RAIL FY 2015 AS PASSED - TRANSPORTATION PROGRAM Earnark 5/27/2014 8:57 PROJECT NAME DESCRIPTION NUMBER OTHER PE ROW CONST TOTAL T FUND TIB FEDERAL LOCAL TOTAL Clarendon & Pitsford Railroad: 0 HYDEVILLE BLISSVILLE ROAD CROSSING STP 2033(26) 300,000 300,000 30,000 270,000 300,000 Green Mountain Railroad: BELLOWS FALLS-CHESTER INSTALLATION OF SIX MILES OF 105# RAIL 40,000 40,000 40,000 40,000 CHESTER BRIDGE 119 GMRC(11) 25,000 400,000 425,000 425,000 425,000 CLARENDON EAST CLARENDON ROAD CROSSING STP 2033(25) 400,000 400,000 40,000 360,000 400,000 CLARENDON REHAB BR 95 WCRS(10) 75,000 75,000 15,000 60,000 75,000 LUDLOW WEST HILL ROAD CROSSING STP 2033(23) 200,000 200,000 20,000 180,000 200,000 ROCKINGHAM BRIDGE 111 GMCR(10) 25,000 400,000 425,000 425,000 425,000 ROCKINGHAM BRIDGE 107 - SCOPING PROJECT STP GMRC(9) 400,000 400,000 80,000 320,000 400,000 Montreal, Maine & Atlantic Railway: NEWPORT-RICHFORD IMPROVE FIVE RAIL/HIGHWAY CROSSINGS STP 2030(7) 350,000 350,000 35,000 315,000 350,000 New England Central Railroad: ST ALBANS - CANADA UPGRADES ALONG NECR RR FROM ST ALBANS - CANADA BORDER RR13NE01 3,000,000 3,000,000 2,100,000 900,000 3,000,000 Vermont Railway: ARLINGTON CROSSING STP 0114(4) 400,000 400,000 40,000 360,000 400,000 DORSET BRIDGE 79 WCRS(8) 150,000 150,000 30,000 120,000 150,000 LEICESTER OLD JERUSALEM ROAD CROSSING STP 2033(24) 200,000 200,000 20,000 180,000 200,000 MANCHESTER BRIDGE 72 WCRS(24) 15,000 15,000 3,000 12,000 15,000 MIDDLEBURY BRIDGE 234 WCRS(16) 10,000 10,000 2,000 8,000 10,000 MIDDLEBURY MIDDLEBURY DOWNTOWN TUNNEL WCRS(23) 357,029 357,029 71,406 285,623 357,029 MIDDLEBURY BRIDGE 239 WCRS(9) 10,000 1,050,000 1,060,000 212,000 848,000 1,060,000 NEW HAVEN BRIDGE 242 WCRS(18) 200,000 200,000 40,000 160,000 200,000 PITTSFORD CROSSING - WHIPPLE HOLLOW ROAD STP 2033(21) 20,000 20,000 2,000 18,000 20,000 PITTSFORD BRIDGE 219 HPP ABRB(9) 3,500,000 3,500,000 700,000 2,800,000 3,500,000 RUTLAND-BURLINGTON CWR UPGRADE - PHASE I VTRY(1) 100,000 2,875,000 2,975,000 2,677,500 297,500 2,975,000 RUTLAND-BURLINGTON CWR UPGRADE - PHASE II VTRY( ) 100,000 3,200,000 3,300,000 330,000 2,970,000 3,300,000 RUTLAND-LEICESTER TIGER V FRA GRANT 305,283 3,388,079 3,693,362 672,007 3,021,355 3,693,362 SALISBURY BRIDGE 232 WCRS(15) 10,000 10,000 2,000 8,000 10,000 SHELBURNE-BURLINGTON MAINTAIN QUIET ZONE EQUIPMENT SF9043-007 75,000 75,000 75,000 75,000 SUNDERLAND BRIDGE 63 - REHAB BRIDGE WCRS(25) 1,000,000 1,000,000 200,000 800,000 1,000,000 SUNDERLAND BRIDGE 64 - REPLACE PIER WCRS(19) 2,000,000 2,000,000 160,906 239,094 1,600,000 2,000,000 0 COLOR KEY

Upload: others

Post on 30-Jan-2020

0 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: FY 2018 - Vermont Agency of Transportation · chester bridge 119 gmrc(11) 25,000 400,000: 425,000 425,000: 425,000 clarendon east clarendon road crossing: ... budget year projected

RAIL FY 2015 AS PASSED - TRANSPORTATION PROGRAM

Earnark

5/27/2014 8:57

PROJECT NAME DESCRIPTION NUMBER OTHER PE ROW CONST TOTAL T FUND TIB FEDERAL LOCAL TOTAL

Clarendon & Pitsford Railroad: 0

HYDEVILLE BLISSVILLE ROAD CROSSING STP 2033(26) 300,000 300,000 30,000 270,000 300,000

Green Mountain Railroad:

BELLOWS FALLS-CHESTER INSTALLATION OF SIX MILES OF 105# RAIL 40,000 40,000 40,000 40,000

CHESTER BRIDGE 119 GMRC(11) 25,000 400,000 425,000 425,000 425,000

CLARENDON EAST CLARENDON ROAD CROSSING STP 2033(25) 400,000 400,000 40,000 360,000 400,000

CLARENDON REHAB BR 95 WCRS(10) 75,000 75,000 15,000 60,000 75,000

LUDLOW WEST HILL ROAD CROSSING STP 2033(23) 200,000 200,000 20,000 180,000 200,000

ROCKINGHAM BRIDGE 111 GMCR(10) 25,000 400,000 425,000 425,000 425,000

ROCKINGHAM BRIDGE 107 - SCOPING PROJECT STP GMRC(9) 400,000 400,000 80,000 320,000 400,000

Montreal, Maine & Atlantic Railway:

NEWPORT-RICHFORD IMPROVE FIVE RAIL/HIGHWAY CROSSINGS STP 2030(7) 350,000 350,000 35,000 315,000 350,000

New England Central Railroad:

ST ALBANS - CANADA UPGRADES ALONG NECR RR FROM ST ALBANS - CANADA BORDER RR13NE01 3,000,000 3,000,000 2,100,000 900,000 3,000,000

Vermont Railway:

ARLINGTON CROSSING STP 0114(4) 400,000 400,000 40,000 360,000 400,000

DORSET BRIDGE 79 WCRS(8) 150,000 150,000 30,000 120,000 150,000

LEICESTER OLD JERUSALEM ROAD CROSSING STP 2033(24) 200,000 200,000 20,000 180,000 200,000

MANCHESTER BRIDGE 72 WCRS(24) 15,000 15,000 3,000 12,000 15,000

MIDDLEBURY BRIDGE 234 WCRS(16) 10,000 10,000 2,000 8,000 10,000

MIDDLEBURY MIDDLEBURY DOWNTOWN TUNNEL WCRS(23) 357,029 357,029 71,406 285,623 357,029

MIDDLEBURY BRIDGE 239 WCRS(9) 10,000 1,050,000 1,060,000 212,000 848,000 1,060,000

NEW HAVEN BRIDGE 242 WCRS(18) 200,000 200,000 40,000 160,000 200,000

PITTSFORD CROSSING - WHIPPLE HOLLOW ROAD STP 2033(21) 20,000 20,000 2,000 18,000 20,000

PITTSFORD BRIDGE 219 HPP ABRB(9) 3,500,000 3,500,000 700,000 2,800,000 3,500,000

RUTLAND-BURLINGTON CWR UPGRADE - PHASE I VTRY(1) 100,000 2,875,000 2,975,000 2,677,500 297,500 2,975,000

RUTLAND-BURLINGTON CWR UPGRADE - PHASE II VTRY( ) 100,000 3,200,000 3,300,000 330,000 2,970,000 3,300,000

RUTLAND-LEICESTER TIGER V FRA GRANT 305,283 3,388,079 3,693,362 672,007 3,021,355 3,693,362

SALISBURY BRIDGE 232 WCRS(15) 10,000 10,000 2,000 8,000 10,000

SHELBURNE-BURLINGTON MAINTAIN QUIET ZONE EQUIPMENT SF9043-007 75,000 75,000 75,000 75,000

SUNDERLAND BRIDGE 63 - REHAB BRIDGE WCRS(25) 1,000,000 1,000,000 200,000 800,000 1,000,000

SUNDERLAND BRIDGE 64 - REPLACE PIER WCRS(19) 2,000,000 2,000,000 160,906 239,094 1,600,000 2,000,000

0

COLOR KEY

Page 2: FY 2018 - Vermont Agency of Transportation · chester bridge 119 gmrc(11) 25,000 400,000: 425,000 425,000: 425,000 clarendon east clarendon road crossing: ... budget year projected

RAIL FY 2015 AS PASSED - TRANSPORTATION PROGRAM

Earnark

5/27/2014 8:57

PROJECT NAME DESCRIPTION NUMBER OTHER PE ROW CONST TOTAL T FUND TIB FEDERAL LOCAL TOTAL

COLOR KEY

Washington County RR-Barre-Mtplr:

BARRE CITY RTE 62 CROSSING STP 026-1(42) 25,000 250,000 275,000 27,500 247,500 275,000

BARRE-BERLIN-MONTPELIER WACR LEASE SUBSIDY 04-9038 260,000 260,000 260,000 260,000

MONTPELIER PIONEER STREET CROSSING STP 6400(30) 25,000 250,000 275,000 27,500 247,500 275,000

Washington County RR-Conn River:

