gca construction news bulletin may 2015
DESCRIPTION
Guam Contractors' Assn. Monthly Construction News Bulletin is Guam's official construction news publication.TRANSCRIPT
CONSTRUCTION NEWS BULLETIN
VOL.
56 I
SSUE
5 M
AY 2
015
• GUA
M C
ONTR
ACTO
RS’ A
SSOC
IATI
ONVO
L. 56
ISS
UE 5
MAY
201
5 • G
UAM
CON
TRAC
TORS
’ ASS
OCIA
TION
The Team of GPSI Guam
CHARTINGTHE COURSE
© 2015 Caterpillar. All Rights Reserved. CAT, CATERPILLAR, BUILT FOR IT, their respective logos, “Caterpillar Yellow,” the “Power Edge” trade dress as well as corporate and product identity used herein, are trademarks of Caterpillar and may not be used without permission.
671.649.4249hawthornecat.com
When you choose Cat®, you get what you pay for — durable and reliable equipment, and long-lasting relationships. Discover what we’re built for.
HAWTHORNE CAT NOW OFFERS FUEL DELIVERY SERVICESTogether with South Pacific Petroleum Corporation, we are now offering to our valued customers on-site fuel delivery.
You can count on Hawthorne Cat to be there to provide the service and support you need.
Crane Critique
26
Feature Story
16
S.A.M.E.
INSIDER NEWS
AROUND THE BENCH
FEATURE STORY
PHOTO HIGHLIGHTS
CRANE CRITIQUE
GARRISON REPORT
REPORTS/INFORMATION
6
10
12
16
20
26
28
30
Chamorro Phrase Of The Month
2 | MAY2015 CONSTRUCTION NEWS BULLETIN www.guamcontractors.org
TABL
E O
F C
ON
TEN
TS
Fino Chamorro:
English:Mala'gu y mannahak. The rabbit fish is running.
brought to you by The Guam Contractors Association.
Guam Contractor’s Association (GCA) in conjunction with AdzTech and Public Relations, Inc. publishes the Construction News Bulletin (CNB) monthly. Reproduction of materials appearing in this publication is strictly forbidden without written permission by GCA. While we always strive for accu-racy, we will from time to time over-look mistakes. In order to help us improve the quality and accuracy of this publication, we ask that you take the time to look at the information provided and notify GCA of any corrections as needed. Opinions and editorial content of this publication may not necessarily be those of the publisher, production team, staff, GCA members, GCA Board of Directors and advertisers. For more information about advertising in the GCA Construction News Bulletin contact the advertising department at (671) 477-1239/2239 or email at [email protected]. Distributed to GCA members or can be obtained by stopping by the Guam Contractors’ Association office located at 718 N. Marine Corps Drive,Suite 203, East West Business Center, Upper Tumon, Guam.
To find out more about how you can become a GCA member contact Guam Contractors’ Association at Tel: (671)647-4840/41 Fax: (671) 647-4866 or Email: [email protected]
Postmaster. Send address changes to Guam Contractors’ Association, located at 718 N. Marine Drive Corps Suite 203, East West Business Center, Upper Tumon, Guam.
PUBLISHER:James Martinez
PRODUCTION TEAMGeri Leon Guerrero
AD SALES:Jaceth Duenas
PRODUCTION:Geri Leon GuerreroChristopher “Taco” RowlandJaceth Duenas
PHOTOGRAPHERS:Christopher “Taco” Rowland
EDITOR:Adztech
CONTRIBUTING WRITERS:John RobertsonR.D. GibsonShawn GumataotaoDave BarnhouseTim WaiteTed Garrison
GCA STAFF:Francine ArceoDesiree Lizama
COVER:Sailing forward with the Team of GPSI
THETEAMTHEDIRECTORS THEEDITORIALSPRESIDENTJames A. Martinez Guam Constractors Association
PAST CHAIRMANTom Anderson Black Construction Corporation
CHAIRMAN - ELECTArt Chan Hawaiian Rock Products
VICE CHAIRMAN - ELECTJohn Sage WATTS Constructors
SECRETARY/TREASURERWilliam Beery Tutujan Hill Group
CONTRACTORS DIRECTORS:Narci Dimaoala Amazon Construction
Carlo Leon Guerrero M80s Office Systems
Conchita Bathan Core Tech International
Tom San Nicolas dck pacific guam LLC
Miguel Rangel Maeda Pacific Corporation
ASSOCIATE DIRECTORS:Jeffrey Larson TakeCare Insurance
Ray Yanger Fastenal
Patty Lizama Pacific Isla Life
Michael Kikuta Matson Navigation
Guam ContractorsAssociation
TRADES ACADEMYGCA
B u i l d i n g S k i l l s F o r A L i f e t i m e
Don’t wait for a typhoon to hit!
CALL NOW 649-1966
Our convenient service saves you time and money!
• Diesel at Pump Prices• Reliable Six-Truck Fleet• Professional Drivers• 24-Hour Delivery (After Typhoons)
ON-SITE DIESEL DELIVERY
www.morricoequipment.com
Onsite Diesel Ad GCA 25yrs.qxp_Layout 1 4/02/2015 6:17 pm Page 1
242 W. Harmon Industrial Park RD, Guam 96913Tel: (671) 646-9524/40 Fax: (671) 649-3888
GUAM’S LEADEROCCUPATIONAL ENVIRONMENTALSAFETY EQUIPMENT & SUPPLIES
20’ and 40’ ModifiedContainer Offices
20’ and 40’ New and UsedShipping Containers
20’ and 40’ ModularContainer Field Offices
Mini Cube Containers Available In:
Specializing in new and used Shipping Containers,Modified Containers, Modular Container Field Offices,
Cube Containers, and Galvalume Steel Buildings.See our models at our showroom across Crown Bakery in Mangilao.
Members of the Society of American Military Engineers (SAME) Guam Post held their monthly
Beach Resort in Tumon, April 16.
Squadron 2LT Omar Cervantes. During his brief he discussed what it means to be an Air Force civil engineer, and presented numerous projects in progress at Andersen Air Force Base.
Smithbridge Guam, Inc. Vice President and Gener-al Manager Stevyn Radonich gave the sustaining member brief, which highlighted Smithbridge’s history, goals, commitment to safety, and scope of
equipment rental, rock mining, and quarry products.
-sized the importance of maintaining readiness and
disasters such as typhoons, earthquakes, and tsunamis.
