    00 G676RA8 R69:R6M67T! 1

    00;1000 '3RMAT< =6'7T37! A7= :!6 3' T>6!$6C'CAT37

    00.1001 Specification Format00.1002 Work Section Categories00.1003 Supplemental Information00.1004 Definitions00.1005 Copyrigt00.100! Disclosure

    00;2000 =6!CR$T37 3' T>6 $R3*6CT

    00.2001 "ro#ect Description

    00;000 =6TA8! 3' TRA=6 C37TRACT3R?!

    R6!$37!B8T6!

    00;100 =6!CR$T@6 686M67T! 3' T>6 W3R! 4=5

    00.3101 $eneral %e&uirements00.3102 'ra(e Contractor %esponsi)ilities00.3103 'ra(e Contractor*s "roposals00.3104 'e Detaile( Design00.3105 Supply of Supplemental Information00.310! Systems+ "ro(ucts an( ,aterials "references00.310- Detaile( Design+ ,anufacturing an( Installation 'olerances00.310 Su)stitution at te 'ime of 'en(er

    00;200 $R6!CR$T@6 686M67T! 3' T>6 W3R! 4$5 00.3201 $eneral %e&uirements00.3202 'ra(e Contractor %esponsi)ilities00.3203 /lternatie Systems+ "ro(ucts an( ,aterials

    00;#000 !:BMTTA8!

    00.4001 "roce(ure00.4002 'en(er Su)mittals00.4003 "ost Contract /ar( Su)mittals00.4004 "ost Contract /ar( %esponse00.4005 Samples $enerally

    00.400! "recontract Samples00.400- "ost Contract /ar( Samples00.400 ,ockups00.400 "rototypes00.4010 uality encmarks00.4011 Working Draings00.4012 /s)uilt Draings an( ,anuals00.4013 6ter Su)mittals00.4014 %eie of Su)mittals

    00;&000 $6R'3RMA7C6 R69:R6M67T! A7= =ATA

    00;&100 G676RA8

    00.5101 "erformance %e&uirements

  • 8/17/2019 General Build w

    3/90

    00;&200 =6!G7 A7= !6R@C6 8'6

    00.5201 Design 7ife of uil(ing00.5202 Serice 7ife of Components

    00;&00 !TR:CT:RA8

    00.5301 $eneral00.5302 ,oements an( 'olerances00.5303 Dea( 7oa(s00.5304 Impose( 7oa(s00.5305 Deflections00.530! Win( 7oa(s00.530- Seismic Con(itions00.530 8i)ration

    00; 67@R37M67TA8 C37=T37!

    00.5401 $eneral00.5402 Climatic Data

    00.5403 Solar "erformance00.5404 7ocal Factors

    00;&&00 67@R37M67TA8 R69:R6M67T!

    00.5501 $eneral

    00;&)00 !6C:RT

    00.5!01 $eneral

    00;&+00 'R6 A7= !M36

    00.5-01 $eneral %e&uirements

    00;&00 C3RR3!37 $R3T6CT37

    00.501 $eneral00.502 $alanising Corrosion "rotection00.503 9lectrolytic "rotection

    00;&/00 6ART> B37=7G A7= 8G>T77G $R3T6CT37

    00.501 $eneral

    00;)000 9:A8T C37TR38

    00;)100 G676RA8 9:A8T A!!:RA7C6< 9:A8T C37TR38< T6!T7G

    9uality Assurance< 9uality Control

    00.!101 $eneral00.!102 ,eans of /u(iting00.!103 uality Control ,eto(s00.!104 Summary

    Testing

    00.!105 'esting an( Inspection

    00.!10! /irtigtness Fan 'est00.!10- %esults an( Certificates

  • 8/17/2019 General Build w

    4/90

    00;)200 !TAT:T3R R6G:8AT37!

    00.!201 Stan(ar(s00.!202 uil(ing Co(es an( %egulations00.!203 Su)missions to /utorities00.!204 Design %egulations

    00;)00 !A'6T% $R3T6CT37

    !afety

    00.!301 :ealt an( Safety %egulations

    $rotection

    00.!302 Damage /nticipation00.!303 "rotectie Deices00.!304 "rotectie ,easures00.!305 "acking an( Crating00.!30! "rotection of $la;e( 9lements

    00.!30- "est Infestations

    00;)#00 MA7T67A7C6< TRA77G A7= R6$8AC6M67T MAT6RA8!

    00.!401 $eneral00.!402 ,aintenance ,anual00.!403 'raining of $ R69:R6M67T!

    Materials

    00.!501 Stan(ar( of ,aterials an( uality00.!502 :ealt :a;ar(s

    Workmansi(

    00.!503 Skille( "ersonnel00.!504 Suita)ility of Structure00.!505 Setting 6ut00.!50! "ro#ect 'olerances Definitions00.!50- Compati)ility00.!50 ,anufacturer*s %ecommen(ations00.!50 Suppliers00.!510 Coering

  • 8/17/2019 General Build w

    5/90

    00.-201 Definitions00.-202 Sustaina)ility /n( 9nironmental /ims00.-203 %eference

    Requirements an" Res(onsibilities

    00.-204 Conflicting %e&uirements00.-205 $eneral

    Termal $erformance

    00.-20! $eneral

    Air $ermeability

    00.-20- 9=filtration

    nternal Air 9uality

    00.-20 $eneral

    00;+00 $R3=:CT! A7= MAT6RA8!

    00.-301 Sourcing ,aterials00.-302 Deleterious ,aterials

    Water :se Re"uction% Attenuation

    00.-303 Water 'e Specification comprises Sections / to ? an( follos te

    classification system.)> Sections / an( ? proi(e general re&uirements applica)le to te Work Sections.c> 'e Work Sections liste( erein form part of te Specification it (esign responsi)ility an(

    specification type in(icate( for eac as follosAi> "rescriptie @">A 'e Section is a (etaile( materials an( orkmansip Specification reflecting te

     /rcitect*s (esign solution. 'e 'ra(e Contractor may )e re&uire( to proi(e some (raings an(tecnical information )ut (esign responsi)ility remains it te /rcitect.

    ii> Descriptie @D>A 'e Section+ en rea( it te Design Draings+ in(icates te re&uirements it

    ic te 'ra(e Contractor must comply en un(ertaking te Detaile( Design. 'e 'ra(eContractor retains full responsi)ility for completing te Detaile( Design an( e=ecution of te orksan( for meeting te specifie( re&uirements.

    (> 'e Work Sections of te Specification sall not impose a lesser stan(ar( of material ororkmansip tan (efine( in Sections / an( ?.

    e> 'e Specification sall )e rea( in con#unction it te Con(itions of Contract+ "reliminaries+ DesignDraings+ Instructions to 'en(erers+ supplemental information an( oter releant (ocuments.

    f> "erformance criteria ere specifie( sall )e consi(ere( as minimum stan(ar(s it ic te'ra(e Contractor*s proposals sall comply.

    g> Sections / to ? sall constitute a single (ocument.> refer to

    ork to )e proi(e( )y+ an( o)ligations of+ te 'ra(e Contractor an( terefore all clauses area((resse( to+ an( refer to+ te 'ra(e Contractor.

    00.1002 Work Section Categories00 $eneral %e&uirements @,>01 lock Walling @">

  • 8/17/2019 General Build w

    6/90

    02 ,asonry /ccessories @D>03 Cement San( Scree(s @">04 "lastere(B %en(ere( Coatings @">05 FireB Smoke Stopping @">0! oinery /n( Carpentry0- ,etalork0 "reseratieB Fire %etar(ant 'reatment

    0 Fi=ingsB /(esies10 ,ortars11 Sealants12 $askets13 ,etalork Finises14 ,icaceous Iron 6=i(e @,I6>

    00.1003 Supplemental Informationa> %efer to te re&uirements of te folloing (raings+ reports an( supplemental information as

    releantAi> Site Inestigation %eport.ii> $eotecnical %eport.iii> Fire Strategy %eport.i> /coustic %eport.

    > Design Draings.i> Structural 9ngineer*s (ocumentation.ii> 9nironmental %eport.iii> Serices 9ngineer*s (ocumentation.i=> "ro#ect 9=tranet "rotocol Document.=> 9cology Stu(y.=i> 'ermal %eport.=ii> $eomorpology an( Seismic /ssessment %eport.)> %efer to te *' Seet*+ ic is a (irectory of references for )uil(ing elementsB systems an(

    proi(es a link )eteen te Specification an( te Design Draings.

    00.1004 Definitions'e folloing (efinitions apply to te SpecificationA

    a> SpecificationA 'is (ocument+ comprising Sections / ? inclusie.)> 'ra(e Contractor*s "roposalsA Draings+ (etaile( tecnical specifications+ meto( statements+

    risk assessment+ calculations an( any oter releant information prepare( )y te 'ra(e Contractoran( su)mitte( it te 'en(er response+ maintaining te (esign an( isual intent+ functional+performance criteria an( tecnical re&uirements as state( in te 'en(er (ocuments.

    c> DesignAi> "rescriptie @">A 'e (esign solution prepare( )y te /rcitect for 'en(er purposes+ represente( )y

    te Design Draings an( te Specification. 'is may )e supplemente( )y (raings an( tecnicalinformation+ prepare( )y te 'ra(e Contractor @or is specialist su)contractor> on )ealf of te /rcitect+ after te 'en(er.

    ii> Descriptie @D>A 'e (esign intent prepare( )y te /rcitect for 'en(er purposes+ represente( )yte Design Draings an( te Specification.

    (> Detaile( DesignA 'at prepare( )y te 'ra(e Contractor+ for orks specifie( (escriptiely @D>+represente( )y te Working Draings an( 'ra(e Contractor*s specifications+ un(ertaken tocomplete te Design.

    e> Design DraingsA

    i> "rescriptie @">A Draings issue( )y te /rcitect+ representing te Design.ii> Descriptie @D>A Draings issue( )y te /rcitect+ representing te Design for 'en(er purposes+

    soing te isual an( (esign intent+ scope+ layout+ principal (imensions+ arrangement of sericesan( structure+ function+ isual an( aestetic re&uirements.

    f> Working DraingsA Draings representing te Detaile( Design for orks specifie( (escriptiely@D>+ prepare( )y te 'ra(e Contractor @or is specialist su)contractor> )ase( upon te DesignDraings+ soing plans+ eleations+ sections an( (etails of te orks+ su)mitte( to te /rcitectfor reie prior to manufacture+ fa)rication an(B or installation+ maintaining te (esign intent.

    g> /s)uilt DraingsA Draings pro(uce( )y te 'ra(e Contractor+ ere re&uire(+ ic so teorks as finally constructe( as represente( )y te Working Draings unless oterise agree(.

    > Contract DraingsA 'e (raings liste( in te Contract+ comprising Design Draings an( 'ra(eContractor*s 'en(er response (raings agree( it te /rcitect it ic all Working Draingssall comply.

    i> 9aluationA %eies carrie( out )y te /rcitect an( 'ra(e Contractor )eteen 'en(er return an(

    Contract aar( to consi(er systems+ pro(ucts+ materials+ performance criteria+ typical (etails an(critical interfaces to esta)lis specifications an( (raings for Contract purposes. @Similar reiesmay )e re&uire( at oter times (uring te procurement process>.