BARTON ROUTE 16, EASTERN AVENUE CROSSING STP 0286(6) 375,000 375,000 37,500 337,500 375,000

STATEWIDE STATEWIDE RAILROAD TIES CRTIES01 300,000 300,000 300,000 300,000

Statewide Projects

STATEWIDE STATEWIDE-3WAY PARTNERSHIP RR3WY 600,000 600,000 200,000 400,000 600,000

STATEWIDE STATEWIDE - ADMIN A6232 965,862 965,862 965,862 965,862

STATEWIDE STATEWIDE - AMTRAK MARKETING AMTRK15-0001 50,000 50,000 50,000 50,000

STATEWIDE STATEWIDE - BRIDGE INSP STRBINSP 850,000 850,000 850,000 850,000

STATEWIDE STATEWIDE - BRIDGE LOAD RATING IMPROVEMENTS STRBLOAD 610,000 610,000 562,000 48,000 610,000

STATEWIDE STATEWIDE - CROSSING MGMT STP 2030(10) 22,000 22,000 2,200 19,800 22,000

STATEWIDE STATEWIDE - D & E 240,000 240,000 109,500 130,500 240,000

STATEWIDE STATEWIDE - LEASE MGMT SF9043-000 & 201 325,000 325,000 325,000 325,000

STATEWIDE STATEWIDE - MAINT RR BLDG SF9043-310 175,000 175,000 175,000 175,000

STATEWIDE STATEWIDE - OPER LIFEWAVER RAWP 30,000 30,000 6,000 24,000 30,000

STATEWIDE STATEWIDE - AMTRAK AMTRK15-002 7,800,000 7,800,000 7,800,000 7,800,000

STATEWIDE STATEWIDE - CROSSING RESURF SF9045-000 250,000 250,000 250,000 250,000

STATEWIDE STATEWIDE - RAIL TRAIL MAINTENANCE SF9046 100,000 100,000 100,000 100,000

STATEWIDE STATEWIDE - BRIDGE MAINTENANCE PROGRAM STRBMATN 500,000 500,000 500,000 500,000

Rail - FEMA

BARRE CITY BRIDGE 308 (IRENE DISASTER #4022) RREW12R 115,000 115,000 11,500 103,500 115,000

CAVENDISH BRIDGE 127 RREW12K 300,000 300,000 30,000 270,000 300,000

EAST WALLINGFORD MP 41.05(JUNE 27 - JULY 11 DISASTER #4140) REW4140A 75,000 75,000 18,750 56,250 75,000

ROCKINGHAM BRIDGE 110 (IRENE DISASTER #4022) RREW12J 250,000 250,000 25,000 225,000 250,000

RUPERT D&H BRIDGE 95 (IRENE DISASTER #4022) RREW12M 33,502 33,502 3,350 30,152 33,502

RUPERT D&H BRIDGE 98 (IRENE DISASTER #4022) RREW12N 127,728 127,728 12,773 114,955 127,728

RUPERT D&H BRIDGE 114.27 (IRENE DISASTER #4022) RREW12O 26,448 26,448 2,645 23,803 26,448

RUTLAND-BENNINGTON FOUR CULVERTS ON THE VTR LINE (IRENE DISASTER #4122) RREW001-402 575,000 575,000 57,500 517,500 575,000

STATEWIDE LVRT WASHOUTS (SEVERAL DISASTER #S) 950,000 950,000 190,000 760,000 950,000

TOTAL RAIL PROGRAM 12,240,862 1,274,312 0 27,520,757 41,035,931 14,088,993 2,720,000 22,629,438 1,597,500 41,035,931

TOTAL RAIL APPROPRIATION * 14,088,993 2,720,000 20,528,278 37,337,271

*LOCAL FUNDS ARE PAID UP FRONT AND ARE NOT APPROPRIATED.

FRA funding - 5,121,355

FHWA funding - 3,295,423

Earmark W. Corridor - FHWA 12,111,500

FEMA funding for these projects is included in the Public Assistance Appropriation

Page 3: FY 2018 - Vermont Agency of Transportation · chester bridge 119 gmrc(11) 25,000 400,000: 425,000 425,000: 425,000 clarendon east clarendon road crossing: ... budget year projected

RAIL

PE ROWCONSTOTHER

1,884,3120

27,420,757

1,162,00015,000

14,098,645

1,072,0000

5,375,000

41,035,931 27,056,507 18,227,862TOTAL11,730,862 11,780,862 11,780,862

Projected ProjectedBudget YearEstimated

FY 2015 FY 2016 FY 2017

1,072,0000

1,600,000

14,452,86211,780,862

ProjectedFY 2018

Page 4: FY 2018 - Vermont Agency of Transportation · chester bridge 119 gmrc(11) 25,000 400,000: 425,000 425,000: 425,000 clarendon east clarendon road crossing: ... budget year projected

PROJECTED

FY 2018

Agency of Transportation Multiyear Transportation Program

PHASE AND FUNDING

PROJECT INFORMATION

ESTIMATED TOTAL COST

ESTIMATED COST TO

COMPLETE

ACTUAL EXPENDED

THRU FY 2013

ESTIMATED CURRENT

YEAR FY 2014

ESTIMATED BUDGET YEAR

FY 2015

PROJECTED

FY 2016

PROJECTED

FY 2017

Description: PLANNING FOR WORK AT THE MONTREAL CENTRAL STATION TO ACCOMMODATE THE AMTRAK "VERMONTER".

AMTRAK "VERMONTER"

Comments: PROJECT SUBSTANTIALLY COMPLETE.

PE ROWCONST

000

RAIL

Project Manager:DAN DELABRUERE

OTHER

000

000

000

0 0 0TOTAL 00

50,00000

50,0000 0 0 0

50,000000

50,000

802-828-1331

00000Route:

000

00

Year Added: 2013

Description: SAFETY IMPROVEMENTS AT THE TH1/VERMONT RAILWAY GRADE CROSSING IN ARLINGTON, INCLUDING NEW SIGNALS, SIGNAL BOX, DRIVEWAY RELOCATION AND MUTCD UPGRADES.

TH 1 851-184B

ARLINGTONSTP 0114(4)

Comments:

PE ROWCONST

45,31300

RAIL

Project Manager:JOSH SCHULTZ

OTHER

00

400,000

00

275,000

000

400,000 275,000 0TOTAL 45,3130

70,00025,000

0

95,0000 0 0 0

115,31325,000

675,0000

815,313

802-828-5764

00000Route:

000

00

Year Added: 2012

Description: REPLACEMENT OF TRUSS BR535 ON THE WASHINGTON COUNTY RAILROAD - CONNECTICUT RIVER LINE IN BARNET.CONN RIVER MAIN LINE

BARNETSTRB(36)

Comments: PROJECT SUBSTANTIALLY COMPLETE.

PE ROWCONST

252,8040

670,874

RAIL

Project Manager:JOSH SCHULTZ

OTHER

000

000

000

0 0 0TOTAL 923,6780

00

350,000

350,0000 0 0 0

252,8040

1,020,8740

1,273,678

802-828-5764

00000Route:

000

00

Year Added: 2011

Page 1

Page 5: FY 2018 - Vermont Agency of Transportation · chester bridge 119 gmrc(11) 25,000 400,000: 425,000 425,000: 425,000 clarendon east clarendon road crossing: ... budget year projected

PROJECTED

FY 2018

Agency of Transportation Multiyear Transportation Program

PHASE AND FUNDING

PROJECT INFORMATION

ESTIMATED TOTAL COST

ESTIMATED COST TO

COMPLETE

ACTUAL EXPENDED

THRU FY 2013

ESTIMATED CURRENT

YEAR FY 2014

ESTIMATED BUDGET YEAR

FY 2015

PROJECTED

FY 2016

PROJECTED

FY 2017

Description: REPLACEMENT OF ABUTMENT NO. 2 AND RETAINING WALL FOR BRIDGE NO. 308 ON THE WASHINGTON COUNTY RAILROAD'S GRANITE INDUSTRIES SPUR.

WASHINGTON CO. RR

BARRE CITYRREW12R-100

Comments:

PE ROWCONST

68,70100

RAIL

Project Manager:JOSH SCHULTZ

OTHER

00

115,000

000

000

115,000 0 0TOTAL 68,7010

30,0000

900,000

930,0000 0 0 0

98,7010

1,015,0000

1,113,701

802-828-5764

00000Route:

000

00

Year Added: 2014

Description: INSTALLATION OF A WARNING SYSTEM AT THE VT62/WASHINGTON COUNTY RR CROSSING IN BARRE CITY.VT 62 837-345K

BARRE CITYSTP 026-1(42)

Comments:

PE ROWCONST

000

RAIL

Project Manager:JOSH SCHULTZ

OTHER

25,0000

250,000

000

000

275,000 0 0TOTAL 00

50,0000

200,000

250,0000 0 0 0

75,0000

450,0000

525,000

802-828-5764

00000Route:

000

00

Year Added: 2013

Description: LEASE SUBSIDY, AND INFRASTRUCTURE REPAIR.WASHINGTON CO. RR

BARRE-BERLIN-MONTPELIER04-9038

Comments:

PE ROWCONST

000

RAIL

Project Manager:DAN DELABRUERE

OTHER

000

000

000

260,000 260,000 260,000TOTAL 1,838,2511,838,251

000

260,000260,000 260,000 260,000 260,000

000

3,138,2513,138,251

802-828-1331

00000Route:

000

260,000260,000

Year Added: Prior to 2006

Page 2

Page 6: FY 2018 - Vermont Agency of Transportation · chester bridge 119 gmrc(11) 25,000 400,000: 425,000 425,000: 425,000 clarendon east clarendon road crossing: ... budget year projected

PROJECTED

FY 2018

Agency of Transportation Multiyear Transportation Program

PHASE AND FUNDING

PROJECT INFORMATION

ESTIMATED TOTAL COST

ESTIMATED COST TO

COMPLETE

ACTUAL EXPENDED

THRU FY 2013

ESTIMATED CURRENT

YEAR FY 2014

ESTIMATED BUDGET YEAR

FY 2015

PROJECTED

FY 2016

PROJECTED

FY 2017

Description: VT16, EASTERN AVE. CROSSING.FAS 0286 850-896Y

BARTONSTP 0286(6)

Comments:

PE ROWCONST

000

RAIL

Project Manager:JOSH SCHULTZ

OTHER

00

375,000

000

000

375,000 0 0TOTAL 00

60,00000

60,0000 0 0 0

60,0000

375,0000

435,000

802-828-5764

00000Route:

000

00

Year Added: 2014

Description: UPGRADE THE GREEN MOUNTAIN RAILROAD TO 105-LB. RAIL, BEGINNING AT MP 3.32 IN BELLOWS FALLS AND EXTENDING NORTHERLY 6.680 MILES TO CHESTER.

