g:composite housingcomposite housing4earth.africa/composite/forearth/wp-content/... · with sabs...

1
DRAWN JOB No DATE DRG No / CAD FILE SCALE REVISION DRAWING TITLE PROJECT TITLE REV. DESCRIPTION DATE KENILWORTH STUDIO 43B GOLDBOURBE ROAD KENILWORTH 7708 P.O. BOX 53031 KENILWORTH 7745 Tel: 021 762 6290 Fax: 021 797 9955 Email: [email protected] Reg. No. Sign. M. HURWORTH & ASSOCIATES cc CONSULTING CIVIL AND STRUCTURAL ENGINEERS PROJECT MANAGERS Empowerment through Engineering GENERAL NOTES. ALL LEVELS AND DIMENSIONS SHOWN ON THIS DRAWING ARE TO BE VERIFIED ON SITE BY THE CONTRACTOR PRIOR TO COMMENCEMENT OF WORK. ALL DIMENSIONS ARE TO BE CHECKED ON SITE AGAINST THE ARCHITECT'S DRAW INGS. ALL SETTING OUT IS TO BE DONE ACCORDING TO THE ARCHITECT'S DRAWINGS. ANY DISCREPANCIES SHOW N ON THIS DRAWING IS TO BE REPORTED TO THE ENGINEER. ALL WORK IS TO BE DONE IN ACCORDANCE WITH THE LOCAL AUTHORITY BY- LAWS. DIMENSIONS ARE NOT TO BE SCALED OFF THIS DRAWING. ALL REINFORCED CONCRETE WORK IS TO BE DONE IN ACCORDANCE WITH SABS 0100 OR LASTEST AMENDMENT THEREOF. ALL STRUCTURAL STEELWORK IS TO BE DONE IN ACCORDANCE WITH SABS 1200H -1980 OR LASTEST AMENDMENT THEREOF. THE CONTRACTOR IS RESPONSIBLE FOR MAINTAINING THE REINFOCE- MENT IN THE CORRECT POSITIONS AT ALL TIMES. NO CAST OF CONCRETE IS TO BE UNDERTAKEN WITHOUT THE ENGINEER'S APPROVAL. ALL CONCRETE IS TO BE VIBRATED. ALL STRUCTURAL TIMBER WORK IS TO BE DONE IN ACCORDANCE WITH SABS 082-1988 OR THE LASTEST AMENDMENT THEREOF. ALL STRUCTURAL BRICKWORK IS TO BE DONE IN ACCORDANCE W ITH SABS 0145-1978 AND SABS 0164-1980. ALL WATERPROOFING TO ARCHITECTS OR SPECIALISTS DETAILS AND SPECIFICATIONS. ALL STRUCTURAL TIMBER WORK IS TO BE APPROVED BY THE ENGINEER. REINFORCED CONCRETE MAXIMUM ALLOWABLE GROUND BEARING PRESSURE = 100 KN/m ALL STRUCTURAL CONCRETE TO BE 30 MPa AT 28 DAYS UNLESS OTHERWISE STATED. COVER TO REINFORCEMENT: SLAB 20MM BEAMS 30MM COLUMNS 30MM RETAINING WALLS 20MM FOUNDATIONS 50MM LOADBEARING BRICKWORK MASONARY UNITS - MINIMUM COMPRESSIVE STRENGTH TO BE 15 MPa MORTAR - CLASS 2 TOP OF LOADBEARING WALLS TO BE FINISHED WITH STEEL TROWELLED MORTAR BED. TWO LAYERS OF PLASTIC BONDBREAKER TO BE LAID ON WALL PRIOR TO CASTING OF CONCRETE. ALL EXPOSED CONCRETE EDGES TO BE CHAMFERED 25mm ALL EXCAVATIONS AND TRENCHES TO BE APPROVED BY THE ENGINEER PRIOR TO CASTING OF FOOTINGS AND / OR BASES. ALL REINFORCING STEEL TO BE APPROVED BY THE ENGINEER PRIOR TO CASTING OF CONCRETE. CONTRACTOR IS REPONSIBLE FOR MAINTAINING REINFORCING STEEL IN POSITION DURING POURING OF CONCRETE. 3 CONCRETE CUBES TO BE TAKEN FOR EACH NEW BATCH OF CONCRETE MIXED. CONTRACTOR TO ARRANGE FOR TESTING AT 7, 14 AND 28 DAYS. THE RESULTS OF THE TESTS TO BE FORWARDED TO THE ENGINEER AS SOON AS IT BECOMES AVAILABLE. THIS DRAWING IS TO BE READ IN CONJUNCTION WITH THE RELEVANT BENDING SCHEDULES. STRUCTURAL STEEL ALL STEEL TO BE HOT ROLLED GRADE 300W STEEL UNLESS OTHERWISE STATED. ALL WELDING TO BE 5mm FILLET W ELDING UNLESS OTHERWISE INSTRUCTED BY THE ENGINEER. PLATE THICKNESS > 12 TO 20 WELD = 6mm PLATE THICKNESS > 20 TO 40 WELD = 8mm ALL BOLTS TO METRIC SIZED GALVANISED BLACK BOLTS GRADE 8.8. ALL CUTTING, WELDING AND DRILLING TO CONFORM TO THE REQUIREMNTS OF SABS 0162-1984. CUTS TO BE FREE OF ALL DIRT AND GREASE PRIOR TO WELDING. WORKSHOP DRAWINGS TO BE FORWARDED TO THE ENGINEER FOR APPROVAL BEFORE MANUFACTURE. STRUCTURAL STEEL CONTRACTOR TO ENSURE THAT SUFFICIENT TEMPORARY VERTICAL BRACING IS INSTALLED DURING CONSTRUCTION. THIS MAY BE REMOVED DURING CONSTRUCTION OF THE BRICK INFILL PANELS, UNLESS OTHERWISE INSTRUCTED BY THE ENGINEER. STRUCTURAL STEEL CONTRACTOR IS REPONSIBLE FOR ALL VALLEY, HIP AND GABLE END TRIMMERS. STRUCTURAL STEEL PAINT SPECIFICATION SURFACE PREPARATION. ABRASIVE BLAST CLEAN TO SWEDISH STANDARD SIS 055900 OF 1967 TO SA2.5 OR WIRE BRUSHING TO ST 3 ( BLAST PROFILE 40 - 75 MICROMETRES ) PRIMER APPLY ONE COAT OF ZINC PHOSPHATE PRIMER BY BRUSH, ROLLER OR AIRLESS SPRAY. DRY FILM THICKNESS : 40 - 50 MICROMETRES FINISHING COAT -1 APPLY ONE COAT OF ALKYD MICACEOUS IRON ORE BY BRUSH, ROLLER OR AIRLESS SPRAY. DRY FILM THICKNESS : 35 - 40 MICROMETRES FINISHING COAT - 2 APPLY ONE COAT OF MICACEOUS IRON ORE OR SUPER ENAMEL TO COLOUR SPECIFIED BY BRUSH, ROLLER OR AIRLESS SPRAY. DRY FILM THICKNESS : 35 MICROMETRES SHEET No G:\COMP OSITE HOUSING \COMPOSITE HO USING.rvt ISMAIL 04/06/18 C1000 PERSPECTIVE STRUCTURAL COMPOSITE HOUSING PLANNING 02-06

