Future Plans
ROLANDS & ASSOCIATES Corporation 2
• Currently No Concrete Plan– Improvements To JTLS 4.0
• Several Minor ECPs – Require No New Data• Expected Around February or March
– JTLS 4.1 - ECPs - Require New Data• Plan: Before Next User Conference
– JTLS 5.0 - Major Restructuring Discuss By JCW• Work Starts Almost Immediately• Plan: Delivery In 2013
Plan Of Way Forward
October 2011
ROLANDS & ASSOCIATES Corporation 3
• Implications– R&A Has
• Two Separate Development Streams (JTLS 4.1, 5.0)• Two Maintenance Streams (JTLS 3.4, JTLS 4.0)
– This Will Take A Month Just To Alter Procedures– When To Integrate Changes
• Immediately – Interferes With Big Changes• Postpone – Will New Changes
– Work With New Structure– Will We Remember What Needs To Be Integrated
Plan Of Way Forward
October 2011
Post JTLS 4.0
October 2011ROLANDS & ASSOCIATES Corporation 4
ROLANDS & ASSOCIATES Corporation 5
• Add Random Process Visualization Tool– Existed In Old DDS
• Add GDP Capabilities To DDS– Map / Terrain Changes– Object Movement– Network Creation– Command Hierarchy– Logistics Hierarchy
DDS
October 2011
ROLANDS & ASSOCIATES Corporation 6
• Provide Remaining Battery Time On IMT– Currently Only Get Percentage Remaining
• Address Assumptions– Speed Greater Submerged– Battery Not Used When Surfaced or Snorkel
Diesel Electric Submarines
October 2011
ROLANDS & ASSOCIATES Corporation 7
• Add OPM Time Unit Of Measure• BDA Summary Data In Air Mission Reports• Improve Intelligence Reports
– JCW Provided Some New Requirements• Catapults Only Limit Takeoff
– Limit Landing – Also Represent Arresting Gear• More Than One Glassfish Per Machine
Odds and Ends
October 2011
ROLANDS & ASSOCIATES Corporation 8
• Air Force Agency For Modeling and Simulation–Conducting Test – Can JTLS Be Used For
• Tier 3 AOC Training
– Prior To Test• Fix Some Known Tanker Reporting Issues• Expand TBMCS Reporting Details
– Three Possible Outcomes• Yes, No• Maybe Due To Restrictions
– Probably We Would Be Tasked To Correct Restrictions
AFAMS Test
October 2011
ROLANDS & ASSOCIATES Corporation 9
• Start Working Toward Link– 1516 Evolved
Link To JCATS / VBS2
October 2011
JTLS 4.1
October 2011ROLANDS & ASSOCIATES Corporation 10
ROLANDS & ASSOCIATES Corporation 11
• Better Representation Of– Detection
• No Change – Assign Un-Identified Number
– Classification• Obtain Ship Basic Type (Symbol)
– Recognition• Obtain Ship Class
– Identification• Obtain Ship Name
Naval Detections
October 2011
ROLANDS & ASSOCIATES Corporation 12
• Existing– Sensor Detects Ship
• Initial Report Time – Get Unidentified Ship Detection• Fusion Time – Get Identification
• Basic New Concept– Not Every Sensor Can Accomplish Task
• Requires Imagery Of Some Type
– Not A Matter Of Time – Matter Of Distance– Fusion Time Only Used If Previously Detected
Naval Detections
October 2011
ROLANDS & ASSOCIATES Corporation 13
• Purpose– Make Orders More Consistent– More Flexibility In HRU Makeup
• Entire HUP Capabilities Must Be Available• Need To Add Systems / Supplies To Meet Task
– Multi-Simultaneous Tasks• Ability To Detect And Accomplish Other Tasks
– Relook At Air Missions Rules At The Same Time
Re-Write Of HRU Code
October 2011
ROLANDS & ASSOCIATES Corporation 14
• Also Known As Tomahawk® Block IV• Additional Capability Required
– Reprogram the missile while in-flight • Required Two-way Satellite Communications• Can Only Strike15 Pre-Programmed Alternate Targets
