  • FUEL GAS HANDLING SYSTEMAND BOG RELIQUEFACTION

    FOR LNG CARRIEREIRIK MELAAEN

    WÄRTSILÄ OIL & GAS SYSTEMS AS

    1 © Wärtsilä 12 November 2013 Fuel Gas Handling System and BOG Reliquefaction for LNG Carrier_Eirik Melaaen

  • Wärtsilä Oil & Gas Systems

    Agenda:• BOG Reliquefaction plant• Low Pressure Gas to Engine(e.g. DFDE, 2-Stroke DFE) and BOG

    Reliquefaction System• High Pressure Gas to Engine(Gas Diesel Engine) and BOG

    Reliquefaction System• Future concepts

    12 November 2013 Fuel Gas Handling System and BOG Reliquefaction for LNG Carrier_Eirik Melaaen2 © Wärtsilä

  • Our Expertise in the Gas Value Chain

    Exploration &development

    ProductionFPSOFlare recoveryOil separation

    LNG carrier

    LNG liquefaction& terminal

    Distribution & transportPower generation

    Oil tankerwith VOC

    Exploration & Drilling

    Production & liquefaction

    Transport & storage

    Receiving terminals &

    regasification

    Distribution & transport to the

    users

    • LNG fuel gas systems for OSVs

    • Gensets

    • LNG fuel gas systems• LPG, LEG & LNG cargo

    handling

    • On- & Offshore small scale liquefaction

    • Antiflaring/VOC• Oil separation• Gas FPSO

    • Jetty & Floating regasification

    • Bunkering & barges• Receiving terminals

    • Gas/LNG distribution/logistics

    • Feed gas to Power plants

    LNG bunkering& barges

    LNG fuelledvessels

    Regasification(FSRU/JRU)

    Small scale liquefaction plants

    LNG/LBG

    LNG receiving terminal

    Re-liquefaction of Boil Off Gas,

    12 November 2013 Fuel Gas Handling System and BOG Reliquefaction for LNG Carrier_Eirik Melaaen3 © Wärtsilä

  • • First free-standing small scale LNG plant in Northern Europe delivered March 2003.

    • Hamworthy EPCIC contract with GASNOR.

    • Technology feasibility and robustness thoroughly and successfully demonstrated.

    35 LNG BOGReliquefaction systems

    Kollsnes II LNG

    • 2 x capacity of existing Linde plant (Kollsnes I).

    • Hamworthy EPCIC contract with GASNOR.

    • Full production August 2007.

    Al Gattara (Hyundai) BOG ReliquefactionSystem (58,000 tpy )

    Kollsnes II (Gasnor) LNG Plant(84,000 tpy )

    Snurrevarden LNG Plant(22,000 tpy )

    LNG Technology Development

    Wärtsilä (Hamworthy) LNG process history

    12 November 2013 Fuel Gas Handling System and BOG Reliquefaction for LNG Carrier_Eirik Melaaen4 © Wärtsilä

  • BOG RELIQUEFACTION PLANTBOG RELIQUEFACTION PLANT

  • BOG to Engines or Returned to Tank

    Different solutions available for LNG carrier propulsion:1. Use BOG & LNG as fuel e.g steam turbines, dual-fuel diesel electric, dual-fuel engines

    12 November 2013 Fuel Gas Handling System and BOG Reliquefaction for LNG Carrier_Eirik Melaaen6 © Wärtsilä

    Pattern for ship’s using BOG & LNG as fuel for propulsion

    Laden BallastBallast

    Maximum(Laden voyage)

    Minimum(Ballastvoyage)

    LNG level in tanks

    Minimum heel required for cool down of tanks

    Fuel used during roundtrip(Natural BOG & forced)

    Additional LNG delivered with full BOG Reliquefaction System

    2. BOG reliquefaction, liquefy and sell excessive BOG or all LNG loaded onboard

  • Boil-off gas from cargo tanks vs. Fuelgas required by the engine

    12 November 2013 Fuel Gas Handling System and BOG Reliquefaction for LNG Carrier_Eirik Melaaen7 © Wärtsilä

    Speed of the Vessel (knots)

