general information · general information s. no. question response 1. company name dolphin...
TRANSCRIPT
General Information
S. No. Question Response
1. Company Name Dolphin Engineer
2. Name and Contact information of contact person Rajesh Saxena
C-49, B-3, Vidya Apartments, Paras Marg, Bapu Nagar Jaipur - 302015
3. Connect No. +91-9680026609, 0141-4036515
4. Annual Turnover of the company (Last Three
Years)
1.10 Cr.
5. Specify any taxes applicable (along with rate) GST 18.00 %
6. Pan No BLPPSO 212P
7. GST No 08BLPPSO 212P1ZL
8. Bank Name Oriental Bank of Commerce
9. Bank Address 69/334 V.T. Road Madhyam Marg Mansarover Jaipur-
10. Bank Branch CBS BRANCH (022)
11. Account Type Current A/c
12. Account Number 07031011002625
13. RTGS / IFSC Code (11 characters) ORBC 0100703
14. MICR Code (9 digits) 302022007
15. Specify any taxes applicable (along with rate) GST 18.00 %
16. Experience Details Profile Copy Attached
17. Key Projects in hand Profile Copy Attached
18. Equipment & Resource details Profile Copy Attached
Client Reference 1
Company Name Thought Consultant Jaipur Pvt Ltd
Contact Name Mr. Ashish Gupta
Title / Position Director
Address 1 DA 15, Jawahar Nagar Jaipur.302017
Telephone Number 09829055330
Email Address [email protected]
Length of Relationship 10 Year
Nature of Relationship Survey Work
Customer Reference 2
Company Name CEG Test House & Research Centre
Contact Name Mr. Amar Singh Rajawat
Title / Position Sr. General Manager
Address CEG tower, B-11 G Malviya Industrial Area -302017
Telephone Number 07300000111
Email Address [email protected]
Length of Relationship 20 Year
Nature of Relationship Survey Work
Dolphin Engineer’ lies in the following.
• Conducting accurate & precise Topographical Surveys using Tota l Station & DGPS for So lar parks , Wind Energy, Highways a lignments,
Bridge location, Pipeline & Sewerage Systems, Bu ilding & Town Planning Projects, and Water Supply Schemes etc.
• Dolphin Engineer’s have provided serv ices to various pub lic & private agencies, government & semi- government departments,
consultants etc.
The important bodies with which Dolphin Engineer is provided services are listed below: -
RAJASTHAN PUBLIC WORKS DEPARTMENT (PWD)
GUJARAT AMBUJA CEMENT, PALI.
RELIANCE ENGINEERING ASSOCIATE LTD., JAIPUR.
MEGHA ENGINEERING & INFRASTACTURE LTD
PDCOR JAIPUR
MANGLAM CEMENT
SHREE CEMENT. BEAWAR. (AJMER)
SUZLON INFRASTRUCTURE SERVICE LIMITED
ENERCON INDIA
LAHOTY BUILDCAON
CHANDRKALA ARCHITECTURE
SPMAL JAIPUR
GVR AJMER NAGAUR TOLLWAY PRIVATE LTD
THOUGHTS CONSULTANT JAIPUR PVT LTD
EMCO LIMITED
PEARL KRISHNAM DEVELOPER
GOVT. ENGINEERING COLLAGE BHARTPUR
BENGAL CITY NIRMAN PVT LTD
RAYS POWER INFRA PRIVATE LIMITED
THEME ENGINEERING SERVICES PVT. LTD
OPULENT RESORTS K KOLKOTA
GAMESA WIND TURBINES PVT. LTD
V & A VENTURES LLP
ADANI RENEWABLE ENERGY PARK
SANKARA EYE HOSPITAL
VISHVARAJ ENVIRONMENT PVT LTD
HINDUSTAN ZINC LTD
OPULENT RESORT LTD KOLKATTA
JAI MAHAL PALACE JAIPUR
COUNTRY CONDO’S LIMITED
A.B.ENTERPRIEASE
ADANI RENWABLE ENERGY PARK RAJASTHAN
.
1. Details of Technical Personal/detail of the firm-
SR. NO.
