from camelot to avalon - the knights of iso 15926 make progress r e a l i z i n g o p e n i n f o r...
TRANSCRIPT
From Camelot to Avalon - the knights of ISO 15926 make progress
R e a l i z i n g O p e n I n f o r m a t i o n I n t e r o p e r a b i l i t y
ids-adi.org
R e a l i z i n g O p e n I n f o r m a t i o n I n t e r o p e r a b i l i t y
Camelot Objectives
• To build and deploy an ISO 15926, open source infrastructure on the internet and to show the following capabilities:
• The use of ISO 15926 in modeling business information• The setup, configuration, and use of publicly available tools to
map legacy systems to ISO 15926• The demonstration of several data exchange scenarios
between several companies using ISO 15926 over the internet
… and make all of the deliverables available in the public domain, ready for business use by May 29th 2009
R e a l i z i n g O p e n I n f o r m a t i o n I n t e r o p e r a b i l i t y
Camelot and the iRING
• Camelot is an industry collaboration project ( POSC Caesar/FIATECH, IDS-ADI)
• Companies participating in Camelot:
• Bechtel• Bentley• Chevron• Consolidated
Contractors Company (CCC)
• DNV• Dow• DuPont
• Emerson Process Management
• Fluor• Hatch• Intergraph• NRX Global• Tata Consultancy
Services (TCS)• Zachry
R e a l i z i n g O p e n I n f o r m a t i o n I n t e r o p e r a b i l i t y
The iRING
ISO 15926 Realtime Interoperability Network Grid
EPC
Owner Operator
RDS/WIPEPC
Supplier
ISO 15926
ISO 15926
Supplier
Supplier
Job Site
R e a l i z i n g O p e n I n f o r m a t i o n I n t e r o p e r a b i l i t y
ISO 15926
Firewall
Firew
all
EPC
Engineering
Construction
Procurement
Project ControlsInformation infrastructure
for both internal andexternal interoperability
The iRING in your Company
R e a l i z i n g O p e n I n f o r m a t i o n I n t e r o p e r a b i l i t y
iRING v1.0.0 Deliverable
ApplicationiRING
Adapter Service
iRINGInterface Service
“Façade”
iRINGMapping
RD Service
RDS/WIP
RDS/WIPEditor
iRINGWeb ServiceProtocolSpecification
Part 7 QXFRepresentation
Proprietary Format
ISO 15926
Note: Components shown in green are included in the May 29 th, 2009 delivery
iRINGMapping
Editor
ISO 15926 Information
Model
RDS/WIP
Hatch
Bechtel
Intergraph
Emerson
Dow
DuPontCCC
PlantSpaceP&ID
OpenPlantPowerPID
C3D
Excel
SmartPlantFoundation
SmartPlantP&ID
OpenPlantPowerPID
P&IDValve, Line, In-line Instrument,
and Vessel
iRINGWeb
Service
iRINGWeb
Service
Demonstration Landscape
Internet
Brisbane
Frederick
Athens
Pune
Huntsville
Houston
Wilmington
Oslo
TCS
RDS/WIP Editor
NRXBentley
RDS/WIP System
OpenPlantClass Editor
R e a l i z i n g O p e n I n f o r m a t i o n I n t e r o p e r a b i l i t y
R e a l i z i n g O p e n I n f o r m a t i o n I n t e r o p e r a b i l i t y
Avalon Project• Purpose
• To establish industry services that supports the open publication and collaborative generation of reference data
• To establish a collaboration place for companies that are using and extending reference data
• Objectives• Define and deliver a scalable ISO 15926 WIP• Provide the industry with a wiki on the usages of ISO
15926 (content collaboration)• Establish source code management and repository
for iRING technology
Timeframe: June 10th, 2009 to November 20th, 2009
WIPGlobal
Sandbox
Community A
SandboxCommunity
BSandbox
Community C
Sandbox
Immutab
leRe
ad-W
rite
RDS/WIPEditor
http://[TBD].org
http://[TBD].org
Reference Data Service – Logical Map
RDSWork Area
RDSPCA RDL
RDSISO / TS 15926
RDSRDLFacade.org
Endpoint
RDSPCA RDLEndpoint
RDSEditor
http://rdlfacade.org
http://[TBD].org
http://[TBD].org
Batch LoadingI/F
Industry
Batch ReportsAccess MDB
PCA RDS
RDSInbox
Avalon
R e a l i z i n g O p e n I n f o r m a t i o n I n t e r o p e r a b i l i t y
iRINGAdapter
R e a l i z i n g O p e n I n f o r m a t i o n I n t e r o p e r a b i l i t y
The Takeaways…
• iRING version 1.0.0 available now!!!
http://iring.ids-adi.org
• Avalon project starts June 10th, 2009
Get the iRING!
Questions?
R e a l i z i n g O p e n I n f o r m a t i o n I n t e r o p e r a b i l i t y