fprb installation manual for spd rev ac
DESCRIPTION
FPRB Installation ManualTRANSCRIPT
-
Flexi Power Rectifier FPRB
Installation Manual for SPD, Rev AC Page 1 of 45
Installation Manual forSurge Protective Device
Flexi Power RectifierFPRB
Manufactured by: Artesyn Embedded TechnologiesManufacturing PN: AA27540L
Visit us @ http://www.artesyn.com/
-
Flexi Power Rectifier FPRB
Installation Manual for SPD, Rev AC Page 2 of 45
Manual Number: 970-009473-0000
Manual Issue: AC
Manual Status: Standard
Release Date: Jun 30, 2014
Copyright 2014 Artesyn Embedded TechnologiesCONSIDER IT SOLVED
Published in China
This document, and the information it contains, are the property of Artesyn EmbeddedTechnologies Co., Ltd, and are protected by law. Both must be held in strictest confidence at alltimes. Artesyn Embedded Technologies grants no license or right to copy, use or disclose either,expressly or by implication.
Disclaimer
This document and the information contained herein are provided on an "AS IS" basis. ArtesynEmbedded Technologies may make improvements or changes in this documentation, at anytime and without notice and as it sees fit. The information in this documentation was preparedby Artesyn Embedded Technologies with reasonable care and is believed to be accurate.However, Artesyn Embedded Technologies shall not assume responsibility for losses or damagesresulting from any omissions, inaccuracies, or errors contained herein.
-
Flexi Power Rectifier FPRB
Installation Manual for SPD, Rev AC Page 3 of 45
History
Date
DD-MM-YYYVersion Author Change Note
30-06-2013 AA Ferdinand Sisracon First release for FPRB
30-10-2013
30-06-2014
AB
AC
Ferdinand Sisracon
Alex Ding
Release to be used as a commonSPD Instruction Manual for bothFPRA and FPRB
Added special instruction toconnect the N link cable for bothFPRA and FPRB
Change the brand from EmersonNetwork Power to ArtesynEmbedded Technologies
-
Flexi Power Rectifier FPRB
Installation Manual for SPD, Rev AC Page 4 of 45
Table of Contents
History ...................................................................................................................3Table of Contents ....................................................................................................4List of Figures ..........................................................................................................5List of Tables ...........................................................................................................5Preface...................................................................................................................9
Application of this manual ..................................................................................10Chapter 1 Product Introduction.............................................................................11
1.1 General Description .................................................................................111.2 Main Specification of the SPD....................................................................111.3 Properties ...............................................................................................16
Chapter 2 Preparation ..........................................................................................182.1 Installation tools ......................................................................................182.2 Delivery contents .....................................................................................18
Chapter 3 SPD Installation ....................................................................................203.1 Make AC connection with the SPD .............................................................20
3.1.1 Preparation ................................................................................................... 213.1.2 Configure the Terminal Block ...................................................................... 273.1.3 3-phase star (3Y) AC connection with the SPD ........................................... 293.1.4 Single-phase (1) AC connection with the SPD.......................................... 353.1.5 2-phase AC connection with the SPD ........................................................ 383.1.6 3-phase delta (3) AC connection with the SPD ......................................... 40
3.2 Replace the SPD .......................................................................................44
-
Flexi Power Rectifier FPRB
Installation Manual for SPD, Rev AC Page 5 of 45
List of Figures
Figure 1 Internal circuit diagram of the SPD .................................................................. 11Figure 2 Structure of the SPD......................................................................................... 12Figure 3 Dimension of the SPD top view..................................................................... 13Figure 4 Dimension of the SPD side view.................................................................... 14Figure 5 SPD configuration in a TN-S system ................................................................. 16Figure 6 Checking failure of the SPD .............................................................................. 17Figure 7 PDA rear internal chassis layout ...................................................................... 21Figure 8 The AC cable connection chart ........................................................................ 27Figure 9 AC terminal block configuration 1 and 2 Configuration ......................... 28Figure 10 AC terminal block configuration 3 ............................................................ 28Figure 11 AC terminal block configuration 3Y ............................................................ 29Figure 12 Schematic diagram of AC connection with the SPD 3Y............................... 29Figure 13 - Assemble the Link Cables to SPD .................................................................... 