Name of Technical Personnel along with Qualification
Experience ENGINEERS (WITH Specialization)
Qualification GIS Experts Whether employed of Associated on Other condition
1. Rajesh Saxena 22 Yrs Managing Director Diploma in Civil /
Programming
Employed
2. Rakesh Sankhla 21 Yrs Project Manager M.TECH. Employed
3. Shashi Kant 18 Yrs Project
Coordinator
Diploma in Civil /
Programming
Data base Software
developer
Employed
4. Hemant Chandwani 15 yrs Degree in Civil /
Programming
Data base Software
developer
Employed
5. Jitendra Sharma 8 yrs Diploma in Civil /
Programming
Data base Software
developer
Employed
6. Mujmmil Ahmed Ansari 10 Yrs I.T.I. Diploma Employed
7. Raj Kumari Sharma 4 Yr Diploma in Civil Employed
8. Bhagchand
Bairwa
2 Yrs Diploma in ARC `
GIS
Data base Software
developer
Employed
9. Rajendra saini 8 Yrs I.T.I. Diploma Employed
10. Rakesh Saini 7 Yrs I.T.I. Diploma Employed
11. Bhagchand
Meena
7 Yrs Diploma in civil Employed
12. Jay Prakesh 1.5 Yrs I.T.I. Draftsman Employed
13. Ashok Saini 1.5 Yrs I.T.I. Draftsman Employed
14. Mohammed Naeem 2.5 Yrs I.T.I. Surveyor Employed
15. Rajesh Meena 2.5 Yrs I.T.I. Surveyor Employed
16. Pradeep Senwar 3.5 Yrs I.T.I. Surveyor Employed
17. Raju Lal Meena 3.5 Yrs I.T.I. Surveyor Employed
18. Gunjan 1.7 Yrs Draftsman Employed
19. Shiv Lal Saini 2.2 Yrs Surveyor Employed
20. Lala ram Saini 2.2 Yrs Surveyor Employed
21. Puk Raj Saini 3.5 Yrs Surveyor Employed
22. Ganga Ram 3.5 Yrs Surveyor Employed
23. Mukesh Swami 3.5 Yrs I.T.I. Surveyor Employed
24. Banwari lal Kumavat 3.5 Yrs I.T.I. Surveyor Employed
25. Ratan malo 3.5 Yrs I.T.I. Surveyor Employed
26. Shubaham
Khandelwal
3.5 Yrs I.T.I. Surveyor
Draftsman
Employed
27. Daulat Kumar 3.5 Yrs I.T.I. Surveyor Employed
28. VIRI SINGH 5 Yrs I.T.I. Surveyor
Employed
29. BIJOY BARMAN 5 Yrs I.T.I. Surveyor
Employed
Details of the work experience:-
SR. NO. Name of Project Name of the client (Govt./Semi. Govt./
Private) Page No.
Estimated Project
Cost
Status of the Project
(completed / under Execution / Under Planning
Process)
Details / Proof of Agreement/ Letter of Intent/ Work order etc. (Copy to be attached) Page No.
1. Detail survey plan of existing land at RAJPURA DARIBA MINES (Hindusthan
Zink)
CONSULTING ENGNEERING GROUP
LTD.
.80 LAC Completed CEGTH/WO/TS/2018-19/0681 Dated 08/01/2019
2.
Detail survey plan of existing land taking all measurement at Onamakulam, Sankaraperi & Kuppanapuram Village Tirunelveli.
RAYS POWER INFRA PVT. LTD.
3.41
LAC
Completed Rays/Tamil nadu/100mw/Survey/WO-04
Dated 12/12/2018
3.
Topographical survey for Upgradation of Two lane with Paved Shoulder from Kati to Telore nagar, MDR - 39 in state of Maharashtra in EPC mode.
Thought Consultants 11.5 Lac Completed Dated 10/12/2018
4.
Conduction bathymetry survey at TIDI DAM, Rajasthan including taking underwater level up Datum
VEXL ENVIRON PROJECTS PVT.LTD
5.45
LAC
Completed P.O.NO. 8520000805/333
Dated 12/10/2018
5.
Topographical survey for Upgradation of Two lane with Paved Shoulder from AT SH-57 Bhoom to Beed- Solapur Road (NH-211) in state of Maharashtra in EPC mode.
Thought Consultants 10.5 Lac Completed Dated 15/09/2018
6.
Survey Work of BHADANPUR PARASMANIYA GROUP WATER SUPPLY SCHEME , SATNA,MP
Sharma Associates ( L & T )
20 LAC Completed Dated 22/07/2018
7.
Detail survey plan of existing RAILSAY CROSSING C_64 FOR PROPOSED ROB AT NAGOUR
Thought Consultants .95 LAC Completed
Dated 28/06/2018
8. Topographical survey for Karanpura-Mandrayal MDR 3A Existing bridge survey
Thought Consultants 0.60
LAC Completed Dated 06/07/2018
9.
Detail survey plan of existing RAILSAY CROSSING 142/T3 FOR PROPOSED ROB AT Rajgarh (Sadullpur) Churu
Thought Consultants 2.4 LAC Completed Dated 28/05/2018
10. Survey Work of Pipe line Pertaining to Pune 24X7 Water Supply Line Project,
Sharma Associates ( L & T )
12 LAC Completed Dated 25/04/2018
11.
Topographical survey for Upgradation of Two lane with Paved Shoulder from Jhadol to Ambhabhelly (Section Nh-58E – 47.00 kms) in state of Rajasthan in EPC mode.
Shri Kushalsuri Engineering Services
Pvt. Ltd.
12.26
Lacs
Completed SKES/D-005/2018/008
Dated 18/04/2018
12. Detail survey plan of existing RAILSAY CROSSING LC/116 FOR PROPOSED ROB AT - Keshoraipatan - Bundi
Thought Consultants 2.5
LAC Completed Dated 24/03/2018
13.
Detail survey plan of existing land taking all measurement at Bijapur, Karnataka
RAYS POWER INFRA PVT. LTD.
