FY 2017-2022 STORMWATERUPDATE TO CITY COUNCIL
MARCH 8, 2016
1
• Fund Summary• Functional Components • Closing• Discussion
OVERVIEW
2
FUND SUMMARY
3
FY17 PROPOSED REVENUE
4
▪ERU Daily Fee = $0.433▪ERU Annual Fee = $158.48 ▪ERU’s (FY 17) = 248,723▪SWU Generates $39,417,213 Annually
ERU = EquivalentResidential Unit
FY17 RESOURCE ALLOCATIONOPERATING AND CIP
Flood Control 20% $13,105,246Water Quality 14% $ 8,893,889Operation and Maintenance
66% $41,639,962
Total Program$63,639,097
5
STORM WATER DEBT
Debt Amount Interest Rate Debt Service Payments(FY17)
2010B Storm Water Revenue RefundingBonds
$ 4,530,000 2.597%$641,581
2010A Storm Water Revenue Bonds
$17,295,000 3.238% $1,391,695
2015 Storm Water Revenue Bonds
$22,270,000 2.829% $1,359,106
Total $44,095,000 $3,392,383
7
FUNCTIONAL COMPONENTS
7
THREE MAJOR COMPONENTSFULLY INTEGRATED
Flood Control
Operations &Maintenance
WaterQuality
8
9
Storm Water FY 2017-22Requested Program
CIP Appro. FY 2017 FY 2018 FY 2019 FY 2020 FY 2021 FY 2022
Project Total To Date Budget Budget Budget Budget Budget Budget
Operations & Maintenance7032000 Flood Mitigation Assistance Grant Program 1,227,144 1,227,144 0 0 0 0 0 0
7415000 Lake Management II 47,031,404 17,045,492 5,247,652 4,947,652 4,947,652 4,947,652 4,947,652 4,947,652
7411000 Oceanfront Storm Water Facilities Maintenance 5,708,000 1,208,000 750,000 750,000 750,000 750,000 750,000 750,000
7023000 Primary System Infrastructure Improvements II 17,430,000 3,810,000 2,270,000 2,270,000 2,270,000 2,270,000 2,270,000 2,270,000
7026000 Residential Drainage Cost Participation Program II 450,000 150,000 50,000 50,000 50,000 50,000 50,000 50,000
7200000 Severe Repetitive Loss Grant Program 1,847,009 1,847,009 0 0 0 0 0 0
7412000 Storm Water Pump Station Modifications 7,416,889 2,416,889 750,000 1,250,000 750,000 750,000 750,000 750,000
7034000 Stormwater Operations Modular Building 890,000 490,000 400,000 0 0 0 0 0
7416000 SW Infrastructure Rehabilitation & Improvements II 56,172,866 21,872,866 5,550,000 5,750,000 5,750,000 5,750,000 5,750,000 5,750,000
Water Quality7406000 Elizabeth River TMDL Implementation Plan 2,200,000 1,000,000 200,000 200,000 200,000 200,000 200,000 200,000
7153000 Lynnhaven Watershed Restoration 6,518,242 4,658,446 309,068 309,068 309,068 309,068 311,762 311,762
7410000 Southern Rivers TMDL Implementation Plan 2,200,000 1,000,000 200,000 200,000 200,000 200,000 200,000 200,000
7414000 Storm Water Quality Enhancements II 14,054,704 8,193,928 602,694 1,052,694 1,052,694 1,052,694 1,050,000 1,050,000
7042000 Surface Water Regulatory Compliance Program 6,600,000 0 1,100,000 1,100,000 1,100,000 1,100,000 1,100,000 1,100,000
7043000 Water Quality and Restoration Participation Projects II 1,350,000 0 600,000 150,000 150,000 150,000 150,000 150,000
Flood Control7400000 Aragona Drainage Improvements 2,360,000 2,360,000 0 0 0 0 0 0
7036000 Baker Road Culvert and Ditch Improvements 450,000 450,000 0 0 0 0 0 0
7037000 Bellamy Manor Outfall Ditch 750,000 750,000 0 0 0 0 0 0
