Legacy Collections Center Western Michigan University B/A #12100284 / WMU Project No. R8952 FUNCTIONAL TEST BUILDING AUTOMATION SYSTEM & CONTROLS PC 230900 - 1 Functional Test PC: 230900 ITEM: Building Automation System and Temperature Controls System ID: AREA SERVED: Legacy Collections Center Submittal / Approvals Submittal. The above equipment and systems integral to them are complete and ready for functional testing. The checklist items are complete and have been checked off only by parties having direct knowledge of the event, as marked below, respective to each responsible contractor. This construction checklist is submitted for approval, subject to an attached list of outstanding items yet to be completed. A Statement of Correction will be submitted upon completion of any outstanding areas. None of the outstanding items preclude safe and reliable functional tests being performed. ___ List attached. Mall City Mechanical Havel Bros. Mechanical Contractor Date Controls Contractor Date Parkway Electric LaPine Electrical Contractor Date Sheet Metal Contractor Date Quality Air Service Christman Co. TAB Contractor Date General Contractor Date Construction checklist items are to be completed as part of startup & initial checkout, preparatory to performing test procedures. This checklist does not take the place of the manufacturer’s recommended checkout and startup procedures or report. If this form is not used for documenting, one of similar rigor shall be used. Contractors assigned responsibility for sections of the checklist shall be responsible to see that checklist items by their subcontractors are completed and checked off.

Upload: others

Post on 18-Dec-2021

3 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Functional Test - wmich.edu

Legacy Collections Center

Western Michigan University

B/A #12100284 / WMU Project No. R8952

FUNCTIONAL TEST – BUILDING AUTOMATION SYSTEM & CONTROLS

PC 230900 - 1

Functional Test

PC: 230900

ITEM: Building Automation System and Temperature

Controls System

ID:

AREA SERVED: Legacy Collections Center

Submittal / Approvals

Submittal. The above equipment and systems integral to them are complete and ready for functional testing. The checklist items are complete and have been checked off only by parties having direct knowledge of the event, as marked below, respective to each responsible contractor. This construction checklist is submitted for approval, subject to an attached list of outstanding items yet to be completed. A Statement of Correction will be submitted upon completion of any outstanding areas. None of the

outstanding items preclude safe and reliable functional tests being performed. ___ List attached.

Mall City Mechanical

Havel Bros.

Mechanical Contractor Date Controls Contractor Date

Parkway Electric

LaPine

Electrical Contractor Date Sheet Metal Contractor Date

Quality Air Service

Christman Co.

TAB Contractor Date General Contractor Date

Construction checklist items are to be completed as part of startup & initial checkout, preparatory to performing test procedures.

This checklist does not take the place of the manufacturer’s recommended checkout and startup procedures or report.

If this form is not used for documenting, one of similar rigor shall be used.

Contractors assigned responsibility for sections of the checklist shall be responsible to see that checklist items by their subcontractors are completed and checked off.

Page 2: Functional Test - wmich.edu

Legacy Collections Center

Western Michigan University

B/A #12100284 / WMU Project No. R8952

FUNCTIONAL TEST – BUILDING AUTOMATION SYSTEM & CONTROLS

PC 230900 - 2

Approvals. This filled-out checklist has been reviewed. Its completion is approved with the exceptions noted below.

Byce & Associates, Inc. 9/12 &

9/13/2013

Commissioning Authority Date Owner’s Representative Date

Equipment Verification.

As Specified As Submitted As Installed

Manufacturer

Model No.

Serial No.

CPU

Monitor

Other primary features:

As Specified As Submitted As Installed

Manufacturer

Model No.

Serial No.

CPU

Monitor

Other primary features:

Requested documentation submitted Rec’d Comments

Manufacturer’s cut sheets

Installation and startup manual and plan

O&M manuals

Sequences and control strategies

Sequences and list of all control strategies

Completed control drawings

List of all control parameters, settings and setpoints

Point-to-point checks

Comments:

Page 3: Functional Test - wmich.edu

Legacy Collections Center

Western Michigan University

B/A #12100284 / WMU Project No. R8952

FUNCTIONAL TEST – BUILDING AUTOMATION SYSTEM & CONTROLS

PC 230900 - 3

Installation Checks

Check if acceptable, provide comment if unacceptable NA Comment

Terminal Interface and Sub-Panel Checks

General appearance good, no apparent damage

Equipment labels affixed

Layout and location of control panels match drawings

Areas or equipment panels served clear in control drawings

Wiring labeled inside panels (to controlled components)

Controlled components labeled/tagged

BAS connection made to labeled terminal(s) as shown on drawings

Shielded wiring used on electronic sensors, grounded at 1 end

110 volt AC power available to panel

Compressed air available to panel (if applicable)

Battery backup in place and operable UNC520 Network controller

Surge suppression in place and operable

Panels properly grounded

Environmental conditions according to manufacturer’s requirements

System date and time correct

Comments:

Page 4: Functional Test - wmich.edu

Legacy Collections Center

Western Michigan University

B/A #12100284 / WMU Project No. R8952

FUNCTIONAL TEST – BUILDING AUTOMATION SYSTEM & CONTROLS

PC 230900 - 4

BAS Point to Point Verification Sample Form

(Static Testing)

Project: WMU Zhang Legacy Collections Center

Date: 9/13 and 10/29/2013

Building: Charles C. and Lynn L. Zhang L.C.C.