  • 8/17/2019 General Build w

    7/90

     #> InspectionA Inspection carrie( out )y te /rcitect of systems+ pro(ucts+ materials+ components+e&uipment an( installation of te orks. Suc inspection sall )e limite( to an inspection of teisual appearance only. 'e Detaile( DesignE selection of systems+ pro(ucts an( materials+ an(construction of components an( e&uipment sall remain te sole responsi)ility of te 'ra(eContractor for orks specifie( (escriptiely. Suc inspections )y te /rcitect sall not reliee te'ra(e Contractor from compliance it te Contract Documents.

    k> /@a>ccepte(+ /@a>cceptance or /@a>ccepta)leA Systems+ pro(ucts+ materials+ components+

    e&uipment an( installations accepte( )y te /rcitect after ealuation an( it (ue regar( toresponsi)ilities as (efine( in te Contract Documents an( state( in te Specification.

    l> accepta)le e&uialentA Systems an( pro(ucts propose( )y te 'ra(e Contractor as alternaties+e&ual to or an enancement of tose specifie( in eery respect. Su)#ect to acceptance )y te /rcitect folloing ealuation an( it (ue regar( to responsi)ilities as (efine( in te ContractDocuments an( state( in te Specification.

    m> 'ra(e Contractor*s Supplemental InformationA Documentation pro(uce( after Contract aar(+ )yte 'ra(e Contractor+ (emonstrating tat te Detaile( Design complies it te ContractDocuments.

    n> Inspecting o(yA Competent in(epen(ent )o(y or association+ ic erifies compliance it teSpecification.

    o> 'esting o(yA Competent accre(ite( in(epen(ent testing )o(y or association+ ic proi(esappropriate testing e&uipment+ testing enironment an( in(epen(ent testing results ic ill )euse( to erify conformance it te Specification. 'e 'esting /utority sall )e su)#ect to

    acceptance )y te /rcitect.p> orksA 'e scope of ork coere( )y te Specification.&> Detaile( Design "rogrammeA Su)mitte( )y te 'ra(e Contractor+ prior to Contract aar(+

    soing te Detaile( Design (raing su)mission (ates+ sample su)missions+ prototyping an(testing actiities prior to manufacture.

    00.1005 Copyrigt'e copyrigt in any (esigns or installation (etails (eelope( for tis pro#ect )y te /rcitect sall)e este( in te /rcitect an( may not )e repro(uce( elseere itout te /rcitect*s rittenpermission. 'is ill not apply to stan(ar( pro(ucts an( (esigns alrea(y in e=istence )efore te(ate of ten(er.

    00.100! Disclosure'e nature of te (esign an( construction ork performe( an( any information )elonging to te /rcitect+ it ic te 'ra(e Contractor may )ecome familiar+ ill )e treate( as confi(ential an(may not )e (isclose( itout te ritten consent of te /rcitect. Do not pu)lis any (raings+sketces or potograps of te orks or )uil(ing or its construction itout te prior ritten consentof te /rcitect.

    00;2000 =6!CR$T37 3' T>6 $R3*6CT

    00.2001 "ro#ect Description%efer to te /rcitect*s narratie.

    00;000 =6TA8! 3' TRA=6 C37TRACT3R?!R6!$37!B8T6!

    00;100 =6!CR$T@6 686M67T! 3' T>6 W3R! 4=5

    00.3101 $eneral %e&uirementsa> 'ake responsi)ility for te 'ra(e Contractor Design orks as i(entifie( erein+ an( comply it te

    re&uirements of te Contract an( Specification.)> Design an( general performance re&uirements sall )e as state( erein. Specific performance

    re&uirements are proi(e( in eac Work Section of te Specification.c> Were no material+ pro(uct or supplier is in(icate( in te Specification+ propose suita)le materials

    an( systems prior to Contract aar( ic comply it te (esign intent an( performance criteriastate( an( remain fully responsi)le for te Detaile( Design of te orks.

    e> Were a particular material+ pro(uct or supplier is in(icate( in te Specification+ suc material+pro(uct or supplier sall )e (eeme( in(icatie representing te /rcitect*s (esign intent only. 'e

    'ra(e Contractor may complete te installation using tat pro(uct+ or suc oter confirme( asaccepta)le )y te /rcitect in riting+ )ut sall remain fully responsi)le for te Detaile( Design an(performance of te orks.

  • 8/17/2019 General Build w

    8/90

    f> InterfacesAi> Coor(inate it te ork of oters inclu(ing all interfacing as re&uire(.ii> "erformance sall )e maintaine( at all interface con(itions.iii> Complete te Detaile( Design of all interfaces it a(#oining tra(es prior to commencement of

    manufacture.

    00.3102 'ra(e Contractor %esponsi)ilities

    a> "roi(e (etaile( proposals+ (emonstrating compliance it te (esign intent an( confirm teproision of fully arrante( systems in accor(ance it te Contract con(itions.

    c> 'e 'ra(e Contractor*s proposals sall inclu(e (raings+ calculations+ meto(s+ tecnicalspecifications an( risk assessment (etailing te propose( materials an( systems in or(er tat atecnical appraisal can )e ma(e )y te /rcitect.

    (> / 'en(er )ase( on te 'ra(e Contractor*s on preferre( (esign solution may )e offere( foracceptance )y te /rcitect proi(e( te performance an( isual re&uirements are fully satisfie(. /ny alternatie solutions sall not alter te performance re&uirements+ appearance or (esign intentof te Design Draings an( te Specification.

    e> 'e (esign an( isual caracter of te pro#ect is important an( sall )e maintaine(. :ence+ teresall )e no ariation in te final surface finis of similar materials+ ic sall remain isuallyconsistent+ inclu(ing colour an( te=ture+ regar(less of orientation or natural grain itin agree(

    tolerances an( agree( samples.f> "roi(e su)mittals outline( itin te / Section an( eac Work Section.g> "roi(e Working Draings an( tecnical information to (emonstrate compliance it te Design

    Draings an( Specification. 'e 'ra(e Contractor*s final Detaile( Design sall )e )ase( on teDesign Draings ic in(icate generic solutions an( may not coer all con(itions. Design riskassessment sall )e su)mitte( as part of te (ocumentation.

    > Were proprietary pro(ucts are to )e installe(+ )e responsi)le for proi(ing any mo(ification+a((itional )racing+ reinforcing+ suita)le fi=ings+ etc. to ensure tat te pro(ucts meet tere&uirements of te Specification for te circumstances an( situation in ic tey sall )ee=pecte( to perform. e responsi)le for coneying any concerns tat te manufacturers may aee=presse( regar(ing te suita)ility of pro(ucts for te

    purpose inten(e(.i> Go portion of te orks sall commence itout acceptance of te re&uire( su)mittals )y te

     /rcitect. #> e responsi)le for ensuring tat items specifie( are installe( correctly suc tat te performance

    re&uirements specifie( are fully satisfie( for te serice life re&uire(. /ll fi=ings an( oter aspectsnot fully (etaile( or specifie( sall )e regar(e( as te 'ra(e Contractor*s responsi)ility.

    k> e responsi)le for te f inal selection of pro(ucts an( associate( components+ ic sall satisfyte re&uirements of te Specification.

    l> e responsi)le for te carrying out of all testing as specifie(.m> "roi(e arranties as re&uire(.n> Su)mit releant (ocuments to local an( national )uil(ing regulation an( legislation approal

    autorities as re&uire( to comply it te re&uirements of te Specification.o> Comply it te re&uirements of "lanning "ermission.p> Su)mit releant (ocuments for su)mission to te "lanning /utority.&> Set out te orks an( accurately coor(inate all relate( orks.r> "roi(e (etails+ calculations an( any oter releant information to te /rcitect for su)mission to

    an( approal )y te local an( national )uil(ing regulation an( legislation approal autorities. ,akeany a(#ustments re&uire( )y te local autorities+ folloing su)missions+ to te satisfaction of te

     /rcitect. 9nsure tat te Detaile( Design an( installations are in accor(ance it all local an(national )uil(ing regulation an( legislation approal autorities.

    s> In a((ition to su)missions to te local an( national )uil(ing regulation an( legislation approalautorities+ )e responsi)le for su)mitting structural+ (eflection an( oter calculations an( tecnicalinformation+ ere re&uire( @as re&ueste( in te Specification> for reie )y te /rcitect. Sucsu)missions sall (emonstrate compliance it te Specification.

    00.3103 'ra(e Contractor*s "roposalsa> 'e 'ra(e Contractor*s "roposals ill )e reiee( (uring te 9aluation )y te /rcitect. /tten(

    ealuation meetings as re&uire( an( make a(#ustments an( alterations to te 'ra(e Contractor*s"roposals to agree te ma#or (esign principles to te satisfaction of te /rcitect prior to tepossi)le Contract aar(.

    )> "roi(e te /rcitect it access to te (esign office an( personnel (uring te Design 9aluation.c> 'e 'ra(e Contractor*s "roposals as a minimum sall inclu(eA

    i> Full (etails of systems+ materials an( suppliers.ii> "recontract proposals.iii> Details of any *Specialist* inolement.

  • 8/17/2019 General Build w

    9/90

    i> Details of Working Draings programme.> Samples of propose( materials as re&uire( )y te releant ork sections.i> Full (etails of systems+ materials an( suppliers ere (ifferent from tose specifie(.ii> Compreensie tecnical specifications of te 'ra(e Contractor*s "roposals.iii> %eleant supplementary information.i=> Draings as re&uire( )y te Specification or as (eeme( necessary to e=plain te 'ra(e

    Contractor*s "roposals.

    => 'ecnical statements confirming performance compliance.=i> Details of guarantees an( arranties inclu(ing (etails of pre(icte( serice lies for primary an(

    secon(ary components.=ii> Interfaces.=iii> Summary of (eiations from te Design Draings an( Specification.=i> Commissioning information as releant.

    00.3104 'e Detaile( Designa> /ltoug te Design Draings so consi(era)le (etail an( (imensions+ no arranty or

    representation is gien )y te /rcitect as to te accuracy of suc (imensions or te a(e&uacy or)uil(a)ility of suc (etails. Soul( te 'ra(e Contractor a(opt te (etails or arrangements in(icate(on te Design Draings it sall )e (eeme( tat e as cecke( teir )uil(a)ility an( performancein terms of tis Specification+ all releant %egulations an( co(es of practice+ an( manufacturers*recommen(ations for any pro(ucts referre( to.

    )> Comply it all releant Co(es of "ractice+ Stan(ar(s+ Fire %egulations+ uil(ing %egulations@refer to clause series 00.!200> an( local uil(ing Co(es+ Safety %egulations an( any oterregulations applica)le to te installation+ togeter it all releant Statutory %ules+ %egulations+yelas an( oter enforcea)le instruments applica)le to )ot te (esign an( e=ecution of teorks.

    c> "repare a programme for te Detaile( Design soing all tasks an( su)missions an( su)mit foracceptance )y te /rcitect.

    (> "ro(uce Working Draings to represent te Detaile( Design+ supporte( )y calculations for reie)y te /rcitect.

    e> Su)mit to te /rcitect one (istri)ute( transmitte( electronic copy an( to full si;e paper copies ofall (esignB pro(uction information.

    f> 'e Working Draings sall finalise all manufacturing+ interface an( installation (etails.g> 9nsure tat any necessary amen(ments are ma(e in a timely manner+ unless an( until te

     /rcitect confirms tat resu)mission is not re&uire(+ su)mit copies of amen(e( (raings+ etc.+ an(ensure incorporation of necessary amen(ments.

