gantry covered with noise / dust barrier

1
MTR Corporation Limited Kwun Tong Line Extension Contract No. NEX/2207 Environmental Impact Assessment TYPICAL LAYOUT OF ENCLOSURE FOR MUCKOUT POINTS Figure: Scale: 7.22 NTS Rev: GANTRY COVERED WITH NOISE / DUST BARRIER

Upload: others

Post on 20-Nov-2021

1 views

Category:

Documents


0 download

TRANSCRIPT

MTR Corporation LimitedKwun Tong Line Extension Contract No. NEX/2207 Environmental Impact Assessment

TYPICAL LAYOUT OF ENCLOSURE FOR MUCKOUT POINTS

Figure:

Scale:

7.22

NTS

Rev:

GANTRY COVERED WITH

NOISE / DUST BARRIER