0.94
LAC
Completed RPIPL/BIJAPUR/45MW/Survey/SO-44
Dated 12/01/2018
14.
Detail survey plan of existing land taking all measurement at Kushtagi Koppal Dist. Karnataka
RAYS POWER INFRA PVT. LTD.
1.94
LAC
Completed RPIPL/KUSHTAGI/SURVEY/SO-02
Dated 06/01/2018
15.
Rehabilitation of Thikri-Anjad Road Section: Thikri to Anjad [Design km. 0+000 to km. 34+560] Rigid Pavement two lane with paved shoulder configuration in the state of Madhya Pradesh on EPC mode.
Translink Infrastructure Consultants (P.) Ltd.
7.36
Lacs
Completed Translink/TIC133-SC/01/2018
Dated 19/03/2018
16.
Topographical Survey for Proposed ROB at LC – 116 at Keshauraipatan, Bundi
Thought Consultants 1.10 Lacs Completed As per Mail confirmation
17.
Work order for carrying out Topographical survey at MBA-2 surface facility project at Barmer, Rajastha (OSWAL INFRA)
CONSULTING ENGNEERING GROUP
LTD.
0.32
LAC
Completed CEGTH/WO/TS/2018-19/0657
Dated 22/12/2018
18.
Topographical Survey for Newly Declared National Highway Umred Bypass (NH-353D.) under package no. NH/IAHE/03
Theme Engineering Services Pvt.Ltd.
1.25 Lacs Completed MOU dated 20/02/2018
19.
Detailed Plan & contour Survey Grid level at Every 10X10 Meter of Proposed Land at 4 locations – Ludhiana, Patiala, Meerut & Hapur for Maruti Suzuki Pvt. Ltd.
Maruti Suzuki Pvt. Ltd. 1.25 Lacs Completed As per Mail confirmation
20.
Topographical Survey for Newly Declared National Highway Barmer-Ramsar-Munabao (NH-25 Extn.)
Theme Engineering Services Pvt.Ltd.
12 Lacs Completed Job no. NH-25 Ext./RJ/2016-17/887
21. Detailed Project Report on Indore Water Supply System GIS Based Hydraulic Model, Design of Distribution Pipe Network for Indore City
Sharma Associates ( L & T )
9 LAC Completed Dated 13/11/2017
22.
Detailed Plan & contour Survey Grid level at Every 5X5 Meter of 15 Proposed & Existing Thanas at Various Locations in Rajasthan
Rajasthan Police Housing & Construction Corporation Ltd. Jaipur
2.00 Lacs Completed RPHCCL/2017-18/15
23.
Topographical survey at Mohanpura extn (Jaipur Panipat Pipeline Project).
CONSULTING ENGNEERING GROUP
LTD.
1.05 Lacs Completed CEG/WO/TS/2016-17/1047(A) DATED 16/01/2017
24.
Topographical survey for the Toll Plaza Location at Cable bridge Kota.
CONSULTING ENGNEERING GROUP
LTD.
1.15 Lacs Completed CEG/D-144/2017/352
25.
Topographical Survey & Auto Leveling DGPS Control Point Work for upgradation of the stretches of Deeg-Alwar-Bahror(124 kms)
Info Trans Engineers Pvt Ltd.
14.98
Lacs
Completed Rajasthan/Dolphin/03/2017
26.
Augmentations and rehabilation of urban water supply bnaran under amrut mission
STS Completed STS/2017-18/615
Dated 25/06/2017
27.
Detail survey plan of existing land taking all measurement at Alabal Village, Jamkhandi, Town bagalkot, District, Karnataka.
RAYS POWER INFRA PVT. LTD.
2.17
LAC
Completed RPIPL/RFE/KARNATAKAS/SURVEY/SO-02
Dated 29/09/2017
28.
Demarcation and survey work in vighyan nagar and shalimaar yojana
UIT, ALWAR 6.92
LAC
Completed UIT/ACCTS/WORKS/5921/17
Dated 25/07/2017
29.
RTK Survey of 10 kms from Piprai To Ashoknagar in Madhya Pradesh.
Krishna Infra 2.65 Lacs Completed As per Mail Confirmation 01/07/2017
30.
RTK and STATIC survey project for Bhorkebardi to Amrawati & Amarawati to Karanji (157 to 475)
Technocons Construction
8.4 Lacs Completed NA/2016-17/AMRAVATI/312/
Dated 01/06/2016
31.
Topographical Survey for Proposed Byepass at various Location
Asegaon Purna Bypass, Amarawati bypass, Dharni Bypass, Paratwada Bypass,
Manglam Associates 9.36 Lacs Completed As per Mail confirmation
Walgaon Bypass, Ner Bypass, Yavatmal Bypass (Amarawati to Karanji)
32.
Topographical Survey & Auto Leveling DGPS Control Point Work for Four Laning/Two Laning with Paved Shoulder from Km 0.000 to Km 83.453 of Dausa-Lalsot-Kauthun section of NH-11A Extn. in the State of Rajasthan under NHDP Phase-IV on Hybrid Annuity Mode
CONSULTING ENGNEERING GROUP
LTD.