Upload: others

Post on 24-Oct-2020

3 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: G:COMPOSITE HOUSINGCOMPOSITE HOUSING4earth.africa/composite/forearth/wp-content/... · with sabs 0100 or lastest amendment thereof. all structural steelwork is to be done in accordance

DRAWN

JOB No

DATE

DR

G N

o /

CA

D F

ILE

SCALE

REVISION

DRAWING TITLE

PROJECT TITLE

REV. DESCRIPTION DATE

KENILWORTH STUDIO

43B GOLDBOURBE ROADKENILWORTH 7708P.O. BOX 53031KENILWORTH 7745Tel: 021 762 6290Fax: 021 797 9955Email: [email protected]

Reg. No.

Sign.

M. HURWORTH & ASSOCIATES ccCONSULTING CIVIL AND STRUCTURAL ENGINEERS

PROJECT MANAGERS

Empowerment through Engineering

GENERAL NOTES.

ALL LEVELS AND DIMENSIONS SHOWN ON THIS DRAWING ARE TO BE VERIFIED ON SITE BY THE CONTRACTOR PRIOR TO COMMENCEMENTOF WORK.

ALL DIMENSIONS ARE TO BE CHECKED ON SITE AGAINST THE ARCHITECT'S DRAWINGS.

ALL SETTING OUT IS TO BE DONE ACCORDING TO THE ARCHITECT'S

DRAWINGS.

ANY DISCREPANCIES SHOWN ON THIS DRAWING IS TO BE REPORTEDTO THE ENGINEER.

ALL WORK IS TO BE DONE IN ACCORDANCE WITH THE LOCAL AUTHORITY BY-LAWS.

DIMENSIONS ARE NOT TO BE SCALED OFF THIS DRAWING.

ALL REINFORCED CONCRETE WORK IS TO BE DONE IN ACCORDANCEWITH SABS 0100 OR LASTEST AMENDMENT THEREOF.

ALL STRUCTURAL STEELWORK IS TO BE DONE IN ACCORDANCE WITHSABS 1200H -1980 OR LASTEST AMENDMENT THEREOF.

THE CONTRACTOR IS RESPONSIBLE FOR MAINTAINING THE REINFOCE-MENT IN THE CORRECT POSITIONS AT ALL TIMES.

NO CAST OF CONCRETE IS TO BE UNDERTAKEN WITHOUT THE ENGINEER'S APPROVAL.

ALL CONCRETE IS TO BE VIBRATED.

ALL STRUCTURAL TIMBER WORK IS TO BE DONE IN ACCORDANCEWITH SABS 082-1988 OR THE LASTEST AMENDMENT THEREOF.

ALL STRUCTURAL BRICKWORK IS TO BE DONE IN ACCORDANCE WITHSABS 0145-1978 AND SABS 0164-1980.