    > 'e Specification sall not )e altere( itout te /rcitect*s prior ritten consent.i> Select suita)le materials+ si;es+ ticknesses+ types an( locations of fi=ings an( sealants+ all in

    accor(ance it specifie( stan(ar(s an( ensure tat tey are use( for te purpose inten(e( )y temanufacturer.

     #> /ny necessary support structure sall incorporate all moements an( tolerances to ic it issu)#ecte(.

    k> Inclu(e (escriptions of releant structural performance principles of te orks+ inclu(ing o an(ere loa(s are transmitte( to te primary structure an( te accommo(ation of tolerances.

    l> So (etails of all fi=ing re&uirements to interfacing elements of te orks+ ic sall )e agree(it te /rcitect prior to commencement of te installation.

    m> Coor(inate all interfaces.n> 'e /rcitect*s reie of Working Draings sall relate to isual performance an( functional

    matters only.o> e responsi)le for compiling te Working Draings an( 'ecnical Specifications of any cosen

    su)contractors to ensure tat all te contractual o)ligations are met to te satisfaction of te /rcitect.

    00.3105 Supply of Supplemental Informationa> "roi(e suc supplemental information in respect of (esign+ materials+ systems+ meto(s+

    installation an( proce(ures as re&uire( )y te /rcitect after Contract aar(.)> Supplemental information sall comply fully it te (esign intent+ functional an( performance

    re&uirements of te Design.c> Were alternatie systems+ pro(ucts+ materials+ manufacturers+ suppliers or su)contractors are

    propose(+ tey sall not )e utilise( until ritten acceptance is receie( from te /rcitect.(> Su)mit all releant information sufficient to (emonstrate compliance it te Specification to te

    %eleant /utorities.

    00.310! Systems+ "ro(ucts an( ,aterials "references

    a> Were te Specification i(entifies preferre( systems+ pro(ucts an( materials+ tese sall )econfirme( as )eing suita)le for teir specifie( an( inten(e( purpose it te 'en(er return. If nosuc specific confirmation is receie(+ ten te su)mission of te 'en(er return itself sall

  • 8/17/2019 General Build w

    10/90

    constitute suc a confirmation. If te preferre( systems+ pro(ucts an( materials are consi(ere(unsuita)le+ a(ise at te time of 'en(er.

    )> /cceptance of alternatie proposals )y te /rcitect sall not reliee te 'ra(e Contractor fromresponsi)ility to proi(e suita)le systems+ materials+ components an( assem)lies+ ic sall )euse( as inten(e( )y te manufacturer an( in compliance it te Contract Documents.

    c> If+ it te 'en(er return+ te 'ra(e Contractor su)mits no suc alternatie proposal to any of tepreferences in(icate( in te 'en(er Documents+ ten te solutions propose( in te Specification

    an( on te Design Draings sall )e (eeme( to )e accepta)le an( )e arrante( )y te 'ra(eContractor.

    00.310- Detaile( Design+ ,anufacturing an( Installation 'olerancesa> 'e Specification togeter it te correspon(ing Design Draings in(icate te (imensional

    tolerances @ereafter referre( to as tolerances> to ic te 'ra(e Contractor sall ork @erereleant> for te Detaile( Design+ manufacture+ su)assem)ly+ setting out an( installation of teorks.

    )> 'e Working Draings sall clearly (emonstrate o manufacturing an( construction tolerancesare to )e accommo(ate(.

    c> 'ake account of arious specifie( tolerances an( teir effect on te orks. Inform te /rcitect ofany apparent tolerance omissions+ inconsistencies or incompati)ilities.

    (> ,aintain te tolerances as (efine( an( (emonstrate+ upon re&uest )y te /rcitect+ te means )yic specifie( tolerances sall )e assure( an(+ ere appropriate+ ic specialist e&uipment

    an(B or meto(s sall )e use(.e> /ll (imensions sall )e cecke( on Site+ confirming all (imensions critical to te orks. Site

    measurements sall )e un(ertaken in sufficient time to ena)le correctie action to )e taken to teorks+ or te ork of oters+ to ensure an accurate fit itin agree( or implie( tolerances.

    f> %efer to an( take account of te Structural 9ngineer*s (ocumentation.g> Confirm common reference points an( agree it te /rcitect. Carry out (imensional cecks prior

    to te commencement of manufacture as necessary.> 9nsure tat any (imensions are compati)le an( consistent it oter releant (esign (imensions

    an( accumulate( tolerances an( moements. State an(B or so+ on te Working Draings+ teproisions ma(e ic are inten(e( to accommo(ate te accumulate( tolerances of a(#oining ora(#acent tra(es.

    i> Inform te /rcitect of any ork tat (oes not meet te specifie( tolerances. #> 'e orks sall )e free from (eformation outsi(e of specifie( tolerances an( sall not )e su)#ect to

    arping+ tisting an(B or perising )ut remain sta)le+ firm+ free from i)rations+ knocking+ rattlesan(B or istles+ s&ueaks or oter suc noises+ taking into account knon or specifie( con(itions.

    k> Details sall )e proi(e( for acceptance )y te /rcitect of te 'ra(e Contractor*s propose(meto(s for acieing an( monitoring te fa)rication an( erection tolerances (uring all stages ofte orks. Detaile( recor(s of te control an( tolerance aciee( sall )e su)mitte( to te /rcitect.

    l> In te eent of tere )eing any (iscrepancy in te alues of e=isting (atum reference points+ (atumleels+ )uil(ings+ foun(ations or oter features to ic te orks are relate(+ (etermine an( reportsuc a (iscrepancy to te /rcitect an( o)tain ritten instructions )efore procee(ing.

    m> 'e permissi)le tolerances state( in te Specification sall )e progressiely cecke( up toan(oer. Were to or more (ifferent tolerances can )e (erie( )y calculation an(Bor from teDesign Draings for te same (imension+ te least tolerance sall apply ic sall )e confirme()y te 'ra(e Contractor to te /rcitect. 'olerances sall not )e cumulatie.

    00.310 Su)stitution at te 'ime of 'en(er a> Soul( te 'ra(e Contractor+ after consi(eration of all te criteria ic in is specialist knole(ge

    are releant to te (esign an( construction of te orks+ is to make proposals for canges in any(etails+ (imensions or materials in(icate( in te Design Draings or referre( to in te Specification+ten suc proposals sall )e proi(e( as separate alternatie options an( returne( it te 'en(er.In no ay sall any proposal fail to meet te minimum performance re&uirements erein specifie(.

    )> / re&uest for a su)stitution sall )e (eeme( to )e a arranty )y te 'ra(e Contractor to te clienttat suc su)stitutions meet te re&uirements of te Specification an( as suc must )e confirme(in riting as e&ual )y te 'ra(e Contractor an( accepte( in riting )y te /rcitect. /(missi)ility ofany re&uest for su)stitution after 'en(er sall )e at te sole (iscretion of te /rcitect an( may )ere#ecte( itout reason gien.

    c> In te case tat any su)stitution alters te specifie( re&uirements+ su)mit sufficient information onsu)stitute( materials to allo ealuation )y te /rcitect on any (eiations from te Specification.

    00;200 $R6!CR$T@6 686M67T! 3' T>6 W3R! 4$5

    00.3201 $eneral %e&uirements

  • 8/17/2019 General Build w

    11/90

    a> Supply+ (elier+ install an( arrant te orks in strict compliance it te materials an(orkmansip re&uirements of te Specification.

    )> Were re&uire( to prepare (raings tese sall )e limite( to final (etailing of components+systems+ etc. in(icate( on te Design Draings+ necessary to (emonstrate teir safe installation.

    00.3202 'ra(e Contractor %esponsi)ilitiesa> /ll material an( orkmansip stan(ar(s sall )e satisfie( )y te 'ra(e Contractor as specifie( in

    te Work Sections of te Specification.)> "roi(e eeryting ic is necessary for te e=ecution an( completion of te orks an( (elier up

    te orks complete in eery particular to te satisfaction of te /rcitect.c> Were necessary+ proi(e (raings an( tecnical information to (emonstrate compliance it te

    Design Draings an( Specification an( comply it te approals process specifie(.(> Go portion of te orks sall commence itout acceptance of te re&uire( su)mittals )y te

     /rcitect.e> "roi(e any a((itional )racing+ reinforcing+ fi=ings+ etc. necessary to ensure tat te orks are

    installe( safely taking into account te circumstances an( situation in ic tey are fi=e(. Coneyany concerns tat te manufacturers may ae e=presse( regar(ing te suita)ility of pro(ucts forte purpose inten(e(.

    00.3203 /lternatie Systems+ "ro(ucts an( ,aterialsa> /lternatie systems+ pro(ucts an( materials may )e propose( )ut suc alternatie proposals sall

    )e accepte( in riting )y te /rcitect folloing ealuation+ )efore procee(ing.)> For suc alternaties+ proi(e full tecnical literature+ (raings+ samples an( oter supporting

    (ocumentation in respect of te complete installation to (emonstrate tat alternatie proposals areof a stan(ar( at least e&ual to tat specifie( an( compati)le it te (esign intent.

    c> Clearly i(entify all an( any (eiations from te Design Draings an( Specification.

    00;#000 !:BMTTA8!

    00.4001 "roce(urea> Go portion of te orks sall commence itout acceptance of te re&uire( su)mittals )y te

     /rcitect.)> / sce(ule of su)mittals sall )e proi(e( for agreement it te /rcitect. Sce(ule to in(icate

    te (ates on ic te /rcitect sall receie te re&uire( su)mittals. 'e sce(ule sall )ecorrelate( it te master programme an( allo a reasona)le amount of time for te reie ofeac su)mittal. Critical (ecision (ates sall )e in(icate( for selection of finises an( colours. 'esce(ule of su)mittals sall )e reise( an(

    resu)mitte( as necessary.c> "roi(e su)mittals in accor(ance it te folloingAi> /((ressing of Su)mittalsA Su)mittals sall )e (eliere( to te premises i(entifie( )y te /rcitect.ii> I(entification of Su)mittalsA 9ac su)mittal sall )e in(ii(ually i(entifie( on a selfa(ere( printe(

    la)el it te pro#ect name+ respectie specification reference+ supplier*sB manufacturer*s name an(pro(uct reference as appropriate. 9ac su)mittal sall )e accompanie( )y a transmittal formcontaining similar informationE togeter it te purpose for ic te su)mittal is )eing ma(e.Space sall )e proi(e( on te la)el on eac item su)mitte( for acceptance )y te /rcitect.

    iii> Gum)ering of Su)mittalsA Su)mittals sall )e num)ere( consecutiely an( tat num)ering systemsall )e retaine( trougout all reisions an( resu)mittals.

    i> Completeness of Su)mittalsA /ll releant information sall )e inclu(e( itin eac su)mittal to(efine completely an( e=plain eac separate system of ork. Su)mittals may )e com)ine( from

    arious sections as necessary an( furnise( at one time as a single su)mission.> 8ariations an( Su)stitutionsA Su)mittals tat (iffer from te re&uirements of te Design Draings

    an( te Specification sall )e so i(entifie(.(> Su)mission an( %eturn of Working DraingsB DocumentsAi> /llo for a sufficient perio( @a minimum of 10 @ten> orking (ays> )eteen te first su)mission of a

    (raingB (ocument an( receipt of comments. /llo for resu)missions for eac item to aciee an*/* or ** status.

    ii> "roi(e a list of Working Draings propose(.iii> Information specifically re&ueste( for eac element of te orks sall )e proi(e(. /((itional

    information may )e re&uire( )y te /rcitect on inspection of te 'ra(e Contractor*s su)mittals toallo for accurate comments to )e ma(e.

    e> 'e 'ra(e Contractor*s su)mittals sall )e reiee( )y te /rcitect (uring te 9aluation+ an( anyalteration an(B or agreements reace( sall )e incorporate( into te Contract (ocumentation.

