frank f. hejazi architect
DESCRIPTION
Frank F. Hejazi Architect. Façade Improvements. Existing Conditions 1st Floor Facing South. Left Wing. Right Wing. Metal Sun Screens. Metal Sun Screen. Fabric Sun Screen. View from inside out through Fabric Screens. 3. Mechanical Air Louvers used overhead. 1. 2. Canopy. 4. - PowerPoint PPT PresentationTRANSCRIPT
![Page 1: Frank F. Hejazi Architect](https://reader034.vdocument.in/reader034/viewer/2022050714/56812fdd550346895d95531d/html5/thumbnails/1.jpg)
Frank F. Hejazi Architect
Façade Improvements
![Page 2: Frank F. Hejazi Architect](https://reader034.vdocument.in/reader034/viewer/2022050714/56812fdd550346895d95531d/html5/thumbnails/2.jpg)
Existing Conditions 1st Floor Facing South
![Page 3: Frank F. Hejazi Architect](https://reader034.vdocument.in/reader034/viewer/2022050714/56812fdd550346895d95531d/html5/thumbnails/3.jpg)
Left Wing
![Page 4: Frank F. Hejazi Architect](https://reader034.vdocument.in/reader034/viewer/2022050714/56812fdd550346895d95531d/html5/thumbnails/4.jpg)
Right Wing
![Page 5: Frank F. Hejazi Architect](https://reader034.vdocument.in/reader034/viewer/2022050714/56812fdd550346895d95531d/html5/thumbnails/5.jpg)
Metal Sun Screens
![Page 6: Frank F. Hejazi Architect](https://reader034.vdocument.in/reader034/viewer/2022050714/56812fdd550346895d95531d/html5/thumbnails/6.jpg)
Metal Sun Screen Fabric Sun Screen
![Page 7: Frank F. Hejazi Architect](https://reader034.vdocument.in/reader034/viewer/2022050714/56812fdd550346895d95531d/html5/thumbnails/7.jpg)
View from inside out through Fabric Screens
![Page 8: Frank F. Hejazi Architect](https://reader034.vdocument.in/reader034/viewer/2022050714/56812fdd550346895d95531d/html5/thumbnails/8.jpg)
ArchitecturalTools / Ideas
for improvements
1 2
3
4
5
6
7
Exterior Blinds
Canopy
Mechanical Air Louvers used overhead
Landscape Elements
![Page 9: Frank F. Hejazi Architect](https://reader034.vdocument.in/reader034/viewer/2022050714/56812fdd550346895d95531d/html5/thumbnails/9.jpg)
3. Look at a Series of AvailableSun Protection Parts and Products
2. Identify Levels of Improvements Desired
4. Consider Costs of each Level / Option
1. Identify Existing Issues / Problems
To Make Façade Improvements:
![Page 10: Frank F. Hejazi Architect](https://reader034.vdocument.in/reader034/viewer/2022050714/56812fdd550346895d95531d/html5/thumbnails/10.jpg)
1. Identify Existing Issues / Problems( Verify in Field (VIF))12 Large Column Bays 4 Small Column Bays
18’-1”19’-0”19’-8”
19’-11”20’-5”20’-6”
18’-2”19’-1”19’-9”
19’-10”20’-4”20’-5”
Lft. Wing Rt. Wing
12’-8”13’-9”
Lft. Wing Rt. Wing
12’-9”13’-11”
1/3 Size Similar to 1/2 Size 1/2 Size Similar to 1/3 Size
![Page 11: Frank F. Hejazi Architect](https://reader034.vdocument.in/reader034/viewer/2022050714/56812fdd550346895d95531d/html5/thumbnails/11.jpg)
Existing Conditions – Design Study
Not Okay
Okay
2. Identify Levels of Improvements Desired
The Bays seams to work fine architecturally. Where is the problem?
Can an arbitrary line define where the problems stop or start?