The Society of American Military Engineers (SAME), the premier professional military engineering
-lic and private sectors to prepare for—and overcome— natural and manmade disasters, and to improve security at home and abroad.
6 | MAY2015 CONSTRUCTION NEWS BULLETIN www.guamcontractors.org
S.A.
M.E
. UPD
ATE
Photos by Shaina Marie Santos
To join SAME Guam Post, log onto SAME.org and click on “Membership” at the top of the home page.
Smithbridge Vice President and General Manager Stevyn Radonich gives the monthly sustaining
the Outrigger Guam Beach Resort Tumon, April 16.
16. .
www.guamcontractors.org CONSTRUCTION NEWS BULLETIN MAY2015 | 7
Don't replace. Repair in place.
With 40+ years of proven performance, our FX-70® Structural Repair and Protection System repairs concrete, steel and wood piles and protects against further deterioration. From custom-manufactured fiberglass jackets to underwater epoxies and cementitious grouts, we have cost-effective, practical, long-term solutions for your repair projects.
Since 1956, Simpson Strong-Tie has brought innovative solutions to customers’ construction challenges. To learn more about our products that repair, protect and strengthen, contact a Simpson Strong-Tie representative in Guam at (671) 689-6201 and visit strongtie.com/rps.
©2015 Simpson Strong-Tie Company Inc. RPSUW13
Watch the FX-70® Pile Repair Cyclic Testing at strongtie.com/videolibrary and subscribe to our YouTube Channel at youtube.com/strongtie
SSTM-RPSUW13_Carbon_7_1-2x10.indd 1 4/28/15 8:59 AM
Pyongyang could double nuclear-weapons arsenal by next year, according to latest Beijing estimates
China’s top nuclear experts have increased their estimates of North Korea’s nuclear weapons production well beyond most pre-vious U.S. figures, suggesting Pyongyang can make enough warheads to threaten regional security for the U.S. and its allies. The latest Chinese estimates, relayed in a closed-door meeting with U.S. nuclear specialists, showed that North Korea may already have 20 warheads, as well as the capability of producing enough weapons-grade uranium to double its arsenal by next year, according to people briefed on the matter. A well-stocked nuclear armory in North Korea ramps up security fears in Japan and South Korea, neighboring U.S. allies that could seek their own nuclear weapons in defense. Washington has mutual defense treaties with Seoul and Tokyo, which mean an attack on South Korea or Japan is regarded as an attack on the U.S. “I’m concerned that by 20, they actually have a nuclear arsenal,” said Siegfried Hecker, a Stanford University professor and former head of the Los Alamos National Laboratory, who attended the closed-door meeting in February. “The more they believe they have a fully functional nuclear arsenal and deterrent, the more difficult it’s going to be to walk them back from that.” Chinese experts now believe North Korea has a greater domestic capacity to enrich uranium than previously thought, Mr. Hecker said.
The Chinese estimates reflect growing concern in Beijing over North Korea’s weap-ons program and what they see as U.S. inaction while President Barack Obama focuses on a nuclear deal with Iran.
A well-armed North Korea may prompt the U.S. to adopt countermeasures, especially in missile defense. Adm. William Gortney, head of U.S. Northern Command, said this month that defense officials believe North Korea can now mount a nuclear warhead on an intercontinental ballistic missile called the KN-08. U.S. officials don’t believe the missile has been tested, but experts estimate it has a range of about 5,600 miles—within reach of the western edge of the continental U.S., including California. An increase in North Korea’s nuclear arsenal feeds international concern about prolifera-tion from a country that, U.S. officials said, previously exported nuclear technology to Syria and missile components to Iran, Yemen and Egypt.
In Washington, some Republican lawmak-ers said the pending White House deal with Iran could mirror the 1994 nuclear agree-ment the Clinton administration made with North Korea. The deal was intended to halt Pyongyang’s nuclear weapons capabilities, but instead, they allege, provided diplomatic cover to expand them. North Korea tested its first nuclear device in 2006. “We saw how North Korea was able to game this whole process,” U.S. Rep. Ed Royce (R., Calif.), chairman of the House Foreign Affairs Committee, said in an
The security of our region is not only related to China and its growing economy and expanding military strength, but also a small rogue nation to the north of us. The North Korean threat has been a concern for a number years and it is becom-ing more evident, with its only ally, China, now expressing concern to the U.S. The North Korean military could not conduct a sustained military engagement with its neighbors but it could do a lot of damage and perhaps bring China or Russia into the fray in its support. A strong nuclear capability could also be used as a bargaining chip with the west in future confrontations and also be used to provide revenue through sales of nuclear weaponry and technology to other warring nations and factions. Bottom line, a strong military and diplomatic pres-ence on Guam, at the tip of the U.S. spear, is vital to the security and peace of the region and our great nation.
China Warns North Korean Nuclear Threat Is Rising
10 | MAY2015 CONSTRUCTION NEWS BULLETIN www.guamcontractors.org
By John M. Robertson
North Korean Threatto the Western Pacific Region
INSI
DER
NEW
S
expert, has long been part of international efforts to understand North Korea’s nuclear program. In 2010, he revealed North Korea had a large uranium enrichment program after he saw the facilities during a visit there. The estimate that North Korea may have had 20 warheads at the end of last year—and could build 20 more by 2016—was given during a presentation by one of China’s top uranium enrichment ex-perts, according to people familiar with the meeting. They said it was the first time they had heard such a high Chinese estimate.
Mr. Hecker declined to comment on the meeting but said he had met with Chinese experts to discuss North Korea’s capabilities at least once a year since 2004. “They believe on the basis of what they’ve put together now that the North Koreans have enough enriched uranium capacity to be able to make eight to 10 bombs’ worth of highly enriched uranium per year,” said Mr. Hecker, who added that estimates by China and the U.S. involved a great deal of guesswork.
U.S. officials didn’t attend the meeting but some expressed surprise when they were later briefed on the details, said people familiar with the matter. Some Chinese experts said the estimates revealed in February were at the higher range among local peers. Mr. Hecker said he estimated North Korea could have no more than 12 nuclear bombs now, and as many as 20 next year. “Some eight, nine or 10 years ago, they had the bomb but not much of a nuclear arsenal,” he said. “I had hoped they wouldn’t go in this direction, but that’s what happened in the past five years.”
interview. “I wouldn’t be surprised if Iran had its hands on the same playbook.” The pace of North Korea’s nuclear arms growth depends on its warhead designs and its uranium-enrichment capacity, Mr. Royce said: “We know they have one factory; we don’t know if they have another one.”
