1 From: Harris, Carol Sent: 06 August 2019 16:50 To: [email protected]; A2BE Representations; Murphy, Robert J Subject: Re: Automatic reply: Pre-Enquiry Meeting Follow Up Flag: Follow up Flag Status: Flagged Hi Denise, The address is 141 Springhead Parkway - the building is called Eastgate. I am not aware of anything you need to bring. However, it would be good if we could discuss the modification with you. Hopefully you have seen this? If not then it would be good to talk you through the plans. Regards, Carol Harris CEng MICE Chief Engineer, Transportation ATKINS Mobile 07776 487729 Sent from my iPhone On 6 Aug 2019, at 15:32, "[email protected]" <[email protected]> wrote: Thank you for your email, I am on annual leave until Tuesday 20th August. If your enqiury is urgent please contact another member of the highways team on 03000418181

Upload: others

Post on 10-Jul-2020

3 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: From: Harris, Carol Sent: To: Denise.Sutton@kent.gov.uk ...programmeofficers.co.uk/A2bean/CoreDocuments/Q.11.pdf · Eastgate, 41 Springhead Parkway, DA11 8AD. This is a large building

1

From: Harris, Carol

Sent: 06 August 2019 16:50

To: [email protected]; A2BE Representations; Murphy, Robert J

Subject: Re: Automatic reply: Pre-Enquiry Meeting

Follow Up Flag: Follow up

Flag Status: Flagged

Hi Denise, The address is 141 Springhead Parkway - the building is called Eastgate. I am not aware of anything you need to bring. However, it would be good if we could discuss the modification with you. Hopefully you have seen this? If not then it would be good to talk you through the plans. Regards, Carol Harris CEng MICE Chief Engineer, Transportation ATKINS Mobile 07776 487729 Sent from my iPhone On 6 Aug 2019, at 15:32, "[email protected]" <[email protected]> wrote:

Thank you for your email, I am on annual leave until Tuesday 20th August. If your enqiury is urgent please contact

another member of the highways team on 03000418181

Page 2: From: Harris, Carol Sent: To: Denise.Sutton@kent.gov.uk ...programmeofficers.co.uk/A2bean/CoreDocuments/Q.11.pdf · Eastgate, 41 Springhead Parkway, DA11 8AD. This is a large building
Page 3: From: Harris, Carol Sent: To: Denise.Sutton@kent.gov.uk ...programmeofficers.co.uk/A2bean/CoreDocuments/Q.11.pdf · Eastgate, 41 Springhead Parkway, DA11 8AD. This is a large building

1

From: Harris, Carol

Sent: 01 August 2019 17:04

To: [email protected]

Cc: A2BE Representations; Neelam Sheemar; Murphy, Robert J;

[email protected]

Subject: RE: Pre enquiry meeting

Follow Up Flag: Follow up

Flag Status: Flagged

Hello Carol, KCC should have received a notification from the DfT about the meeting. It is going to be held in Ebbsfleet at Eastgate, 41 Springhead Parkway, DA11 8AD. This is a large building at the end of the road, the sat nav takes you somewhere else. Its at the junction with Thackeray Drive and scheduled to run form 10-12. However timing is not certain as it is the Inspectors meeting. Look forward to seeing you there. Regards,

Carol Harris MEng CEng MICE Chief Engineer, Transportation UK & Europe Engineering, Design and Project Management

01245 245168

07776 487729

To help protect you r priv acy, Microsoft Office prevented automatic download of this picture from the Internet.