Line is not Arbitrary but the lowest horizontal member above headroom
![Page 12: Frank F. Hejazi Architect](https://reader034.vdocument.in/reader034/viewer/2022050714/56812fdd550346895d95531d/html5/thumbnails/12.jpg)
3
6Exterior Moving Shade
Architectural Tools / Ideas
3. Look at a Series of AvailableSun Protection Parts and Products
2
Canopy
![Page 13: Frank F. Hejazi Architect](https://reader034.vdocument.in/reader034/viewer/2022050714/56812fdd550346895d95531d/html5/thumbnails/13.jpg)
Exterior Blinds
![Page 14: Frank F. Hejazi Architect](https://reader034.vdocument.in/reader034/viewer/2022050714/56812fdd550346895d95531d/html5/thumbnails/14.jpg)
Canopy
![Page 15: Frank F. Hejazi Architect](https://reader034.vdocument.in/reader034/viewer/2022050714/56812fdd550346895d95531d/html5/thumbnails/15.jpg)
Fixed Sun Louvers
![Page 16: Frank F. Hejazi Architect](https://reader034.vdocument.in/reader034/viewer/2022050714/56812fdd550346895d95531d/html5/thumbnails/16.jpg)
Fixed Sun Louvers
![Page 17: Frank F. Hejazi Architect](https://reader034.vdocument.in/reader034/viewer/2022050714/56812fdd550346895d95531d/html5/thumbnails/17.jpg)
Movable Louvers
![Page 18: Frank F. Hejazi Architect](https://reader034.vdocument.in/reader034/viewer/2022050714/56812fdd550346895d95531d/html5/thumbnails/18.jpg)
Detached MotorizedSun Louvers - 24” Offset
![Page 19: Frank F. Hejazi Architect](https://reader034.vdocument.in/reader034/viewer/2022050714/56812fdd550346895d95531d/html5/thumbnails/19.jpg)
Concept Study w/ Available Products
w/ or w/o Canopy as Add Alternate
With Existing orNew Storefront
w/ or w/o Optional ExteriorBlind / Shadewith Concealed Housing
Louvers Over Existing Conditions as cover up or demo existing substrate-panels and rebuild new.
3. Look at a Series of Available Sun Protection Parts and Products2. Identify Levels of Improvements Desired1. Identify Existing Issues / Problems
![Page 20: Frank F. Hejazi Architect](https://reader034.vdocument.in/reader034/viewer/2022050714/56812fdd550346895d95531d/html5/thumbnails/20.jpg)
Existing Location of Existing Storefront
Look for Effects and Causes
Scan and review both new designs and
existing conditions for cause and effect
With a Magnifying lens when necessary!
Ask Questions like: What if the overhead louvers moved forward, but the doors and windows did not?
![Page 21: Frank F. Hejazi Architect](https://reader034.vdocument.in/reader034/viewer/2022050714/56812fdd550346895d95531d/html5/thumbnails/21.jpg)
N
S
W E
Existing
02AIM Architecture PC
1ST Floor Partition locations not shown on existing as builts. Needs to be site verified before additional design study.
1 2 3 4 5 6 7 8 161514131211109
Who Owns Bay No. 9?
![Page 22: Frank F. Hejazi Architect](https://reader034.vdocument.in/reader034/viewer/2022050714/56812fdd550346895d95531d/html5/thumbnails/22.jpg)
01
02
03
04
Mechanical Air Lovers used as Bookend Design.
Mechanical Air Lovers used at top only.
Mechanical Air Lovers used to create Large Glass Bays.
Mechanical Air Lovers used to create Small Glass Bays.