    00.4002 'en(er Su)mittalsa> "roi(e su)mittals at te time of 'en(er as liste( in te Specification.

  • 8/17/2019 General Build w

    12/90

    )> 'e 'en(er response sall )e proi(e( containing te particular re&uirements as state( in te WorkSections.

    00.4003 "ost Contract /ar( Su)mittals /fter Contract aar( proi(e Working Draings+ samples+ mockups+ prototypes+ &uality)encmarks+ calculations an( test reports as re&ueste( in te Specification an( oter releant(at00.

    00.4004 "ost Contract /ar( %esponsea> "ost Contract aar( responses sall )e proi(e( containing+ as a minimum+ te particular

    re&uirements as state( in te Work Sections.)> Su)mit a (esign response+ to inclu(e all profiles of typical con(itions+ it (imensions.c> 'e "ost Contract aar( (esign response sall inclu(eAi> Samples ere specifie(.ii> 7ist of 'ests inclu(e(.iii> /B C programme.i> 7ist of propose(B accepte( Working Draings @for orks specifie( (escriptiely> or (raings @for

    orks specifie( prescriptiely>.> Summary of (eiations from te Design Draings an( Specification.i> 'ecnical specifications reflecting accepte( materialsB systems.ii> / list of accepte( suppliers an( su)contractors inten(e( to )e use(.

    00.4005 Samples $enerallya> Samples sall inclu(e arious pro(ucts+ natural materials+ fa)ricate( items+ e&uipment+ (eices+

    appliances or components tereof+ as may )e re&uire( to satisfy te isual appearance an(tecnical re&uirements of te Design.

    )> Samples sall )e reiee( for teir isual caracteristics an( ere moing or operating elementsare inole(+ te /rcitect sall )e gien te opportunity to reie orking samples.

    c> %anges of samples sall )e proi(e( ere a consi(era)le range of colour+ graining+ te=ture+smootness an( oter caracteristics may )e anticipate( in te orks.

    (> Were )espoke colours are specifie(+ samples sall )e su)mitte( illustrating precise colours+te=tures+ patterns an( finises for reie )y te /rcitect.

    00.400! "recontract Samplesa> Samples proi(e( it te 'en(er or (uring te 9aluation prior to Contract aar(.)> Samples sall )e as in(icate( in te Work Sections ic are re&uire( to erify te isual

    appearance of suc items for compliance it te re&uirements of te Design Draings an(Specification.

    c> "recontract samples sall )e la)elle( an( kept )y te /rcitect as a recor( of materials agree( forContract until completionB an(oer.

    00.400- "ost Contract /ar( Samplesa> Samples proi(e( (uring te Detaile( Design sall )e cecke( against te "recontract samples+

    ere applica)le+ an( te Specification to ensure tat &uality an( type ae )een maintaine(.)> /t te appropriate time proi(e te /rcitect it samples in(icate( in Work Sections+ ic sall

    )e kept as a recor( of materials to )e incorporate( in te orks an( use( as references forcontrolling consistency trougout te orks.

    c> "ost contract aar( samples sall comprise materials in teir final form.(> Samples sall inclu(e releant tra(e literature an( tecnical specifications.

    00.400 ,ockupsa> During te Working Draings preparation pase @in (ue time to permit a(#ustments to te (esign>

    an( ere (escri)e( in te Work Sections+ te 'ra(e Contractor sall proi(e full si;e mockups@unless oterise agree( it te /rcitect> for inspection )y te /rcitect.

    )> ,ockups sall )e erecte( eiter on or off Site+ not necessarily using actual materials to )eincorporate( in te orks )ut representing te (esign solutions.

    c> 'e mockup sall )e constructe( to confirm te general isual intent inclu(ing colour+ si;e an( coor(ination.

    00.400 "rototypesa> "rior to manufacture of elements of te orks+ construct off Site @or on Site if specifically re&ueste(

    )y te /rcitect> full scale tree(imensional assem)lies ere (escri)e( in te Work Sections an(Bor in(icate( on te Design Draings utilising final specifie( materials )ut not necessarily finalpro(uction tecni&ues.

    )> Were necessary+ te prototypes sall )e teste( fully to ensure tat te systems meet tere&uirements of te Specification )y application of te ma=imum applie( loa(s+ climatic con(itionsan( structural moements+ an(B or )e use( as a uality /ssuranceBuality Control :ol( "oint.

  • 8/17/2019 General Build w

    13/90

    ,anufacture of materialsB pro(ucts for inclusion in te orks sall not commence until te /rcitect*s ritten acceptance of te prototypes as )een receie(.

    c> Working Draings for te prototypes sall )e su)mitte( in accor(ance it te re&uirements of teSpecification.

    (> /ny mo(ifications re&uire( to te prototypes sall )e recor(e( to so teir final construction.e> 'e timing of tests sall allo any necessary a(#ustments to )e ma(e itout (elaying te orks

    programme.

    00.4010 uality encmarksa> 'e /rcitect*s reie of te Working Draings sall not reliee te 'ra(e Contractor of isresponsi)ility for errors+ or for supplying components an( materials to te full satisfaction of te /rcitect.

    (> 'e Working Draings sall )e fully (imensione( in metric+ to an agree( scale appropriate to te(etail+ an( inclu(eA

    i> Full si;e (etails an( grapic representation (escri)ing materials+ components an( e&uipment+construction+ finises+ proision for moements+ fa)rication an( erection tolerances.

    ii> 7ayouts+ locations an( assem)lies of all types of construction (etail an( #unctions+ (etails ofmaterials+ meto( of #ointing+ (etails of all connections an( fi=ing an( sealing meto(s+ finises an(all pertinent information relate( toA

    H ,eto( of fa)rication an( construction.H "roper relation to a(#oining ork.H Finises.H /mplification of (etails.H ,inor canges to te Design to suit actual con(itions.e> Su)mit Working Draings in accor(ance it te Con(itions of Contract an( (o not commence

    fa)rication of components until formally returne( )y te /rcitect it eiter */* or ** marke( oneac of te Working Draings. 9nsure tat space is left clear on eac of te Working Draings formarking )y te /rcitect. 'e folloing (raing inspection co(es sall )e use( en returning teWorking Draings to te 'ra(e ContractorA

    i> Draing marke( */* Fa)rication+ manufacture or construction may procee( in accor(ance it te(raing su)mitte(.

    ii> Draing marke( ** Fa)rication+ manufacture or construction may procee( in accor(ance it te(raings su)mitte( su)#ect to te 'ra(e Contractor taking necessary action )ase( on te /rcitect*s comments an( all annotations a((e( to te returne( (raings. sall )e con(itional upon receipt of all(ocumentation+ certification+ acceptances in respect of ancorages+ fire stop assem)lies+ samples+mockups an( test reports+ etc. as (efine( in te Specification.

    g> 'e receipt of Working Draings )y te 'ra(e Contractor from te /rcitect marke( */* or ** sallnot constitute agreement of a ariation.

    > Wen preparing te Working Draings consult te current /rcitectural+ Structural an( SericesDesign Draings+ a(#usting te Working Draings to allo for any canges to Site tolerances an(B

    or (iscrepancies ere applica)le.

  • 8/17/2019 General Build w

    14/90

    i> If+ )efore commencing or (uring te preparation of te Working Draings te (esign intent of teDesign Draings an(B or Specification may )e affecte(+ or ere oter elements of te orks may)e affecte(+ notify te /rcitect imme(iately.

     #> Were applica)le+ te Working Draings may utilise te manufacturer*s stan(ar( (etails proi(e(tat tey comply it te (esign intent.

    k> 'e /rcitect sall ae te rigt at all reasona)le times to isit te 'ra(e Contractor*s @or isspecialist su)contractors> (esign office to ceck on progress.

    l> 'e Working Draings sall )e annotate( in 9nglis an( title( in te manner (etermine( for teContract+ it te title )lock fully in(icating te part of te orks to ic tey apply.

    m> Information containe( in any of te Design Draings sall )e treate( as confi(ential an( sall not)e utilise( for any purpose oter tan for te orks. Suc information sall not )e communicate( totir( parties for oter purposes itout te specific acceptance of te /rcitect.

    n> ,aintain on Site a full set of Design Draings+ Working Draings an( tecnical specifications.o> Go Working Draings sall )e accepte( if pro(uce( to a re(uce( si;e.&> 'e Working Draings sall )e fully coor(inate( it interfacing tra(es.

    00.4012 /s)uilt Draings an( ,anualsa> 'e /s)uilt Draings referre( to a)oe sall inclu(e any Site ariances or installation a(#ustments

    or ariations an( any actual Site or settingout (imensional mo(ifications as installe(.c> /s)uilt Draings sall )e pro(uce( to a releant an( agree( scale an( sall )e use( to

    complement te ,aintenance ,anual for te specific purpose of locating te elements itin teoerall structure.

    00.4013 6ter Su)mittalsa> "ro(uct DataA "roi(e tecnical information (etailing te caracteristics of eac system+ system

    component or material incorporate( in te orks. 'is sall inclu(e material sce(ules an(manufacturer*s literature.

    )> CertificationsA "roi(e in(epen(ently certifie( reports erifying compliance of eac element orcomponent it te re&uirements of te Design Draings an( Specification.

    c> /B C "rogrammeA "roi(e a programme to satisfy te re&uirements of 00.!000 of teSpecification+ te Contract con(itions or any oter (ocuments referre( to in te ContractDocumentation.

    (> "reconstruction 'esting %eportsAi> "roi(e tecnical reports recor(ing test results of systems+ components an( materials as re&uire(

    )y te Design Draings+ te Specification+ te /rcitect or a testing la)oratory+ prior tocommencement of installation.

    ii> 'ese reports sall state compliance it te tecnical re&uirements of te Specification an(inclu(e+ ere appropriate+ test certificates.

    e> ,aintenanceB 6peration ,anualsA ,anuals prepare( )y te 'ra(e Contractor for te ClientB)uil(ing user*s maintenance an( operation of te arious )uil(ing systems an(B or componentstereof.

    f> "rior to Contract /ar( su)mit to te /rcitect a replacement strategy in te eent of (amage an(Bor (efectie orks prior to "ractical Completion an( a similar replacement strategy post "racticalCompletion inclu(ing proce(ures to )e a(opte(+ meto( statements an( e=tent of (isruptionB(amage likely to occur to oter areas of te Works.

    g> Supplementary "ro(uct 7iteratureA Suc literature may inclu(e manufacturer*s catalogueinformation+ pro(uct specifications+ stan(ar( illustrations+ (iagrams an( stan(ar( (etails. 'esupplementary pro(uct literature sall (escri)e pysical caracteristics suc as si;e+ eigt+ finis+material analysis+ electrical re&uirements an( oter information suc as loa( ta)les+ test results+assessments an( in(ustry &uality stan(ar(s.

    > ,anufacturer*sB Supplier*s %ecommen(ationsA ,anufacturer*sB supplier*s recommen(ations sall )econtaine( itin a formal printe( (ocument in accor(ance it te /B C proce(ures. 6ralrecommen(ations receie( on site sall not )e acte( upon until formal (ocumentation as )eenreceie(.

    i> 'ecnical CalculationsA 'ese sall consist of tecnical engineering calculations ic (ocumenttecnical performance of arious systems+ system components an(B or materials+ as re&uire( )yte Design Draings an( Specifications.