    Boi

    l-off

    Gas

    (kg/

    hr)

    Available BOG

    BO

    G c

    onsu

    med

    in

    the

    engi

    neE

    xces

    sB

    OG

    ForcedLNG

    Balance between Vessel speed and BOG flow

    Avai

    labl

    e B

    OG

  • Boil-

    off g

    as

    BOG Reliquefaction System (LNGRS – Mark III)No feeding of gas to engines (QFLEX vessels)

    12 November 2013 Fuel Gas Handling System and BOG Reliquefaction for LNG Carrier_Eirik Melaaen8 © Wärtsilä

  • Mark III layout/QG

    12 November 2013 Fuel Gas Handling System and BOG Reliquefaction for LNG Carrier_Eirik Melaaen9 © Wärtsilä

    Cold box

    Typical dimensions: 30 x 22,5 x 7 m (L x W x H)Equipment weights: 240 ton

    LNG pump skid N2

    reserviorN2 supply skid

    BOG compressorsPre-heater

    N2 companders

    N2 companders

  • ENGINES REQUIRING LOW ENGINES REQUIRING LOW PRESSURE GAS PRESSURE GAS (DFDE, 2(DFDE, 2--STROKE DFE)STROKE DFE)

    AND BOG RELIQUEFACTION AND BOG RELIQUEFACTION PLANTPLANT

  • Boil-

    off g

    as

    12 November 2013 Fuel Gas Handling System and BOG Reliquefaction for LNG Carrier_Eirik Melaaen11 © Wärtsilä

    LP-compressor

    BOG Reliquefaction System (LNGRS)Low-Pressure Fuel Gas Supply System (LP FSSS)

  • Wärtsilä Oil & Gas Systems AS

    12 November 2013 Fuel Gas Handling System and BOG Reliquefaction for LNG Carrier_Eirik Melaaen12 © Wärtsilä

    Dual-fuel propulsion system

  • ENGINES REQUIRING HIGH ENGINES REQUIRING HIGH PRESSURE GAS PRESSURE GAS ((GasGas Diesel Diesel EngineEngine))AND BOG RELIQUEFACTION AND BOG RELIQUEFACTION

    SYSTEMSYSTEM

  • BOG Reliquefaction System (LNGRS)High-Pressure Fuel Gas Supply System (HP FGSS)

    12 November 2013 Fuel Gas Handling System and BOG Reliquefaction for LNG Carrier_Eirik Melaaen14 © Wärtsilä

    HP-pump and Optimizer

  • PFD – Vaporization System

    12 November 2013 Fuel Gas Handling System and BOG Reliquefaction for LNG Carrier_Eirik Melaaen15 © Wärtsilä

    TO GAS ENGINE

    HP PUMP

    BRINE PUMP

    LNG VAPORIZER

    STEAM/HOT WATERHEATER

    HIGH PRESSURE GASOR LNG FROM CARGO TANKSCONDENSATE FROM BOG RS

    Temprature: 45 ±10°CPressure: Max 300 bar

    Temprature: -160°CPressure: 3-5 bar

  • HP LNGpump (2)

    Brine heater (1)

    Brine circulationpump (2)

    Pulsedamper (1)

    Suctiondrum (1)

    LNG vaporizer (1)

    Updated Arrangement - Gas Supply System

    Typical dimensions: 7 x 3 x 2 m (L x W x H)Equipment weights: Ca 25 ton

    HP LNGpump (2)

    12 November 2013 Fuel Gas Handling System and BOG Reliquefaction for LNG Carrier_Eirik Melaaen16 © Wärtsilä

  • BOG Reliquefaction System (LNGRS)High-Pressure Fuel Gas Supply System (HP FGSS)

    12 November 2013 Fuel Gas Handling System and BOG Reliquefaction for LNG Carrier_Eirik Melaaen17 © Wärtsilä

    HP-compressor and HP-pumpLNGRS for excessive BOG?