Rt. Wing Design Studies
![Page 23: Frank F. Hejazi Architect](https://reader034.vdocument.in/reader034/viewer/2022050714/56812fdd550346895d95531d/html5/thumbnails/23.jpg)
OFFICE SIGNAGE
Doctor's OfficeSuite C-7
Stephen D. BloodD.O., FACOFP, FAAO, FCA
Mechanical Air Lovers in Levels 2 & 3
Canopy either in Level 2 or 3
Exterior Blinds in Level 2 or 3Existing Storefront in Level 2 or
new Storefront in Level 3
Overlapping Design Features
![Page 24: Frank F. Hejazi Architect](https://reader034.vdocument.in/reader034/viewer/2022050714/56812fdd550346895d95531d/html5/thumbnails/24.jpg)
Optional Levels of Improvements
• Level 1 $20,000 - $40,000– Basic
• Level 2 $100,000 – $200,000– Mid Level
• Level 3 $250,000– Ultimate
![Page 25: Frank F. Hejazi Architect](https://reader034.vdocument.in/reader034/viewer/2022050714/56812fdd550346895d95531d/html5/thumbnails/25.jpg)
• Level 1 $20,000 - $40,000– Crew of 4 to 6– Duration: 1 Month - Both Sides
• Level 2 $100,000 – $200,000– Crew of 4 to 8– Duration: 1 Month - Both Side
• Level 3 $250,000– Crew of 6 to 10– Duration: 1 Month - Per Sides
4 Consider Costs of each Level or Option
![Page 26: Frank F. Hejazi Architect](https://reader034.vdocument.in/reader034/viewer/2022050714/56812fdd550346895d95531d/html5/thumbnails/26.jpg)
• Remove Metal/Fabric Screens, Fasteners• Repair surface damage and holes
• Sand Blast Frames / Clear Coat / Paint• Clean window exterior and interior• Remove/Replace Reflective Film, Add Alt.• Blackout Film for Privacy & Decal Signage• Repairs at Floor and Ceiling• Recycling• Management and supervision
Additional items not yet included
• Level 1 $20,000 - $40,000– Crew of 4 to 6– Duration: 1 Month - Both Sides
$895.35
$2.5 K
$10 K
$1.5 K
$20 K
$1.0 K
$1.0 K
$1.0 K
$2.0 K
_____
$40 K
![Page 27: Frank F. Hejazi Architect](https://reader034.vdocument.in/reader034/viewer/2022050714/56812fdd550346895d95531d/html5/thumbnails/27.jpg)
$895.35
$2.5 K
$10 K
$1.5 K
$20 K
$1.0 K
$1.0 K
$1.0 K
$2.0 K
_____
$40 K
$895.35
$12 K
$50 K
$20 K
$100K
$1.0 K
$3.0 K
$3.0 K
$10 K
____
$100 K
• Level 2 $100,000 – $200,000– Crew of 4 to 8– Duration: 1 Month - Both Side
• Remove Metal/Fabric Screens, Fasteners and Accessories
• Louvers Above Doors Cost• Canopy Cost• Pickup/Delivery/Installation• Exterior motorized Blinds, Add Alt.• Blackout Film for Privacy & Decal Signage• Repairs at Floor and Ceiling• Recycling• Management and supervision
Additional items not yet included
![Page 28: Frank F. Hejazi Architect](https://reader034.vdocument.in/reader034/viewer/2022050714/56812fdd550346895d95531d/html5/thumbnails/28.jpg)
$895.35
$2.5 K
$10 K
$1.5 K
$20 K
$1.0 K
$1.0 K
$1.0 K
$2.0 K
_____
$40 K
$895.35
$12 K
$50 K
$20 K
$100K
$1.0 K
$3.0 K
$3.0 K
$10 K
____
$100 K
$895.35
$12 K
$50 K
$20 K
$140K
$1.0 K
$5.0 K
$5.0 K
$20 K
_____
$250 K
• Level 3 $250,000– Crew of 6 to 10– Duration: 1 Month - Per Sides
• Remove Metal/Fabric Screens, Fasteners and Accessories
• Louvers Above Doors Cost• Canopy Cost• Pickup/Delivery/Installation• Storefront Systems w/ Insul. Glazing• Blackout Film for Privacy & Decal Signage• Repairs at Floor and Ceiling• Recycling• Management and supervision
Additional items not yet included
![Page 29: Frank F. Hejazi Architect](https://reader034.vdocument.in/reader034/viewer/2022050714/56812fdd550346895d95531d/html5/thumbnails/29.jpg)
3 Look at a Series of AvailableSun Protection Parts and Products
2 Identify Levels of Improvements Desired
4 Consider Costs of each Level / Option
1 Identify Existing Issues / Problems
What’s Next? Action Items.Define Project CharterDefine Scope of Work Statement
Form Workgroups and Talk to Your Architect.
![Page 30: Frank F. Hejazi Architect](https://reader034.vdocument.in/reader034/viewer/2022050714/56812fdd550346895d95531d/html5/thumbnails/30.jpg)
To make Progress,
Set your Next Meeting Date,
Today!
![Page 31: Frank F. Hejazi Architect](https://reader034.vdocument.in/reader034/viewer/2022050714/56812fdd550346895d95531d/html5/thumbnails/31.jpg)
Reference Material: Solar Film Spec
Canopy Spec
Storefront Specs
The End
![Page 32: Frank F. Hejazi Architect](https://reader034.vdocument.in/reader034/viewer/2022050714/56812fdd550346895d95531d/html5/thumbnails/32.jpg)
Thank you for your time and interest …
Sincerely,
Frank F. Hejazi, Architect