Location: Oakland Dr., Kalamazoo, Michigan

Point Type Description Point to

Point

Sensor

Calibration

Initials/Date

AHU-1, SF-3 VFD

AO Supply Fan VFD speed control N/A JSH, 10/29/13

SF-3, VFD HOA position

DI Supply Fan VFD H-O-A switch position N/A JSH, 10/29/13

SF-3, VFD Fault

DI VFD fault alarm N/A JSH, 10/29/13

SF-3 VFD DI VFD Bypass control N/A JSH, 10/29/13

SF-3 VFD DO VFD start/stop N/A JSH, 10/29/13

AHU-1, SF-3 motor

DI SF-3 motor fault alarm N/A JSH, 10/29/13

SF-3 Static DO SF-3 Static high limit reset Factory JSH, 10/29/13

AHU-1, RF-1 VFD

AO Return Fan VFD speed control N/A JSH, 10/29/13

RF-1, VFD HOA position

DI Return Fan VFD H-O-A switch position N/A JSH, 10/29/13

RF-1 VFD Fault

DI VFD fault alarm N/A JSH, 10/29/13

RF-1 VFD DI VFD Bypass control N/A JSH, 10/29/13

RF-1 VFD DO VFD start/stop N/A JSH, 10/29/13 AHU-1, RF-1

motor RF-1 motor fault alarm N/A JSH, 10/29/13

RF-1 Static RF-1 Static high limit reset Factory JSH, 10/29/13

AHU-1, CP-10 DO CP-10 start/stop N/A JSH, 10/29/13

AHU-1, CP-10 DI CP-10 Status N/A JSH, 10/29/13

AHU-1, CP-10 DI CP-10 Alarm N/A JSH, 10/29/13

AHU-1 ERW DI Energy Recovery Wheel motor status N/A JSH, 10/29/13

AHU-1 ERW DI Energy Recovery Wheel Diff. Pressure Factory JSH, 10/29/13

AHU-1 ERW DO Energy Recovery Wheel Start/Stop N/A JSH, 10/29/13

AHU-1 DAT DI AHU-1 Discharge Air Temperature Factory JSH, 10/29/13

AHU-1 MAT DI AHU-1 Mixed Air Temperature Factory JSH, 10/29/13

AHU-1 RAT DI AHU-1 Return Air Temperature Factory JSH, 10/29/13

AHU-1, HC-1 DI AHU-1, HC-1 heating coil temperature Factory JSH, 10/29/13

AHU-1, HC-1 DI AHU-1, HC-1 low limit freeze status alarm N/A JSH, 10/29/13

AHU-1, RH% DI AHU-1 Supply Air Relative Humidity Factory JSH, 10/29/13

AHU-1, RH% DI AHU-1 Return Air Relative Humidity Factory JSH, 10/29/13

Page 5: Functional Test - wmich.edu

Legacy Collections Center

Western Michigan University

B/A #12100284 / WMU Project No. R8952

FUNCTIONAL TEST – BUILDING AUTOMATION SYSTEM & CONTROLS

PC 230900 - 5

AHU-1 OA DI AHU-1 entering Outside Air temperature Factory JSH, 10/29/13 AHU-1 OA

