Possibilities for a Better Functioning Nordic market in the Construction Branch” The GNA project’s recommendations VIA NORDICA, Helsinki, June 9 th , 2008 Director Bjørn Erik Selnes Norwegian Public Roads Administration G N A A COMMON NORDIC INFRASTRUCTURE MARKET

Upload: others

Post on 27-May-2022

3 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: G N A A COMMON NORDIC INFRASTRUCTURE MARKET

”Possibilities for a Better Functioning Nordic market in the Construction Branch”

The GNA project’s recommendations

VIA NORDICA, Helsinki, June 9th, 2008

Director Bjørn Erik Selnes Norwegian Public Roads Administration

G N A

A COMMON NORDIC INFRASTRUCTURE MARKET

Page 2: G N A A COMMON NORDIC INFRASTRUCTURE MARKET

Background GNA

• Initiative Nordic Council of Ministers Swedish precidency 2002

Focus on Integration– Improve mobility - reduce border obstacles– Improve Construction Market Innovation, Competition, Cooperation

National level Sweden: Conflicts, competency and quality problems

FIA: Renewal of Construction Sector

Page 3: G N A A COMMON NORDIC INFRASTRUCTURE MARKET

The Asssumption (1)

Construction

AircraftsShipbuilding

Automotive industry

Steel

RetailBanking

AirlinesWhite goods

Industry position

Performance improvement

Public sectorservices

Electronics

Sailboats

“Industry under massive transformation - Rapid

performance improvements”

“Industry under massive transformation - Rapid

performance improvements”

“Old school – Low or even negative productivity/cost

development”

“Old school – Low or even negative productivity/cost

development”

“Fully leveraging lean approaches - 3–5% annual

cost improvements”

“Fully leveraging lean approaches - 3–5% annual

cost improvements”

Hospitals

Difficult to compare project oriented activities and industry production –but undoubtedly considerable potential for increased total efficiency

Page 4: G N A A COMMON NORDIC INFRASTRUCTURE MARKET

Infra-Sector ”C ircle of R egret””A L L P arties L OSE ”

L IT T L E or NO C OST E F F IE C IE NC Y

NO T R UST &ST R IC T E R

INSP E C T ION

L OW -B ID

INNOV A T ION IS SUPR E SSE D

P OOR P R ODUC TDE V E L OPME NT

PR ODUC T IV IT YDE C R E ASE S

L OW P R OF ITL OW MA R G IN

C ONT R A C T ORC UT C OR NE R S

L IT T L E or NO C OST E F F IE C IE NC Y

NO T R UST &ST R IC T E R

INSP E C T ION

L OW -B ID

INNOV A T ION IS SUPR E SSE D

P OOR P R ODUC TDE V E L OPME NT

PR ODUC T IV IT YDE C R E ASE S

L OW P R OF ITL OW MA R G IN

C ONT R A C T ORC UT C OR NE R S

Infra-Sector ” C ircle of Hope””A L L P arties B E NE F IT ”

C OST SA V ING S& E F F IE C IE NTPR OC UR E ME NT

T R UST &P A R T NE R ING

C R E A T E D

Innovation ViaL ong T ermC ontracts INNOV A T ION

C A N B E UT IL IZE D

OP P OR T UNIT Y F ORP R ODUC T

DE V E L OPME NT

P R OF IT A B L EB USINE SS

P R ODC UT IV ITY

INC R E SE S

C OST SA V ING S& E F F IE C IE NTPR OC UR E ME NT

C OST SA V ING S& E F F IE C IE NTPR OC UR E ME NT

T R UST &P A R T NE R ING

C R E A T E D

T R UST &P A R T NE R ING

C R E A T E D

Innovation ViaL ong T ermC ontracts

Innovation ViaL ong T ermC ontracts INNOV A T ION

C A N B E UT IL IZE D

OP P OR T UNIT Y F ORP R ODUC T

DE V E L OPME NT

OP P OR T UNIT Y F ORP R ODUC T

DE V E L OPME NT

P R OF IT A B L EB USINE SS

P R OF IT A B L EB USINE SS

P R ODC UT IV ITY

INC R E SE S

P R ODC UT IV ITY

INC R E SE S

The Assumption (2)