30Figure 14 - AC Ground wire............................................................................................... 31Figure 15 - Secure the SPD into the DIN rail ..................................................................... 31Figure 16 - Connect the Link cables to Terminal Block ..................................................... 32Figure 17 - Special Instruction for N Link Cable Installation ............................................. 33Figure 18 AC connection with the SPD - 3Y ................................................................... 34Figure 19 Schematic diagram of AC connection with the SPD 1.............................. 35Figure 20 SPD configuration for single-phase AC connection ....................................... 36Figure 21 - Connection of AC link cables from SPD to Terminal Block ............................. 37Figure 22 Schematic diagram of AC connection with the SPD 2- Phase...................... 38Figure 23 - AC connection with the SPD 2- Phase.......................................................... 39Figure 24 Schematic diagram of AC connection with the SPD 3 .............................. 40Figure 25 - Connection of AC link cables and SPD ground cables..................................... 41Figure 26 Connecting the AC terminal block 3 ......................................................... 42Figure 27 3-phase delta (3) AC connection with the SPD.............................................. 43Figure 28 Removing the damaged OVP module from the SPD ..................................... 44Figure 29 The OVP module and the SPD base ............................................................... 45Figure 30 Fitting a new OVP module to the SPD ........................................................... 45
List of Tables
Table 1 Contents of this manual...........................................................................................9Table 2 Symbols in this manual ............................................................................................9Table 3 Reference documents of the SPD .........................................................................10Table 4 Main specification of the SPD ...............................................................................15Table 5 Delivery contents of the SPD .................................................................................19Table 6 Recommended preparation for AC mains cable ..................................................22Table 7 AC connection with the SPD ..................................................................................23
-
Flexi Power Rectifier FPRB
Installation Manual for SPD, Rev AC Page 6 of 45
Table 8 Schematic diagram of AC connection with the SPD ............................................25
List of TermsA Ampere
AC Alternative current
AWG American Wire Gauge
BAT Battery
BR Battery Return
BTS Base Transceiver Station
CB Circuit Breaker
CSA Cross Section Area
CU Control unit
DC Direct current
EMC Electromagnetic Compatibility
ESD Electrostatic Discharge
FPRB Flexi Power Rectifier
GND Ground
GUI Graphical User Interface
IE Internet Explorer
IP Internet Protocol
L Live cable from the AC mains
LAN Local Area Network
LED Light Emitting Diode
LVD Low Voltage Disconnect
MAC Media Access Control
MCB Miniature Circuit Breaker
N Neutral cable from the AC mains
PC Personal Computer
PCB Printed Circuit Board
PDA Power Distribution Assembly
PE Protective earth
PSU Power Supply Unit
-
Flexi Power Rectifier FPRB
Installation Manual for SPD, Rev AC Page 7 of 45
SPD Surge Protective Device
V Volt
VPN Virtual Private Network
1 Single-phase AC type
3Y 3-phase star AC type
3 3-phase delta AC type
-
Flexi Power Rectifier FPRB
Installation Manual for SPD, Rev AC Page 8 of 45
This page left intentionally blank
-
Flexi Power Rectifier FPRB
Installation Manual for SPD, Rev AC Page 9 of 45
Preface
About this manual
This manual provides all the necessary information to operate, install and maintain theSurge Protective Device (SPD) used in the Flexi Power Rectifier (FPRB).
Table 1 lists the contents of this manual:
Table 1 Contents of this manual
Chapter Title Content
1 Product instruction Describes the specifications and properties of theSPD
2 Preparation Describes the SPD installation preparations
3 SPD installation Describes how to install and replace the SPD into theFPRB
Terms and Symbols in this manual
These term and symbols in Table 2 might appear in the manual:
Table 2 Symbols in this manual
Symbol Description
Warning statement identifies conditions or practices that couldresult in bodily injury or loss of life.
It warns the reader to be extremely careful.
Caution statement identifies conditions or practices that couldresult in damage to this product or devices connect to it.
It indicates that the reader must be careful.
Provides hints to the user for easier installation
The necessary supplementary of the article to let user be clearer.
-
Flexi Power Rectifier FPRB
Installation Manual for SPD, Rev AC Page 10 of 45
Reference documents
Table 3 contains the reference documents of the SPD:
Table 3 Reference documents of the SPD
DocumentArtesyn Embedded Technologies
File No.
Product Specification FPRB 970-009025-0000
FPRB Installation Manual for SPD (This manual) 970-009473-0000
FPRB User Manual 970-009474-0000
FPRB Installation Manual 970-009475-0000
FPRB Quick Start Guide for SPD 970-009476-0000
FPRB Quick Start Guide 970-009477-0000
Application of this manual
This manual is regarded as a substitution of the part Make AC connection without the SPD(refer to section 3.4 of the Flexi Power Rectifier - Installation Manual, Artesyn File No. 970-009475-0000).
This manual is based on the present SPD in use. Artesyn may change the SPD to a secondsource in future. However Artesyn ensures the compatibility of the new SPD in the FPRB.This manual supports all applications of the SPD that can be used in the FPRB.