GREEN MTN RR CORP

BELLOWS FALLS-CHESTER

Comments:

PE ROWCONST

000

RAIL

Project Manager:JOSH SCHULTZ

OTHER

40,00000

00

3,000,000

00

2,000,000

40,000 3,000,000 2,000,000TOTAL 00

000

00 0 0 0

40,0000

5,000,0000

5,040,000

802-828-5764

00000Route:

000

00

Year Added: 2015

Description: IDENTIFY AND PRIORITZE BRIDGES FOR REHABILITATION OR REPLACEMENT, ALONG THE VERMONT RAILWAY BETWEEN BENNINGTON AND BURLINGTON.

VT RAILWAY, INC.

BENNINGTON-RUTLANDWCRS(4)

Comments: PROJECT SUBSTANTIALLY COMPLETE.

PE ROWCONST

411,43400

RAIL

Project Manager:MLADEN GAGULIC

OTHER

000

000

000

0 0 0TOTAL 411,4340

200,00000

200,0000 0 0 0

811,027000

811,027

802-828-6502

199,593000

199,593Route:

000

00

Year Added: 2012

Page 3

Page 7: FY 2018 - Vermont Agency of Transportation · chester bridge 119 gmrc(11) 25,000 400,000: 425,000 425,000: 425,000 clarendon east clarendon road crossing: ... budget year projected

PROJECTED

FY 2018

Agency of Transportation Multiyear Transportation Program

PHASE AND FUNDING

PROJECT INFORMATION

ESTIMATED TOTAL COST

ESTIMATED COST TO

COMPLETE

ACTUAL EXPENDED

THRU FY 2013

ESTIMATED CURRENT

YEAR FY 2014

ESTIMATED BUDGET YEAR

FY 2015

PROJECTED

FY 2016

PROJECTED

FY 2017

Description: RECONSTRUCTION OF THE EXISTING BOX CULVERT BENEATH BRIDGE NO. 127, ON THE GREEN MOUNTAIN RAILROAD IN CAVENDISH.GREEN MTN RR CORP

CAVENDISHRREW12K

Comments: IRENE PROJECT.

PE ROWCONST

57,73500

RAIL

Project Manager:JOSH SCHULTZ

OTHER

00

300,000

000

000

300,000 0 0TOTAL 57,7350

65,0000

500,000

565,0000 0 0 0

122,7350

800,0000

922,735

802-828-5764

00000Route:

000

00

Year Added: 2013

Description: IMPROVEMENTS TO BR119 ON THE GREEN MOUNTAIN RR IN CHESTER.GREEN MTN RR CORP

CHESTERGMRC(11)

Comments:

PE ROWCONST

000

RAIL

Project Manager:JOSH SCHULTZ

OTHER

25,0000

400,000

00

100,000

000

425,000 100,000 0TOTAL 00

000

00 0 0 0

25,0000

500,0000

525,000

802-828-5764

00000Route:

000

00

Year Added: 2010

Description: EAST CLARENDON ROAD CROSSING.GREEN MTN RR CORP

CLARENDONSTP 2033(25)

Comments:

PE ROWCONST

000

RAIL

Project Manager:JOSH SCHULTZ

OTHER

00

400,000

000

000

400,000 0 0TOTAL 00

80,00000

80,0000 0 0 0

80,0000

400,0000

480,000

802-828-5764

00000Route:

000

00

Year Added: 2014

Page 4

Page 8: FY 2018 - Vermont Agency of Transportation · chester bridge 119 gmrc(11) 25,000 400,000: 425,000 425,000: 425,000 clarendon east clarendon road crossing: ... budget year projected

PROJECTED

FY 2018

Agency of Transportation Multiyear Transportation Program

PHASE AND FUNDING

PROJECT INFORMATION

ESTIMATED TOTAL COST

ESTIMATED COST TO

COMPLETE

ACTUAL EXPENDED

THRU FY 2013

ESTIMATED CURRENT

YEAR FY 2014

ESTIMATED BUDGET YEAR

FY 2015

PROJECTED

FY 2016

PROJECTED

FY 2017

Description: IMPROVEMENTS TO BR95 ON THE VERMONT RAILWAY IN CLARENDON.VT RAILWAY, INC.

CLARENDONWCRS(10)

Comments:

PE ROWCONST

165,93400

RAIL

Project Manager:JOSH SCHULTZ

OTHER

00

75,000

000

000

75,000 0 0TOTAL 165,9340

50,0000

700,000

750,0000 0 0 0

215,9340

775,0000

990,934

802-828-5764

00000Route:

000

00

Year Added: 2011

Description: DESIGN AND CONSTRUCTION FOR REPLACEMENT OF BR562.CONN RIVER MAIN LINE

COVENTRYSTRB(42)

Comments:

PE ROWCONST

294,78400

RAIL

Project Manager:MLADEN GAGULIC

OTHER

000

00

675,000

00

2,025,000

0 675,000 2,025,000TOTAL 294,7840

25,00000

25,0000 0 0 0

319,7840

2,700,0000

3,019,784

802-828-6502

00000Route:

000

00

Year Added: 2011

Description: REMOVE FIVE LARGE-DIAMETER CULVERTS, AND CONSTRUCT NEW STEEL TRESTLE ON THE WASHINGTON COUNTY RAILROAD - CONNECTICUT RIVER LINE IN COVENTRY, TO PROVIDE FLOW EQUIVOCATION CHANNEL. BRIDGE NO. 561.

CONN RIVER MAIN LINE

COVENTRYSTRB(47)

Comments:

PE ROWCONST

33,45100

RAIL

Project Manager:MLADEN GAGULIC

OTHER

000

10,0000

400,000

00

300,000

0 410,000 300,000TOTAL 33,4510

000

00 0 0 0

43,4510

700,0000

743,451

802-828-6502

00000Route:

000

00

Year Added: 2012

Page 5

Page 9: FY 2018 - Vermont Agency of Transportation · chester bridge 119 gmrc(11) 25,000 400,000: 425,000 425,000: 425,000 clarendon east clarendon road crossing: ... budget year projected

PROJECTED

FY 2018

Agency of Transportation Multiyear Transportation Program

PHASE AND FUNDING

PROJECT INFORMATION

ESTIMATED TOTAL COST

ESTIMATED COST TO

COMPLETE

ACTUAL EXPENDED

THRU FY 2013

ESTIMATED CURRENT

YEAR FY 2014

ESTIMATED BUDGET YEAR

FY 2015

PROJECTED

FY 2016

PROJECTED

FY 2017

Description: STRUCTURAL MODIFICATIONS TO INCREASE LOAD CAPACITY OF BRIDGE NO. 79 ON THE VERMONT RAILWAY IN DORSET.VT RAILWAY, INC.

DORSETWCRS(8)

Comments:

PE ROWCONST

187,65100

RAIL

Project Manager:JOSH SCHULTZ

OTHER

00

150,000

000

000

150,000 0 0TOTAL 187,6510

45,0000

350,000

395,0000 0 0 0

232,6510

500,0000

732,651

802-828-5764

00000Route:

000

00

Year Added: 2010

Description: REPAIR LARGE SLOPE FAILURE ADJACENT TO THE GREEN MOUNTAIN RAILROAD IN EAST WALLINGFORD, DAMAGED BY HEAVY RAINS BETWEEN 6/25/13 AND 7/11/13. FEMA DECLARATION #4140.

GREEN MTN RR CORP.

EAST WALLINGFORDREW4140A

Comments: FEMA DECLARATION #4140.

PE ROWCONST

000

RAIL

Project Manager:MLADEN GAGULIC

OTHER

00

75,000

000

000

75,000 0 0TOTAL 00

00

225,000

225,0000 0 0 0

00

300,0000

300,000

802-828-6502

00000Route:

000

00

Year Added: 2015

Description: BLISSVILLE ROAD CROSSING.CLP RR

HYDEVILLE (CASTLETON)STP 2033(26)

Comments:

PE ROWCONST

000

RAIL

Project Manager:JOSH SCHULTZ

OTHER

00

300,000

000

000

300,000 0 0TOTAL 00

60,00000

60,0000 0 0 0

60,0000

300,0000

360,000

802-828-5764

00000Route:

000

00

Year Added: 2014

Page 6

Page 10: FY 2018 - Vermont Agency of Transportation · chester bridge 119 gmrc(11) 25,000 400,000: 425,000 425,000: 425,000 clarendon east clarendon road crossing: ... budget year projected

PROJECTED

FY 2018

Agency of Transportation Multiyear Transportation Program

PHASE AND FUNDING

PROJECT INFORMATION

ESTIMATED TOTAL COST

ESTIMATED COST TO

COMPLETE

ACTUAL EXPENDED

THRU FY 2013

ESTIMATED CURRENT

YEAR FY 2014

ESTIMATED BUDGET YEAR

FY 2015

PROJECTED

FY 2016

PROJECTED

FY 2017

Description: SAFETY IMPROVEMENTS AT THE TH12 (OLD JERUSALEM RD)/VERMONT RAILWAY CROSSING IN LEICESTER.TH 12 851-341S

LEICESTERSTP 2033(24)

Comments:

PE ROWCONST

000

RAIL

Project Manager:JOSH SCHULTZ

OTHER

00

200,000

000

000

200,000 0 0TOTAL 00

40,00000

40,0000 0 0 0

40,0000

200,0000

240,000

802-828-5764

00000Route:

000

00

Year Added: 2014

Description: SAFETY IMPROVEMENTS AT THE TH362 (WEST HILL RD.)/GREEN MOUNTAIN RR CROSSING IN LUDLOW.TH 362 859-859C

LUDLOWSTP 2033(23)

Comments:

PE ROWCONST

000

RAIL

Project Manager:JOSH SCHULTZ

OTHER

00

200,000

000

000

200,000 0 0TOTAL 00

40,00000

40,0000 0 0 0

40,0000

200,0000

240,000

802-828-5764

00000Route:

000

00

Year Added: 2014

Description: CONDUCT TEST BORINGS AND PREPARE SCOPING REPORT DETAILING ANTICIPATED EFFECTS OF ABUTMENT SCOUR AND EROSION WITH REMOVAL OF DUFRESNE POND DAM BY THE AGENCY OF NATURAL RESOUCES.

