ge energy wind products overview - tureb.com.tr · © 2012 general electric company. ge energy wind...

22
© 2012 General Electric Company. GE Energy Wind Products Overview © 2012 General Electric Company. TWEC 2012 November 8th Mete Maltepe

Upload: others

Post on 01-Sep-2019

5 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: GE Energy Wind Products Overview - tureb.com.tr · © 2012 General Electric Company. GE Energy Wind Products Overview TWEC 2012 November 8th Mete Maltepe

© 2012 General Electric Company.

GE Energy

Wind Products Overview

© 2012 General Electric Company.

TWEC 2012

November 8th

Mete Maltepe

Page 2: GE Energy Wind Products Overview - tureb.com.tr · © 2012 General Electric Company. GE Energy Wind Products Overview TWEC 2012 November 8th Mete Maltepe

© 2012 General Electric Company.

GE Power & Water

Biogas

Water

Gas Turbines Steam

Nuclear Cleaner Coal

Wind

Solar

Renewable Energy

Renewables – building on power generation technology &

expertise

2 GE Renewable Energy business

GE Proprietary and Confidential

Page 3: GE Energy Wind Products Overview - tureb.com.tr · © 2012 General Electric Company. GE Energy Wind Products Overview TWEC 2012 November 8th Mete Maltepe

GE Wind Introduction

Page 4: GE Energy Wind Products Overview - tureb.com.tr · © 2012 General Electric Company. GE Energy Wind Products Overview TWEC 2012 November 8th Mete Maltepe

© 2012 General Electric Company.

GE’s Installed Wind Fleet USA

(12,617 units/19,202 MW) China (792 units/1,188

MW)

Japan (290 units/478 MW)

Europe +Turkey –

16 Countries (3,533 units/5,900 MW)

Canada (1,070 units/1,619 MW)

Over 18,000+ WTGs, 28GW+ installed … 22

countries

As of 2Q 2012

4

© 2012 General Electric Company.

Brazil (59 units/94 MW)

Page 5: GE Energy Wind Products Overview - tureb.com.tr · © 2012 General Electric Company. GE Energy Wind Products Overview TWEC 2012 November 8th Mete Maltepe

© 2012 General Electric Company.

Evolution of GE wind products 10,000th 1,000th 18,000th

GE wind products … proven performance and

reliability

GE Wind Products ‘02 ‘12

Capacity Factor (%)* 45 60

Availability (%) 85 98

*[email protected]/s, EOY ‘12

+33%

+15%

GE enters wind industry

GE 37c

blade

5

WindBOOST LVRT introduced GE

Pitch

5,000th Units >>

Model introduction 2.75-103

1.6-100

HALT

Introduced

GE 40m blade

Mark VIe

controller

© 2012 General Electric Company

1.5i (65m) 1.5sle (77m) 1.5xle (82.5m) 1.6-82.5

2.75-100 2.5xl (100m) 2.5s (88m)

1.5s (70.5m)

2.85-103

Enhanced controls

GE 48.7m blade Next Gen

Grid

‘02 ‘96 ‘07 ‘09 ‘10 ‘03 ‘08 ‘04 ‘05 ‘06 ‘11 ‘12 ‘13

Page 6: GE Energy Wind Products Overview - tureb.com.tr · © 2012 General Electric Company. GE Energy Wind Products Overview TWEC 2012 November 8th Mete Maltepe

© 2012 General Electric Company.

Improved design Year over year

1.5/1.6MW availability trends

World’s best running fleet defined

Model year: The year in which a turbine is commissioned

First 12 weeks of operation excluded

6

‘07 ‘08 ‘09 ‘10 ’11 ’2Q 12

2007 95.6% 97.1% 97.6% 96.9% 97.6% 98.3%

2008 97.0% 98.1% 98.0% 98.4% 98.6%

2009 97.0% 98.1% 98.1% 98.0%

2010 97.9% 98.2% 98.3%

2011 98.2% 98.6%

1.5-82.5 98.5% 98.2% 98.5% 98.8%

1.6-82.5 98.5% 98.6%

2007-2

01

2 1

.X p

latf

orm

M

od

el Y

ear

Tre

nd

s

Improved service, resolved top issues 2Q 2012

© 2012 General Electric Company.

