Page 1: Future Surface Decision Support Overview · Future Surface Decision Support Overview Airspace Technology Demonstration 2 (ATD-2) Industry Workshop September 4, 2019 Isaac Robeson

Future Surface Decision Support

Overview

Airspace Technology Demonstration 2 (ATD-2)

Industry Workshop

September 4, 2019

Isaac Robeson (NASA ATD-2)

Liang Chen (NASA ATD-2)

Yoon Jung (NASA ATD-2)

Page 2: Future Surface Decision Support Overview · Future Surface Decision Support Overview Airspace Technology Demonstration 2 (ATD-2) Industry Workshop September 4, 2019 Isaac Robeson

Agenda

2

• ATD-2 Overview

• Electronic Data Exchange

• Common Situational Awareness

• Surface Scheduling

• Departure Scheduling for Overhead Stream Insertion

• Surface Metering

Page 3: Future Surface Decision Support Overview · Future Surface Decision Support Overview Airspace Technology Demonstration 2 (ATD-2) Industry Workshop September 4, 2019 Isaac Robeson

3

Center airspace

Terminal airspace

Well-equipped

airportGate

Spot

OFF

Queue

OFF

OFF

Departure

meter points

Arrival

meter point

Arrival

meter point

Downstream

demand/capacity

imbalance

Departure

meter points

Operational Environment for the ATD-2 Concept

Less-equipped

airports

Terminal airspace

Overhead stream

insertion

Departure

Metering

Page 4: Future Surface Decision Support Overview · Future Surface Decision Support Overview Airspace Technology Demonstration 2 (ATD-2) Industry Workshop September 4, 2019 Isaac Robeson

What is Airspace Technology Demonstration 2 (ATD-2)?

• NASA/FAA/Industry collaborative project that demonstrates the benefits of an integrated

arrival, departure and surface (IADS) traffic flow decision making process while introducing

new trajectory based operations (TBO) technologies and procedures

• Responds to a NextGen Advisory Committee (NAC) recommendation/need

4

ATC/Operator Data Exchange and Integration Initial Digital Transformation of Airport Surface

Overhead Stream Operational Integration Collaborative Surface Metering

Page 5: Future Surface Decision Support Overview · Future Surface Decision Support Overview Airspace Technology Demonstration 2 (ATD-2) Industry Workshop September 4, 2019 Isaac Robeson

ATD-2 Capabilities

5

Ca

pa

bil

itie

sb

uil

d u

po

n e

ac

h o

the

r

Real-Time Electronic Data Exchange

Policies and Procedures /

Roles and Responsibilities

The foundation of all of the other ATD-2

capabilities

The capstone needed for each

capability to work and provide benefits

Common Situational Awareness:

Shared view of flights, airport, airspace,

and TMIs

Surface Scheduling: Predict when

each flight will operate and determine

how it will fit into the overhead stream

Surface Metering: Hold flights at the

gate to reduce surface congestion and

save fuel + emissions

Common Situational

Awareness

Surface Scheduling

From Gate into Overhead Stream

Surface

Metering

(Phase 1 & 2)

Departure

Fix Load

Balancing

(Phase 3)

Departure Fix Load Balancing: Use

improved predictions and TOSs to

balance demand across fixes

Page 6: Future Surface Decision Support Overview · Future Surface Decision Support Overview Airspace Technology Demonstration 2 (ATD-2) Industry Workshop September 4, 2019 Isaac Robeson

RTC

STBO

Client

ATD-2

Data

from

External

Systems

ATD-2 System Overview

6

Flight

Matching

and

Fusion

TMI

Processing

Flights

TMIs

External

Flight Data

TMIs

Flight

Data

Model /

Scheduling /

Metering

Data

Surface

Modeling,

Scheduling,

and

Metering

IADS Model

& Scheduler

TMIs

TTP SWIM

Feed

Page 7: Future Surface Decision Support Overview · Future Surface Decision Support Overview Airspace Technology Demonstration 2 (ATD-2) Industry Workshop September 4, 2019 Isaac Robeson

Electronic Data Exchange

7

Page 8: Future Surface Decision Support Overview · Future Surface Decision Support Overview Airspace Technology Demonstration 2 (ATD-2) Industry Workshop September 4, 2019 Isaac Robeson

