gb-0980013-web
DESCRIPTION
*See further sizing details on enclosed project drawings, if any, and also see deli- very note (packing list) and read off position description. Please find Information on delivery and installa- tion in the box labelled INFO. KE-------- #Office 1 ---------- ---------- D-SafeTrack system 2 Check nut------------------------ Alu-suspension section--- SafeJoint (200 mm)--------------------- Screw------------------------ Spacing profile-- Delivery Note Room reference 82842 Suspension type D * LS *TRANSCRIPT
Følgeseddel
82842
Room reference
Suspension type
Delivery Note
50mm
LS*
O*
Ø*
O*
H*W*
O*
H*W*
Inlet option BInlet option A Inlet option C
*See further sizing details on enclosed project drawings, if any, and also see deli-very note (packing list) and read off position description.
50mm
LS*50mm LS*
Alu-rails labelled with a saw symbol do not require further trimming.
Please find Information on delivery and installa-tion in the box labelled INFO.
L = Length of ductLS = Length of socketO = OffsetW = WidthØ = Inlet diameterH = HeightD = Interior duct diameterA = Distance socket 1B = Distance socket 2
max 500 mm
max 2000 mm
L*
A*
B*
Ø*
LS*
max 500 mm
50mm20mm
D*
D*
Expansion bolt------------------
Connector------------------------
M6 thread bar------------------- (std. 1 metre)
Check nut------------------------Alu-suspension section---SafeJoint (200 mm)---------------------Screw------------------------Spacing profile--
SafeTrack----------
End section
KE--------#Office 1--------------------D-SafeTrack system 2
54mm
D-SafeTrack (exp. bolt)General rules
0980013-GB
7The 4 SafeLock expansion screws replace the former tightening cords. The SafeLock is inserted into the “keyhole” at the end of the SafeTrack and is tightened with a screwdriver (max. 5 rotations). It is important to fully insert the screw before tightening.
3End sections are to be mounted to rail ends (must be prior to mounting duct).
4KE Interior System is fed from box into rails (so as to keep duct clean!)...
5...and is pulled out at the same time.
6Mounting of clamp.Inlet sockets in duct roof areaccessed viazippers.
A*
1Supports and spacing profiles are mounted on the ceiling; positioned in accordance to the location of inlet socket, duct start or duct bot-tom.
2Rails are clicked into holders (click/rotation is in one direction ONLY).
January 2012