4th Floor, Amlin House, 90-96 Victoria Road, Chelmsford, CM1 1QU

To help protect your privacy, Microsoft Office prevented automatic download of this picture from the Internet.Main Banner Image

To help protect your privacy, Microsoft Office prevented automatic download of this picture from the Internet.h ttp s: / /media.emailhype.co.uk /00000142-7ca5a830c034a5bc967bbd1da0b95cc8/images/snc_atkins_logo.png

Company

From: [email protected] <[email protected]> Sent: 01 August 2019 16:51 To: Harris, Carol <[email protected]> Subject: Pre enquiry meeting Carol Can you please confirm the details for the above meeting next week

Page 4: From: Harris, Carol Sent: To: Denise.Sutton@kent.gov.uk ...programmeofficers.co.uk/A2bean/CoreDocuments/Q.11.pdf · Eastgate, 41 Springhead Parkway, DA11 8AD. This is a large building

2

thanks

Carol Valentine | Highways Project Manager Live Labs| Highways Transportation and Waste | Kent County Council | Aylesford Highway Depot, Aylesford, ME20 7BU | Internal: 7000 413843 | External: 03000 418181 | www.kent.gov.uk |

@kenthighways

Page 5: From: Harris, Carol Sent: To: Denise.Sutton@kent.gov.uk ...programmeofficers.co.uk/A2bean/CoreDocuments/Q.11.pdf · Eastgate, 41 Springhead Parkway, DA11 8AD. This is a large building

1

From: Harris, Carol

Sent: 31 July 2019 18:02

To: [email protected]

Cc: Murphy, Robert J; [email protected]; A2BE

Representations; [email protected]

Subject: A2BE Design Modification - Bean North Roundabout

Follow Up Flag: Follow up

Flag Status: Flagged

Hello Angela, Thanks for talking to me earlier today, I appreciate you are very busy before going on leave. To summarise what was discussed. Through value engineering work Balfour Beatty has identified a design modification at Bean north roundabout. As this is a promoters alternative we need to publish this before the PIM and we intend to do so Friday 02 Aug or Mon 05 Aug. We wanted to advise you of this and talk through in a little more detail, but appreciate we are working to tight timelines and it is the holiday season. You asked whether KCC had to respond and what the timescales might be. I was not sure. I have now been advised that KCC is not obliged to respond on these modifications and there is no statutory timescale for submission of comments on detailed modifications. Balfour Beatty will be appointed soon and will work through the detailed design and so there may be other modifications that develop through that process. Equally between now and the PI in October there may also be alternatives suggested by Objectors and these will also need due consideration before the PI. This is the plan showing the difference between the current proposals and the modifications – current are in blue, modifications are in red.

Page 6: From: Harris, Carol Sent: To: Denise.Sutton@kent.gov.uk ...programmeofficers.co.uk/A2bean/CoreDocuments/Q.11.pdf · Eastgate, 41 Springhead Parkway, DA11 8AD. This is a large building

2

The detail of the modification is essentially that the off slip from the A2 eastbound will remain largely in its current location. This avoids the need for earthworks and will help reduce costs and will have an impact on programme. There are some other alterations to the geometry of the roundabout but the number of circulatory lanes remains as it was in the design presented for the orders. You asked about signalisation – the modification includes signalisation as the same as it was proposed for the orders. The revised layout has been assessed by the traffic team and this includes assumptions about signal timings. They confirmed it worked from a traffic perspective. We have also considered the impacts on the environment, the original scheme impacted some existing planting and this is reduced with the modified scheme. We are preparing a note to explain the changes and the consideration of the various impacts – at present this is in review so we are not yet able to release it. We also touched today on the impact to the orders. The short section of existing slip was noted on the Main Line Order and so this needs to be considered. There is a section in the note that considers the impact on the drawings that accompanied the orders and as I mentioned to you we are working to update these so that they can be published together with the note. You advised that there were others within your team that would need to review this information and so I would be grateful if you would pass on this email. Given we have the PIM next week on the 7 August and potentially KCC might be in attendance, perhaps we can discuss after the PIM (this is only expected to last a couple of hours).

Page 7: From: Harris, Carol Sent: To: Denise.Sutton@kent.gov.uk ...programmeofficers.co.uk/A2bean/CoreDocuments/Q.11.pdf · Eastgate, 41 Springhead Parkway, DA11 8AD. This is a large building

3

We look forward to hearing from you. Regards,

Carol Harris MEng CEng MICE Chief Engineer, Transportation UK & Europe Engineering, Design and Project Management

01245 245168

07776 487729

To help protect you r priv acy, Microsoft Office prevented automatic download of this picture from the Internet.