Electronic Data Exchange

between ATCT and Airlines

8

TFMS

ATD-2

SWIM

EOBT, Gate, Tail

Air

lin

e

ETOT, Runway, TMIs, Airport Config,

SMPs, TOBT/TMAT

TTP (SWIM)

SWIM

EOBT, Gate, Tail

Ramp Control

Ramp

Controller

RTC

*NOTE: With TFDM, the data to and from ramp

tools will need to be routed through the

airline’s SWIM feeds

Page 9: Future Surface Decision Support Overview · Future Surface Decision Support Overview Airspace Technology Demonstration 2 (ATD-2) Industry Workshop September 4, 2019 Isaac Robeson

9

SWIM TTP

Services

Mobile App

for General

Aviation

Applications that

Leverage the TTP

Prototype Feed

SWIM feed

to Air

Carriers

Future Use

ATD-2 IADS

System

NASA and the FAA are collaborating to provide a prototype TFDM Terminal Publication (TTP) feed via SWIM R&D network as part of the ATD-2 Field Demonstration

The ATD-2 Prototype TTP feed will include these services:• Flight Data• Airport Information• Traffic Management Restrictions• Flight Delay• Operational Metrics

TTP is now available on SWIM R&D for

CLT. You are welcome to onboard now!

IADS Data Sharing via Prototype TTP

Page 10: Future Surface Decision Support Overview · Future Surface Decision Support Overview Airspace Technology Demonstration 2 (ATD-2) Industry Workshop September 4, 2019 Isaac Robeson

... the pilot submits their best prediction of Ready-to-Taxi Time (RTT) and Ramp Area(for one Corporate Flight Co., that is +10–15 min)

When the passengers arrive ...

RTT

One pilot waits in the FBO for passengers.

RTT Location~ 10 – 15 minutes after RTT submission

FBOPilots receive Data Elements(see image)

Data

ElementsRWY 36R / 18L

Electronic Data Exchange with GA / BA

Mobile App Ready-to-Taxi Time Submission

10

Page 11: Future Surface Decision Support Overview · Future Surface Decision Support Overview Airspace Technology Demonstration 2 (ATD-2) Industry Workshop September 4, 2019 Isaac Robeson

Electronic Data Exchange in the ATCT Cab

AEFS/ATD-2 Integration

• ATD-2 data elements are integrated into AEFS V5.5.0 Build 1 which was

deployed to CLT on Thu 9/20/2018

11

ATD-2 Times: EOBT, TOBT, AOBT, TMAT, AMAT, ETD (TTOT)

TMAT in

block 11

APREQ release

time in block 16

Parking

Gate

APREQ

indicator

Other data from ATD-2: ONR, SWAP, STOP

Page 12: Future Surface Decision Support Overview · Future Surface Decision Support Overview Airspace Technology Demonstration 2 (ATD-2) Industry Workshop September 4, 2019 Isaac Robeson

TFMS

Electronic Data Exchange

Of Traffic Management Initiatives (TMIs)

12

ATD-2

NTML

FSM

OIS

SWIMTfmData

Flow

ATC

Personnel

Restrictions

Restrictions,

GSs, GDPs

Page 13: Future Surface Decision Support Overview · Future Surface Decision Support Overview Airspace Technology Demonstration 2 (ATD-2) Industry Workshop September 4, 2019 Isaac Robeson

Common Situation Awareness

13

Page 14: Future Surface Decision Support Overview · Future Surface Decision Support Overview Airspace Technology Demonstration 2 (ATD-2) Industry Workshop September 4, 2019 Isaac Robeson

14

• A single system running with multiple users (i.e., Tower, Ramp, TRACON,

Center) to interact with one another

• Users share the same data, exchange information, and make decisions

collaboratively

• Inputs are from multiple sources, including FAA, Airlines, ATC, and Ramp

Surface Trajectory-Based Operation (STBO)

Client - Tower, TRACON, and Center

Ramp Traffic Console (RTC) and Ramp Manager

Traffic Console (RMTC)

Common Situational Awareness

between ATCT and Airlines

Page 15: Future Surface Decision Support Overview · Future Surface Decision Support Overview Airspace Technology Demonstration 2 (ATD-2) Industry Workshop September 4, 2019 Isaac Robeson