     #> $uarantees an( arrantiesA "roi(e certifie( copies of all releant guarantees an( arrantiesaaila)le for installe( materials an( pro(ucts.

    k> "repare an( su)mit meto( statements an( risk assessments for reie.l> /ll ritten su)mittals proi(e( sall )e in te %ussian an( te 9nglis languages.

  • 8/17/2019 General Build w

    15/90

    00.4014 %eie of Su)mittalsa> 'e /rcitect sall reie su)mittals for general an( practical conformance it te re&uirements

    of te Design. Su)mittals ic meet tese re&uirements sall )e stampe( or marke( inaccor(ance it te proce(ure (escri)e( erein. Su)mittals ic are incomplete or erroneous+ oric are not re&uire(+ ill )e returne( an( a ne su)mittal ma(e as necessary. 'e /rcitect*sreie sall not )e e=austie an( sall not reliee te 'ra(e Contractor of te responsi)ility forany omission or (eficiencies or from te responsi)ility to coor(inate te ork it tat of oters

    @ic inclu(es te taking of releant Site (imensions as necessary>.)> Su)mittals ic proi(e supplementary information to su)stantiate te tecnical performance of

    )uil(ing systems+ components an( materials inclu(ing+ )ut not necessarily limite( to+supplementary pro(uct literature+ certifications+ statements of manufacturer*s reie an( preconstruction testing an( inspection reports+ ill )e stampe( *%ecor( Document* )y te 'ra(eContractor )efore su)mission.

    c> %esu)mittals sall )e ma(e un(er te proce(ure for initial su)mittalsE i(entifying canges ma(esince preious su)mittals.

    00;&000 $6R'3RMA7C6 R69:R6M67T! A7= =ATA

    00;&100 G676RA8

    00.5101 "erformance %e&uirementsa> 'e orks sall comply it te folloing performance criteria an( tat (etaile( in te "articular

    Work Sections. %efer also to te Structural 9ngineer*s (ocumentation an( Serices 9ngineer*s(ocumentation for specific performance re&uirements ere applica)le.

    )> 'e performance criteria inclu(e( in te Specification sets te minimum stan(ar(s it ic teDetaile( Design sall comply.

    c> ,inimum %e&uirementsA Were tere is in e=istence a releant ritis Stan(ar(+ S co(e ofpractice+ (raft S+ $erman DIG Stan(ar(+ IS6 Stan(ar(+ 9uropean Stan(ar( or ritis oar( of /grment Certificate applica)le to te (esign+ e=ecution or performance of te orks or any parttereof+ ten te recommen(ations an( re&uirements of suc (ocuments sall )e consi(ere( aminimum stan(ar( for te ork (escri)e( an( must )e complie( it. Soul( to stan(ar(sconflict+ (ra attention to tis an( state te option cosen+ at 'en(er stage.

    00;&200 =6!G7 A7= !6R@C6 8'6

    00.5201 Design 7ife of uil(ing'e (esign life of te )uil(ing sall )e as S IS6 15!!A "art 1+ 'a)le .1+ !0 years an( it S-543 maintenance leel 2.

    00.5202 Serice 7ife of Componentsa> 'e (esign life of te )uil(ing sall )e te perio( state( in 00.5201 a)oeE oeer+ it is recognise(

    tat arious elementsB components ae arying *serice life* @i.e. actual perio( of time (uring icno e=cessie e=pen(iture is re&uire( on operation+ maintenance or repair of a component orconstruction as recor(e( in use> for primary an( secon(ary components.

    )> "rimary components are all components it a pre(icte( serice life not less tan te (esign life of te element )eing specifie( itout te nee( for maintenance+ oter tan regular cleaning.

    c> Secon(ary componentsAi> Secon(ary components are all components tat may re&uire replacement (uring te (esign life of

    te )uil(ing+ assuming regular cleaning an( maintenance as )een carrie( out in accor(ance itinformation to )e proi(e( )y te 'ra(e Contractor an( is releant suppliers.

    ii> Secon(ary components sall )e capa)le of easy replacement itout compromising te structuralor eaterproof integrity of te element )eing specifie(.

    iii> Secon(ary components sall )e capa)le of replacement itout progressie (ismantling ofa(#acent elements.

    (> Confirm te pre(icte( serice life @i.e. te serice life pre(icte( from recor(e( performance oraccelerate( tests> an( maintenance re&uirements of te components of te )uil(ing as (efine( inS -543 an( S IS6 15!! for te reie )y te /rcitect an( proi(e (etaile( information at'en(er Stage.

    e> ,aterials sall )e use( solely for te purpose inten(e( )y te manufacturer an( ic satisfy tere&uirements of te Specification.

    f> "remature (eterioration sall not )e accepta)le.

    00;&00 !TR:CT:RA8

    00.5301 $eneral

  • 8/17/2019 General Build w

    16/90

    %efer to te Structural 9ngineer*s (ocumentation for particular re&uirements.

    00.5302 ,oements an( 'olerancesa> %efer to te "ro#ect Common 'olerance an( ,oement Document.)> 'e Detaile( Design+ fa)rication an( installation sall take into account all tolerances an(

    moements of te )uil(ing structure. ,oements inclu(e te application of (ea(+ lie an( in(loa(s plus moisture+ srinkage+ creep an( termal effects.

    c> 'e Detaile( Design sall take account of all structural moement an( tolerances+ in permanentan( temporary con(itions+ to aoi( stress+ (eformation an( material failure.

    (> 'e Detaile( Design sall take into account te am)ient temperature at te time of te respectieoperations of fa)rication+ assem)ly an( erection+ it appropriate alloances )eing ma(e for any(imensional canges resulting terefrom.

    e> 'orsional stresses sall )e accommo(ate( safely.f> 'e orks sall itstan( all moements of te )uil(ing structure un(er all (esign loa(s or

    com)ination of loa(s itout (amage or any re(uction in performance.g> /ll fi=ings sall )e capa)le of proi(ing a(e&uate a(#ustment to suit )uil(ing moement an( preent

    systemB installation failure.> ,oement #oints sall accommo(ate te ma=imum moement tat can )e (erie( from te

    specifie( an( (etermine( (esign loa(s an( moements. 'e orks sall resist all specifie( static an( (ynamic (esign loa(s likely to )e encountere( itout

    causing permanent (eformation of components or te failure of systems+ materials or seals an(sall transmit suc loa(s safely to te points of support.

     #> 'e orks sall not (eflect un(er loa(ing in any ay tat is (etrimental to any a(#acent tra(e.k> 'e orks sall accommo(ate te folloing moements itout any permanent (eformation or

    re(uction in te specifie( performanceAi> Deflection un(er (esign loa(s.ii> 'e effects of any in( or pressure loa(ings.iii> Canges in (imension an( sape of components arising from )uil(ing moements+inclu(ing settlement+ creep+ tisting an( racking.i> ,oement of any #oint eter (esigne( to permit moement or not.> 'ermal an( moisture relate( moements.

    00.5303 Dea( 7oa(sa> 'e orks sall )e capa)le of accommo(ating te folloing (ea( loa(s itout any re(uction in

    performanceAi> 'e component an( final assem)ly (ea( loa( ic sall )e accommo(ate( locallyitout causing (eflections or moements ic a(ersely affect any component.ii> 'e (ea( loa(s (erie( from any permanent fi=tures or serices attace( to te surfaces of te

    orks.)> Wen calculating loa(s te orst com)ination sall )e consi(ere(.

    00.5304 Impose( 7oa(sa> 'e orks sall )e capa)le of accommo(ating te folloing impose( loa(s itout any re(uction in

    performanceAi> /ll loa(s resulting from moements of te )uil(ing structure an( support structure.ii> Impact loa(s+ or transferre( impact loa(s+ tat occur (uring te serice life of teorks+ itout (eterioration in performance an( itout sustaining nonrepaira)le (amage.iii> 7oa(s impose( (uring replacement of system components an( components of interfacing systems.)> Wen calculating loa(s te orst com)ination sall )e consi(ere(.

    00.5305 Deflectionsa> 'e orks en carrying full (esign loa(s sall not e=cee( te (eflection limits specifie( itin te

    releant Work Section.)> 'e orks sall not (eflect un(er loa(ing in any ay tat is (etrimental to te appearance or

    performance of te orks. Deflections sall not )e (etrimental to te appearance or performance of any a(#acent material+ system or pro(uct.

    c> /ll components+ couplings an( fi=ings sall )e capa)le of accommo(ating (eflections itoutpermanent (istortion+ (eformation or failure.

    (> 'e orks sall accommo(ate (ifferential structural moements arising from any loa(s impose( )ya(#acent structures.

    e> 'e magnitu(e of te alloa)le (eflections sall )e re(uce( if tey are (etrimental to any part ofte orks+ its support structure or finises.

    00.530! Win( 7oa(sa> %efer to te Structural 9ngineer*s (ocumentation.

  • 8/17/2019 General Build w

    17/90

    )> 'e orks sall itstan( itout permanent (eformation+ te effects of in( loa(s ereappropriate @e.g. e=ternal con(itions or internal areas su)#ect to e=ternal in( pressure>.

    c> Design Win( "ressuresAi> "recise in( loa( alues sall )e (etermine( in accor(ance it te geograpical location of te

    Site+ te topograpical con(itions an( te type of )uil(ing in accor(ance it S 9G 11A "art 14.ii> "recise in( loa( alues sall )e (etermine( in accor(ance it te principles of S 9G 11A "art

    14 it reference to geograpical location of te Site+ te topograpical con(itions+ te type of

    )uil(ing an( oter factors as applica)le.iii> Wen assessing te in( pressure alloances+ account sall )e taken of te sape of te )uil(ing

    an( its location in relation to te layout of any a(#acent structures.i> "articular attention is to )e pai( to areas su)#ect to increase( pressures+ i.e. eaes+ canopies an(

    e=ternal corners. Special care sall also )e taken to i(entify an( (esign for any situation not clearly(efine( in S 9G 11A "art 14 ere it is )eliee( tat te geometry of te )uil(ing sall causeincrease( pressure (ue to

    orte= or e((y con(itions. ,a=imum gust in( pressure sall )e calculate( in accor(ance it S 9G11A "art 14.

    > Wen calculating loa(s it sall )e ensure( tat te orst com)ination of loa( cases ae )eenconsi(ere( an( in particular+ tat te goerning in( pressure coefficients may )e (etermine( )ymore tan one in( regime.

    00.530- Seismic Con(itions

    %efer to te $eomorpology an( Seismic /ssessment %eport.

    00.530 8i)ration9nsure tat te orks itstan( all i)ration cause( )y traffic+ aircraft+ e&uipment effects or any oter

    socks+ slamming+ strains+ stresses an( moement impose(+ tus aoi(ing (eterioration or fractureof any element+ )ot (uring construction an( after installation.

    00; 67@R37M67TA8 C37=T37!

    00.5401 $enerala> %efer to te Serices 9ngineer*s (ocumentation for particular re&uirements.)> 9nsure tat te orks conform to all aspects of te Specification+ taking into account all local

    enironmental con(itions preailing at Site.c> %efer to te Work Sections for specific performance (at00.