4th Floor, Amlin House, 90-96 Victoria Road, Chelmsford, CM1 1QU

To help protect your privacy, Microsoft Office prevented automatic download of this picture from the Internet.Main Banner Image

To help protect your privacy, Microsoft Office prevented automatic download of this picture from the Internet.h ttp s: / /media.emailhype.co.uk /00000142-7ca5a830c034a5bc967bbd1da0b95cc8/images/snc_atkins_logo.png

Company

Page 8: From: Harris, Carol Sent: To: Denise.Sutton@kent.gov.uk ...programmeofficers.co.uk/A2bean/CoreDocuments/Q.11.pdf · Eastgate, 41 Springhead Parkway, DA11 8AD. This is a large building
Page 9: From: Harris, Carol Sent: To: Denise.Sutton@kent.gov.uk ...programmeofficers.co.uk/A2bean/CoreDocuments/Q.11.pdf · Eastgate, 41 Springhead Parkway, DA11 8AD. This is a large building

1

From: Binkuweir, Stephen <[email protected]>

Sent: 23 May 2019 15:53

To: '[email protected]'

Cc: [email protected]; Garrard, Philip; Harris, Carol; Murphy, Robert J;

A2BE Representations; Montes Lopez, Adela

Subject: RE: Meeting Dartford Borough Council

GEN-048-002-Kent County Council-Christine Bates-Request for Meeting Hello Christine Thanks for the heads up. I am actually on holiday now and next week, did not think things would be moving this quick. Carol Harris will be back next week so she can coordinate as to the best time to hold meetings. Any update on signing a contact on the new place. Best regards Stephen

From: [email protected] [mailto:[email protected]] Sent: 23 May 2019 15:08 To: Binkuweir, Stephen Cc: [email protected] Subject: Meeting Dartford Borough Council Hi Stephen, Cllr David Hammock DBC has been trying to reach you to discuss dates for a meeting next week as requested by you. I have no contact details for you so can you please make contact with David direct Kind Regards Christine Bates

This email may contain information which is confidential and is intended only for use of the recipient/s named above. If you are not an intended recipient, you are hereby notified that any copying, distribution, disclosure, reliance upon or other use of the contents of this email is strictly prohibited. If you have received this email in error, please notify the sender and destroy it. Highways England Company Limited | General enquiries: 0300 123 5000 |National Traffic Operations Centre, 3 Ridgeway, Quinton Business Park, Birmingham B32 1AF | https://www.gov.uk/government/organisations/highways-england | [email protected] Registered in England and Wales no 9346363 | Registered Office: Bridge House, 1 Walnut Tree Close, Guildford, Surrey GU1 4LZ

Consider the environment. Please don't print this e-mail unless you really need to.

Page 10: From: Harris, Carol Sent: To: Denise.Sutton@kent.gov.uk ...programmeofficers.co.uk/A2bean/CoreDocuments/Q.11.pdf · Eastgate, 41 Springhead Parkway, DA11 8AD. This is a large building
Page 11: From: Harris, Carol Sent: To: Denise.Sutton@kent.gov.uk ...programmeofficers.co.uk/A2bean/CoreDocuments/Q.11.pdf · Eastgate, 41 Springhead Parkway, DA11 8AD. This is a large building

Registered office Bridge House, 1 Walnut Tree Close, Guildford GU1 4LZ Highways England Company Limited registered in England and Wales number 09346363

Our ref: REP - 048 - Kent County Council - Carol Valentine - Representation on traffic modelling Your ref: Carol Valentine Highway Manager West Kent Kent County Council Aylesford Highway Depot Aylesford ME20 7BU

Highways England Company Limited Bridge House, 1 Walnut Tree Close, Guildford GU1 4LZ Telephone: 0300 123 5000 Date: 12/04/2019

