Page 1: GE Metals Solutions - AMM...GE Title or job number 6/27/2012 Syngas turbine controls & accessories Ventilation mods Inlet filter house Inlet duct & plenum Gas fuel module Water injection

1GE Title or job number

6/27/2012

GE

Solutions for Steel

Metals Solutions

Page 2: GE Metals Solutions - AMM...GE Title or job number 6/27/2012 Syngas turbine controls & accessories Ventilation mods Inlet filter house Inlet duct & plenum Gas fuel module Water injection

2GE Title or job number

6/27/2012

Global Challenges

What if …you could reduce operational energy costs?

20-40% of the cost of steel comes from energy costs

Page 3: GE Metals Solutions - AMM...GE Title or job number 6/27/2012 Syngas turbine controls & accessories Ventilation mods Inlet filter house Inlet duct & plenum Gas fuel module Water injection

3GE Title or job number

6/27/2012

Global Challenges

What if …you could considerably increase your power output & efficiency utilizing the same amount of process gas?

30-40Typical power increase seen when shifting from BSTG to HDGT configuration

Page 4: GE Metals Solutions - AMM...GE Title or job number 6/27/2012 Syngas turbine controls & accessories Ventilation mods Inlet filter house Inlet duct & plenum Gas fuel module Water injection

4GE Title or job number

6/27/2012

Global Challenges

What if …you could utilize by-pass gases as a means to reduce or eliminate your plants oxygen load?

10/700Pressure and temperature of compressor off-gassing in low-BTU applications

Page 5: GE Metals Solutions - AMM...GE Title or job number 6/27/2012 Syngas turbine controls & accessories Ventilation mods Inlet filter house Inlet duct & plenum Gas fuel module Water injection

5GE Title or job number

6/27/2012

Global Challenges

What if …you could rapidly shift from one fuel source to the next without worrying about the calorific value?

1050+Currently advertised lowest heating value of a GE 9E low-BTU HDGT

Page 6: GE Metals Solutions - AMM...GE Title or job number 6/27/2012 Syngas turbine controls & accessories Ventilation mods Inlet filter house Inlet duct & plenum Gas fuel module Water injection

6GE Title or job number

6/27/2012

You can… Technology & constant Innovation are the keys to answering these challenges

6

GE Low BTU fuel experience:• 4.7 GW installed (21 plants)• 47 gas turbines with LBTU/syngas• Over 2,000,000 operating hours• Plants in USA, Germany, Italy, Canada, Netherlands, Singapore, Czech Rep., China, Middle East

China170 MW Fuel: COREXSteel mill gases

Singapore173 MW Fuel: Refinery ResidueGE Gasification

Czech Republic350 MW Fuel: Brown CoalLurgi Gasification

Page 7: GE Metals Solutions - AMM...GE Title or job number 6/27/2012 Syngas turbine controls & accessories Ventilation mods Inlet filter house Inlet duct & plenum Gas fuel module Water injection

7GE Title or job number

6/27/2012

38,000The number of homes’ equivalent of energy saved by installing one of GE’s 9E Gas Turbines

Power: From Process Gases

Combined Cycle Power: China175 MW Power houseBFG/COG fueledSaves $32 MM/yearReduces CO2 by 2 MM tons/year

Page 8: GE Metals Solutions - AMM...GE Title or job number 6/27/2012 Syngas turbine controls & accessories Ventilation mods Inlet filter house Inlet duct & plenum Gas fuel module Water injection

8GE Title or job number

6/27/2012

IGCC Demo (1984)120 MW, 107E

GE Gasifier on Coal

IGCC (1996)350 MW, 209E

ZVU Gasifier on Coal

Clean Coal Proj. IGCC (1996)250 MW, 107FA

E-gas Gasifier on Coal/Coke

IGCC (1996)70 MW, 6B

GSP Gasifier on Coal

Refinery (1996)40 MW, 6B Cogen

GE Gasifier on Coke

Refinery (1997)120 MW, 206B Cogen/H2

Shell Gasifier on Coke

Refinery (2001)550 MW, 3x109E Cogen

GE Gasifier on TarRefinery (2000)180 MW, 2x6FA Cogen

GE Gasifier on Coke

Refinery (2000)173 MW, 2x6FA Cogen

GE Gasifier on Oil

Refinery (2008)160 MW, 2x7EA Cogen

Shell Gasifier on Asphaltene

Refinery (2009)253 MW, 2x9E CogenShell Gasifier on Oil

Steel Mill (1996)520MW, 3x109E Cogen

BFG/COG/LDG

Steel Mill (2001)180MW, 1x109E Cogen

BFG/COG/LDG

Steel Mill (2003)50MW, 6B Cogen

BFG/COG

Steel Mill (2008)450MW, 9x106B Cogen

BFG/COG

Steel Mill (2010)348MW, 2x109E Cogen

COREX

More than 4.7 GW of installed base operating on low BTU fuels, with over 2,000,000 operating hours