Recent estimates by U.S. experts range from 10 to 16 nuclear bombs today.
Mr. Royce said he met Chinese academics on a recent trip to Beijing and was struck by the concerns he heard about Pyongyang’s nuclear capabilities. Relations between North Korea and China have deteriorated since Xi Jinping became China’s leader in 2012 and North Korea’s leader, Kim Jong Un, took power following the death of his father in late 2011. China, which is North Korea’s largest investor, aid donor and trade partner, has for most of the past decade underestimated Pyongyang’s nuclear capabilities, nuclear experts said, including its capacity to produce fissile material. Estimates of North Korea’s capabilities by Chinese experts began to align with those in the U.S. after 2010, and moved beyond after 2013, according to people familiar with exchanges on the matter between China and the U.S. Until recently, the Chinese “had a pretty low opinion of what the North Koreans could do,” said David Albright, an expert on North Korea’s nuclear weapons and head of the Institute for Science and International Security in Washington. “I think they’re worried now.”
China’s foreign and defense ministries didn’t respond to requests for comment. Diplomats at North Korea’s mission to the United Nations didn’t respond to attempts to seek comment. The White House, State Department and Pentagon declined to provide U.S. estimates of North Korea’s nuclear arsenal. “We have been and remain concerned about North Korea’s nuclear
program and believe China should continue to use its influence to curtail North Korea’s provocative actions,” said Patrick Ventrell, a spokesman for the U.S. National Security Council. He said the U.S. was working with other countries to implement U.N. sanctions designed to press North Korea “to return to credible and authentic denuclearization talks and to take concrete steps to denucle-arize.” The U.S. hasn’t engaged in regular high-level talks with Pyongyang since 2012, when North Korea conducted a long-range missile test. The U.S. has instead pressed China to use its economic leverage to rein in North Korea.
The latest Chinese estimates of North Korea’s nuclear capability were shared during a February meeting at the China Institute of International Studies, the Chinese foreign ministry’s think tank. The Chinese brought technical, political and diplomatic experts on North Korea’s nuclear program, as well as military representatives, said people familiar with the meeting. Mr. Hecker, the U.S. team’s lead technical
North Korean leader Kim Jung Un tours a plant in Pyongyang that produces missile parts and other military supplies. PHOTO: RODONG SINMUN/EUROPEAN PRESSPHOTO AGENCY
The foregoing was extracted from a 23 April 2015 article in the Wall Street Journal written by Jeremy Page in Beijing and Jay Solomon in Washington.
www.guamcontractors.org CONSTRUCTION NEWS BULLETIN MAY2015 | 11
Simpson Strong-Tie Company demon-strated several new concrete anchor and repair products at its annual workshop at Guam Community College on March 11 and 12, 2015. Over a hundred people from Guam’s construction and design community attended the workshop con-sisting of product solutions for Guam’s concrete anchoring, cracking, spalling, and repair needs.
In addition to classroom training, the highlight of the workshop was live outdoor demos showing how concrete crack repair, vertical patch repair, fiber reinforced polymers (carbon fiber), and precision grouts are installed and how they actually perform in the field. New products were demonstrating highlight-ing Simpson’s expanding concrete solutions product lines.
Together with Bosch Tool Company, an alliance partner, they demonstrated the broad line of tools available to work with concrete. Workshop attendees
received a certificate of completion for taking the course, as well the ability to pick up continuing education units. The attendees took away product binders, several giveaways, and were treated to a hot catered lunch.
This years instructors were Joel Frenzel, Territory Manager for Hawaii and Guam; Tim Waite, Sr. Territory Manager for the Pacific Region; Ken Bell, ICI Manager for the US Southwest Region; Roky Kriskovic, RPS and FRP Specialist for Simpson, and Vicky Zhao, Marketing Manager from Simpson’s Hong Kong office.
The Simpson Strong-Tie line of repair, protection and strengthening systems for concrete and masonry includes a wide variety of new products, including repair mortars, FRP, grouts, epoxies, sealants and the FX-70® structural repair and protection system for repair-ing existing wood, steel, and concrete piles. The new Repair, Protection and
Strengthening Systems for Concrete and Masonry product guide features all of the new products and is available at www.strongtie.com/rps. To speak with a local Simpson representative, please call 671.689.6201.
by Tim Waite
Strenghtening Your Knowledgewith Simpson Strong-Tie
12 | MAY2015 CONSTRUCTION NEWS BULLETIN www.guamcontractors.org
ARO
UND
TH
EBE
NC
H
GET, LLC received a great piece of advice from our partners at Savoy Contract Furniture that we wanted to share with you-practice cost avoidance by minimizing furniture repairs and replacements.
From experience, Savoy Furniture has found that their respective customers experience a significant reduction in these costs with their durable, high qual-ity residence hall and lounge furniture. From campuses to corporate offices, this practice of cost-avoidance through the implementation of revenue producing ideas attracts and retaining students and or repeat customer business. They ask that we all differentiate our office or housing facility with all new designs, and unique personalization options. Savoy Furniture takes it one step further by recommending that we provide our end users with the versatility to reinvent their respective spaces with stacking chests, loftable beds, and mobile furniture. Why is this important?
Spending on quality furniture can pay off in years to come. according to The Wall Street Journal. In fact, the publication asserted in 2012 that buying top-grade pieces can be a good investment: good
furniture, along with other home design elements, can last a lifetime and increase in value.
Also, purchase a high-quality product which is easier to maintain than lower-quality furniture. You'll find high-quality furniture, at a variety of price levels, from a well established company with a good reputation.
“Learn the history of the company from which you want to buy,” said Assistant Director of North Carolina State University’s Furniture Manufacturing and Management Center (FMMC) Steve Walker.
Furniture manufacturer Shelby Williams released a report recently that stated that there are four things to take into account when investing in high-quality furniture.
1. Choose the Right Product for the Ap-plication - different applications require different products, so the way you oper-ate your business should determine the furniture selection.
2. Ensure Furniture Is Tested to Stan-dards - The Business and Institutional Furniture Manufacturers Association (BIFMA) has a series of widely recog-
nized tests for seating.
3. Request a Furniture Sample
4. Consider Your Brand’s Environmental & Social Reputation-Environmentally re-sponsible solutions such as Forest Stew-ardship Council (FSC)-certified wood, bio-based foam and formadahyde-free finishes are very typical today. These are all great features; however, buying good quality furniture that performs well for many years might be the ‘greenest’ action of all, as it means less furniture goes to the landfill.