Dear Carol Valentine, PROJECT: A2 BEAN AND EBBSFLEET JUNCTION IMPROVEMENTS

REP - 048 - Kent County Council - Carol Valentine - Representation on traffic modelling Thank you for your representation on the A2 Bean and Ebbsfleet Junction Improvements Orders published on 14 February 2019. As discussed with Angela Coull (of KCC) at the last collaborative planning meeting with the Local Planning Authorities (LPAs) for this scheme held at Eastgate on 13 March 2019, we intend to prepare a Statement of Common Ground (SoCG) with Kent County Council (as well as separate SoCGs with Ebbsfleet Development Corporation, Gravesham Borough Council and Dartford Borough Council). We will also provide responses to your representation, including the comments received from Lis Dyson (Heritage Conservation Manager) on 13 March 2019 and Helen Forster (Biodiversity Officer) on 8 March 2019, both directed via Dartford Borough Council. We are currently working though these comments and have agreed an approach to addressing heritage relates queries with Lis Dyson, English Heritage and Dartford Borough Council in the meeting held on 9 April 2019. This approach includes a separate SoCG for heritage related matters; we trust this is acceptable to you. We will send you a draft of the KCC SoCG in advance of the collaborative planning meeting arranged for Wednesday 8 May 2019. Highways England would like to reiterate our commitment to liaise and engage with the impacted local authorities throughout the development and construction of the scheme.

If you have any further queries regarding the above, then please feel free to contact us again. You can find further information about the A2 Bean and Ebbsfleet Junction Improvements on Highways England’s website at the following link: https://highwaysengland.co.uk/projects/a2-bean-and-ebbsfleet-junction-improvements/ Yours sincerely,

Stephen Binkuweir, Project Manager RIP SE [email protected]

Page 12: From: Harris, Carol Sent: To: Denise.Sutton@kent.gov.uk ...programmeofficers.co.uk/A2bean/CoreDocuments/Q.11.pdf · Eastgate, 41 Springhead Parkway, DA11 8AD. This is a large building
Page 13: From: Harris, Carol Sent: To: Denise.Sutton@kent.gov.uk ...programmeofficers.co.uk/A2bean/CoreDocuments/Q.11.pdf · Eastgate, 41 Springhead Parkway, DA11 8AD. This is a large building

1

From: Harris, Carol

Sent: 08 April 2019 12:08

To: Murphy, Robert J; A2BE Representations

Cc: [email protected]; Shipley, Craig; Brown, Liz J; Ballesteros

Bueno, Enrique; Wallis, Sarah;

[email protected]

Subject: Fwd: Kent County Council response to The Orders and Environmental Statement

REP-048-Kent County Council-Carol Valentine-Representation on traffic modelling Hello, Please can this be logged and a response template set up with Craig to originate response with input from Liz or Sarah. Rob - please would you follow up with DfT. Stephen - this is for your records. Regards, Carol Harris CEng MICE Chief Engineer, Transportation ATKINS Mobile 07776 487729 Sent from my iPhone Begin forwarded message:

From: <[email protected]> Date: 8 April 2019 at 11:57:23 BST To: <[email protected]> Cc: <[email protected]> Subject: FW: Kent County Council response to The Orders and Environmental Statement

Carol Please see below regards

Carol Valentine | Highway Manager West Kent | Highways Transportation and Waste | Kent County Council | Aylesford Highway Depot, Aylesford, ME20 7BU | Internal: 7000 413843 | External: 03000 418181 | www.kent.gov.uk |

@kenthighways

From: Valentine, Carol - GT HTW Sent: 27 March 2019 12:27 To: '[email protected]' <[email protected]> Subject: Kent County Council response to The Orders and Environmental Statement

Page 14: From: Harris, Carol Sent: To: Denise.Sutton@kent.gov.uk ...programmeofficers.co.uk/A2bean/CoreDocuments/Q.11.pdf · Eastgate, 41 Springhead Parkway, DA11 8AD. This is a large building

2

Hello Please see KCCs comments below:

The Stage 3 A2BE model has used a combination of 2014, 2015, 2016 and 2017 data, normalised to March 2016. Given its age, this data is now on the cusp of acceptability. The forecasting report shows that at three of the junctions where traffic counts were undertaken, the vehicle flows were higher during the interpeak than in the AM, yet no interpeak period has been modelled. It is noted, however, that the PM peak hour flows are higher than the inter-peak period, and the PM peak hour has been modelled for capacity.