Illustration FINNRA

Page 5: G N A A COMMON NORDIC INFRASTRUCTURE MARKET

The Mission (2003-2004)

IncreasedCompetition

Other

MARKET

BetterCooperation

DevelopClient

&Customer

Analysis ofactual situation

Possibleimprovement

Activity Plan

Activity 1 Activity 2 Activity 3

IncreasedCompetition

Other

IncreasedCompetition

Other

MARKET

BetterCooperation

DevelopClient

&Customer

Analysis ofactual situation

Possibleimprovement

Activity Plan

Activity 1 Activity 2 Activity 3

Report for Nordic Council of Ministersby the Road and railway authorities

www.norden.org

Page 6: G N A A COMMON NORDIC INFRASTRUCTURE MARKET

OthersMarket Place Guidelines andregulations

Procurementprocess

Cooperationpractice

Database for appropriations and plansWord list

Technical descriptionsGeneral contract conditionsProduct standardsDispute proceduresInterpretation EU-directivesRules for fair competition(”jävfrågor”)Health Security EnvironmentMachinery specificationsCompetence requirements

VisionTender- and contract-specificationsInnovative procurementmodelsElektronic tender-treatmentEducation of procurementpersonnel

Models for cooperation-practice, risk handlingCommon performancespecificationsFollow up practice/ Information, experiencetransfer

Review of tax- andtoll regulationsReview of competition-obstructing agreementsCommon IT-systems

2

3

45 67

8 9

11 12

13

1416 10

17

18

2123

115

2022

21

0

1

2

3

4

5

6

0 1 2 3 4 5 6

Complexity

Effe

ct

Possible actions (2004)

Page 7: G N A A COMMON NORDIC INFRASTRUCTURE MARKET

Project Report mission from Nordic Council of Ministers2003-2004www.nortden.org

Agreement on further development to achieve a better functioning common Nordic Construction Market

Priority to eight development projects to be carried out by the Authorities 2005-2006

Phase 2

Decision to prolong andconsolidate2007-2008

Phase 3

Project Progress

Phase 1

Page 8: G N A A COMMON NORDIC INFRASTRUCTURE MARKET

Organization phase 2 and 3

Group of GD’s

Nordic steering group

Nordic Vision

DevelopmentProject

Project-description

Bjørn E Selnes, Statens vegvesen (chairman)Rolf Kr. Jelstad, JernbaneverketPer Simonsen, VejdirektoratetMatti Piispanen (M Pukkila), VägförvaltningenTom Ramstedt, VägverketHelené From (H Øhman), Banverket(Juha-Heikki Paasanen, RHK)Camilla Svendgård (A Aaland), Statens vegv. (secretary)

Responsibility for each project to specified authorityProject reports autumn 2006

Prolonged 2007-2008

IndustryNRA

NationalProjects

(FIA INFRA21010)

Swedish Road Adm and Rail Adm, FINNRA, Road Directorate Danmark, Norwegian Public Road Adm National Rail Adm, Observers: RHK Finland (phase 3), Vegagerdin Iceland, Landsverk Faro Islands

Page 9: G N A A COMMON NORDIC INFRASTRUCTURE MARKET

NORDIC VISION:A well functioning Nordic Construction Market

without borders!

The Common Nordic Market is recognized by:

Socio-economic efficiency, high ethic standards and good confidence

No national obstacles limiting the suppliers mobilityA broad supplier market with good experience transfer between client and producerSecure and environment friendly construction methodsCommon understanding of the direction of the traffic authorities’ procurement strategiesProcurement practice stimulating innovative project delivery, increased productivity and profitability for all partsAn interesting future orientated sector attracting youth of both sex

Approved by Directors General Feb 2006

Page 10: G N A A COMMON NORDIC INFRASTRUCTURE MARKET

• The Common Nordic Market is recognized by

• Socio-economic efficiency, high ethic standards and good confidence

• No national obstacles limiting the suppliers mobility• A broad supplier market with good experience transfer between

client and producer• Secure and environment friendly construction methods• Common understanding of the direction of the traffic authorities’

procurement strategies• Procurement practice stimulating innovative project delivery,

increased productivity and profitability for all parts• An interesting future orientated sector attracting youth of both

sex

Nordic Vision

Page 11: G N A A COMMON NORDIC INFRASTRUCTURE MARKET

Project Organization Country

A Nordic vision for the future supplier market Road Administration (phase 2) Sweden