-
Flexi Power Rectifier FPRB
Installation Manual for SPD, Rev AC Page 11 of 45
Chapter 1 Product Introduction
1.1 General Description
The Flexi Power Rectifier (FPRX, Artesyn part number AA25020L/ CS7000013.XX for 6kWand AA27540L/ CS7000030.XX for 9kW) is a 6kW or 9kW output power AC rectifier packagerespectively. The Surge Protective Device (SPD, Artesyn part number AA25130L/CS7000002.XX) is used to prevent damage to the FPRX caused by high input voltages orsurge.
The SPD consists of three equivalent OVP modules used between live cables and neutralcable from the AC mains; one OVP module used between the neutral cable from the ACmains and the earth; and one remote signaling contact.
The SPDs mentioned in this manual are applicable for both 6kW and 9kW system. The SPDused is the same as the one we used in FPRA.
1.2 Main Specification of the SPD
The SPD illustrated in this manual is made by Phoenix Contact CO., Ltd (model number:VAL-MS 230IT/3+1-FM), or SICHUAN ZHONGGUANG LIGHTNING (model number:ZGG40-385(3+1)).
L1 L2 L3 N
11
12 14
FM
VAL-MS 230 IT ST F-MS12 ST
VAL-MS 230IT/3+1-FM
Figure 1 Internal circuit diagram of the SPD
-
Flexi Power Rectifier FPRB
Installation Manual for SPD, Rev AC Page 12 of 45
The SPD (module name VAL-MS 230IT/3+1-FM) consists of three equivalent OVPmodules used between live cables and neutral cable from the AC mains (module nameVAL-MS 230 IT ST), one OVP module used between the neutral cable from the ACmains and the earth (module name F-MS 12 ST) and one remote signaling contact(module name VAL-MS 230IT-FM) (see Figure 1).
The four OVP modules and the remote signaling contact are all installed on the SPD baseand can be removed from the base. This structure leads to easier configuration andreplacement of the OVP modules (seeFigure 2).
Figure 2 Structure of the SPD
VAL-MS230 IT ST
F-MS12 ST
Base
VAL-MS230IT-FM Terminal
-
Flexi Power Rectifier FPRB
Installation Manual for SPD, Rev AC Page 13 of 45
Figure 3 and Figure 4 show the dimension of the SPD. The four OVP modules are of thesame dimensions.
VAL-MS 230IT/3+1-FM
ZGG40-385(3+1)
Figure 3 Dimension of the SPD top view
17.5m 17.5m70m
-
Flexi Power Rectifier FPRB
Installation Manual for SPD, Rev AC Page 14 of 45
VAL-MS 230IT/3+1-FM
ZGG40-385(3+1)
Figure 4 Dimension of the SPD side view
-
Installation Manual for SPD, Rev A
Table 4 lists the main specifications of the OVP modules.
Module name Parameter
VAL-MS 230 ITST
(OVP module forL-N)
UN (L-N / L-L)
UC (L-N)
UP (L-N)
In / Imax (8/20 S)
Screw thread / torque
F-MS 12 ST
(OVP module forN-PE)
UN (N-PE)
UC (N-PE)
UP (N-PE)
In / Imax (8/20 S)
Screw thread / torque
VAL-MS 230IT-FM
(Remotesignalingcontact)1
Imax
Screw thread / torque
VAL-MS230IT/3+1-FM
(The whole SPDmodule)
Temperature
IP-code
Class II
Type 2
Flexi Power Rectifier FPRB
Installation Manual for SPD, Rev AC Page
lists the main specifications of the OVP modules.
Table 4 Main specification of the SPD
Specification Description
230VAC / 400VAC Rated voltage
385VAC Clamping voltage
1.9kV Protective voltage
(8/20 S) 20kA / 40kA Rated discharge current /maximum discharge current
Screw thread / torque M5 / 4.5Nm
230 VAC Rated voltage
260VAC Clamping voltage
1.0kV Protective voltage
(8/20 S) 20kA / 40kA Rated discharge current /maximum discharge current
Screw thread / torque M5 / 4.5Nm
AC: 3A (125V)
0.75A (250V)
DC: 2A (30V)
Screw thread / torque M2 / 0.25Nm
-40C ~ +80C
IP20 Ingress Protectiondegree
IEC 61643-1: 2005-01
EN 61643-11: 2002-12
Flexi Power Rectifier FPRB
Page 15 of 45
Description
Rated voltage
Clamping voltage
Protective voltage
Rated discharge current /maximum discharge current
Rated voltage
Clamping voltage
Protective voltage
Rated discharge current /maximum discharge current
Ingress Protection (IP)degree
-
Flexi Power Rectifier FPRB
Installation Manual for SPD, Rev AC Page 16 of 45
Note:
1 Although the SPD remote signaling contact has three pins, only two are applied whenconfigured in the FPRB. Refer to Figure 13
1.3 Properties
Typical use
Figure 5 shows the configuration of the SPD in a TN-S system.
