Copyright © 2018 by Technical Training Professionals Course 214 7FA Gas Turbine Major Inspections Technical Training Professionals

Upload: hoangnga

Post on 25-May-2019

232 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Gas turbine fundamentals course 0301 - tectrapro.com · Provides a description of the required clearance measurements taken during the Gas Turbine Hot Gas Path inspection reassembly

Copyright © 2018 by Technical Training Professionals

Course 214

7FA Gas Turbine Major Inspections

Techn

ical T

rainin

g Prof

essio

nals

Page 2: Gas turbine fundamentals course 0301 - tectrapro.com · Provides a description of the required clearance measurements taken during the Gas Turbine Hot Gas Path inspection reassembly

214 - 7FA Gas Turbine Major Inspections

Copyright © 2018 by Technical Training Professionals

Copyright © 2018 by Technical Training Professionals

All rights reserved. No part of this publication may be reproduced, distributed, or transmitted in

any form or by any means, including photocopying, recording, or other electronic or mechanical

methods, without the prior written permission of the publisher, except in the case of brief

quotations embodied in critical reviews and certain other noncommercial uses permitted by

copyright law. For permission requests, write to the publisher, addressed “Attention: Permissions

Coordinator,” at the address below.

Technical Training Professionals

9401 Indian Creek Parkway Suite 1170

Overland Park, KS 66210

www.tectrapro.com.com

Ordering Information:

Quantity sales. Special discounts are available on quantity purchases by corporations,

associations, and others. For details, contact the publisher at the address above.

Orders by U.S. trade bookstores and wholesalers. Please contact Technical Training

Professionals: Tel: (913) 338-1143; Fax: (316) 462-5649 or visit www.tectrapro.com.

Printed in the United States of America

Techn

ical T

rainin

g Prof

essio

nals

Page 3: Gas turbine fundamentals course 0301 - tectrapro.com · Provides a description of the required clearance measurements taken during the Gas Turbine Hot Gas Path inspection reassembly

214 - 7FA Gas Turbine Major Inspections

Copyright © 2018 by Technical Training Professionals

7FA Gas Turbine Major Inspections Course

Disclaimer:

The intent of this course is to familiarize the trainee with the steps necessary to

perform a Hot Gas Path inspection on a 7FA Gas Turbine. It is not intended to be used

as a field procedure for performing a hot gas path inspection. Please refer to proper

and specific plant procedures.

Techn

ical T

rainin

g Prof

essio

nals

Page 4: Gas turbine fundamentals course 0301 - tectrapro.com · Provides a description of the required clearance measurements taken during the Gas Turbine Hot Gas Path inspection reassembly

214 - 7FA Gas Turbine Major Inspections

Copyright © 2018 by Technical Training Professionals

7FA Gas Turbine Major Inspections Course

Learning Objectives, Chapter:

1.0 Overview

This chapter provides an overview of the hot gas path and major inspections. At the

completion of this topic the trainee will be able to identify the different types of

maintenance performed on the gas turbine.

2.0 HGP Clearance Measurements

Provides a description of the steps required to measure and record component

clearances as part of the Hot Gas Path inspection.

3.0 Turbine Casing Removal

Provides a description of the steps required to remove the turbine casing to conduct a

Hot Gas Path inspection.

4.0 HGP Concentricity, Rotor Float, & Clearance Checks

Provides a description of the steps required to measure the concentricity of the first

stage nozzle assembly and take rotor float measurements and internal turbine

clearances.

5.0 HGP Component Removal

This chapter provides a step for step description of the disassembly of the gas turbine

combustion system for inspection.

6.0 Hot Gas Path Inspection

This chapter provides a description of the steps necessary to inspect the hot gas path

components.

7.0 HGP Turbine Section Assembly

Provides a description of the reassembly process following a Gas Turbine Hot Gas Path

inspection.

8.0 HGP Assembly Clearances

Provides a description of the required clearance measurements taken during the Gas

Turbine Hot Gas Path inspection reassembly.

9.0 HGP Combustion Section Assembly

This chapter provides a description of the steps necessary to reassemble the

combustion section following a Gas Turbine Hot Gas Path inspection.

10.0 HGP External Equipment Assembly and Testing

This chapter provides a step by step description of the reassembly of the gas turbine

combustion system following the combustion inspection, including machine retest.

Techn

ical T

rainin

g Prof

essio

nals

Page 5: Gas turbine fundamentals course 0301 - tectrapro.com · Provides a description of the required clearance measurements taken during the Gas Turbine Hot Gas Path inspection reassembly

214 - 7FA Gas Turbine Major Inspections

Copyright © 2018 by Technical Training Professionals

214_B5_Ch1 Overview

1. Inspection Scope

a. The purpose of hot gas path and major inspection is to examine those parts that are

exposed to high temperatures from the combustion process and parts that have been in-

service for a long period of time, such as compressor blades and bearings.

b. The hot gas path inspection includes the full scope inspection of the combustion system

components and a detailed inspection of the turbine nozzles, shrouds, and buckets.

c. The major inspection includes the full scope inspection of the combustion system

components, the full scope of the hot gas path inspection and a detailed inspection of

the compressor blades, turbine buckets, bearings, rotor, and casing conditions.

d. Good preparation for these outages will include having all of the spare parts and tools on

site prior to the start of the inspection.