– May Not Implement This Restriction
• Alternate Strike Any Target Coordinates– Using Global Positioning System (GPS)
Representation Of TLAM-E
October 2011
ROLANDS & ASSOCIATES Corporation 15
• Additional Capability Required (Con’t)– Can Loiter Over Target Area
• Current Capability In JTLS• What Is Not Current Capability
– Intel Collection While Doing So Using On Board Camera
Representation Of TLAM-E
October 2011
ROLANDS & ASSOCIATES Corporation 16
• Current Capability– If Ship Has JU Source Number
• Generates Message 2.3 – PPLI
– We Do Not Support Link-16 Surface Tracks• Working With PACOM To Design Task
– Consider How This Works With PIFF Codes• Passive Identification Friend or Foe
Self Report Link-16 Ships
October 2011
ROLANDS & ASSOCIATES Corporation 17
• Easy Way To Indicate When– Combat Action Starts– Combat Action Ends– What Is Happening In Combat
Combat Action Alert
October 2011
ROLANDS & ASSOCIATES Corporation 18
• More Explicit Representation Of– Hiding
• In Bunkers• In Tunnels
– Little Design Done So Far• Size Of Hiding Area• Where To Get In / Out• Possibility Of Being Trapped
– JCATS Uses “Portals”
Unit / Target Hiding
October 2011
ROLANDS & ASSOCIATES Corporation 19
• Continue Improvement To– ICC / TBMCS
• New Links– PACOM - GDSS2 (Air Mobility)– JCW
• HUMINT On-Line Tasking and Reporting– HOTR
• Advanced Field Artillery Tactical Data Systems– AFATDS
Link To Real World C4I
October 2011
ROLANDS & ASSOCIATES Corporation 20
• Add Higher Level Planning Capability– New WHIP Tools
• Air Tasking Order Generator• Ground Plan Development Tool
– Contingency Development– Rule Based Execution Start
• Spreadsheet Type Order Specification
– Automated MSEL or MEL/MIL Order Entry
Improve User Workload
October 2011
ROLANDS & ASSOCIATES Corporation 21
• Service Oriented Architecture – Possible Models
• Maintenance Model• Weather Model• Contamination Model• Line of Sight Model• Emitter Model
Investigate SOA
October 2011
ROLANDS & ASSOCIATES Corporation 22
• Service Oriented Architecture – Investigate
• Method To Communicate (HLA / Other)– One Way Service– Request Service– Two Way Service
• Speed Implications• Time Coordination Issues
Investigate SOA
October 2011
ROLANDS & ASSOCIATES Corporation 23
Investigate SOA
October 2011
One Way Service - Example
JTLS EmitterTurn OnTurn Off
ROLANDS & ASSOCIATES Corporation 24
Investigate SOA
October 2011
Request Service - Example
JTLS Weather
What Is The Weather At
The Weather Is Cloudy
ROLANDS & ASSOCIATES Corporation 25
Investigate SOA
October 2011
Two Way Service - Example
JTLS Maintenance
Accept Damaged SystemAssets Such As Tow Truck
System Is Repaired
JTLS 5.0
October 2011ROLANDS & ASSOCIATES Corporation 26
ROLANDS & ASSOCIATES Corporation 27
• Obviously Large Job• Terrain Service
– How To Get The Data• No Problem For U. S. Government Users• Foreign Customers - Combatant Command Access
– Time Consuming and Not Flexible– Limited To Military Customers– Civilian Customers Have No Choice
– Allows Coordinate Terrain Data – JCATS / VBS2
Remove Hex Terrain
October 2011
Remove Hex Terrain
No Restrictions To Tiles
Remove Hex Terrain
Nested Tile Restriction
ROLANDS & ASSOCIATES Corporation 30
• Committed To Network Overlay– Types Of Networks
• Road• River – May Be Move To 4.1• Rail• Air Corridor• Naval Lanes
– Smooth Movement
Remove Hex Terrain
October 2011
Questions
October 2011 ROLANDS & ASSOCIATES Corporation 31