The assessment has not considered a future scenario (post 2027) without the Lower Thames Crossing. The Lower Thames Crossing model has not included a number of planned development sites (including the objectively assessed needs) and therefore, these have also not been included within the A2BE model. This is a concern. However, it is recognised that local developments have been assessed, the impact of the additional planned sites is likely to be focussed on the A2 mainline flow and overall, the local area is constrained and the models show that the proposed mitigation to the junctions will provide much needed capacity during the future scenario.

An Outline Environmental Plan has been provided which makes reference to a number of construction related issues. However, A Construction Management Plan is required to minimise disruption to the local highway network. This should include more detailed information about the construction period including (but not limited to) the number of construction related vehicle trips, construction vehicle routeing, employee trips and parking arrangements, employee Travel Plan and the management of deliveries.

The results of the Bluewater Sensitivity Assessment were provided to KCC on 08/03/2019 and showed that the junctions are predicted to operate within capacity during the 2038 design year, which is positive. However, the peak hour assessed within the model was 1600-1700 which is surprising for this type of use. The traffic counts sent to Highways England on 11/12/2018 appear to suggest the peak hour occurs between 12:00-13:00. KCC therefore requests confirmation of the peak hour.

Carol Valentine | Highway Manager West Kent | Highways Transportation and Waste | Kent County Council | Aylesford Highway Depot, Aylesford, ME20 7BU | Internal: 7000 413843 | External: 03000 418181 | www.kent.gov.uk |

@kenthighways

Page 15: From: Harris, Carol Sent: To: Denise.Sutton@kent.gov.uk ...programmeofficers.co.uk/A2bean/CoreDocuments/Q.11.pdf · Eastgate, 41 Springhead Parkway, DA11 8AD. This is a large building

1

From: Harris, Carol

Sent: 08 April 2019 12:09

To: [email protected]

Cc: [email protected]; A2BE Representations

Subject: Re: Kent County Council response to The Orders and Environmental Statement

Thanks Carol, We will start working on our response and will follow up with DfT.

Regards, Carol Harris CEng MICE Chief Engineer, Transportation ATKINS Mobile 07776 487729 Sent from my iPhone On 8 Apr 2019, at 12:00, "[email protected]" <[email protected]> wrote:

Carol Please see below regards

Carol Valentine | Highway Manager West Kent | Highways Transportation and Waste | Kent County Council | Aylesford Highway Depot, Aylesford, ME20 7BU | Internal: 7000 413843 | External: 03000 418181 | www.kent.gov.uk |

@kenthighways

From: Valentine, Carol - GT HTW Sent: 27 March 2019 12:27 To: '[email protected]' <[email protected]> Subject: Kent County Council response to The Orders and Environmental Statement Hello Please see KCCs comments below:

The Stage 3 A2BE model has used a combination of 2014, 2015, 2016 and 2017 data, normalised to March 2016. Given its age, this data is now on the cusp of acceptability. The forecasting report shows that at three of the junctions where traffic counts were undertaken, the vehicle flows were higher during the interpeak than in the AM, yet no interpeak period has been modelled. It is noted, however, that the PM peak hour flows are higher than the inter-peak period, and the PM peak hour has been modelled for capacity.

The assessment has not considered a future scenario (post 2027) without the Lower Thames Crossing. The Lower Thames Crossing model has not included a number of planned development sites (including the objectively assessed needs) and therefore, these have also

Page 16: From: Harris, Carol Sent: To: Denise.Sutton@kent.gov.uk ...programmeofficers.co.uk/A2bean/CoreDocuments/Q.11.pdf · Eastgate, 41 Springhead Parkway, DA11 8AD. This is a large building

2

not been included within the A2BE model. This is a concern. However, it is recognised that local developments have been assessed, the impact of the additional planned sites is likely to be focussed on the A2 mainline flow and overall, the local area is constrained and the models show that the proposed mitigation to the junctions will provide much needed capacity during the future scenario.