For more on how GET, LLC through our friends at Savoy Contract Furniture and teaming partner American Hotel Register can assist you with your specific furniture needs- please check out our website at www.get-guam.com or give us a call at 671-483-0789 to discuss the best solution for your facility. All the solutions are Made in America!
by Shawn Gumataotao
Do You Practice Cost-Avoidancewith Your Inventory of Furniture?
14 | MAY2015 CONSTRUCTION NEWS BULLETIN www.guamcontractors.org
ARO
UND
TH
EBE
NC
H
C
M
Y
CM
MY
CY
CMY
K
Step-Thru Ad GCA 25YRS.pdf 1 14/05/2015 11:40 am
by R.D. Gibson
FEAT
URE
STO
RY
Sometimes all you need to do is to roll up your sleeves, have a ‘can do’ attitude, and charge for-ward. Sometimes longevity and growth depends on a good plan. Sometimes it rests on luck. And then there’s that small percentage of both. The story of Galaide Professional Services Incorporated Guam has the charm of the Cinderella fairy tale, but with the heart of Hercules.
It always seems like a win-win situation when locally grown talent comes back home to accentuate, even augment and foster talent back home. GPSI Guam started as a conversation between two 1977 graduates of George Washington Senior High School and Guam Vocational Technical High School who were probably slightly mahalang (homesick). Stationed in the Washington, D.C. met-ropolitan area, Albert Yanger and Frankie Dumanal decided they wanted to come back home with the skillsets they learned in the military, federal gov-ernment, and work as civilian contractors. With both their undergraduate and graduate
degrees, and having served in the United States Army and United States Air Force, respectively, they decided to leave their jobs and return to their paradise home and open up a business focused on “professional services.” Their core business and ‘opportunity focus’ is in Professional Technical Ser-vices, which includes Program and Project Manage-ment, Risk Management, Configuration/Change Management, Logistics, and Strategic Planning, among other management related areas. They are currently considering bidding for a NAVFAC Service Disabled Veteran Owned Small Business Multiple Award Construction Contract (MACC).
Albert Yanger, President and Co-founder of GPSI Guam fondly recalls the early days of GPSI Guam. “This was a very scary time for us because “no one” understood our vision…our intentions…or believed that a small company could perform the kinds of contracts traditionally performed by large, off-island companies,” Yanger recounted. “We absolutely proved them wrong.’
In January 2012, Yanger and Dumanal added Chuck Rios, a 1978 John F. Kennedy High School graduate into their management/ownership mix. From working in a local hotel lobby to recently being awarded the Joint Region Marianas and NAVFAC Navy Occupational Safety and Health contract, the minds at GPSI Guam continue to work with the mindset that ‘failure is not an option.’ In an ever-growing, -expanding, and –varied industry like construction, it’s important to keep an open mind about projects. Sometimes it’s not a matter of getting the job, but just an opportunity for something greater. Their first contract was providing support for the Guam MACC Builders (GMB) for the Tango/Uniform Wharf Renovation on Naval Base. They were asked to assist in the acquisition and movement of $7M worth of steel from Japan to Guam. With no real background in ‘steel,’ they used project management best practices, created
a communication plan, and coordinated the trans-fer between all parties. Good planning usually leads to repeat business, and, even better, an expanded network of poten-tial clients and future partners. For GPSI Guam, the project wasn’t just a win because of the project, it was also an opportunity to open doors for future projects. The GPSI Guam team doesn’t just see these projects as mere instances, but opportunities to expand, grow, and nurture talent.
GPSI Guam also provides Project Management Sup-port for the Guam Office of the Attorney General for the development of application software. Usually this work is contracted and performed by larger, off-island vendors, but through perseverance, and sheer will, GPSI Guam is demonstrating the talent pool, education, and incomparable quality of small businesses on Guam and throughout the region. “We want to grow our business on Guam and the region…then extend our little company to the continental United States…specifically Washington, D.C.,” said Yanger. He added that there is potential money there for the Department of Defense buildup on Guam. GPSI Guam’s goal: bring that money to Where America’s Day Begins.
But, why ‘Galaide?’ Galaide are historically known to have been the fast boats the ancient Chamorros used to trade and travel. Yanger explained the owners all grew up fishing with a deep connection to Guam. “We chose the name Galaide as our ‘vehicle’ of commerce into Guam business…and she will serve as our vehicle into the Global market-place.” On their website, gpsiguam.com, it states “Profes-sionalism matters. Raising the bar. Locally-owned.” Their business plan, like most, lays out the goals of the company and road to profit. But these three phrases are more than that. They lay down the foundation set by the patriarchs of the business. Their upbringing, coupled with their service in the military, has paved their way for success.
Though success is sometimes measured in dollar signs, it seems the minds of Galaide Professional Services, Inc. have made it a point to grow talent as well as a network of professionals through their list of projects. “We continue to support and seek opportunities within the Government of Guam and also in the commercial sector. We don’t consider anything off-limits . . . just opportunities,” said Yanger. With that kind of attitude, the only place else to go is onward and forward in the galaide they have built.
www.guamcontractors.org CONSTRUCTION NEWS BULLETIN MAY2015 | 17
Sometimes all you need to do is to roll up your sleeves, have a ‘can do’ attitude, and charge for-ward. Sometimes longevity and growth depends on a good plan. Sometimes it rests on luck. And then there’s that small percentage of both. The story of Galaide Professional Services Incorporated Guam has the charm of the Cinderella fairy tale, but with the heart of Hercules.
It always seems like a win-win situation when locally grown talent comes back home to accentuate, even augment and foster talent back home. GPSI Guam started as a conversation between two 1977 graduates of George Washington Senior High School and Guam Vocational Technical High School who were probably slightly mahalang (homesick). Stationed in the Washington, D.C. met-ropolitan area, Albert Yanger and Frankie Dumanal decided they wanted to come back home with the skillsets they learned in the military, federal gov-ernment, and work as civilian contractors. With both their undergraduate and graduate
degrees, and having served in the United States Army and United States Air Force, respectively, they decided to leave their jobs and return to their paradise home and open up a business focused on “professional services.” Their core business and ‘opportunity focus’ is in Professional Technical Ser-vices, which includes Program and Project Manage-ment, Risk Management, Configuration/Change Management, Logistics, and Strategic Planning, among other management related areas. They are currently considering bidding for a NAVFAC Service Disabled Veteran Owned Small Business Multiple Award Construction Contract (MACC).