Common portal for appropriations and plans Road Directorate Denmark

Common word list Road Administration Sweden(Finland)

Development of new contract types and alternative ways of cooperation Road Administration Finland

Sweden

Common requirements for health, safety and environment (HSE) Road Administration Norway

Common performance specifications for road operations and maintenance Road Administration Norway

Common railway engineering and safety requirements for machinery used in railway

construction

Rail Administration Norway(Sweden)

Uniform competence requirements Rail Administration (phase 2) Sweden

Review of tax regulations and agreements that obstruct competition

Nordic Council of Ministers

Projects GNA phase 2 og 3

Page 12: G N A A COMMON NORDIC INFRASTRUCTURE MARKET

Common project portal and word list

• Web-portal established through link to the different authorities’ web pages for project- and contract information

• All authorities present projects > 5 mill €• Some have produced detailed list of upcoming contracts (Swedish

rail and road administrations have made a common plan for tenders for the next 12 months)

• Word list (appr. 1000 words) established connected to the web portal (Swedish, Finnish, Danish, Norwegian, English)

• National industry wants extensive information at contract level with frequent update (including consultant contracts).

• International contractors’ interest is primarely the really large projects/contracts

• Can be basis for coordination of large projects

www.nvf.norden.org http://webapp.vd.dk/gna/

Status June 1st 2008

Page 13: G N A A COMMON NORDIC INFRASTRUCTURE MARKET

Common HSE-practice

• Differences in practice despite same basis (EU)– Most emphasized in Norway, influence from offshore industry– Inspection authorities different approach, stricter demands for

the client in Norway – more a matter between inspection and contractor in the other countries

• Contractors response after phase 2:– The most important project in GNA– The authorities’ focus and practice crucial

• GNA has focused on health, working environment and safety– GNA contributed to national focus (feedback Finland)

• Still some differences in attitude and motivation?

Status June 1st 2008

Page 14: G N A A COMMON NORDIC INFRASTRUCTURE MARKET

Common HSE-practice

• The project has made a proposal for common HSE indicators, reporting and evaluation routines, and a plan for development with possibility for varying adjustment period. The evaluation can be basis for bonus system.

• Recommendation: Implementation and network including inspection authorities

Status June 1st 2008

Health, Environment and Safety:

Joint Nordic Development Plan

Operation

Adjust

Establish

20122011201020092008Time schedule

Operation

Adjust

Establish

20122011201020092008Time schedule

Review and developmentOperation

Implementation of procedures in client organisation

Evaluation - AdjustmentAdjust

Decision to implement Joint Nordic Development Plan

Develop procedures in client organisation

Involvment: Client – contractor – enforcement agent

Establish

Review and developmentOperation

Implementation of procedures in client organisation

Evaluation - AdjustmentAdjust

Decision to implement Joint Nordic Development Plan

Develop procedures in client organisation

Involvment: Client – contractor – enforcement agent

Establish

Incitaments/sanctions:

Number of days of absence from work rel. hours worked(Severity rate, S-rate)

F

System for evaluation of contractor performance and feedback to contractor

Number of personal injuries rel. hours workedH2

Number of accidents with absence from work rel. hours worked(Lost-time injury frequency rate, LTI)

H1

Number of risk assessment performedRisk

Number of near accidents rel. hours workedN

Performance Indicators: Monthly Reporting

Incitaments/sanctions:

Number of days of absence from work rel. hours worked(Severity rate, S-rate)

F

System for evaluation of contractor performance and feedback to contractor

Number of personal injuries rel. hours workedH2

Number of accidents with absence from work rel. hours worked(Lost-time injury frequency rate, LTI)

H1

Number of risk assessment performedRisk

Number of near accidents rel. hours workedN

Performance Indicators: Monthly Reporting

Page 15: G N A A COMMON NORDIC INFRASTRUCTURE MARKET

Common performance specifications for operations and maintenance of road

Status June 1st 2008

Page 16: G N A A COMMON NORDIC INFRASTRUCTURE MARKET

Common performance specifications for operations and maintenance of road

Status June 1st 2008

Recommended as basis for national revisions, network for improvements (also English version)