An Outline Environmental Plan has been provided which makes reference to a number of construction related issues. However, A Construction Management Plan is required to minimise disruption to the local highway network. This should include more detailed information about the construction period including (but not limited to) the number of construction related vehicle trips, construction vehicle routeing, employee trips and parking arrangements, employee Travel Plan and the management of deliveries.

The results of the Bluewater Sensitivity Assessment were provided to KCC on 08/03/2019 and showed that the junctions are predicted to operate within capacity during the 2038 design year, which is positive. However, the peak hour assessed within the model was 1600-1700 which is surprising for this type of use. The traffic counts sent to Highways England on 11/12/2018 appear to suggest the peak hour occurs between 12:00-13:00. KCC therefore requests confirmation of the peak hour.

Carol Valentine | Highway Manager West Kent | Highways Transportation and Waste | Kent County Council | Aylesford Highway Depot, Aylesford, ME20 7BU | Internal: 7000 413843 | External: 03000 418181 | www.kent.gov.uk |

@kenthighways

Page 17: From: Harris, Carol Sent: To: Denise.Sutton@kent.gov.uk ...programmeofficers.co.uk/A2bean/CoreDocuments/Q.11.pdf · Eastgate, 41 Springhead Parkway, DA11 8AD. This is a large building

1

From: [email protected]

Sent: 06 April 2019 13:50

To: Harris, Carol; [email protected]; [email protected]

Cc: Murphy, Robert J; [email protected]; A2BE Representations;

[email protected];

[email protected]; Wallis, Sarah

Subject: RE: A2BE Representation from KCC

Hello Carol I believe Carol Valentine submitted our comments on 27/3/19, Carol please could you confirm and attach the response? Many thanks Regards

Angela Coull | Principal Transport and Development Officer – West Kent | Highways, Transportation & Waste | Kent County Council | Ashford Highway Depot, Henwood Industrial Estate, Javelin Way, Ashford, TN24 8AD | 03000 41 81 81 |www.kent.gov.uk/highways

@KentHighways Please consider the environment before printing this email

From: Harris, Carol <[email protected]> Sent: 04 April 2019 16:18 To: Coull, Angela - GT HTW <[email protected]>; Moreton, Andy - GT HTW <[email protected]> Cc: Murphy, Robert J <[email protected]>; Potter, Francesca - GT EPE <[email protected]>; A2BE Representations <[email protected]>; [email protected]; [email protected]; Wallis, Sarah <[email protected]> Subject: A2BE Representation from KCC Importance: High Hello Angela and Andy, Please can you confirm whether KCC has lodged and representation with DfT for the A2BE scheme as at the moment nothing appears to have come through to us. The closing date was 28 March and we were expecting to hear something from KCC. If you have sent something to DfT then would you mind also sending us a copy to work with while we confirm with DfT. If you have not sent anything then please would you confirm if you are planning to respond and when that might be. From our part we are continuing to develop the Statements of Common Ground and will be in touch on that matter shortly. If there is anything further that you need from us then please do let us know. Thanks,

Page 18: From: Harris, Carol Sent: To: Denise.Sutton@kent.gov.uk ...programmeofficers.co.uk/A2bean/CoreDocuments/Q.11.pdf · Eastgate, 41 Springhead Parkway, DA11 8AD. This is a large building

2

Carol Harris CEng MICE

Chief Engineer, Transportation

ATKINS

Elizabeth House, 28 Baddow Road, Chelmsford CM2 0DG

TEL: 01245 245168 | MOB: 07776 487729

To help protect you r priv acy, Microsoft Office prevented automatic download of this picture from the Internet.Main Banner Image

To help protect your privacy, Microsoft Office prevented automatic download of this picture from the Internet.Atkins Logo

