Functions & Activities of GFCC

GANGA FLOOD CONTROL COMMISSION

2

Ganga Flood Control Commission

Ganga Flood Control Board (GFCB)

Setup by the Government of India in 1972 Functions

To effectively address the chronic and recurring flood, erosion and drainage problems in the Ganga basin through an integrated plan

To lay down the broad policies and decide priorities in the implementation of various schemes

To accord approval to the schemes and recommend annual outlays for their implementation

To issue necessary directions to Ganga Flood Control Commission in respect of formulation of comprehensive plan of flood control in the Ganga Basin and approval of schemes

Its 16th & last meeting was held on 16.01.2013 at New Delhi

3

Ganga Flood Control Commission

Ganga Flood Control Commission(GFCC)

Constituted by the Government of India in 1972

Acts as the Secretariat and the Executive Wing of the Ganga Flood Control Board

Subordinate office of the Ministry of Water Resources

Headquarter at Patna Establishment cost of GFCC is included in

MoWR Plan Scheme “River Management Activities & Works related to Border Areas”

Total allocation during XII plan is Rs 45 crore.

46th & last meeting of GFCC held on 19.11.2014 at New Delhi

4

Ganga Flood Control Commission

GFCC Broad Functions

Techno-economic appraisal of flood control, drainage, anti-water logging and anti-erosion schemes of Ganga Basin States except for those on the river Yamuna in the reach between Tajewala to Okhla Barrage.

Monitoring of the implementation of selected flood control schemes particularly those receiving Central Assistance / executed under the Central Sector.

Performance Evaluation of selected Flood Control Schemes

Preparation and updating of Comprehensive Plans of Flood Management for various river systems in the Ganga basin.

Assessment of the adequacy of existing waterways under road and rail bridges.

5

Ganga Flood Control Commission

Cooperation with Nepal / Bangladesh

Provides technical support to MoWR Participation in various Committees formed

for the purpose: Chairman, GFCC is member of Indian Team in

JMCWR, JCWR and JTE, Indian Team Leader of JSTC and Chairman of GHLSC and KHLC.

Member, GFCC is Indian Team Leader of JCIFM and member of JCKGP.

Chairman, GFCC / Member GFCC is member of Indian Team in Indo-Bangladesh Joint River Commission

Appraisal and monitoring of works taken up with funding from Government of India, wherever required

6

Ganga Flood Control Commission

GFCC Organisational Chart

Chairman

Member(Planning)

Director(MP-I)

Dy. Director (2)Asstt. Director (2)

Asstt. Director-II (1)

Director(MP-II)

Dy. Director (2)Asstt. Director (2)Asstt.Director-II (2)

Member(Coordination)

Director(Planning)

Dy. Director (2)Asstt. Director (2)Asstt.Director-II (2)

Director(Coordination)

Dy. Director (2)Asstt. Director (2)Asstt.Director-II (2)

Supporting Technical Staff - Supporting Ministerial Staff -

Expenditure and Budget provisionGanga Flood Control Commission

7

AMOUNT IN CRORE

YEAR BE RE ACTUAL EXPENDITURE

2012-13 7.58 6.80 4.80

2013-14 10.58 4.56 4.56

2014-15 6.93 5.94 5.51

2015-16 6.95

8

Ganga Flood Control Commission

Achievements of GFCC

Comprehensive plans for flood management for all 23 river systems prepared between 1975 – 1990. These are also updated as per requirement. So far, 22 plans have been updated once and five plans have been updated twice.(Details at web-site: http://gfcc.bih.nic.in/achievements.htm )

Study for assessment of the adequacy of existing waterways under road and rail bridges for 21 river system in Ganga Basin has been completed so far.

Appraisal of Flood Management schemes of Ganga Basin About 300 schemes appraised since XI Plan

Monitoring of Scheme implemented with Central funding 114 schemes taken up under FMP in Ganga Basin in Bihar,

Uttar Pradesh, West Bengal, Himachal Pradesh, Jharkhand and Uttarakhand . 58 schemes have been completed so far and 4 withdrawn/dropped.

Report of the Committee constituted by MoWR to find the cause for severe destruction in Uttarakhand due to flood and erosion during 16-17 June, 2013.

9

FMP – Physical Progress

Status of Schemes included in FMP during XI PlanSl. No.

