fssd’s ongoing path towards energy neutrality · power production (kw) time september 4, 2015...

7
1 FSSD’s Ongoing Path Towards Energy Neutrality FairfieldSuisun Sewer District BAYWORK North Bay II Workshop on Wheels October 14, 2015 Ben Carver & Jordan Damerel FairfieldSuisun Sewer District Special District established in 1951 The District provides: Wastewater conveyance and treatment Stormwater drainage maintenance services

Upload: others

Post on 04-Jul-2020

2 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: FSSD’s Ongoing Path Towards Energy Neutrality · Power Production (kW) Time September 4, 2015 (12:00AM ‐11:59PM) Electricity Profile PG&E kW Cogen kW Solar kW Wind kW Total Plant

1

FSSD’s Ongoing Path Towards Energy Neutrality

Fairfield‐Suisun Sewer District

BAYWORK North Bay II Workshop on Wheels

October 14, 2015

Ben Carver & Jordan Damerel

Fairfield‐Suisun Sewer District• Special District established in 1951

• The District provides:

–Wastewater conveyance and treatment

– Stormwater drainage maintenance services

Page 2: FSSD’s Ongoing Path Towards Energy Neutrality · Power Production (kW) Time September 4, 2015 (12:00AM ‐11:59PM) Electricity Profile PG&E kW Cogen kW Solar kW Wind kW Total Plant

2

Key District Stats

EMPLOYEES TREATMENT PLANT SITE (350 ACRE BUFFER)

OFF-SITE WASTEWATER PUMP STATIONS

STORMWATER PUMP STATIONS (O&M)

Key District Stats (continued)

DRY WEATHER TREATMENT CAPACITY

WET WEATHER TREATMENT CAPACITY

LENGTH OF DISTRICT-OWNED GRAVITY SEWERS

AND FORCE MAINSSERVICE AREA POPULATION

Page 3: FSSD’s Ongoing Path Towards Energy Neutrality · Power Production (kW) Time September 4, 2015 (12:00AM ‐11:59PM) Electricity Profile PG&E kW Cogen kW Solar kW Wind kW Total Plant

3

Renewable Energy Portfolio

N

Anaerobic Digesters

• 2 anaerobic digesters (1 currently in use)

• 2015 stats:• 69,000 gpd sludge

feed

• 62% volatile solids reduction

• 214,000 scf/d gas production

Page 4: FSSD’s Ongoing Path Towards Energy Neutrality · Power Production (kW) Time September 4, 2015 (12:00AM ‐11:59PM) Electricity Profile PG&E kW Cogen kW Solar kW Wind kW Total Plant

4

Cogeneration

• 2 functional cogenengines

• 900 kW• 500 kW

• Blends digester gas with natural gas to steady engine operation

• 2015 average = 14,000 kWh/d

• Approx. 33% of District’s electricity use over the last year

Wind Turbines

• 4 wind turbines, 50 kW capacity each

• 2015 average: 515 kWh/d total

• Approx. 1% of District’s electricity use over the last year

Page 5: FSSD’s Ongoing Path Towards Energy Neutrality · Power Production (kW) Time September 4, 2015 (12:00AM ‐11:59PM) Electricity Profile PG&E kW Cogen kW Solar kW Wind kW Total Plant

5

Solar Panels

• 1 MW capacity solar array

• Single-axis tracking

• 2015 average: 7,100 kWh/d

• Approx. 21% of District’s electricity use over the last year (a portion of which was exported to PG&E)

A Typical Day of Energy Use

‐1000

‐500

0

500

1000

1500

2000

0:00

1:00

2:00

3:00

4:00

5:00

6:00

7:00

8:00

9:00

10:00

11:00

12:00

13:00

14:00

15:00

16:00

17:00

18:00

19:00

20:00

21:00

22:00

23:00

0:00

Power Production (kW

)

Time

September 4, 2015 (12:00AM ‐ 11:59PM) Electricity Profile

PG&E kW Cogen kW Solar kW Wind kW Total Plant Power

Page 6: FSSD’s Ongoing Path Towards Energy Neutrality · Power Production (kW) Time September 4, 2015 (12:00AM ‐11:59PM) Electricity Profile PG&E kW Cogen kW Solar kW Wind kW Total Plant

6

Annual Power Use

PG&E Import45%

Solar (On‐Site)16%

Solar (Export)5%

Cogen Production33%

Wind Turbine Production

1%

FSSD POWER SOURCES

Partnership with Lystek

• Lystek International• Will process up to 150,000 wet tons (18%±) biosolids into Class A liquid

fertilizer product at the District’s treatment plant• Goal is to import up to ~135,000 wet tons of biosolids from other agencies• Proprietary process uses heat, alkali, and high shear mixing to lyse biological

material

FSSD Biosolids

Lystek Process

Agricultural Fertilizer

(LysteGro)

Sold by Lystek as Fertilizer

Digester Supplement

(LysteMize)

Re‐Fed to FSSD Digester for Increased Gas Production

Additional Energy

Imported Biosolids

Page 7: FSSD’s Ongoing Path Towards Energy Neutrality · Power Production (kW) Time September 4, 2015 (12:00AM ‐11:59PM) Electricity Profile PG&E kW Cogen kW Solar kW Wind kW Total Plant

7

Thank you!

Jordan DamerelEnvironmental Engineer

(707) 428‐[email protected]

Ben CarverO&M Tech 5

(707) 428‐[email protected]