Figure 5 SPD configuration in a TN-S system
Note:
It is recommended to use the SPD with a mains utility offering the appropriate linefuse protection.
-
Flexi Power Rectifier FPRB
Installation Manual for SPD, Rev AC Page 17 of 45
Failure Detection
If any OVP module has been damaged, Artesyn will provide the user with the individual OVPmodule but not the whole SPD for replacement.
In the event that any one of the four OVP modules is damaged, the PDA will send alarmsignal via the LCD.
After opening the rear top cover of the PDA (refer to section 3.4 of the Flexi PowerRectifier Installation Manual, Artesyn File No. 970-009475-0000), the user can confirmwhich OVP module is in failure.
Failure Indication
If the window is transparent, the OVP is OK; if the window is red, the OVP is damagedand should be replaced in time (see Figure 6).
Figure 6 Checking failure of the SPD
Window
-
Flexi Power Rectifier FPRB
Installation Manual for SPD, Rev AC Page 18 of 45
Chapter 2 Preparation
2.1 Installation tools
Tool kit:
Allen key (hex key): 8 mm (0.31 in.)
Allen key (hex key): 4 mm
Awl: diameter of 2mm
ESD wrist strap and cable
TORX screwdriver set: T10, T20, T25
Flat screwdriver
Cross screwdriver
Wrench 13 mm (0.51 in.)
Folding knife
Adjustable (monkey) wrench
Side cutters
Lint-free swab or wipe and 99% alcohol for cleaning optical connectors
Cable ties for routing cables
Tape measure
Flashlight, pocket lamp or torch
Hammer drill
Marker pen or comparable tool
Pliers
Wire-stripper
Test equipment:
Multi-meter
2.2 Delivery contents
The SPD is optional for the user and shipped independent from the FPRB.
Verify that all the material listed in Table 5 has been received and is in good condition.Report any missing or damaged items to our Artesyn Embedded Technologies ServiceDepartment.
-
Flexi Power Rectifier FPRB
Installation Manual for SPD, Rev AC Page 19 of 45
Table 5 Delivery contents of the SPD
Part Figure Description Usage Artesyn
Part Number
Artesyn
ModuleNumber
SPD Surge Protective Device
Manufacturer p/n:VAL-MS230IT/3+1-FM
Manufacturer: PHOENIXCONTACT (SEA), PTE. LTD.
1 pc 440-000700-0000
AA25130L
Surge Protective Device
Manufacturer p/n: ZGG40-385(3+1)
Manufacturer: SICHUANZHONGGUANG LIGHTNINGPROTECTION TECHNOLOGIESCO.,LTD.
SPDJumper
Short link for SPD terminals insingle-phase AC connection
(Color of plastic may vary)
1 each 502-000496-000X/
500-001769-0000
L lineshort link
L1/L2/L3 for three phase,
L for single phase (AWG10)
1 750-000984-000X
N lineshort link
N for three phase star,
N for single phase (10mm2)
1 750-000983-000X
SPDgroundlink
SPD ground link to Chassis 1 750-000988-000X
SPDsensecable
SPD signal cable connecting tothe MCU
1 750-001004-000X
-
Flexi Power Rectifier FPRB
Installation Manual for SPD, Rev AC Page 20 of 45
Chapter 3 SPD Installation
3.1 Make AC connection with the SPD
The AC power supply must be switched off prior to accessing the AC cable.
This manual concentrates on the AC connection with the SPD, and omits the steps priorto the SPD installation, i.e. the AC terminal block configuration, etc. The user shouldrefer to Flexi Power Rectifier Installation Manual (Artesyn File No. 970-009475-0000)for the relevant previous steps.
The colors of the AC mains wire used in this manual are for illustration purpose only.However, the user should verify the AC mains referring to the color-coding in therespective field or country of application.
-
Flexi Power Rectifier FPRB
Installation Manual for SPD, Rev AC Page 21 of 45
3.1.1 Preparation
3.1.1.1 Detach the PDA rear top cover referring to Flexi Power Rectifier InstallationManual (Artesyn File No. 970-009475-0000).
3.1.1.2 Loosen screws A, B and C as per attached photo with a TORX screwdriver (T20)
Figure 7 PDA rear internal chassis layout
B
C
PDA earthcable
AC groundclamp
SPD groundclamp
SPDDIN Rail
ACterminalblock
FSPD sensorconnection
A
Strain-relief
-
Flexi Power Rectifier FPRB
Installation Manual for SPD, Rev AC Page 22 of 45
3.1.1.3 Preparing the AC mains cable. The color of the wires may vary depending on thecountry where the SPD will be mounted.