    (> 6)tain any a((itional meteorological an( climate (ata consi(ere( necessary in or(er to fulfilcontractual o)ligations.

    e> /llo for te fact tat te orks ill )e erecte( in all e=tremes of eater con(itions trougout teyear an( tat te )uil(ing may not )e climatically controlle( (uring construction. Damage tomaterials as a result of Site con(itions sall )e te 'ra(e Contractor*s responsi)ility.

    f> /ll orks sall )e fully capa)le of resisting te preailing atmosperic con(itions.g> /ll material gra(es+ manufacturing meto(s an( stan(ar(s sall )e selecte( to suit te internal an(

    e=ternal enironmental con(itions as set out )elo @to meet te releant ritis Stan(ar(s an( alloter releant stan(ar(s> an( as containe( in te releant parts of te Serices 9ngineer*s(ocumentation.

    00.5402 Climatic Dataa) External Climate: Summer:i) 32°C temperature.

    ii) 30% relative humidity.b) External Climate: Winter:i) – 1!"°C temperature.#i) 0% relative humidity.$) #nternal Cnditin& 'dependin( n rmarea):

  • 8/17/2019 General Build w

    18/90

    00.5403 Solar "erformance9=posure to sunligt (uring te serice life of te orks sall not re(uce te performance+ orprematurely re(uce te isual appearance+ of any elementB component.

    00.5404 7ocal Factorsa> 8isit te Site in or(er to )ecome familiar it local re&uirements. 7ocal microclimatic con(itions

    sall )e taken into account an( gra(es of materials assesse( as suita)ly (ura)le for te locationsall )e selecte(.

    )> /n assessment of microclimatic con(itions sall )e ma(e it (ue alloance for any factors likelyto ae an a(erse effect on materials inten(e( for te orks. ,ore appropriate materials sall )e

    su)stitute( if a(erse effects are pre(icte(.

    00;&&00 67@R37M67TA8 R69:R6M67T!

    00.5501 $eneral%efer to clause series 00.-300 for sustaina)ilityB enironmental re&uirements.

    00;&)00 !6C:RT

    00.5!01 $eneralWere re&uire( )y te Contract te orks sall comply it te recommen(ations of te *Secure()y Design* initiatie as pro(uce( )y te /ssociation of Cief "olice 6fficers.

    00;&+00 'R6 A7= !M36

    00.5-01 $eneral %e&uirementsa> %efer to te Fire Strategy %eport.)> Were te Statutory /utorities an(B or 7ocalB Gational Fire %egulations re&uire a specific fire

    resistance to elements of structure ic form a #unction it a(#acent components+ ensure tat te #unction is fire stoppe( to te same (egree as te elements.

    c> Supply test certificates to (emonstrate tat all materials meet te a)oe re&uirements.(> 'e orks sall comply it all Statutory /utorities* an( Fire Serices* re&uests+

    recommen(ations or con(itions.

    00;&00 C3RR3!37 $R3T6CT37

    00.501 $eneral

    a> 9nsure tat protectie measures are taken to aoi( any corrosion or any (eleterious effects cause()y manufacturing+ finising+ transportation+ storage an( installation of materials.

  • 8/17/2019 General Build w

    19/90

    )> 9nsure full resistance to any corrosion for components tat are secure( or )olte( to eac oter+paying particular attention to te surface (amage cause( )y suc )olting or securing.

    c> 9nsure full resistance in repair of corrosion protection to cope it te Site cutting of components+especially at )oun(ary an( e=ternal con(itions.

    (> 'e minimum re&uirements for te corrosion protection system for secon(ary structural steelorksall conform to S 543+ S 9G IS6 1244A "arts 1 an( S 9G IS6 14-13 as appropriate. Forprimary structural steelork refer to te Structural 9ngineer*s (ocumentation.

    e> 'e enironmental category un(er S 9G IS6 1244A "art 2 sall )eAi> 9=ternal corrosionA Category C1B C2B C3B C4B C5IB C5,.ii> Internal corrosionA Category C1B C2B C3B C4B C5IB C5,.f> /llo for protection against all corrosion arising from e=posure to seaater+ nonsaline ater+ soil+

    ig umi(ity+ lo or ig temperatures+ cemical aci(s an( alkalis+ a)rasion an( impact+ fungi an()acteria.

    00.502 $alanising Corrosion "rotection'e interal to first maintenance sall )e no less tan *8ery ig @8:> @e&ual to or greater tan 20years>* as (efine( in S 9G IS6 14-13A "art 1. %efer also to te re&uirements for (esign an(serice life.

    00.503 9lectrolytic "rotection /t all locations ere (ifferent metals are assem)le( togeter+ ensure tat electrolytic corrosion(oes not occur an( tat te necessary protection is proi(e( ere nee(e(+ in )ot temporary an(

    permanent con(itions.

    00;&/00 6ART> B37=7G A7= 8G>T77G $R3T6CT37

    00.501 $enerala> 9lectrical continuity sall )e aciee( )eteen con(uctie parts suc tat te orks sall )eelectrically continuous as re&uire( )y S -!-1.

    c> /ll e=traneous con(uctie parts of te orks sall )e effectiely )on(e( to eart. /n e=traneouscon(uctie part is (efine( as )eing tat part ic is lia)le to transmit a potential+ inclu(ing eartpotential+ an( not forming part of te electrical installation. 9ac component sall constitute an

    e=traneous con(uctie part.(> 9&uipotential )on(ing sall )e proi(e( to ensure tat te arious e=pose( con(uctie parts an(

    e=traneous con(uctie parts as (efine( )y S -!-1 sall )e at a su)stantially e&ual potential.e> 9arting connections sall )e in accor(ance it te Serices 9ngineer*s (ocumentation an(B or

    comply it S 9G !2305A "arts 14 an( S -430.

    00;)000 9:A8T C37TR38

    00;)100 G676RA8 9:A8T A!!:RA7C6< 9:A8T C37TR38< T6!T7G

    9uality Assurance< 9uality Control

    00.!101 $eneral

    a> 9sta)lis+ (ocument an( maintain a &uality assurance an( &uality control system capa)le oferifying to te satisfaction of te /rcitect tat all materials an( orkmansip+ ateer teirsources+ conform to te re&uirements of te Specification. Soul( te 'ra(e Contractor or any ofis su)contractors )e certifie( to te S 9G IS6 000 family of stan(ar(s ten tese orks sall)e monitore( accor(ingly.

    )> 'e &uality programme sall )e (efine( in a &uality control manual or similar (ocument in icte organisation systems+ inspection an( test plan proce(ures are fully (escri)e( to ensure tat allessential inspection re&uirements are (etermine( an( satisfie( trougout all pases of te orks.

    c> 9sta)lis a tolerance &uality control manual to coer all aspects of tolerance compliance relating tote orks. / &uality control proposal sall )e prepare( for su)mission to te /rcitect foracceptance. 'is sall (escri)e+ in (etail+ te arious types of &uality control cecks tat sall )ecarrie( out (uring eac stage of te orksE at means an( meto(s sall )e use(E icpersonnel sall )e employe(+ togeter it teir &ualifications+ an( o eac type of tolerancececk sall )e recor(e( an( kept for future reference.

    (> 'e 'ra(e Contractor*s proposals for te &uality control manual sall meet te re&uirements of tissection as a minimum an( )e su)mitte( to te /rcitect. "roi(e facilities in te eent tat te

  • 8/17/2019 General Build w

    20/90

     /rcitect ises to e=amine tese proposals at te orks. Inclu(e (etails of any formal approalsel( for te 'ra(e Contractor*s or any

    su)contractor*s &uality system or any ealuations or assessments carrie( out )y in(epen(ent tir(parties.

    e> Witin 30 (ays of te ritten or(er to commence te orks+ su)mit a compreensie &uality controlmanual to te /rcitect for reie+ amen(ment ere appropriate an( acceptance.

    f> Inclu(e it te &uality control manual an inspection an( test plan for eac ma#or item of ork or

    type of fa)rication ic sall (etail+ in se&uential or(erAi> 'e principal actiities to )e carrie( out.ii> 'e type+ meto( an( fre&uency of inspections an( tests to )e carrie( out.iii> 'e inspecting autority.i> 'e acceptance criteri00.> 'e recor(s to )e kept.g> 'e inspection an( test plan sall contain sufficient space for te /rcitect to in(icate on it te

    actiities e ises to inspect as eiter ol( or itness points.> / ol( point is (efine( as a point on te inspection an( test plan )eyon( ic te process may

    not continue until it as )een accepte( )y te /rcitect.i> / itness point is (efine( as a point on te inspection an( test plan ere te 'ra(e Contractor

    sall gie reasona)le notice tat a particular part of te process as )een reace( altoug teprocess may continue itout acceptance )eing notifie( )y te /rcitect.

     #> 'e inspection an( test plan sall proi(e te )asis of inspection for te item of ork an( sall )e

    accepte( prior to commencement of te ork.k> /t all times (uring te Contract perio(+ make aaila)le at te orks all necessary resources an(

    facilities an( implement any reies an( amen(ments of te &uality control manual (eeme(necessary or (esira)le )y te /rcitect.

    l> /s a minimum te &uality control manual sall inclu(e information an( proce(ures as (efine( )eloAi> 6rganisation an( ,anagement.ii> Facilities+ ,easuring an( 'est 9&uipment.iii> "ersonnel 'raining an( Certification.i> Documentation.> %eceipts+ Storage+ :an(ling an( 'ransportation.i> ,aterials.ii> Wel(ing.iii> Fa)rication an( 9rection.i=> 'olerance Control.=> "rototypes.=i> "ainting an( Coating.=ii> Inspection an( 'esting of ,aterials an( Workmansip.=iii> Gonconforming Items.=i> Detaile( Design.=> Control of "urcase( ,aterials an( Serices.=i> Complete( Item+ Inspection an( 'est %esults.=ii> %ecor(s.=iii> %eie of te uality System.

    00.!102 ,eans of /u(itinga> 'e /rcitect sall reie te 'ra(e Contractor*s proposals an( carry out suc tasks as are

    necessary to ensure tatAi> 'e 'ra(e Contractor*s meto(s of orking are likely to pro(uce accepta)le ork.ii> Finise( items an( assem)lies conform to te Specification.

    )> Gominate a senior mem)er of te tecnical organisation as uality ,anager o sall )ein(epen(ent of te oter functions an( )e el( responsi)le for all matters relating to te pro(uctionan( implementation of te &uality control manual.

    c> /t any stage (uring te Contract perio(+ inclu(ing tose times prior to fa)rication+ make all facilitiesaaila)le to te /rcitect suc tat &uality au(its+ accor(ing to te S 9G IS6 000 family ofstan(ar(s or any oter esta)lise( system+ may )e carrie( out.

    (> Jeep an( maintain+ at an agree( location+ a copy of all releant ceck certificates for inspection )yte /rcitect upon re&uest.

    e> If te /rcitect (etects any (eficiencies+ eiter in te ork or te 'ra(e Contractor*s /BC system+tese matters sall )e reporte( to te 'ra(e Contractor. /ll items affecte( )y sai( (eficiencies sall)e consi(ere( as )eing of suspect &uality an( sall )e pysically &uarantine( in a separate ol(ingare00. Go ork may )e carrie( out on tese items until te /rcitect instructs to eiter reork orrepair te affecte( item+ or (emonstrates tat it

    is not compliant it te Specification an( terefore re#ecte(.