Page 7: GE Energy Wind Products Overview - tureb.com.tr · © 2012 General Electric Company. GE Energy Wind Products Overview TWEC 2012 November 8th Mete Maltepe

© 2012 General Electric Company.

24X7 customer support including

strong collaboration with field

engineers

Centers - Salzbergen, Germany &

Schenectady, NY – Hot Swap

Capability

50+ customer service specialists

7,000+ turbines controlled remotely …

98%+ availability

Fleet analysis operating rhythm with

engineering-based fault resolution,

continuously evolved

12,700+ turbines w/ data connections

* As of EOY 2011

Remote Monitoring & Diagnostics … maximized availability

© 2012 General Electric Company.

7

Page 8: GE Energy Wind Products Overview - tureb.com.tr · © 2012 General Electric Company. GE Energy Wind Products Overview TWEC 2012 November 8th Mete Maltepe

© 2012 General Electric Company.

Model Overview 1.6-100

Page 9: GE Energy Wind Products Overview - tureb.com.tr · © 2012 General Electric Company. GE Energy Wind Products Overview TWEC 2012 November 8th Mete Maltepe

© 2012 General Electric Company.

• ~2,000 MWs of 1.6-100 to be installed in 2012

• 1.6-100 validation unit installed February 2011

• Complete: component validations & certifications, certified

power curve measurement, loads validation, sound

measurements

Continued evolution of the industry leader

Highest AEP per wind farm

9

© 2011 General Electric Company.

1.6-100 world’s most efficient turbine in it’s class

1.6-100 100MWs

7.5m/s 62 #WTGs

CF * 53.20% 99.2 Total MWs

AEP* 7,556 462,304 Total AEP

8.5m/s

CF * 60.70% 99.2

AEP* 8,608 527,478 Total AEP

* Gross

Page 10: GE Energy Wind Products Overview - tureb.com.tr · © 2012 General Electric Company. GE Energy Wind Products Overview TWEC 2012 November 8th Mete Maltepe

© 2012 General Electric Company.

GE 2.X Platform - Turbine of Choice

Largest Wind Farm in North America

Shepherds Flat

Wind Farm – 845 MWs Eastern Oregon Morrow & Gilliam counties

Largest Wind Farm in Europe

Fântânele-Cogealac

Wind Farm – 600 MWs South East Romania

The 2.5-100 achieved 98+% average availability on 900+

units

© 2012 General Electric Company.

10

Page 11: GE Energy Wind Products Overview - tureb.com.tr · © 2012 General Electric Company. GE Energy Wind Products Overview TWEC 2012 November 8th Mete Maltepe

© 2012 General Electric Company.

Global 2.x turbine population

Median turbine availability by year

2007 2008 2009 2010 2011 2012 YTD Lifetime

2.3-94/2.5-

88 94.1% 96.4% 97.4% 97.3% 97.0% 98.7% 96.1%

2.5-100 91.7% 96.9% 97.9% 98.5% 97.7%

2.x Fleet 94.1% 96.4% 97.1% 97.0% 97.8% 98.5% 97.5%

Page 12: GE Energy Wind Products Overview - tureb.com.tr · © 2012 General Electric Company. GE Energy Wind Products Overview TWEC 2012 November 8th Mete Maltepe

© 2012 General Electric Company.

Model Overview 2.85-103

Page 13: GE Energy Wind Products Overview - tureb.com.tr · © 2012 General Electric Company. GE Energy Wind Products Overview TWEC 2012 November 8th Mete Maltepe

© 2012 General Electric Company.

• Over 2,000 GE WTGs with 100M rotors installed by EOY 2012

• 2.85-103 validation unit installed November, 2012

• 2.85-103 components same as 2.75-103 except for electrical system

• Over 1,000 2.X WTG in operation worldwide

• O&M technical expertise across all functions

Ability to meet site constrained requirements

Capacity factor & AEP

13

© 2011 General Electric Company.

2.85-103 for constrained sites

2.85-103 100MWs

7.5m/s 35 #WTGs

CF * 40.70% 100 Total MWs

AEP* 7,556 356,532 Total AEP

8.5m/s CF * 48.70% 100 Total MWs

AEP* 8,608 426,612 Total AEP

* Gross

Page 14: GE Energy Wind Products Overview - tureb.com.tr · © 2012 General Electric Company. GE Energy Wind Products Overview TWEC 2012 November 8th Mete Maltepe

Model Overview – Services

Page 15: GE Energy Wind Products Overview - tureb.com.tr · © 2012 General Electric Company. GE Energy Wind Products Overview TWEC 2012 November 8th Mete Maltepe

© 2012 General Electric Company.