Table 6 Recommended preparation for AC mains cable
(Tolerance: 3mm)
AC type L1 L2 L3 N PE
Single-phase
(1)
A (mm) 55 70 100
B (mm) 20 20 20
2-phase A (mm) 55 100 N/A
B (mm) 20 20 N/A
3-phase delta
(3)
A (mm) 55 60 70 N/A 100
B (mm) 20 20 20 N/A 20
3-phase star
(3Y)
A (mm) 55 60 70 85 100
B (mm) 20 20 20 20 20
-
Flexi Power Rectifier FPRB
Installation Manual for SPD, Rev AC Page 23 of 45
Table 7 AC connection with the SPD
AC type Terminals connection Short link available (1) AC terminal block
Configuration (2)SPD configuration
ACmains
SPD AC terminalblock
Chassis (3)
1
N/A L1 6 N/A L1 for three-phase Short terminals 1,2,3 and4,5,6 respectively
Short terminals L1,L2, L3
L L2 5 N/A L2 for three-phase
N/A L3 4 N/A L3 for three-phase
N N 2 N/A N for single phase
PE N/A N/A AC ground clamp N/A
N/A N/A SPD ground clamp SPD ground link
2-Phase N/A L1 6 N/A L1 for three-phase Short terminals 1,2,3 and4,5,6 respectively
Short terminals L1,L2, L3
L1 L2 5 N/A L2 for three-phase
N/A L3 4 N/A L3 for three-phase
L2 N 2 N/A N for single phase
N N/A N/A AC ground clamp N/A
N/A N/A SPD ground clamp SPD ground link
3YL1 L1 6 N/A L1 for three-phase Short terminals 1,2,3 N/A
L2 L2 5 N/A L2 for three-phase
-
Flexi Power Rectifier FPRB
Installation Manual for SPD, Rev AC Page 24 of 45
L3 L3 4 N/A L3 for three-phase
N N 2 N/A N for three-phase star
PE N/A N/A AC ground clamp N/A
N/A N/A SPD ground clamp SPD ground link
3
L1 L1 5 N/A L1 for three-phase Short terminals 1,2 and 3,4and 4,5 respectively
N/A
L2 L2 3 N/A L2 for three-phase
L3 L3 1 N/A L3 for three-phase
PE N/A N/A AC ground clamp
N/A N N/A SPD ground clamp SPD ground link
Note:
(1) The short link names listed herein are in accordance with the actual labels on the short links.
(2) The AC terminal block should be configured before the AC connection. User shall refer to section 3.4 in
Flexi Power Rectifier Installation Manual (Artesyn file No.970-009475-0000) for more details
-
Flexi Power Rectifier FPRB
Installation Manual for SPD, Rev AC Page 25 of 45
(3) Refer to Table 3for the corresponding clamps.
Table 8 Schematic diagram of AC connection with the SPD
ACType
Schematic diagram Configuration of ACterminal block
3Y
L1 L2 L3 N
1 2 3 4 5 6SPD
AC Terminal Block
L1 L2PE
AC Mains
L3 N
Short terminals 1,2,3
1
L1 L2 L3 N 1 2 3 4 5 6
SPDAC Terminal Block
L NPE
AC mains
Short terminals 1,2,3;4,5,6 respectively
-
Flexi Power Rectifier FPRB
Installation Manual for SPD, Rev AC Page 26 of 45
3
L1 L2 L3 N
1 2 3 4 5 6SPD
AC Terminal Block
L1 L2PE
AC mains
L3
Short terminals 1,2; 3,4;5,6 respectively
2-phase
Short terminals 1,2,3;4,5,6 respectively
-
Flexi Power Rectifier FPRB
Installation Manual for SPD, Rev AC Page 27 of 45
3.1.2 Configure the Terminal Block
Verify the AC power system types in field, and make sure the corresponding bridgeconfiguration is used.
The AC terminal block has been already configured for 3-phase star AC mains beforethe shipment. Therefore the user has to change the AC terminal block configurationif required referring to the actual AC type in field.
Insert the bridges and screws (provided as accessories) to the corresponding slots ontop of the AC terminal block referring to the AC CABLE CONNECTION CHART locatedon the chassis (and reproduced in Figure 8).
Secure the screws with a flat screwdriver, tightening to 0.8Nm.
Figure 8 The AC cable connection chart
There are three AC power system types (see above Figure), and thus three ACconfigurations of the AC terminal block.