COMPANY

This email and any attached files are confidential and copyright protected. If you are not the addressee, any dissemination of this communication is strictly prohibited. Unless otherwise expressly agreed in writing, nothing stated in this communication shall be legally binding. The ultimate parent company of the Atkins Group is SNC-Lavalin Group Inc. Registered in Québec, Canada No. 059041-0. Registered Office 455 boul. René-Lévesque Ouest, Montréal, Québec, Canada, H2Z 1Z3. A list of Atkins Group companies registered in the United Kingdom and locations around the world can be found at http://www.atkinsglobal.com/site-services/group-company-registration-details Consider the environment. Please don't print this e-mail unless you really need to.

Page 19: From: Harris, Carol Sent: To: Denise.Sutton@kent.gov.uk ...programmeofficers.co.uk/A2bean/CoreDocuments/Q.11.pdf · Eastgate, 41 Springhead Parkway, DA11 8AD. This is a large building

1

From: Harris, Carol

Sent: 04 April 2019 16:18

To: [email protected]; [email protected]

Cc: Murphy, Robert J; [email protected]; A2BE Representations;

[email protected];

[email protected]; Wallis, Sarah

Subject: A2BE Representation from KCC

Importance: High

Follow Up Flag: Follow up

Flag Status: Completed

Hello Angela and Andy, Please can you confirm whether KCC has lodged and representation with DfT for the A2BE scheme as at the moment nothing appears to have come through to us. The closing date was 28 March and we were expecting to hear something from KCC. If you have sent something to DfT then would you mind also sending us a copy to work with while we confirm with DfT. If you have not sent anything then please would you confirm if you are planning to respond and when that might be. From our part we are continuing to develop the Statements of Common Ground and will be in touch on that matter shortly. If there is anything further that you need from us then please do let us know. Thanks,

Carol Harris CEng MICE

Chief Engineer, Transportation

ATKINS

Elizabeth House, 28 Baddow Road, Chelmsford CM2 0DG

TEL: 01245 245168 | MOB: 07776 487729

To help protect you r priv acy, Microsoft Office prevented automatic download of this picture from the Internet.Main Banner Image

To help protect your privacy, Microsoft Office prevented automatic download of this picture from the Internet.Atkins Logo

COMPANY

Page 20: From: Harris, Carol Sent: To: Denise.Sutton@kent.gov.uk ...programmeofficers.co.uk/A2bean/CoreDocuments/Q.11.pdf · Eastgate, 41 Springhead Parkway, DA11 8AD. This is a large building
Page 21: From: Harris, Carol Sent: To: Denise.Sutton@kent.gov.uk ...programmeofficers.co.uk/A2bean/CoreDocuments/Q.11.pdf · Eastgate, 41 Springhead Parkway, DA11 8AD. This is a large building

1

From: Harris, Carol

Sent: 28 March 2019 11:57

To: [email protected]

Cc: Binkuweir, Stephen; [email protected]; A2BE Representations; Murphy,

Robert J; Shipley, Craig

Subject: A2BE Saturday Scenario Testing note

Hello Angela, I’ve just tried calling you and have left a message. Stephen and I met with Bean Residents Association yesterday and they have requested a copy of the Saturday Scenario Testing note. Please would you confirm that you are content with the note and that you also agree to us sharing it with Bean Residents Association. The representations period closes today and we would like to issue this as soon as possible. Thanks,

Carol Harris CEng MICE

Chief Engineer, Transportation

ATKINS

Elizabeth House, 28 Baddow Road, Chelmsford CM2 0DG

TEL: 01245 245168 | MOB: 07776 487729

To help protect you r priv acy, Microsoft Office prevented automatic download of this picture from the Internet.Main Banner Image

To help protect your privacy, Microsoft Office prevented automatic download of this picture from the Internet.Atkins Logo