    00.!103 uality Control ,eto(s

  • 8/17/2019 General Build w

    21/90

    a> 'e appointment of any su)contractors+ or te carrying out of any ork at any place oter tan te'ra(e Contractor*s nominate( principal orkplace+ sall only occur it te acceptance of te /rcitect. 'e ork sall )e carrie( out only un(er e&uialent con(itions of /B C to tose at tenominate( principal orkplace. Demonstrate to te satisfaction of te /rcitect te meto(s use( toselect+ control+ inspect an( erify tat te ork carrie( out conforms to te re&uirements of teSpecification.

    )> ,ake aaila)le to te /rcitect copies of eac purcase or(er for any item or serice ise( to )e

    inclu(e( itin te orks if re&ueste(. 9ac purcase or(er sall fully (etail te item or serice interms of &uality+ gra(e+ type+ appropriate ritis or oter Stan(ar( applica)le+ inspection+ test an((ocumentation re&uirements.

    c> 'e organisation an( management of te 'ra(e Contractor*s /B C programme sall )econfirme( to )e compreensie an( effectie for te proision of ork to te Specificationre&uirements. /ll suc (etails sall )e fully (escri)e( in a (ocument+ referre( to as te &ualitycontrol manual+ ic sall )e accepte( for use )y te

     /rcitect.(> /ll facilities+ measuring an( test e&uipment sall )e recali)rate( an( cecke( against stan(ar(s at

    ateer fre&uency is (etermine( appropriate )y te e&uipment manufacturer. Were suc itemsare not consi(ere( )y te /rcitect to gie sufficiently accurate rea(ings or results+ or are not a)leto pro(uce consistent results+ tey sall not )e use( on tis Contract.

    e> "ersonnel training an( certification sall )e su)#ect to te acceptance of te /rcitect.f> Documentation of materials an( processes sall only )e consi(ere( a(e&uate en+ aing )een

    cecke( )y te /rcitect+ tey are (eeme( )y te /rcitect to erify tat te Specificationre&uirements are+ in all respects+ satisfie(.

    g> %eceipt an( storage of incoming materials sall )e suita)ly controlle( suc tat+ in te opinion ofte /rcitect+ it can )e rea(ily confirme( tat te correct materials ae )een employe( at tecorrect locations in te ork as (escri)e( in te Specification.

    > 'e 'ra(e Contractor sall )e a)le to confirm+ upon re&uest )y te /rcitect+ tat all materials use(comply it te Specification re&uirements.

    i> "rogress potograps sall )e proi(e( on a montly )asis. #> /ll fa)rication operations sall use processes+ consuma)les an( testing proce(ures+ confirme( )y

    suita)le tests+ tat ena)le te /rcitect to confirm tat te connections place( (uring fa)rication+an( if appropriate (uring erection+ ae mecanical properties an( free(om from unaccepta)le(efects sufficient to ensure tat te Specification re&uirements are satisfie(.

    k> Fa)rication an( erection ork sall )e monitore( )y te 'ra(e Contractor to ensure tat pieces areassem)le( correctly an( en complete are compliant it te correct (raings an( teSpecification re&uirements.

    l> ,ake aaila)le to te /rcitect a (etaile( programme of ork so tat e may itness significantstages in te fa)rication process.

    m> "ainting an( coatings materials an( processes cecks sall )e as state( a)oe an( sall )emonitore( )y te /rcitect at suc interals necessary to confirm tat te fa)ricator is carrying outtis ork properly an( to te re&uire( leels of &uality.

    00.!104 Summarya> /ll items referre( to a)oe sall primarily )e controlle( an( implemente( )y te 'ra(e Contractor

    accor(ing to is on (eise( meto(s an( proce(ures.)> 'e 'ra(e Contractor sall un(ertake ateer steps are necessary to confirm to te /rcitect tat

    te 'ra(e Contractor is (iscarging is responsi)ilities in tis respect.c> 6n (ispatc of eac finise( item from te point of manufacture+ confirm in riting tat sai( items+

    as far as is knon+ ae )een fa)ricate( accor(ing to te re&uirements of te &uality controlmanual an( satisfy te Specification.

    Testing

    00.!105 'esting an( Inspectiona> Were re&uire(+ engage an accre(ite( in(epen(ent testing specialist+ as agree( it te /rcitect+

    to erify tat te re&uirements of te Contract ae )een satisfie(.)> /llo for testing on samples an( materials incorporate( in te orks as necessary.c> /cceptance sall only )e gien to materials tat comply it te stan(ar(s set out in te

    Specification. Inform te /rcitect of test results for materials not complying. 'e official certificationof test results sall )e gien after acceptance an( )efore manufacture of te materials.

    (> /pproac to testingAi> 6ffSite testingAH 'e 'ra(e Contractor may proi(e (ata from preious in(epen(ently certifie( tests an( /grment

    certificates to (emonstrate tat te propose( systems

    meet te performance re&uirements of te Specification. 'e information sall )e to te entiresatisfaction of te /rcitect. Were applica)le+ tests sall inclu(e static an( (ynamic results.

  • 8/17/2019 General Build w

    22/90

    H /ll tests sall comply it te rules an( stan(ar(s lai( (on )y te appropriate testing autorities+unless it can )e (emonstrate( tat te final (esign solution as )een preiously teste( an( certifie(to te acceptance of te /rcitect. In any eent+ te performance of te installe( orks sall remainte 'ra(e Contractor*s responsi)ility.

    H If suita)le (ata to (emonstrate compliance it te performance re&uirements is not aaila)le+proi(e prototypes of eac type an( ae tem in(epen(ently teste( in accor(ance it te testingcriteria in(icate( in te Specification.

    ii> 6nSite testingA 'e 'ra(e Contractor sall inclu(e for all onSite testing specifie( erein.e> Inclu(e an( supply (etaile( proposals of tests tat (emonstrate compliance it te re&uirements

    of te Specification an( te Design Draings.f> 'e folloing minimum proisions sall )e ma(e aaila)le to te /rcitect at all timesAi> Suita)ly &ualifie( personnel using appropriate ali(ate( e&uipment.ii> /ll necessary access an( facilities for inspection an( testing in fa)rication sops an( on Site.iii> %egularly cali)rate( e&uipment for te purposes of loa( measuring.g> ,aintain te folloingAi> 'ests an( inspection results (uring all stages of manufacture+ assem)ly an( installation of

    components.ii> Certificates relating to te materials use( in te ork+ as confirmation of tests carrie( out in

    accor(ance it te releant stan(ar(s an( co(es.iii> %ecor(s of all inspections an( tests performe( to su)stantiate conformity it te Specification+

    inclu(ing tose carrie( out )y su)contractors an( su)suppliers.

    > Soul( any test reeal (efectie material an(B or orkmansip+ imme(iately carry out any reme(ialork an(B or retesting+ inclu(ing tat of a special nature+ un(er instruction from te /rcitect.

    i> In(icate on te Contract "rogramme te e=act timing of all testing+ proce(ural trials an( trialassem)lies+ in or(er to allo te /rcitect te opportunity of atten(ing.

     #> If te /rcitect is of te opinion tat te orks (o not conform to te re&uirements of tis (ocument+or to te (etails in(icate( on te Working Draings+ ten te /rcitect sall gie instructions forspecial tests to )e carrie( out to esta)lis te case.

    00.!10! /irtigtness Fan 'esta> 'e e=ternal )uil(ing fa)ric sall )e teste( for airtigtness on completion of te ole uil(ing

    sell+ )y an accepte( in(epen(ent testing autority appointe( )y te 'ra(e Contractor.)> %esponsi)ility for te temporary sealing+ carrying out te airtigtness testing an( smoke tests along

    it preparation of %eports ill )e te full responsi)ility of an accepte( in(epen(ent testingautority. :oeer+ te 'ra(e Contractor may carry out te temporary sealing un(er tein(epen(ent testing autority*s superision.

    c> 'est sall )e carrie( out to meet te re&uirements of te /pproe( Document to "art 7 of teuil(ing %egulations+ CIS9 ',23 'esting of )uil(ings for air leakage an( S 9G 132+ toensure te re&uirements of te Specification are aciee(.

    (> 'e test ill re&uire temporary sealing of all openings.e> /ir pressure ill )e proi(e( )y ay of fans+ of knon capacity+ positione( e=ternally to pump air

    into te *con(itione( spaces*. 7ocations sall )e as recommen(e( )y te in(epen(ent testingautority an( as agree( it te /rcitect.

    f> In te eent of failure or te re&uirements of te Specification not )eing met (uring te test+ a(iagnostic test sall )e carrie( out to (etermine te leakage pat@s>. Carry out te retests itinone eek @or as agree(> of te airleakage test.

    g> 6nce te leakage pats ae )een rectifie( or seale(+ te pressurisation test an(+ if e&uire(+furter smoke tests or as agree(+ ill )e repeate( until te re&uire( air leakage rate is aciee(.'e 'ra(e Contractor sall )e responsi)le for te making goo( or sealing of all leaks to te )uil(ingenelope.

    > /ll e=ternal enelope elements of te )uil(ing sall )e assesse( for leakage+ inclu(ing roofingsystem @e.g. roof seeting>+ alling system @e.g. curtain alling+ all panels+ )lockork an( sericepenetrations an( apour )arriers>+ etc. as re&uire(.

    i> 'e final air leakage test sall )e carrie( out prior to "ractical Completion.

    00.!10- %esults an( Certificatesa> 'ests an( inspection results sall )e su)mitte( imme(iately tey are aaila)le.)> Su)mit certificates relating to te materials use( in te ork as confirmation of tests carrie( out in

    accor(ance it te releant ritis Stan(ar(s+ an(B or oter national stan(ar(s as appropriate.c> ,aintain+ until te en( of te (efects lia)ility perio(+ recor(s of all inspections an( tests performe(+

    material certification+ inspection an( test plans+ (raings+ an( any oter (ocumentation tosu)stantiate conformity it te Specification+ inclu(ing tose carrie( out )y su)contractors.

    (> 'e recor(s sall )e store( in suc a ay tat tey are i(entifia)le to te component to ic teyrefer an( are retriea)le.

    e> 'e recor(s sall )e aaila)le for inspection )y te /rcitect an( copies of recor(s sall )e gien tote /rcitect upon re&uest. /t te en( of te (efects lia)ility perio( tey sall )e su)mitte( to te /rcitect.

  • 8/17/2019 General Build w

    23/90

    00;)200 !TAT:T3R R6G:8AT37!

    00.!201 Stan(ar(sa> ritis Stan(ar(s sall )e te goerning stan(ar(s for te orks.)> 6nly ere e=pressly state( in te Specification sall oter stan(ar(s )e applica)le to te orks.

    c> /ll reference to ritis an( oter stan(ar(s+ regulations an( re&uirements of statutory )o(ies sallmean te latest pu)lise( e(itions+ an( Gational /nne=es to tose stan(ar(s+ at te time ofContract aar(. Were suc stan(ar(s+ regulations an( re&uirements are amen(e( after Contractaar( an( affect te 'ra(e Contractor*s responsi)ilities (uring te course of te orks+ imme(iatelyinform te /rcitect in riting.

    (> If una)le to comply it te goerning stan(ar(s or regulations an( proposing to su)stitute oterstan(ar(s+ inform te /rcitect itin te summary of (eiations from te Specification. "roi(efully (etaile( reasons for )eing una)le to comply+ togeter it any (esign an(B or tecnicalimplications. Failure to proi(e suc notification prior to Contract aar( sall )e (eeme( to )eacceptance of te goerning stan(ar(s or regulations an( later notification sall )e a nullity.