17.71
Lacs
Completed CEG/D-136/2016/302
33.
Topographical Survey & Auto Leveling DGPS Control Point Work for upgradation of the stretches from Khakashi titha to Aronda (Km 122 of MSH-4) to 2 lanes with paved shoulder (Maharashtra to Goa coastal region)
Thought Consultants 28.24
Lacs
Completed As per Mail confirmation
34.
Detailed Plan & contour Survey Grid level at Every 5X5 Meter of Proposed Extension of Kolana Airport, Jhalwara, Rajasthan
Sangeeta Aviation Services Pvt Ltd.
1.50 Lacs Completed SASPL/102/2017
35.
Detailed Plan & contour Survey Grid level at Every 10X10 Meter of Proposed Land at Koppal and Bijapur, Karnataka (300 Hect Area)
Rays Power infra Pvt. Ltd.
6.00 Lacs Completed RPIPL/BIJAPUR/45 MW/SURVEY/SO-17
36.
Detailed Plan & contour Survey Grid level at Every 10X10 Meter of Proposed Land at Jamkhandi, Karnataka (170 Hect Area)
Rays Power infra Pvt. Ltd.
3.50 Lacs Completed RPIPL/RFE/KARNATAKA/SURVEY/SO-02
37.
Bathematery Survey of Proposed Chikili Bridge at Mahi river, Dungarpur, Rajasthan
Thought Consultants 2.50 Lacs Completed
38.
Detailed Plan & contour Survey Grid level at Every 10X10 Meter of Proposed Land at 14 locations throughout India for Maruti Suzuki Pvt. Ltd.
Maruti Suzuki Pvt. Ltd. 3.25 Lacs Completed As per Mail confirmation
39.
Survey Work of Pipeline pertaining to Indore UWSS project (750 Km )
Larsen & Toubro, Chennai
9.70 Lacs Completed LTCCD/IUWSS/WET/WSD/VTV/LOI/1117/002
40.
Topographical Survey & Auto Leveling Work for Road widening & Strengthening Hanumangarh To Abhohar(Length-42 km approx)
Thoughts Consultant Jaipur Pvt Ltd
Completed As per Mail confirmation
41.
Detail Topographical survey of existing Land OF SSB campus, Vill. Faliyawas, Near Bassi, Kanota, Jaipur (24.28 hect.)
Millenium Consultants
Jaipur
Completed As per Mail confirmation
42.
Detail Topographical survey of existing Land OF CRPF campus, Vill. Faliyawas, Near Bassi, Kanota, Jaipur (19.97 hect.)
Millenium Consultants
Jaipur
Completed As per Mail confirmation
43.
Topographical Survey work at existing land AT Killa village Tehsil Degana with 5m x 5mgrid level & 0.25 m contour interval with total station.
Opulent Resorts Pvt.
Ltd.
1.17 Lac Completed ORPL/NAGAUR/SURVEY/DOLPHIN/
WO-1/120717
44.
Survey work and Soil testing at institute 's land IPS-1,11,12 & 13 SITAPURA INDUSTRIAL AREA, Sitapura Phase III, Sanganer, Jaipur
The Institute of Cost
Accountants of India
1.15 Lac Completed WO dated 24-02-2017
45.
Detailed Plan & contour Survey Grid level at Every 5X5 Meter of Proposed HDD location on crossings alignment of IOCL pipe line & Pump House Locations for PARADEEP TO HYDERABAD PIPE LINE PROJECT (1100KM)
Consulting Engineers
Group Ltd , B-11(G),
Malviya Industrial Area,
Jaipur-1 Rajasthan
10.0 Lac completed CEG/IOCL/PHPP/2016-17/199
Dated 23 May 2016
46.
Topographical Survey Plan of Existing Land for solar Park at 500MW Bhadla solar park at Village Bhadla, District Jodhpur, Rajasthan India (1339 hect)
Adani Renewable
Energy Park Rajasthan
15 Lac completed AREPRL/DE/C/SO/04/16 on dated
2nd Feb 2016.
47.
Topographical Survey & Auto Leveling Work for Road widening & Strengthening DARA to JHALAWAR (Length-82 km)
Thoughts Consultant
Jaipur Pvt Ltd
2.45 Lac Completed
Mail conformation on 20/01/2016
48.
Topographical Survey & New Route
Alignment for proposed new bypass for
Pratap garh District (Length-22 km)
Thoughts Consultant
Jaipur Pvt Ltd
1.85 Lac Completed
Mail conformation on 25/02/2016
49.
Topographical Survey & Auto Leveling Work for Road widening & Strengthening RAJGARH TO LOHARU (Length-57 km)
Thoughts Consultant
Jaipur Pvt Ltd
2.35 Lac Completed
Mail conformation on 15/03/2016
50. Topographical Survey for Proposed ROB
at Abu Road Railway Crossing LC 132
Thoughts Consultant Jaipur Pvt Ltd
Completed
51.
