gantt chart

1
Magnetic Tweezers Group D Project Lead: Dr. Valentine Vullev Today's Date: 6/7/2010 (vertical red line) [42] Start Date: 1/4/2010 (Mon) 0 # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # # WBS Tasks Task Lead Start End % Complete Working Days Days Complete Days Remaining ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### ### 1 Magnet Parameters Mohammed 1/04/10 2/14/10 42 100% 30 42 0 1.1 Single Magnet Runs 1/04/10 1/22/10 19 100% 15 19 0 1.2 Double Magnet Runs 1/23/10 2/05/10 14 100% 10 14 0 1.3 Optimum Angle 2/06/10 2/15/10 10 100% 6 10 0 1.4 Material Core 2/06/10 2/15/10 10 100% 6 10 0 2 Fabrication Koji 2/01/10 3/14/10 42 100% 30 42 0 2.1 Ordering Materials 2/01/10 3/15/10 43 100% 31 43 0 2.2 Generating Design 2/01/10 2/18/10 18 100% 14 18 0 2.3 Building Device 2/19/10 3/05/10 15 100% 11 15 0 2.4 Prefecting Design 4/15/07 5/12/07 28 100% 20 28 0 3 Calibration Mike/Arieo 3/12/10 5/31/10 81 100% 57 81 0 3.1 Device Placement 3/12/10 3/26/10 15 100% 11 15 0 3.2 3/27/10 4/10/10 15 100% 10 15 0 3.3 Other Objects 4/11/10 4/25/10 15 100% 10 15 0 3.4 Tweaking Device 4/26/10 6/01/10 37 100% 27 37 0 Duration (Days) Measurements

Upload: ravitejaasodi

Post on 01-Oct-2015

214 views

Category:

Documents


0 download

DESCRIPTION

gfgchgf

TRANSCRIPT

Excel Gantt Chart Template

GanttChartExcel Gantt Chart 2008 Vertex42 LLCGantt Chart TemplateMagnetic TweezersGroup DProject Lead:Dr. Valentine VullevToday's Date:6/7/10(vertical red line)[42]Start Date:1/4/1040182.001/4/101/5/101/6/101/7/101/8/101/11/101/12/101/13/101/14/101/15/101/18/101/19/101/20/101/21/101/22/101/25/101/26/101/27/101/28/101/29/102/1/102/2/102/3/102/4/102/5/102/8/102/9/102/10/102/11/102/12/102/15/102/16/102/17/102/18/102/19/102/22/102/23/102/24/102/25/102/26/103/1/103/2/103/3/103/4/103/5/103/8/103/9/103/10/103/11/103/12/103/15/103/16/103/17/103/18/103/19/103/22/103/23/103/24/103/25/103/26/103/29/103/30/103/31/104/1/104/2/104/5/104/6/104/7/104/8/104/9/104/12/104/13/104/14/104/15/104/16/104/19/104/20/104/21/104/22/104/23/104/26/104/27/104/28/104/29/104/30/105/3/105/4/105/5/105/6/105/7/105/10/105/11/105/12/105/13/105/14/105/17/105/18/105/19/105/20/105/21/105/24/105/25/105/26/105/27/105/28/105/31/106/1/106/2/106/3/106/4/106/7/106/8/106/9/106/10/106/11/106/14/106/15/106/16/106/17/106/18/106/21/106/22/106/23/106/24/106/25/106/28/106/29/106/30/107/1/107/2/107/5/107/6/107/7/107/8/107/9/107/12/107/13/107/14/107/15/107/16/107/19/107/20/107/21/107/22/107/23/107/26/107/27/107/28/107/29/107/30/108/2/108/3/108/4/108/5/108/6/108/9/108/10/108/11/108/12/108/13/108/16/108/17/108/18/108/19/108/20/108/23/108/24/108/25/108/26/108/27/108/30/108/31/109/1/109/2/109/3/109/6/109/7/109/8/109/9/109/10/109/13/109/14/109/15/109/16/109/17/109/20/109/21/109/22/109/23/109/24/109/27/109/28/109/29/109/30/1010/1/1010/4/1010/5/1010/6/1010/7/1010/8/1010/11/1010/12/1010/13/1010/14/1010/15/1010/18/1010/19/1010/20/1010/21/1010/22/1010/25/1010/26/1010/27/1010/28/1010/29/1011/1/1011/2/1011/3/1011/4/1011/5/1011/8/1011/9/1011/10/1011/11/1011/12/1011/15/1011/16/1011/17/1011/18/1011/19/1011/22/1011/23/1011/24/1011/25/1011/26/1011/29/1011/30/1012/1/1012/2/1012/3/10WBSTasksTask LeadStartEndDuration (Days)% CompleteWorking DaysDays CompleteDays Remaining1 / 4 / 101 / 11 / 101 / 18 / 101 / 25 / 102 / 1 / 102 / 8 / 102 / 15 / 102 / 22 / 103 / 1 / 103 / 8 / 103 / 15 / 103 / 22 / 103 / 29 / 104 / 5 / 104 / 12 / 104 / 19 / 104 / 26 / 105 / 3 / 105 / 10 / 105 / 17 / 105 / 24 / 105 / 31 / 106 / 7 / 106 / 14 / 106 / 21 / 106 / 28 / 107 / 5 / 107 / 12 / 107 / 19 / 107 / 26 / 108 / 2 / 108 / 9 / 108 / 16 / 108 / 23 / 108 / 30 / 109 / 6 / 109 / 13 / 109 / 20 / 109 / 27 / 1010 / 4 / 1010 / 11 / 1010 / 18 / 1010 / 25 / 1011 / 1 / 1011 / 8 / 1011 / 15 / 1011 / 22 / 1011 / 29 / 101Magnet ParametersMohammed1/04/102/14/1042100%304201.1Single Magnet Runs1/04/101/22/1019100%151901.2Double Magnet Runs1/23/102/05/1014100%101401.3Optimum Angle2/06/102/15/1010100%61001.4Material Core2/06/102/15/1010100%61002FabricationKoji2/01/103/14/1042100%304202.1Ordering Materials2/01/103/15/1043100%314302.2Generating Design2/01/102/18/1018100%141802.3Building Device2/19/103/05/1015100%111502.4Prefecting Design4/15/075/12/0728100%202803CalibrationMike/Arieo3/12/105/31/1081100%578103.1Device Placement3/12/103/26/1015100%111503.2Distance Measurements3/27/104/10/1015100%101503.3Other Objects4/11/104/25/1015100%101503.4Tweaking Device4/26/106/01/1037100%27370