VT RAILWAY, INC.

MANCHESTERWCRS(24)

Comments:

PE ROWCONST

69,30900

RAIL

Project Manager:JOSH SCHULTZ

OTHER

00

15,000

000

000

15,000 0 0TOTAL 69,3090

70,0000

100,000

170,0000 0 0 0

139,3090

115,0000

254,309

802-828-5764

00000Route:

000

00

Year Added: 2012

Page 7

Page 11: FY 2018 - Vermont Agency of Transportation · chester bridge 119 gmrc(11) 25,000 400,000: 425,000 425,000: 425,000 clarendon east clarendon road crossing: ... budget year projected

PROJECTED

FY 2018

Agency of Transportation Multiyear Transportation Program

PHASE AND FUNDING

PROJECT INFORMATION

ESTIMATED TOTAL COST

ESTIMATED COST TO

COMPLETE

ACTUAL EXPENDED

THRU FY 2013

ESTIMATED CURRENT

YEAR FY 2014

ESTIMATED BUDGET YEAR

FY 2015

PROJECTED

FY 2016

PROJECTED

FY 2017

Description: REHABILITATION OF BR234 ON THE VERMONT RAILWAY IN MIDDLEBURY, INCLUDING REMOVAL OF EXISTING SUPERSTRUCTURE, INSTALLATION OF NEW CONCRETE SLABS, AND SUBSTRUCTURE REPAIRS.

VT RAILWAY, INC

MIDDLEBURYWCRS(16)

Comments:

PE ROWCONST

11,1770

3,452

RAIL

Project Manager:JOSH SCHULTZ

OTHER

00

10,000

000

000

10,000 0 0TOTAL 14,6290

6,8230

574,000

580,8230 0 0 0

18,0000

587,4520

605,452

802-828-5764

00000Route:

000

00

Year Added: 2010

Description: LOWER GRADE OF THE VERMONT RAILWAY IN MIDDLEBURY TO ACCOMMODATE 21-FT. VERTICAL CLEARANCE, AND REPLACEMENT OF THE VT30 AND MERCHANTS ROW BRIDGES AT THEIR CURRENT LOCATIONS.

VT RAILWAY, INC.

MIDDLEBURYWCRS(23)

Comments: CONSTRUCTION FUNDED IN STATE BRIDGE PROGRAM.

PE ROWCONST

342,97100

RAIL

Project Manager:JOEL PERRIGO

OTHER

357,02900

000

000

357,029 0 0TOTAL 342,9710

1,900,00000

1,900,0000 0 0 0

2,600,000000

2,600,000

802-828-2583

00000Route:

000

00

Year Added: 2012

Description: STRUCTURAL MODIFICATIONS TO INCREASE LOAD CAPACITY OF BRIDGE NO. 239 ON THE VERMONT RAILWAY IN MIDDLEBURY.VT RAILWAY, INC.

MIDDLEBURYWCRS(9)

Comments:

PE ROWCONST

73,71900

RAIL

Project Manager:JOSH SCHULTZ

OTHER

10,0000

1,050,000

000

000

1,060,000 0 0TOTAL 73,7190

30,00000

30,0000 0 0 0

113,7190

1,050,0000

1,163,719

802-828-5764

00000Route:

000

00

Year Added: 2010

Page 8

Page 12: FY 2018 - Vermont Agency of Transportation · chester bridge 119 gmrc(11) 25,000 400,000: 425,000 425,000: 425,000 clarendon east clarendon road crossing: ... budget year projected

PROJECTED

FY 2018

Agency of Transportation Multiyear Transportation Program

PHASE AND FUNDING

PROJECT INFORMATION

ESTIMATED TOTAL COST

ESTIMATED COST TO

COMPLETE

ACTUAL EXPENDED

THRU FY 2013

ESTIMATED CURRENT

YEAR FY 2014

ESTIMATED BUDGET YEAR

FY 2015

PROJECTED

FY 2016

PROJECTED

FY 2017

Description: PROJECT IS FOR CONSTRUCTION OF ACTIVE AND PASSIVE WARNING DEVICES AT THE PIONEER ST./WASHINGTON COUNTY RR GRADE CROSSING IN MONTPELIER.

PIONEER ST. 837-327M

MONTPELIERSTP 6400(30)

Comments:

PE ROWCONST

245,6337,171

0

RAIL

Project Manager:JOSH SCHULTZ

OTHER

25,0000

250,000

00

250,000

000

275,000 250,000 0TOTAL 252,8040

75,00020,000

0

95,0000 0 0 0

345,63327,171

500,0000

872,804

802-828-5764

00000Route:

000

00

Year Added: Prior to 2006

Description: REHABILITATION OF BR242 ON THE VERMONT RAILWAY IN NEW HAVEN, INCLUDING REMOVAL OF EXISTING SUPERSTRUCTUE, INSTALLATION OF NEW BEARING SEAT AND BACKWALLS, AND INSTALLATION OF OPEN DECK STRINGER SUPERSTRUCTURE.

VT RAILWAY, INC

NEW HAVENWCRS(18)

Comments:

PE ROWCONST

48,08400

RAIL

Project Manager:JOSH SCHULTZ

OTHER

00

200,000

000

000

200,000 0 0TOTAL 48,0840

75,0000

300,000

375,0000 0 0 0

123,0840

500,0000

623,084

802-828-5764

00000Route:

000

00

Year Added: 2010

Description: IMPROVEMENTS TO FIVE RAIL/HIGHWAY CROSSINGS ALONG THE MONTREAL, MAINE & ATLANTIC RR: US5 IN NEWPORT CITY (DOT #847-921B); FARM ACCESS IN NEWPORT TOWN (847-908M); VT105 IN TROY (847-891L); DOMINION AVE. IN NORTH TROY (847-883U); AND VT105 IN RICHFORD (847-879E).

MM&A RAILROAD

NEWPORT-RICHFORDSTP 2030(7)

Comments:

PE ROWCONST

214,4140

1,480

RAIL

Project Manager:JOSH SCHULTZ

OTHER

00

350,000

000

000

350,000 0 0TOTAL 215,8940

60,0000

806,520

866,5200 0 0 0

274,4140

1,158,0000

1,432,414

802-828-5764

00000Route:

000

00

Year Added: 2010

Page 9

Page 13: FY 2018 - Vermont Agency of Transportation · chester bridge 119 gmrc(11) 25,000 400,000: 425,000 425,000: 425,000 clarendon east clarendon road crossing: ... budget year projected

PROJECTED

FY 2018

Agency of Transportation Multiyear Transportation Program

PHASE AND FUNDING

PROJECT INFORMATION

ESTIMATED TOTAL COST

ESTIMATED COST TO

COMPLETE

ACTUAL EXPENDED

THRU FY 2013

ESTIMATED CURRENT

YEAR FY 2014

ESTIMATED BUDGET YEAR

FY 2015

PROJECTED

FY 2016

PROJECTED

FY 2017

Description: CONSTRUCTION OF ONE NEW ABUTMENT, FOR BRIDGE NO. 94 ON THE DELAWARE & HUDSON RAIL TRAIL IN PAWLET.D & H RAIL TRAIL

PAWLETRREW12L

Comments: IRENE PROJECT. PROJECT SUBSTANTIALLY COMPLETE.

PE ROWCONST

56,92200

RAIL

Project Manager:JOSH SCHULTZ

OTHER

000

000

000

0 0 0TOTAL 56,9220

4,0780

427,155

431,2330 0 0 0

61,0000

427,1550

488,155

802-828-5764

00000Route:

000

00

Year Added: 2013

Description: REPLACEMENT OF EXISTING TRUSS BRIDGE AND PLATE GIRDER APPROACH, BR219, ON THE VERMONT RAILWAY IN PITTSFORD.VT RAILWAY, INC.

PITTSFORDHPP ABRB(9)

Comments:

PE ROWCONST

1,249,64316,913

0

RAIL

Project Manager:JOSH SCHULTZ

OTHER

00

3,500,000

000

000

3,500,000 0 0TOTAL 1,266,5560

300,00000

300,0000 0 0 0

1,549,64316,913

3,500,0000

5,066,556

802-828-5764

00000Route:

000

00

Year Added: 2008

Description: RECONSTRUCTION OF THE VERMONT RWY/TH2 (KENDALL HILL RD.) GRADE CROSSING IN PITTSFORD. DOT #851-320Y.TH 2 851-320Y

PITTSFORDSTP 2033( )

Comments: KENDALL HILL ROAD CROSSING WILL NOT BE CONSTRUCTED AS PART OF BR219 AS ANTICIPATED. THIS PROJECT WILL NOT BE BUILT.

PE ROWCONST

000

RAIL

Project Manager:MLADEN GAGULIC

OTHER

000

000

000

0 0 0TOTAL 00

000

00 0 0 0

15,0000

1,188,9350

1,203,935

802-828-6502

15,0000

1,188,9350

1,203,935Route:

000

00

Year Added: 2013

Page 10

Page 14: FY 2018 - Vermont Agency of Transportation · chester bridge 119 gmrc(11) 25,000 400,000: 425,000 425,000: 425,000 clarendon east clarendon road crossing: ... budget year projected

PROJECTED

FY 2018

Agency of Transportation Multiyear Transportation Program

PHASE AND FUNDING

PROJECT INFORMATION

ESTIMATED TOTAL COST

ESTIMATED COST TO

COMPLETE

ACTUAL EXPENDED

THRU FY 2013

ESTIMATED CURRENT

YEAR FY 2014

ESTIMATED BUDGET YEAR

FY 2015

PROJECTED

FY 2016

PROJECTED

FY 2017

Description: DESIGN OF SAFETY IMPROVEMENTS FOR TWO RAIL/HIGHWAY CROSSINGS ON TH8 (WHIPPLE HOLLOW RD.) IN PITTSFORD: DOT CROSSING NUMBERS 837-138R AND 837-139X.