Topographical Survey for Proposed ROB
at Bhilwara-Swaroopganj Railway
Crossing LC 72C/E2
Thoughts Consultant Jaipur Pvt Ltd
Completed
52.
Topographical Survey for Proposed
Bridge and existing bridge at Mandrayil
River
Thoughts Consultant Jaipur Pvt Ltd
Completed
53. Detailed Topographical Survey for
Proposed New Road to Jalor Fort
Thoughts Consultant Jaipur Pvt Ltd
Completed
54.
Detailed Topographical Survey for
Proposed New Road Alignment For
Bhadresh Mines at Barmer
Thoughts Consultant Jaipur Pvt Ltd
Completed
55. Topographical Survey for Proposed ROB
at Narena Railway Crossing
Thoughts Consultant Jaipur Pvt Ltd
Completed
56. Topographical Survey for Proposed ROB
at Kachroda Railway Crossing LC 249
Thoughts Consultant Jaipur Pvt Ltd
Completed
57.
Total Station Survey (Pilot area ward 39) under project ‘Capacity Building Support for Building Innovative Sanitation Solution for Rajasthan’
IPE Global Limited House, B- 84, Defense
Colony, New Delhi 110 024, India.
0.50 Lac Completed MD/IPE-DE/2015/703,
dated 27/07/2016
58.
Topographical Survey for Proposed ROB
at Neem Ka Thana Railway Crossing LC
72
Thoughts Consultant Jaipur Pvt Ltd
Completed
59. Topographical Survey for Proposed New Thoughts Consultant Completed
Bridge on Anas River at Bhil Kunwa
Banswara
Jaipur Pvt Ltd
60.
Detailed Topographical Survey & Auto
Leveling work for road widening and
strengthening from Banswara to Aaspur
(Length-67.25 km approx)
Thoughts Consultant Jaipur Pvt Ltd
Completed
61.
Topographical Survey & Auto Leveling
Work for Road widening &
Strengthening of route from Kapsen
Circle to Flyover at Chittorgarh (Length-
3.75 km approx)
Thoughts Consultant Jaipur Pvt Ltd
Completed
62.
Carrying out Topographical survey Plan
Work for Rajgarh water supply scheme
package NO. PHED/RGH/WS
A.B. Enterprises &
DEEM Construction
Pvt Ltd
5.22 Lac Completed AB & DEEM /Rajgarh/2016-17/24
63.
Detailed Topographical Survey &
Contour Survey for 80 MW Project
Village Balswaj Tehsil Roorkee Near
Chudiyala Railway Station Uttrakhand
Rays Power Infra
Private Limited
0.89 Lac Completed RAYS/UK/80MW/contour/wo-003
64.
Detailed Topographical Survey &
Contour Survey for 5 MW Project Village
Bewoor District Koppal, KARNATAKA
Rays Power Infra
Private Limited
0.89 Lac Completed RAYS/KARNATAKA/5MW/CONTOU
R/W0-01
65.
Consultancy provide for detailed survey
plan & Auto Leveling for proposed Pump
house & distribution pipe line for water
Intergen Energy
Limited
1.95 Lac Completed Unknown
Mail conformation on 12/12/2015
pipe line at Hanumana M.P.
66.
Consultancy provide for detailed
Topographical survey plan & Contour
Plan for waste water treatment Plant at
Narnod Hissar & Thallapallen Andra -
Pradesh
Intergen Energy
Limited
1.95 Lac Completed Unknown
Mail conformation on 12/01/2016
67.
Consultancy provide for detailed survey
plan & Auto Leveling for proposed
Sewerage Line from Pratap nagar to
Chitroli Bagru via Mahindra SEZ Jaipur
(length 110 Km )Rajasthan
VIshvaraj Environment
Pvt. Ltd.
2.57 Lac Completed VEPL/RAJ/WO/SURVEY/2015/001,
on dated 28th Dec 2015
68.
Providing an experienced Surveyor Team
who can Measure your Crane track
alignment and leveling work with
Computerized Instrument Total Station
HINDUSTAN ZINC
LIMITED
0.72 Lac completed No. RGARG-552/ 510001876 &
Vendor Code 9006420
69.
Detailed survey plan & Contour survey
of Proposed for Multi Level Car Parking
using with DGPS & total at Amritsar &
Jaipur Airport
Landmark Material
Testing And Research
Laboratory Pvt. Ltd.
0.50 Lac Completed
Mail conformation on 12/03/2016
70.
Detailed topographical survey of Project
road (part of National Highway 07 (NH-
11C)) for Proposed Elevated Road
starting from Ambedkar Junction to
Ajmer Road Junction for a length of
3kms in Jaipur City falling under Jaipur
Landmark Material
Testing And Research
Laboratory Pvt. Ltd
5.00 Lac Completed
Mail conformation on 06/04/2016
Corridor - Package-I & II.
71.