Clean Coal Proj. IGCC (1996)250 MW, 107FA

GE Gasifier on Coal/Coke

Heavy Duty Gas Turbine Syngas Experience

Steel Mill (2010)328MW, 2x109E Cogen

BFG/COG

GTL Project (2011)209 MW, 6x6B CogenShell Process Off-gas

Refinery (2003)105 MW, 3x6B Cogen

Lean Methane

Page 9: GE Metals Solutions - AMM...GE Title or job number 6/27/2012 Syngas turbine controls & accessories Ventilation mods Inlet filter house Inlet duct & plenum Gas fuel module Water injection

9GE Title or job number

6/27/20129

9E Medium Btu fuel blend – Steelworks, Italy (BFG-COG-LDG-NG fuel blend solution)

• Syngas operation since 1996

• 520 MW 3x9E combined cycle w/cogeneration steam

• Blast furnace/coke oven/LDG fuel gas blend w/NG … 1810 kcal/Nm3 (~193 Btu/scf)

• Integrated single-shaft gas turbine/fuel gas compressor

• Availability >94% since ‘97

Page 10: GE Metals Solutions - AMM...GE Title or job number 6/27/2012 Syngas turbine controls & accessories Ventilation mods Inlet filter house Inlet duct & plenum Gas fuel module Water injection

10GE Title or job number

6/27/2012

9E steel mill - Corex gas, China• 1x9E combined cycle in operation since 2008; 1x109E operation 1Q2011• COREX gas (~20%H2, 45%CO, 30%CO2) … 1950 kcal/Nm3 (~208 Btu/scf)• Integrated single-shaft gas turbine/fuel gas compressor designs• Multi-shaft combined cycle power generation• 1st plant achieved over 24,000 hrs. of operation with COREX gas in June ‘11

Alternative steel process- export gas 1x9E in operation since 2008

1x109E

Page 11: GE Metals Solutions - AMM...GE Title or job number 6/27/2012 Syngas turbine controls & accessories Ventilation mods Inlet filter house Inlet duct & plenum Gas fuel module Water injection

11GE Title or job number

6/27/2012

9E, Steel Mill – BFG/COG Gas, China

Page 12: GE Metals Solutions - AMM...GE Title or job number 6/27/2012 Syngas turbine controls & accessories Ventilation mods Inlet filter house Inlet duct & plenum Gas fuel module Water injection

12GE Title or job number

6/27/2012

9E Low Heating Value ModificationsIncreased S1N Throat Area

Tfire OptimizationSyngas Combustor

Air Extraction

Minimal changes….maintain 9E Robust Reliability

Page 13: GE Metals Solutions - AMM...GE Title or job number 6/27/2012 Syngas turbine controls & accessories Ventilation mods Inlet filter house Inlet duct & plenum Gas fuel module Water injection

13GE Title or job number

6/27/2012

Syngas turbine controls & accessoriesVentilation mods

Inlet filter house

Inlet duct & plenum

Gas fuel module

Water injection skidExhaust system

Controls hardware and software

Accessory module

Liquid fuel and atomizing air

Static starter

Inlet bleed heat system

IGCC Controls with added I/O

N2/Steam injection skid

Syngas fuel skid with N2 purge

Optional air extraction skid

Enclosure modifications:• Piping for syngas, diluent, etc.• Explosion proofing• Hazardous gas detection• Fire protection

Page 14: GE Metals Solutions - AMM...GE Title or job number 6/27/2012 Syngas turbine controls & accessories Ventilation mods Inlet filter house Inlet duct & plenum Gas fuel module Water injection

14GE Title or job number

6/27/2012

Packaging modifications for ultra LHV blended fuelgas PipingEnclosure

Air Extraction Fuel Skid

Page 15: GE Metals Solutions - AMM...GE Title or job number 6/27/2012 Syngas turbine controls & accessories Ventilation mods Inlet filter house Inlet duct & plenum Gas fuel module Water injection

15GE Title or job number

6/27/2012

Summary• GE has considerable operational experience using low

calorific fuel gas for both steel mill and IGCC applications

• Blending of available mill fuel gas must be considered to meet minimum fuel heating value constraints

• Mill fuel gas must be extensively cleaned…removing particulate and tars to comply with turbine fuel specification requirements

• GT fuel control systems with load turndown, co-firing, and automation response capability provide flexibility with variable mill operations

• GE Gas turbine/combined cycle plants can be successfully utilized with ultra low heating value steel mill fuels

Page 16: GE Metals Solutions - AMM...GE Title or job number 6/27/2012 Syngas turbine controls & accessories Ventilation mods Inlet filter house Inlet duct & plenum Gas fuel module Water injection

16GE Title or job number

6/27/2012

GE

Solutions for Steel

Metals Solutions

Questions?