gadus neptun - havfisk with reservation for possible mistakes in the brochure. gadus neptun ......

4
GADUS NEPTUN Fishing Vessel / Stern Trawler

Upload: nguyenbao

Post on 20-Aug-2018

218 views

Category:

Documents


0 download

TRANSCRIPT

Photo: Valderhaug. Layout/print: STX OSV. W

ith reservation for possible mistakes in the brochure.

gadus neptun

Fishing Vessel / Stern Trawler

gadus neptunThe vessel designed as vessel for year around fishing in North Sea, Northern Atlantic and Barents sea waters. With the following special features:

• The vessel is specially designed and equipped for bottom- and pelagic trawling duties with a high focus on good sea-keeping abilities.• The deck layout and electrical winch equipment is arranged for both single- and twin-trawling.• High standard and comfortable accommodation with low noise levels.• The vessel is environmental friendly with focus on low fuel consumption and pre cautions equivalent to DNV’s CLEAN CLASS requirements are incorporated in the design.• The vessel is arranged as a Stern trawler with Twin Screw and Diesel Electric power system.• Modern, efficient, hygienic and automatically fish processing factory. • Offal from fish processing will be produced into fishmeal.

DELIVERED BY: Vard Brattvaag

OWNER: Finnmark Havfiske AS

YARD NO: 790

DELIVERY: Februar 2014

DESIGN: VARD 8 01

PROCESSINGAREA

MEAL PLANT

CARGO HOLDFREEZING 1200 m³

MEAL HOLD140 m³incl.baggingstation

F.O.

F.O.

DRY TANK

DRY TANK

F.O.

BOWTHRUSTERROOM

F.O.

F.W.

F.W.

F.W.

REFR.MACHINERY

MEAL PLANT

MEAL HOLD140 m³incl.baggingstation

MEALBAGGING

F.O.

F.O.

F.O.

DRY TANK

DRY TANK

CASING SEWAGETANK

ROLLREDUCTION

TANK

TANK FOR FISHWASTE

MEALBUFFER

TRUCK STORECHARGING &REPAIR

CHILLEDPALLETIZING

ROOM

F.O.

MEALBUFFER

CARGO HOLDFREEZING 1200 m³

ENGINEROOM

AIRDUCT

CASINGABOVE

REFR.MACHINERY

F.O.SERVICE

F.O.SETTL.

DRY TANK

DRY TANK

HYDR.OIL

HYDR.OIL

LUBOIL

BILGE TANK

F.O.SERVICE

AIRDUCT

BOWTHRUSTERROOM

ROLLRED./FO

TK.

AP

ENGINESTORE

AIRDUCT

CASING

MAIN PARTICULARSAPPROX.L.O.A. 69,8 mL.P.P. (LOAD LINE) 62,784 (62,4) mBREADTH MLD. 15,6 mDEPTH A-DECK. 9,95 mMAX. DRAUGHT , BELOW KEEL 8,0 m

CARGO HOLD FREEZING 1200 m³PALLETIZING ROOM, MAIN DECK 150 m³ MEAL HOLD, MAIN DECK 140 m³

FUEL OIL 600 m³FRESH WATER 150 m³

ACCOMMODATION:SINGLE CABINS 13 PERSONSDOUBLE CABINS 12 PERSONS

TOTAL 25 PERSONS

ENGINESTORE

PROCESSINGAREA

CARGO HOLDFREEZING

AIRDUCTAIRDUCT

PROCESSINGOFFICE

WORKSHOPSTORE

CONTROLROOM(ECR)

SWITCHBOARD ROOM

WINDOW

230 V 440 V

ENGINEWORKSHOP

Siemens-Drive2200kW, 690V

Siemens-Drive2200kW, 690V

Siemens Trafo2530 kVA, 690V

Siemens Trafo2530 kVA, 690V

#4

ROLLRED./FO

TK.

ROLLREDUCTION

TANK

Vard Design ASP.O. Box 76NO-6001 ÅlesundNorwayTel: +47 70 21 06 00www.vard.com

ACCORDING TO INTERNATIONAL LAWS, THIS DRAWING AND ITS CONTENT IS THE PROPERTY OF VARD GROUP AS.THE DRAWING CAN NOT BE MADE PUBLIC, COPIED OR OTHERWISE USED, WITHOUT OUR WRITTEN CONSENT.

General ArrangementTwin Trawler

A0 NOD-730 FV 01

790-101-001

21.11.20131 of 1

23.08.2011 SAJ

Inge W.

FP

MAIN PARTICULARS:

Length overall 69.80 mLength between p.p. 62.40 mBreadth moulded 15.60 mDepth main deck 6.85 mDesign draught 6.85 mFrame spacing 0.60 m

CLASS:

DNV +1A1, STERN TRAWLER, ICE 1B (HULL), E0, CLEAN CLASS, SILENT-F, T_MON, BIS.

Fuel oil tanks to be built according to CLEAN DESIGN

ACCoMMoDATIoN:

Accommodation and equipment for 25 persons

CAPACITIeS:

Freezing hold 1 200 cu.m Packing hold 380 cu.m Meal store 140 cu.m Fish receiving bins 70 cu.m Fuel oil 600 cu.m Fresh water 150 cu.m

DIeSeL eLeCTRIC PRoPULSIoN:

Twin-screw CP- propellers in nozzle, dia. 3 500 mm, rpm 0-135

2 off main propulsion electrical motors regulated by frequency converters , 2 200 ekW

2 off reduction gears with vertical offset

STeeRINg geARS AND RUDDeRS:

2 off high lift flap rudders with electric hydraulic steering gears boW ThRUSTeRS:

1 off electrical driven tunnel thruster forward, 600 kW CP-propeller, fixed rpm

DeCk CRANe / eLeVAToRS:

3 off deck service cranes1 off elevator with side hatch for offloading 1 off cargo elevator

fIShINg eqUIPMeNT:

3 off electrical trawl winches, 55 tons8 off electrical sweep line winches, 18 tons3 off gilson winches, 20 tons2 off ice trawl davits, hydr. operated2 off center block slides below gallow, 55 tonsNet drum midship, 25 cum, 30 tonsAuxiliary winches

fISh PRoCeSSINg PLANT:

Processing equipment for complete product handling, grading, processing and freezing,80 tons / 24 h

Fish meal plant to be installed for fish waste production, 25 tons of raw material / 24 h

The factory to be arranged for automatic processing with overboard arrangement, necessery conveyors, buffer stores, by-pass functions etc. Vertical plate freezer with conveyors for loading/unloading.

geNeRAToRS:

2 off main generators 2 450 ekW , 720 rpm2 off aux. generators 750 ekW , 1 800 rpm1 off emg. generator 75 ekW, 1 800 rpm

SAfeTy eqUIPMeNT:

1 off MOB boat with davit in hangar, SOLAS approved

hULL/oUTfITTINg:

Vard Braila / Vard Brattvaag / Vard Søviknes

specifications

Photo: Valderhaug. Layout/print: VARD

. With reservation for possible m

istakes in the brochure.