Topographical Survey Plan of Existing
Land for solar Park at Badla Viilage
Phalodi (2650 Hect.) Phase – III rd
IL&FS Energy Ltd
Sub contract by CEGTH
Jaipur
19.50 Lac completed CEGTH&RC/WO/2014-15-325
On Dated 25/03/2015
72.
Topographical Survey & Auto Leveling
DGPS Control Point Work for Six Line
Project MSH-9 Nagpur to Armori
Maharastra Length 137 km
Theme Engineering
Services Pvt. Ltd
27.75 Lac Completed
Unknown
12/06/2015
73.
RTK and Statis Survey and establishing
control point at every 10 km from
Hamirpur to Mandi
Theme Engineering Services Pvt. Ltd
Completed Verbal Confirmation 06-04-2013
74.
Detailed Survey Plan of existing railway crossing taking all existing features like Building , railway track, Tin shades, B.T. roads, Nalla, Boundary /Compound walls, , WBM roads, wells, wire fencings, H.T. lines, EP lines, other utility services. Taking spot level rail top & each side 300 m. * LC‐200 Bassi * LC‐211 Dantli * LC‐70 Sitapura
Theme Engineering Services Pvt. Ltd
Completed MoU Dated 26-05-2015
75.
Detailed Survey Plan of existing site at Biradawal Phatek 105, Suratgarh, taking all existing features like Building , Tin shades, B.T. roads, Nalla, Boundary /Compound walls, , WBM roads, wells, tube wells, wire fencings, H.T. lines, EP lines, other utility services. Taking Contour Survey Plan & Taking Spot Level every 10 X 10 Grid. Contour Interval 0.25
Theme Engineering Services Pvt. Ltd
Completed Verbal Confirmation 02-08-2015
Meter.
76.
Detailed survey plan & Contour survey
of existing site using with DGPS & total
& Khasra Superimposing work for resort
at Degana Rajasthan
Opulent Resorts
Pvt Ltd
Kolkota
0.50 Lac Completed
ORPL/Project/15-16/PO/01
On dated 11/06/2015
77. Taking all required measurement &
prepared existing Building drawing.
Jai Mahal Palace
Taj Group
0.50 Lac Completed WO/taj/2015/64 Dated
29th May 2015
78.
Service for Field Up-diction of ABD with
Auto Cad. Field Verification & prepared
ABD drawing as per required Format at
Jhalander city
V & A Ventures LLP.
(Reliance Power)
New Dehli
5.50 Lac Completed WO/JLD/00073
on dated 15th April 2015,
79.
Land Survey work study for new Projects
at Gunga-II Balasar Project and Dharvi
Kalan Project in Rajasthan.
Gamesa Wind Turbines
Pvt. Ltd
7.83
Lac
Completed 40873597 on
dated 17/03/2015
80. Land Survey work study for new Projects
at Gunga Balasar Project in Rajasthan.
Gamesa Wind Turbines
Pvt. Ltd
4.89
Lac
Completed 40873616 on
dated 17/03/2015
81.
Taking all Government features and
related to our Project like Canals, Border
windmill location, Road & rasta etc in
Ramgarh Village in Rajasthan.
Gamesa Wind Turbines
Pvt. Ltd
2.13
Lac
Completed 40830145 on
dated 24/11/2014
82.
Service for Field Up-diction of ABD with
Auto Cad. Field Verification & prepared
ABD drawing as per required Format at
Jhalander city
V & A Ventures LLP.
(Reliance Power)
New Dehli
5.50 Lac Completed WO/JLD/00052 on dated 17th Dec 2014,
83. Topographical Survey Plan of Existing Rays Power Infra 0.26 Lac Completed Rays/Ridhu/jul-14cs/WO-01
Land for mini solar Park at kolayat
Viilage Bikane (15 Acre )
Private Limited Dated 25/07/14
84.
Topographical Survey Plan of Existing
Land for mini solar Park at kolayat
Viilage Bikane (86 Acre )
TecSo Projects Limited
Gujrat
1.50 Lac Completed TPL/PO/2014-15/1016 On dated 31 July
2014
85.
Digitization work of village map hard
copy, conversion in UTM with village
reference point, with Google image
superimposing work at various locations
in Rajasthan.
Gamesa Wind Turbines
Pvt. Ltd
4.88 Lac Completed 40779212 on
dated 26/06/2014
86. Layout Marking at given coordinates
at shri balaji campus.
Shri Balaji Industrial
products Ltd
0.18 Lac Completed No. 02/2014-15
Dated 24/06/014
87.
Digitization work of village map hard
copy, conversion in UTM with village
reference point, with Google image
superimposing work at various locations
in Rajasthan.
Gamesa Wind Turbines
Pvt. Ltd
3.25 Lac Completed 40785710 on
dated 15/07/2014
88.
Detailed Survey & DPR Project for
Proposed Agriculture Collage at Balara
Village Tehsil Kumhre Distt Bhartpur
Office of the Estate
Officer Jobner
0.18 Lac Completed SKANU/JOB/2013-2014
60-63
89.