Albert Yanger, President and Co-founder of GPSI Guam fondly recalls the early days of GPSI Guam. “This was a very scary time for us because “no one” understood our vision…our intentions…or believed that a small company could perform the kinds of contracts traditionally performed by large, off-island companies,” Yanger recounted. “We absolutely proved them wrong.’
In January 2012, Yanger and Dumanal added Chuck Rios, a 1978 John F. Kennedy High School graduate into their management/ownership mix. From working in a local hotel lobby to recently being awarded the Joint Region Marianas and NAVFAC Navy Occupational Safety and Health contract, the minds at GPSI Guam continue to work with the mindset that ‘failure is not an option.’ In an ever-growing, -expanding, and –varied industry like construction, it’s important to keep an open mind about projects. Sometimes it’s not a matter of getting the job, but just an opportunity for something greater. Their first contract was providing support for the Guam MACC Builders (GMB) for the Tango/Uniform Wharf Renovation on Naval Base. They were asked to assist in the acquisition and movement of $7M worth of steel from Japan to Guam. With no real background in ‘steel,’ they used project management best practices, created
a communication plan, and coordinated the trans-fer between all parties. Good planning usually leads to repeat business, and, even better, an expanded network of poten-tial clients and future partners. For GPSI Guam, the project wasn’t just a win because of the project, it was also an opportunity to open doors for future projects. The GPSI Guam team doesn’t just see these projects as mere instances, but opportunities to expand, grow, and nurture talent.
GPSI Guam also provides Project Management Sup-port for the Guam Office of the Attorney General for the development of application software. Usually this work is contracted and performed by larger, off-island vendors, but through perseverance, and sheer will, GPSI Guam is demonstrating the talent pool, education, and incomparable quality of small businesses on Guam and throughout the region. “We want to grow our business on Guam and the region…then extend our little company to the continental United States…specifically Washington, D.C.,” said Yanger. He added that there is potential money there for the Department of Defense buildup on Guam. GPSI Guam’s goal: bring that money to Where America’s Day Begins.
But, why ‘Galaide?’ Galaide are historically known to have been the fast boats the ancient Chamorros used to trade and travel. Yanger explained the owners all grew up fishing with a deep connection to Guam. “We chose the name Galaide as our ‘vehicle’ of commerce into Guam business…and she will serve as our vehicle into the Global market-place.” On their website, gpsiguam.com, it states “Profes-sionalism matters. Raising the bar. Locally-owned.” Their business plan, like most, lays out the goals of the company and road to profit. But these three phrases are more than that. They lay down the foundation set by the patriarchs of the business. Their upbringing, coupled with their service in the military, has paved their way for success.
Though success is sometimes measured in dollar signs, it seems the minds of Galaide Professional Services, Inc. have made it a point to grow talent as well as a network of professionals through their list of projects. “We continue to support and seek opportunities within the Government of Guam and also in the commercial sector. We don’t consider anything off-limits . . . just opportunities,” said Yanger. With that kind of attitude, the only place else to go is onward and forward in the galaide they have built.
18 | MAY2015 CONSTRUCTION NEWS BULLETIN www.guamcontractors.org
LOOK AT YOUR CONSUMABLE PRODUCT SPEND
… NOW SUBTRACT 30%
THAT’S A TYPICAL RESULT FOR THOUSANDS OF COMPANIES THAT ARE USING FASTENAL’S
VENDING SOLUTIONS TO DISPENSE, CONTROL AND TRACK THEIR SUPPLIES.
DO THE MATH, CONSIDER THE IMPACT, THEN MAKE IT HAPPEN BY
CONTACTING YOUR LOCAL FASTENAL STORE TODAY.
Fastenal_Jan2014_DeltaAd.indd 1 11/26/13 9:17 AM
Tel: 648-1406 Fax: 648-1408 [email protected] Rojas Street, Unit 125, Harmon Industrial Park, Tamuning, GU 96913
OVER 10K SKU'S IN STOCKLOCALLY
April 15, 2015Hilton Resort Guam
Guest SpeakersMs. Lynne Meyer
20 | MAY2015 CONSTRUCTION NEWS BULLETIN www.guamcontractors.org
PHO
TO H
IGH
LIG
HTS
WE’VE BEEN DEIONIZED!
“After raising five kids, shuttling between sports events with all their "scented gear", car full of kids to and from the mall. Food in tow! Things are bound to leave "aromas" but with the help of Paradise Auto Spa’s deionization treatment! Our car smells like a new car! We will return!”
- Joe Pangelinan
989-ASPA (2772) | [email protected]
your small business.
William “Bill” Beery, P.E.General Manager, Tutujan Hills Group Ltd.Immediate Past Chairman, GCA
“For some time our group had been asking for a 401(k) benefit. My first impression was that providing this type of program for a group as small as ours might be on the expensive side. Not only did ASC Trust Corporation break this
misconception, they surpassed my expectations. We were able to start a plan that was both fairly priced and made sense with what we were looking for. In the end, the tailored-solution was exactly what our team needed.” - Bill Beery
Schedule to meet with our team today e: [email protected] w: asctrust.com p: (671)-477-2724
Retirement solutions for
Finding a tailor-made solution is just the beginning. ASC offers a level of service that sets us apart from other retirement plan providers in the region.
Let us help you save for a successful retirement, one paycheck at a time.
Your Exclusive Guam Dealer
May 11-12, 2015Onward Beach Resort
22 | MAY2015 CONSTRUCTION NEWS BULLETIN www.guamcontractors.org
PHO
TO H
IGH
LIG
HTS
May 7, 2015Hilton Resort Guam
Bring on the Green.
Pacific Unlimited Inc. DBA: Pacific Trucking
Not sure where to bring your wooden pallets, crates, untreated wood waste from construction & renovations, land clearing shrubbery, trees refuse & yard trimmings?
We are the nearest, most affordable option on island.Pick up services available as well.
For more Information, hours ofoperation or credit applicationcall 437-4374., Ext. 100 or email usat [email protected]
Located at our EPA Permitted Ordot Green Waste & Composting Facility just across the former Ordot Landfill.
Erosion Control Mulch &
Colored Mulch!
