gb0-010 model (1) - aes indiana · 2021. 6. 7. · varies per project requirements. (i.e....

16
It is unlawful to break seals on company meters or to disconnect meters from service without notifying the service connection division on telephone number (317) 261-8133. (see section 555) Electricity used on construction services shall be metered. Services that have been disconnected by the company are to be restored only by AES Indiana's personnel. Unmetered circuits and jumpered meter bases will be disconnected, an energy diversion charge, and pro-rated billing will be assessed. (see section 555) It is unlawful to attach and/or mount any customer owned equipment, wire, cable, lights, signs, etc. To any of AES Indiana's facilities without obtaining an attachment permit. (see section 180) Important notices GB0-010 REV 11/28/17

Upload: others

Post on 17-Jul-2021

0 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: gb0-010 Model (1) - AES Indiana · 2021. 6. 7. · Varies per project requirements. (i.e. easements, connect infor-mation, site plans etc.) 4 weeks minimum IPL contractor labor takes

It is unlawful to break seals on company meters or to disconnect meters from service without notifying the service connection division on telephone number (317) 261-8133. (see section 555) Electricity used on construction services shall be metered. Services that have been disconnected by the company are to be restored only by AES Indiana's personnel. Unmetered circuits and jumpered meter bases will be disconnected, an energy diversion charge, and pro-rated billing will be assessed. (see section 555) It is unlawful to attach and/or mount any customer owned equipment, wire, cable, lights, signs, etc. To any of AES Indiana's facilities without obtaining an attachment permit. (see section 180)

Important notices GB0-010 REV 11/28/17

Page 2: gb0-010 Model (1) - AES Indiana · 2021. 6. 7. · Varies per project requirements. (i.e. easements, connect infor-mation, site plans etc.) 4 weeks minimum IPL contractor labor takes

Electric Red Gas or oil Yellow Communications Orange Potable water Blue Sewer Green Reclaimed water & irrigation lines Purple Temporary survey markings Pink Proposed excavation White

All of the following information is needed when calling Indiana 811: County Township Street address Type of work Extent of work Name of caller and title

Telephone number Best time to call Start date and start time Contractor Contractor address

Call two working days before you dig

Underground plant protection information

Toll free call 811

before you dig

"Holey Moley sez"

Don't dig

blind

GB0-020 REV 6/6/17

Page 3: gb0-010 Model (1) - AES Indiana · 2021. 6. 7. · Varies per project requirements. (i.e. easements, connect infor-mation, site plans etc.) 4 weeks minimum IPL contractor labor takes

CODE CLEARANCES

NES

C H

OR

IZO

NTA

L C

LEA

RA

NC

ES O

FW

IRES

, CO

ND

UC

TOR

S A

ND

CA

BLE

SFR

OM

BU

ILD

ING

S

NES

C V

ERTI

CA

L C

LEA

RA

NC

ES O

FW

IRES

, CO

ND

UC

TOR

S A

ND

CA

BLE

SFR

OM

BU

ILD

ING

STH

E IN

DIAN

APOL

IS P

OWER

& LI

GHT

COM

PANY

IS C

ONCE

RNED

ABO

UT Y

OUR

SAFE

TY A

ND T

HE S

AFET

Y OF

THE

PUB

LIC.

THE

DIM

ENSI

ONS

IN T

HE A

BOVE

DRA

WIN

GS A

RE M

INIM

UM C

LEAR

ANCE

S TH

AT S

HALL

BE

MAI

NTAI

NED

AFTE

RCO

NSTR

UCTI

ON O

F YO

UR P

ROJE

CT. T

HE N

ATIO

NAL E

LECT

RICA

L SAF

ETY

CODE

IS T

HE LA

W IN

THE

STA

TE O

F IN

DIAN

A AN

D TH

E DI

MEN

SION

S SH

OWN

SHAL

L BE

OBSE

RVED

. GEN

ERAL

LY, T

HE O

VERH

EAD

HIGH

VOL

TAGE

WIR

ES A

RE N

OTIN

SULA

TED

FROM

CON

TACT

.

DURI

NG C

ONST

RUCT

ION

OF Y

OUR

PROJ

ECT

AND

THE

LINE

IS A

DIS

TRIB

UTIO

N LI

NE (N

OT A

TRA

NSM

ISSI

ON LI

NE),

STAY

AT

LEAS

T 10

FEE

T AW

AY. T

HIS

CLEA

RANC

E DI

STAN

CE IS

20

FEET

FOR

CRA

NES

AND

DERR

ICKS

USE

D IN

CON

STRU

CTIO

NUN

LESS

YOU

HAV

E TA

KEN

OSHA

-MAN

DATE

D EN

CROA

CHM

ENT

PREV

ENTI

ON P

RECA

UTIO

NS. I

F YO

U AR

E UN

SURE

OF

THE

POW

ER LI

NE'S

VOL

TAGE

, CON

TACT

THE

INDI

ANAP

OLIS

POW

ER &

LIGH

T CO

MPA

NY B

EFOR

E W

ORK

BEGI

NS. F

ORSP

ECIF

IC C

LEAR

ANCE

REQ

UIRE

MEN

TS V

ISIT

WW

W.O

SHA.