7041000 Central Resort District Drainage Improvements 300,000 0 300,000 0 0 0 0 0
7030000 Citywide Sea Level Rise/Recurrent Flooding Analysis 3,000,000 3,000,000 0 0 0 0 0 0
7402000 College Park and Level Green Drainage Improvements 1,098,687 498,687 0 0 600,000 0 0 0
7151000 Eastern Shore Drive Drainage Phase I 18,939,356 13,139,356 0 1,000,000 1,200,000 1,200,000 1,200,000 1,200,000
7413000 Neighborhood SW Infrastructure Improvements II 6,249,995 3,349,995 150,000 550,000 550,000 550,000 550,000 550,000
7005000 North Lake Holly Watershed 18,671,135 17,071,135 200,000 1,400,000 0 0 0 0
7016000 South Lake Holly Watershed 16,338,000 13,438,000 2,300,000 600,000 0 0 0 0
7024000 Southern Canal/Lead Ditch and Culvert Improvements 3,550,000 1,750,000 300,000 300,000 300,000 300,000 300,000 300,000
7027000 SWM Master Planning, Analysis, and Inventory 9,870,906 3,570,906 1,800,000 1,300,000 800,000 800,000 800,000 800,000
7028000 Windsor Woods Drainage 10,484,453 3,184,453 700,000 0 1,200,000 1,800,000 1,800,000 1,800,000
Report Total 263,158,790 127,482,306 23,779,414 23,179,414 22,179,414 22,179,414 22,179,414 22,179,414
GovMax V5 1/12/2016
• Operations & Maintenance• Cheryl Cole
• Water Quality• Melanie Coffey
• Flood Control • Mike Mundy
FUNCTIONAL COMPONENTS
10
OPERATIONS AND MAINTENANCE
11
Flood Control
Operations &Maintenance
WaterQuality
OPERATIONS AND MAINTENANCE
12
System has Multiple Components to Maintain:
1200 miles Pipe 160 miles Off Road Ditch 450 miles Roadside Ditch 15 Pump Stations 776 Lakes to inspect; 491 Lakes to maintain 58 Dams/Spillways
CIP Appro. FY 2017 FY 2017-22
Project Total To Date Budget Budget
7416000 SW Infrastructure Rehabilitation & Improvements II 56,172,866 21,872,866 5,550,000 34,300,000
7026000 Residential Drainage Cost Participation Program II 450,000 150,000 50,000 300,000
7023000 Primary System Infrastructure Improvements II 17,430,000 3,810,000 2,270,000 13,620,000
7411000 Oceanfront Storm Water Facilities Maintenance 5,708,000 1,208,000 750,000 4,500,000
7412000 Stormwater Pump Station Modifications 7,416,889 2,416,889 750,000 5,000,000
7415000 Lake Management II 47,031,404 17,045,492 5,247,652 29,985,912
7034000 Stormwater Operations Modular Building 890,000 490,000 400,000 400,000
7200000 Severe Repetitive Loss Grant Program 1,847,009 1,847,009 0 0
7032000 Flood Mitigation Assistance Grant Program 1,227,144 1,227,144 0 0
Report Total 138,173,312 50,067,400 15,017,652 88,105,912
GovMax V5 1/12/2016
STORMWATER FY 2017-22 REQUESTED PROGRAM – O&M
13
7-416 SW INFRASTRUCTURE REHABILITATION & IMPROVEMENTS II
14
Misc Drainage Project Constr. CostBoardwalk Pipeline CCTV FY16 $700KN Bay Shore Improvements FY16 $600KFleet Terrace Improvements FY16 $125KBasin Road Improvements FY16 $135KWheelgate Lane Improvements FY16 $100KWhiting Lane Improvements FY16 $70KShad Lane Improvements FY16 $100KLakeview Drive Improvements FY17 $1.5MDam Neck Road Phase II FY17 $350KArnold Circle FY17 $50KLee Avenue FY17 $100K22nd Street Pipe Repair FY17 $450K
Total: $4.3M
Dam Neck Road Phase I