RH% DI AHU-1 entering Outside Air relative humidity Factory JSH, 10/29/13

AHU-1 EA DI AHU-1 Exhaust Air temperature Factory JSH, 10/29/13

AHU-1, RH% DI AHU-1 Exhaust Air Relative Humidity Factory JSH, 10/29/13

AHU-1, econo DO AHU-1 Outside Air damper command N/A JSH, 10/29/13

AHU-1, econo DI AHU-1 Outside Air damper position N/A JSH, 10/29/13

AHU-1, OA DI AHU-1 Low O.A. Flow Alarm N/A JSH, 10/29/13

AHU-1, econo DO AHU-1 Return Air (M.A.) damper command N/A JSH, 10/29/13

AHU-1, econo DI AHU-1 Return Air (M.A.) damper position N/A JSH, 10/29/13

AHU-1, MAT DI AHU-1 Low Mixed Air Temperature Alarm N/A JSH, 10/29/13

AHU-1, econo DO AHU-1 Exhaust Air damper command N/A JSH, 10/29/13

AHU-1, econo DI AHU-1 Exhaust Air damper position N/A JSH, 10/29/13

AHU-1 OA DI AHU-1 Outside Air flow monitoring, AFMS Factory JSH, 10/29/13

AHU-1 SA DI AHU-1 Supply Air flow monitoring, AFMS Factory JSH, 10/29/13

AHU-1 RA DI AHU-1 Return Air flow monitoring, AFMS Factory JSH, 10/29/13

AHU-1 ERW DO AHU-1 ERW R.A. Bypass Damper command N/A JSH, 10/29/13

AHU-1 ERW DI AHU-1 ERW R.A. Bypass Damper Status N/A JSH, 10/29/13

AHU-1 ERW DO AHU-1 ERW S.A. Bypass Damper command N/A JSH, 10/29/13

AHU-1 ERW DI AHU-1 ERW S.A. Bypass Damper Status N/A JSH, 10/29/13

AHU-1 Heating DO AHU-1, HC-1 heating valve command N/A JSH, 10/29/13

AHU-1 Heating DI AHU-1, HC-1 heating valve position N/A JSH, 10/29/13

AHU-1 Cooling DO AHU-1, CC-1 chilled water valve command N/A JSH, 10/29/13

AHU-1 Cooling DI AHU-1, CC-1 chilled water valve position N/A JSH, 10/29/13

AHU-1, SF-3 DI SF-3 High Supply Static Alarm N/A JSH, 10/29/13

AHU-1, RF-1 DI RF-1 Low Return Static Alarm N/A JSH, 10/29/13

AHU-1, Zone DI AHU-1 zone alarm N/A JSH, 10/29/13

AHU-1 OA DI AHU-1 Outside Air CO2 Factory JSH, 10/29/13

AHU-1, Zone DI AHU-1 Zone average CO2 Factory JSH, 10/29/13

AHU-1, Zone DI AHU-1 Space High CO2 level Alarm N/A JSH, 10/29/13

AHU-1, Zone DI AHU-1 Supply Duct Static Pressure monitoring Factory JSH, 10/29/13