State Approved

Completed

(2007-12)

Completed

(2012-13)

Completed

(2013-14)

Dropped/

Withdrawn

Ongoing

(1) (2) (3) (4) (5) (6) (7) (8)

1 Bihar 46 33 1 3 3 6

2 UP 24 6 - - - 18

3 WB 11 4 2 - 1 4

4 UK 12 3 1 4 - 4

5 HP 1 - - - - 1

6 JKH 3 1 - - - 2

Total 97 47 4 7 4 35

contd…

Ganga Flood Control Commission

10

FMP – Physical Progress

Status of Schemes included in FMP during XII PlanSl. No.

State Approved

Completed

Ongoing

(1) (2) (3) (5) (8)

1 Bihar 4 - 4

2 UP 2 - 2

3 WB 1 - 1

4 UK 9 - 9

5 HP 1 - 1

6 JKH - - -

Total 17 - 17

Ganga Flood Control Commission

11

Ganga Flood Control Commission

FMP – Financial Progress

Sl. No

State Approved Central Share

Amount Released in

2013-14

Amount Released in

2014-15

Total amount released up to

31, March 2015

1. Bihar 1392.42 88.57 24.92 839.63

2. Jharkhand 29.48 - - 21.34

3. Uttarakhand 288.07 53.13 - 102.75

4. Himachal Pradesh

31.21 - 2.42 36.05

5. Uttar Pradesh 645.89 21.96 15.69 337.49

6. West Bengal 1679.02 128.80 7.84 1823.5

7. Xth Plan Spill over

- - - 35.43

TOTAL 4066.09 292.46 50.87 2129.86

Amount in crore

Details of Posts sanctioned, filled & vacant in GFCC up to 31.03.2015

DAC stands for deemed abolition category

12

Sl.No.

Name of post Sanctioned strength

Filled Live vacant Post

DAC Post

GROUP “A”

1. Chairman 1 1 - -

2. Member 2 2 - -

3. Director 4 3 - 1

4. Dy.Director 8 5 2 1

5. Asstt.Director 8 4 - 4

Total Group “A” 23 15 2 6

Details of Posts sanctioned, filled & vacant in GFCC up to 31.03.2015

Ganga Flood Control Commission

13

Sl.No.

Name of post Sanctioned strength

Filled Live vacant Post

DAC Post

GROUP “B” GAZ.6. P.S. to Chairman 1 - - 17. Asstt. Director-II 7 2 1 4

8. Administrative Officer 1 - - 19. Private Secretary 2 1 1 -

10. Head Draftsman 1 - 1 --

11. Asstt.Director Gr.II(OL) 1 1 - -Total Group “B” 13 4 3 6

Details of Posts sanctioned, filled & vacant in GFCC up to 31.03.2015

Ganga Flood Control Commission

14

Sl.No.

Name of post Sanctioned strength

Filled Live vacant Post

DAC Post

GROUP “B” (NON-GAZ.)

12. Steno Grade-I

7 5 1 1

Total Group “B” (Non-Gaz) 07 05 01 01

Details of Posts sanctioned, filled & vacant in GFCC up to 31.03.2015

15

Sl.No.

Name of post Sanctioned strength

Filled Live vacant Post

DAC Post

13. Head Clerk 4 1 - 314. Hindi Translator Gr.II 1 1 - -15. Upper Division. Clerk 4 4 - -16. L.D.C. 10 2 4 417. Steno Gr.II 3 1 - 218. Jr. Engineer 5 - - 519. Draftsman Gr.I 6 4 1 120. Draftsman Gr.II 1 - - 121. Sr. Computer 1 1 - -22. Jr. Computer 3 3 - -23. Ferro Printer 2 - - 224. Driver 2 1 - 1

Total Group “C” 42 18 05 19

Details of Posts sanctioned, filled & vacant in GFCC up to 31.03.2015

16Sl.

No.Name of post Sanctioned

strength Filled Live

vacant Post

DAC Post

25. Jr. Gestetnor Operator 1 - - 1

26. Senior Peon 3 1 - 2

27. Daftary 1 - 1 -

28. Peon 9 6 - 3

29. Chowkidar 1 1 - -

30. Safaiwala 1 1 - -

Total Gr. D 16 09 01 06

Grand Toal (A + B + C )101 51 12 38

Opening of Regional Directorate at Lucknow

Ministry has sanctioned opening of a regional directorate at Lucknow on 12th March, 2015.

As of now, SE (C), UGBO, Lucknow, CWC has been given additional charge and a room in CWC complex, Lucknow has been allotted for this office. However, the State Government is yet to provide accommodation for office as well as residence and other logistics to set up Directorate of GFCC at Lucknow.

