Industrial Training Report In TENUGHAT VIDYUT NIGAM LIMITED Submitted in partial fulfillment of the requirement for the award of the B.Tech In Mechanical Engineering Submitted by:- Name:-GANESH KUMAR RAM University Roll No:-1404535 Trade / Sem:-MECHANICAL/5th

Upload: 1996kuldeep

Post on 22-Jan-2018

197 views

Category:

Engineering


14 download

TRANSCRIPT

Industrial Training ReportIn

TENUGHAT VIDYUT NIGAM LIMITED

Submitted in partial fulfillment of the requirement

for the award of the B.Tech

In

Mechanical Engineering

Submitted by:-

Name:-GANESH KUMAR RAM

University Roll No:-1404535Trade / Sem:-MECHANICAL/5th

Tenughat Vidyut Nigam Limited is a power generating company incorporated on 26.11.1989 of Jharkhand .

The project site known as Tenughat Thermal Power Station (TTPS) is located at village.Lalpania in Dist‐Bokaro. The project is situated on the bank of Tenughat reservior. . .

The total installed capacity of Tenughat Thermal Power Station is 420MW having two units of 210 MW capacity each.

The daily requirement of coal for full load generation from its 2x210 MW units is a approximately 7000 MTs which is met from coal mines of CCL situated in the vicinity of plant within 50 Kms..

TTPS has an acquired land of approx. 1800 acer

• Principle

• Layout

• Coal handling plant

• Boiler

• Super heater

• Steam Turbine

• Economizer

• Generator

• Water Treatment Plant

• Ash handling plant

• Control Room

BOILER

TURBINE

DM PLANT

CONTROL ROOM

SWITCH YARD

ESP

GENERATOR SECTION

COAL HANDLING PLANT

1 -2 :-isenotrophic expansion(steam turbine)

2-3:-isobaric heat expension(condenser)

3-4:-isenotrophic expension(pump)

4-1:- isobaric heat supply(steam generator or boiler)

COAL:-

Plant needs 700 mt coal per day for the running of 2x210 mw plant

It is supply by coal block ccl which is 50 kmsaway from the plant

WATER:-

Plant get water from tenughat dam

Coal Handling Plant

• Wagon unloading system

• Crushing system

• Conveying system

Coal handling plant section

Unload the coal from wagon to hopper with the help of wagon Tripler.

Hopper allows to pass coal pieces ≤ 200mm

From hopper coal fall on vibrator which is supported by roller.

Belt are used to convey coal from coal handling plant to furnace.

Specification:-◦ Belt width : 1400mm◦ Speed : 2.2m/sec◦ Total install power : 360kw ◦ Capacity : 1350/750 ton/hr◦ No. of conveyor: 38

CRUSHER HOUSE:- It consists of crushers which are used to crush the coal to 20 mm size.

Two types

Primary crusher

oRail crusher

oRotary breaker

Secondary crusher

RAW COAL FROM CCL To TTPS via a single railway track & trucks

Wagon tippler

hoppersCrusher housebunkers

Row coal feeders

Coal mills(pulverization)

Boiler furnace ( tangential firing of pulverized coal)

CWPH1-5

CONDENSOR

6-7

COOLING TOWER 6-7

CWPH6-7

DM PLANTWTP

CONDENSOR

1-5

CLOSED LOOP SYSTEM

SOFT WATERDM WATER

CLARIFIED WATER

RAW WATER

FILTER WATER

OPEN LOOP SYSTEM

WATER CYCLECHAMBALUPSTREAM

RIVERHOT WATER

It is a closed vessel in which water under pressure is converted into steam.

Hot water or steam used to transfer heat to a process.

A boiler is always designed to absorb maximum amount of heat released in process of combustion.

Furnace:- It is primary part of boiler where the fuel is burnt to liberate the heat energy.

Chemical Energy of

fuel

Thermal Energy by combustio

n

•FUNCTION- Turbine is a machine in which shaft is rotated by the impact of the working fluid such as steam,water etc.

•Type – Reaction

•TECHNICAL SPECIFICATION-Rated output -- 110 MWRated speed – 3000 rpmDirection of rotation – clockwiseType -3 cylinder, impulse reactionHeat flow at rated output – 2152.5 kcal/kwhQuantity of oil - 1800 liters

It converts mechanical power into electrical power.

PRINCIPLE- Electromechanical energy

conversion

TECHNICAL SPECIFICATION-

Apparent output – 137.5 MVA

Active output - 110 MW

Power factor – 0.85 lag

Excitation voltage - 230 Volt

Rated voltage – 11 KV

Rated speed – 3000 rpm

Phase connection – star-star

21

Used for the removal of suspended particles and fly ash from

industrial flue gases

PRINCIPLE- Produces an electrostatic field which attracts the

ionized carbon particles and other such particulates which cause

environmental pollution.

Main Equipment Of Switchyard

Bus Bar Bus Coupler Isolating switch Earthing Switch Lightning Arrester Current & Potential Transformer (CT&PT) Circuit Breaker Capacitive Voltage Transformer (CVT)

Place where switching operations of power

distribution is perfomed.

Outgoing Feeder

patratu feeder -1

Bihar sarif feeder- 2

Control Room