    00.!202 uil(ing Co(es an( %egulationsa> /ll materials+ components+ e&uipment an( orkmansip sall comply it all 7ocal /utority Co(es

    an( uil(ing %egulations+ ritis Stan(ar(s+ an( any oter regulations applica)le to te orks+togeter it all releant Statutory %ules+ %egulations+ ye7as an( oter enforcea)le

    instruments in )ot te (esign an( e=ecution of te installation.)> Wen re&uire( )y te Statutory /utorities+ su)mit to tem any component part of te orks for

    appraisal+ testing+ stamping or certifying.)> /fter suc component part as )een satisfactorily approe(+ teste(+ stampe( or certifie(+ return te

    marke( component or (ocumentary ei(ence of its approal+ as appropriate+ to Site for referencepurposes.

    c> If te Statutory /utority re#ects components+ replace te component part@s> it tose tat areaccepta)le.

    (> 6)tain any approals re&uire( from te Statutory /utorities.

    00.!204 Design %egulations9nsure tat te Working Draings comply it all Statutory %egulations+ re&uirements an( releant

    co(es an( tat tey receie te necessary approal in goo( time to ensure tat tere is noprogramme (elay cause( )y aaiting suc approals.

    00;)00 !A'6T% $R3T6CT37

    !afety

    00.!301 :ealt an( Safety %egulationsa> Comply it te latest :ealt an( Safety %egulations+ ensuring tat full consi(eration is gien to

    te ealt an( safety of operaties en completing te Detaile( Design+ manufacturing+ installingor operating an( maintaining te orks.

    )> 'e Working Draings sall only incorporate meto(s of manufacture+ installation+ maintenance

    an( use tat are safe an( comply it all :ealt an( Safety regulatory re&uirements.

    $rotection

    00.!302 Damage /nticipation6ter tan (amage troug terrorist attack or similar actiity+ anticipate te possi)le sources of(amage to te orks an( take actie an( positie protectie measures to maintain tem in pristinecon(ition until full "ractical Completion. 'e acceptance of responsi)ility for making goo( in teeent of (amage sall not )e consi(ere( a(e&uate.

    00.!303 "rotectie Deices"roi(e necessary protectie (eices to protect all goo(s an( materials incorporate( into te orks+at all stages troug to "ractical Completion+ against (amage arising from )ut not limite( toeater con(itions+ construction+ oter contractors+ arping+ (istortion+ a)rasion an( oter

    con(itions ic coul( ae an a(erse effect on any goo(s an(B or materials use( in te orks.

    00.!304 "rotectie ,easures

  • 8/17/2019 General Build w

    24/90

    "roi(e full (etails of te protectie measures propose( for implementation at eac of te folloingstagesA

    a> ,anufacture an( packaging of goo(s an( materials at offSite locations.)> Sipment to Site an( unloa(ing.c> Storage on Site an( moement to point of installation or construction.(> InstallationB construction.e> Completion to an(oer.

    00.!305 "acking an( Cratinga> Were components are (eliere( to te Site in packages or crates+ ten eac package or rate sall

    )e la)elle( on te outsi(e giing te reference an( &uantity of te contents so tat (elieries can )eaccepte( at te Site itout te necessity of )reaking open any package.

    )> Carefully remoe all protection from te orks )efore "ractical Completion an( leae te orksclean an( rea(y for imme(iate use.

    00.!30! "rotection of $la;e( 9lementsa> /ll elements of frameork an( associate( components sall )e store( on Site suc tat tey sall

    not )e (amage(+ (istorte( or eatere( uneenly.)> Finise( components sall )e carefully packe( in stillages or crates suc tat tey are suita)ly

    separate( an( protecte( to preent scratcing+ scuffing or oter surface (amage.c> ,aterials sall )e store( on Site in accor(ance it te manufacturer*s ritten recommen(ations.

    00.!30- "est Infestationsa> 'e Detaile( Design+ manufacture an( installation of te orks sall protect against an( not

    contain or proi(e ar)ourage for infestation )y pests.)> Carry out te recommen(ations an( take account of Digest 415 pro(uce( )y te uil(ing %esearc

    9sta)lisment.

    00;)#00 MA7T67A7C6< TRA77G A7= R6$8AC6M67T MAT6RA8!

    00.!401 $enerala> %eplacea)le materialsB components sall )e ma=imise(.)> ,aterials sall )e capa)le of simple maintenanceB repair an( integration it oter maintenance

    systems.

    00.!402 ,aintenance ,anuala> 6ne mont )efore programme( completion of te orksB "ractical Completion prepare an( su)mit+

    to te satisfaction of te /rcitect+ si= copies of a ,aintenance ,anual re&uire( to maintain teorks.

    )> ContentAi> 'e ,aintenance ,anual sall incorporate all maintenance systems an( gie (etails of te safe

    operation an( re&uire( maintenance of all items+ components an( systems comprising te orks.ii> 'is information sall )e supplie( for te /rcitect*s reie in te folloing formatAH Specially ritten information sall )e on /4 si;e pages it type( te=t using (ou)le spacing an( in a

    format agree( prior to su)mission.H Dran information generally sall )e on /1 si;e seets.H Stan(ar( pu)lise( information sall )e carefully selecte( an( e(ite( to inclu(e only tose items

    installe(. Were e(iting is not appropriate+ te releant items sall )e type( out an( inclu(e(.c> Component InformationA 'e folloing information sall )e supplie( for eery item+ component an(B

    or systemAi> Certifie( manufacturing certificate.ii> Full (escription giing any special features. / full )reak(on of te parts an( te catalogue num)er 

    of te constituent parts.iii> 'e guarantee perio( of any element or material ere in e=cess of te arranty re&uire( )y te

    Contract Documents.(> ,aintenance "roce(uresA 'e ,aintenance ,anual sall inclu(e fully compreensie (etails in

    respect ofAi> Safe cleaning proce(ures for all elements of te orks.ii> Safe replacement proce(ures.iii> %egular cyclical maintenance proce(ures @aoi(ing (amage>.i> Safe repair proce(ures in te eent of (amage.> Wasing meto(s+ inclu(ing te fre&uency an( meto( of asing re&uire( to maintain

    performance an( appearance. Details sall )e proi(e( in respect of te ma=imum time (uringic performance of components can )e maintaine(+ togeter it te fre&uency an( meto( of

    asing re&uire( to aciee tis.

  • 8/17/2019 General Build w

    25/90

    00.!403 'raining of 'rougout te training perio( remain responsi)le for te operation an( maintenance of te orks.

    (> Were suc training cannot )e carrie( out prior to "ractical Completion of te orks (ue to tenature of te e&uipment+ return to Site at a later mutually agree( (ate to complete te trainingperio(.

    00.!404 %eplacement ,aterialsa> Were re&uire( )y te Contract+ proi(e replacement materials upon completion of te orks.)> /ll replacement materials sall )e of i(entical &uality to tose installe( in te orks.c> In a((ition+ supply a list of recommen(e( replacement materials+ togeter it unit prices for

    specialist elements of te orks. @GoteA 'is sall not form part of te 'en(er price )ut sall formte )asis for costing of materials as re&uire( )y te user>.

    (> /ll replacement materials proi(e( as part of te orks sall )e an(e( oer in crates+ )o=es orca)inets+ eac in(ii(ually marke( it te or(s %eplacement "arts for . . an( te componentor e&uipment name an( reference num)er stencille( on. Suc materials sall )e i(entifie( itinte Contract Documents.

    00.!405 "ro#ect Completion %ecor(sa> "roi(e necessary ,aintenance ,anual information for inclusion in te :ealt an( Safety File.)> In a((ition+ agree it te /rcitect suita)le crossreferencing in te ,aintenance ,anual so tat it

    is fully coor(inate( it te :ealt an( Safety File an( oter contractors* 6K, manuals.

    00;)&00 G676RA8 MAT6RA8! A7= W3RMA7!>$ R69:R6M67T!

    Materials

    00.!501 Stan(ar( of ,aterials an( ualitya> ,aterials sall )e ne+ unless oterise specifie(+ carefully selecte( an( of te )est mercanta)le

    &uality.)> /ll materials sall )e to te acceptance of te /rcitect.

    c> ,aterialsB components sall not )e store( or use( )eyon( te manufacturer*s e=piry (ate.(> "roprietary systemsB components sall generally )e ritis oar( of /grment @/> certifie( or

    certifie( )y an e&uialent internationally recognise( )o(y accepta)le to te /rcitect. WeresystemsB components (o not ae suc certification+ or ere te certification (oes not clearly(emonstrate compliance it te re&uirements of te pecification+ suita)le testing sall )e carrie(out.

    e> ,aterialsB pro(ucts sall comply it te 9uropean .

    f> Insulation materials generally sall comply it all te recommen(ations of te 7"C Design $ui(efor te Fire "rotection of uil(ings.

    g> /ll foame( insulation use( in te orks sall )e manufacture( using :FC CFC an( :CFCfreeprocesses+ i.e. ;ero 6D" an( a glo)al arming potential of less tan 5.

    > Foam core san(ic panels sall not )e use( in te orks unless te 'ra(e Contractor compliesit all te recommen(ations ofA

    i> 'e 7"C Design $ui(e for te Fire "rotection of uil(ings 2000 from te (ate of its first pu)licationin Decem)er 1 or any su)se&uent gui(ance ic superse(es tis e(ition+ orii> Factory ,utual @F,> /pproal stan(ar(s+ or iii> In(epen(ent fire consultants /rup Fire or Warrington Fire.i> S 4-!A "arts ! an( -.i> Insulation materials sall )e eiter noncom)usti)le or not easily ignita)le @to a minimum of

    9uroclass /2 an( oter applica)le international stan(ar(s>+ an( sall not pro(uce measura)le&uantities of smoke or to=ic gases.

    00.!502 :ealt :a;ar(s /ll propose( materials sall not in any ay )e a potential ealt a;ar(. ,aintain a full+ upto(ate

    knole(ge of all current pu)lise( researc an( legislation in tis respect. 'e 'ra(e Contractorsall also accept te e=clusions containe( in te Contract (ocuments.

    Workmansi(

    00.!503 Skille( "ersonnel

  • 8/17/2019 General Build w

    26/90

    9=ecute te ork using persons skille( in te processes to )e a(opte(. Were re&ueste(+ proi(esuc (ocumentation necessary to (emonstrate an in(ii(ual*s a)ility to carry out te ork to ice as )een assigne(.

    00.!504 Suita)ility of Structureefore commencing any part or element of te orks+ surey te structure+ cecking line+ leel an(fi=ing points an( report imme(iately to te /rcitect if te structure is consi(ere( to )e unsuita)le. If 

    te structure is unsuita)le+ propose reme(ial action.

    00.!505 Setting 6uta> 9sta)lis a pysical ase %eference Datum on Site from ic all primary plan positione( gri(s

    an( principal leels are su)se&uently set out. 'is ase %eference Datum point sall )estrategically place( suc tat it can )e referre( to as necessary for te (uration of te orks. It sall)e pysically ro)ust an( locate( in groun( tat is not prone to moement or i)ration (uring teorks so tat it is spatially fi=e( for te (uration of te orks. 'e ase %eference Datum sall )elocate( to itin L2mm accuracy of te (esign (imension to te (esignate( reference point.

    )> Suita)ly &ualifie( personnel sall carry out all primary setting out. It sall )e (one usinginstruments an( meto(s appropriate for acieing te necessary precision an( accuracy.

    c> "rior to commencing te installation+ su)mit to te /rcitect te propose( meto( of setting out+o gri( lines sall )e marke( on Site a