ALL WATERPROOFING TO ARCHITECTS OR SPECIALISTS DETAILS ANDSPECIFICATIONS.

ALL STRUCTURAL TIMBER WORK IS TO BE APPROVED BY THEENGINEER.

REINFORCED CONCRETE

MAXIMUM ALLOWABLE GROUND BEARING PRESSURE = 100 KN/mALL STRUCTURAL CONCRETE TO BE 30 MPa AT 28 DAYSUNLESS OTHERWISE STATED.

COVER TO REINFORCEMENT:SLAB 20MMBEAMS 30MMCOLUMNS 30MMRETAINING WALLS 20MMFOUNDATIONS 50MM

LOADBEARING BRICKWORKMASONARY UNITS - MINIMUM COMPRESSIVE STRENGTH TO BE 15 MPaMORTAR - CLASS 2

TOP OF LOADBEARING WALLS TO BE FINISHED WITH STEEL TROWELLED MORTAR BED. TWO LAYERS OF PLASTIC BONDBREAKERTO BE LAID ON WALL PRIOR TO CASTING OF CONCRETE.

ALL EXPOSED CONCRETE EDGES TO BE CHAMFERED 25mm

ALL EXCAVATIONS AND TRENCHES TO BE APPROVED BY THE ENGINEER PRIOR TO CASTING OF FOOTINGS AND / OR BASES.

ALL REINFORCING STEEL TO BE APPROVED BY THE ENGINEERPRIOR TO CASTING OF CONCRETE.

CONTRACTOR IS REPONSIBLE FOR MAINTAINING REINFORCINGSTEEL IN POSITION DURING POURING OF CONCRETE.

3 CONCRETE CUBES TO BE TAKEN FOR EACH NEW BATCH OFCONCRETE MIXED. CONTRACTOR TO ARRANGE FOR TESTING AT 7, 14 AND 28 DAYS. THE RESULTS OF THE TESTS TO BEFORWARDED TO THE ENGINEER AS SOON AS IT BECOMES AVAILABLE.

THIS DRAWING IS TO BE READ IN CONJUNCTION WITH THERELEVANT BENDING SCHEDULES.

STRUCTURAL STEEL

ALL STEEL TO BE HOT ROLLED GRADE 300W STEEL UNLESSOTHERWISE STATED.

ALL WELDING TO BE 5mm FILLET WELDING UNLESS OTHERWISEINSTRUCTED BY THE ENGINEER.

PLATE THICKNESS > 12 TO 20 WELD = 6mmPLATE THICKNESS > 20 TO 40 WELD = 8mm

ALL BOLTS TO METRIC SIZED GALVANISED BLACK BOLTS GRADE 8.8.

ALL CUTTING, WELDING AND DRILLING TO CONFORM TO THEREQUIREMNTS OF SABS 0162-1984.

CUTS TO BE FREE OF ALL DIRT AND GREASE PRIOR TOWELDING.

WORKSHOP DRAWINGS TO BE FORWARDED TO THE ENGINEER

FOR APPROVAL BEFORE MANUFACTURE.

STRUCTURAL STEEL CONTRACTOR TO ENSURE THAT SUFFICIENTTEMPORARY VERTICAL BRACING IS INSTALLED DURING CONSTRUCTION.THIS MAY BE REMOVED DURING CONSTRUCTION OF THE BRICK INFILL PANELS, UNLESS OTHERWISE INSTRUCTED BY THE ENGINEER.

STRUCTURAL STEEL CONTRACTOR IS REPONSIBLE FOR ALL VALLEY, HIP AND GABLE END TRIMMERS.

STRUCTURAL STEEL PAINT SPECIFICATIONSURFACE PREPARATION.ABRASIVE BLAST CLEAN TO SWEDISH STANDARD SIS 055900 OF 1967TO SA2.5 OR WIRE BRUSHING TO ST 3 ( BLAST PROFILE 40 - 75 MICROMETRES )

PRIMERAPPLY ONE COAT OF ZINC PHOSPHATE PRIMER BY BRUSH, ROLLEROR AIRLESS SPRAY.

DRY FILM THICKNESS : 40 - 50 MICROMETRES

FINISHING COAT -1APPLY ONE COAT OF ALKYD MICACEOUS IRON ORE BY BRUSH,ROLLER OR AIRLESS SPRAY.

DRY FILM THICKNESS : 35 - 40 MICROMETRES

FINISHING COAT - 2APPLY ONE COAT OF MICACEOUS IRON ORE OR SUPER ENAMEL TOCOLOUR SPECIFIED BY BRUSH, ROLLER OR AIRLESS SPRAY.

DRY FILM THICKNESS : 35 MICROMETRES

SHEET No

G:\C

OM

PO

SIT

E H

OU

SIN

G\C

OM

PO

SIT

E H

OU

SIN

G.r

vt

ISMAIL 04/06/18

C1000

PERSPECTIVE STRUCTURAL

COMPOSITE HOUSING

PLANNING

02-06