Page 17: G N A A COMMON NORDIC INFRASTRUCTURE MARKET

Development of new contract types and alternative ways of cooperation

• Challenging – varying organization models, strategies, practice differing from strategy

• Established understanding for use of different models, improvement potential in present models, interest for new models

• Made a basis for more systemized network, but not managed to establish common practice

• Key personnel want to use experiences and good ideas in their own practice”Find the balance between coordination and freedom to creation”

Status June 1st 2008

Page 18: G N A A COMMON NORDIC INFRASTRUCTURE MARKET

Development of new contract types and alternative ways of cooperation

• Development of Nordic application of alllianse model/ early contractor involvment (Finnra)

• Report with analysis of different contracts and cooperation models

• ”Best practice evaluation”• Report describing procurement routines• Seminars key personnel, industry

Recommendations: Strengten network to harmonize practiceand evaluate new models, seminars Common education/trainingPlan for partnering

Status June 1st 2008

Page 19: G N A A COMMON NORDIC INFRASTRUCTURE MARKET

Nordic vision Approved

Common portal for appropriations and plans Established

Word list Established

Development of new contract types and alternative ways

of cooperationReports, recommendations for practice and network

Common HSE-practice Proposal for common routines and developmentand implementation plan

Common performance specifications for road

operations and maintenanceCommon description – implementation phase

Machinery railway construction System for cross allowance worked out, initiative ministries, inspection authorities

Uniform competence requirements Stopped after phase 2 – new project?

Review of tax regulations and agreements that obstruct

competitionNordic Council of Ministers

Summarized

Page 20: G N A A COMMON NORDIC INFRASTRUCTURE MARKET

Laws, regulations, national standards, border obstacles

Internal routines and procedures

Network and exchange of knowledge

Information

Levels of Co-ordination (practical)

Page 21: G N A A COMMON NORDIC INFRASTRUCTURE MARKET

Laws, regulations, national standards, border obstacles

Internal routines

Network

Information

Status cooperation levels – potential?V

isio

n

Proj

ect p

orta

l

Wor

d lis

t

Con

tract

ing

and

way

sofc

oope

ratio

n

Hea

th, s

afet

yan

d en

viro

nmen

t

Proc

urem

entp

ract

ice

Com

mon

perf

orm

ance

spec

ifica

tions

Com

mon

spec

ifica

tions

mac

hine

ryra

ilway

cons

truct

ion

Com

mon

com

peta

nce

dem

ands

Page 22: G N A A COMMON NORDIC INFRASTRUCTURE MARKET

TheNordic Regional Cooperation

• Analysis for the Council of Ministers:

– Lack of resultats caused by high level of ambition, many involved, unclear responsibility for following up and progress plan, uncertainty concerning EU regulations, national differences

– Recommendation:Long term high ambition combined with initiatives that can beimplemented immediately and initiatives that generate a processwith milestones and clear responsibility for progress and following up

GNA structure fits well to the recommendation

Page 23: G N A A COMMON NORDIC INFRASTRUCTURE MARKET

Processes - progress

Planned stages

Traditional progress

time

effect

Page 24: G N A A COMMON NORDIC INFRASTRUCTURE MARKET

Cooperation, strategies :Recommendation

• The common vision should be basis for further development of thetraffic authorities’ procurement strategies

• Principles and actions must be incorporated the authorities’ management systems with distinct demands combined with assistance and training of operative project personnel

• Establish structured cooperation programme with the industry and others

• Utilize and establish common training and development (RD)

Page 25: G N A A COMMON NORDIC INFRASTRUCTURE MARKET

Cooperation, strategies:Recommendations

• The authority’s focus and claerness is crucial for the common development and the industry’s possibilities

• The top managements priorities, the linje organization’s responsibility and involvment, and competency and challenges for the operative personnel

Page 26: G N A A COMMON NORDIC INFRASTRUCTURE MARKET

Cooperation, strategies:Recommendation

• Continue the GNA-cooperaton in a network – find an involving way of working – NB don’t exclude other infrastructure authorities (NVF: open seminars)

• Establish common experience transfer forum - yearly benchmarking