Masayuki Ono Princeton Plasma Physics Laboratory For the NSTX National Research Team 15th NSTX PAC Meeting January 12-14, 2004 PPPL, Princeton, NJ FY05 - 06 NSTX Facility In Support of the NSTX Research Program Supported by Columbia U Comp-X General Atomics INEL Johns Hopkins U LANL LLNL Lodestar MIT Nova Photonics NYU ORNL PPPL PSI SNL UC Davis UC Irvine UCLA UCSD U Maryland U New Mexico U Rochester U Washington U Wisconsin Culham Sci Ctr Hiroshima U HIST Kyushu Tokai U Niigata U Tsukuba U U Tokyo JAERI Ioffe Inst TRINITI KBSI KAIST ENEA, Frascati CEA, Cadarache IPP, Jülich IPP, Garching U Quebec

Upload: gefjun

Post on 14-Jan-2016

33 views

Category:

Documents


0 download

DESCRIPTION

Supported by. FY05 - 06 NSTX Facility In Support of the NSTX Research Program. Columbia U Comp-X General Atomics INEL Johns Hopkins U LANL LLNL Lodestar MIT Nova Photonics NYU ORNL PPPL PSI SNL UC Davis UC Irvine UCLA UCSD U Maryland U New Mexico U Rochester U Washington - PowerPoint PPT Presentation

TRANSCRIPT

Page 1: FY05 - 06 NSTX Facility  In Support of the NSTX Research Program

Masayuki OnoPrinceton Plasma Physics Laboratory

For the NSTX National Research Team

15th NSTX PAC Meeting

January 12-14, 2004PPPL, Princeton, NJ

FY05 - 06 NSTX Facility In Support of the NSTX Research Program

Supported by

Columbia UComp-X

General AtomicsINEL

Johns Hopkins ULANLLLNL

LodestarMIT

Nova PhotonicsNYU

ORNLPPPL

PSISNL

UC DavisUC Irvine

UCLAUCSD

U MarylandU New Mexico

U RochesterU Washington

U WisconsinCulham Sci Ctr

Hiroshima UHIST

Kyushu Tokai UNiigata U

Tsukuba UU Tokyo

JAERIIoffe Inst

TRINITIKBSI

KAISTENEA, Frascati

CEA, CadaracheIPP, Jülich

IPP, GarchingU Quebec

Page 2: FY05 - 06 NSTX Facility  In Support of the NSTX Research Program

Significant budget gap between 5 year plan and FWP budget guidance needs to be resolved

5 Year Plan Budget Plan:• 21 weeks per year operations.

• ~ 10 % above the overall FY 04 presidential level for both PPPL and collaborators; relatively flat for future years.

• Key upgrade investment of ~ 12% of total budget.

FWP Base Budget Plan:• FY 04 Presidential budget allowed 21 run weeks and key upgrades.

• Assumed flat $ at the FY 04 presidential level for FY 05 and FY 06.

• However, effective reduction of ~ $0.9 M for FY 05 and ~ $1.8 M FY 06 due to

inflation.

• Latest information: Due to the congressional rescission, OFES has given a

guidance of $500k reduction from NSTX operations with reduction of three run

weeks from 21 to 18.

Page 3: FY05 - 06 NSTX Facility  In Support of the NSTX Research Program

NSTX Budget Summary ($M)

FacilitiesRun Weeks

FY 0418

FY 0518

FY0521

FY0615

FY0621

Base Base Incr. Base Incr.

Facility Op. 16.90 17.5 0.55 17.52 1.14Fac. Upgds. 1.35 1.35 1.44 1.50 2.40

Facility Total 18.25 18.85 1.99 19.02 3.54

Science

PPPL Science 9.90 9.90 0.43 9.90 0.73Diag. Upgds. 1.09 1.10 0.80 0.92 0.63

Coll.Diag. Interf. 0.54 0.57 0.10 0.58 0.10Collaborations 4.77 4.77 0.27 4.77 0.27Science Total 16.30 16.34 1.60 16.17 1.73

Grand Total 34.55* 35.19 3.59 35.19 5.27

* $500k rescission reduction + fin plan transfer of $140 k due to prior commitments.

Page 4: FY05 - 06 NSTX Facility  In Support of the NSTX Research Program

Facility Upgrades Summary ($k)

*

* OH spare was considered to be high priority spare part due to its criticality to the NSTX research at the 5 year review.

FACILITY UPGRADES FY04 FY05 FY 05 FY06 FY 06 (Base) (Base) (Inc.) (Base) (Inc.)