GOV.

IF T

HE IN

DIAN

APOL

IS P

OWER

& LI

GHT

COM

PANY

OVE

RHEA

D LIN

ES A

RE C

LOSE

TO

YOUR

STR

UCTU

RE, P

LEAS

E CA

LL (3

17) 2

61-8

196

IN O

RDER

TO

ENSU

RE S

AFET

Y AN

D CO

MPL

IANC

E W

ITH

THE

NATI

ONAL

ELE

CTRI

CAL S

AFET

Y CO

DE A

NDOS

HA R

EGUL

ATIO

NS.

GB0-025

Page 4: gb0-010 Model (1) - AES Indiana · 2021. 6. 7. · Varies per project requirements. (i.e. easements, connect infor-mation, site plans etc.) 4 weeks minimum IPL contractor labor takes

Service address

Zip code

Mailing address

Mailing city/state/zip code

Federal tax ID

Yes

No

Phone number

Service size amperes

Service type 1Ø, 3-Wire 3Ø, 4-Wire Wye 3Ø, 4-Wire Delta

Voltage 120/240 V 120/208 V 277/480 V

kW Load

Permanent Temporary

Owner Tenant

Date wanted (service ready?)

Date of full operation

Electrician's company name

Electrician's name

Phone number

Form completed by:

Title/role:

REV 4-24-18 GB0-030

The following information is required for electric service from the

company. All fields are mandatory.

Customer name (Bill payer when

the service is initially engergized)

Commercial / industrial information sheet

You must be registered. Please do so at

https://www.in.gov/sos/business/. Contact the IPL

business line on (317) 261-8444 if you have questions.

Is this a registered business

in the state of Indiana?

Responsible party (To answer

questions regarding the bill).

Page 5: gb0-010 Model (1) - AES Indiana · 2021. 6. 7. · Varies per project requirements. (i.e. easements, connect infor-mation, site plans etc.) 4 weeks minimum IPL contractor labor takes

Work management

• The flow chart below is an essential tool in helping our customers and Project Designers arrive at an accurate project completion date.

• Since each project is unique, the requirements for successful project completion will vary. • Please keep in mind that requirements such as easements and railroad crossings require longer

lead times and have the potential to greatly affect the timeliness of the project. • AES Indiana's Project Designers will work with you to determine these requirements as well as

the expected project completion date.

Potential causes for delay

• Delays in Project Designer receiving site plans on time. • Delays in receiving customer load and/or billing information. • Not obtaining an easement in a timely manner. • Not obtaining necessary permits. • Weather delays - excessive rain or storms in our service territory and surrounding area. • Failure to place Self Certification/City-Inspection Tag in meter equipment.

GB0-040 REV 4/24/06 Work management

engineering time scheduling construction

Varies per project requirements. (i.e. easements, connect infor-mation, site plans etc.)

4 weeks minimum IPL contractor labor takes place during this time frame. Easement must be granted before project will be allowed to flow into construction status.

AES labor only. Length in days or weeks depending on

job scope.

Initial meeting

date estimated AES const start date

requested completion

date

Page 6: gb0-010 Model (1) - AES Indiana · 2021. 6. 7. · Varies per project requirements. (i.e. easements, connect infor-mation, site plans etc.) 4 weeks minimum IPL contractor labor takes

ENGINEERING DISTRICT MAP

CUSTOMER PROJECTS

465

465

465

465

465

74

70

74

65

65

65

70

70

please refer to drawing GB0-110.