Common Situational Awareness – Ramp View

15

The ramp traffic console has many lessons learned woven into its Human Computer Interface

Page 16: Future Surface Decision Support Overview · Future Surface Decision Support Overview Airspace Technology Demonstration 2 (ATD-2) Industry Workshop September 4, 2019 Isaac Robeson

Common Situational Awareness – Ramp View

KILNS

Dep Fix change (CDR)

KILNS

JBU1118 E190

JFK

A4 27

Dep Fix closure

DAL8928

BARMY-EWR

B752

A2 27

Miles in trail (MIT)

A2100

UAL1087

KILNS-EWR

A10 27

Call for release (APREQ)

E2230

FDX1935 B752

KILNS-EWR

FDX

Ground delay (EDCT)

PHL

UPS1283 B752

UPS

Airport ground stop

18L

SWA210

A6

ATC runway change

E2340Q

JIA5026

E5 27

APREQ + EDCT

ATC to Operator

• Real-time traffic management initiatives

• Airport configuration coordination

• Runway intent information

Ramp Tool Colors and Symbology

Ramp control entries

are key to accurate

measures of benefit

and good system

performance

16

Page 17: Future Surface Decision Support Overview · Future Surface Decision Support Overview Airspace Technology Demonstration 2 (ATD-2) Industry Workshop September 4, 2019 Isaac Robeson

Surface Scheduling

17

Page 18: Future Surface Decision Support Overview · Future Surface Decision Support Overview Airspace Technology Demonstration 2 (ATD-2) Industry Workshop September 4, 2019 Isaac Robeson

Surface Modeling

18

• Detects the flight’s current state

• Predicts which resources a flight

will use

– Gate

– Spot

– Runway

– Fix

• Predicts undelayed 4D trajectory

• Tracks aircraft line of flight and

predicts gate conflicts

Page 19: Future Surface Decision Support Overview · Future Surface Decision Support Overview Airspace Technology Demonstration 2 (ATD-2) Industry Workshop September 4, 2019 Isaac Robeson

Surface Scheduling

19

• Predicts when each flight will take

off or land

• Considers

– Current flight state

– Undelayed 4D trajectory

– Other flights arriving and departing

from the same runway

– Runway separation requirements

– EDCTs

– Release times

– Ground stops and fix closures

Page 20: Future Surface Decision Support Overview · Future Surface Decision Support Overview Airspace Technology Demonstration 2 (ATD-2) Industry Workshop September 4, 2019 Isaac Robeson

Scheduling Flights into

Overhead Stream

20

• ATD-2 allows ATCT TMC to electronically negotiate release time into the

overhead stream using IDAC-style interface

• Displays green-space / red-space that shows available time slots for flight

to take off

• Take off time prediction for

flight shown relative to other

flights on the same runway

• EDCT and local information

displayed for the flight

Page 21: Future Surface Decision Support Overview · Future Surface Decision Support Overview Airspace Technology Demonstration 2 (ATD-2) Industry Workshop September 4, 2019 Isaac Robeson

Pre-Scheduling with EOBTs

from CLT to ATL / ORD

21

At an adaptable time prior to departure (e.g. 20

min) the ATD-2 system uses the EOBT, taxi

time estimate and a buffer to electronically

submit a release time request to TBFM

Center TMC approves or adjusts the

time based on center constraints

ATCT and Ramp utilize the now

visible APREQ time on their strips

and pushback advisories

The data is made available on the TTP SWIM

feed so that Operators can get it to their pilots

2

3

IDAC-style scheduling between TBFM and

ATD-2 is used to re-schedule as necessary4

Page 22: Future Surface Decision Support Overview · Future Surface Decision Support Overview Airspace Technology Demonstration 2 (ATD-2) Industry Workshop September 4, 2019 Isaac Robeson

Surface Metering

22

Page 23: Future Surface Decision Support Overview · Future Surface Decision Support Overview Airspace Technology Demonstration 2 (ATD-2) Industry Workshop September 4, 2019 Isaac Robeson

Surface Metering – Process Flow

23

ATD-2 generates demand and capacity predictions

ATD-2 recommends and TMC affirms SMPs.

TOBT

Advisory

TMAT

Advisory

TMC enables metering capability and sets metering parameters in collaboration with ramp manager

Ramp controllers honor metering hold advisories3

1 2

4