TH 8

PITTSFORDSTP 2033(21)

Comments:

PE ROWCONST

128,58500

RAIL

Project Manager:JOSH SCHULTZ

OTHER

00

20,000

000

000

20,000 0 0TOTAL 128,5850

31,4150

872,399

903,8140 0 0 0

160,0000

892,3990

1,052,399

802-828-5764

00000Route:

000

00

Year Added: 2010

Description: IMPROVEMENTS TO BR111 ON THE GREEN MOUNTAIN RR IN ROCKINGHAM.GREEN MTN RR CORP

ROCKINGHAMGMRC(10)

Comments:

PE ROWCONST

000

RAIL

Project Manager:JOSH SCHULTZ

OTHER

25,0000

400,000

00

100,000

000

425,000 100,000 0TOTAL 00

25,00000

25,0000 0 0 0

50,0000

500,0000

550,000

802-828-5764

00000Route:

000

00

Year Added: 2010

Description: STABILIZATION OF THE LEDGE FOUNDATION FOR BRIDGE NO. 110 ON THE GREEN MOUNTAIN RAILROAD IN ROCKINGHAM, ALONG WITH THE APPROACH RAILROAD EMBANKMENT SLOPE.

GREEN MTN RR CORP

ROCKINGHAMRREW12J

Comments: IRENE PROJECT.

PE ROWCONST

63,50300

RAIL

Project Manager:JOSH SCHULTZ

OTHER

00

250,000

000

000

250,000 0 0TOTAL 63,5030

136,4970

250,000

386,4970 0 0 0

200,0000

500,0000

700,000

802-828-5764

00000Route:

000

00

Year Added: 2013

Page 11

Page 15: FY 2018 - Vermont Agency of Transportation · chester bridge 119 gmrc(11) 25,000 400,000: 425,000 425,000: 425,000 clarendon east clarendon road crossing: ... budget year projected

PROJECTED

FY 2018

Agency of Transportation Multiyear Transportation Program

PHASE AND FUNDING

PROJECT INFORMATION

ESTIMATED TOTAL COST

ESTIMATED COST TO

COMPLETE

ACTUAL EXPENDED

THRU FY 2013

ESTIMATED CURRENT

YEAR FY 2014

ESTIMATED BUDGET YEAR

FY 2015

PROJECTED

FY 2016

PROJECTED

FY 2017

Description: DESIGN COUNTERMEASURES TO STABILIZE PIER FROM LONG-TERM EFFECTS OF RIVER SCOUR, AND SOUTH ABUTMENT WING WALL EMBANKMENT STABILIZATION OF THE RAIL BED.

GREEN MTN RR CORP

ROCKINGHAMSTP GMRC(16)

Comments: PROJECT SUBSTANTIALLY COMPLETE.

PE ROWCONST

48,1150

243,314

RAIL

Project Manager:JOSH SCHULTZ

OTHER

000

000

000

0 0 0TOTAL 291,4290

00

100,000

100,0000 0 0 0

48,1150

343,3140

391,429

802-828-5764

00000Route:

000

00

Year Added: 2010

Description: ROCKINGHAM BRIDGE #107 @ MILE POST 5.023 BRIDGE BEARINGS.GREEN MTN RR CORP

ROCKINGHAMSTP GMRC(9)

Comments:

PE ROWCONST

153,12700

RAIL

Project Manager:JOSH SCHULTZ

OTHER

00

400,000

000

000

400,000 0 0TOTAL 153,1270

40,0000

400,000

440,0000 0 0 0

193,1270

800,0000

993,127

802-828-5764

00000Route:

000

00

Year Added: 2010

Description: CONSTRUCTION OF ONE NEW ABUTMENT, FOR BRIDGE NO. 95 ON THE DELAWARE & HUDSON RAIL TRAIL IN RUPERT.D & H TRAIL

RUPERTRREW12M

Comments: IRENE PROJECT.

PE ROWCONST

41,68500

RAIL

Project Manager:JOSH SCHULTZ

OTHER

00

33,502

000

000

33,502 0 0TOTAL 41,6850

4,3150

134,010

138,3250 0 0 0

46,0000

167,5120

213,512

802-828-5764

00000Route:

000

00

Year Added: 2013

Page 12

Page 16: FY 2018 - Vermont Agency of Transportation · chester bridge 119 gmrc(11) 25,000 400,000: 425,000 425,000: 425,000 clarendon east clarendon road crossing: ... budget year projected

PROJECTED

FY 2018

Agency of Transportation Multiyear Transportation Program

PHASE AND FUNDING

PROJECT INFORMATION

ESTIMATED TOTAL COST

ESTIMATED COST TO

COMPLETE

ACTUAL EXPENDED

THRU FY 2013

ESTIMATED CURRENT

YEAR FY 2014

ESTIMATED BUDGET YEAR

FY 2015

PROJECTED

FY 2016

PROJECTED

FY 2017

Description: CONSTRUCTION OF ONE NEW ABUTMENT, FOR BRIDGE NO. 98 ON THE DELAWARE & HUDSON RAIL TRAIL IN RUPERT.D & H TRAIL

RUPERTRREW12N

Comments: IRENE PROJECT.

PE ROWCONST

5,68700

RAIL

Project Manager:JOSH SCHULTZ

OTHER

00

127,728

000

000

127,728 0 0TOTAL 5,6870

50,31300

50,3130 0 0 0

56,0000

127,7280

183,728

802-828-5764

00000Route:

000

00

Year Added: 2013

Description: CONSTRUCTION OF ONE NEW ABUTMENT, FOR BRIDGE NO. 114.27 ON THE DELAWARE & HUDSON RAIL TRAIL IN RUPERT.D & H TRAIL

RUPERTRREW12O

Comments: IRENE PROJECT.

PE ROWCONST

36,96400

RAIL

Project Manager:JOSH SCHULTZ

OTHER

00

26,448

000

000

26,448 0 0TOTAL 36,9640

5,0360

79,344

84,3800 0 0 0

42,0000

105,7920

147,792

802-828-5764

00000Route:

000

00

Year Added: 2013

Description: CONSTRUCTION OF A NEW CULVERT TO REPLACE A CATTLE PASS ON THE DELAWARE & HUDSON RAIL TRAIL IN RUPERT.D & H TRAIL

RUPERTRREW12P

Comments: IRENE PROJECT. PROJECT SUBSTANTIALLY COMPLETE.

PE ROWCONST

36,16500

RAIL

Project Manager:JOSH SCHULTZ

OTHER

000

000

000

0 0 0TOTAL 36,1650

4,8350

225,000

229,8350 0 0 0

41,0000

225,0000

266,000

802-828-5764

00000Route:

000

00

Year Added: 2013

Page 13

Page 17: FY 2018 - Vermont Agency of Transportation · chester bridge 119 gmrc(11) 25,000 400,000: 425,000 425,000: 425,000 clarendon east clarendon road crossing: ... budget year projected

PROJECTED

FY 2018

Agency of Transportation Multiyear Transportation Program

PHASE AND FUNDING

PROJECT INFORMATION

ESTIMATED TOTAL COST

ESTIMATED COST TO

COMPLETE

ACTUAL EXPENDED

THRU FY 2013

ESTIMATED CURRENT

YEAR FY 2014

ESTIMATED BUDGET YEAR

FY 2015

PROJECTED

FY 2016

PROJECTED

FY 2017

Description: FOUR CULVERTS ON THE VTR LINE. MAY FLOODING EMERGENCY WORK (FEMA).VT RAILWAY, INC.

RUTLAND-BENNINGTONRREW001-402

Comments:

PE ROWCONST

00

62,772

RAIL

Project Manager:JOSH SCHULTZ

OTHER

00

575,000

000

000

575,000 0 0TOTAL 62,7720

200,0000

1,200,000

1,400,0000 0 0 0

200,0000

1,837,7720

2,037,772

802-828-5764

00000Route:

000

00

Year Added: 2014

Description: REPLACEMENT OF EXISTING JOINTED RAIL WITH CONTINUOUS WELDED RAIL, RECONSTRUCTION OF SEVERAL HIGHWAY CROSSINGS, AND REPLACEMENT OF SEVERAL SWITCHES (PHASE II).

VT RAILWAY, INC.

RUTLAND-BURLINGTON

Comments:

PE ROWCONST

000

RAIL

Project Manager:MLADEN GAGULIC

OTHER

100,0000

3,200,000

000

000

3,300,000 0 0TOTAL 00

00

4,000,000

4,000,0000 0 0 0

100,0000

7,200,0000

7,300,000

802-828-6502

00000Route:

000

00

Year Added: 2014

Description: REPLACEMENT OF JOINTED RAIL WITH CWR, RECONSTRUCTION OF SEVERAL HIGHWAY CROSSINGS, AND THE REPLACEMENT OF SEVERAL SWITCHES IN THE TOWNS OF NEW HAVEN, FERRISBURGH, VERGENNES, SOUTH BURLINGTON AND BURLINGTON (PHASE I).