-
Flexi Power Rectifier FPRB
Installation Manual for SPD, Rev AC Page 28 of 45
Single-phase (1) and Two-phase (2 ) configuration
For Single- phase AC system, use two 3-pole bridges to short the terminals 1, 2,3 and 4, 5, 6 respectively on the AC terminal block (see Figure 9)
Figure 9 AC terminal block configuration 1 and 2 Configuration
3- phase delta (3) configuration
For 3-phase delta AC system, use three 2-pole bridges to short the terminals 1, 2and 3, 4 and 5, 6 respectively on the AC terminal block (see Figure 10 )
Figure 10 AC terminal block configuration 3
-
Flexi Power Rectifier FPRB
Installation Manual for SPD, Rev AC Page 29 of 45
3- phase star (3Y) configuration
For 3-phase star AC system, use one 3-pole bridges to short the terminals 1, 2, 3on the AC terminal block (see Figure 11)
Figure 11 AC terminal block configuration 3Y
3.1.3 3-phase star (3Y) AC connection with the SPD
L1 L2 L3 N
1 2 3 4 5 6SPD
AC Terminal Block
L1 L2PE
AC Mains
L3 N
Figure 12 Schematic diagram of AC connection with the SPD 3Y
-
Flexi Power Rectifier FPRB
Installation Manual for SPD, Rev AC Page 30 of 45
The terminal marks in Figure 12 are in accordance with the actual SPD and ACterminal block.
Use the indicated L or N short link for the AC mains as shown in Figure 12 and Table7 referring to labels on the short links.
The terminals 1, 2, 3 on the AC terminal block should be shorted before theconnection. Refer to section 3.4 in Flexi Power Rectifier Installation Manual(Artesyn file No.970-009475-0000) for details.
3.1.3.1 Detach the cable strain-relief from the chassis by loosening the screw C inFigure 7 with a TORX screwdriver (T20). Insert the AC mains cable on thestrain relief.
3.1.3.2 Detach the AC ground clamp and SPD ground clamp from the chassis byloosening the screws A and B with a TORX screwdriver (T20).
3.1.3.3 Prepare the AC mains of 3-phase star as per Table 6.
3.1.3.4 Assemble the Link cables, the AC mains cable, the SPD sensor cable and theSPD grounding cable into the SPD. Refer to Figure 13
Figure 13 - Assemble the Link Cables to SPD
L1 forthree-phase
L2 forthree-phase
L3 forthree-phase
N forthree-phasestar SPD
groundcable
SPDsensecable
-
Flexi Power Rectifier FPRB
Installation Manual for SPD, Rev AC Page 31 of 45
Insert the connector of the SPD sense cable into the left two contacts; otherwise it willblock the SPD from installing onto the chassis.
3.1.3.5 Fix the AC ground wire into the terminal lug.
.
Figure 14 - AC Ground wire
3.1.3.6 Secure the SPD into the SPD DIN rail. Connect the SPD sense cable to thestand by mating connector. Connect the SPD grounding cable into theterminal lug. Refer to Figure 15.
Figure 15 - Secure the SPD into the DIN rail
SPDsensecable
SPDGroundingcable
SPD
-
Flexi Power Rectifier FPRB
Installation Manual for SPD, Rev AC Page 32 of 45
3.1.3.7 Connect the AC link cables from SPD to the Terminal Block. Assemble theSPD grounding cable and the AC grounding cable into the PDA
Figure 16 - Connect the Link cables to Terminal Block
1. Use the appropriate L and N short link referring to the label on the short linksand the indications in Figure 12 and Table 7.
2. Rotate the N link cable 90 degrees either clockwise or counter clockwise whenassembling the SPD on the FPRA due to the smaller slot of the terminal block.Refer to Figure 17 - Special Instruction for N Link Cable Installation
SPDgroundingcable lug
ACgroundingcable lug
N linkcable
L3 linkcableL2 linkcable
L1 linkcable
-
Flexi Power Rectifier FPRB
Installation Manual for SPD, Rev AC Page 33 of 45
Figure 17 - Special Instruction for N Link Cable Installation
It is recommended to clamp the AC wire and the corresponding short link with oneoverlapping on another.
-
Flexi Power Rectifier FPRB
Installation Manual for SPD, Rev AC Page 34 of 45
Below figure shows the PDA rear layout after completing the 3-phase star ACconnection with the SPD.
Figure 18 AC connection with the SPD - 3Y
3.1.3.8 After finishing and checking the AC cable installation, re-install the PDA rearcover referring to Flexi Power Rectifier Installation Manual (Artesyn FileNo. 970-009475-0000).
After installation of the SPD kit has been completed, the installer should check theinstallation against the steps outlined within this document, supported by a multi-meter to check for wiring continuity.