Topographical Survey Plan of Existing
Land for solar Park at Badla Viilage
Phalodi (5000 Hect.) Phase 2nd
CEG test House Jaipur
7.50 Lac completed CEGTH&RC/WO/2013-14-625
On dated 21 Dec 2013
90. Carrying out Topographical survey Plan
Work for Regional WSS for 246 Village of
Saraswati Technical
Services (P)ltd
15.50 Lac Completed STS/2013-14/607
Dated 25th Nov2013
Kaman& Pahari thasil Bhartpur
91.
Carrying out Topographical survey Plan
Work for Regional WSS for 199 Village of
Beawer tehsil Ajmer
Saraswati Technical
Services (P)ltd
12.36 Lac Completed STS/2013-14/608
Dated 25th Nov2013
92.
Detailed Survey & DPR Project for
Proposed route alignment at SH-62
Adjacent To Binnaigram Pindwada
Binani Cement 1.80 Lac Completed BCL/WO/2013-3014/34
Dated 05/09/2013
93.
Consultancy Service for Preparation of L-
Section for water supply schemes in
Gangapur Lift Canal
SPMAL Jaipur 17.37 Lac Completed SPML-/13-14/Gangapur/proj-
/c/01/41
94.
Preparation of water supply schemes for
laying Pipe lines in Bhilwara
Megha Engineering
Hyderabad
4.25 Lac completed MAIL/ Bhilwara –PHED(Raj)13-
14/W.O.1464
Date 10.09.13
95.
Survey Work for Off take work H
Narmada Canal DPR for 140 Village of
tehsil Gudamalani Badmer
PDCOR Limited 1.23 Lac completed PDCOR/BRWSP/226B
June 27 2013
96.
Survey Work for Off take work L
Narmada Canal DPR for 205Village of
Sheo & Ramsar, 322 Villgae of Choutan
Barmer
PDCOR Limited 1.11 Lac completed PDCOR/BRWSP/226A
June 27 2013
97.
Conducting survey in 668 village in jalor
dist. Capturing Latitude & Longitude &
secondary data collection of existing
water supply
PDCOR Limited 3.75 Lac completed PDCOR/Jalor/69A
April 26 2013
98. Preparation of L-Section for water Lahoty Builcaon 25.56 Lac completed LBL/2012-13/Ratangarh /648
supply schemes in Fatehpur Ratan, Ghar 12/04/2013
99.
Consultancy Service for “Survey Along
the existing Road from Chikalwas Dam
to Railmagra via Rajamasnd
PDCOR Limited 1.24 Lac completed PDCOR/ Transport Hub /69A
April 26 2013
100.
Consultancy Service for Topographical
Survey of Mangli River for Chambal
Bisalpur Link Project
PDCOR Limited 0.70 Lac completed PDCOR/CBWS/982 A
Feb 22, 2013
101.
Consultancy Service for Survey &
demarcation Work of Existing Land at
Village Ramchandra pura Sitapura Jaipur
Pearl Krishnam
Developer
1.96 Lac completed SBPL 2012-13/05
15/02/2013
102.
Preparation of L-Section for water
supply schemes in AKELGARH , Krishi
upaj Mandi Kota
Lahoty Builcaon 0.74 lac completed LBL/2013-13/Akelgarh/444
24/12/2012
103.
Consultancy Service for Govt P.G.
Collage Campus & District Stadium
Campus Dausa
Public Work
Department
0.29 Lac completed Agreement no. 276/10590
01/11/2012
104.
Consultancy Service for Zila Parishad &
DJ Court Campus Dausa
Public Work
Department
0.29 Lac completed Agreement no. 275/10593
01/11/2012
105. Consultancy Service for Survey Work on
MDR 48 Km-0/00 to 4/300 Dausa
Public Work
Department
0.29 Lac completed Agreement no. 278/10757
08/11/2012
106.
Consultancy Service for Topographical
Survey for New Jail Building Campus
Dausa
Public Work
Department
0.29 Lac completed Agreement no. 70/1020
12/06/2012
107. Consultancy Service for Contour Survey
for New Jail Building Campus Dausa
Public Work
Department
0.29 Lac completed Agreement no. 72/1819
15/06/2012
108. Detailed Survey Plan of Existing Colonies
at Dungarpur & Ganagapur
ChandraKala
Architecture
1.35 Lac completed CK-2011-8
24/4/2012
109.
Consultancy Service for Preparation of L-
Section for water supply schemes in
Nagaour Lift Canal
SPMAL Jaipur 12.29 Lac Completed SPML-124/12-13/Nagaur/proj-
/c/01/02
110.
Consultancy Service for Preparation of L-
Section for water supply schemes in
Nagaour Lift Canal
Lahoty Builcaon 1.03 Lac Completed LBL/2012-13/Nagour/317
26/06/2013
111.
Consultancy Service for Preparation of
Route Plan L-Section & Complete DPR
Report at Ratan garh
L & T Jaipur 2.70 Lac completed Unknown
112.
Consulting Service for Traffic Volume,
Origin/Destination Survey & Axle Load
survey
GVR Ajmer Nagaur
Tollway Private Ltd
2.45 Completed+
GVRAJNTPL/GEN/04/12-13
Sep 20 , 2012
113.