AHU-2, SF-4 VFD

AO Supply Fan VFD speed control N/A JSH, 10/29/13

SF-4, VFD HOA position

DI Supply Fan VFD H-O-A switch position N/A JSH, 10/29/13

SF-4, VFD Fault

DI VFD fault alarm N/A JSH, 10/29/13

SF-4 VFD DI VFD Bypass control N/A JSH, 10/29/13

SF-4 VFD DO VFD start/stop N/A JSH, 10/29/13

AHU-2, SF-4 motor

DI SF-4 motor fault alarm N/A JSH, 10/29/13

SF-4 Static DO SF-4 Static high limit reset Factory JSH, 10/29/13

AHU-2, SF-5 VFD

AO Regen Supply Fan VFD speed control N/A JSH, 10/29/13

SF-5, VFD HOA position

DI Regen Supply Fan VFD H-O-A switch position N/A JSH, 10/29/13

SF-5, VFD Fault

DI VFD fault alarm N/A JSH, 10/29/13

Page 6: Functional Test - wmich.edu

Legacy Collections Center

Western Michigan University

B/A #12100284 / WMU Project No. R8952

FUNCTIONAL TEST – BUILDING AUTOMATION SYSTEM & CONTROLS

PC 230900 - 6

SF-5 VFD DI VFD Bypass control N/A JSH, 10/29/13

SF-5 VFD DO VFD start/stop JSH, 10/29/13

AHU-2, SF-5 motor

DI SF-5 motor fault alarm N/A JSH, 10/29/13

SF-5 Static DO SF-5 Static high limit reset Factory JSH, 10/29/13

AHU-2 Dehumid

DI Regeneration desiccant wheel motor status N/A JSH, 10/29/13

AHU-2 Dehumid

DI Regeneration desiccant wheel Diff. Pressure Factory JSH, 10/29/13

AHU-2 Dehumid

DO Regeneration desiccant wheel Start/Stop N/A JSH, 10/29/13

AHU-2, OAT DI AHU-2 Min Outdoor Air Temperature Factory JSH, 10/29/13

AHU-2, OA DI AHU-2 low OA flow alarm N/A JSH, 10/29/13

AHU-2 DAT DI AHU-2 Discharge Air Temperature Factory JSH, 10/29/13

AHU-2 MAT DI AHU-2 Mixed Air Temperature Factory JSH, 10/29/13

AHU-2 MA DI AHU-2 Low Mixed Air Temperature Alarm N/A JSH, 10/29/13

AHU-2 RAT DI AHU-2 Return Air Temperature Factory JSH, 10/29/13

AHU-2, Regen DI AHU-2 Regeneration Discharge Temperature Factory JSH, 10/29/13

AHU-2, Regen DI AHU-2 Regeneration Exhaust Temperature Factory JSH, 10/29/13

AHU-2, SF-5 DI AHU-2 SF-5 Leaving Air Temperature Factory JSH, 10/29/13

AHU-2, HC-2 DI AHU-2, HC-2 heating coil temperature Factory JSH, 10/29/13

AHU-2, HC-2 DI AHU-2, HC-2 low limit freeze status alarm N/A JSH, 10/29/13

AHU-2, HC-3 DI AHU-2, HC-3 heating coil temperature Factory JSH, 10/29/13

AHU-2, HC-3 DI AHU-2, HC-3 low limit freeze status alarm N/A JSH, 10/29/13

AHU-2, CC-2 DI AHU-2, CC-2 cooling coil temperature Factory JSH, 10/29/13

AHU-2, RA RH%

DI AHU-2 Return Air Relative Humidity Factory JSH, 10/29/13

AHU-2, SA RH%

DI AHU-2 Supply Air Relative Humidity Factory JSH, 10/29/13

AHU-2, Regen RH%

DI AHU-2 Regeneration Relative Humidity Factory JSH, 10/29/13

AHU-2, econo DO AHU-2 Min. Outside Air damper command N/A JSH, 10/29/13

AHU-2, econo DI AHU-2 Min. Outside Air damper position N/A JSH, 10/29/13

AHU-2, econo DO AHU-2 Return Air damper command N/A JSH, 10/29/13

AHU-2, econo DI AHU-2 Return Air damper position N/A JSH, 10/29/13

AHU-2, Regen DO AHU-2 Outside Air damper command N/A JSH, 10/29/13

AHU-2, Regen DI AHU-2 Outside Air damper position N/A JSH, 10/29/13

AHU-2, Regen DO AHU-2 Exhaust Air damper command N/A JSH, 10/29/13

AHU-2, Regen DI AHU-2 Exhaust Air damper position N/A JSH, 10/29/13

AHU-2, Dehumid

DO AHU-2 Dehumidification wheel face damper

command N/A JSH, 10/29/13

AHU-2, Dehumid

DI AHU-2 Dehumidification wheel face damper

position status N/A JSH, 10/29/13

AHU-2, Dehumid

DO AHU-2 Dehumidification wheel face damper

command N/A JSH, 10/29/13

AHU-2, Dehumid

DI AHU-2 Dehumidification wheel bypass damper

position status N/A JSH, 10/29/13

AHU-2, HC-2 DO AHU-2, HC-2 heating valve command N/A JSH, 10/29/13

AHU-2, HC-2 DI AHU-2, HC-2 heating valve position N/A JSH, 10/29/13

AHU-2, CC-2 DO AHU-2, CC-2 chilled water valve command N/A JSH, 10/29/13

Page 7: Functional Test - wmich.edu

Legacy Collections Center

Western Michigan University

B/A #12100284 / WMU Project No. R8952

FUNCTIONAL TEST – BUILDING AUTOMATION SYSTEM & CONTROLS

PC 230900 - 7

AHU-2, CC-2 DI AHU-2, CC-2 chilled water valve position N/A JSH, 10/29/13

AHU-2, HC-3 DO AHU-2, HC-3 Regen heating valve command N/A JSH, 10/29/13

AHU-2, HC-3 DI AHU-2, HC-3 Regen heating valve position N/A JSH, 10/29/13

AHU-2, SF-4 Static

DI AHU-2, SF-4 supply high static limit reset N/A JSH, 10/30/13

AHU-2, SF-4 Static

DI AHU-2, SF-4 supply low static limit reset N/A JSH, 10/30/13

AHU-2, SF-5 Static

DI AHU-2, SF-4 supply high static limit reset N/A JSH, 10/30/13

AHU-2, SF-5 Static

DI AHU-2, SF-4 supply low static limit reset N/A JSH, 10/30/13

AHU-2, SF-4 Min. O.A.

DI AHU-2, SF-4 Min. Outside Air flow monitoring,

AFMS Factory JSH, 10/30/13

AHU-2 Regen O.A.