Its strongly suggested that the insulation test (2.5kV Hi-pot) is carried out.
L1 short link
L2 short link
L3 short link
N short link
SPD sense cable
L2
L3
L1
SPD groundcable
N
PE of ACmains
-
Flexi Power Rectifier FPRB
Installation Manual for SPD, Rev AC Page 35 of 45
3.1.4 Single-phase (1) AC connection with the SPD
L1 L2 L3 N 1 2 3 4 5 6
SPDAC Terminal Block
L NPE
AC mains
Figure 19 Schematic diagram of AC connection with the SPD 1
The terminal marks in Figure 19 are in accordance with the actual SPD and ACterminal block.
Use the indicated L or N short link for the AC mains as shown in Figure 19 and Table7 referring to labels on the short links.
The terminals 1,2,3 and 4,5,6 on the AC terminal block should be shortedrespectively before the connection. Refer to section 3.4 in Flexi Power Rectifier Installation Manual (Artesyn file No.970-009475-0000) for details.
3.1.4.1 Perform the same procedure in preparing the AC cables SPD grounding cablesand the SPD sense cables.
3.1.4.2 As indicated in Figure 19 and Table 7, the SPD terminals L1, L2 and L3 have to beparalleled by the SPD jumper (see Figure 20).
L1 for three-phase
L2 for three-phase
L3 for three-phase
N for single phase
AC groundclamp
SPD groundclamp
SPD ground link
-
Flexi Power Rectifier FPRB
Installation Manual for SPD, Rev AC Page 36 of 45
The user should loosen the three terminal clamps of L1, L2 and L3, and hold the SPDupside down. Thus the SPD jumper can be easily inserted into the parallel clamps.
The jumper should be fixed in the SPD together with the live cables of the AC mainsand L line short links.
Figure 20 SPD configuration for single-phase AC connection
3.1.4.3 Connect the live cable from the AC mains and L2 short link into terminal L2 onthe SPD referring to Figure 19 and Table 7, tightening the top screw to 4.5Nmwith a cross screwdriver (see Figure 21).
SPD jumper
-
Flexi Power Rectifier FPRB
Installation Manual for SPD, Rev AC Page 37 of 45
Figure 21 - Connection of AC link cables from SPD to Terminal Block
3.1.4.4 After finishing and checking the AC cable installation, re-install the PDA rearcover referring to section 3.4 in Flexi Power Rectifier Installation Manual(Artesyn File No. 970-009475-0000).
L1 forthree-phase
L2 forthree-phase
L3 forthree-phase
N for singlephase
AC groundclamp
SPD groundclamp
SPDgroundlink
-
Flexi Power Rectifier FPRB
Installation Manual for SPD, Rev AC Page 38 of 45
3.1.5 2-phase AC connection with the SPD
Figure 22 Schematic diagram of AC connection with the SPD 2- Phase
3.1.5.1 Perform the same procedure in preparing the AC cables SPD grounding cablesand the SPD sense cables
3.1.5.2 As indicated in Figure 19 and Table 7, the SPD terminals L1, L2 and L3 have to beparalleled by the SPD jumper (see Figure 20).
L1 for three-phase
L2 for three-phase
L3 for three-phaseAC groundclamp
SPD groundclamp
SPD ground link
-
Flexi Power Rectifier FPRB
Installation Manual for SPD, Rev AC Page 39 of 45
3.1.5.3 Connect the AC link cables and the AC cables to the SPD and to terminal block.Refer to Figure 23)
Figure 23 - AC connection with the SPD 2- Phase
3.1.5.4 After finishing and checking the AC cable installation, re-install the PDA rearcover referring to section 3.4 in Flexi Power Rectifier Installation Manual(Artesyn File No. 970-009475-0000).
After installation of the SPD kit has been completed, the installer should check theinstallation against the steps outlined within this document, supported by a multi-meter to check for wiring continuity.
Its strongly suggested that the insulation test (2.5kV Hi-pot) is carried out.
Use DMM to measure L1-L2 voltage
Ensure L1-L2 voltage between 180VAC-276VAC
L1 forthree-phase
L2 forthree-phase
L3 forthree-phase
N for singlephase
AC groundclamp
SPD groundclamp
SPDgroundlink
-
Flexi Power Rectifier FPRB
Installation Manual for SPD, Rev AC Page 40 of 45
The terminal marks in Figure 22 are in accordance with the actual SPD and ACterminal block.
Refer to Single-phase (1) AC connection for details.
3.1.6 3-phase delta (3) AC connection with the SPD
L1 L2 L3 N
1 2 3 4 5 6SPD
AC Terminal Block
L1 L2PE
AC mains
L3
Figure 24 Schematic diagram of AC connection with the SPD 3
The terminal marks in Figure 24 are in accordance with the actual SPD and ACterminal block.
