Page 1: Gas power stations - Sika · 2018-07-01 · Hurghada - 6 x LM6000 + SPRINT – DUAL FUEL. 3. Port Said - 2 x LM6000 – DUAL FUEL. PROJECT REQUIREMENTS - high strength, shrinkage

REFURBISHMENT : Sikadur® -42HS , Sikagrout® -214Sikacrete®-114 WATERPROOFING : SikaSwell® S-2SEALING&BONDING : Sikaflex®-1A

SIKA AT WORKGAS POWER STATIONS SHARM ELSHIEKH - HURGHADA PORT SAID

Page 2: Gas power stations - Sika · 2018-07-01 · Hurghada - 6 x LM6000 + SPRINT – DUAL FUEL. 3. Port Said - 2 x LM6000 – DUAL FUEL. PROJECT REQUIREMENTS - high strength, shrinkage

GAS POWER STATIONS SHARM ELSHIEKH - HURGHADA - PORT SAID

PROJECT DESCRIPTION- Three Power Stations with 14 Turbines to upgrade the electrical output power from 396 Megawatts to 670 Megawatts, enough for serve 2.5 Million Egyptian homes.

- The Power Stations plants included: 1. Sharm El Sheikh - 6 x LM6000 + SPRINT – DUAL FUEL. 2. Hurghada - 6 x LM6000 + SPRINT – DUAL FUEL. 3. Port Said - 2 x LM6000 – DUAL FUEL.

PROJECT REQUIREMENTS- high strength, shrinkage free, self levelling epoxy grout suitable for application:

• Under turbine footprint • Fill all anchor pockets in turbine pedestal. • Under stack footprint. • Fill all anchor pockets in stack foundation. • Under gas compressor footprint. • Fill all anchor pockets in gas compressor foundation.

- High Performance, Non Shrink, Expanding Cementitious Grouting Mortar • Some equipment and frames Reciprocating engines, compressors, pumps, presses, etc. and to fill cavities in concrete and levelling layer for pile cap.

Page 3: Gas power stations - Sika · 2018-07-01 · Hurghada - 6 x LM6000 + SPRINT – DUAL FUEL. 3. Port Said - 2 x LM6000 – DUAL FUEL. PROJECT REQUIREMENTS - high strength, shrinkage

Why Sika: Sika Huge references Sika Technical supports at the sites and during the project all di�erent phase mainly the application of the epoxy grout foot prints for the large 14 turbines. Sika strong supply chain.

Sika Solution:• High strength, shrinkage free, self levelling epoxy grout under turbine

footprint with heavy impact and vibration Sikadur® -42HS

• Cement grout High Performance, Non Shrink, Expanding Cementitious

Grouting Mortar Sikagrout® -214

• Sikacrete®-114 , Free Flowing Micro-concrete for grouting

Page 4: Gas power stations - Sika · 2018-07-01 · Hurghada - 6 x LM6000 + SPRINT – DUAL FUEL. 3. Port Said - 2 x LM6000 – DUAL FUEL. PROJECT REQUIREMENTS - high strength, shrinkage

For More Projects Information

http://egy.sika.com/en/group/Publications/Sika_At_Work.html

Products Delivered:• Sikadur® -42HS 300 Ton• Sikagrout® -214 200 Ton• Sikacrete®-114 150 Ton• SikaSwell® S-2 100 Cartridge• Sikaflex®-1A 1000 Cartridge

GAS POWER STATIONS

PROJECT PARTICIPANTS:

Main Applicator :Sub Applicators :

Allam Sons Group (HAC)

A-build Company and Target Company

SIKA EGYPT ContactPhone1st Industrial zone (A)

Section # 10, Block 13035

El Obour City, Egypt

202 44810580

Fax 202 44810459

egy.sika.com