DI AHU-2 Regeneration Outside Air flow

monitoring, AFMS Factory JSH, 10/30/13

AHU-2, SF-4 Supply Air

DI AHU-2, SF-4 Supply Air flow monitoring,

AFMS Factory JSH, 10/30/13

AHU-2 Zone Temperature

DI AHU-2 Space Temperature Average Factory JSH, 10/30/13

AHU-2, Humidification

DI AHU-2 Space Humidity Sensor Average Factory JSH, 10/30/13

AHU-2 Humidification

DI AHU-2 Supply Duct Humidity Sensor Factory JSH, 10/30/13

AHU-2 Humidification

DO AHU-2 Humidifier Command N/A JSH, 10/30/13

AHU-2 Zone Alarm

DI AHU-2 Zone Alarm N/A JSH, 10/30/13

Geothermal System

DI Geothermal 3-way diverting valve status N/A JSH, 10/30/13

Geothermal System

DO Geothermal 3-way diverting valve command N/A JSH, 10/30/13

Geothermal System

DI Geothermal Source Supply Temperature Factory JSH, 10/30/13

Geothermal System

DI Geothermal Load Supply Temperature Factory JSH, 10/30/13

Geothermal System

DI Geothermal Load Supply Flow rate Factory JSH, 10/30/13

Geothermal System

DI Geothermal Load Return Temperature Factory JSH, 10/30/13

Geothermal System

DI Geothermal Load Min. Bypass valve position N/A JSH, 10/30/13

Geothermal System

DO Geothermal Load Min. Bypass valve Command N/A JSH, 10/30/13

Geothermal System

DI Geothermal Source Pressure Differential Factory JSH, 10/30/13

Geothermal System

DO Geothermal Source Pressure Differential S.P. N/A JSH, 10/30/13

Geothermal System, CP-2

AI Geothermal System CP-2 VFD Status N/A JSH, 10/30/13

Geothermal System, CP-2

DO Geothermal System circulator CP-2 Start/Stop N/A JSH, 10/30/13

Geothermal System, CP-2

AO Geothermal System circulator CP-2 Speed N/A JSH, 10/30/13

Geothermal System, CP-2

DI Geothermal System circulator CP-2 Alarm N/A JSH, 10/30/13

Page 8: Functional Test - wmich.edu

Legacy Collections Center

Western Michigan University

B/A #12100284 / WMU Project No. R8952

FUNCTIONAL TEST – BUILDING AUTOMATION SYSTEM & CONTROLS

PC 230900 - 8

Geothermal System, CP-2

DI Geothermal System CP-2 VFD H-O-A switch

position N/A JSH, 10/30/13

Geothermal System, CP-3

AI Geothermal System CP-3 VFD Status N/A JSH, 10/30/13

Geothermal System, CP-3

DO Geothermal System circulator CP-3 Start/Stop N/A JSH, 10/30/13

Geothermal System, CP-3

AO Geothermal System circulator CP-3 Speed N/A JSH, 10/30/13

Geothermal System, CP-3

DI Geothermal System circulator CP-3 Alarm N/A JSH, 10/30/13

Geothermal System, CP-3

DI Geothermal System CP-3 VFD H-O-A switch

position N/A JSH, 10/30/13

Chilled Water System

DI Chilled Water Source Min. Bypass valve

position N/A JSH, 10/30/13

Chilled Water System

DO Chilled Water Source Min. Bypass valve

command N/A JSH, 10/30/13

Chilled Water System

DI Chilled Water Source Supply Flow Factory JSH, 10/30/13

Chilled Water System

DI Chilled Water Source Supply Temperature Factory JSH, 10/30/13

Chilled Water System

DI Geothermal Source Pressure Differential Factory JSH, 10/30/13

Chilled Water System

DO Geothermal Source Pressure Differential S.P. N/A JSH, 10/30/13

Chilled Water System

DO Chilled Water Load Min. Bypass valve

position N/A JSH, 10/30/13

Chilled Water System

DI Chilled Water Load Min. Bypass valve

command N/A JSH, 10/30/13

Chilled Water System

DI Chilled Water Load Return Temperature Factory JSH, 10/30/13

Chilled Water System

DI Geothermal Load Pressure Differential Factory JSH, 10/30/13

Chilled Water System

DO Geothermal Load Pressure Differential S.P. N/A JSH, 10/30/13

Chilled Water System, CP-4

AI Chilled Water System CP-4 VFD Status N/A JSH, 10/30/13

Chilled Water System, CP-4

DO Chilled Water System circulator CP-4

Start/Stop N/A JSH, 10/30/13

Chilled Water System, CP-4

AO Chilled Water System circulator CP-4 Speed N/A JSH, 10/30/13

Chilled Water System, CP-4

DI Chilled Water System circulator CP-4 Alarm N/A JSH, 10/30/13

Chilled Water System, CP-4

DI Chilled Water System CP-4 VFD H-O-A switch

position N/A JSH, 10/30/13

Chilled Water System, CP-5

AI Chilled Water System CP-5 VFD Status N/A JSH, 10/30/13

Chilled Water System, CP-5

DO Chilled Water System circulator CP-4

Start/Stop N/A JSH, 10/30/13

Chilled Water System, CP-5

AO Chilled Water System circulator CP-4 Speed N/A JSH, 10/30/13

Chilled Water System, CP-5

DI Chilled Water System circulator CP-4 Alarm N/A JSH, 10/30/13

Chilled Water System, CP-5

DI Chilled Water System CP-4 VFD H-O-A switch

position N/A JSH, 10/30/13

Page 9: Functional Test - wmich.edu

Legacy Collections Center

Western Michigan University

B/A #12100284 / WMU Project No. R8952

FUNCTIONAL TEST – BUILDING AUTOMATION SYSTEM & CONTROLS

