered: 01/10/2011 – 30/04/2013
• Periodic Report: within 60 days after the end of the period Periodic (31 May 2013)
– Activity report: about 75% have been completed– Explanation of the Use of Ressources: 2 UoR missing– Financial Statement (FormC): 2 FS missing
• Delay until 30 June 2013!
Status of task/WP reportAction: the responsible partner should report the status of these taks/WP
WP01 Project scientific and technological coordination xT01.01 Project coordination vT01.02 Internal and external communication v
WP02 Integration in the GOOS xT02.01 Assessment of a glider component in the GOOS vT02.02 Legal framework vT02.03 Financial framework v
WP03 Scientific Innovation xT03.01 New contribution of gliders to marine research vT03.02 Data flow and processing vT03.03 Capacity building and training, Outreach v
WP04 Targeted Experiments vT04.01 Endurance lines xT04.02 Fleet missions vT04.03 Synergies with other platforms v
WP05 Observatory Infrastructure vT05.01 Ground segment description vT05.02 Glider payload assessment vT05.03 Mission planning and analysis vT05.04 Estimated setup and running costs v
WP06 Project Management v
Deliverables and Milestones
Up to now•8 deliverables have been submitted•6 deliverables have been slighly delayed•3 milestones have been reached•1 milestone have been slightly delayed
•D2.5 has been delayed from M24 to M33•D4.2, D4.3 and D4.7 have been grouped together under a common deliverable due at M33: ‘Conformity of GROOM glider and multi platform missions with standards'
Deliverables and Milestones
Deliverables and Milestones: shall be submitted as foreseen in the Annex I during the course of the project
In case of delay of more than 3 months :
- Justify the delay by providing details for Commission
- Explain impact of possible deviation
16 Deliverables due by September 30!
Deliverable n° Deliverable Title WP n° Lead beneficiary Delivery date (Annex I)
D01.02 Advisory Board meeting minutes WP01 UPMC 24D01.05 Policy Makers Board meeting minutes WP01 UPMC 24D01.08 Reports on the Stakeholder Forum activities WP01 UPMC 24
D02.01 Current and future GOOS requirements and the need for a glider component WP02 IFM-GEOMAR 24
D02.03 Legal aspects of glider operations in European Waters WP02 UT 24
D02.04 The legal framework for joint management of a European glider component WP02 UT 24
D03.01 Evaluation of submesoscale Physical/ Biogeochemical study WP03 IFM-GEOMAR 24
D03.03 Report on GDAC portal organization WP03 IFREMER 24
D03.04 Report on capacity building activities and web-sites completed WP03 OGS 24
D03.05 Scientific report on existing sensors to be integrated on gliders for biogeochemical and biological WP03 UPMC 24
D04.01 Assess how existing hydrographic endurance line can be supported by the glider infrastructure WP04 NERC 24
D04.06 Field trials of new sensors for gliders WP04 UPMC 24
D05.02 Report assessing the predominant sensors for gliders and recommending the new sensors to be integrat WP05 OC-UCY 24
D05.03 Report describing protocols for sampling, sample analysis, inter-calibration of missions, data analy WP05 OC-UCY 24
D05.05 Environmental conditions and glider mission risk assessment tool WP05 NURC 24
D06.11 Steering Comittee meeting minutes WP06 UPMC 24
3 Milestones related to deliverables are due by M24
Status of the use of the resources
33%
30%
23% 42%
36%29%
40%
Status of the use of the resourcesType of
expenditure% spent
Total
Personnel costs38,81%
Subcontracting21,17%
Travel24,59%
Equipment4,76%
Consumables7,91%
Other costs86,37%
Status of the use of the resources
% spend
WP01 38,71%
WP02 25,01%
WP03 43,89%
WP04 36,34%
WP05 32,47%
WP06 39,11%
Total 35,14%
Financial issues• EC contribution budgeted: 3 500 000€
• Max EC distribuable (85%): 2 975 000€
• Pre-financing: Distributed to the partners in 2 advance payments (Section 7.3.2 of the C.A)– 1st payment (90%): 2 362 500€– 2nd payment (10%): 262 500€ (after submission of the 1st report)
Financial issuesNext payment:
Remaining prefinancing: after the submission of the 1st report
+Interim payment : after the periodic reports have been accepted, the payment is calculated on the basis of the declared costs
Forecast of EC contribution to receive: 350 000€ (estimated)Max EC distribuable (85%): 2 975 000€Less : Prefinancing: 2 625 000€
Future Work for the period 2• Input for the Gender Action report needed
(D6.2 and D6.3)• Interim financial report at M27 (December
2013) in Vitamib Important for the follow-up of the work and
avoid surprises before the final report
Dissemination
During the course of the project : - all scientific (peer reviewed) publications relating to the foreground of the
project - all dissemination activities : Publications, conferences, workshop, web
sites, press releases, flyers, articles published in the popular press, videos, media briefings, presentations, exhibitions, thesis, interviews, films, TV clips and posters
DisseminationUpdate the dissemination table at any time on VitamibSection management > Foreground/Dissemination
Dissemination• All publications shall indicate that the project received the
financial support from the Commission • Any dissemination activity shall be reported in the plan for the
use and dissemination of foreground, including sufficient details/references to enable the Commission to trace the activity.
Thank you for your attention!
For any further questions, please contact:
Mélanie PellenTel.: +33 1 44 27 84 52