Other posts of DD(02 nos), AD and AD-II (04 nos)are to be filled.

Group C post services are to be outsourced.

Ganga Flood Control Commission

17

18

Ganga Flood Control Commission

Ganga Basin – Salient Features

Drainage area: 86.1 MhaWater Resources: 525 BCMAverage rainfall: 800-1400 mmLength of Ganga main stem: 2525 KmCropped area: 58.0 MhaFlood prone area: 20.4 MhaArea protected: 9.4 Mha

19

Ganga Flood Control Commission

Flood Prone / Protected Areas

# State Flood Prone Area as per RBA (Mha)

Area Protected(Mha)

1 Bihar (including Jharkhand) 4.260 2.9502. Delhi 0.070 0.0703. Haryana 2.350 2.0004. Himachal Pradesh 0.476 0.0125. Madhya Pradesh (including Chhattisgarh) 0.337 0.0046. Rajasthan 3.260 0.0827. Uttar Pradesh (including Uttarakhand) 7.340 1.705

8. West Bengal 2.670 2.568Total 20.420 9.391

(46%)

Flood Prone Area of Ganga Basin States (Total Area: 20.40 Mha as per RBA)

Ganga Flood Control Commission

20

Bihar(including Jharkhand)

20.88%

West Bengal12.99%

Uttar Pradesh(including Uttarakhand)

35.98%

Rajasthan15.98%

Madhya Pradesh(including Chhattishgarh)

1.27%NCT ofDelhi0.25%

Haryana11.52%

Himachal Pradesh1.13%

GFCC Budget 13-14

S.No. Head of account Final Estimate 2013-14 Expenditure 2013-14

1 Salary 3,36,00,000 3,56,08,204

2. Medical 1,50,000 65,235

3 Domestic Travel Expenses 29,00,000 28,96,070

4 Foreign Travel Expenses 1,00,000 1,05,138

5 Office Expenses 8,00,000 5,01,602

6 Minor Works 73,90,000 58,13,149

7 Machinery & Equipment 6,00,000 6,28,821

8 Over Time Allowances 10,000 -Nil-

  TOTAL 4,55,50,000 4,56,18,219

Ganga Flood Control Commission

21

GFCC Budget 14-15

S.No. Head of account Final Estimate 2014-15 Expenditure 2014-15

1 Salary 4,38,90,000 4,19,55,000

2. Medical 3,00,000 1,33,000

3 Domestic Travel Expenses 30,00,000 29,97,000

4 Foreign Travel Expenses 7,00,000 1,29,000

5 Office Expenses 10,00,000 9,85,000

6 Minor Works 80,00,000 68,69,000

7 Machinery & Equipment 25,00,000 20,25,000

8 Over Time Allowances 10,000 5,000

  TOTAL 5,94,00,000 5,50,98,000

Ganga Flood Control Commission

22

23

Ganga Flood Control Commission

GFCB Composition

Union Minister for Water Resources - ChairmanUnion Minister of State for Water Resources - Member*Union Ministers of Finance, Road Transport & Highways, Railways and Agriculture (or their representative)

- Member

Chief Ministers of Bihar, Uttar Pradesh, West Bengal, Haryana, Rajasthan, Madhya Pradesh, Himachal Pradesh, Delhi, Uttarakhand, Jharkhand, Chhattisgarh (or their representatives)

- Member

Member, Planning Commission - Member

Chairman, GFCC - Member-Secretary

* Chairman in absence of Union Minister of Water Resources

24

Ganga Flood Control Commission

GFCC Composition Chairman, GFCC - Full Time Chairman

Member(Planning) & Member(Coordination), GFCC Full Time Members

Chief Engineer in charge of Flood Control from Bihar, Uttar Pradesh, West Bengal, Jharkhand and Uttarakhand

- Part Time Members

Engineer-in-Chief(WRD) of Chhattisgarh and Madhya Pradesh - Part Time Members

Member (RM), CWC - Part Time Member

Director, CWPRS - Part Time Member

Chief Engineer(LGB), CWC - Part Time Member

Chief Engineer (Planning), Roads Wing, MoRTH - Part Time Member

Director (Civil Engg. Wing), Railway Board - Part Time Member

Chief Engineer in charge of Flood Management from Haryana, Himachal Pradesh, Rajasthan & Delhi

- Permanent Invitees

Director, RDSO, Ministry of Railways - Permanent Invitee