PC 230900 - 9

Heating Water System

DI Heating Water Source Min. Bypass valve

position N/A JSH, 10/30/13

Heating Water System

DO Heating Water Source Min. Bypass valve

command N/A JSH, 10/30/13

Heating Water System

DI Heating Water Source Supply Flow Factory JSH, 10/30/13

Heating Water System

DI Heating Water Source Supply Temperature Factory JSH, 10/30/13

Heating Water System

DI Heating Water Source Pressure Differential Factory JSH, 10/30/13

Heating Water System

DO Heating Water Source Pressure Differential

S.P. N/A JSH, 10/30/13

Heating Water System

DI Heating Water Load Min. Bypass valve position N/A JSH, 10/30/13

Heating Water System

DO Heating Water Load Min. Bypass valve

command N/A JSH, 10/30/13

Heating Water System

DI Heating Water Load Return Temperature Factory JSH, 10/30/13

Heating Water System

DI Heating Water Load Pressure Differential Factory JSH, 10/30/13

Heating Water System

DO Heating Water Load Pressure Differential S.P. N/A JSH, 10/30/13

Heating Water System, CP-6

AI Heating Water System CP-6 VFD Status N/A JSH, 10/30/13

Heating Water System, CP-6

DO Heating Water System circulator CP-6

Start/Stop N/A JSH, 10/30/13

Heating Water System, CP-6

AO Heating Water System circulator CP-6 Speed N/A JSH, 10/30/13

Heating Water System, CP-6

DI Heating Water System circulator CP-6 Alarm N/A JSH, 10/30/13

Heating Water System, CP-6

DI Heating Water System CP-6 VFD H-O-A

switch position N/A JSH, 10/30/13

Heating Water System, CP-7

AI Heating Water System CP-7 VFD Status N/A JSH, 10/30/13

Heating Water System, CP-7

DO Heating Water System circulator CP-7

Start/Stop N/A JSH, 10/30/13

Heating Water System, CP-7

AO Heating Water System circulator CP-7 Speed N/A JSH, 10/30/13

Heating Water System, CP-7

DI Heating Water System circulator CP-7 Alarm N/A JSH, 10/30/13

Heating Water System, CP-7

DI Heating Water System CP-7 VFD H-O-A

switch position N/A JSH, 10/30/13

Mech. Rm. Vent., SF-1

Mechanical Room 1210 ventilation Supply Fan

area relief damper command N/A JSH, 10/31/13

Mech. Rm. Vent., SF-1

Mechanical Room 1210 ventilation Supply Fan

area relief damper position N/A JSH, 10/31/13

Mech. Rm. Vent., SF-1

SF-1 start-stop command from space sensor Factory JSH, 10/31/13

Mech. Rm. Vent., SF-1

SF-1 space high temperature alarm N/A JSH, 10/31/13

Mech. Rm. Vent., SF-1

SF-1 fan status N/A JSH, 10/31/13

Mech. Rm. Vent., SF-1

SF-1 filter status N/A JSH, 10/31/13

Elect. Rms. Vent., SF-2

Electrical Room 1203. 1204, & 1205 ventilation

Supply Fan area relief damper command N/A JSH, 10/31/13

Page 10: Functional Test - wmich.edu

Legacy Collections Center

Western Michigan University

B/A #12100284 / WMU Project No. R8952

FUNCTIONAL TEST – BUILDING AUTOMATION SYSTEM & CONTROLS

PC 230900 - 10

Elect. Rms. Vent., SF-2

Electrical Room 1203, 1204, & 1205 ventilation

Supply Fan area relief damper position N/A JSH, 10/31/13

Elect. Rms. Vent., SF-2

SF-2 start-stop command from space sensor

averages in rooms: 1203, 1204, & 1205 Factory JSH, 10/31/13

Elect. Rms. Vent., SF-2

SF-2 space high temperature alarm N/A JSH, 10/31/13

Elect. Rms. Vent., SF-2

SF-2 fan status N/A JSH, 10/31/13

Elect. Rms. Vent., SF-2

SF-2 filter status N/A JSH, 10/31/13

VAV-1001 Discharge Air Temperature Factory JSH, 10/31/13

VAV-1001 Reheat Valve position N/A JSH, 10/31/13

VAV-1001 Reheat Valve command N/A JSH, 10/31/13

VAV-1001 HHWS temperature Factory JSH, 10/31/13

VAV-1001 Space temperature Factory JSH, 10/31/13

VAV-1001 Occupancy Sensor Factory JSH, 10/31/13

VAV-1001 Space CO2 Sensor Factory JSH, 10/31/13

VAV-1001 VAV inlet velocity pressure Factory JSH, 10/31/13

VAV-1001 VAV inlet temperature Factory JSH, 10/31/13

VAV-1014 Discharge Air Temperature Factory JSH, 10/31/13

VAV-1014 Reheat Valve position N/A JSH, 10/31/13

VAV-1014 Reheat Valve command N/A JSH, 10/31/13

VAV-1014 HHWS temperature Factory JSH, 10/31/13

VAV-1014 Space temperature Factory JSH, 10/31/13

VAV-1014 Occupancy Sensor Factory JSH, 10/31/13

VAV-1014 Space CO2 Sensor Factory JSH, 10/31/13

VAV-1014 VAV inlet velocity pressure Factory JSH, 10/31/13

VAV-1014 VAV inlet temperature Factory JSH, 10/31/13

VAV-1020 Discharge Air Temperature Factory JSH, 10/31/13

VAV-1020 Reheat Valve position N/A JSH, 10/31/13

VAV-1020 Reheat Valve command N/A JSH, 10/31/13

VAV-1020 HHWS temperature Factory JSH, 10/31/13

VAV-1020 Space temperature Factory JSH, 10/31/13

VAV-1020 Occupancy Sensor Factory JSH, 10/31/13

VAV-1020 Space CO2 Sensor Factory JSH, 10/31/13