1200 miles of PipeAnnual Scope of Work:1. Misc. Drainage Projects, $1M to $2M 2. Major Neighborhood Rehabs 3. Corrugated Metal Pipes, $500k4. Cave-In Repairs, $1M
$5.5M
15
Current /Completed Major Neighborhood Rehabs:Neighborhood Constr. Cost Phase
Princess Anne Plaza FY13 $5.5M CompleteAragona FY14 $2.8M CompleteGreen Run FY15/16 $2.8M CompleteGlenwood FY16 $1.8M ConstructionPine Ridge/Hunt Club/Middle Oaks/Strawbridge FY17 $1.1M ConstructionKings Grant FY17 $2.0M DesignMagic Hollow FY17 $2.0M CCTV
Total: $18M
Green Run Pipe Lining Green Run Pole Grouting
7-416 SW INFRASTRUCTURE REHABILITATION & IMPROVEMENTS II
$5.5M
Upcoming: $19M
Future Neighborhood Rehabs:
16
Neighborhood Est. Pop. Cost Const. Start
Fairfield 1970s 6,000 $2M FY18Southgate 1980s 3,000 $1M FY18Ocean Lakes 1980s 7,000 $2M FY19Windsor Woods 1960s 5,000 $2M FY19Indian Lakes 1970s 8,000 $2M FY20Salem Woods 1980s 6,000 $2M FY20Salem Lakes 1980s 10,000 $1M FY21Red Mill Farms 1980s 19,000 $2M FY21Lagomar 1980s 4,000 $1M FY21Malibu 1960s 5,000 $1M FY22Foxfire 1990s 5,000 $1M FY22Courthouse Estates 1990s 8,000 $2M FY22
7-416 SW INFRASTRUCTURE REHABILITATION & IMPROVEMENTS II
$5.5M
7-026 RESIDENTIAL COST PARTICIPATION
17
Program Components: Cost participation between City and
residents Enclosure of existing ditches within pre-
1970 neighborhoods Safety and/or maintenance conditions
developed due to minimum drainage standards utilized during original development
Future Components: This CIP is proposed to expand to include
water quality treatment of existing city owned & City impacted lakes for algae & non-native plant removal.
$50K Annually
18
Council DistrictsMiles of Ditch:District Miles
Bayside 12
Beach 13
Centerville 5
Kempsville 16
Lynnhaven 5
Princess Anne 99
Rose Hall 10
Total: 160
ORD ProgramMiles by Fiscal Year:
Year Zones Miles
FY14 F, J 20FY15 B, M 27FY16 C, N 17FY17 D, L 27FY18 E, K 18FY19 A, I 10FY20 G, O 17FY21 H, P 24
Total: 160
7-023 PRIMARY SYSTEM INFRASTRUCTURE IMPROVEMENTS II
Off-Road Ditch Program:
$2.27M
19
CIP used for Off Road: Overall program management Plan development for annual
program Environmental permits Contracted ditch work
Arrowfield Rd ORD (Zone F) Before Arrowfield Rd ORD (Zone F) After
Program Cycles: Original Cycle: 16 years Goal Cycle: 8 - 10 years Current Cycle: 12 years
7-023 PRIMARY SYSTEM INFRASTRUCTURE IMPROVEMENTS II
$2.27M
20
15 Stormwater Pump Stations
7-411 OCEANFRONT SW FACILITIES MAINTENANCE7-412 SW PUMP STATION MAINTENANCE
42nd Street Pump Station Outfall RepairsEstimated Project Cost: $330,000
Stair Nosing Replacements Estimated Project Cost: $50,000
Boardwalk Joint Sealant Repairs Estimated Project Cost: $50,000
Implementing SCADA into all SW Pump Stations, Estimated Project Cost: $500,000
16th Street Pump Station Repairs & Rehab Estimated Project Cost: $300,000
7-411: $750K
7-412: $750K
21
Salem Lakes
Brigadoon Lake # 4Brigadoon Lake # 4
BMP Maintenance Dredging
Capability: ASC Contractor & Design team for efficiency Prequalify Contractors