Techn

ical T

rainin

g Prof

essio

nals

Page 6: Gas turbine fundamentals course 0301 - tectrapro.com · Provides a description of the required clearance measurements taken during the Gas Turbine Hot Gas Path inspection reassembly

214 - 7FA Gas Turbine Major Inspections

Copyright © 2018 by Technical Training Professionals

Techn

ical T

rainin

g Prof

essio

nals

Page 7: Gas turbine fundamentals course 0301 - tectrapro.com · Provides a description of the required clearance measurements taken during the Gas Turbine Hot Gas Path inspection reassembly

214 - 7FA Gas Turbine Major Inspections

Copyright © 2018 by Technical Training Professionals

2. Hot Gas Path Inspection

a. A hot gas path inspection is estimated to take 176 hours or 22 eight hour shifts to

perform.

b. The hot gas path inspection includes the combustion inspection and a detailed

inspection of the turbine nozzles and shrouds.

c. In order to perform this inspection, the top half of the turbine shell is removed.

d. The nozzles, diaphragms, and shrouds are removed.

e. The turbine buckets will be inspected visually while in place.

Techn

ical T

rainin

g Prof

essio

nals

Page 8: Gas turbine fundamentals course 0301 - tectrapro.com · Provides a description of the required clearance measurements taken during the Gas Turbine Hot Gas Path inspection reassembly

214 - 7FA Gas Turbine Major Inspections

Copyright © 2018 by Technical Training Professionals

3. Major Inspection

a. A major inspection is estimated to take 368 hours or 46 eight hour shifts to perform.

b. The major inspection is a flange-to-flange inspection of gas turbine components which

are subject to wear during normal turbine operation.

c. This inspection includes elements of the combustion system inspection and the hot gas

path inspections, plus:

• The upper inlet case, mid, and discharge cases are removed.

• The compressor and inlet cases are inspected for fouling, erosion, corrosion, and leakage.

• The rotor and stator compressor blades are checked for tip clearances, rubs, bowing, cracking, and warping.

• The turbine nozzles and shrouds are checked for clearance, foreign object damage, cracking, erosion and corrosion.

• The seals and hook fits of the nozzles and diaphragms are inspected for rubs, erosion, fretting or thermal deterioration.

• Turbine buckets are removed and the bucket, bucket grooves and dovetails are inspected foreign object damage, cracking, erosion and corrosion.

• Bearings and seals are inspected for clearance and wear.

• All clearances are checked against their original values.

Techn

ical T

rainin

g Prof

essio

nals

Page 9: Gas turbine fundamentals course 0301 - tectrapro.com · Provides a description of the required clearance measurements taken during the Gas Turbine Hot Gas Path inspection reassembly

214 - 7FA Gas Turbine Major Inspections

Copyright © 2018 by Technical Training Professionals

Techn

ical T

rainin

g Prof

essio

nals

Page 10: Gas turbine fundamentals course 0301 - tectrapro.com · Provides a description of the required clearance measurements taken during the Gas Turbine Hot Gas Path inspection reassembly

214 - 7FA Gas Turbine Major Inspections

Copyright © 2018 by Technical Training Professionals

Techn

ical T

rainin

g Prof

essio

nals

Page 11: Gas turbine fundamentals course 0301 - tectrapro.com · Provides a description of the required clearance measurements taken during the Gas Turbine Hot Gas Path inspection reassembly

214 - 7FA Gas Turbine Major Inspections

Copyright © 2018 by Technical Training Professionals

Test

1) Scope

Besides the combustion system parts, what additional parts are inspected during a hot

gas path inspection?

A. Nozzles

B. Shrouds

C. Buckets

D. All of the above

2) Buckets

The buckets must be removed to in order to inspect them.

A. True

B. False

Techn

ical T

rainin

g Prof

essio

nals

Page 12: Gas turbine fundamentals course 0301 - tectrapro.com · Provides a description of the required clearance measurements taken during the Gas Turbine Hot Gas Path inspection reassembly

214 - 7FA Gas Turbine Major Inspections

Copyright © 2018 by Technical Training Professionals

3) Cases

Which of the following cases are removed for a hot gas path inspection?

A. The upper turbine case

B. The upper compressor discharge case

C. The exhaust frame

D. The upper and lower turbine case

4) Equipment

The major inspection includes bearings and seals.

A. True

B. False

Techn

ical T

rainin

g Prof

essio

nals

Page 13: Gas turbine fundamentals course 0301 - tectrapro.com · Provides a description of the required clearance measurements taken during the Gas Turbine Hot Gas Path inspection reassembly

214 - 7FA Gas Turbine Major Inspections

Copyright © 2018 by Technical Training Professionals

5) Compressor

What are the compressor blades inspected for during the major inspection?

A. Rubs

B. Bows

C. Cracks

D. All of the above

Techn

ical T

rainin

g Prof

essio

nals

Page 14: Gas turbine fundamentals course 0301 - tectrapro.com · Provides a description of the required clearance measurements taken during the Gas Turbine Hot Gas Path inspection reassembly

214 - 7FA Gas Turbine Major Inspections

Copyright © 2018 by Technical Training Professionals

Test Answers

1) D

2) False

3) A

4) True

5) D