SampleNoteSampleNoteSampleNoteWork Breakdown StructureEnter the Task# and Subtask#22.12.2etc.Working DaysCounts only Mon-Fri, using the NETWORKDAYS() formula. When planning work based upon the number of working days, adjust the Duration until the desired # of working days is reached.Note: If the start date is later changed, the number of working days may also change.Calendar Days CompleteThis column is calculated by multiplying the Duration by the %Complete and rounding down to the nearest integer.Calendar Days RemainingThis column is calculated by subtracted the Days Complete from the Duration.Duration (Calendar Days)Enter the number of calendar days for the given task. Refer to the Working Days column or use a calendar to determine the corresponding working days.

For the main tasks, you can calculate the duration by finding the maximum End date of the sub tasks and subtracting the earliest start date. For example:F13=MAX(E14:E17)-D13Percent CompleteUpdate the status of this task by entering the percent complete (between 0% and 100%).

For the main tasks, you can use a weighted average of the sub tasks by adding the formula:G13=SUMPRODUCT(F14:F17,G14:G17)/SUM(F14:F17)Note: If you insert rows, make sure that the calculation is updated correctly.End DateThe ending date is calculated by adding the Duration (calendar days) to the Start date minus 1 day, because the task duration is from the beginning of the Start day to the end of the End day.Start DateEnter the starting date for this task. To associate the start date with the end of another task, enter a formula in the start date that refers to the end date of that task.Limited Use PolicyYou may download this template free of charge, make archival copies, and customize the template for personal use or for your company use. The customized template (with your specific personal or company information) may be used and distributed within your company, but otherwise, this template or any document including or derived from this template may NOT be sold, distributed, or placed on a public server such as the internet without the express written permission of Vertex42 LLC.

The copyright notice(s) within the spreadsheet may NOT be removed, deleted, or hidden.

No WarrantiesTHE SOFTWARE AND ANY RELATED DOCUMENTATION ARE PROVIDED TO YOU "AS IS." VERTEX42, LLC MAKES NO WARRANTIES, EXPRESS OR IMPLIED, AND EXPRESSLY DISCLAIMS ALL REPRESENTATIONS, ORAL OR WRITTEN, TERMS, CONDITIONS, AND WARRANTIES, INCLUDING BUT NOT LIMITED TO, IMPLIED WARRANTIES OF MERCHANTABILITY, FITNESS FOR A PARTICULAR PURPOSE, AND NONINFRINGEMENT. WITHOUT LIMITING THE ABOVE YOU ACCEPT THAT THE SOFTWARE MAY NOT MEET YOUR REQUIREMENTS, OPERATE ERROR FREE, OR IDENTIFY ANY OR ALL ERRORS OR PROBLEMS, OR DO SO ACCURATELY. This Agreement does not affect any statutory rights you may have as a consumer.

Some states do not allow the limitation or exclusion of liability for incidental or consequential damages, so the above limitation may not apply to you.

Limitation of LiabilityIN NO EVENT SHALL VERTEX42, LLC BE LIABLE TO YOU, FOR ANY DAMAGES, INCLUDING ANY LOST PROFITS, LOST SAVINGS, OR ANY OTHER DIRECT, INDIRECT, SPECIAL, INCIDENTAL, OR CONSEQUENTIAL DAMAGES ARISING FROM THE USE OR THE INABILITY TO USE THE SOFTWARE (EVEN IF WE OR AN AUTHORIZED DEALER OR DISTRIBUTOR HAS BEEN ADVISED OF THE POSSIBILITY OF THESE DAMAGES), OR ANY MISTAKES AND NEGLIGENCE IN DEVELOPING THIS SOFTWARE, OR FOR ANY CLAIM BY ANY OTHER PARTY. THE ORGANIZATION, BUSINESS, OR PERSON USING THIS SOFTWARE BEARS ALL RISKS AND RESPONSIBILITY FOR THE QUALITY AND PERFORMANCE OF THIS SOFTWARE.

Somes states do not allow the limitation or exclusion of liability for incidental or consequential damages, so the above limitation may not apply to you.Gantt Chart Template