VAV-1020 VAV inlet velocity pressure Factory JSH, 10/31/13

VAV-1020 VAV inlet temperature Factory JSH, 10/31/13

VAV-1100A Discharge Air Temperature Factory JSH, 10/31/13

VAV-1100A Reheat Valve position N/A JSH, 10/31/13

VAV-1100A Reheat Valve command N/A JSH, 10/31/13

VAV-1100A HHWS temperature Factory JSH, 10/31/13

VAV-1100A Space temperature Factory JSH, 10/31/13

VAV-1100A Occupancy Sensor Factory JSH, 10/31/13

VAV-1100A Space CO2 Sensor Factory JSH, 10/31/13

VAV-1100A VAV inlet velocity pressure Factory JSH, 10/31/13

VAV-1100A VAV inlet temperature Factory JSH, 10/31/13

VAV-1100B Discharge Air Temperature Factory JSH, 10/31/13

Page 11: Functional Test - wmich.edu

Legacy Collections Center

Western Michigan University

B/A #12100284 / WMU Project No. R8952

FUNCTIONAL TEST – BUILDING AUTOMATION SYSTEM & CONTROLS

PC 230900 - 11

VAV-1100B Reheat Valve position N/A JSH, 10/31/13

VAV-1100B Reheat Valve command N/A JSH, 10/31/13

VAV-1100B HHWS temperature Factory JSH, 10/31/13

VAV-1100B Space temperature Factory JSH, 10/31/13

VAV-1100B Occupancy Sensor Factory JSH, 10/31/13

VAV-1100B Space CO2 Sensor Factory JSH, 10/31/13

VAV-1100B VAV inlet velocity pressure Factory JSH, 10/31/13

VAV-1100B VAV inlet temperature Factory JSH, 10/31/13

VAV-1125 Discharge Air Temperature Factory JSH, 10/31/13

VAV-1125 Reheat Valve position N/A JSH, 10/31/13

VAV-1125 Reheat Valve command N/A JSH, 10/31/13

VAV-1125 HHWS temperature Factory JSH, 10/31/13

VAV-1125 Space temperature Factory JSH, 10/31/13

VAV-1125 Occupancy Sensor Factory JSH, 10/31/13

VAV-1125 Space CO2 Sensor Factory JSH, 10/31/13

VAV-1125 VAV inlet velocity pressure Factory JSH, 10/31/13

VAV-1125 VAV inlet temperature Factory JSH, 10/31/13

CAV-1006 Discharge Air Temperature Factory JSH, 10/31/13

CAV-1006 Reheat Valve position N/A JSH, 10/31/13

CAV-1006 Reheat Valve command N/A JSH, 10/31/13

CAV-1006 HHWS temperature Factory JSH, 10/31/13

CAV-1006 Space temperature Factory JSH, 10/31/13

CAV-1006 Occupancy Sensor Factory JSH, 10/31/13

CAV-1006 Space CO2 Sensor Factory JSH, 10/31/13

CAV-1006 VAV inlet velocity pressure Factory JSH, 10/31/13

CAV-1006 VAV inlet temperature Factory JSH, 10/31/13

AC-1 Split System IT Room Air Conditioner Factory JSH, 10/31/13

Comments:

Page 12: Functional Test - wmich.edu

Legacy Collections Center

Western Michigan University

B/A #12100284 / WMU Project No. R8952

FUNCTIONAL TEST – BUILDING AUTOMATION SYSTEM & CONTROLS

PC 230900 - 12

Sensor Calibration Documentation

Sensor and Actuator Calibration All field-installed sensors and gages, and all actuators (dampers and valves) on this piece of equipment shall be calibrated in accordance with Specification Section 01810. All test instruments shall have had a certified calibration within the last 12

months: Y/N___. Sensors installed in the unit at the factory with calibration certification provided need not be field calibrated.

Sensor or Actuator Tag

& Location

Location

OK

1st Gage or

BAS Value

Instrument

Measured Value

Final Gage or

BAS Value

Pass

Y / N

Valve and Damper Actuator Check Documentation

VALVES, DAMPERS and STATES VALVE LEAK-BY TESTS

Procedure # A;B C D;E A; B or C

Name and

Location

Link-

age

OK?

Initial

BAS

Value

Initial

Visual

Observa-

tion

Final

Visual

Observa-

tion

OK

Y/N

Nor-

mal

OK?

Clos-

ure

OK?

State Leak-By method used

(A, B or C) and results,

(final dT, etc.)

OK

Y/N

AHU-1/CCV N/A Open

Closed Open

100%

Open Y Y Y

C method, >1 deg. F. Y

AHU-1/HCV N/A Open

Closed Closed

0%

Open Y Y Y

C method, >2 deg. F. Y

AHU-2/CCV N/A Open

Closed Closed

0%

Open Y Y Y

C method, >1 deg. F. Y

AHU-2/HCV N/A Open

Closed Closed

0%

Open Y Y Y

C method, >2 deg. F. Y

AHU-2/ Regen

HCV N/A

Open

Closed Closed

0%

Open Y Y Y

C method, >2 deg. F. Y

GeoThermal 3-

way diverting N/A

Open

Closed Divert

6.4%

open to

Geo Ret

Y Y Y

C method, >1 deg. F. Y

GeoThermal,

Min Bypass N/A

Open

Closed Open Open Y Y Y

C method, >1 deg. F. Y

Page 13: Functional Test - wmich.edu

Legacy Collections Center

Western Michigan University

B/A #12100284 / WMU Project No. R8952

FUNCTIONAL TEST – BUILDING AUTOMATION SYSTEM & CONTROLS

PC 230900 - 13

VALVES, DAMPERS and STATES VALVE LEAK-BY TESTS

Procedure # A;B C D;E A; B or C

Name and

Location

Link-

age

OK?

Initial

BAS

Value

Initial

Visual

Observa-

tion

Final

Visual

Observa-

tion

OK

Y/N

Nor-

mal

OK?

Clos-

ure

OK?

State Leak-By method used

(A, B or C) and results,

(final dT, etc.)

