gantt chart and table
DESCRIPTION
Sample Gantt Chart for a Project ReportTRANSCRIPT
9-6-2014 10-1-2014 10-26-2014 11-20-2014 12-15-2014 1-9-2015 2-3-2015 2-28-2015 3-25-2015 4-19-2015 5-14-2015
BE Project
Phase I
Feasibility Study
Requirement Gathering
Literature Review
Requirement Analysis
Prescriptive Architecture Report
Proposed Design Presentation
Phase II
Design Decisions for Software
Study of MATLAB
Algorithm Research
Coding
Testing
Final Report Preparation
Final Report Presentation
Task Start Date End Date Duration (Days)BE Project 06-09-2014 24-04-2015 230
Phase I 06-09-2014 05-11-2014 61Feasibility Study 06-09-2014 15-09-2014 10Requirement Gathering 16-09-2014 23-09-2014 8Literature Review 24-09-2014 07-10-2014 14Requirement Analysis 08-10-2014 19-10-2014 12Prescriptive Architecture Report 20-10-2014 01-11-2014 13Proposed Design Presentation 02-11-2014 05-11-2014 4
Phase II 02-02-2015 24-04-2015 82Design Decisions for Software 02-02-2015 10-02-2015 9Study of MATLAB 11-02-2015 26-02-2015 16Algorithm Research 27-02-2015 10-03-2015 12Coding 11-03-2015 09-04-2015 30Testing 10-04-2015 14-04-2015 5Final Report Preparation 15-04-2015 20-04-2014 6Final Report Presentation 21-04-2015 24-04-2015 4