Full-scale Reflective Cracking Test Update
Presented to: FAA Airport Pavement Working Group Meeting
By: Hao Yin, Ph.D., P.E. Gemini Technologies, Inc.
Date: April 24, 2012
Acknowledgement
FAA
• Dr. Satish Agrawal
• Dr. Gordon Hayhoe
• Donald Babargallo
• Ryan Rutter
• Frank Petch
• Murphy Flynn
SRA
• Chuck Teubert
• Jerry Connelly
• Renaldo Aponte
• Jeff Stein
• Gupta Durgesh
• David Traverzo
• Pochtar Daniel
• Bing Xiao
• Henry Fermin
RMD
• Roy McQueen
• Christopher Deker
Generate information from full-scale tests
(NAPTF) to assist in the improvement of
current design procedures for AC overlay
on rigid airport pavements.
Objective
Evaluate the initiation and propagation
of bottom-up reflection cracks due to
temperature effect acting alone
(thermally induced fatigue), assuming
intact PCC slabs.
Scope
Nunn, M., 1st RILEM 1989
1. Pavement Temperature: T=32oF, T=17oF
Key Parameters
0123456789
1011121314151617
-10 0 10 20 30
Temperature, oF
Dep
th, i
n
0:00 1:00
2:00 3:00
4:00 5:00
6:00 7:00
8:00 9:00
10:00 11:00
12:00 13:00
14:00 15:00
16:00 17:00
18:00 19:00
20:00 21:00
22:00 23:00
AC
PCC
0
5
10
15
20
25
30
35
40
45
Month
Max
Dai
ly A
ir T
emp
Dif
f,
o F
Fairbanks, AK
Scottsbluff, NE
Dulles, DC
Elkins, WV
Rapid City, SD
Concord, NH
Burns, OR
Augusta, GA
Roswell, NM
Bishop, CA
2. Horizontal Displacement at Joint: 15 mils
Key Parameters
3. Loading Rate ?
4. AC-PCC Interface Bond ?
Key Parameters
Progress Since 2011
• Laboratory tests
• Construction, instrumentation, and data collection
• Temperature Effect Simulation System (TESS) tune-up and
enhancements
• Trial test
Texas Overlay Tester
Temp: 32 oF
Max Hori Dip: 15 mils
Loading Rate: 0.25, 0.50, 1.0 mil/sec
Determination of Loading Rate
Overlay Tester Results
0.05
Interface Bond Experiment
steel rake heavy broomStraight Asphalt
Emulsion
Bond Strength Test
Temp: 32 oF
Loading Rate: 0.05 mil/sec
Bond Strength Test
PG 64-22 Straight Asphalt and Heavy Broom
Bond Strength Test
Temperature Unit Re-design
P-401 (PG 64-22)
Subgrade
P-209 (Dense Graded Aggregate)
P-501
5”
12”
P-501 8”
6”
Pavement Construction
Pavement Construction
Pavement Construction
Pavement Construction
Instrumentation Layout
ASG/CSG
T
ASG/CSG
ASG/CSG ASG/CSG
ASG/CSG ASG/CSG
1.5’
1.5’T T T
T
T
T
12.0’
L
L
L
L
L
L
North
South
Surface SG
Data Collection
Mishap Before Overlay
South
North
N S
E
W
Force,
92,000 lb
Force
-85,000 lb
Mishap After Overlay
-46 mil56 mil
Ten Com
N S
E
W
TenCom
Mishap After Overlay
Mishap After Overlay
Crack Arrester
Trial Test
• Feb 27 – March 15
• AC/PCC interface temperature: 32oF
• Max Hori Dis: 0.015 in
• 600 sec per cycle
• 144 cycles per day
• Total of 2641 cycles
Hydraulic Control
Hydraulic Control – Cont.
Hori Dis Along Joint
North South
Pavement Temperature
Crack Development36 Cycles
Crack Development180 Cycles
Crack initiation
Dynamic Modulus
430,000
Temperature: 14oF
Loading Rate: 8 mil/sec (0.5 in/min)
Tensile Strength Lab = 500 psi
Buttlar et al. 2011
Tensile Strength Field = 200 psi
Tensile Strength: Field vs. Lab
Crack Development280 Cycles
Actuator Force
Crack Development2641 Cycles
17” 37.5”
Surface SG Response
Surface SG Response
Surface SG Response
Embedded SG Response
Future Activities
• Experiment instrumentation
• Mill existing AC and overlay
• Full-scale test
• Laboratory tests• Fracture energy of AC
• Creep compliance of AC
• Tensile strength of AC
• Thermal Coefficient of PCC
Image Recording - North
Image Recording - South