Accomplishments (FY13-FY16): 9 Lakes Completed, 2 Under Construction 109,600 CY Dredged (FY13-16 YTD) 3 Lakes Under Design FY11 - 950 year cycle time pre CIP FY15 - 95 year cycle time
7-415 LAKE MANAGEMENT II
$4.7M Dredging
CIP Total: $5.2M
22
7-415 LAKE MANAGEMENT II
RANKING ASSET DESCRIPTION CONSTRUCTION START (FISCAL YEAR) PHASE
KINGSTON LAKE 2013 COMPLETEGREEN RUN LAKE #1 2014 COMPLETE
1 CINNAMON RIDGE/TIMBERLAKE 2014 COMPLETE2 BRIGADOON LAKE #2 2015 COMPLETE3 BRIGADOON LAKE #8 2015 COMPLETE4 SALEM LAKES #2 2015 COMPLETE5 BRIGADOON LAKE #1 2017 DESIGN6 BRIGADOON LAKE #3 2016 CONSTRUCTION7 BRIGADOON LAKE #4 2016 COMPLETE8 BRIGADOON LAKE #5 2016 COMPLETE9 BRIGADOON LAKE #6 2016 CONSTRUCTION
10 BRIGADOON LAKE #7 2016 COMPLETE11 GREEN RUN LAKE #2 2017 DESIGN12 GREEN RUN LAKE #3 2018 DESIGN13 GREEN RUN LAKE #4 201814 GREEN RUN LAKE #5 201815 BROOKSIDE #1 2018
Top 50 Lakes Dredging List:$4.7M Dredging
23
$5.7M
7-415 LAKE MANAGEMENT II
RANKING ASSET DESCRIPTION CONSTRUCTION START (FISCAL YEAR) PHASE
16 GREENVIEW LAKE 201817 CENTRE POINTE #1 201818 CENTRE POINTE #2 201819 LYNNHAVEN WOODS LAKE #1 201920 STRATFORD CHASE #1 201921 STRATFORD CHASE #2 201922 STRATFORD CHASE #3 201923 TURTLE LAKE 201924 LEVEL GREEN 1 201925 LEVEL GREEN 2 202026 KINGS LAKE SOUTH 202027 WEST LAKE PEMBROKE 202028 SOUTHGATE LAKE #1 202129 SOUTHGATE LAKE #2 202130 SOUTHGATE LAKE #3 202131 THREE OAKS LAKE #1 202132 SABRE STREET EXTENDED #2 2021
Top 50 Lakes Dredging List:$4.7M Dredging
24
7-415 LAKE MANAGEMENT II
RANKING ASSET DESCRIPTION CONSTRUCTION START (FISCAL YEAR) PHASE
33 ROCK CREEK #1 202134 ROCK CREEK #2 202235 ROCK CREEK #3 202236 SALEM VILLAGE #2 202237 GLENWOOD LAKE #7 202338 LAKE PLACID #3 202339 CHIMNEY HILL #1 202340 CHIMNEY HILL #2 202441 REEDTOWN (LAKE) AKA WISHART LAKE 202542 INDEPENDENCE PH 4A 202543 LAKE #2 (GREAT NECK AREA) 202544 JOHN B. DEY 202545 ROSEMONT FOREST #5 202546 ROSEMONT FOREST #B 202547 LAKE #4 (THOROUGHGOOD AREA) 202648 LAKE RIDGE AREA LAKE #1 202649 DODD DRIVE LAKE 202650 HOLLAND WOODS LAKE 2026
Top 50 Lakes Dredging List:$4.7M Dredging
25
7-415 LAKE MANAGEMENT II
Kingston Dam
Lake Dowdy Spillway
Dams & Spillways
Requirements: Condition assessed on a 1 to 3 year cycle
dependent upon condition MS4 reporting requirement
Accomplishments: FY15: Kingston Lake Dam Rehabilitation FY 16: Lake Dowdy Dam Outfall Structure
Repair
Future Efforts: FY 17: Regulatory Dam Assessment,
i.e., Lake Holly Dam, Indian Lakes Dam
$500K Dams
CIP Total: $5.2M
26
$400K
7-034 STORMWATER OPERATIONS MODULAR BUILDING
New 3,600 ft2 building to be located at PW/OPS Dam Neck Yard
Building will accommodate previous SW Program expansions
Current Modular (Pictured) Staff Capacity: 16 New Modular Staff Capacity: 19, 1 Conference Room
$490K previously funded in FY16 (total cost $890K)
27
SRL 2010 Program (1st Grant - Complete): • Awarded in 2010 to elevate 8 homes with
government and private funding• Total amount of $1,721,265; no further funds
required• NTP issued August 2014 with completion in
September 2015• Resulted in 7 homes successfully lifted
(1 homeowner dropped out of the program)After