  • Wärtsilä Oil & Gas Systems AS

    12 November 2013 Fuel Gas Handling System and BOG Reliquefaction for LNG Carrier_Eirik Melaaen18 © Wärtsilä

    Layout – Burckhardt compressors + BOG Reliq plant

    Typical dimensions:30 x 22,5 x 7 m (L x W x H)

  • FUTURE CONCEPTSFUTURE CONCEPTSNEW MRNEW MR

    TWO REFERENCES:TWO REFERENCES:NEW MR DEMONSTRATION PLANT NEW MR DEMONSTRATION PLANT –– 2,5 TON/DAY2,5 TON/DAY

    NEWMR EGE PLANT NEWMR EGE PLANT –– 11 TON/DAY11 TON/DAY

  • Demonstration plant – 2,5 ton/hr

    12 November 201320 © Wärtsilä Fuel Gas Handling System and BOG Reliquefaction for LNG Carrier_Eirik Melaaen

  • New MR Process Overview

    12 November 2013 Fuel Gas Handling System and BOG Reliquefaction for LNG Carrier_Eirik Melaaen21 © Wärtsilä

  • Pictures EGE - Project

    12 November 201322 © Wärtsilä Fuel Gas Handling System and BOG Reliquefaction for LNG Carrier_Eirik Melaaen

  • Flow Sheet of Liquefaction Plant

    12 November 201323 © Wärtsilä

    H2O & CO2removal

    LNG tank

    Gas pre-

    cooling

    Cold Box

    MR refrigeration

    unit

    Pre Cooling system

    Main biomethane flow

    Mixed refrigerant (MR) flow

    CO2 from stripper column

    Glycol cooling from pre-cooling unit

    Return gas truck loading

    Export LNG pump

    Gas return from trucks

    Raw gas inlet

    To flare gas systemExpansion

    Flare gas

    H2O &

    CO2

    Pretreatment Liquefaction process

    Storage system

    LBG Truck Filling station

    Fuel Gas Handling System and BOG Reliquefaction for LNG Carrier_Eirik Melaaen

  • BOG Reliquefaction System (LNGRS)

    NewMR LP-Pressure Fuel Gas Supply System (LP FGSS)Compressor and Forcing VaporizerLNGRS for excessive BOG

    12 November 2013 Fuel Gas Handling System and BOG Reliquefaction for LNG Carrier_Eirik Melaaen24 © Wärtsilä

  • Summary – Wärtsilä NewMR technology

    BOG reliquefaction system on LNG vessels in the future

    NewMR Why?• Demonstration plant proven

    to be successful– Robust– Low OPEX– Load variations

    • Robust main rotating machinery with high efficiency

    • Designed for unmanned operation

    • Shorter delivery time• Simple energy supply,

    only electric power needed• Easy and quick start up and

    shut down of all systems• Standardisation of

    capacities: 1,5 ton/hr, 2,5 ton/hr etc.

    • Supplied as modules• Refrigerant process with

    phase changes which reduce the size of equipment and piping

    • Simplified maintenance• Reduced CAPEX compared

    to Nitrogen loop• Two references

    12 November 201325 © Wärtsilä Fuel Gas Handling System and BOG Reliquefaction for LNG Carrier_Eirik Melaaen

  • EIRIK MELAAENEIRIK MELAAENBusiness DevelopmentBusiness Development ManagerManagerTel:Tel: +47 66 10 95 66+47 66 10 95 66Mobile: +47 959 67 377Mobile: +47 959 67 377Fax:Fax: +47 815 48 510+47 815 48 510EE--mail: mail: [email protected]@hamworthy.comWeb:Web: http://www.hamworthy.comhttp://www.hamworthy.com

    Thank you for your attention!