GE wind fleet

2.000

5.500

13.500

21,000

'03 '06 '09 '12F

Expanding after-market offerings

World’s best running fleet … 98%+ availability

Technical fleet data and insight

• 18,000+ units operating globally

• 1,000+ technicians, 350 reliability

engineers

Differentiated rigor and speed

• 80% of issues resolved within 10 mins

• Smart early warning algorithms

Upgrading fleet performance

• Driving new tech into fleet

Mining the installed base

Cumulative units

15

+

Page 16: GE Energy Wind Products Overview - tureb.com.tr · © 2012 General Electric Company. GE Energy Wind Products Overview TWEC 2012 November 8th Mete Maltepe

© 2012 General Electric Company.

Multi-level support packages

Remote Monitoring & Troubleshooting

Routine Services

Preventative Maintenance

Flexible options crucial to meeting unique customer needs

Maintenance and Remote Operations

Extended Parts and Services

Availability Guarantee

Parts Package

On-Site Support

Full Service Agreement

Unplanned Maintenance

Turbine Performance & Life Extension

Providing defined scope

of planned maintenance.

Ensuring highest

standards of operation. Worry-free operation &

maintenance.

Condition Monitoring

Page 17: GE Energy Wind Products Overview - tureb.com.tr · © 2012 General Electric Company. GE Energy Wind Products Overview TWEC 2012 November 8th Mete Maltepe

Production based availability

Production Availability

measures MWhs a turbine

generates / by the MWhs it

should have generated

Time Based Availability

measures the time the

turbine is available / by the

time it should be available

VS.

17

Aligning with customers

metrics

© 2012 General Electric Company.

Page 18: GE Energy Wind Products Overview - tureb.com.tr · © 2012 General Electric Company. GE Energy Wind Products Overview TWEC 2012 November 8th Mete Maltepe

© 2012 General Electric Company.

NORTH SEA

ATLANTIC OCEAN

MEDTERRANEAN SEA

Denmark

Finland

Poland

France

Germany

Spain

Portugal

Greece

Italy

Turkey

Switzer- land

Austria

Czech Republic

Estonia

Latvia

Lithuania

Belarus

Ukraine

Romania

Hungary

Slovakia Moldova

Bulgaria

Russia

Ireland

Great Britain

Monte- negro

Serbia

Slovenia

Croatia

Bosnia- Herze- govina

Mace- donia

Albania

Norway

Nether-

lands

Belgium

Luxembourg

Malta

Central Europe

Germany, Belgium, Netherlands,

Austria

East Europe

Poland, Romania, Estonia, Turkey

South Europe

Spain, Portugal, Italy and France

North Europe & Offshore

UK, Ireland, Scandinavia

Europe Wind field services

Page 19: GE Energy Wind Products Overview - tureb.com.tr · © 2012 General Electric Company. GE Energy Wind Products Overview TWEC 2012 November 8th Mete Maltepe

Local Content

Page 20: GE Energy Wind Products Overview - tureb.com.tr · © 2012 General Electric Company. GE Energy Wind Products Overview TWEC 2012 November 8th Mete Maltepe

© 2012 General Electric Company.

Turkish Content Capability TODAY Tower: Spanish Gestamp Wind Steel Gesbey in Bandırma

Blade: American TPI TPI Kompozit Kanat Sanayi ın Izmır

Page 21: GE Energy Wind Products Overview - tureb.com.tr · © 2012 General Electric Company. GE Energy Wind Products Overview TWEC 2012 November 8th Mete Maltepe

© 2012 General Electric Company.

Base feed in tarriff 7.3 US c / kWh

• Booster for tower 0.6

• Booster for blades 0.8

TOTAL 8.7 US c / kWh

Local content FiT Boosters

1.4 US c / kWh

Page 22: GE Energy Wind Products Overview - tureb.com.tr · © 2012 General Electric Company. GE Energy Wind Products Overview TWEC 2012 November 8th Mete Maltepe

© 2012 General Electric Company.

Thank You

© 2012 General Electric Company.