Before
Before After
7-200 SEVERE REPETITIVE LOSS GRANT PROGRAM
FMA 2013 Program (2nd Grant): ▪ Awarded in September 2014 to
elevate 8 homes using 100% federal funds
▪ Total program amount of $1,227,144
▪ Design phase began in October 2015
▪ Project expected to go to bid in Spring 2016
▪ Grant Completion: Fall 2018
7-032 FLOOD MITIGATION ASSISTANCE GRANT PROGRAM
$1.2M
28
WATER QUALITY
29
Flood Control
Operations &Maintenance
WaterQuality
WATER QUALITY
30
Manage the new and changing complex requirements for watersheds and individual waterways Chesapeake Bay Watershed Southern Rivers Watershed Atlantic Ocean Watershed
Manage programs and projects to improve water quality and ensure compliance with regulations
STORM WATER FY 2017-22REQUESTED PROGRAM – WATER QUALITY
31
CIP Appro. FY 2017 FY 2017-22
Project Total To Date Budget Budget
7406000 Elizabeth River TMDL Implementation Plan 2,200,000 1,000,000 200,000 1,200,000
7153000 Lynnhaven Watershed Restoration 6,518,242 4,658,446 309,068 1,859,796
7410000 Southern Rivers TMDL Implementation Plan 2,200,000 1,000,000 200,000 1,200,000
7414000 Storm Water Quality Enhancements II 14,054,704 8,193,928 602,694 5,860,776
7042000 Surface Water Regulatory Compliance Program 6,600,000 0 1,100,000 6,600,000
7043000 Water Quality and Restoration Participation Projects II 1,350,000 0 600,000 1,350,000
Report Total 32,922,946 14,852,374 3,011,762 18,070,572
GovMax V5 1/12/2016
Funds compliance activities for the new VPDES MS4 Stormwater Permit
Program Administration and Reporting
Stormwater Pollution Reduction
Operational Requirements
Infrastructure Data Management
Public Outreach and Education
STORM WATER CIP - WATER QUALITY
32
7-042 Surface Water Regulatory Compliance Program
$ 1.1 M annual FY17
33
Lynnhaven River Basin Ecosystem Restoration Project Joint Venture with the Army Corps of Engineers (ACOE)
Phase I – Design and Acquisition
Design of reef habitat and submerged aquatic vegetation
Cost Participation Agreement 65% ACOE / 35% City
City share is estimated at $1.5M
$600 K annual FY17
Oyster Reefs in the Lynnhaven River
7-043 Water Quality and Restoration Participation Projects II
STORM WATER CIP - WATER QUALITY
Funds stormwater quality projects citywide TMDL Action Planning Design and Construction of SWMFs &
retrofits Program Implementation
Completed retrofit projects: Alanton Elementary Lynnhaven Middle Bow Creek BMP expansion Pembroke Elementary School Bioretention Princess Anne High School Permeable
Paver Retrofit
34
7-414 Storm Water Quality Enhancements II
STORM WATER CIP - WATER QUALITY
Pembroke Elementary Bioretention
Princess Anne HS Permeable Pavers
35
Owls Creek Boat Pump Out Facility
Mill Dam Creek Stream Restoration
STORM WATER CIP - WATER QUALITY
7-414 Storm Water Quality Enhancements II Projects under construction
Mill Dam Creek Stream Restoration
Owls Creek Boat Pump Out Facility
$ 603 K annual FY17
Pembroke Lake Retrofit Project Estimated at $4.95 M Improve the existing pond
by adding pretreatment forebays, wetlands, dredging and aeration