COMPANY

Page 22: From: Harris, Carol Sent: To: Denise.Sutton@kent.gov.uk ...programmeofficers.co.uk/A2bean/CoreDocuments/Q.11.pdf · Eastgate, 41 Springhead Parkway, DA11 8AD. This is a large building
Page 23: From: Harris, Carol Sent: To: Denise.Sutton@kent.gov.uk ...programmeofficers.co.uk/A2bean/CoreDocuments/Q.11.pdf · Eastgate, 41 Springhead Parkway, DA11 8AD. This is a large building

1

From: Harris, Carol

Sent: 25 March 2019 10:52

To: [email protected]; [email protected]

Cc: A2BE Representations; Murphy, Robert J; Wallis, Sarah; Appleyard, Laurie

Subject: A2BE Comments raised by Bean Residents Association - KCC

Hello Francesca and Angela, In the Bean Residents Association objection they make a number of comments related to KCC and in some cases these appear to be quotations. It would be good to make you aware of these comments and in some cases gather some further detail to help inform our response. In particular we would like to confirm the comments made in relation to point 55. Adequacy of consultation 14 Feb 2019 to 28 Mar 2019 - Point 54. On 4-Apr-2018 KCC said, “Without this information, it is not known how the network would perform or whether the proposed designs for both junctions would satisfactorily accommodate the forecast traffic flows”. We are planning to respond as follows, ‘…the traffic modelling was still development at this time. However, once it was available we met with KCC to discuss the findings and to explain how we had carried out the modelling. We have had several meetings with KCC on this matter and we await their formal comments.’ - Point 55. On 21-Nov-2018 KCC said comments on modelling awaited replies. Please would you confirm this statement is correct and would it be possible for you to provide a copy of those comments to us to help us respond.

- Point 57. On 14-Feb-19 KCC said they still awaited sensitivity assessments. We are planning to respond as follows, ‘The Saturday traffic model sensitivity tests have been provided to KCC and we have yet to receive comments.’

Summary - Point 11. Even on 7-Mar-19 KCC were still awaiting information from HE/ Atkins. We are planning to respond as follows, ‘At this time KCC were waiting for the outcome of the Saturday scenario testing and the traffic model reports. The key points from the traffic modelling had already been discussed with KCC at a number of earlier meetings.’ Thanks,

Carol Harris CEng MICE

Chief Engineer, Transportation

ATKINS

Elizabeth House, 28 Baddow Road, Chelmsford CM2 0DG

TEL: 01245 245168 | MOB: 07776 487729

To help protect you r priv acy, Microsoft Office prevented automatic download of this picture from the Internet.Main Banner Image

Page 24: From: Harris, Carol Sent: To: Denise.Sutton@kent.gov.uk ...programmeofficers.co.uk/A2bean/CoreDocuments/Q.11.pdf · Eastgate, 41 Springhead Parkway, DA11 8AD. This is a large building
Page 25: From: Harris, Carol Sent: To: Denise.Sutton@kent.gov.uk ...programmeofficers.co.uk/A2bean/CoreDocuments/Q.11.pdf · Eastgate, 41 Springhead Parkway, DA11 8AD. This is a large building

1

From: Harris, Carol

Sent: 14 March 2019 10:14

To: [email protected]; [email protected]

Cc: Binkuweir, Stephen; Appleyard, Laurie; A2BE Representations; Murphy, Robert J

Subject: A2BE Traffic Reports

Attachments: A2BE Transport Packages Zip file.zip

Hello Angela, As discussed at yesterday’s Local Authority Planners meeting, please find attached the following reports (24KB zip file):

Transport Data Package

Transport Model Package

Transport Forecasting Package Apologies I was not able to sent these out yesterday evening. Any problems please do give me a call. I can send via FTP if the zip file is too large for your system. Regards,

Carol Harris CEng MICE

Chief Engineer, Transportation

ATKINS

Elizabeth House, 28 Baddow Road, Chelmsford CM2 0DG

TEL: 01245 245168 | MOB: 07776 487729

To help protect you r priv acy, Microsoft Office prevented automatic download of this picture from the Internet.Main Banner Image

To help protect your privacy, Microsoft Office prevented automatic download of this picture from the Internet.Atkins Logo

COMPANY