For Central Business District

465

70

69

465

465

65

65

GB0-100

Page 7: gb0-010 Model (1) - AES Indiana · 2021. 6. 7. · Varies per project requirements. (i.e. easements, connect infor-mation, site plans etc.) 4 weeks minimum IPL contractor labor takes

ENGINEERING DISTRICT MAP

Monument

Circle

CENTRAL BUSINESS DISTRICT

65

65

70

70

70

65

65

70

ALL NEW SERVICES IN

THE CENTRAL

BUSINESS DISTRICT

ARE TO BE REFERRED TO

KEN JENKINS

FOR ASSIGNMENT

GB0-110

Page 8: gb0-010 Model (1) - AES Indiana · 2021. 6. 7. · Varies per project requirements. (i.e. easements, connect infor-mation, site plans etc.) 4 weeks minimum IPL contractor labor takes

Distributed generation contact information Level I applications (10 kW or Smaller) First Contact: Aaron Bruner, Major Distribution Projects Engineering, (317) 261-3474 Matthew Fields, Marketing and Program Management, (317) 261-3421 Justin Sufan, Regulatory Affairs, (317) 261-6629 Level II and III applications (Over 10 kW) First Contact: Account management executives shown on drawing GB0-120 Technical Robert Grubb, Planning, (317) 261-5714 Regulatory Justin Sufan, Regulatory Operations, (317) 261-8072 NOTE: EMAIL ADDRESS FORMAT IS [email protected]

DISTRIBUTED GENERATION GB0-115

REV 8/24/20

Page 9: gb0-010 Model (1) - AES Indiana · 2021. 6. 7. · Varies per project requirements. (i.e. easements, connect infor-mation, site plans etc.) 4 weeks minimum IPL contractor labor takes

ACCOUNT MANAGEMENT EXECUTIVES

65

465

465

465

465

465

465

465

465

74

70

69

70

74

65

65

65

70

70

65

GB0-120

Page 10: gb0-010 Model (1) - AES Indiana · 2021. 6. 7. · Varies per project requirements. (i.e. easements, connect infor-mation, site plans etc.) 4 weeks minimum IPL contractor labor takes

METER INSTALLATIONSDISTRICT MAP

65

465

465

465

465

465

465

465

465

74

70

69

70

7465

65

6570

70

65

GB0-130

Page 11: gb0-010 Model (1) - AES Indiana · 2021. 6. 7. · Varies per project requirements. (i.e. easements, connect infor-mation, site plans etc.) 4 weeks minimum IPL contractor labor takes

CONSTRUCTION AND MAINTENANCE

DISTRICT MAP

engineering department

first regarding new or

powerline questions.

DOWNTOWN NETWORK

Refer to pages GB0-100

65

65

70

70

70

65

TEAM LEADERS

NOTE:

Please contact the

altered services, or other

and GB0-110.

WORK SCHEDULER

65

465

465

465

465

465

465

74

70

69

70

74

65

65

70

70

65

ARLINGTON AVE

DISTRICT

SOUTH

DISTRICT

34TH ST

DISTRICT

MILL ST

DISTRICT

WEST INDIANAPOLIS

DISTRICT

GB0-140

Page 12: gb0-010 Model (1) - AES Indiana · 2021. 6. 7. · Varies per project requirements. (i.e. easements, connect infor-mation, site plans etc.) 4 weeks minimum IPL contractor labor takes