CHI Pwr Supplies 142 100RWM 1074 100 500MAST EBW Launcher 80 300EBW-PPPL 100 185 255 200EBW-Coll/Industry 300 500 500HHFW Antenna Upgrade 300PF1A Upgrade 250 250Cryo-Panel 200 300Stab Plate Mod 100 500Pellet Inj 100 200Outer PF Start-Up 250 100Lithium Coatings 50 100 100CT-Injection 100OH Spare 400 400Total 1346 1350 1435 1505 2400

Page 5: FY05 - 06 NSTX Facility  In Support of the NSTX Research Program

Diagnostic Upgrades Summary ($k)

DIAGNOSTIC UPGRADES FY04 FY05 FY 05 FY06 FY 06 (Base) (Base) (Inc.) (Base) (Inc.)

CS & Divertor Probe Arrays 230 144Horiz Div Bolo 105Vert Div Bolo 165 0Fast IR Cam 180Div Visible Spect 120He Jet Spectroscopy 150Div TS 230Deposition Monit 75MPTS 20-30 ch 86 216MPTS Addl Laser 140Edge Rotation Prototype 140Edge Poloidal CHERS 405 27Full Poloidal CHERS 400 150 250Neutron Collimator 100 240Tang Scatt 354 63Imag Refl 270 286

Total 1085 1101 795 915 630

Page 6: FY05 - 06 NSTX Facility  In Support of the NSTX Research Program

MHD Mode StabilizationMHD Mode Stabilization

Six-element external Six-element external coils with a SPA supplycoils with a SPA supply

Opportunity Areas are Shape Control and RWM

Res. Field & RWM system Res. Field & RWM system upgrade possibilities:upgrade possibilities:- control- control- power supplypower supply- coil/antennacoil/antenna

MHD MHD DiagnosticsDiagnostics

&&Analysis ToolsAnalysis Tools

PlasmaOperations FY04 FY05 FY06

Wall-mode sensorsWall-mode sensors

Ultra-soft x-ray arrays Ultra-soft x-ray arrays (JHU)(JHU)

Fast MHD sensorsFast MHD sensors

Improved magnetics and EFIT Improved magnetics and EFIT (Columbia)(Columbia)

Fast X-ray cameras Fast X-ray cameras (Frascati, JHU, PSI)(Frascati, JHU, PSI)

Res. Field & Res. Field & RWM ControlRWM Control (Columbia, GA)

Real time EFIT Real time EFIT (GA)(GA)

Design / Fabri / Instl / Test

- Incremental

- Base

• RWM coil FDR completed (Dec. 03)• SPA supply RFQ issued (Dec. 03)• RWM coil to be installed during maintenance weeks by summer of 04

PF1A UpgradePF1A UpgradeShape ControlShape Control Faster Response PCSFaster Response PCS

Page 7: FY05 - 06 NSTX Facility  In Support of the NSTX Research Program

Confinement and TransportConfinement and TransportExciting Opportunities For Advanced Fluctuation Diagnostics

PlasmaOperations FY04 FY05 FY06

(Run Weeks) 4 21 21

Low k Imaging Reflectometer

Prototype High k Microwave Scattering( UCD)

Tor CHERS 51 Channel Edge Pol CHERSProfile Profile

DiagnosticsDiagnostics

Energetic Energetic PatriclesPatricles

Fluctuation Fluctuation DiagnosticsDiagnostics

Fast Loss Ion Probe

FIReTIP FIReTIP 4 Channel4 Channel(UCD) (UCD)

FIReTIPFIReTIP 7 Channel 7 Channel (UCD)(UCD)

MPTS 30 ChannelsMPTS Third laser

Edge Rotation Spect.

Low k Reflectometer (UCLA)

Reciprocating probe (UCSD)

Gas-puff Imaging(LANL, PSI)

Core Pol CHERS

ERS Upgrade

Neutron Collimator

MSE/CIF MSE/CIF 3 Channel3 Channel

(Nova)(Nova)

MSE / LIFMSE / LIF(Nova)(Nova)

MSE/CIFMSE/CIF10 Channel10 Channel

((Nova)Nova)

- Incremental

- Base

MPTS 20 Channels

Page 8: FY05 - 06 NSTX Facility  In Support of the NSTX Research Program

Non-Inductive CD SystemsNon-Inductive CD SystemsEnhancement Opportunity Areas are EBW and Solenoid-free Start-up

PlasmaOperations FY04 FY05 FY06

(Run Weeks) 4 21 21

CHICHI(I(ITT = 0.5 MA) = 0.5 MA)

U. WashingtonGA, LANL, UCSD

HHFWHHFW(6MW)(6MW)ORNL/VLT, GA,UCSD, MIT

Plasma Feed-back Plasma Feed-back phase controlphase control

Absorber field null controlAbsorber field null control

EBWEBW

Dynamo-probe Dynamo-probe (UCSD)(UCSD)

EBWEEBWE/ Edge n/ Edge nee(r) (r)

(ORNL/MAST)(ORNL/MAST)

HHFW Antenna HHFW Antenna ImprovementImprovement

Transient-Start-upTransient-Start-upCapacitor BankCapacitor Bank

Pre-ionization/current Pre-ionization/current ramp-upramp-up

PF CoilPF CoilStart-upStart-up

KAIST, U. Tokyo, GA

PF 4 power supplyPF 4 power supply PF 5 bi-polar power supplyPF 5 bi-polar power supply

First I MA TubeEngineering

Design(VLT, ORNL)

- Incremental

- Base

MAST EBWMAST EBWLauncher?Launcher?