VT RAILWAY, INC

RUTLAND-BURLINGTONVTRY(1)

Comments:

PE ROWCONST

26,49300

RAIL

Project Manager:JOSH SCHULTZ

OTHER

100,0000

2,875,000

000

000

2,975,000 0 0TOTAL 26,4930

143,5070

1,000,000

1,143,5070 0 0 0

270,0000

3,875,0000

4,145,000

802-828-5764

00000Route:

000

00

Year Added: 2013

Page 14

Page 18: FY 2018 - Vermont Agency of Transportation · chester bridge 119 gmrc(11) 25,000 400,000: 425,000 425,000: 425,000 clarendon east clarendon road crossing: ... budget year projected

PROJECTED

FY 2018

Agency of Transportation Multiyear Transportation Program

PHASE AND FUNDING

PROJECT INFORMATION

ESTIMATED TOTAL COST

ESTIMATED COST TO

COMPLETE

ACTUAL EXPENDED

THRU FY 2013

ESTIMATED CURRENT

YEAR FY 2014

ESTIMATED BUDGET YEAR

FY 2015

PROJECTED

FY 2016

PROJECTED

FY 2017

Description: BRIDGE SCOPING AND PRELIMINARY ENGINEERING FOR THE VERMONT RAILWAY BETWEEN RUTLAND AND BURLINGTON.VT RAILWAY, INC.

RUTLAND-BURLINGTONWCRS(3)

Comments: BRIDGE LOAD CAPACITY ANALYSIS. PROJECT SUBSTANTIALLY COMPLETE.

PE ROWCONST

254,35900

RAIL

Project Manager:MLADEN GAGULIC

OTHER

000

000

000

0 0 0TOTAL 254,3590

100,00000

100,0000 0 0 0

625,000000

625,000

802-828-6502

270,641000

270,641Route:

000

00

Year Added: 2007

Description: REHABILITATION OF THE VERMONT RAILWAY BETWEEN RUTLAND AND LEICESTER.VT RAILWAY, INC.

RUTLAND-LEICESTER

Comments:

PE ROWCONST

000

RAIL

Project Manager:JOSH SCHULTZ

OTHER

305,2830

3,388,079

00

7,498,645

000

3,693,362 7,498,645 0TOTAL 00

000

00 0 0 0

305,2830

10,886,7240

11,192,007

802-828-5764

00000Route:

000

00

Year Added: 2015

Description: REHABILITATION OF BR232 ON THE VERMONT RAILWAY IN SALISBURY, INCLUDING REMOVAL OF EXISTING SUPERSTRUCTURE, INSTALLATION OF NEW CONCRETE SLABS, AND SUBSTRUCTURE REPAIRS.

VT RAILWAY, INC

SALISBURYWCRS(15)

Comments:

PE ROWCONST

16,2610

2,997

RAIL

Project Manager:JOSH SCHULTZ

OTHER

00

10,000

000

000

10,000 0 0TOTAL 19,2580

6,7390

679,395

686,1340 0 0 0

23,0000

692,3920

715,392

802-828-5764

00000Route:

000

00

Year Added: 2010

Page 15

Page 19: FY 2018 - Vermont Agency of Transportation · chester bridge 119 gmrc(11) 25,000 400,000: 425,000 425,000: 425,000 clarendon east clarendon road crossing: ... budget year projected

PROJECTED

FY 2018

Agency of Transportation Multiyear Transportation Program

PHASE AND FUNDING

PROJECT INFORMATION

ESTIMATED TOTAL COST

ESTIMATED COST TO

COMPLETE

ACTUAL EXPENDED

THRU FY 2013

ESTIMATED CURRENT

YEAR FY 2014

ESTIMATED BUDGET YEAR

FY 2015

PROJECTED

FY 2016

PROJECTED

FY 2017

Description: REPLACEMENT OF EXISTING BR57 (COLD SPRING BROOK STONE ARCH BRIDGE) ON THE VERMONT RAILWAY IN SHAFTSBURY.VT RAILWAY, INC

SHAFTSBURYWCRS(26)

Comments:

PE ROWCONST

88,77900

RAIL

Project Manager:JOSH SCHULTZ

OTHER

000

80,00015,000

0

00

500,000

0 95,000 500,000TOTAL 88,7790

20,00000

20,0000 0 0 0

188,77915,000

1,850,0000

2,053,779

802-828-5764

00000Route:

00

1,350,000

1,350,0000

Year Added: 2012

Description: PROJECT IS FOR QUIET ZONE CROSSING MAINTENANCE ALONG THE VERMONT RAILWAY, BETWEEN SHELBURNE AND BURLINGTON.VT RAILWAY, INC.

SHELBURNE-BURLINGTONSF9043

Comments: REQUIRED UNDER 1998 ACCESS AGREEMENT.

PE ROWCONST

000

RAIL

Project Manager:DAN DELABRUERE

OTHER

000

000

000

75,000 75,000 75,000TOTAL 1,000,5841,000,584

000

75,00075,000 75,000 75,000 75,000

000

1,375,5841,375,584

802-828-1331

00000Route:

000

75,00075,000

Year Added: Prior to 2006

Description: IMPROVEMENTS TO THE NEW ENGLAND CENTRAL RR/NO. ELM ST. GRADE CROSSING IN ST. ALBANS CITY.NO. ELM ST. 247-412X

ST. ALBANS CITYSTP 2038(14)

Comments: PROJECT SUBSTANTIALLY COMPLETE.

PE ROWCONST

169,1130

816,618

RAIL

Project Manager:JOSH SCHULTZ

OTHER

000

000

000

0 0 0TOTAL 985,7310

00

500,000

500,0000 0 0 0

169,1130

1,316,6180

1,485,731

802-828-5764

00000Route:

000

00

Year Added: Prior to 2006

Page 16

Page 20: FY 2018 - Vermont Agency of Transportation · chester bridge 119 gmrc(11) 25,000 400,000: 425,000 425,000: 425,000 clarendon east clarendon road crossing: ... budget year projected

PROJECTED

FY 2018

Agency of Transportation Multiyear Transportation Program

PHASE AND FUNDING

PROJECT INFORMATION

ESTIMATED TOTAL COST

ESTIMATED COST TO

COMPLETE

ACTUAL EXPENDED

THRU FY 2013

ESTIMATED CURRENT

YEAR FY 2014

ESTIMATED BUDGET YEAR

FY 2015

PROJECTED

FY 2016

PROJECTED

FY 2017

Description: UPGRADES ALONG THE NEW ENGLAND CENTRAL RAILROAD FROM ST. ALBANS TO THE CANADIAN BORDER, INCLUDING BRIDGE AND GRADE CROSSING IMPROVEMENTS, REPLACEMENT OF RAIL AND TIES, AS WELL AS BALLAST AND SURFACING WORK.

NEW ENGLAND CENTRAL

ST. ALBANS-CANADARR13NE01

Comments: FRA TIGER IV GRANT.

PE ROWCONST

000

RAIL

Project Manager:TRINI BRASSARD

OTHER

00

3,000,000

000

000

3,000,000 0 0TOTAL 00

00

9,600,000

9,600,0000 0 0 0

00

12,600,0000

12,600,000

802-828-2828

00000Route:

000

00

Year Added: 2014

Description: PROJECT IS FOR THE PURCHASE OF INTERSTATE RAIL PASSENGER SERVICE, AND RELATED EXPENSES.RAIL PASS. SERVICE

STATEWIDE

Comments:

PE ROWCONST

000

RAIL

Project Manager:DAN DELABRUERE

OTHER

000

000

000

7,800,000 7,800,000 7,800,000TOTAL 7,476,4977,476,497

000

7,600,0007,600,000 7,800,000 7,800,000 7,800,000

000

46,276,49746,276,497

802-828-1331

00000Route:

000

7,800,0007,800,000

Year Added: Prior to 2006

Description: PROJECT IS FOR THE ADMINISTRATIVE SUPPORT OF THE RAIL PROGRAM.RAILROAD ADMIN.

STATEWIDE

Comments:

PE ROWCONST

000

RAIL

Project Manager:DAN DELABRUERE

OTHER

000

000

000

965,862 965,862 965,862TOTAL 13,420,56313,420,563

000

1,005,0001,005,000 965,862 965,862 965,862

000

18,289,01118,289,011

802-828-1331

00000Route:

000

965,862965,862

Year Added: Prior to 2006

Page 17

Page 21: FY 2018 - Vermont Agency of Transportation · chester bridge 119 gmrc(11) 25,000 400,000: 425,000 425,000: 425,000 clarendon east clarendon road crossing: ... budget year projected

PROJECTED

FY 2018

Agency of Transportation Multiyear Transportation Program

PHASE AND FUNDING

PROJECT INFORMATION

ESTIMATED TOTAL COST

ESTIMATED COST TO

COMPLETE

ACTUAL EXPENDED

THRU FY 2013

ESTIMATED CURRENT

YEAR FY 2014

ESTIMATED BUDGET YEAR

FY 2015

PROJECTED

FY 2016

PROJECTED

FY 2017

Description: INVENTORY, INSPECTION AND CLASSIFICATION OF STATE-OWNED RAILROAD BRIDGES.RAILROAD BRIDGES

STATEWIDE

Comments:

PE ROWCONST

000

RAIL

Project Manager:DAN DELABRUERE

OTHER

000

000

000

850,000 900,000 900,000TOTAL 195,617195,617

000

850,000850,000 850,000 900,000 900,000

000

4,595,6174,595,617

802-828-1331

00000Route:

000

900,000900,000

Year Added: Prior to 2006

Description: PROJECT IS FOR THE AGENCY'S ESTIMATED EXPENDITURES ON TRANSPORTATION - RAILROAD BRIDGE PROJECTS THAT ARE CURRENTLY UNDER DEVELOPMENT, EVALUATION AND SCOPING.