65

465

465

465

465

465

465

465

465

74

70

69

70

7465

65

6570

70

65

RESIDENTIAL SERVICE INSTALLATIONS400 AMPERES AND BELOW

GB0-150

AutoCAD SHX Text
LAFAYETTE RD
AutoCAD SHX Text
CRAWFORDSVILLE RD
AutoCAD SHX Text
KENTUCKY AVE
AutoCAD SHX Text
ROCKVILLE RD
AutoCAD SHX Text
SR 37
AutoCAD SHX Text
US 31
AutoCAD SHX Text
County Rd 300 W
AutoCAD SHX Text
MASSACHUSETTS AVE
AutoCAD SHX Text
ALLISONVILLE RD
AutoCAD SHX Text
HARDING ST
AutoCAD SHX Text
KENTUCKY AVE
AutoCAD SHX Text
KENTUCKY AVE
AutoCAD SHX Text
KENTUCKY AVE
AutoCAD SHX Text
WASHINGTON ST
AutoCAD SHX Text
SR 37
AutoCAD SHX Text
BLUFF RD
AutoCAD SHX Text
SR 37
AutoCAD SHX Text
KENTUCKY AVE
AutoCAD SHX Text
HARDING ST
AutoCAD SHX Text
KENTUCKY AVE
AutoCAD SHX Text
ROCKVILLE RD
AutoCAD SHX Text
WASHINGTON ST
AutoCAD SHX Text
CRAWFORDSVILLE RD
AutoCAD SHX Text
ROCKVILLE RD
AutoCAD SHX Text
LAFAYETTE RD
AutoCAD SHX Text
WASHINGTON ST
AutoCAD SHX Text
HARDING ST
AutoCAD SHX Text
MICHIGAN RD
AutoCAD SHX Text
BLUFF RD
AutoCAD SHX Text
MERIDIAN ST
AutoCAD SHX Text
MERIDIAN ST
AutoCAD SHX Text
EAST ST
AutoCAD SHX Text
US 31
AutoCAD SHX Text
BLUFF RD
AutoCAD SHX Text
MERIDIAN ST
AutoCAD SHX Text
BLUFF RD
AutoCAD SHX Text
WEST ST
AutoCAD SHX Text
MADISON AVE
AutoCAD SHX Text
EAST ST
AutoCAD SHX Text
MASSACHUSETTS AVE
AutoCAD SHX Text
SOUTHEASTERN AVE
AutoCAD SHX Text
DR M L KING JR ST
AutoCAD SHX Text
MERIDIAN ST
AutoCAD SHX Text
MERIDIAN ST
AutoCAD SHX Text
FALL CREEK PKWY
AutoCAD SHX Text
N. DR.
AutoCAD SHX Text
WASHINGTON ST
AutoCAD SHX Text
LAFAYETTE RD
AutoCAD SHX Text
LAFAYETTE RD
AutoCAD SHX Text
MICHIGAN RD
AutoCAD SHX Text
MICHIGAN RD
AutoCAD SHX Text
MERIDIAN ST
AutoCAD SHX Text
MERIDIAN ST
AutoCAD SHX Text
SR 37
AutoCAD SHX Text
ALLISONVILLE RD
AutoCAD SHX Text
SR 37
AutoCAD SHX Text
PENDLETON PIKE
AutoCAD SHX Text
SOUTHEASTERN AVE
AutoCAD SHX Text
SOUTHEASTERN AVE
AutoCAD SHX Text
SOUTHEASTERN AVE
AutoCAD SHX Text
PENDLETON PIKE
AutoCAD SHX Text
PENDLETON PIKE
AutoCAD SHX Text
State Hwy 67
AutoCAD SHX Text
16TH ST
AutoCAD SHX Text
CRAWFORDSVILLE RD
AutoCAD SHX Text
WASHINGTON ST
AutoCAD SHX Text
WASHINGTON ST
AutoCAD SHX Text
REV
AutoCAD SHX Text
NEW
AutoCAD SHX Text
CONVERSION FROM AN OVERHEAD SERVICE DROP TO AN UNDERGROUND SERVICE LATERAL. NEW SINGLE LOT UNDERGROUND SERVICE INSTALLATIONS. UNDERGROUND SERVICE LATERAL RELOCATIONS.
AutoCAD SHX Text
TEAM LEADER Mark Kivett (317)261-5097 [email protected]
AutoCAD SHX Text
16TH ST
AutoCAD SHX Text
16TH ST
AutoCAD SHX Text
Alex Smith (317)785-8104 [email protected]
AutoCAD SHX Text
William Maines (317)261-8731 [email protected]
Page 13: gb0-010 Model (1) - AES Indiana · 2021. 6. 7. · Varies per project requirements. (i.e. easements, connect infor-mation, site plans etc.) 4 weeks minimum IPL contractor labor takes

Michael Schaefer (317) 261-5097 Team leader Residential service installations and small commercial (non-CT metered) installations

Covers the entire Company service territory for the service connection crews

Monsanto Love (317) 261-8672 Team leader Underground construction except for residential services Covers the entire Company service territory

Note: email address format is [email protected]

Residential service installations and small commercial (non-CT metered)

installations GB0-160 REV 02/16/21

Page 14: gb0-010 Model (1) - AES Indiana · 2021. 6. 7. · Varies per project requirements. (i.e. easements, connect infor-mation, site plans etc.) 4 weeks minimum IPL contractor labor takes

RESPONSIBILITIES

65

465

465

465

465

465

465

465

465

74

70

69

70

7465

65

6570

70

65

CONTRACT COORDINATOR

GB0-165

Page 15: gb0-010 Model (1) - AES Indiana · 2021. 6. 7. · Varies per project requirements. (i.e. easements, connect infor-mation, site plans etc.) 4 weeks minimum IPL contractor labor takes

DISTRICT MAP

STREET LIGHTING

CONTRACTOR COORDINATOR

LIGHTING DESIGN TEAM LEADER

CONSTRUCTION & MAINTENANCE

65

465

465

465

465

465

465

465

465

74

70

69

70

74

65

65

70

70

65

65

GB0-170

Page 16: gb0-010 Model (1) - AES Indiana · 2021. 6. 7. · Varies per project requirements. (i.e. easements, connect infor-mation, site plans etc.) 4 weeks minimum IPL contractor labor takes

TREE TRIMMING COORDINATORS

65

465

465

465

465

465

465

465

74

70

69

7465

65

6570

70

65

465

70

COLL

EGE

AVE

SHEL

BY S

TSH

ELBY

ST

COLL

EGE

AVE

GB0-180