Coming Soon:
24 | MAY2015 CONSTRUCTION NEWS BULLETIN www.guamcontractors.org
PHO
TO H
IGH
LIG
HTS
We have all witnessed an accident or near-miss involving a crane lift while using rigging gear. Crane operators must pass rigorous written as well as practical tests before being found competent to operate a particular type of crane. Riggers must also prove to be competent by testing. All rigging gear has a safety factor of 5:1, meaning the safe working load, or SWL, is one fifth the actual tested breaking strength. With these requirements one would think there should never be an accident caused by a rigging failure. Unfortunately there are rigging failure accidents and most likely more than most supervisors are aware of. Rigging accidents, most of the times, can be avoided provided one is vigilant and follows the best safety practices. From shipyards to construction sites, rigging plays a major role in all kinds of industrial and commercial activities. Without rigging, one cannot imagine moving heavy loads easily and quickly. No matter how much a load is over-sized and overweight, rigging services make it possible to relocate heavy loads in the most secured manner. In spite of following safety precautions and OSHA guidelines, lifting rigging accidents do occur at workplaces and result in severe injuries or property damage.Two major reasons I believe rigging accidents exist: ignorance and the ‘don’t care’ attitude. Both can and must be addressed with training and supervision.
Most of my students attending a rigging class have years of experience rigging for your cranes on your job sites. Yet they are completely unaware of some very important issues regarding safe rigging practice, namely inspections and rating of gear, sling angle tension factors, proper hitch usage, and the importance of softener use on sharp pick-points.
A monthly crane and rigging informative column for all personnel directly or indirectly involved with crane safety. Each month we will attempt to explain a different technical issue pertaining to crane operations here on Guam, addressing the sometimes over-looked or misunderstood topics by management and operators alike. By Dave Barnhouse
CRANE RIGGINGACCIDENTS
WHY DO THEY EVER HAPPEN?
The 'soft sling' synthetic sling or round sling, is very much misused. We use the soft sling when lifting heavy parts to help safeguard an abrasion on the connecting part of machinery, it has a more flexible wrap on tension, unlike chain or wire rope, which tend to cut or bite in more aggressively regarding its lifting weight. The problem with riggers using soft slings is they use little or no protection on the connect-ing parts. Softeners are used not only to protect sling from cuts but also slippage at pick-points. Smaller sling angles will exacer-bate this condition. Using flat slings of more than 4" width for angular lifts is dangerous, particularly on flat base sharp cornered materials, as the load at each pick point is not
equally distributed upon the full width but is concentrated more at the outer edges of the sling which can result in tearing apart the sling. It is recommended that in such cases the slings should be used vertically. In addition correct type of shackles must be used for flat slings as standard types are not suitable due to crimp-ing or bunching.
And who has not witnessed synthetic slings placed over the blades of a fork truck? Although the blades do not appear to be sharp, effectively the angle of the sling is 90 degrees off the blade, creating a cutting strain. If your company uses a forklift or telehandler for lifting suspended loads a hook attachment must be used. Also the operator is now more
26 | MAY2015 CONSTRUCTION NEWS BULLETIN www.guamcontractors.org
CRA
NE
CRI
TIQ
UE
Dave Barnhouse resides in Tamuning and has been involved with operations, maintenance, operator training, and/or inspections, of cranes since 1969. He is a Certified Environmental Trainer, CHST, NCCCO certified crane operator, Lift Director, Level II Rigger, NCCCO practical examiner for all types of mobile crane operators, riggers, signal persons, and the only OSHA accredited crane inspec-tor on Guam.
than a forklift operator, he must be competent with rigging gear use.
A recent survey conducted by a state- side crane and rigging training company, found that 81% of rigging accidents had involved synthetic slings. The survey made clear that synthetic sling accidents, typically categorized by cutting or abrasion, are due to the lack of sling protection utilized during a lift. But the nature of the type of rigging does not heighten or lower the risk, what really counts is the degree to which users are knowledgeable and competent to complete their lifting activities safely.
This may very well be the number one most important factor in synthetic sling failure and riggers must evaluate each lift if needed. Riggers should be re-minded "If you have a synthetic sling in your right hand, you should have sling protection in your left."
One example of importance of inspection of synthetic web sling and what can happen if the slightest tear on the sling exists and is permit-ted to be used for a lift. We have all used packaging tape, sometimes thinner than paper at 2-3 mils thick, to wrap a shipping box. How to you break or cut the tape to length? You simply put some tension on it and jab it with a pen. What results is a clean break right at the point of the jab. This is exactly what happens to a synthetic sling once tension is placed on it and there is a shock load on the sling. A shock load may result from one of many reasons and is another responsibility of the rigger, to make sure shock loading does not take place. This may happen if the signal person or rigger does not confirm all connection points before giving the operator the all-clear signal to hoist. A common occurrence is for a sling eye to come up on the side of the shackle body and actually start to pick the load, when the shackle up-rights itself there is a shock load created on the sling, rigging gear, as well as the crane. If there happens to be a damaged area of the sling, how-ever slight, when this shock load occurs, the sling may part.
To exemplify a shock load and how dangerous one can be, consider this experiment to demonstrate: suspending a one lb. weight from a string with a scale in-line, lift the weight only four inches and release. The scale will jump momentarily to five lbs. This makes clear the importance of preventing shock loads as it increased the tension on the sling by exactly 5, the safety factor of all rigging gear, 5:1.
Another area I find riggers are weak in which contributes to overloading any type of sling is the vertical to horizontal sling angle. What
riggers must consider when using a bridle sling is the angle created between horizontal and the sling. At 60° the tension on this sling will increase 15.5%. Not an enormous amount but at 30° (the lowest allowed), the tension will exactly double. What this equates to is as an example: Lifting a 10 ton load a rigger config-ures a 2-part bridle hitch at 30° angle between each sling leg and horizontal. Though each sling leg share of the 10 ton load will of course be 5 ton, the tension on each leg will be 10 ton. If the rigger would assume any 5 to 10 ton capacity sling would be sufficient, he would be overloading the rigging. The obvious solution to decrease the tension would be to use longer slings, increasing the horizontal to sling angle. But what lengths would be sufficient? The longer the better but there are limits in most cases, how much head room, what lengths are available, etc. The recommended sling angle is 60°, easily con-figured and assured by using the same length slings as the pick points are from each other. At 60° the tension would measure 5.775 ton as compared to 10 ton with 30° angles.