RAILROAD BRIDGES

STATEWIDE

Comments:

PE ROWCONST

000

RAIL

Project Manager:DAN DELABRUERE

OTHER

240,00000

750,00000

750,00000

240,000 750,000 750,000TOTAL 00

350,00000

350,0000 0 0 0

2,840,000000

2,840,000

802-828-1331

00000Route:

750,00000

750,0000

Year Added: Prior to 2006

Description: RAIL/HIGHWAY SURFACE AND SUBSTRUCTURE IMPROVEMENT.VARIOUS RAILROADS

STATEWIDE

Comments:

PE ROWCONST

000

RAIL

Project Manager:DAN DELABRUERE

OTHER

00

250,000

00

250,000

00

250,000

250,000 250,000 250,000TOTAL 851,081851,081

00

400,000

400,0000 0 0 0

00

1,400,000851,081

2,251,081

802-828-1331

00000Route:

00

250,000

250,0000

Year Added: 2008

Page 18

Page 22: FY 2018 - Vermont Agency of Transportation · chester bridge 119 gmrc(11) 25,000 400,000: 425,000 425,000: 425,000 clarendon east clarendon road crossing: ... budget year projected

PROJECTED

FY 2018

Agency of Transportation Multiyear Transportation Program

PHASE AND FUNDING

PROJECT INFORMATION

ESTIMATED TOTAL COST

ESTIMATED COST TO

COMPLETE

ACTUAL EXPENDED

THRU FY 2013

ESTIMATED CURRENT

YEAR FY 2014

ESTIMATED BUDGET YEAR

FY 2015

PROJECTED

FY 2016

PROJECTED

FY 2017

Description: LEASE AND ENCROACHMENT MANAGEMENT OF STATE-OWNED RAILROAD RIGHT-OF-WAY.VARIOUS RAILROADS

STATEWIDE

Comments:

PE ROWCONST

000

RAIL

Project Manager:DAN DELABRUERE

OTHER

000

000

000

325,000 325,000 325,000TOTAL 1,489,1601,489,160

000

325,000325,000 325,000 325,000 325,000

000

3,114,1603,114,160

802-828-1331

00000Route:

000

325,000325,000

Year Added: 2011

Description: OPERATION LIFESAVER.VARIOUS RAILROADS

STATEWIDE

Comments:

PE ROWCONST

000

RAIL

Project Manager:DAN DELABRUERE

OTHER

000

000

000

30,000 30,000 30,000TOTAL 00

000

30,00030,000 30,000 30,000 30,000

000

150,000150,000

802-828-1331

00000Route:

000

30,00030,000

Year Added: 2011

Description: RAIL PASSENGER MARKETING.VARIOUS RAILROADS

STATEWIDE

Comments:

PE ROWCONST

000

RAIL

Project Manager:DAN DELABRUERE

OTHER

000

000

000

50,000 50,000 50,000TOTAL 67,01967,019

000

50,00050,000 50,000 50,000 50,000

000

317,019317,019

802-828-1331

00000Route:

000

50,00050,000

Year Added: 2011

Page 19

Page 23: FY 2018 - Vermont Agency of Transportation · chester bridge 119 gmrc(11) 25,000 400,000: 425,000 425,000: 425,000 clarendon east clarendon road crossing: ... budget year projected

PROJECTED

FY 2018

Agency of Transportation Multiyear Transportation Program

PHASE AND FUNDING

PROJECT INFORMATION

ESTIMATED TOTAL COST

ESTIMATED COST TO

COMPLETE

ACTUAL EXPENDED

THRU FY 2013

ESTIMATED CURRENT

YEAR FY 2014

ESTIMATED BUDGET YEAR

FY 2015

PROJECTED

FY 2016

PROJECTED

FY 2017

Description: PROJECT IS FOR THE PURPOSE OF PARTICIPATING IN THREE-WAY PARTNERSHIPS WITH RAILROADS AND RAIL SHIPPERS, TO DEVELOP NEEDED FACILITIES, INCLUDING SIDINGS, SPURS & SYSTEM DEVELOPMENT.

VARIOUS RAILROADS

STATEWIDE

Comments:

PE ROWCONST

000

RAIL

Project Manager:DAN DELABRUERE

OTHER

000

000

000

600,000 600,000 600,000TOTAL 250,401250,401

000

600,000600,000 600,000 600,000 600,000

000

3,250,4013,250,401

802-828-1331

00000Route:

000

600,000600,000

Year Added: Prior to 2006

Description: INSTALLATION OF CROSSTIES ON VARIOUS STATE-OWNED RAILROADS.VARIOUS RAILROADS

STATEWIDECRTIES01

Comments:

PE ROWCONST

00

789,968

RAIL

Project Manager:DAN DELABRUERE

OTHER

00

300,000

00

300,000

00

300,000

300,000 300,000 300,000TOTAL 789,9680

5,0000

600,000

605,0000 0 0 0

5,0000

2,289,9680

2,294,968

802-828-1331

00000Route:

000

00

Year Added: 2013

Description: INSTALLATION OF PROTECTION AT 15 GRADE CROSSINGS.FHWA CROSSING GRANT

STATEWIDENECR(3)

Comments: PROJECT SUBSTANTIALLY COMPLETE.

PE ROWCONST

00

1,412,994

RAIL

Project Manager:TRINI BRASSARD

OTHER

000

000

000

0 0 0TOTAL 1,412,9940

00

1,287,006

1,287,0060 0 0 0

00

2,700,0000

2,700,000

802-828-2828

00000Route:

000

00

Year Added: 2014

Page 20

Page 24: FY 2018 - Vermont Agency of Transportation · chester bridge 119 gmrc(11) 25,000 400,000: 425,000 425,000: 425,000 clarendon east clarendon road crossing: ... budget year projected

PROJECTED

FY 2018

Agency of Transportation Multiyear Transportation Program

PHASE AND FUNDING

PROJECT INFORMATION

ESTIMATED TOTAL COST

ESTIMATED COST TO

COMPLETE

ACTUAL EXPENDED

THRU FY 2013

ESTIMATED CURRENT

YEAR FY 2014

ESTIMATED BUDGET YEAR

FY 2015

PROJECTED

FY 2016

PROJECTED

FY 2017

Description: MAINTENANCE OF STATE-OWNED RAILROAD PROPERTY AND BUILDINGS.VARIOUS RAILROADS

STATEWIDERR 1002

Comments:

PE ROWCONST

000

RAIL

Project Manager:DAN DELABRUERE

OTHER

000

000

000

175,000 175,000 175,000TOTAL 445,218445,218

000

100,000100,000 175,000 175,000 175,000

000

1,245,2181,245,218

802-828-1331

00000Route:

000

175,000175,000

Year Added: 2011

Description: STATEWIDE RAIL PLAN.STATEWIDE RAIL PLAN

STATEWIDERR13PLAN

Comments: PROJECT SUBSTANTIALLY COMPLETE.

PE ROWCONST

000

RAIL

Project Manager:COSTA PAPPIS

OTHER

000

000

000

0 0 0TOTAL 00

000

250,000250,000 0 0 0

000

250,000250,000

802-828-5790

00000Route:

000

00

Year Added: 2014

Description: ONE CULVERT ON THE WACR LINE. MAY FLOODING EMERGENCY WORK (FEMA).WASHINGTON CO RR

STATEWIDERREW001-403

Comments:

PE ROWCONST

000

RAIL

Project Manager:JOSH SCHULTZ

OTHER

000

000

000

0 0 0TOTAL 00

00

400,000

400,0000 0 0 0

00

400,0000

400,000

802-828-5764

00000Route:

000

00

Year Added: 2014

Page 21

Page 25: FY 2018 - Vermont Agency of Transportation · chester bridge 119 gmrc(11) 25,000 400,000: 425,000 425,000: 425,000 clarendon east clarendon road crossing: ... budget year projected

PROJECTED

FY 2018

Agency of Transportation Multiyear Transportation Program

PHASE AND FUNDING

PROJECT INFORMATION

ESTIMATED TOTAL COST

ESTIMATED COST TO

COMPLETE

ACTUAL EXPENDED

THRU FY 2013

ESTIMATED CURRENT

YEAR FY 2014

ESTIMATED BUDGET YEAR

FY 2015

PROJECTED

FY 2016

PROJECTED

FY 2017

Description: LVRT WASHOUTS - TROPICAL STORM IRENE EMERGENCY WORK (FEMA).LAMOILLE VALLEY R.T.

STATEWIDERREW001-405

Comments:

PE ROWCONST

1350

67

RAIL

Project Manager:JOSH SCHULTZ

OTHER

00

950,000

00

50,000

000

950,000 50,000 0TOTAL 2020

00

600,000

600,0000 0 0 0

1350

1,600,0670

1,600,202

802-828-5764

00000Route:

000

00

Year Added: 2014

Description: RAIL TRAIL MAINTENANCE.VARIOUS RAIL TRAILS

STATEWIDESF9046

Comments:

PE ROWCONST

000

RAIL

Project Manager:DAN DELABRUERE

OTHER

000

000

000

100,000 100,000 100,000TOTAL 00

000

100,000100,000 100,000 100,000 100,000

000

500,000500,000

802-828-1331

00000Route:

000

100,000100,000

Year Added: 2014

Description: SECTION 130 DATA COMPILATION, AND ANALYISIS AND MAINTENANCE FOR RAIL/HIGHWAY CROSSING IMPROVEMENTS (E.G. CRASH DATA, TRAFFIC VOLUME AND MIX, ROADWAY INVENTORY, ETC.), AND EVALUATION OF DATABASE SYSTEMS.