Use the indicated L or N short link for the AC mains as shown in Figure 24 and Table7 referring to labels on the short links.
The terminals 1,2 and 3,4 and 5,6 on the AC terminal block should be shortedrespectively before the connection. Refer to section 3.4 in Flexi Power Rectifier Installation Manual (Artesyn file No.970-009475-0000) for details.
L1 for three-phase
L2 for three-phase
L3 for three-phase
SPD ground link
AC groundclamp
SPD groundclamp
-
Flexi Power Rectifier FPRB
Installation Manual for SPD, Rev AC Page 41 of 45
3.1.6.1 Perform the same procedure in preparing the AC cables SPD grounding cablesand the SPD sense cables
3.1.6.2 Configure the terminal block as per Figure 10
3.1.6.3 Assemble the AC cables, AC link cables into the SPD.
3.1.6.4 Assemble the AC link cables into the Terminal Block.
Figure 25 - Connection of AC link cables and SPD ground cables
SPDgroundingcableconnected toN terminal ofthe SPD.
N connectedto Ground
-
Installation Manual for SPD, Rev A
3.1.6.5 Connect the L1, L2 and L3 short links to terminals 5, 3, 1 on the AC terminalblock respectively referring toto 1.5Nm with a Cross screwdriver (see
Figure 26
SPDSenseCable
SPDgroundlink
Flexi Power Rectifier FPRB
Installation Manual for SPD, Rev AC Page
Connect the L1, L2 and L3 short links to terminals 5, 3, 1 on the AC terminalblock respectively referring to Figure 24 and Table 7, tightening the top screwsto 1.5Nm with a Cross screwdriver (see Figure 26).
26 Connecting the AC terminal block 3
Flexi Power Rectifier FPRB
Page 42 of 45
Connect the L1, L2 and L3 short links to terminals 5, 3, 1 on the AC terminal, tightening the top screws
L1shortlink
L2shortlink
L3shortlink
-
Flexi Power Rectifier FPRB
Installation Manual for SPD, Rev AC Page 43 of 45
3.1.6.6 Figure 27 shows the PDA rear internal layout after completing the 3-phase deltaAC connection with the SPD.
Figure 27 3-phase delta (3) AC connection with the SPD
3.1.6.7 After finishing and checking the AC cable installation, replace the PDA rear coverreferring to section 3.4 in Flexi Power Rectifier Installation Manual (ArtesynFile No. 970-009475-0000).
After installation of the SPD kit has been completed, the installer should check theinstallation against the steps outlined within this document, supported by a multi-meter to check for wiring continuity.
Its strongly suggested that the insulation test (2.5kV Hi-pot) is carried out.
L1 forthree-phase
L2 forthree-phase
L3 forthree-phase
AC groundclamp
SPD groundclamp
SPDgroundlink
-
Installation Manual for SPD, Rev A
3.2 Replace the SPD
The AC power supply must be switched off prior to accessing the SPD.
Ask Artesyn Embedded Technologiesbeen damaged. Artesynnot the whole SPD for replacement.
The user shall only replace thethe whole SPD from the PDA chassis.
The user can verify which OVP module has been damaged Referring to sectionProperties.
3.2.1 Hold the two sides of the damaged OVP module and pulbase (see Figure
Figure 28 Removing the damaged OVP module from the SPD
Flexi Power Rectifier FPRB
Installation Manual for SPD, Rev AC Page
The AC power supply must be switched off prior to accessing the SPD.
Artesyn Embedded Technologies service people for help if any OVP module hasArtesyn will provide the user with the individual OVP module but
not the whole SPD for replacement.
The user shall only replace the damaged OVP module of the SPD without removingthe whole SPD from the PDA chassis.
The user can verify which OVP module has been damaged Referring to section
Hold the two sides of the damaged OVP module and pull it out from the SPDFigure 28)
Removing the damaged OVP module from the SPD
Flexi Power Rectifier FPRB
Page 44 of 45
service people for help if any OVP module haswill provide the user with the individual OVP module but
damaged OVP module of the SPD without removing
The user can verify which OVP module has been damaged Referring to section
l it out from the SPD
Removing the damaged OVP module from the SPD
-
Flexi Power Rectifier FPRB
Installation Manual for SPD, Rev AC Page 45 of 45
3.2.2 The SPD base is designed such that the two kinds of OVP modules cannot bemixed when installing onto it (see Figure 29).
Figure 29 The OVP module and the SPD base
3.2.3 Fit the new module into its position on the SPD base (see Figure 30).
Figure 30 Fitting a new OVP module to the SPD