The example hitch in photo #1 illustrates a lower sling angle than 30°, unsafe and an OSHA violation. Two factors may result in an accident in this example: First, with the low sling angle the tension on the slings has multiplied many times more than the weight of the load. Second, at any moment the sling on the hook tip may slide up and off the hook, resulting in a dropped load. Hook safety latches are only to secure unloaded slings on the hook, they cannot support a load. Also, by
tip loading the hook past 60° the hook may spread open, forcing it to be taken out of service. The #2 photo is example of using synthetic slings with no softeners. Though not visible in photo the top side where the sling is exiting the corner post fitting can be assumed to be as sharp as the side visible. Once tension is placed on this sling and the sliding motion drags the sling across the sharp edge it will most likely fail. Regardless, this is not a good hitch for lifting containers.
Please e-mail any comments, questions, or specific topics you would like to see addressed in this column to [email protected] and we will cer-tainly attempt to accommodate your requests.
Comprehensive inspections offered for heavy equipment,cargo containers, above-ground storage tanks, and structural welds
Relevant heavy-equipment operator training: Rigging, cranes, excavators, forklifts, aerial lifts, bucket trucks, etc.
OSHA safety training and onsite consultations Welder qualification testing
[email protected]: (671) 653-5501
Accredited MaritimeCrane Inspector per OSHA 29CFR1919
General Contractor
www.guamcontractors.org CONSTRUCTION NEWS BULLETIN MAY2015 | 27
Strategic thinking and strategic planning are related, but they are two distinctly different activities. First, let’s look at the definitions.
Strategic Thinking: Strategic thinking is an intensified exploration of strategy from new directions that create new concepts. It’s a thinking process, an exploration process, and a discovery process.
Strategic Planning: Strategic Planning is a planning process that determines how the organization will operate by identifying the specific tasks, the schedule, and how to measure success.
In simple terms, strategic thinking deter-mines the “what” and strategic planning focuses on “how” to achieve the “what.”
Contractors far too often make the mistake of jumping into the planning process too soon. They do this in part because they are more comfortable with planning. After all they have a great deal of experience plan-ning projects. When contractors are handed a complete set of construction document it makes sense for the contractors to immedi-ately being to plan how they will construct the project because the project has already been defined. However, that is not always the case. For example, on a design-build project the design-build team must start by strategically thinking about the project. In essence, they must define the project in terms of the client’s needs and budget. It’s not good enough to simply define a building in terms of some generic type. The design or the building’s definition must incorporate the client’s specific and often unique needs and how best to achieve them before anyone can begin to plan the construction process. In essence, the team must determine “what” needs to be built before moving on to “how” to build it. In other words, a good design doesn’t stop with a generic type of building, such as an office building but further defines the building around the specific needs of the client. Don’t be confused by the fact that during design-build efforts, both designing
and planning go on at the same time, but the planning is restricted to the elements already defined. The team merely doesn’t wait until all designing is completed before beginning to work on the plan.
When contractors create their business strategy, the same rules apply. Instead of describing a generic construction company, contractors must explore from a variety of perspectives what services they are selling, what makes their clients different, and how they differentiate themselves from their competition. Failing to take the necessary time to perform this critical strategic thinking and jump into the planning phase too soon usually result in the contractor just tweaking its current business plan. Instead of analyzing “what” it should be doing, the contractor merely extends what it has already been doing and simply adjusts some of the financial figures. Unfortunately, the figures tossed around are more of a wish than anything derived from any hard research or thinking. In the end, contractors that don’t differentiate themselves from their competitors usually end up competing on price; instead of value.
Which is More Important: Strategic Think-ing or Strategic Planning?
It’s not a fair question because both are needed. It like asking which is more impor-tant, knowing where we are going or having a means of travel to get there? Of course, you need a means of transportation, but if you don’t know the destination you are completely lost.
Peter Drucker has written that managers do things right while leaders to the right thing. This concept can be applied to companies also. The leading companies focus on doing the right things. In business terms that means they have the right strategy, which will only occur if they take the time to do the necessary strategic thinking. Of course, what’s needed is doing the right thing the right way. However, unless you start with the
right thing you have no hope of achieving that goal.
Therefore, from that perspective, strategic thinking is more important because unless you first identify the right things to be done, you will remain stuck in the world of low-cost bidding. Even contractors forced to compete in the design-bid-build arena must have the right strategy. That enables them to compete based on their knowledge and experience to bring in a lower cost to win the bid, instead of just the lowest price.
Peter Drucker wrote in The Practice of Management, “Because the purpose of business is to create a customer, the business enterprise has two – and only two – basic functions; marketing and innovation.” Innovation is what allows you to differentiate your business from your competition and in-novation comes from a thinking process, an exploration process, and a discovery process, just like strategic thinking. Daniel Pink wrote in The Whole New Mind, “For business, it’s no longer enough to create a product that’s reasonably priced and adequately functional.” In other words, today it’s essen-tial for contractors to provide outstanding value by delivering better solutions for their clients and differentiating themselves by the value they deliver enabling them to avoid competing solely on price.
This goal can only be achieved by first devel-oping a sound strategy through strategic thinking followed a by the completion of a strategic plan on how to achieve the desired strategy.
28 | MAY2015 CONSTRUCTION NEWS BULLETIN www.guamcontractors.org
GAR
RISO
NRE
PORT
Comparing Strategic Thinkingand Strategic Planning
To learn more about strategic thinking and strategic planning go to http://ow.ly/LsAwI for books on strategic thinking and strategic planning by Ted.