VARIOUS RAILROADS

STATEWIDESTP 2030(10)

Comments:

PE ROWCONST

000

RAIL

Project Manager:NYDIA LUGO

OTHER

22,00000

22,00000

22,00000

22,000 22,000 22,000TOTAL 13,83913,839

000

00 0 0 0

88,00000

13,839101,839

802-828-5763

00000Route:

22,00000

22,0000

Year Added: 2015

Page 22

Page 26: FY 2018 - Vermont Agency of Transportation · chester bridge 119 gmrc(11) 25,000 400,000: 425,000 425,000: 425,000 clarendon east clarendon road crossing: ... budget year projected

PROJECTED

FY 2018

Agency of Transportation Multiyear Transportation Program

PHASE AND FUNDING

PROJECT INFORMATION

ESTIMATED TOTAL COST

ESTIMATED COST TO

COMPLETE

ACTUAL EXPENDED

THRU FY 2013

ESTIMATED CURRENT

YEAR FY 2014

ESTIMATED BUDGET YEAR

FY 2015

PROJECTED

FY 2016

PROJECTED

FY 2017

Description: BRIDGE LOAD RATING IMPROVEMENTS.VARIOUS RAILROADS

STATEWIDESTRBLOAD

Comments:

PE ROWCONST

000

RAIL

Project Manager:DAN DELABRUERE

OTHER

610,00000

300,00000

300,00000

610,000 300,000 300,000TOTAL 00

300,00000

300,0000 0 0 0

1,810,000000

1,810,000

802-828-1331

00000Route:

300,00000

300,0000

Year Added: 2013

Description: BRIDGE MAINTENANCE.VARIOUS RAILROADS

STATEWIDESTRBMATN

Comments:

PE ROWCONST

000

RAIL

Project Manager:DAN DELABRUERE

OTHER

000

000

000

500,000 500,000 500,000TOTAL 00

000

500,000500,000 500,000 500,000 500,000

000

2,500,0002,500,000

802-828-1331

00000Route:

000

500,000500,000

Year Added: 2013

Description: IMPROVEMENTS TO BR64 ON THE VERMONT RAILWAY IN SUNDERLAND.VT RAILWAY, INC

SUNDERLANDWCRS(19)

Comments:

PE ROWCONST

41,77900

RAIL

Project Manager:JOSH SCHULTZ

OTHER

00

2,000,000

00

200,000

000

2,000,000 200,000 0TOTAL 41,7790

75,00000

75,0000 0 0 0

116,7790

2,200,0000

2,316,779

802-828-5764

00000Route:

000

00

Year Added: 2010

Page 23

Page 27: FY 2018 - Vermont Agency of Transportation · chester bridge 119 gmrc(11) 25,000 400,000: 425,000 425,000: 425,000 clarendon east clarendon road crossing: ... budget year projected

PROJECTED

FY 2018

Agency of Transportation Multiyear Transportation Program

PHASE AND FUNDING

PROJECT INFORMATION

ESTIMATED TOTAL COST

ESTIMATED COST TO

COMPLETE

ACTUAL EXPENDED

THRU FY 2013

ESTIMATED CURRENT

YEAR FY 2014

ESTIMATED BUDGET YEAR

FY 2015

PROJECTED

FY 2016

PROJECTED

FY 2017

Description: REDESIGN ABUTMENTS AND SUPERSTRUCTURE AND PREPARE CONTRACT DOCUMENTS, FOR IMPROVEMENTS TO BR63 ON THE VERMONT RAILWAY IN SUNDERLAND, OVER MILL BROOK.

VT RAILWAY, INC

SUNDERLANDWCRS(25)

Comments:

PE ROWCONST

71,95100

RAIL

Project Manager:JOSH SCHULTZ

OTHER

00

1,000,000

00

1,000,000

000

1,000,000 1,000,000 0TOTAL 71,9510

8,04900

8,0490 0 0 0

80,0000

2,000,0000

2,080,000

802-828-5764

00000Route:

000

00

Year Added: 2012

Description: PURCHASE OF BUILDING IN WHITE RIVER JCT. FOR RAILROAD STATION.NEW ENGLAND CENTRAL

WHITE RIVER JCT.RR14TRST

Comments: PROJECT SUBSTANTIALLY COMPLETE.

PE ROWCONST

000

RAIL

Project Manager:DAN DELABRUERE

OTHER

000

000

000

0 0 0TOTAL 00

0900,000

0

900,0000 0 0 0

0900,000

00

900,000

802-828-1331

00000Route:

000

00

Year Added: 2013

Description: UPDATE BRIDGE LOCATIONS ASSESSMENT OF SCOUR AND EROSION EFFECTS WITH SITE SURVEY AND RETROFIT EVALUATION AT ELEVEN WORST-RATED BRIDGES ALONG THE WASHINGTON COUNTY RR - CONNECTICUT RIVER LINE.

CONN. RIVER LINE

WHITE RIVER JCT.-NEWPORTSTRB43

Comments: PROJECT SUBSTANTIALLY COMPLETE.

PE ROWCONST

130,43900

RAIL

Project Manager:MLADEN GAGULIC

OTHER

000

000

000

0 0 0TOTAL 130,4390

00

302,171

302,1710 0 0 0

130,4390

302,1710

432,610

802-828-6502

00000Route:

000

00

Year Added: 2012

Page 24

Page 28: FY 2018 - Vermont Agency of Transportation · chester bridge 119 gmrc(11) 25,000 400,000: 425,000 425,000: 425,000 clarendon east clarendon road crossing: ... budget year projected

Project Name Manager

RAIL - CAPITAL PROGRAM

PE ROW Const Total Federal State Local

SFY 2015 D&E

DescriptionProject NumberYear

Added

Bradford - Wash. Co. - Conn. River Josh Schultz 20,000 0 0 20,000 18,000 2,000 0Crossing - Piermont Rd. 2014

Clarendon - Green Mtn RR Corp Josh Schultz 25,000 0 0 25,000 0 25,000 0Bridge No. 152 RehabilitaGMRC(13) 2010

Fair Haven - Clarendon & Pittsford Josh Schultz 20,000 0 0 20,000 18,000 2,000 0Crossing - So. Main St. 2014

Lyndonville - Wash. Co. - Conn. Rive Josh Schultz 25,000 0 0 25,000 22,500 2,500 0Crossing - Broad St. 2014

Middlebury - VT Railway, Inc Dan Delabruere 50,000 0 0 50,000 40,000 10,000 0Final Design & PermittingST SPUR(2) Prior 2006

Montpelier - Washington County Josh Schultz 35,000 0 0 35,000 0 35,000 0Bridge 306WACR(6) 2013

Rockingham - Green Mtn RR Corp Josh Schultz 25,000 0 0 25,000 0 25,000 0Bridge No. 112 RehabilitaGMRC(14) 2010

Rutland - VT Railway, Inc. Dan Delabruere 0 0 0 0 0 0 0Railyard RelocationWCRS(21) 2014

Vergennes - VT Railway, Inc. Josh Schultz 20,000 0 0 20,000 16,000 4,000 0Crossing - Monkton Rd. 2014

Wallingford - VT Railway, Inc. Josh Schultz 20,000 0 0 20,000 16,000 4,000 0Crossing - Anderson's 2014

240,000 0 0 240,000 130,500 109,500 0Totals:

Page 1

Page 29: FY 2018 - Vermont Agency of Transportation · chester bridge 119 gmrc(11) 25,000 400,000: 425,000 425,000: 425,000 clarendon east clarendon road crossing: ... budget year projected

Project Name Route Project Number Project Manager Phone No. Project Description

RAIL CANDIDATES

Year Added

BARTON WCRL(11)CONN RIVER MAIN LINE REHABILITATION OF BR558JOSH SCHULTZ 828-5764 2010

BARTON WCRL(13)CONN RIVER MAIN LINE REHABILITATION OF BR557JOSH SCHULTZ 828-5764 2010

BRADFORD WCRL(7)CONN RIVER MAIN LINE REHABILITATION OF BR516JOSH SCHULTZ 828-5764 2010

BRANDON TH 42 851-326P IMPROVE VTR/TH42 CROSSINGJOSH SCHULTZ 828-5764 2015

BURKE WCRL(14)CONN RIVER MAIN LINE REHABILITATION OF BR544JOSH SCHULTZ 828-5764 2010

COVENTRY WCRL(10)CONN RIVER MAIN LINE REHABILITATION OF BR566JOSH SCHULTZ 828-5764 2010

COVENTRY WCRL(12)CONN RIVER MAIN LINE REHABILITATION OF BR563JOSH SCHULTZ 828-5764 2010

COVENTRY WCRL(8)CONN RIVER MAIN LINE REHABILITATION OF BR565JOSH SCHULTZ 828-5764 2010

COVENTRY WCRL(9)CONN RIVER MAIN LINE REHABILITATION OF BR564JOSH SCHULTZ 828-5764 2010

FERRISBURGH TH 31 851-380H IMPROVE VTR/TH31 CROSSINGJOSH SCHULTZ 828-5764 2015

FERRISBURGH TH 60 851-389U IMPROVE VTR/TH60 CROSSINGJOSH SCHULTZ 828-5764 2015

LEICESTER TH 12 851-340K IMPROVE VTR/TH12 CROSSINGJOSH SCHULTZ 828-5764 2015

LEICESTER TH 12 851-341S IMPROVE VTR/TH12 CROSSINGJOSH SCHULTZ 828-5764 2015

LEICESTER-NEW HAVEN VT RAILWAY, INC. INSTALL WELDED RAILJOSH SCHULTZ 828-5764 2015

LYNDON WCRL(4)CONN RIVER MAIN LINE REHABILITATION OF BR541JOSH SCHULTZ 828-5764 2010

MIDDLEBURY TH 31 851-351X IMPROVE VTR/TH31 CROSSINGJOSH SCHULTZ 828-5764 2015

NEW HAVEN TH 26 851-364Y IMPROVE VTR/TH26 CROSSINGJOSH SCHULTZ 828-5764 2015

NEWBURY WCRL(15)CONN RIVER MAIN LINE REHABILITATION OF BR519JOSH SCHULTZ 828-5764 2010

NEWBURY WCRL(16)CONN RIVER MAIN LINE REHABILITATION OF BR500JOSH SCHULTZ 828-5764 2010

PITTSFORD TH 37 851-316J IMPROVE VTR/37 CROSSINGJOSH SCHULTZ 828-5764 2015

SALISBURY TH 1 851-346B IMPROVE VTR/TH1 CROSSINGJOSH SCHULTZ 828-5764 2015

SALISBURY TH 18 851-344M IMPROVE VTR/TH18 CROSSINGJOSH SCHULTZ 828-5764 2015

WATERFORD WCRL(5)CONN RIVER MAIN LINE REHABILITATION OF BR537JOSH SCHULTZ 828-5764 2010

WELLS RIVER WCRL(6)CONN RIVER MAIN LINE REHABILITATION OF BR522JOSH SCHULTZ 828-5764 2010

WESTERN CORRIDOR VT RAILWAY, INC. UPGRADE 28 RAIL CROSSINGSJOSH SCHULTZ 828-5764 2015