36
$ 309 K annual FY17
7-153 Lynnhaven Watershed Restoration
STORM WATER CIP - WATER QUALITY
Pembroke Lakes BMP Retrofit Project
37
7-406 Elizabeth River TMDL Implementation Plan
$200 K annual FY17
STORM WATER CIP - WATER QUALITY
Turtle Lake BMP Retrofit Project
Planned Retrofit Projects
Chatham Hall Pond Retrofit Project is estimated at $1.27 M
Kemps Lake Retrofit Project is estimated at $2.55 M
Turtle Lake Retrofit Project is estimated at $830 K
All projects improve the existing pond by adding pretreatment forebay, wetlands, dredging and aeration
38
Development of TMDL Action Plans required by new MS4 permit
Public participation, education and information
Watershed analysis, study, design and construction of retrofits
7-410 Southern River TMDL Implementation Plan
$200 K annual FY17
STORM WATER CIP - WATER QUALITY
FLOOD CONTROL
39
Flood Control
Operations &Maintenance
WaterQuality
40
Lawson Forest Drainage ImprovementsSouthern Drainage - Crags CausewaySouthern Drainage - Head River RoadSouthern Drainage - Muddy Creek RoadThoroughgood Drainage Improvements
2015 Completed Flood Control
Lawson Forest
Thoroughgood Head River Road
Crags Causeway
Muddy Creek Rd
41
Cape Henry Tide GateSouthern Drainage – Indian Creek RoadSouth Lake Holly Phase I & II
2016 Current Flood Control & Water Quality Construction Projects
South Lake Holly
Indian Creek Rd Cape Henry Tide Gate
CIP Appro. FY 2017 FY 2017-22Project Total To Date Budget Budget
7400000 Aragona Drainage Improvements 2,360,000 2,360,000 0 0
7036000 Baker Road Culvert and Ditch Improvements 450,000 450,000 0 0
7037000 Bellamy Manor Outfall Ditch 750,000 750,000 0 0
7041000 Central Resort District Drainage Improvements 300,000 0 300,000 300,000
7030000 Citywide Sea Level Rise/Recurrent Flooding Analysis 3,000,000 3,000,000 0 0
7402000 College Park and Level Green Drainage Improvements 1,098,687 498,687 0 600,000
7151000 Eastern Shore Drive Drainage Phase I 18,939,356 13,139,356 0 5,800,000
7413000 Neighborhood SW Infrastructure Improvements II 6,249,995 3,349,995 150,000 2,900,000
7005000 North Lake Holly Watershed 18,671,135 17,071,135 200,000 1,600,000
7016000 South Lake Holly Watershed 16,338,000 13,438,000 2,300,000 2,900,000
7024000 Southern Canal/Lead Ditch and Culvert Improvements 3,550,000 1,750,000 300,000 1,800,000
7027000 SWM Master Planning, Analysis, and Inventory 9,870,906 3,570,906 1,800,000 6,300,000
7028000 Windsor Woods Drainage 10,484,453 3,184,453 700,000 7,300,000
Report Total 92,062,532 62,562,532 5,750,000 29,500,000GovMax V5 1/12/2016
42
Storm Water FY 2017-22Requested Program – Flood Control
STORM WATER CIP SECTION FLOOD CONTROL
43
▪ Storm drain improvements to address severe roadway and property flooding
▪ Under Design▪ Construction: 6/2017 – 6/2018
Total Project Cost: $2.36M
7-400 Aragona Drainage Improvements
STORM WATER CIP SECTION FLOOD CONTROL
44
7-036 Baker Road Culvert & Ditch Improvements
Storm drain pipe and ditch improvements from Baker Rd. to Diamond Spring Rd. north of Northampton Blvd .