GU
AM
DEP
ART
MEN
T O
F LA
BOR
Alie
n La
bor P
roce
ssin
g Ce
rti�
cati
on D
ivis
ion
Empl
oyer
s W
orkp
lace
Mon
thly
Rep
ort S
tati
stic
sM
ON
TH E
ND
ING
: Feb
ruar
y 20
15
1
Spec
ialty
Coo
k2
Aut
o Re
paire
rCe
men
t Mas
on37
3
Trai
ning
& D
ev. S
peci
alis
t12
Bake
rCa
rpen
ter
387
1 2 4
Ultr
asou
nd T
echn
icia
nBa
ker M
echa
nic
Rein
forc
ing
Met
alw
orke
r11
0
Wed
ding
Ser
vice
Att
enda
nts
Stru
ctur
al S
teel
wor
ker
12
Wel
der
Wel
der -
Fitt
er1 2 01
0 0 0 0 0
1 0 0 0 0 0
Conc
ierg
ePl
umbe
r15 3 17 4
Elec
tric
Mot
or R
epai
rer
Shee
tmet
al W
orke
r
231
Elec
tric
al D
raft
erFi
eld
Supe
rvis
orH
eavy
Equ
ip. O
pera
tor
1Ba
ker M
aste
r2
Gol
dsm
ith60
Elec
tric
ian
0 5 0
Mec
hani
c
Mai
nten
ance
Ele
ctric
ian
Elev
ator
Inst
alle
r
1 5 1
Gol
f Ins
truc
tor
Cam
p Co
ok
Hea
vy E
quip
men
t Mec
hani
cTo
tal C
omm
on C
onst
.98
1H
vac
Tech
nici
an213 1
2 1 1 1 1
Chef
Spa
Supe
rvis
or -
Trai
ner
Aut
omot
ive
Mec
hani
cBa
ker M
echa
nic
1A
uto
Body
Rep
aire
r Tec
h.1
OSH
Inst
ruct
or1
Buye
r3
HVA
C M
echa
nic
5A
C M
aint
enan
ce T
ech
1El
ec./
Elec
tron
ic S
ervi
ce T
ech
Biom
edic
al E
quip
men
t Spe
cial
ist
Japa
nese
Spe
cial
ty C
ook
Phili
ppin
esLa
ndsc
ape
Gar
dene
rs1211
59Ko
rea
Laun
dry
Supe
rvis
or0172
6Ja
pan
Kirib
ati
Uni
ted
King
dom
8Le
s M
ills
Cert
i�ed
Inst
ruct
or2
Mac
hini
st2
Mar
ine
Mai
nt. M
achi
nist
Tota
l by
Nat
iona
lity
1183
Mar
ine
Mai
nt. M
echa
nic
MRI
Tec
hnic
ian
Mas
sage
The
rapi
st7
Cons
truc
tion
47 40M
otor
Rew
inde
rN
on-C
onst
ruct
ion
Nur
sery
Wor
ker
5To
tal H
-2B
Empl
oyer
s87
Pain
ter,T
rans
port
er E
quip
men
t
10018101
Pipe
�tte
r4
Qua
lity
Insp
ecto
rsTo
tal U
.S. W
orke
rs38
41
Radi
olog
ic T
echn
icia
n0
Gra
nd T
otal
H-2
B W
orke
rs11
83Re
stau
rant
Man
ager
44121
Refr
iger
atio
n &
AC
Mec
hani
c
Scub
a D
ive
Inst
ruct
or1
Ship
�tte
rSo
us C
hef
171
31
1012
Tota
l Non
-Con
stru
ctio
n H
2-B
Wor
kers
Hea
vy E
quip
men
t Mec
hani
c
Tota
l OTH
ER C
onst
ruct
ion
Tow
er C
rane
Ope
rato
r
Wor
kers
by
Nat
iona
lity
Empl
oyer
s By
Indu
stry
TOTA
L Co
nstr
ucti
on H
-2B
Wor
kers
Wel
der
Proj
ect S
uper
viso
r
1Pr
ojec
t Man
ager
Gen
eral
Mai
nten
ance
& R
epai
rer
Fiel
d Su
perv
isor
Plas
tere
r
Elec
tric
al P
ower
Lin
eman
Estim
ator
HVA
C M
echa
nic
Fore
man
AC&
Ref
riger
atio
n M
echa
nic
Com
mon
Con
stru
ctio
n O
ccup
atio
ns
Land
scap
er
Oth
er N
on-C
onst
ruct
ion
Occ
upat
ions
Oth
er C
onst
ruct
ion
Occ
upat
ions
Arc
hite
ctur
al D
raft
er
Civi
l Eng
inee
r
H-2
B Po
pula
tion
by N
atio
nalit
y
Phili
ppin
es97
.97%
Kore
a1.
01%
Japa
n0.
68%
Kirib
ati
0.17
%U
K0.
17%
Phili
ppin
es
Kore
a
Japa
n
Com
mon
Con
stru
ctio
n O
ccup
atio
ns 38.0
2%
39.4
5%
11.2
1%
1.22
%
1.53
%
0.31
%1.
73%
6.12
%0.
41%
Cem
ent M
ason
Carp
ente
r
Rein
forc
ing
Met
alw
orke
rSt
ruct
ural
Stee
lwor
ker
Plum
ber
Shee
tmet
al W
orke
r
Hea
vy E
quip
.O
pera
tor
Elec
tric
ian
Cam
p Co
ok
US
Wor
kers
vs.
H-2
B
0
500
1000
1500
2000
2500
3000
3500
4000
4500
Tota
l U.S
.W
orke
rsG
rand
Tot
al H
-2B
Wor
kers
Prep
ared
By:
She
rine
Espi
nosa
Cont
act i
nfor
mat
ion:
Gre
g M
asse
y, A
LPCD
Adm
inis
trat
orP.
O. B
ox 9
970
Tam
unin
g, G
uam
969
31(6
71)4
75-8
005/
8003
Kirib
ati
UK
30 | MAY2015 CONSTRUCTION NEWS BULLETIN www.guamcontractors.org
REPO
RTS/
IN
FORM
ATIO
N
gives back to the community.
gives back to the community.
GCA Construction Index
0
1,000
2,000
3,000
4,000
5,000
6,000
7,000
8,000
‘01 ‘02 ‘03 ‘04 ‘05 ‘06 ‘07 ‘08 ‘09 ‘10 ‘11 ‘12 ‘13 ‘14
Construction Employment
0
1000
2000
‘01 ‘02 ‘03 ‘04 ‘05‘06 ‘07‘08 ‘09 ‘10 ‘11 ‘12 ‘13 ‘14
H2 Labor
05
10152025303540
‘05 ‘06 ‘07 ‘08 ‘09 ‘10 ‘11 ‘12 ‘13 ‘14 ‘15
GCA Apprenticeship Registrations
Statistics provided by Guam Department of Labor,
Bureau of Labor Statistics; Guam Contractors Association; and the GCA Trades Academy.
$0$50,000,000
$100,000,000$150,000,000
$250,000,000$200,000,000
$300,000,000$350,000,000$400,000,000
‘01‘02‘03‘04‘05‘06‘07‘08‘09‘10‘11‘12‘13‘14
Building Permits
DOD Contracts
$0$50,000,000
$100,000,000$150,000,000
$250,000,000$200,000,000
$300,000,000$350,000,000$400,000,000
‘01 ‘02 ‘03 ‘04 ‘05 ‘06 ‘07 ‘08 ‘09 ‘10 ‘11 ‘12 ‘13 ‘14
1500
500
32 | MAY2015 CONSTRUCTION NEWS BULLETIN www.guamcontractors.org
REPO
RTS/
IN
FORM
ATIO
N