Topographical Survey & Auto Leveling
Work for Jaisalmer Barmer NH-15 Km
123/40 to 144/500 km Length 21 km
Thoughts Consultant
Jaipur Pvt Ltd
1.05 Lac Completed+
Unknown
20/12/2012
114.
Topographical Survey & Auto Leveling
Work for Shri Ganganagar Padampura
Road (Length-36 km)
Thoughts Consultant
Jaipur Pvt Ltd
1.08 Lac Completed+
Unknown
23/11/2011
115.
Preparation of water supply schemes for
laying Pipe lines in ChottorGarh
Megha Engineering
Hyderabad
1.23 Lac completed Chittorgarh/WSP/Rajasthan-
2010/11 WO.No.1012
Date 25.05.11
116.
Preparation of Route Plan L-Section &
Complete DPR Report for Ambuja
Cement. At Marwar Mundwa for
Drinking water Line
Ambuja Cement
MERTA
3.56 Lac Completed+
2800246531
14.07.11
117.
Road alignment & Platform Survey for
our proposed wind farm project sites at
Udaipur
Suzlon Infrastructure
Service Limited
3.20 Lac completed 4500234517
20.07.11
118.
Detailed Survey Plan & 10x 10 m Grid
Contouring of Existing Land for Manglam
Cement (70.0 Hect.)
Mangalam Cement
Ltd
1.07 Lac completed
MC/PS/WO/15438
119.
Topographical Survey & Auto Leveling
Work for Chidawa Singana Road SH-13
Including Chidawa Bye pass ( Length 43
km)
Thoughts Consultant
Jaipur Pvt Ltd
1.16 Lac Completed+
Unknown
25/09/2010
120.
Topographical Survey & Auto Leveling
Work for Bhilwara Mandal garh Ladpura
Including Mandal Garh Byepass (Le
ngth 53 Km )
Thoughts Consultant
Jaipur Pvt Ltd
1.08 Lac Completed+
Unknown
02/09/2010
121.
Topographical Survey & Auto Leveling
Work for Beawer Ras Lambiya Merta
Road, Lambiya Jaitaran & Mangliyawas
Ras Road (Length 178 km)
Thoughts Consultant
Jaipur Pvt Ltd
5.34 Lac Completed+
Unknown
20/03/2010
122.
Road alignment & Platform Survey for
our proposed wind farm project sites at
Jodhpur & Jaiselmer,
Enercon India 4.55 Lac completed 9500023537
25.08.11
Details of Empanelment with Central Govt/State Govt/ Development Authorities / Local Body etc. (Proof to be attached):
123.
Detailed Survey Plan by DGPS & Grid
Contouring of Existing Land 400KV
Power Grid Station Udaipur
EMCO Limited 0.35 Lac completed LOI/PPP-5/soil/2012/1
124. Route Alignment Survey for Proposed
Railway Yard.
Shree Cement 0 Lac completed SCL/Bwr/logistics/16810
125. Detailed Survey Plan & Contouring of
Govt. Engineering College at Bhartpur
Govt. Engineering
Collage
0.35 Lac completed GECB/2424
126. Contour Survey Plan of Existing Land at
Kota
Bengal City Nirman Pvt
Ltd
0.23 Lac completed TIG/KOTA/0001
127.
128. Details of financial turn-over of Consultancy fee for last financial year and current year.
S. NO. Annual Turnover Year & turnover in Rs. Remarks/Page No.
1. 9,75,890.00 Finical Year 2009-2010 --------------------
2. 18,07,980.00 Finical Year 2010-2011 --------------------
3. 37,91,307.00 Finical Year 2011-2012 Audited
4. 32,50,765.00 Finical Year 2012-2013 Provisional
5. 65,25,746.00 Finical Year 2013-2014 Audited
6. 80,01,425.00 Finical Year 2014-2015 Audited
IN HOUSE FACILITIES
In House Equipment (Survey)
Equipment Details Quantity (No’s / Set)
NAVCOM DGPS (SF-3040) Set
GeoMax DGPS (Zenith 10) Set
Total Station (HoriZon Destop 555 R, Sokia Set 500,Pentex-325)
Auto Levels (Sokkia 20 X C 41)
Auto Levels (Sokkia 22 X C33)
Auto Levels (Sokkia 24 X C 32)
04
02
12
03
05
04
Theodolites 03
Dumpy Level 03
Plane Table 08
Prismatic Compass 10
Measuring Tapes 20
Rodometer 06
Computer Facilities
The computer support of Dolphin Engineers consists of the following:
S. No. Equipment Details Quantity (No’s / Set)
A Hardware
a. Computers
Laptop (Hp Pavilion) 03
Curie 3 05
Core two 04
C2D 05
Total 17
b. Plotter A0 Size HP Design Jet 500 C (Up to 42”) 01
c. Printers 02
HP LaserJet 01
HP DeskJet 640 C 01
Canon S100SP 01
Total 03
d. Scanners (HP) 01