Coordinating with Burton Station SGA
Acquisition phase Construction: 1/2017 –
6/2018Total Project Cost: $450K
STORM WATER CIP SECTION FLOOD CONTROL
45
7-037 Bellamy Manor Outfall Ditch▪ Drainage improvements to the
existing primary drainage system within Bellamy Manor
▪ Under design & acquisition▪ Construction: 10/2016 – 6/2017
Total Project Cost: $750K
STORM WATER CIP SECTION FLOOD CONTROL
46
▪ Study drainage issues and develop alternative solutions
▪ Review interim improvements to improve drainage in area around Baltic Avenue and 21st Street
▪ Current Requested Funding $300K
7-041 Central Resort District Drainage Imp
Total Project Cost: > $100M
47
Total Project Cost: $3.0M
7-030 Citywide Sea Level Rise (SLR) /Recurrent Flooding (RF) Analysis
Identify the probable extent of SLR / RF impacts
Evaluate appropriate adaptation strategies in the vulnerable areas; and
Identify budgetary costs for engineered protection measures and other adaptation
STORM WATER CIP SECTION FLOOD CONTROL
STORM WATER CIP SECTION FLOOD CONTROL
48
7-402 College Park/Level Green Drainage Improvements
• Improve neighborhood storm drain system
• Under Preliminary Design• Construction: 1/2018 –
12/2018• Current Requested Funding
$1.1 MTotal Project Cost:
> $5.6M
7-151 Eastern Shore Drive Drainage
STORM WATER CIP SECTION FLOOD CONTROL
49
• Drainage study completed July 2012 – June 2014• Interim Project- Under construction 3/2016 – 12/2016• Current Requested Funding $18.9M• Phases I and II design underway, Phases I and II construction not funded• Phases III and IV not funded
II
IIIIII
IIII
IVIV
I
III
II
IV
Total Project Cost: > $70M
STORM WATER CIP SECTION FLOOD CONTROL
50
▪ 24th-1/2 Street Drainage Imp’ts
▪ Muddy Creek Rd. Culvert Imp’ts
• Indian River Rd. Culvert Imp’t• Ocean Park Drainage Imp’t• Southside Rd. Drainage Imp’t
Oak Street Drainag• Goodspeed Road
7-413 Neighborhood Storm Water Infrastructure Improvements II
Completed Projects
Current Projects
Before After
Project Cost: $150K FY17
50
7-005 North Lake Holly Watershed
STORM WATER CIP SECTIONFLOOD CONTROL
51
Completion in June 2019
Legend
Section I-B $2.47 M
Section I-A $1.43 M
Section II $3.95 M
Section III $ 5.55 M Const. 3/2017–6/2019
Section IV $2.82 M Const. 3/2016–7/2017
Section I-C $2.45 M Const. 8/2017–3/2019
Completed
Under Design
Total Project Cost: $18.67M
7-016 South Lake Holly Watershed
STORM WATER CIP SECTIONFLOOD CONTROL
52
Completion in October 2019
Legend
Section III $2.3 M Const. 9/2013
Section II $4.71 M Const. 9/2014– 6/2017
Section IV $8.73 M Const. 8/2017 –10/2019
Section I $0.60 M Const. 9/2014 –6/2017
Completed
Under Construction
Under Design
Total Project Cost: $16.34M
STORM WATER CIP SECTION FLOOD CONTROL
53
7-024 Southern Canal/Lead Ditch and Culvert Improvements▪ Canal / lead ditch and culvert improvements within
southern watersheds▪ Princess Anne / Morris Neck Culvert Fall 2012▪ Head River Road Culvert Spring 2015▪ Crags Causeway Culvert Summer 2015▪ Indian Creek Culvert Spring 2016
Project Cost: $300K annually
STORM WATER CIP SECTION FLOOD CONTROL
54
7-027 SWM Master Planning, Analysis, and Inventory• Models for Watersheds Plan Will Include
Water Quality and Quantity• Lynnhaven River Watershed In Progress
• Draft models for Watersheds 3 and 5 under review.
• Models for Watersheds 7, 8 and 30 have begun.
• Watersheds 4 and 6 to begin shortly.• Southeast Portion of City (Watersheds 9
and 10) Will Be Next.• Meet Commonwealth Stormwater Permit
Requirements• Perform Preliminary Drainage Analysis For
Future Capital Drainage Projects
Total Project Cost: $9.87M
STORM WATER CIP SECTION FLOOD CONTROL
55
Total Project Cost: > $40M
7-028 Windsor Woods Drainage• Drainage improvements to alleviate
wide spread repetitive storm water flooding
• Tidally influenced• First Phase includes improvements
to Presidential Canal and Northgate Ditch (Under Design)
• Currently Requested Funding $10.5M
Rosemont Road near Clubhouse Road
56
Storm Water FY 2017-22Closing
Emerging Budget Issues▪ Flood Control (FC) becoming more complicated and
more expensive▪ Storm Water and Surface Water Quality (WQ)
Regulations are more demanding▪ More complicated FC and more demanding WQ
Regulations are increasing Operation and Maintenance (O&M) Requirements
▪ Sea Level Rise is compounding FC, WQ and O&M Requirements
▪ Existing funding will not be adequate as we move forward in future years
FY 2017-2022 STORMWATERDISCUSSION
MARCH 8, 2016