Page 9: FY05 - 06 NSTX Facility  In Support of the NSTX Research Program

Boundary PhysicsBoundary PhysicsExciting Enhancement Opportunity in Reduced Particle Recycling

PlasmaOperations FY04 FY05 FY06

(Run Weeks) 4 21 21

FuelingFueling

Wall Wall ConditioningConditioning

SupersonicSupersonicGas injectorGas injector

Power / Power / Particle Particle ControlControl

Divertor Cryo Panel Divertor Cryo Panel Decision PointDecision Point

Li Pellet InjectorLi Pellet Injector

((Gas/plasma Gas/plasma Boronization,Boronization,Between-shot GDC)Between-shot GDC)

(In-board gasInjectors)

Pellet injector in "suitcase”

(ORNL)

Fast IR Camera

(ORNL)

- Incremental

- Base

Divertor Thomson Scattering

- Decision Point

Divertor IR Camera(ORNL)

Lithium EvaporatorLithium Evaporator

Hot-boronizationHot-boronization

Between-shots boronizationBetween-shots boronization

DivertorHorizontal Bolometer

DivertorVertcal

Bolometer

Liquid Lithium Module Liquid Lithium Module Decision PointDecision Point

VLT/CDX-U/LTX

Page 10: FY05 - 06 NSTX Facility  In Support of the NSTX Research Program

Some Facility/Diagnostic Related Issues

• Facility not fully utilized. Facility not fully utilized.

• Flat $ budget causes ~ 3% per year reduction in personnel; Flat $ budget causes ~ 3% per year reduction in personnel; increasingly difficult to support operations and research for increasingly difficult to support operations and research for both PPPL and Collaborators.both PPPL and Collaborators.

• Facility/Diagnostic upgrade investment fraction 7% of the Facility/Diagnostic upgrade investment fraction 7% of the total budget low compared to the 5 year plan (10 - 12%). total budget low compared to the 5 year plan (10 - 12%). FFCC recommends ~ 10 % for a healthy program.FFCC recommends ~ 10 % for a healthy program.

• Struggle to maintain facilities and diagnostics at sensible Struggle to maintain facilities and diagnostics at sensible level including preventive maintenance and spare parts. level including preventive maintenance and spare parts.

• Long range capital intensive upgrades not adequately Long range capital intensive upgrades not adequately funded.funded.

Page 11: FY05 - 06 NSTX Facility  In Support of the NSTX Research Program

Incremental Funding Enhances Science Output and Programmatic Flexibility

• Improve facility reliability and availability Improve facility reliability and availability • Spare parts and preventive maintenance.Spare parts and preventive maintenance.

• Improve diagnostic capability: Improve diagnostic capability: •• Fast infrared camera for boundary physics (FY05)Fast infrared camera for boundary physics (FY05)

• • He Jet Spectroscopy (FY06)He Jet Spectroscopy (FY06)

• • Divertor MPTS (FY06)Divertor MPTS (FY06)

• • Full poloidal CHERS (FY06)Full poloidal CHERS (FY06)

• Restore 21 run weeks through FY06Restore 21 run weeks through FY06

• Improve facility capability: Improve facility capability: • • Implement deuterium pellet injector for core fueling(FY05)Implement deuterium pellet injector for core fueling(FY05)

• • HHFW Antenna Upgrade (FY05)HHFW Antenna Upgrade (FY05)

• • Accelerate the first MW EBW 15 GHz tube fabrication (FY05-06)Accelerate the first MW EBW 15 GHz tube fabrication (FY05-06)

• • Divertor cryo-pumping particle control system (FY06)Divertor cryo-pumping particle control system (FY06)

• • RWP coil upgrade (FY06)RWP coil upgrade (FY06)

Page 12: FY05 - 06 NSTX Facility  In Support of the NSTX Research Program

• New TF being commissioned: New TF should provide reliable operations for years to come.

• The facility and diagnostic capabilities are being readied to support exciting FY04 run.

• FY04 18 run weeks should be completed by August with September as contingency.

• The flat $ FY 05 - 06 budget forces tough choices among runs and upgrades.

• Incremental funding would greatly enhance NSTX science output restoring 21 run weeks and key upgrades.

Summary

NSTX is well aligned with the IPPA and ITPA Science Goals