OK

Y/N

Chilled Water,

Load Min

Bypass

N/A Open

Closed Open

100%

Open Y Y Y

C method, >1 deg. F. Y

Chilled Water,

Source Min

Bypass N/A

Open

Closed Open Open Y Y Y

C method, >1 deg. F. Y

Heating Water,

Load Min

Bypass N/A

Open

Closed Open Open Y Y Y

C method, >1 deg. F. Y

Heating Water,

Source Min

Bypass N/A

Open

Closed Open Open Y Y Y

C method, >1 deg. F. Y

CUH-1, 2-way

Htg. N/A

Open

Closed Closed Closed Y Y Y

C method, >1 deg. F. Y

UH-1, 2-way

Htg. N/A

Open

Closed Closed Closed Y Y Y

C method, >1 deg. F. Y

UH-2, 2-way

Htg. N/A

Open

Closed Closed Closed Y Y Y

C method, >1 deg. F. Y

FCU-1, 2-way

Reheat N/A

Open

Closed Closed Closed Y Y Y

C method, >1 deg. F. Y

FCU-2, 2-way

Reheat N/A

Open

Closed Closed Closed Y Y Y

C method, >1 deg. F. Y

CAV-1006, 2-

way Reheat N/A

Open

Closed Closed Closed Y Y Y

C method, >1 deg. F. Y

VAV-1001, 2-

way Reheat N/A

Open

Closed Closed Closed Y Y Y

C method, >1 deg. F. Y

VAV-1014, 2-

way Reheat N/A

Open

Closed Closed Closed Y Y Y

C method, >1 deg. F. Y

VAV-1020, 2-

way Reheat N/A

Open

Closed Closed Closed Y Y Y

C method, >1 deg. F. Y

VAV-1100A, 2-

way Reheat N/A

Open

Closed Closed Closed Y Y Y

C method, >1 deg. F. Y

VAV-1100B, 2-

way Reheat N/A

Open

Closed Closed Closed Y Y Y

C method, >1 deg. F. Y

Page 14: Functional Test - wmich.edu

Legacy Collections Center

Western Michigan University

B/A #12100284 / WMU Project No. R8952

FUNCTIONAL TEST – BUILDING AUTOMATION SYSTEM & CONTROLS

PC 230900 - 14

VALVES, DAMPERS and STATES VALVE LEAK-BY TESTS

Procedure # A;B C D;E A; B or C

Name and

Location

Link-

age

OK?

Initial

BAS

Value

Initial

Visual

Observa-

tion

Final

Visual

Observa-

tion

OK

Y/N

Nor-

mal

OK?

Clos-

ure

OK?

State Leak-By method used

(A, B or C) and results,

(final dT, etc.)

OK

Y/N

VAV-1125, 2-

way Reheat N/A

Open

Closed Closed Closed Y Y Y

C method, >1 deg. F. Y

AHU-1, O.A.

Damper Y

Open

Closed Open Open Y Y Y

Visual, CFM leakage unknown Y

AHU-1,

R.A./M.A.

Damper

Y Open

Closed Open Open Y Y Y

Visual, CFM leakage unknown Y

AHU-1, ERW

Bypass Damper

O.A.

Y Open

Closed Closed Closed Y Y Y

Visual, CFM leakage unknown Y

AHU-1, ERW

Bypass Damper

R.A. Y

Open

Closed Closed Closed Y Y Y

Visual, CFM leakage unknown Y

AHU-1,

Relief/Exh

Damper

Y Open

Closed Open Open Y Y Y

Visual, CFM leakage unknown Y

AHU-2, Min.

O.A. Damper Y

Open

Closed Open Open Y Y Y

Visual, CFM leakage unknown Y

AHU-2, R.A.

Damper Y

Open

Closed Open Open Y Y Y

Visual, CFM leakage unknown Y

AHU-2,

Desiccant Face

Damper

Y Open

Closed Open Open Y Y Y

Visual, CFM leakage unknown Y

AHU-2,

Desiccant

Bypass Dmpr.

Y Open

Closed Closed Closed Y Y Y

Visual, CFM leakage unknown Y

AHU-2,

Regeneration

O.A. Damper

Y Open

Closed Closed Closed Y Y Y

Visual, CFM leakage unknown Y

AHU-2,

Regeneration

E.A. Damper

Y Open

Closed Closed Closed Y Y Y

Visual, CFM leakage unknown Y

CAV-1006 Inlet

Damper Y

Open

Closed Open Open Y Y Y

Visual, CFM leakage unknown Y

VAV-1001 Inlet

Damper Y

Open

Closed Open Open Y Y Y

Visual, CFM leakage unknown Y

Page 15: Functional Test - wmich.edu

Legacy Collections Center

Western Michigan University

B/A #12100284 / WMU Project No. R8952

FUNCTIONAL TEST – BUILDING AUTOMATION SYSTEM & CONTROLS

PC 230900 - 15

VALVES, DAMPERS and STATES VALVE LEAK-BY TESTS

Procedure # A;B C D;E A; B or C

Name and

Location

Link-

age

OK?

Initial

BAS

Value

Initial

Visual

Observa-

tion

Final

Visual

Observa-

tion

OK

Y/N

Nor-

mal

OK?

Clos-

ure

OK?

State Leak-By method used

(A, B or C) and results,

(final dT, etc.)

OK

Y/N

VAV-1014 Inlet

Damper Y

Open

Closed Open Open Y Y Y

Visual, CFM leakage unknown Y

VAV-1020 Inlet

Damper Y

Open

Closed Open Open Y Y Y

Visual, CFM leakage unknown Y

VAV-1100A

Inlet Damper Y

Open

Closed Open Open Y Y Y

Visual, CFM leakage unknown Y

VAV-1100B

Inlet Damper Y

Open

Closed Open Open Y Y Y

Visual, CFM leakage unknown Y

VAV-1125 Inlet

Damper Y

Open

Closed Open Open Y Y Y

Visual, CFM leakage unknown Y

CCV = cooling coil valve, HCV = heating